Work Inspection Request 003

This work inspection request is for test pit excavations and soil sampling at three points along the Dolores River for the North-South Commuter Railway Extension Project. A backhoe will be used to excavate the test pits from 9:00 AM to 12:00 PM on April 16, 2021 to determine the water table level under the supervision of the contractor's staff and inspector. The contractor, Northern Builders, requested the inspection and it was approved by their site representative and project manager.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
180 views2 pages

Work Inspection Request 003

This work inspection request is for test pit excavations and soil sampling at three points along the Dolores River for the North-South Commuter Railway Extension Project. A backhoe will be used to excavate the test pits from 9:00 AM to 12:00 PM on April 16, 2021 to determine the water table level under the supervision of the contractor's staff and inspector. The contractor, Northern Builders, requested the inspection and it was approved by their site representative and project manager.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

WORK INSPECTION REQUEST

Project Title: North – South Commuter Railway Extension Project WIR No. 003
Contractor: Northern Builders
Construction Process: EARTHWORKS
Location: DOLORES RIVER
Requested Date and Time: APRIL 16, 2021 / 9:00 AM TO 12:00 PM

DETAILS OF WORK TO BE DONE:


TEST PIT EXCAVATION TO DETERMINE WATER TABLE LEVEL (POINT 1, POINT 2, POINT 3) AND SOIL SAMPLING.

TOOLS, EQUIPMENTS, AND VEHICLES:


BACKHOE

NOTES: 1) Work shall proceed past the above Work Inspection request (WIR) unless the Contractor is instructed otherwise.
2) Works associated with this WIR will be checked by Contractor's staff prior to the requested inspection time to ensure that works are in
accordance with the approved drawings and specification
 

Requested by:           Approved by:        


 
 

EUGENIO DURADO
  CHRISTIAN HINDANG   APRIL 15, 2021/3:00PM APRIL 15, 2021/3:00PM
Signature Above Printed Name  
Contractor's Site Representative Date/Time Signature Above Printed Name
Date/Time
    Contractor's Project Manager  
ESH: REMARKS/ OBSERVATIONS

Date: Section Head/Date/Time


LINES/GRADES: REMARKS/ OBSERVATIONS

Date: Section Head/Date/Time


QA/QC: REMARKS/ OBSERVATIONS

Date: Section Head/Date/Time


STRUCTURES: REMARKS/ OBSERVATIONS

Date: Section Head/Date/Time


ROADWORKS: REMARKS/ OBSERVATIONS

Date: Section Head/Date/Time


FOE/NON-FOE : REMARKS/ OBSERVATIONS

Date:
ER’s Comment Concurred by: Noted by:
WORK INSPECTION REQUEST

Signature Above Printed Name Signature Above


TO BE MARKED WITH ACTUAL DATE OF COMPLETION
Contractor's AND ATTACHED TO APPROPRIATE REPORT
Project Manager Printed Name