Tal Ge PNG Iso 1cc004201 - 02 (As Built)
Tal Ge PNG Iso 1cc004201 - 02 (As Built)
Tal Ge PNG Iso 1cc004201 - 02 (As Built)
ITEM. DIAM.
_____ DESCRIPCION
_____________ COMM CODE
____________ CANT.
______
(in)
SHOP MATERIALS 02
PIPE
1 4 PIPE SMLS, ASTM A106 Gr. B, S-40, BE, HPPIPEA101201A1000 10.6 M
ASME B36.10
03 2 3 PIPE SMLS, ASTM A106 Gr. B, S-40, BE, HPPIPEA101201A1000 1.1 M
152
ASME B36.10
FITTINGS
3 4X3 RED TEE 90 DEG, SMLS, ASTM A234 Gr WPB, HART90A301C01A5000 1
4 in/S-40 x 3 in/S-40, BW, ASME B16.9
PD
02 4 4 90 DEG ELBOW LR , SMLS, ASTM A234 Gr HA90ELA301C01A5000 4
4"N WPB, S-40, BW, ASME B16.9
J 5 3 90 DEG ELBOW LR , SMLS, ASTM A234 Gr HA90ELA301C01A5000 1
WPB, S-40, BW, ASME B16.9
4 FLANGES
SEE ISO
TAL-GE-PNG-ISO-1CC004202 6 4 WN FLANGE, ASTM A105, 150#, RF, ASME HFWNFLA2017B0A3000 1
E 3255441 B16.5
672
N 2248456 7 3 WN FLANGE, ASTM A105, 150#, RF, ASME HFWNFLA2017B0A3000 1
I
<A> 1
EL +116727 B16.5
FIELD MATERIALS
PIPE SUPPORTS
8 4 SUPPORT FROM EXISTING STEEL PS09-A-130-400-552-100 1
9 4 SINGLE CRADLES 2 TO 60 " 02 C01-300-4-6-CS 5
02
4"-GE-1CC004201-01-B
10 4 SUPPORT FROM EXISTING STEEL PS09-A-150-450-552-100 2
11 4 GUIDE ON PIPE RACK WITHOUT SHOE 2" TO GR01-4 2
556 S8 36"
4
PS09-A-130-400-552-100-L120 S06 12 4 SUPPORT FROM EXISTING STEEL PS11-B-WITH-300-10 1
13 4 FLOOR STAND SLIDING FS01-B-250-350-3-40-CS 2
EL +116055 02 14 4 FLOOR STAND GUIDE FOR FLOOR STAND FG01-1-250 1
H S9
15 4 SUPPORT FROM EXISTING STEEL PS11-B-WITH-400-10 1
S07 190
C01-300-4-6-CS
0 S10
S9 PS09-A-150-450-552-100-L120
C01-300-4-6-CS
696
3
S11 02
GR01-4 300
0
4"-GE-1CC004201-BQ005
S10
PS09-A-150-450-552-100-L120
S05
4"-GE-1CC004201-BQ003
S9
C01-300-4-6-CS
4"-GE-1CC004201-BQ004 5
<B>
1 02
EL +116925
S11
D GR01-4
SEE ISO 4
305
TAL-GE-PNG-ISO-1CC001301 S03 G
E 3251187
N 2241493 S9 F
EL +116925 285 C C01-300-4-6-CS
2
STEM SOUTH
PD
3"N
4
S02
<D> 2
EL +115750
392
1175
4"-GE-1CC004201-BQ002
F7 S13
S12
FS01-B-250-350-3-40-CS
K S14 PS11-B-WITH-300-10
FG01-1-250
5 S13
3 250 FS01-B-250-350-3-40-CS S04
4X3"NPD B
E 3251472 1
> 7
<C 381 S01
F6
LISTA DE CORTES
E S9 PIEZA DIAM. LONG. PREP 1 PREP 2 PIEZA DIAM. LONG. PREP 1 PREP 2
SEE ISO C01-300-4-6-CS <A> 4" 367 BEVEL BEVEL
TAL-GE-PNG-ISO-1CC001302 <B> 4" 6659 BEVEL BEVEL
E 3251291
N 2241493
S15
PS11-B-WITH-400-10
4"-GE-1CC004201-01-A <C>
<D>
<E>
4"
3"
3"
3560
962
100
BEVEL
BEVEL
BEVEL
BEVEL
BEVEL
BEVEL
EL +115750
02 EMITIDO PARA CONSTRUCCIÓN 05/05/20 RR EP JR
181 A
01 EMITIDO PARA CONSTRUCCIÓN 30/03/20 RR EP JR
00 EMITIDO PARA DISEÑO 27/03/20 RR EP JR
STEM UP REV. DESCRIPCIÓN FECHA ELAB. REV. APR.
INGENIERÍA DE DETALLE
NOTAS GENERALES ESPECIFICACIÓN DE SOLDADURA ESPECIFICACIÓN DE AISLAMIENTO PLANOS DE REFERENCIA CONDICIONES PRESIÓN TEMPERATURA
Este documento contiene
información privada y no puede 1.Nivel de Piso Terminado 113000 mm TAL-GEN-PNG-SPE-0008 TAL-GEN-PNG-SPE-0007 DTI APLICADO DISEÑO 12.20 kgf/cm^2g 120.00 C
PLANO
FECHA DE EXTRACCION: MAY 05, 2020