PLC 2 Hatcher
PLC 2 Hatcher
PLC 2 Hatcher
UPS Leds: OK ⃞
ESB to Hubs OK ⃞
Hub to VSD’s OK ⃞
HMI - Switch OK ⃞
PLC - PLC OK ⃞
IP Addresses OK ⃞
Working correct OK ⃞
RUN On OK ⃞
SL1 Flashing OK ⃞
ETH On OK ⃞
CAN.R On OK ⃞
Check Stability OK ⃞
Calibration OK ⃞
Check Stability OK ⃞
Values OK ⃞
Check Stability OK ⃞
Pressure switches Connected to the correct AHU and Function (Supply, extraction,
filter,…) OK ⃞
Check DI on PLC OK ⃞
Check DI on PLC OK ⃞
GENERAL REMARKS: (everything not as request by Petersime specification, to do list by customer or Petersime, etc.)
You are required to send the original form back to your Global Technical Supervisor for later reference. This will allow us to
identify the correct machine and give you our best support in the shortest possible time later during the running of the
machine.