Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
85 views
59 pages
Grid National
national grid
Uploaded by
Muruganandam D
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Grid National For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
85 views
59 pages
Grid National
national grid
Uploaded by
Muruganandam D
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Grid National For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Grid National For Later
You are on page 1
/ 59
Search
Fullscreen
Wy elyaSll, Jai NATIONAL GRID National Grid ss Title: Check List of General Panel Scheme Check and Function Tests Trdex Nonber 3460-00; Page Numbor 1013 1.0 Equipment General Data and Information Substation | AL FARA 380/132/13.8KV BSP Bay/Panel 3 Aecs Equipment Serial No 2.0 Check List of General Scheme check and Function Tests tem Description Done Remarks Check Before testing a. All modifications in pre-check copy of schematic | N/A 1 | Stawings are reflected to Commissioning Copy b. All secondary injection and all related predecessor activities are witnessed completely and its test results WOH GTS cu must be available and signed. Verify that each supply is wired point to point, with no. >, | unsupervised branches. Supervision is checked by wite | ox removal at every point in the circuit to make sure the supervision flag drops. aad 3, [Check that the ability to access to every equipment | 4, terminal is eas = __ | Check DC source and DC loops (control, interlock & power | OK supply) according to the schematic drawings. 5, | Check DC Segregation for opening / tripping circult, ok | closing circuit, & alarm circuit. 6._| Check AC and DC MCB's ratings grading. OK 7.__| Check the supply change over function. NA [ 8.__| Check AC source and AC loops WITH AC CIRCUIT 9. _| Check the thermostat and the heaters. WITH AC CIRCUIT Check the AC lamp, DC lamps and door switch and 10. | Check lamp test for all equipment li TAG Cou 11. [Check AC socket. 7 ~ [WITH ACCIRCUIT 12._| Check the ferrules as per specification OK 13. [Check the labels. ae OK 14. | Check DC supervision. oi ‘OK 15._| Check AC supervision N/A 16, | Check all alarm signals fo common alarm, HMl, fault ok recorder and SCADA. Ee _| 17. [Check All_control, protection, metering and_signaling | OK “Archiving System Webste: hiips/AMASL WD clyanSill ai National Grid sa NATIONAL GRID Title: Check List of General Panel Scheme Check and Function Tests T index Number: Page Number 20f3 CL-NG-6460-002-083 li Squipment are designed to be capable of safisfactory operation at an indoor ambient temperature of 55°C. 1 Check cable into control kiosk icubicles/panels are 8. | properly sealed or glanded and terminated on suitable terminals in kiosk. OK 1 9._ | Check panels earthing as per specification. OK 2 10. | Check cables for proper shielding and grounding OK 2 Check proper Terminal Block arrangement and labeling: Shorting & Isolating for CT circuits Isolating for VT circuits Solid Type for control circuits Trip Isolation facilities where needed Solid type with spring loaded for trip circuits Knife type for alarms 1. reaeoD OK 2 2. | Check that heat sources such as external resistors are covered with suitable covers and far away from panel wiring. OK 2 24, | Ensure availability of proper test facility depending on the 3. | Check that CT and VT circuits are facilitated with suitable covers and caution labels for protection. OK type of protection or metering equipment: Shorting test facility for current circuits Isolating test facility for voltage circuits Trip and Alarm isolation when relays are being tested OK 2 5. | Check that caution labels and caution clauses in the schematic drawing are included to prevent accidental on- load opening of CT circuits. OK 2 6. | Check the availability of proper panel lighting controlled by a door switch and electrically connected to the emergency DC supply as well. OK 2 7. | Check Color coding of panel wiring as per relevant specification OK 2 8. | Check that at least 10% spare cable cores are provided and terminated at the terminal blocks farthest from the cable entry. OK 2 39. | Check that percent (10%) spare terminals shall be provided on each terminal block. OK 3 0. | Check that ten percent (10%) spare alarm windows are available for future modifications OK iS 7] Check that terminal blocks are grouped according to function, i.e. Power Supplies (AC or DC), VT, CT, DC controls, annunciation, SOE, SCADA etc. and shall be labeled accordingly. Terminal blocks for different voltages _ OK ‘chiving System Website: his/AMAS> clan Sil fai \ c i? yaa" NATIONAL GRID National Grid sx L Title: Check List of General Panel Scheme Check and Function Tests [Page Numba 303 i |_ (AC or DC), CT, PT ‘shall be located separated DIN rails. 32. | Check that the physical wiring matches the schematic drawings and that any difference between scheme and OK implementation or correction in interface points is marked | upin green and red ink. 33. | Check wire rating, color coding, cross section, ferruling, a trip markers (‘T') and DC supply markers (‘+', -) 34, | Protective shrouds on high voltage areas in the panel such as CT terminal blocks with caution labels, protective shrouds on exposed resistors for high impedance OK protection relays, protective shrouds on metrosil's for REF etc csD Contractor TaC Contractor Ht Name ‘ABDUS SALAM Zain J Abi awd Sion. Ts ey ze -ctiving System Website: itpv/AMAS40 €2SLZL-as Ocrusy d — LIENSEL ZLENSEL Schneider & Electric Optimized Panel Design Schematic 13.8kV AUTOMATIC CAPACITOR CONTROL SYSTEM =3ACCS GENERAL ARRANGEMENT, PANEL LAYOUT & SCHEMATIC DRAWINGS OPDS-SCHNEIDER #041 ~ REV-04, DATE:19:12:2016 CLIENT: NATIONAL GRID, SA CONTRACTOR NO: 13SN377 CONTRACTOR: AL-GIHAZ Co. JOB ORDER NO: 13SN377. SUPPLIER: SYSTEM HOUSE FACTORY FOR ELECTIC PANELS _ INDUSTRIAL CITY-2, NEW SANAYA P.O. BOX-355950 BUPAG, RIYADH, 11383 s* sep SAUDI ARABIA SEE PROTECTION ENGINEERING DEPARTMENT 138N377—_1ESN3TT We een b S bo se eye i a COMMIS SIOHIN RABY OO fase fei DRAWING CONTROL SHEET se-120380, of sos ‘as Manue#CrURED sp oom om zone SF FRSTISSUE somo elyasil ail aia assist JQ Sel National Grides COVER SHEET 13.8kV AUTOMATIC CAPACITOR CONTROL SYSTEM. ~_ AL-FARA (FRA) 380/132/13.8kV BSP ASIR rs P ASR430 —- SD-121573 01PROTECTION IED APPROVED ORDERING PROPOSED REMARKS ORDERING CODE “AUTOMATIC CAPACITOR \1000260400A0U1111N10 — C264L1116A1000260400A0U1111N1C : ms —C264L1116A1 1111 0 A CONTROL — he ee Lyn Sl Jai clyaSil Jail Auitgll AS pail a FS Ww Nationat GridSSMS — Daan [ioe onOeR wa 15 cere | ciyas ail tag Stal yar ely jai National Grid a Raw By jaan stclyaSil Jail Aibagll AS ll| = DISCREPANCYSMTCEPEDR-DIScONNEC TOR BAY AUTOMATIC © | \eoure TERNITTAL BLOCK: JON CLAMP SPRING TOADED Tag i slyaSil Jail og asycal YQ)
National gridb 0 elyaSll Jail Ayitagll AS yl Vip astaCOMMISSIONINGNING 2 COMMISS enpy lyn Jai ll aig gyal YX ~ clyaSill| COMMISSIONING — i ~—“enpv— a] oes sigs [oss sues =| assbea a ear ess ATER ORCUIT Tun | =xRuPTELEFHONE JOR TOFWT=ALUM. & HEATER CkT / E t ORER SOCK! es ; E | ~HSCHEATER SEL_SWFGE [auto Fa _LPstEaTO : | ee | ae [ Seneas na POUPUENT 7 Sere 7 q Ss eee = aS Sioa ED eee |S [orf am ee ie ase roar a | | eee a A |[WT ON OCA 7E CONTA 1_[piecosvaezyFLsaso0n [COVENZANA SHEITTON FLUSH T7 a(n). TRIP OPERATES BETAEEN TS ND NTACTS, AUK. CONTACT TYPE:ME ZO) a i azz T [NATURE CwRCUT EREAKER, CWCURVE.D POLE, Ea(e), TRIP OPERATES BETVEEN 7 ca Rance [NENOER [SREACNG CaPAOITY 1008, wit re 7 jreance ——wesorsweagy
ini |sesoa ac wee OFF : ae nase les 4 | 221222 |spare a PP cas rc i rut eee 8 4 : / vay i Rt sos L nse |seane a cc an-Mone |ss/oz ac ues oF ° 2324 fseane 'y 221 222 |spare iE & 4 = i / A | 4S fessea 10 auto E ee eis fesyes to woua i |F iE og 4 i LI art 22 |as/e To LUM, 5 1314 [spare is : : one Ce jes oFOER no. 135N577 PANEL NLUMIN, & HEATER CRCUIT i: | EEE eae “ chysSll Jail Aitagll Ay. ly fa a G DRAWN BY_$# _ cHeexep ey __seP__ 13.8KV AUTOMATIC CAPACITOR CONTROL SYSTEM sCCS} a ot [snosaa) AS MANUFACTURED — —— vows — anes ~d Nattonal Grids q ae ove Sar al oareanenn= AS 3/8/30 > eae] a et [ove | Fru paseo SAUDI ARABIA | P |ASR430| SD-121573 | worst] or F Sem /BED BOTD/ON) cee ; EONS) [VECTOR] © uco200DG SA-121034 SHT-20 pwosa- Tito SHO | 4 te Be | Bm ely | ae i 1 9378, $s | agig, BE 1 yg : 3° a Bs Be % | al l Ie ee ee i 14 L Pe heatecimnprtce od hla eB -90¢1 3,5" 26/2 5 ie ry] i \ a ec | | : | z } r & ; ee “ea0es é a F Stil ind ene © i = ; i ws i : 5 id ‘ eF i elects A ; 2) ie 1 i saline ig llewrareriecie [pe ome va a elairay eerie a 1 | ieee Perera ean ae chy Jail Agitogll Spall \p suas : ie oka ey_SHf__ onocen ey Sst a 1S.8KY AVTOUATIC CAPAOTOR CONTROL SYSTEM (=3ACCS) ll National Grid i 1° [cava fou Coane tial cut ein 7 eee ar oe POAT ee TE warn Te | Eebaes — fe eens ie pies) The ~ i 1 | | oan DESCRIPTION PRG. DEPT. ___ eno, pepT._ td ete ta SO me ASR P |ASR420| ‘SD--121573, 26 OF 54 a -& | a si SEEEEEEEEEE EE ee = EERE i 7 ~ NG/b2-D 012/01) . ; “pag GEA en |‘SO-121001 SHS A 7 ING: z DIGITAL INPUT CARD-@ elynSil Bi National Grid Dpranw ex_S8 _ cvceneo oy. elyaoSil Jail Azitagll AS sail TOR CONTROL SYSTEW a OTE stagTeD 189429 pate couneren 27 OF 54 wr R (vecior) i z geome 2Rx(-} 28/F.1A029 6006 Ta sme 7 loweso-12i176 sH40 =aut0 Cora TAZ Sie 0-59 e, 5 wp || ylax a Ege 2 J blak. pean ox orouc G ave stanten 186819 pare couP.eTeD Tse DIGITAL INPUT CARD-O BAY AUTOMATIC CAPACITOR CONTROL SYSTEM ALARA (FRA) $80/152/15.8KV BSP elyaSi Jail iagl 5a) \ $0~121573 :CONTRACT NON 8} '5xXa0 c ie D E F AS-BULT gy owe ie or | 30.05.19] (AS MANRFACTURED ae_fazasre © | owe TescRon 2 _ eect By 208 ORDER WO. 13EN77 DIGITAL INPUT CARD-P TS.SRV AUTOMATIC CAPACITOR CONTROL SYS = slyaSll Jail uibgl sya) AP AL=FARA (FRA) 980/150/180 8S SAUDI ARABIA }aitso0ot soni saws | oat Anescoot COMMISSIONING RADY | 5 FACT EOWIRACT NO 1aSIrF PS BSE cpt __ ens. ver DIGITAL INPUT CARD-P CAPACITOR CONTROL SYSTEM | AyaSil Jail bel asc \YP FARA (FRA) 389/132/12.3R” BSP aE |ASRA3O) SD--121573COMMISSIONING — RABY: > yer 8) Cd] 1 8 | 8 | 7 3 #8 | 3 5 b | | : f # F i i g 4 : AS-BULT gr 5 aC 8 RGR OTT Tees ea Cae : : 2 a aware ener cavio Suv cmcy 7) ell Jal Aig aycar fT eps i x | Clo fore) ae aneten raw ey neces 6y__SF a AR Co 7 E National Grid g | ac fea eee ieee ey a err ~ Pe Tear Trae epee | | one TesenPTEN cumeranesoman | isa SAUD! ARABIA | P_ [ASRA. SD~121573 sorse] ot B | | ek oa eee ——— eo | a |anaacnot TERE Se a Sey SO-121210 sH.90 31.22 aed 25 FACT aor SLE CBNTRACT NO OWT? pee. peer a 7 0.121177 Sriaoaroe 31 elyaSil Jail Ang sya 45 Ha CAPADTOR Dus 3 i i 4 ig Tex ares See ee Ee | 15 15 rid & tly 7 ily : & g & = ie C 1B s6-1\ | Bes- ft Bec-n 118 \ ioe 1 i | S18 (8 cae 1 gl8z x 1 lx I A 5 Be * Bs BSS *9, # ge *9, : he | a be od Bea ea ‘ | \ k i : bo i le € r L E g . \ : i x E i | pe Peer EHE A | seu ee GAG no. aE fice oer ne ETT aL WPUT CORDON eae Ww lyn Sill ai G co ipa be oe weet gece | T.8kV AUTOMATE CAPACITOR CONTROL SYSTEM elyasll Jail Aitagll AS pl Nationa Grid e j Le [soo] a lev " Ee 50/132/) : ToEe_ [aT eT SRE WEE Tse na wena | Peclaan = owe stm 1859 are come [PY 9 ALARA (FRA) 380/132/15 88 BSP 2 | i | RE Tone | DEsERPION vnc. oer, i, er SateaeeRneT | ASR SAUDI ARABIA | P [ASR420] S025 eer red eee La L ss = —_ Seltatatatat nid deta lalaalas ala Ce | |a 7 tall peg a 2R2{+) 35/8 8 : 6A voll 3 i e i a e ; a seo 6 -senca\ | ACCS Coot TKD Sr 3H00¢Rt [EW S0-1275be6 S257] aoa [Bwo SD aides Sr 257] =SHOG=RD BwiG $0-129564 STr-26) o q i a a 4 5 8 AS-BULT oy one — OGIAL INPUT CARON | e ¥ : - N lye ail ito AS hl elyaSIl jai i Z cvgcxeo ey 8 13.BRY AUTOMATIC CAPACITOR CONTROL SYSTEM (=3ACC National arid. iE or [senna eee i i F TEE _[ Rat ne] ‘Deane RWB Tere a oie = OATE stanieo 120L29 pane counter Ae : 7 i a © [oe a core. osm vg eer ARABIA | P__[ASR4SO) S0-12157, | 7COMMIS S0NINE RABY EF Indsotis T an, pel Mn i National Grids. yall Jal Aug ayia \f\7 Sl53 Bys Vt Me tip Ahig| At2©e | ABE T ! a 203 ssa ahd “At || | os 3 Bos ie "bs "| il xq lb ra ne, [> Baie 50. anita ae hy ae tage. TTT National Grid a bya Jal tag asian 97 nSCOMMISSIONING fApy wer Wh gy. ee ~—— elyaSil ail Agitagll Spill \R7 pasaCOMMISSIONING eapy National Grid oe ee I eel a ag Vip yasGUMMISSOMING PABY = eUyaSil Jail Asibogl 6 tu) Yo elyaSil Jai National Grid b = a— COMMISSIONING 1 | eoifb-» 4 Skat | | ae joes ech | SSR ON. Tey = abzaceos ji ie] | I i ! I e I ioe Hl ; i I if I I toh FLY i x @ I I y ie aaa | L ma 8 tes 2 fad ~— — — 128 5 iis S016 sete Fe eoioae OWE:SD-xi7R Oa soatO owsso ses oi seta eee Bir oe ante a E re [aoa > TH iar Pena 7 iW AS-BUILT gy pat (CONTRACT NO. 13577 S08 ORDER NO. 135N377 DIGITAL OUTPUT CONTACTS | uy ha & iz ae are Tema Siw ADDU OA Oe il Aitagll AS ai clyns a 51 [eatin 5S WED aa aaa ais =~" = = |_ aes Rle PRT a DATE staRtED 180309 care commieteo ‘AL-FARA (FRA) 330/152/13.B BSP Sunt xg [pang wave FEET NG] REV. : SD~-121573 on | oi eo NG7D2—6 (GOT2701) | fous] (WECTER] © wc0200,sana SB nw Peace ase 7 fe ese! TR Aiea Reade SH20.17.24 Say Aas sa aap asc YY SAUDI ARABIA | P namn mA AHI AHN CB Ready epon SLT -F | DFT - 24 4 AN28 CB Peanly te per AH2B fe SLAY-F xa ——i44 on .| AK AR COMMISSIONING eApy & Pads 9 fi je epen gh 6 SUT-F an | i agg Mme National Grid lyaSil Yall Asibagll AS ll ee eeCOMMISSIONING eApy oa 2 elyasil Jail Aitagll AS, W Geen National GridSP.100VA IR W32/B /0515/ Bo WOd-2:¢L-0.2/8", 100A NOS~1:C.~0.2/, Um liv YELLOW TAL 2 1-2 sh 5-66 708 aoe 1 | 1 Op 2 13 |3-O is }'3-O-8 7]? -Orr8 19 -{0}-70 BO-2 3 {24 5 {O26 7) 28 lsmare 4/03 470s ja4yo3 aos lss/05 (0 tow SH 107 Date sraRren 182419 ate cowPLeTeD fs ORDER NO. 135N877 ‘ence YAR TRANSDUCERS-VARTI & —VART2 TS.AKV AUTOMATIC CAPACITOR CONTROL SYSTEM (=3AX ARS (FRA) $80/132/1.8KV BSP SAUDI ARABIA Or Jurca sOr+ Jsce s-O-e feces ore face 9-@)-10 [spare nOr12 [spare 13-@p 14 [spare Orie |upoe hyf?-@-1 feos 12 |12-©-20 |sv/o [21] 21@-22 [spare Ia] 25-@)- 24 |sense [25 ]25-0)- 26 [27 ,27-O)-28 [SPARE aia pears clyoSil fai yas lua sc cn an FETS ma $D~121573 460" 54 | ; PEE "NG 7O2=0 s VECTOR[ sesnmo 2 -—9 <2 -— xen (sores Sess wcrc ern rH HS He Ro Hoe Son =O s-O-6 asses Ors asses : oopio [sears 5 1-12 [sare t 13-14 |soane z as-Op18 [45/23 Y w-Ors [a3 i 19-©-29 |as/a3 : XP ou : 20-22 |sonee e ; asp 24 |sease ye? am : 25-25. |seare &K z 27-©)-26 sare i AS-BULT_ gy Da user "WAR TRANSDUCER ARIS ele = aii 4 MT BY ae iS pee ec la ely Sl ai 2 eT gel pe lt Savina oncranin weevesey | alla ua agar YO HMR ‘ oe |22.03,19) TRS? ISSUE ate sranten 180529 pare comuerco —___|”- ae AL-FARA (FRA) 580/152/13.8kY BSP wocx [PLANT NOL “ORAWNG NUVBER SHEET NO. REV._NO, 5 [oe Sa ew aaa Taumaneneem | aR SAUDI ARABIA | P [ASR439] $0-121573 [ssorse| ot F xz a BED GTI d ERS) [HECTGR] | wc0200Gyatgeyeizo ja.zoe | Re jWoS—t: CL:0.2/3R, 2504 WOS-2: ¢1:0.2/30, 25v4 LDNGSO-I217ESHtA AHO W005, aa Xz ae (OwegDszNI9ESH IE 30 ay pra, 48/8.8 awa7 Ws: axz Seme CSP tage Nai3ge¥jo.4go /oigaev ilar aie hee Moc=2 c1:0.2/3, 25¥8 LONGSO-121208 S114 7S wa rAcaRED or Se. Dare STaniea 'SBMIP pane coumueted ceseneTeN ev. err [ics ORDER NO. LIENST? [SSEEEeEe | INCOMER VOLTAGE. TRANSDUCERS elyaSil jai clyasil ail ung asscat 07 ational Grid FARK (FRA) $80/182/15.840 BSP SAUD! ARABIA 4gor 54] 1 VECTOR 6752-0 (2012/01) nooz50184 SPARE SPARE spare spare SPARE SPARE SPARE Senge SPARE |spare B18 (3-PH), «so 21ie6 sH14_ jrro2 linyea sfc ssfca ey) woc- YaRS,BAV 0.120 0.1200 WG-2: CL02/3", 25va,L of vz woo ‘2 ema WO 12 |sPaRE 150-14 shake 1sOh ie sPaRE 17-©> 18 |sPaRE 13-@>20 [spare a} 22 spare 28-24 SPARE 25-O)-26 SPARE 27-{0- 28 SPARE eects || Bas sees 1 S88 on | gyae | 1 Sad | eeergs | ea Ferret ’ | worms» Cl = “Bz SmNe -TS6 1@2 Jace te so lore oS sos feces BF 1-Ops |40/o8 2-@>-10 [spare rO-12 |seare “np seis |seane rs-15 [spare 24 Eb 1 spre spore = YR w@r20 forme ER a@2a sree | Bg zop24 lome aoe {o)-26 |sPare 27-28 |svane CONTRACT NO. WBN foe ono wo. 138N307 ease ev DATE, STARIED TSERI8 oaTE CouPLETED crac. oer BUS VOLTAGE. TRANSDUCERS TS.BK/ AUTOATC CAPACITOR CONTROL SYSTEM (=3ACCS) elyaSil Jail ag aya \Y7 © 16(-) 48/87 135/66 OC SUPPLY FAL clyaSil Jai AL-FARh (FRA). $80/152/ 13K BS oer [RTS AUN HOWE SAUDI ARABIA | P [ASR4SO) SD~121573 fous] [vecToR] oORM NING
You might also like
Xiria - E - Training Nivel 2
PDF
No ratings yet
Xiria - E - Training Nivel 2
59 pages
CL-NG-6460-002-085 Checklist For Relay & Control Panel Scheme Check and Function Test Rev01-1
PDF
No ratings yet
CL-NG-6460-002-085 Checklist For Relay & Control Panel Scheme Check and Function Test Rev01-1
6 pages
CL-NG-6460-002-056 Checklist For Protection Relays General Mechanical Checks - Visual Inspection Rev00
PDF
No ratings yet
CL-NG-6460-002-056 Checklist For Protection Relays General Mechanical Checks - Visual Inspection Rev00
3 pages
WI-NG-6460-002-31WI Indoor and Outdoor Bus Structures Rev00
PDF
No ratings yet
WI-NG-6460-002-31WI Indoor and Outdoor Bus Structures Rev00
5 pages
WI NG 6460 002 023 Work Instruction Current Transformer Rev00
PDF
No ratings yet
WI NG 6460 002 023 Work Instruction Current Transformer Rev00
7 pages
DSS-SLW End To End Test Rev0
PDF
No ratings yet
DSS-SLW End To End Test Rev0
10 pages
Final Trip Test-9003
PDF
No ratings yet
Final Trip Test-9003
6 pages
PR NG 6460 002 Project Commissioning Rev02
PDF
No ratings yet
PR NG 6460 002 Project Commissioning Rev02
40 pages
NGC - 00008 - PM - 005 Commissioning Activities Rev1.0
PDF
No ratings yet
NGC - 00008 - PM - 005 Commissioning Activities Rev1.0
12 pages
Standard Inspection and Test Plan ITP No: 721 Control Panel, Console, Desks and Marshalling Cabinet Installation
PDF
No ratings yet
Standard Inspection and Test Plan ITP No: 721 Control Panel, Console, Desks and Marshalling Cabinet Installation
1 page
Ready For The Challenges of Tomorrow.: FOX615 Multiservice Platform
PDF
100% (1)
Ready For The Challenges of Tomorrow.: FOX615 Multiservice Platform
5 pages
EHV Switchyard Installation
PDF
100% (1)
EHV Switchyard Installation
91 pages
Substation Design Engineer
PDF
No ratings yet
Substation Design Engineer
3 pages
DEWA 400 KV Cable Specification
PDF
No ratings yet
DEWA 400 KV Cable Specification
8 pages
Earthing and Bonding: The First Step in Designing A Substation Is To Design An Earthing and Bonding System
PDF
No ratings yet
Earthing and Bonding: The First Step in Designing A Substation Is To Design An Earthing and Bonding System
10 pages
ECP 11 0507 - Compact & Micro SS Comm Procedure
PDF
100% (1)
ECP 11 0507 - Compact & Micro SS Comm Procedure
6 pages
132 Pro - Bi
PDF
No ratings yet
132 Pro - Bi
2 pages
E04-043 - Gas Insulated Substation Installation - US
PDF
No ratings yet
E04-043 - Gas Insulated Substation Installation - US
34 pages
OMICRON CPC 100 Universal Testing Device For Electrical Diagnostics Datasheet
PDF
No ratings yet
OMICRON CPC 100 Universal Testing Device For Electrical Diagnostics Datasheet
48 pages
Haryana Vidyut Prasaran Nigam LTD.: Technical Specification
PDF
No ratings yet
Haryana Vidyut Prasaran Nigam LTD.: Technical Specification
39 pages
Service Wise Updated Electrical Question and Answer-150 Nos-1
PDF
No ratings yet
Service Wise Updated Electrical Question and Answer-150 Nos-1
9 pages
CHP126 - Substation Automation System - Maintenance
PDF
No ratings yet
CHP126 - Substation Automation System - Maintenance
2 pages
Module 4: Substation Equipment's Details and Operations: July 2021
PDF
No ratings yet
Module 4: Substation Equipment's Details and Operations: July 2021
14 pages
12-Sdms-03 Rev01 Warning Tape
PDF
No ratings yet
12-Sdms-03 Rev01 Warning Tape
12 pages
Low Voltage Switchgear-R1
PDF
No ratings yet
Low Voltage Switchgear-R1
23 pages
PD - MS - Rev 07
PDF
No ratings yet
PD - MS - Rev 07
23 pages
Checklist For Testing IED's Rev00
PDF
No ratings yet
Checklist For Testing IED's Rev00
4 pages
Project Title: Operating Area: Main Contractor: T&C Contractor: Contract No.: Substation
PDF
No ratings yet
Project Title: Operating Area: Main Contractor: T&C Contractor: Contract No.: Substation
1 page
CL-NG-6460-002-023 Checklist For CT Rev00
PDF
No ratings yet
CL-NG-6460-002-023 Checklist For CT Rev00
2 pages
Fakoor Sanat Tehran: Circuit Breaker & Earth Switch Commissioning Test Formats Description: CIRCUIT BREAKER
PDF
No ratings yet
Fakoor Sanat Tehran: Circuit Breaker & Earth Switch Commissioning Test Formats Description: CIRCUIT BREAKER
1 page
Commissioning Test Sheet: Medium Voltage Switchgear
PDF
100% (1)
Commissioning Test Sheet: Medium Voltage Switchgear
2 pages
Stress Controlled High Voltage
PDF
100% (1)
Stress Controlled High Voltage
84 pages
SARATHKUMAR - RTU Engineer - CV
PDF
No ratings yet
SARATHKUMAR - RTU Engineer - CV
4 pages
Site Acceptance Test For 132Kv Gis: Make Name / Type of Equipment Serial Number Rating Power Voltage Current
PDF
No ratings yet
Site Acceptance Test For 132Kv Gis: Make Name / Type of Equipment Serial Number Rating Power Voltage Current
2 pages
Guidelines For The Construction and Maintenance of Transmission Lines
PDF
No ratings yet
Guidelines For The Construction and Maintenance of Transmission Lines
8 pages
MS Cable Installation 001
PDF
No ratings yet
MS Cable Installation 001
11 pages
Alfanar Co.: Site Test Report Ng-Sa Name of Substation: Dammam Housing 115/13.8KV Substation # 3
PDF
No ratings yet
Alfanar Co.: Site Test Report Ng-Sa Name of Substation: Dammam Housing 115/13.8KV Substation # 3
6 pages
MP Central Scada
PDF
No ratings yet
MP Central Scada
40 pages
Power Frequency Withstand Voltage On-Site Testing of 400 KV GIS
PDF
No ratings yet
Power Frequency Withstand Voltage On-Site Testing of 400 KV GIS
9 pages
1.a Power Transformer
PDF
No ratings yet
1.a Power Transformer
28 pages
Comparison of Protection Relay Types
PDF
No ratings yet
Comparison of Protection Relay Types
8 pages
Fat Acsr Condor Conductors - 1 15-10812
PDF
No ratings yet
Fat Acsr Condor Conductors - 1 15-10812
28 pages
NPCC Presentation 01-08-2023 (SIP)
PDF
No ratings yet
NPCC Presentation 01-08-2023 (SIP)
24 pages
Checklist For Protection Relays General Electrical Tests Rev00
PDF
No ratings yet
Checklist For Protection Relays General Electrical Tests Rev00
2 pages
33kv Cables Specs
PDF
No ratings yet
33kv Cables Specs
20 pages
Distribution Commissioning Form 21 High Voltage Xlpe Cable 20190923
PDF
No ratings yet
Distribution Commissioning Form 21 High Voltage Xlpe Cable 20190923
3 pages
CL NG 6460 002 023 Checklist For CT Rev00
PDF
No ratings yet
CL NG 6460 002 023 Checklist For CT Rev00
3 pages
PLCC Tech Specs
PDF
No ratings yet
PLCC Tech Specs
42 pages
CTBCM - Opertunities and Challenges
PDF
No ratings yet
CTBCM - Opertunities and Challenges
5 pages
Pantograph Isolator Hot Spot Elimination
PDF
No ratings yet
Pantograph Isolator Hot Spot Elimination
40 pages
Chapter - E15: Site Testing and Commissioning
PDF
No ratings yet
Chapter - E15: Site Testing and Commissioning
2 pages
Technical Requirements of Rtu
PDF
No ratings yet
Technical Requirements of Rtu
34 pages
LPOF Cables
PDF
No ratings yet
LPOF Cables
15 pages
S.O.W Between Sdi, Msog & Acidchem
PDF
No ratings yet
S.O.W Between Sdi, Msog & Acidchem
4 pages
WI-NG-6460-002-083 - Work Instruction For Panel Scheme Check and Function Tests Rev00
PDF
No ratings yet
WI-NG-6460-002-083 - Work Instruction For Panel Scheme Check and Function Tests Rev00
9 pages
CL-NG-6460-002-029 Checklist For Metal Clad Switchgear Commissioning Rev01
PDF
No ratings yet
CL-NG-6460-002-029 Checklist For Metal Clad Switchgear Commissioning Rev01
10 pages
CL-NG-6460-002-045 Checklist For Protection and Control Panels Rev00
PDF
No ratings yet
CL-NG-6460-002-045 Checklist For Protection and Control Panels Rev00
14 pages
CL-NG-6460-002-045 Checklist For Protection and Control Panels Rev01
PDF
No ratings yet
CL-NG-6460-002-045 Checklist For Protection and Control Panels Rev01
7 pages
WI-NG-6460-002-085 Work Instruction For Relay & Control Panel Scheme and Function Test Rev00
PDF
No ratings yet
WI-NG-6460-002-085 Work Instruction For Relay & Control Panel Scheme and Function Test Rev00
15 pages