Merus STATCOM
Merus STATCOM
POWER
supply and demand of active and substantial benefits to
reactive power have to be balanced supply grid and end
customers alike. It
in order to ensure good power quality. increases the plant
QUALITY
Presence of heavy and fast fluctuating productivity, energy
loads can disturb the balance. Such dis- efficiency, lifetime and
turbance creates power quality challeng- reliability as well as
SOLUTION
es to both supply grids and end custom- reduces the maintenance
costs of the plant. Utilities
ers with demanding loads. Voltage enjoy additional
variations, flicker, harmonic distortions transmission and
FOR HEAVY INDUSTRIES and poor power factor are commonly distribution capacities
experienced power quality problem. from existing networks
without any additional
investments.
To the end customer, poor power quality
means reduced productivity, low
reliability and higher operating costs.
The supply system, on the other hand,
suffers from compromised reliability
and low transmission capacity.
Continuous ▬ 1.3 pu
Short time
1.0 pu ▬ ▬ 1.0 pu
0.2 pu ▬ ▬ 0.2 pu
▌ ▌ ▌ ▌ ▌
2.0 pu 1.0 pu 0.0 pu 1.0 pu 2.0 pu
Capacitive Inductive
Merus Statcom operation regime
EXCELLENT M-Series STATCOM, a Voltage source converter (VSC) based
MERUS
STATCOM
CONFIGURATION
Merus STATCOM is
built on Insulated Gate
Bipolar Transistor (IGBT)
based power electronics
technology. Use of mod-
ern technology brings
benefits of fast switching,
low overall system losses,
smaller footprint and
superior performance.
FAST AND
DYNAMIC REACTIVE
POWER COMPENSATION
FOR DEMANDING APPLICATIONS
ROLLING MILLS
Higher power variable speed drives (VFDs) are key compo-
Flicker Reduction with STATCOM nents of rolling mills operating systems. The drives, however,
lower the power factor and cause voltage sags and harmonic
distortions. Merus STATCOM provides active harmonic fil-
tering in real time, improving power factor and eliminating
voltage sags. Fast and effective response to harmonic distor-
tions allows meeting power quality standards.
Overloading capabilities
Merus STATCOM can be over-loaded
for short periods of time e.g. couple of
seconds per one minute. Overloading
feature of Merus STATCOM offers high
performance in the applications where
instant short period reactive power
compensation is needed. Overloading
capacity has been defined by the size of
energy storage and the thermal limits of
the semiconductors.
C&P system
The Control and Protection system of
Merus STATOM is equipped with ad-
vanced user interface and 19” easy-to-
use touch-screen panel. Proven control
algorithms and close and open loop
strategies enable effective and fast
flicker mitigation, reactive power and
power factor control and harmonic miti-
gation.
TURNKEY Our experienced project team has • System studies and
in-depth analysis
PROJECT
successfully completed a number
• Engineering,
of power quality projects right from simulation and
initial phase of problem recognition to design
Typical STATCOM
layouts
1.
1. 33kV, 144MVAr
2.
2. 6kV, 8MVAr –
Containerized
Solution
2.