General Presentation Eng V 1.1 La 27.10
General Presentation Eng V 1.1 La 27.10
General Presentation Eng V 1.1 La 27.10
BACKGROUND
PETROCONST S.A. – a joint stock company – has been established since 1960 being a major
company with a large experience in the wide sphere of oil industry and performing both on-shore, and
off-shore construction-assembly works.
SCOPE OF WORK:
Our company has the required capability, experience and
endowment in order to provide high quality and
competitive works and services, such as:
Installation of pipelines, tools and equipment for
Refinery and Petrochemistry (capacity of weld
performance – 1000 inch / working day).
Assembly construction works within oil industry for
distribution systems of the oil products – crude oil,
natural gas, water injection deposits, etc. Mild hydrocracking plant
The erection of steel and HDPE pipelines (with operating pressures from 6 to 350 bar) both
underground, and above-ground for the distribution of
various oil products.
Laying out on site of the steel structures which are integral parts
of the crude oil and natural gas production platforms, such as:
Jacket type structures, bridges, tie-in platforms, duty cranes,
dwelling and electric blocks.
Completion of the offshore drilling platforms for commencement
of the development of crude oil and natural gas production
reservoirs by using oil separators, water treatment plants, water
pumping stations for water injection into deposits, gas
compressing stations, social units.
Onshore putting-into-readiness and offshore installing of the
undersea main pipelines with 4” – 16” in diameter.
Preparation and manufacturing in pipeline spool workshop for
crude oil and gas, air, water, foam technological spools, steel
ladders, bridges, hand rails, protective shields, hall steel
structures, steel structures for flare support. Offshore Central Platform
Furthermore, besides the works above mentioned we also have in our scope of work the execution
of construction-assembly works for automation and electric plants, works have been carried out
for some of the largest companies in Romania: Petrom OMV, Transgaz, Rompetrol, etc.
Overground and underground cable routes
Cable layout
Execution of process tie-ins for instrumentation with
stainless steel isometrics and/or Ol, with couplings by
ermetto fittings and/argon welding• Installation of
complex automation systems assisted by high
performance process computers with software able to
ensure the following: Installation of field
instrumentation and/or control panels, junction boxes in
normal and/or explosion dangerous environments
Installation of panels, automation boards,
programmable automatic devices, etc.
Generator’s container
Aerial and
undergrou Transmitter’s room
nd networks for the
electrical power distribution in normal and explosion
dangerous environments
Indoor and outdoor power plants in normal and explosion
dangerous environments
Weak current electric facilities
Passive and/or active cathodic protection facilities to
overground and underground steel constructions
Earthing and lightning installations
Testing and commissioning
All electrical and automation installations to the offshore
platforms from the continental plateau of the Black Sea -
PFCP;PFS3;PFS6;PFS7 ; PFSU
Control room
Fitting out with electrical and automation
installations of gas regulation and measurement
stations along the territory of Romania within the
distribution systems of TRANSGAZ
Fitting out with electrical and automation
installations of potable water pumping stations
Fitting out with electrical and automation
installations of thermal heating plants, etc
Construction works for the development of crude oil
and natural gas fields from the continental plateau of
the Black Sea. Metallic manufactures, concrete and
metallic strength structures, thermal insulations.
GMS Constanta
Over the last 25 years have been mounted approx. 400 Km of submarine pipes (6”-20”) at a depth of
60 m under the sea level (crude oil, natural gas,
and flooding water). Have been executed central
platforms of crude oil and natural gas
development on the Black Sea.
Pipeline insulations both for onshore, and
offshore types of work.
Cathodic protections for pipelines.
Construction of storage tanks with capacities of
50 c.m. – 100,000 c.m.
Construction of natural gas transmission lines
(trunk lines), with diameters between Φ 168 mm
şi Φ 1,200 mm.
Construction of crude oil transmission lines (trunk lines), with diameters between Φ 168 mm şi Φ
1,000 mm.
Electrical and automation installations.
Pumping stations and waste water treatment stations, treatment plants for oil and natural gas cleaning,
oil terminals, gas measuring stations, etc.
Construction works within the fields of: hydro-urban public works, hydrotechnical works, land
reclamation works.
Construction of protection embankments.
Protection of river banks for the undercrossing with
oil and gas pipeline of channels and rivers.
Protection of shores for the installation of the
undersea pipelines.
Recovery of hydrotechnical works damaged by
water floods.
For the above mentioned type of works our
company has the ability to provide our clients with
complete projects on turn-key basis.
50 000 c.m. tank – Oil Terminal
3. CERTIFICATIONS
For all fields of activities our company secured the necessary permits, licenses and certificates, a
highly qualified personnel (approx. 360 employees), and owns the suitable and competitive endowment
for the successful completion of works.
ISSUING AUTHORITY AUTHORIZATION & PERMIT TYPE
SR EN ISO 9001: 2008, or equivalent, implemented and
Quality Management System
maintained
SR EN ISO 14001: 2008, or equivalent, implemented and
Environment Management System
maintained
SR EN ISO 18001: 2008, or equivalent, implemented and
OHSAS Management System
maintained
Authorization aimed for engineering of objectives for surface
technological installations afferent to production activity and/or
ANRE Authorization no.14019
of natural gas storage (compression stations, connections,
regulation-measurement stations and upstream pipelines), type PP
Authorization aimed for engineering of compression stations, of
pipelines, connections and regulation-measurement stations
ANRE Authorization no.14020 afferent to natural gas transmission systems, as well as natural gas
utilization installations having working pressures higher than 6
bar, type PCTRI
Authorization aimed for execution of natural gas transmission
ANRE Authorization no.14021 lines and of natural gas compression stations, afferent to natural
gas transmission systems, type ETC
Authorization aimed for execution of connections and natural gas
regulation-measurement stations having working pressures higher
ANRE Authorization no.14022
than 6 bar, afferent to natural gas transmission systems, type
ETRI
Authorization aimed for execution of afferent objectives to
surface technological installations, natural gas compression
ANRE Authorization no.11506 stations, including connections to supply pipelines from
upstream, from the field of natural gas production and storage,
type EP
Authorization aimed for execution of natural gas distribution
ANRE Authorization no.11657
systems, type EDS
Authorization aimed for engineering of natural gas utilization
ANRE Authorization no.11658 installations working with pressure lower than, or equal to 6 bar,
type PDI
Authorization aimed for execution, verification and revision of
ANRE Authorization no.11659 natural gas utilization installations working with pressure lower
than, or equal to 6 bar, type EDI
Authorization aimed for engineering of natural gas distribution
ANRE Authorization no.11747
systems, type PDS
Permit type Be for “ Execution of indoor electrical installations
ANRE Authorization no.8447 for civil and industrial constructions, aerial and underground
connections, at nominal voltage of 0,4 KV “
INSEMEX Authorization no. Permit regarding the capacity of performing specific activities to
GANEx.Q.2012.(25).12.1199 Norm NEx01-06
ISC Authorization no.2339 Laboratory of gr. III – NDT lab for profiles: CO, INM, IGN, PC
Concrete plant
Capacity / Workload
Our average workload and capacity for fabrication (per day, week or month – with figures from
previous years and actual figures from present year)
Last year we had an average workload of 177 man-hour/month and present year is
178 man-hour/month
Current workload is 15” welded/welder/day
Maximum number of employees - 1.000 employees
6. TURNOVER
1. Turnover 2009 – 141,340,625 Lei
Netto Profit = 26,760,858 Lei
Gross Profit = 33,361,921 Lei
Equipment, materials and associated services provided for performing the works
Description of the infrastructure: