This document specifies requirements for process flow diagrams (PFDs) used in projects by NIOEC.

This document specifies requirements that must be followed to satisfy NIOEC specifications for PFDs, referencing IPS standard IPS-E-PR-170.

Standards referenced include ANSI, ISO, IPS, and various NIOEC specifications for units, P&IDs, plant operating manuals, and numbering systems.

NIOEC-SP-00-52(0)

DOCUMENT CODE NO. OF PAGES: 3


PLAN/PRJ/SUB UNIT PHASE DISCIPLINE DOCUMENT TYPE SERIAL NO. REV. NO. DATE
NIOEC 000 EG PR SP 0052 A0 JULY, 2005

NATIONAL IRANIAN OIL REFINING & DISTRIBUTION COMPANY


NATIONAL IRANIAN OIL ENGINEERING
& CONSTRUCTION COMPANY

NIOEC SPECIFICATION
FOR

PROCESS FLOW DIAGRAM

FIRST EDITION

JULY, 2005

THIS SPECIFICATION IS THE PROPERTY OF NATIONAL IRANIAN OIL ENGINEERING & CONSTRUCTION COMPANY. IT IS CONFIDENTIAL AND ALL
RIGHTS RESERVED TO THE OWNER. NEITHER WHOLE NOR ANY PART OF THIS DOCUMENT MAY BE DISCLOSED TO ANY THIRD PARTY,
REPRODUCTED, STORED IN ANY RETRIEVAL SYSTEM OR TRANSMITTED IN ANY FORM OR BY ANY MEANS WITHOUT THE PRIOR WRITTEN
CONSENT OF THE NATIONAL IRANIAN OIL ENGINEERING & CONSTRUCTION COMPANY
JULY, 2005 NIOEC-SP-00-52(0)

2
JULY, 2005 NIOEC-SP-00-52(0)
REVISION INDEX
REV. REV. REV. REV.
1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
PAGE PAGE PAGE PAGE

1 26 51 76
2 27 52 77
3 28 53 78
4 29 54 79
5 30 55 80
6 31 56 81
7 32 57 82
8 33 58 83
9 34 59 84
10 35 60 85
11 36 61 86
12 37 62 87
13 38 63 88
14 39 64 89
15 40 65 90
16 41 66 91
17 42 67 92
18 43 68 93
19 44 69 94
20 45 70 95
21 46 71 96
22 47 72 97
23 48 73 98
24 49 74 99
25 50 75 100

NOTES:
1) THIS SHEET IS A RECORD OF ALL REVISIONS TO THIS SPECIFICATION.
2) REMARKS RELATED TO EACH REVISION SHOW A BRIEF DESCRIPTION. THESE REMARKS SHALL BE
INTERPRETED IN CONJUNCTION WITH THE REVISED TEXT MARKED BY REVISION NUMBERS.
3) WHEN APPROVED EACH REVISION SHALL BE CONSIDERED AS A PART OF THE ORIGINAL
DOCUMENT.
4) NUMBER OF PAGES EXCLUDES THIS SHEET AND THE COVER SHEET.

1
0 JULY, 2005 M.A.A.SAJEDI M.R.FARZAM M.A.A.SAJEDI
REV. DATE PREPARED CHECKED APPROVED AUTHORIZED

3
JULY, 2005 NIOEC-SP-00-52(0)

CONTENTS: PAGE NO.

0. INTRODUCTION.....................................................................................................................2
1. SCOPE........................................................................................................................................2
2. REFERENCES ..........................................................................................................................2
2.1EQUIVALENT IPS STANDARDS .......................................................................................3
3. ADDENDUM TO IPS-E-PR-170 .............................................................................................3

1
JULY, 2005 NIOEC-SP-00-52(0)

0. INTRODUCTION

To satisfy the requirements of this NIOEC Specification, Iranian Petroleum Standard IPS-E-PR-
170 with the modifications as specified herein after shall be strictly followed.
Articles 1 and 2 of this document replace entirely the related articles in the referenced IPS
Standard.

1. SCOPE

NIOEC specifications cover the general requirements for detailed engineering, procurements,
testing, inspection & construction of refinery/ oil plant, distribution depots, pump stations and
pipelines.

This Specification specifies general and specific requirements for the contents of process flow
diagram (hereinafter called PFD) which shall be used throughout above-said projects. However,
further requirements may be requested by the Company to fulfill specific project requirements.

2. REFERENCES

Throughout this Specification, the following dated and undated standards/ codes are referred to.
These referenced documents shall, to the extent specified herein, form a part of this
Specification.
For undated references, the latest edition of the referenced document (including any
supplements and amendments) applies. For dated references, the edition cited applies.
The applicability of changes in dated references that occur after the cited date shall mutually be
agreed upon by NIOEC and the Vendor/Contractor.

ANSI (AMERICAN NATIONAL STANDARD INSTITUTE)


Process Charts, Y 15.3 M, 1979

ISO (INTERNATIONAL ORGANIZATION FOR STANDARDIZATION)


ISO 7000-1984 (E/F), "Graphical Symbols for Use on Equipment-Index and Synopsis"
1st. Ed. 1984-03-15

IPS (IRANIAN PETROLEUM STANDARDS)


IPS-E-PR-170 "Engineering Standard for Process Flow Diagram"

NIOEC-SP (NIOEC SPECIFICATIONS)


NIOEC-SP-00-10 “NIOEC Specification for Units”
NIOEC-SP-00-55 “NIOEC Specification for Piping & Instrumentation Diagrams (P&IDs)”
NIOEC-SP-00-59 “NIOEC Specification for Plant Operating Manual”
NIOEC-SP-00-62 “NIOEC Specification for Numbering System”

2
JULY, 2005 NIOEC-SP-00-52(0)

2.1 EQUIVALENT IPS STANDARDS


Substitute the following IPS Standards as referred to throughout IPS-E-PR-170 for
relevant NIOEC's Specifications as follows:
IPS Standard Relevant NIOEC Specification
IPS-E-PR-230 NIOEC-SP-00-55
IPS-E-PR-290 NIOEC-SP-00-59
IPS-E-PR-308 NIOEC-SP-00-62

3. ADDENDUM TO IPS-E-PR-170

This addendum revises the below listed articles of the referenced standard as follows:

- CONTENTS (Page 2 of IPS-E-PR-170), (Addition)


Add following phrase after item 13:
14. UNITS……………………………………………………………......... Error! Bookmark not
defined.

14. UNITS (Addition)

International system of units (SI) shall be used in accordance with NIOEC-SP-00-10, unless
otherwise specified.