The document provides instructions for an online examination for a unit test, stating that it is 30 minutes long, students must ensure their details are correct, and they must answer a minimum of 20 out of 25 multiple choice questions, being responsible for logging in on time with a fully charged device. The test then provides 25 multiple choice questions related to automation systems, Programmable Logic Controllers (PLCs), and their components and programming. Students must select one answer for each question and click submit once completed.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
986 views2 pages
Unit Test 1 Question Paper
The document provides instructions for an online examination for a unit test, stating that it is 30 minutes long, students must ensure their details are correct, and they must answer a minimum of 20 out of 25 multiple choice questions, being responsible for logging in on time with a fully charged device. The test then provides 25 multiple choice questions related to automation systems, Programmable Logic Controllers (PLCs), and their components and programming. Students must select one answer for each question and click submit once completed.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
UNIT TEST -I
Government Polytechnic, Pen
Instrumentation and Control Department Sem: V Subject: IAU (22534) Date: 10/11/2021 Time: 30 mins Total Marks: 20 ________________________________________________________________________ Instructions for Students 1. Duration for online examination is 30 min. 2. Students should ensure that they have entered their correct details before starting the examination. 3. Each questions carries 1 mark. 4. Solve minimum 20 questions compulsorily out of total 25 questions. 5. Students with duplicate record not consider. 6. It is the whole responsibility of student to login in time and keep the phone /laptop/desktop in condition (fully charged) during the examination. 7. Students are allowed to submit test only once. 8. Students should make sure that they have correctly attempted all the questions before submission. 9. Students should make sure that they have clicked on submit button to complete the test successfully. ______________________________________________________________________________________ 1. The word Automation was first used at the ____________ company. a)Siemens b) Ford motor c) Rockwell d) Allen-Bradley 2. Automation system is also called as _________. a) Process automation b) Automatic technique c) Manual process d) Manual process 3. SCADA stands for ________. a) Supervisory control and data acquisition system b) Superior control and data acquisition system c) Supervisory control and data appear system d) None of the above 4. DCS stands for ________. a) Distributed control system b) Disturbed control server c) Digital control system d) None of the above 5. Which of the following is an automation system? a) Robotics b) Numerically controlled machines c) Warehouses d) All the above 6. The Boolean representation of this PLC program is:
a)ABC + D b)C + (A + B)D c)C + D(A + B) d)C(AB’ + D’)
7. The below rung would represent what Boolean equation?
a)X • Y = Z b)X + Y = Z c)X • Y’ = Z d)None of the above.
8. Solenoids, lamps, motors are connected to: a)Analog output. b)Digital output. c)Analog input. d)Digital input 9. Normally open contacts are open when: a)When Input is not energized b)When the input is energized c)When input is higher than 20 volts d)None of these 10. What is the largest integer number that a PLC counter function can reach if it uses a 16 bit register? a)32,768 b)65,535 c)65,536 d)65,537 11. An NOR function implemented in ladder logic uses: a)Normally-closed contacts in series b)Normally-open contacts in series c)Normally-open contacts in parallel d)Normally-closed contacts in parallel 12. An OR function implemented in ladder logic uses: a)Normally-closed contacts in series b)Normally-open contacts in series c)Normally-open contacts in parallel d)Normally-closed contacts in parallel 13. Identify the problem in this motor control PLC program:
14. The programmable logic controllers are used in __________ a)Manufacturing b)Automation c)Both a and b d)None of the above 15. What are the components that make the programmable logic controller work? a)Input and output module b)CPU c)Power supply d)All of the above 16. What are the types of programmable logic controllers? a)Fixed, uniform PLC b)Modular, uniform PLC c)Fixed and Modular PLC d)Fixed and Modular PLC 17. Which is the first PLC model? a)PLC 084 b)PLC 085 c)PLC 086 d)None of the above 18. The relays consist of __________ a)Control circuit b)Load circuit c)Both a and b d)None of the above 19. Who invented the Programmable Logic Controller (PLC)? a)Jonas Wenstrom b)Dick Morley c)Thomas Davenport d)None of the above 20. The advantages of PLC are ______ a)Which one is the PLC Easy maintenance b)Reliability is high c)Small in size d)All of the above 21. Which is the following programming language? a)HMI b)MMI c)FBD d)None of the above 22. The standard form of PLC is ______ a)Programmable Logic Controller b)Programmable Load Controller c)Pressure Load Controller d)None of the above 23. The ladder logic in PLC consists of _________ a)Logic gates b)Relay contacts and coils c)Functional blocks d)Relays 24. Which type of memory is used in PLC? a)Random Access Memory b)Read Only Memory c)Both a and b d)None of the above 25. A PLC consists of a)Processor Unit b)Program Memory c)Input/output Section, Display Device d)All of the above