0% found this document useful (0 votes)
75 views5 pages

Progress Report of All

This document provides status updates on various ongoing road works and flood relief works across different local authority constituencies in Kerala. Key details include work name, amount sanctioned, technical sanction order details, agreed contractor, current physical progress of each work. Majority of the works have been delayed or are ongoing due to unfavorable weather conditions like rain. Some flood relief works have been completed while others are in progress hindered by stream flows. Survey works are also ongoing for some projects.

Uploaded by

insafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views5 pages

Progress Report of All

This document provides status updates on various ongoing road works and flood relief works across different local authority constituencies in Kerala. Key details include work name, amount sanctioned, technical sanction order details, agreed contractor, current physical progress of each work. Majority of the works have been delayed or are ongoing due to unfavorable weather conditions like rain. Some flood relief works have been completed while others are in progress hindered by stream flows. Survey works are also ongoing for some projects.

Uploaded by

insafa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Budget works ongoing

AS Details TS Details Work Arrangement Work Status


Sl.No Name of work Amount T.S No. Agt.No & Date Agreed. PAC Name of Current Stats of work Physical
Contractor Progress (%)

Vallikunnu LAC
1 Improvements and and providing BM & BC 175 ORDER SE(K) 09/2019- 16143863 Jabir Usman Culvert and drain completed, GSB ,WMM BM 75%
works to Idimuzhikkal -Agrasala Parakkadavu No.KTY/2018- 20 Dtd: completed.BC rectification pending. Awaited for
road (Reach-II) road between km 1/150 and 3/000 2019/2018/10620D 20/05/2019 favorable weather condition. Work delay due to
in Vallikkunnu LAC ated:18-01-2019 rain.
2 Budget Work 2018-19: Improvements and 100 ORDER EE(M)289/201 8595968 Abdul BM completed and BC 70m pendind due to ROW 90%
providing BM & BC works to Idimuzhikkal- No.KTY/2018- 8-19 dtd Kareem.K.K work in progress. To be completed after rain.
Agrasala- Parakkadavu road (Reach II) between 2019/2018/3354Da 25.02.2019 Awaited for favorable weather condition. Work
km 0/000 to 1/150 in Vallikkunnu LAC ted:12-01-2019 delay due to rain.
Kondotty LAC
3 Budget Work 2018-19: Improvements and 200 MNJ/2018-19 SE(K)237/2018 1,84,87,723 Jabir usman Drainage and cross drain works ,GSB,WMM,BM 80%
providing BM & BC works to Murivayikkal- /2018/7475 -19 Dated 6-03- completed . BC pending. Awaited for favourable
Vallikkad road between km 0/000 and 2/250 in 2019 weather condition. Work delayed due to rain.
Kondotty LAC
4 Providing BM & BC surfacing and other 75 MNJ/2018- EE(M)288/201 6785442.47 Jabir Usman Drainage and cross drain works 80%
improvement works to Murivayikkal Vallikkad 19/2018/10522 8-19 dtd completed .GSB,WMM,BM completed. BC
road between Km 2/250 and 3/200 in Kondotty 25.02.2019 pending. Awaited for favourable weather
LAC condition.
5 Improvements and providing BM & BC Works to 500 RE Work arranged. Pipe line pending. _
Kottappurani Kakkancheri road between _TS/RD/2021/1773 SE(K)52/2021 Ms
KM 0/000 and 5/300 in kondotty LAC _5_1 Dated: 31-05- -22 dated: MALABAR
2021 13.09.2021 39802388 TECH
6 Improvements and providing BM and BC to 200 ORDER SE(K)117/2020 16479217 Aranjikkal Drain, Culvert, Retaining wall works 57%
Mangattumuri- Cherumuttam - Valiyaparamba No.RdDnMNJ/202 -21 dtead 03- Group of Completed.Profile Correction works completed
road b/w km 0/450 and 2/750 0-2021/RD/2020/9 02-2021 constructions shifting utilities completed. Pipe line laying
54Dated:08-10- pending
2020

Ernad LAC
7 Improvements and providing BM and BC works 1200 RdDnMNJ/2020- SE(K)148/2020 96471156 Thrimathy out of 20 Culvert reconstruction,15 was 19%
to SH - 65 Parappanagadi Areacode road between 2021/RD/2020/531 -21 dated 26- Contracting completed ,3 are on going and two are pending
Ekkaparamba and Areacode kn km 28/670 to dated 24-10-2020 02-2021 company due to water logging .Around 1100.00 m of drain
41/060 (excluding km 31/500 to km 32/330) in is completed .450.00 m of retaining wall works
Ernad LAC also completed.Drain and retaining wall works
are ongoing,
Survey work for boundary demarkation also in
progress
FLOOD WORKS 2020-21

Amount
Name of
Sl No LA Constituency Name of work (Rs. in Agreement no & date Agreed PAC Present Status
Contractor
lakhs

Side protection wall damaged in omanoor kuzhimanna road EE (M) 87/2020-21


1 Eranad 25 1824192.48 Abdul Kareem KK work completed
Km 8/000 to 9/000 Dated.19-02-2021

Side protection wall damaged in teacherpadi-muthuvallor road EE(M)73/2020-21 Work started, stream flow is hindering
2 Eranad 25 1723488.79 Abdul Kareem KK
km 0/000 to 0/500 Dated:10/02/2021 the work progress

Re construction of damaged culvert in teacherpadi-muthuvallor EE(M)72/2020-21


3 Eranad 25 1824655.36 Basheer K work completed
road at km 0/050 Dated:10/02/2021

Side protection wall damaged inPonnad Vazhakkad Road in EE(M)25/2021-22 dated


4 Kondotty 25 1877440 Abdul Kareem KK Work completed
between Km 1/200 29-06-2021

Side protection wall damaged inVettukad olavattoor AEE(T)39/2020-21


5 Kondotty 12 500816 Rasak work completed
mundumuzhi Road in between Km 6/100 to 6/400 5/11/2020
Partial construction of Culvert and Drainage in Kondotty
EE (M) 70/2020-21
6 Vallikkunnu Tirurangadi Diversion Road route-2 between km 0/450 to 20 1882333.49 Abdul Kareem KK work completed.
Dated.01-02-2021
1/850
Flood Damage Works 2020-21: Providing side protection work
AS accorded , submitted for
7 Kondotty at Km 1/200 to km 1/800 of Ponnad vazhakkad road in 30
nomenclature change
Kondotty LAC
DETAILS OF NON PLAN WORK 2021-2022
Non Plan works Ongoing
Amount
(Rs. in Agreed PAC Name of
Sl No LA Constituency Name of work lakhs Agreement no & date Contractor Present Status
FDR-2021-22-Reconstruction of retaining wall in farook
Collage vazhakkad road between ch 4/950 and 5/700-
General Civil Work-at kondotty lac
EE(M)36/2021-22 Muhammad
1 Kondotty 15.5 Dated:08/09/2021 1064615 Shameem T started
FDR-2021-22-ReConstruction of retaining wall in
Vettukad Olavattur Mundumuzhy road btwn km 3/700 & Muhammad
EE(M)35/2021-22
2 Kondotty 4/200-General Civil Work-at kondotty Lac 25 Dated:08/09/2021 1711214 Shameem T on progress
Urgent side protection work between km 0/800 and 1/300
of Pallippuraya-Puthiyedathuparambu road in Kondotty 1708960 Muhammad Abdul
EE(M)51/2021-22
3 Kondotty LAC 25 Dated:01/10/2021 Basheer Agreement executed
Protection Works to Mangattumuri cherumuttam yet to be submitted for
4 Kondotty valiyaparamb road between 0/600 and 2/540 25 TS
M/s.SALMANUL
Urgent Construction of Culvert at 0/400 of Mangattumuri AEE(T)49/2021-22 dt 488522.21 HARIS
5 Kondotty Cherumuttam Valiyaparambu road 5 23/09/2021 on progress
Urgent Drainworks to murivazhikkal-vallikkad road AEE(T)50/2021-22 dt 485484 M/s.Mohammed
6 Kondotty between km 1/700 and 2/100-General Civil Work 5 25/09/2021 Shabas C T completed
Road safety Work 2020-21 (Non Plan Work ) :Providing
Sign boards to kondotty -vazhakkad road ( From km
10+600 to 17+100) and Farook College-Vazhakkad Road AEE(T)/40/2021-22 dt 667654
7 Kondotty (From km 4+300 to 11+720 8.45 13/07/2021 Niyazi Haneefa ongoing
Sri. Basheer.K
DETAILS OF NON PLAN WORK 2020-21
Amount Koodamthodi
LA (Rs. in Name
houseof
Sl No Constituency Name of work lakhs Agreement no & date Agreed PAC Contractor
Vavoor Present Status
SLTF 2020-21 : Surface rectification works of service road at Cheekode.(PO)
Ugrapuram of Areecode Vazhakkad road between 19/000 and
19/500 at Eranad Lac EE(M)76/2020-21 dated Malappuram,Pin:
1 Ernad 25 16/02/2021 2163249.6 673645 work completed
Providing BM & BC and other improvements works to Feroke M/s PMR
K.K.
College Vazhakkad road between 1/500 to 4/300 Construction
P.M.R
Aboobacker Survey sketch awaited.Dranage works and Protection work are in progress.30 %
SE(K)144/2020-21 dated: Company,
Haji,, PMR of work is completed , Surfacing work canm be completed only after JJM pipe
CONSTRUCTI
2 Kondotty 300 24-02-2021 23378821.6 Arcade,
ONS
PWD trenches were restored. Survey completed. eMB pending
Melmuri,
Contractor,
SLTF 2020-21 : Urgent Water logging rectification works to Alathoorpadi,
Padinharayil
Feroke College Vazhakkad road between Km 11/400 and 11/700 EE(M)100/2020-21 dated Malappuram
House
3 Kondotty at Kondotty LAC 25 24-02-2021 2446338 676517
M/s PMR ,
Kodangad Culvert &b drain completed. Gsb and wmm alaying work on progress
Construction
Kondotty (PO) -
SLTF 2020-21 : Urgent BT repair and maintanance Works to AEE(T)18/2021-22 Company,
673638PMR BT Work Completed, for Surfacing with Interlocks at mundumuzhy jn Gsb
4 Kondotty Kondotty Vazhakkad road 10/600 - 17/100 10 dt.28/06/2021 968698.84 Arcade,
Malappuram laying work on progress
Melmuri,
M/s PMR
SLTF 2020-21 : Urgent work for Restoration of traffic due to Alathoorpadi,
Construction
collapsed culvert at 6/200 and drainage work in Feroke College EE(M)102/2020-21 dated Malappuram
Company, PMR
5 Kondotty Vazhakkad road between km 2/800 and 11/400 in Kondotty LAC 25 24-02-2021 2228547 676517
Arcade, Work in progress 30% work completed
Melmuri,
SLTF 2019-20 : Urgent flood damage rectification work between Alathoorpadi,
Km 0/670 and Km 2/500 of Faroke College Vazhakkad road in EE(M)105/2020-21, dated Malappuram
6 Kondotty Kondotty LAC 25 25-02-2021 2447080 P.P.676517
Noushad work in progress
Ali, PWD
SLTF 2020-21 Rectification Works between km 3/700 and 4/490
Contractor
of kannamvettikkav - puthupadam-Ayikarappadi-kakancheri road
Pulikkal
7 Vallikkunnu in Vallikunnu lac 45 MT
Palekode(H) Submitted LETTER OF ACCEPTANCE
Nediyiruppu
SLTF 2020-21 : Eviction works to various roads under roads AEE(T)03/2021-22 (PO) 673 638,
10 Vallikkunnu section kondotty in kondotty, vallikunnu,eranad,malappuram lac s 5 Date :17-06-2021 352452 Kondotty Work in progress. Eviction in process
SLTF 2020-21 :Rectification Works between km 0/000 and 0/450
of Diversion road to kondotty -thirurangadi road route II in EE(M)108/2020-21 dated
11 Vallikkunnu Vallikunnu lac 25 26-02-2021 2232078 Zubair work completed

SLTF 2020-21 : Rectification Works between km 7/650 and 8/100


of Kohinoor Puthurpallikkal kumminiparambu Tharayittal road in M s MALABAR
12 Vallikkunnu Vallikunnu LAC 25 2424897 TECH Submitted LETTER OF ACCEPTANCE

SLTF 2020-21 : Rectification Works between km 2/800 and 3/200


of kannamvettikkav - puthupadam- Ayikarappadi- kakancheri road MALABAR
13 Vallikkunnu in Vallikunnu lac 25 2450158 TECH Submitted LETTER OF ACCEPTANCE
SLTF 2020-21 : improvements Works to Idimuzhikkal - Agrasala
- Parakadavu road (Reach I) btwn km 3/000 and 4/500 in EE(M)83/2020-21
14 Vallikkunnu Vallikunnu LAC 25 Dated:17/02/2021 1925288 KABIR NAHA Work started. Drain in progress

SLTF 2018-19 (Flood damage): Providing BM &BC surfacing


from km 3/000 to km 3/500 in Idimuzhikkal-Agrasala-Parakadavu BM work completed . BC work half portion completed. 80 % completed.Road
15 Vallikkunnu road (Reach II) 30 3293665 marking works are pending