Method Statement For External Painting Work With Using Suspended Platform
Method Statement For External Painting Work With Using Suspended Platform
Method Statement For External Painting Work With Using Suspended Platform
Owner’s Engineer
Contractor
Project
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 X 600 MW)
Title
(Housing Complex)
Method Statement for External Painting Work
with Using the Suspended Platform
Document No. Rev. Page No.
NS2-DD09-P0UYK-770019 A 22 Pages
RECORD OF REVISIONS
No Description Q’ty
1 Suspended Platform
3 Moisture meter
5 Barricade
Figure 4: Hoist
Project : Nghi Son 2 BOT Thermal Power Plant( 2 x 600MW) Page 5 of 19
Work Item : Finishing Works
(Housing Complex)Method Statement for External Painting Work with Using Suspended Platform
NS2-DD09-P0UYK-770019
4.2.5 Safety Lock
Anti-tilting safety lock is the safety-protecting device for the suspended platform. When the
working steel rope is broken or the suspended platform is inclined to certain angle, the safety
lock will be actuated to lock the safety steel rope to prevent the suspended platform from
falling down.
The anti-tilting safety lock consists of parts as rope clip, sleeve plate, torsion spring, bracket,
swing arm and roller. It is so arranged that the working steel rope is put against the roller
on the swing arm to make the rope clip open and allow the smooth pass of safety steel
rope. If the suspended platform tilts to its limits or working steel rope break, the pressure
on the swing arm of safety lock will reduce or impair. The safety rope clip swiftly closes and
locks safety steel rope to prevent suspended platform from dropping or tilting by the friction
as that in between torsion spring, rope clip and steel rope. When anti-tilting safety lock is
applied, the tilt angle of suspended platform should be 3 °~8°.
The safety lock is marked by factory for the first time. After the first marking is effective, the
professional technician should conduct maintenance and service at an interval of 6 months
and remark at the end of 6 months.
Insert the tommy bars into the front base and rear base respectively. Adjust the height of
the tommy bars and tighten the bolts to form the front base and rear base. (The height of
which should be adjusted with the 1.365~1.925 m range according to the height of parapet);
Lead the front and rear beams into sleeve on front or rear base, position the middle beam
between the front and rear beams and tighten the bolts and nuts;
Mount the working steel rope and safety steel rope onto the coupling sleeve of the front
beam. Make sure that the ends of the ropes must be clamped well;
Adjust the front beam overhang and fix the upper column with tommy bar with the bolts and
make sure that it is not askew;
Adjust the distance between the front and rear bases. Adjust the three beams to make sure
that the three beams should be in the same straight line. Care must be taken that the height
different between the three beams must not larger than 10 cm. Moreover, it is only allowed
that the front is higher than the rear.
Fix the coupling sleeve on the tommy bar of the rear base. Lead one end of the reinforcing
4.5 Communication
Communications during suspended platform operations are performed by means of an
interphone system installed between the suspended platform itself with ground control team.
At all times, during the operations of the suspended platform system the communications shall
be assigned to the suspended platform operator.
5 QUALITY CONTROL
Inspection and Test plan for Painting works will follow:
The inspection and test plan for Painting works summarizes various characteristics to be
checked.
The concerned Section Engineer/Foreman will be responsible to ensure stage wise
compliance for these operations, and the Site QA/QC Engineer/ Inspector will carry out
quality control checks and report the inspection results
Truck hit to people or - Person injury 3 D H - Flagman for each material truck 3 B M Competent - Site
equipment - Damage flagman supervisor
equipment - Flagman
Sharp edges Physical injury 2 D M - Briefing to workers regarding on hand 2 B L Refresher training Site Supervisor
injury prevention. (hand injury)
- To wear hand protection properly
(hand gloves)
Pinch point Hand/finger injury 3 D M - Workers must aware of pinch point 3 B L Awareness Site Supervisor
hazard during handle the material. training for pinch
- Use a suitable hand glove. point.
Installation Wrong installation - Property damaged 3 D M - Ensure only competency person 3 B L - Quarter color - Site
/preparation a - Person injury and expert person for install the coding system Supervisor
suspended platform equipment be implemented - Mechanical
tool for painting - Equipment no - Operator and mechanical team - Crew
working - Daily inspection
work installation should be good equipment
coordination
- Use 2 way radio
- Use flagman and barricading communication
area during installation equipment
- Operators, keep all other workers
clear of operating equipment moving
- Only competent lifting crew
allowed performing lifting activity and
checking ground condition.
- Only using inspected lifting gear
for lifting activity.
Sling Rope broken / - Property 3 C H - Sling Rope must be inspected by 3 B M - Quarter - Site
damage damaged authorized person and valid certified color coding Supervisor
- Physical injury - Ensure all sling rope in good system be - Mechanic
implemented al Crew
- Condition before install
- Operator
Improper body posture Muscle strain and 3 C M - Implement buddy system during 3 B L Technical handling - Site
body fatigue activity training Supervisor
- Proper body posture during work - Painting
- Crew
- Separate working team properly
Falling from height Person injury 3 C H - Use safe platform and access with 3 B M Strictly supervise - Site
handrail Supervisor
- 100% use safety harness full body - Painting
- Crew
- Competence person
- Equipment inspect and checklist
- All safety device working
Falling object Person injury 3 D H - All lose material and tools will be 3 C M flagman and - Site
Damage equipment properly secured barricading Supervisor
- Check and make secured hand system - Painting
tool to avoid falling down material - Crew
- Isolate safety area as method
statement
Electrocution Physical Injury 4 C H - Ensure the power connection 4 B M - ELCB for all DB - Site Supervisor
been unplugged from outlet before - Only expert - Electrical
inspection. and competence
- Only authorized person allowed to - Electrician
perform inspection activity. for check
- Ensure all electrical system in
good condition before use
Poor housekeeping Slip and trip 2 D M - All lose item must be clear and 2 B L Assign one - Site
secure housekeeper Supervisor
- All material not used must be keep - painting
Crew
Project : Nghi Son 2 BOT Thermal Power Plant( 2 x 600MW) Page 17 of 19
Work Item : Finishing Works
(Housing Complex) Method Statement for External Painting Work with Using Suspended Platform
NS2-DD09-P0UYK-770019
Danger falling object - Property damaged 3 D M - All lose material and tools will be 3 B M Competent person - Site Supervisor
- Physical injury properly secured to work and - Painting crew
- Check and make secured hand supervise
tool to avoid falling down material
- Isolate safety area as method
statement
Chemical material paint - Property 3 C M - Proper manual handling for 3 B L - Follow the - Site Supervisor
contamination damaged chemical material procedure and - painting crew
- Environmental - Make sure all equipment tools in instruction
case Material Safety - workers
good condition
- Chemical Data Sheet / MS
contaminated - Finish working the worker also in
good condition - Provide
chemical tool kit
- Proper care to unused paint cans/
chemical - Proper care for chemical
material transfer in and out to
Chemical storage
- Provide secondary containment
1 2 3 4 5
Severity
Insignificant Minor Moderate Major Catastrophic
Multiple
People Slight Injury Minor Injury Major Injury Single Fatality
Fatalities
Localized
IMPACT Environment Slight Impact Minor Impact Major Impact Massive Impact
Impact
Significant
Assets Slight Damage Minor Damage Local Damage Major Damage
Damage
Major
Considerable
Reputation Slight Impact Limited Impact Major National Impact International
Impact
Impact