RFI LOG June 2021

The document appears to be a list of purchase orders (POs) from June 2021. It includes 34 POs for items such as cladded pipes, fittings, flanges, safety equipment, insulation gaskets, and ball valves. Most of the POs reference inspections that took place between June and July 2021 to verify items met specifications before delivery. Vendors for the orders included companies like STS Clad LLC, Krusman Emergency Showers, and Jiangyin Zhongnan Heavy Industries.

Uploaded by

navneet1986
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views28 pages

RFI LOG June 2021

The document appears to be a list of purchase orders (POs) from June 2021. It includes 34 POs for items such as cladded pipes, fittings, flanges, safety equipment, insulation gaskets, and ball valves. Most of the POs reference inspections that took place between June and July 2021 to verify items met specifications before delivery. Vendors for the orders included companies like STS Clad LLC, Krusman Emergency Showers, and Jiangyin Zhongnan Heavy Industries.

Uploaded by

navneet1986
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 28

Sr No.

Month RFI NO PO NO

1 Jun-21 P11570-RFI-P-BIFP-PP14-109C-0054 P-BIFP-PP14-109C

2 Jun-21 P11570-RFI-P-BIFP-PP14-109C-0053 P-BIFP-PP14-109C

3 Jun-21 P11570-RFI-P-BIFP-PP14-109C-0052 P-BIFP-PP14-109C

4 Jun-21 P11570-RFI-CP-PS01-0015 P-BIFP-PS01-133

5 Jun-21 P11570-RFI-CP-PP21(04)-0017 P-BIFP-PP21-116-04


6 Jun-21 P11570-RFI-CP-PP20(B)-0079 P-BIFP-PP20-115B

7 Jun-21 P11570-RFI-CP-PP20(A)-0035 P-BIFP-PP20-115A

8 Jun-21 P11570-RFI-CP-PP16-0023 P-BIFP-PP16-111B

9 Jun-21 P11570-RFI-CP-PP14(A)-0046 P-BIFP-PP14-109A


10 Jun-21 P11570-RFI-CP-PP12-0058 P-BIFP-PP12-044
11 Jun-21 P11570-RFI-CP-PP12-0057 P-BIFP-PP12-044

12 Jun-21 P11570-RFI-CP-PP07-0026 P-BIFP-PP07-104

13 Jun-21 P11570-RFI-CP-PP07-0025 P-BIFP-PP07-104

14 Jun-21 P11570-RFI-CP-PP07-0024 P-BIFP-PP07-104

15 Jun-21 P11570-RFI-CP-PP05-0028 P-BIFP-PP05-103


16 Jun-21 P11570-RFI-CP-PP01(B)-0044 P-BIFP-PP01-008B

17 Jun-21 P11570-RFI-CP-PP01(A)-0026 P-BIFP-PP01-008A

18 Jun-21 P11570-RFI-CP-PL03(A)-0012 P-BIFP-PL03-003A

19 Jun-21 P11570-RFI-CP-PL03(A)-0011 P-BIFP-PL03-003A

20 Jun-21 P11570-RFI-CP-PL03(A)-0010 P-BIFP-PL03-003A

21 Jun-21 P11570-RFI-CP-PL03(A)-0009 P-BIFP-PL03-003A

22 Jun-21 P11570-RFI-CP-PL03(A)-0008 P-BIFP-PL03-003A


23 Jun-21 P11570-RFI-CP-MS10-0044 P-BIFP-MS10-160A

P-BIFP-MR07-028-
24 Jun-21 P11570-RFI-CP-MR07(003)-0138
003
P-BIFP-MR07-028-
25 Jun-21 P11570-RFI-CP-MR07(003)-0137
003

P-BIFP-MR07-028-
26 Jun-21 P11570-RFI-CP-MR07(001)-0054
001

P-BIFP-MR07-028-
27 Jun-21 P11570-RFI-CP-MR07(001)-0053
001

P-BIFP-MR07-028-
28 Jun-21 P11570-RFI-CP-MR07(001)-0052
001

29 Jun-21 P11570-RFI-CP-IN01(B)-0057 P-BIFP-IN01-153B

30 Jun-21 P11570-RFI-CP-IN01(B)-0056 P-BIFP-IN01-153B

31 Jun-21 P11570-RFI-CP-IC08-0137 P-BIFP-IC08-081

32 Jun-21 P11570-RFI-CP-EL39-0053 P-BIFP-EL39-154

33 Jun-21 P11570-RFI-CP-EL36-0022 P-BIFP-EL36-149


34 Jun-21 P11570-RFI-CP-PL01-0054 P-BIFP-PL01-001
Vendor's
Scope of Supply Date of Inspection
Name

Supply of Cladded Pipe, Fittings & Flanges June 29, 2021 to July 1, 2021 STS Clad LLC

Supply of Cladded Pipe, Fittings & Flanges June 21 - 24, 2021 STS Clad LLC

Supply of Cladded Pipe, Fittings & Flanges June 8 & 10 STS Clad LLC

Krusman
Fire Fighting, Safety Equipments & Safety Signs 02/07/2021 Emergency
Showers AB

JIANGYIN
TIANNING
CS,SS, DSS AND SOLID CRA FLANGES Jul.7th and 12th ,2021 METAL PIPE
FITTING
CO.,LTD
JIANGYIN
TIANNING
CS,SS, DSS AND SOLID CRA FITTINGS Jul.7th and 12th ,2021 METAL PIPE
FITTING
CO.,LTD

Jiangyin
Zhongnan
P-BIFP-PP20-115A / Carbon Steel Fitting June 17th&18th&22th, 2021 Heavy
Industries
Co.,Ltd.

GOODRICH
Design, Manufacturing and Supply of Insulation Gasket Kit & GASKET
28.06.2021
Gaskets PRIVATE
LIMITED

CANGZHOU
LONGTAIDI
PIPELINE FITTINGS 21st June-2021 to 24-Jun-2021 PIPE
TECHNOLOG
Y CO.,LTD
Future Pipe
5th July,2021 ( Lamination Kit
Supply of GRE Piping Bulk Items Industries,
Inspection)
LLC
Future Pipe
Supply of GRE Piping Bulk Items 9th June,2021 Industries,
LLC

ACCESS FITTINGS (CIQ,SP) 05/07/2021 EuropCorr Srl

ACCESS FITTINGS (CIQ,SP) 23/06/2021 EuropCorr Srl

ACCESS FITTINGS (CIQ,SP) 17/06/2021 EuropCorr Srl

ACCESS FITTINGS (CC,CP) 01/06/2021 EuropCorr Srl


JIANGSU
JIULONG
P-BIFP-PP01-008B - PIPING BALL VALVES (API6D UPTO
14th June - 17th June VALVE
12")
MANUFACTU
R CO., LTD.

Zhangjiagang
Guangda
Piping Ball Valves 2021-6-15, 2021-6-16 Special
Material
CO.,LTD

Signing of final MTC, HIC Test


FTV
Report, 3.2 TUV Nord IRN &
PROCLAD
6" WELD OVERLAY CLADDED LINE PIPE PACKAGES Final Documentation as per ITP
LLC/Jindal
●Inspection Dates:
India
02/07/2021 (1 day visit)

CS Pipes Inspection & Activity -


Batch # 2: HIC Test - Stage
Inspection, Final Evaluation & FTV
Documentation - Normal PROCLAD
6" WELD OVERLAY CLADDED LINE PIPE PACKAGES
Production LLC/Jindal
●Inspection Dates: India
17/06/2021, 19/06/2021 &
21/06/2021 (3 days visit)

FTV
CS Pipes Inspection & Activity - PROCLAD
6" WELD OVERLAY CLADDED LINE PIPE PACKAGES
Batch # 2: Normal Production LLC/Jindal
● From: 09/06/2021 India
● Until: 15/06/2021

CS Pipes Inspection & Activity - FTV


Batch # 2: Normal Production PROCLAD
6" WELD OVERLAY CLADDED LINE PIPE PACKAGES
● From: 21/06/2021 LLC/Jindal
● Until: 28/06/2021 India

CS Pipes Inspection & Activity -


FTV
Batch # 2: Billet Identification
PROCLAD
6" WELD OVERLAY CLADDED LINE PIPE PACKAGES (Heat Analysis)
LLC/Jindal
● From: 07/06/2021
India
● Until: 08/06/2021
Nano Gulf Oil
TANK ACCESSORIES (STRUCTURER & SHELL
03-JUNE-2021 Field Services
MANWAYS)
LLC

Chemical Injection Skids package 07.06.2021 Petronash

Chemical Injection Skids package 31.05.2021 to 03.06.2021 Petronash

Descon
P-BIFP-MR07-028-001 / Chemical Injection Skids Package 19 & 20-June-2021 Engineering
FZC, Sharjah ;

Descon
P-BIFP-MR07-028-001 / Chemical Injection Skids Package 05, 06 & 07-Jun-2021 Engineering
FZC, Sharjah ;

Descon
P-BIFP-MR07-028-001 / Chemical Injection Skids Package 01st to 3rd June 2021 Engineering
FZC, Sharjah ;

Extol
Instrumentation Bulk Material July 01, 2021 International
FZC
Extol
Instrumentation Bulk Material June 28,2021 International
FZC

Emerson
Process
23 JUNE 2021, 25 JUNE 2021,
SDV, BDV Management
26 JUNE 2021, 3 JULY 2021
(India) Pvt.
Ltd.

Isma Flag &


Electrical Bulk Materials June 3, 2021 Base Trad:
FZC

MTO for
Earthing Material July 01, 2021 Earthing
material
Bredero Shaw
International
Carbon steel SMLS Pipe 19 June 2021 to 24 June 2021
B.V, Ras al
Khaimah
Location of Inspection Country ADNOC Intervention

STS Clad LLC Facility


PO Box 85785,
PLS328, Zone S, Al
UAE W
Ghail Industrial Zone
Ras Al Khaimah, United
Arab Emirates

STS Clad LLC Facility


PO Box 85785,
PLS328, Zone S, Al
UAE W
Ghail Industrial Zone
Ras Al Khaimah, United
Arab Emirates

STS Clad LLC Facility


PO Box 85785,
PLS328, Zone S, Al
UAE W
Ghail Industrial Zone
Ras Al Khaimah, United
Arab Emirates

Transformatorgatan 1
721 37 Västerås -
SWEDEN W
SWEDEN

NO.281chuangxin
avenue,jiangyin
China W
city,jiangsu province,
china
NO.281chuangxin
avenue,jiangyin
China W
city,jiangsu province,
china

China W,R

#40, Velichai Village,


Vandalur -
Kelambakkam Road, India R
Chennai - 600048.
Tamilnadu, India.

No.33 Huanghe East


Road Economic
China W
Development zone,
Cangzhou, Hebei, China
ICAD 1. Future Pipe
Industries (L.L.C.) 
UAE W
P.O. Box 29205
Abu Dhabi
ICAD 1. Future Pipe
Industries (L.L.C.) 
UAE W
P.O. Box 29205
Abu Dhabi

EuropCorr srl
Via Ardeatina 2479 (km
Italy H,W
22,300)
00134 Rome
EuropCorr srl
Via Ardeatina 2479 (km
Italy H,W
22,300)
00134 Rome
EuropCorr srl
Via Ardeatina 2479 (km
Italy H,W
22,300)
00134 Rome

SA.V.IN snc
VIA VALLE MOLINA , 24
CASTEL DELL AQUILA
Italy R
05020 - ITALY
TEL. 0744935133
ADYARD ABU DHABI
UAE R
LLC

No. 58. Jin Lan


Road,Fenghuang
Town,Zhangjiagang
China W
City,jiangsu
Province,215614,P.R.Ch
ina

P.O. Box: 127847, Abu


India W
Dhabi, UAE

P.O. Box: 127847, Abu


India W
Dhabi, UAE

P.O. Box: 127847, Abu


India W
Dhabi, UAE

P.O. Box: 127847, Abu


India W
Dhabi, UAE

P.O. Box: 127847, Abu


India W
Dhabi, UAE
PRESS BOLT MIDDLE
EAST
PO BOX : 34353
MUSSAFAH-32 India W
ABU DHABI
POC : JOSY JOSEPH -
0564160218
N203, Jebel Ali free
UAE W
zone
N203, Jebel Ali free
UAE W
zone

HAMRIYAH FREE
ZONE- PHASE-01, UAE W
SHARJAH, UAE

HAMRIYAH FREE
ZONE- PHASE-01, UAE W
SHARJAH, UAE

HAMRIYAH FREE
ZONE- PHASE-01, UAE W
SHARJAH, UAE

Extol International Fzc


Ajman Free Zone UAE R
Warehouse E1-14
Extol International Fzc
Ajman Free Zone UAE R
Warehouse E1-14

Emerson Automation
Solutions | 277/278 |
Hinjewadi Phase II |
India W
Maan (Mulshi) | Pune |
Maharashtra | 411057 |
India

Abudhabi UAE R

Extol International Fzc


Ajman Free Zone UAE R
Warehouse E1-14
Bredero Shaw
International B.V.P.O.
UAE H
Box 6997, Ras Al
Khaimah,U.A.E.
Items / Description Status

Request to appoint TPI with 3.1


& 3.2 certification for the activity
as per the approved Inspection
Test Plan no. 11-99-97-6771 for
Approved
Cladding of Pipes
(ITP Activity 2.1 to 5.10)

Request to appoint TPI with 3.1


& 3.2 certification for the activity
as per the approved Inspection
Test Plan no. 11-99-97-6771 for
Approved
Cladding of Pipes
(ITP Activity 2.1 to 5.10)

Request to appoint TPI with 3.1


& 3.2 certification for the activity
as per the approved Inspection
Test Plan no. 11-99-97-6771 for
Approved
Cladding of Pipes
(ITP Activity 2.1 to 5.10)

Inspection of:
Item 13 SAFETY SHOWERS &
EYE WASH STATION N° 2
pcs .
Approved
ITP points: Visual check
(100%); dimensional check
(10%); certificate review.

Witness 11.TENSILE
TEST/12.Hardness/13.Corrosio
n test/14.PRODUCT
ANALYSIS/
Witness 16.ULTRASONIC
EXAMINATION 18.PICKLING
AND PASSIVATION/19.DYE
PENETRANT Approved
EXAMINATION/20.PMI
EXAMINATION/
21.MARKING AND COLOUR
CODE/22 .Visual,Dimension
Inspection/22-24. Document
review&signed
Witness Mechanical
test/Hardness/Corrosion test/
11.PT
/UT12.Visual,Dimension
Approved
Inspection 13.Pickling &
Passivation14.Marking and
color coading 15.PMI and
Document review&signed/

Witness Testing, Final


Approved
inspection & Review MTCs

Final Inspection (TPI) for


Insulation Gasket Kits
Approved
EN 10204-3.1 Certification
package

Production 7. Base Pipe Inner


Surface grit 8. Visual
Inspection 9. Weld Overlay 10.
Band welding 11.NDE 11.1.
Dye Penetration Test 11.2.
Ultrasonic Test 12.Hydrostatic
Test 13.Internal bore machining
and beveling at a length of
100mm 14. NDE For bevel /
pipe end 14.1 Dye Penetration
Test for Bevel and Pipe end
100mm 14.2 Manual UT for
Pipe end
15 Weld Repair(If required)
15.1. Weld Repair 15.2. NDE
after Weld Repair
16. Final Product Inspection Approved
16.1Clad Thickness
measurement 16.2 Base
Material Surface Hardness Test
16.3 Weld Layer Surface
Hardness Test and Band weld
surface 16.4 PMI on weld
overlay surface 16.5
Residual Magnetism Check
16.6 Visual and dimensional
Inspection 17 Pickling &
Passivation & Cleaning 18
Marking, packing 19. Issue of
Release Note and Review
certificates document 20
Shipping of Products
1.1 - Refractive Index of Epoxy
Resin - Hardener Mix
1.2 - Viscosity of Epoxy Resin
1.3 - Resin Gel Time, Cure
Time and Peak Temperature
1.4 - Glass Fibres:
- Moisture content
- Size/Binder content
- Tex properties
1.5 - C-Glass Veil & W/R Mat:
- Moisture content
- Size/Binder content
- Gms. / Sq. Mt.
2.1 Degree of curing (Tg Value)
of Pipes
(DSC Method - Glass
transition temperature)
2.2 Degree of curing (Tg Value)
of Fittings
Approved
(DSC Method - Glass
transition temperature)
2.3 Water absorption test:-
Boil resistance of pipes and
fittings
(Destructive test)
2.4 Loss-on-ignition test:-
Structural glass content of
pipes and fittings
(Destructive test)
2.5Barcol Hardness*
2.6 Dimensional Control*
2.7 Visual Inspection*
(Appearance)
2.8 Hydrostatic Pressure Test of
pipes and Standard
Molded Fittings / spools
(Flanged/Flanged)
2.9Air Test on Pipes &
1.1 - Refractive Index of Epoxy
Resin - Hardener Mix
1.2 - Viscosity of Epoxy Resin
1.3 - Resin Gel Time, Cure
Time and Peak Temperature
1.4 - Glass Fibres:
- Moisture content
- Size/Binder content
- Tex properties
1.5 - C-Glass Veil & W/R Mat:
- Moisture content
- Size/Binder content
- Gms. / Sq. Mt.
2.1 Degree of curing (Tg Value)
of Pipes
(DSC Method - Glass
transition temperature)
2.2 Degree of curing (Tg Value)
of Fittings
Approved
(DSC Method - Glass
transition temperature)
2.3 Water absorption test:-
Boil resistance of pipes and
fittings
(Destructive test)
2.4 Loss-on-ignition test:-
Structural glass content of
pipes and fittings
(Destructive test)
2.5Barcol Hardness*
2.6 Dimensional Control*
2.7 Visual Inspection*
(Appearance)
2.8 Hydrostatic Pressure Test of
pipes and Standard
Molded Fittings / spools
(Flanged/Flanged)
2.9Air Test on Pipes &
As per aprpoved ITP Doc n. 11-
99-97-3919: ITEM 12, 14,15
Approved
ITP Doc n. 11-99-97-3922:
ITEM 11,14,15
As per aprpoved ITP Doc n. 11-
99-97-3919: ITEM 12, 14,15
Approved
ITP Doc n. 11-99-97-3922:
ITEM 11,14,15
As per aprpoved ITP Doc n. 11-
99-97-3919: ITEM 12, 14,15
Approved
ITP Doc n. 11-99-97-3922:
ITEM 11,14,15

Stage 12 of ITP of Doc n. 11-


99-97-3922 - ADHESION TEST Approved
Witness of the valve pressure
testing of the valves as per ITP
Approved
11-99-97-3828 Rev.4 Section
5.4/5.5/5.6

WITNESS ACTIVITIES AS PER


ITP WITNESS POINTS Submitted
2.3/2.4/2.5 for material F316L

Inspection of Claded Line Pipe


as per approved ITP Items
Description:
● 6" x 9.53mm WT API 5L Gr.
Approved
X60 PSL-2 QS (with 3mm CRA
825 internally clad) - 2 lengths
of 3LPP Coated Pipes (POS
SL#2)

Inspection of Claded Line Pipe


as per approved ITP Items
Description:
● 6" x 9.53mm WT API 5L Gr.
Approved
X60 PSL-2 QS (with 3mm CRA
825 internally clad) - 2 lengths
of 3LPP Coated Pipes (POS
SL#2)

Inspection of Claded Line Pipe


as per approved ITP Items
Description:
● 6" x 9.53mm WT API 5L Gr.
Submitted
X60 PSL-2 QS (with 3mm CRA
825 internally clad) - 2 lengths
of 3LPP Coated Pipes (POS
SL#2)

Inspection of Claded Line Pipe


as per approved ITP Items
Description:
● 6" x 9.53mm WT API 5L Gr.
Approved
X60 PSL-2 QS (with 3mm CRA
825 internally clad) - 2 lengths
of 3LPP Coated Pipes (POS
SL#2)

Inspection of Claded Line Pipe


as per approved ITP Items
Description:
● 6" x 9.53mm WT API 5L Gr.
Approved
X60 PSL-2 QS (with 3mm CRA
825 internally clad) - 2 lengths
of 3LPP Coated Pipes (POS
SL#2)
MATERIAL INSPECTION OF
FASTENERS, DIMENSIONAL Approved
AND VISUAL

Inspection of CIS skid as per


Submitted
approved ITP
Inspection of CIS skid as per
Approved
approved ITP

Inspection of CIS skid as per


Approved
approved ITP

Inspection of CIS skid as per


Submitted
approved ITP

Inspection of CIS skid as per


Approved
approved ITP

Final Visual and Dimensional


Approved
checks

Final Visual and Dimensional


Approved
checks

1) 3 nos valves without Actuator


: NDT , PERFORMANCE ,
FET TESTING, FINAL
Approved
INSPECTION, PACKING,
DOCUMENTTAION.

As per ITP no. 11-99-97-3977,


activity no. 4 Final inspection:
Approved
Document Review.
Item no. 11.1, 11.2, 13.1

Final Visual and Dimensional


Approved
checks
Material Testing - Item No 4 to
Item No 8 - of ITP - BSIBV-ITP-
07-2 (PP)Production - Coating
& Lab Test - Item No 9 to Item
No 57 - of ITP - BSIBV-ITP-07-2
(PP)Load Out - Quality
Approved
Procedure for Receipt,
Dispatch, Stockpiling and
Handling (including Material
Coding, Marking, Traceability)
for SMLS Line Pipe Package
(Document no.11-99-90-3690)

You might also like