Working Hour Calculation: Target September WMT/MTH WMT/day Ore 221,676 7,151 Waste 95,767 3,192 Matmov 317,443 10,343
Working Hour Calculation: Target September WMT/MTH WMT/day Ore 221,676 7,151 Waste 95,767 3,192 Matmov 317,443 10,343
400
200
0
44470 44471 44472 44473 44474 44475 44476 44477 44478 44479 44480 44481 44482 44483 44484 44485 44486 44487 44488 44489 44490 44491 44492 44493 44494 44495 44496 44497 44498 44499 44500
Waste Ore
osa
5 44486 44487 44488 44489 44490 44491 44492 44493 44494 44495 44496 44497 44498 44499 44500
Working Hour Calculation Produktivity (WMT)
CT Jumlah Jarak Kapasitas
Unit (Menit) pengisian (Meter) (WMT) Job Efficiency
Planned Working Hour/Day 22.0 Hr Day Mth
Tanggal 1-17 Agustus
Change Shift (S) - PC 350 (2.3) 3.25 5 - 3.8 58% 202.49 2,571.62 77,148.50
Plan Unit Total Matmov
Meal and Rest (S) 2.00 PC 400 (2.7) 4.75 8 - 4.08 58% 238.01 3,022.68 90,680.48 Plan
Safety Talk (S) 0.30 DT 10 R 13.00 1,000 19 58% 50.62 642.90 19,287.13 Exca Komatsu PC 400/380
P2H (S) 0.20 ADT A40F 12.15 1,000 30 58% 85.52 1,086.13 32,583.84 PC 200/300 Selectif Ore
Transport (S) 1.30 DT 10 R 15.00 1,000 30 58% 69.27 879.76 26,392.91 PC 200
Hujan and Slippery (S) 4.00 DT 10 R Barg 25.00 20 58% 27.71 351.91 10,557.16 Volvo A40F
Repair (R) 1.00 DT 12 R Barg 30.00 40 58% 46.18 586.51 17,595.27 Quister/Volvo (19 Ton)
Cofee break (S) 0.50
Shift/day 2.00 Bulldozer
Day Work/Month 30.00
Month Work/Year 12.00 Tanggal 18-31 Agusutus
Effective WH/Day 12.70 Produksi Alat Produksi
Effective WH/Month 381.0 Target September WMT/Mth WMT/day Exca Loading DT 19 wmt DT 30 wmt ADT Selektif Exc ETO
Plan Unit Total Matmov
Mech. Availability (MA) 93% Ore 222,946 7,192 Plan
Phisical Availability (PA) 95% Waste 96,448 3,215 4 4 6 3 3 3
Use Of Availability. (UA) 60% Matmov 319,394 10,407 Exca Komatsu PC 400/380
Effective Utilization (EU) 58% PC 200/300 Selectif Ore
PC 200
Barging Alat Barging Volvo A40F
Target September WMT/Mth WMT/day exca Loading DT 20 wmt DT 40 wmt Trimming Quister/Volvo (19 Ton)
220,000 7,097 4 9 8 3 Bulldozer