WAAA AD 2.1 To AD 2.24 AIRAC AIP AMDT 110 04 NOV 21
WAAA AD 2.1 To AD 2.24 AIRAC AIP AMDT 110 04 NOV 21
WAAA AD 2.1 To AD 2.24 AIRAC AIP AMDT 110 04 NOV 21
Designation = Taxiway C
Width = 23 m
Surface = Asphalt
Strength = PCN 34/F/C/Y/U
Designation = Taxiway D
Width = 30 m
Surface = Asphalt
Strength = PCN 77/F/C/X/T
Designation = Taxiway E
Width = 23 m
Surface = Asphalt
Strength = PCN 77/F/C/X/T
Designation = Taxiway F
Width = 23 m
Surface = Asphalt
Strength = PCN 77/F/C/X/T
Designation = Taxiway G
Width = 30 m
Surface = Asphalt
Strength = PCN 77/F/C/X/T
Designation = Taxiway H
Width = 23 m
Surface = Asphalt
Strength = PCN 77/F/C/X/T
Designation = Taxiway I
Width = 23 m
Surface = Asphalt
Strength = PCN 77/F/C/X/T
Designation = Taxiway J
Width = 45 m
Surface = Asphalt
Strength = PCN 77/F/C/X/T
In Area 3
OBST ID/ OBST OBST Markings/Type,
ELEV/HGT Remarks
Designation type position colour
1 2 3 4 5 6
NIL NIL NIL NIL NIL NIL
THR elevation
and highest
elevation of Slope of SWY Dimensions CWY Strip Dimensions
TDZ of RWY-SWY (M) Dimensions (M) (M)
precision APP
RWY
6 7 8 9 10
1 THR 38 ft 0.032 % 102 x 45 400 x 300 3202 x 300
RWY Designator TORA (M) TODA (M) ASDA (M) LDA (M) Remarks
1 2 3 4 5 6
050335.3S
14 NIL NIL NIL
1193345.9E
1030 MHz (Tx)
1090 MHz (Rx). Operated as
SSR only Nav Aid for Sukhoi
(PRMG and RSBN) are
establish on PSN: Radio
Beacon Group (course bar)
050356.9S
15 81 ft NIL at VASI RWY 13, Height 3m;
1193315.6E
Radio Beacon Group (glide
slope) at Glide Slope RWY
31, Height 4m; RSBN (Radio
Short Range Navigation
System), east side engine
run up, height 1m;
051440.1S
16 NIL NIL NIL
1195357.1E
e. Police
1) Immediately heading to the crash site, the officer required to do take over the
overall coordination of positions on committees related to the emergency.
2) Where possible the officer to perform calculations on all those who were inside
the aircraft.
3) Keeping local events and exercise control over the incoming and outgoing crash
area.
f. Medical
1) Officers conducted checks for medical preparedness and ambulance and then
ordered to go to the meeting point or staging area.
2) Organize activities to collect victims, checking the victim and the evacuation of
the vehicle that has been set.
3) Overcoming first aid activities.
4) Make a list of the number of victims accurately including the full name and the
name of the hospital, the hotel in question.