Piramal Revanta - Tower 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

MAHA­RERA 

Application
General Information

Information Type Other Than Individual

Organization

Name PRL Developers Private Limited
Organization Type Company

Description For Other Type NA
Organization
Do you have any Past No
Experience ?

Address Details

Block Number 8th Floor Building Name Piramal Tower

Street Name Ganpatrao Kadam Marg Locality Lower Parel (W)

Land mark Peninsula Corporate Park State Maharashtra

Division Konkan District Mumbai City

Taluka Mumbai City Village Mumbai City

Pin Code 400013

Organization Contact Details

Office Number 02233514000

Website URL www.piramalrealty.com

Past Experience Details

Member Information

Member Name Designation Photo

Anand Vardhan Authorized Signatory  View Photo

Project

Project Name Piramal Revanta ­ Tower 1 Project Status On­Going Project

Proposed Date of 30/03/2022 Revised Proposed Date of 30/03/2022


Completion Completion

Litigations related to the No Project Type Residential


project ?

Are there any Co­Promoters No
(as defined by MahaRERA
Order) in the project ?

Plot Bearing No / CTS no / CTS No. 491 A/5 and 491 A/6 Boundaries East N 1123 E 960


Survey Number/Final Plot no.
Boundaries West N 1073 E 984 Boundaries North N 1103 E 983

Boundaries South N 1093 E 962 State Maharashtra

Division Konkan District Mumbai Suburban

Taluka Kurla Village Kurla

Pin Code 400080 Area(In sqmts) 945.45

Total Building Count 1

Sanctioned Buildings Count 1 Proposed But Not 0
Sanctioned Buildings Count

Aggregate area(In sqmts) of 0
recreational open space

FSI Details
Built­up­Area as per 26483.52 Built­up­Area as per 0
Proposed FSI (In sqmts) ( Approved FSI (In sqmts)
Proposed but not
sanctioned) ( As soon as
approved, should be
immediately updated in
Approved FSI)

TotalFSI 26483.52

Project Details

Name Proposed Booked WorkDone(In %)

Number of Garages ( In Numbers) 0 0 0

Covered Parking ( In Numbers) 499 82 0

Development Work

Common areas And Facilities, Amenities Available Percent Details

Internal Roads & Footpaths : YES 0 Work yet to be started

Water Supply : YES 0 Work yet to be started

Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Work yet to be started

Storm Water Drains : YES 0 Work yet to be started

Landscaping & Tree Planting : YES 0 Work yet to be started

Street Lighting : YES 0 Work yet to be started

Electrical Meter Room, Sub­Station, Receiving Station : YES 0 No receiving station with Tower 1 handover

Aggregate area of recreational Open Space : NO 0 NA

Open Parking : NO 0 NA

Community Buildings : YES 0 Club house

Treatment And Disposal Of Sewage And Sullage Water : YES 0 Work yet to be started

Solid Waste Management And Disposal : YES 0 Work yet to be started

Water Conservation, Rain water Harvesting : YES 0 Work yet to be started

Energy management : YES 0 Work yet to be started


Fire Protection And Fire Safety Requirements : YES 0 Work yet to be started

Club House : YES 0 Work yet to be started

swimming pool : YES 0 Work yet to be started

Kids Pool and Splash Pad : YES 0 Work yet to be started

Building Details

Sr.No. Project Name Number of Number Number Number of Slab Number Number of Number of
Name Basement's of of of Super of Stilts Open Closed
Plinth Podium's Structure Parking Parking

1 Piramal Tower 1 1 7 46 0 0 499


Revanta ­ 1
Tower 1

Sr.No. Apartment Type Carpet Area (in Sqmts) Number of Apartment Number of Booked Apartment

1 3 BHK Flat 5 Type 1 113.47 5 1

2 3 BHK Flat 5 Type 10 119.21 1 0

3 3 BHK Flat 5 Type 2 113.84 5 0

4 3 BHK Flat 5 Type 7 114.87 1 0

5 2 BHK Flat 6 Type 5 70.60 12 0

6 2 BHK Flat 6 Type 6 70.74 6 0

7 2 BHK Flat 6 Type 7 71.89 1 0

8 2 BHK Flat 6 Type 8 72.19 3 1

9 2 BHK Flat 6 Type 9 72.33 1 0

10 4 BHK Flat 8 Type 6 129.78 1 0

11 3 BHK Flat 8 Type 5 112.59 7 2

12 2 BHK Flat 4 Type 2 70.16 8 5

13 2 BHK Flat 7 Type 4 70.01 5 2

14 2 BHK Flat 7 Type 5 70.01 12 1

15 2 BHK Flat 6 Type 2 69.75 2 0

16 2 BHK Flat 6 Type 3 70.30 3 1

17 2 BHK Flat 6 Type 4 70.59 5 0

18 3 BHK Flat 5 Type 6 114.5 2 0

19 3 BHK Flat 8 Type 4 112.45 9 2

20 4 BHK Flat 8 Type 7 130.91 2 0

21 4 BHK Flat 8 Type 8 131.29 1 0

22 2.5BHK Flat 2 Type 4 90.32 1 0

23 2 BHK Flat 1 Type 3 77.12 10 2

24 2 BHK Flat 1 Type 4 77.46 11 0

25 1 BHK Flat 2 Type 1 41.71 4 3

26 1 BHK Flat 2 Type 2 42.04 20 9

27 1 BHK Flat 2 Type 3 42.68 8 4
28 1 BHK Flat 3 Type 1 41.71 4 3

29 1 BHK Flat 3 Type 2 42.04 20 14

30 1 BHK Flat 3 Type 3 42.68 8 5

31 2 BHK Flat 4 Type 1 69.86 5 2

32 3 BHK Flat 8 Type 3 112.24 6 3

33 6.5BHK Flat 5 Duplex 221.74 1 0

34 3 BHK Flat 5 Type 8 114.97 2 0

35 3.5BHK Flat 6 Type11 128.06 1 0

36 5.5BHK Flat 8 Duplex 212.67 1 0

37 4 BHK Flat 8 Type 9 131.72 1 0

38 2 BHK Flat 7 Type 1 70.21 1 0

39 2 BHK Flat 7 Type 2 69.72 2 0

40 2 BHK Flat 6 Type 1 71.73 1 0

41 2 BHK Flat 7 Type 7 70.47 1 0

42 2 BHK Flat 7 Type 8 70.78 3 1

43 2 BHK Flat 7 Type 3 69.69 3 0

44 3 BHK Flat 5 Type 9 115.1 1 0

45 3 BHK Flat 6 Type 10 123.65 2 0

46 7 BHK Flat 5 Duplex 256.69 1 0

47 2 BHK Flat 7 Type 9 70.94 1 0

48 3 BHK Flat 8 Type 1 111.65 7 1

49 4 BHK Flat 8 Type 10 131.87 2 1

50 3 BHK Flat 8 Type 2 112.03 5 1

51 2 BHK Flat 1 Type 1 76.33 5 1

52 3 BHK Flat 5 Type 3 113.85 5 0

53 3 BHK Flat 5 Type 4 113.95 7 1

54 3 BHK Flat 5 Type 5 114.07 6 0

55 2 BHK Flat 1 Type 2 76.76 8 1

56 2 BHK Flat 4 Type 3 70.78 10 1

57 2 BHK Flat 4 Type 4 71.30 10 0

58 2 BHK Flat 4 Type 5 69.66 1 0

59 2 BHK Flat 7 Type 6 70.17 6 0

Sr.No. Tasks / Activity Percentage of Work

1 Excavation 100

2 X number of Basement(s) and Plinth 60

3 X number of Podiums 0

4 Stilt Floor 0
5 X number of Slabs of Super Structure 0

6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0
Windows to each of the Flat/Premises

7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0

8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and 0
Lifts, Overhead and Underground Water Tanks.

9 The external plumbing and external plaster, elevation, completion of terraces with 0
waterproofing of the Building/Wing

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO 0
NOC, Electrical fittings to Common Areas, electro, mechanical equipment,
Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s,
plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and
all other requirements as may be required to Obtain Occupation /Completion
Certificate

Project Professional Information

Professional Name MahaRERA Certificate No. Professional Type

Eversendai Construction Pvt Ltd NA Contractor

Manoj Dubal & Associates NA Architect

Sandeep Shikre & Associates NA Architect

Buro Happold Engineering NA Structural Engineer

Buro Happold Engineering NA Other

Lerch Bates NA Other

SWA Group NA Other

Green Space Alliance NA Other

Wilson Associates NA Other

Sandeep Shikre & Associates NA Other

Systra MVA NA Other

RWDI NA Other

Kohn Pedersen Fox Associates NA Other

Litigations Details

No Records Found

Uploaded Documents

Document Name Uploaded
Document

Copy of the legal title report  View

Details of encumbrances  View

Copy of Layout Approval (in case of layout)  View

Proforma of the allotment letter and agreement for sale  View

Declaration in FORM B  View
Commencement Certificates  View

Building Plan Approval (IOD)  View

Building Plan Approval (IOD)  View

Building Plan Approval (IOD)  View

Building Plan Approval (IOD)  View

Other  View

Back

You might also like