01 Training Activity Matrix Updated...
01 Training Activity Matrix Updated...
Venue
Training Facilities/Tools Date &
Trainee (Workst Remarks
Activity and Equipment Time
ation/
Area)
Day 1
Prayer Laptop/PC June 30, Proceed to
Recap of 2019 the station
LCD Projector
Activities assigned
Wide Screen Session 8:00 AM to you.
Unfreezing
Speakers Hall of to
Activities All Trainees training 8:30 AM
Feedback Amplifier center
of Training Microphone
Rejoinder/
Motivation
Plan and 1. Bayos, PPE June 30, 1. Bayos,
Prepare OHS Jade Anti-static 2019 jade
and Monica wrist strap Monica
Procedure 2. Bombita, Goggles/ 1hour
Shaira glasses Since you
Meille Anti-static are the
3. Briones, mat first to
Rich Anti-static finish the
Alfred gloves Learning task and
4. Dinglasa, Equipment Resiurce completed
Catleah Laptop s Area you are
Mae Desktop required to
5. Domingo, Computer transfer to
Dwayne Keyboard next work
6. Llonardo, Mouse station.
John AVR / UPS
Philip LCD Projector 2. Bombita
7. Lumaad, Wide Screen , Shaira
Jeanne Speaker Meille
Amplifier Since you
Microphone are finish
and
Tools completed
Screwdriver the task
Brush given to
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
Wrenches you are
Special tools required to
Soldering transfer to
iron / gun next work
Flash light station
Magnifying
Glass 3. Briones,
Multi-meter/te Rich
ster Alfred
LAN tester
Since you
are finish
and
completed
the task
given to
you are
required to
transfer to
next work
station
4. Dinglasa
Catleah
Since you
are second
one to
finish and
completed
the task
given to you
are
required to
transfer to
next work
station
5. Doming
o,
Dwayne
Since you
are finish
and
completed
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
the task
given to you
are
required to
transfer to
next work
station
6. Llonard
o, John
Philip
Since you
are finish
and
completed
the task
given to
you are
required to
transfer to
next work
station
7. Lumaad
, Jeanne
Since you
are finish
and
completed
the task
given to
you are
required to
transfer to
next work
station
Tools, 1. Enrique, PPE Comput June 30, 1) Enriqu
Equipment Samantha Anti-static er 2019 e,
and devices 2. Favor, wrist strap Laborato Samant
Dan Goggles/ ry Area ha
Christoph glasses 10:00 AM
Anti-static
er to You are
mat
3. Franco, 12:00 completed
Anti-static
David gloves Noon this
4. Hufancia, Equipment activity
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
Hamuel Laptop you can
5. Labrador, Desktop proceed for
Nash Computer the next
AVR / UPS Learning
Keyboard outcome.
Mouse
Printer
Scanner observatio
Router ns on the
Switch Hub progress of
Modem each
Patch Panel trainee for
LCD Projector the day
Wide Screen will be
Speaker written
Amplifier here
Microphone
Tools
Screwdriver
Brush
Wrenches
Special tools
Soldering iron /
gun
Soldering Pump
Flash light
Magnifying
Glass
Multi-meter/
tester
LAN tester
Assemble / PPE Pratical June 30, observatio
Disassemble 1. Mejia, Anti-static Work 2019 ns on the
Computer Jade wrist strap Area progress of
Hardware Arrianne Goggles/ each
2. Milano, glasses 1:00 PM trainee for
Anti-static
Leo to the day
mat
Anthony 3:00 PM will be
Anti-static
3. Minor, gloves written
Dharid Equipment here
4. Panganib Laptop
an, Micah Desktop
Mae Computer
5. Regil, Monitor
Chloe AVR / UPS
Anne Keyboard
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
6. Dinglasa, Mouse
Catleah
Mae Tools
7. Domingo, Screwdriver
Dwayne Brush
Wrenches
Special tools
Flash light
Magnifying
Glass
Multi-meter/
tester
BIOS) Basic 1. Rozal, PPE June 30, observatio
Input Output Alissa Anti-static 2019 ns on the
System 2. Sanchez, wrist strap progress of
Configuratio Dirk Allen Goggles/ each
n 3. Sierda, glasses Practical trainee for
Anti-static Work
Guille 3:00 PM the day
mat
4. Tanay, Area to will be
Anti-static
Chris gloves 5:00 PM written
Paul Equipment here
5. Tino, Laptop
Julian Desktop
Raimon Computer
Keyboard
Mouse
AVR / UPS
Tools
Screwdriver
Brush
Wrenches
Special tools
Flash light
Facilities/ Venue
Date &
Training Activity Trainee Tools and Remarks
(Workstatio Time
Equipment
n/ Area)
Day 2
Prayer Laptop/PC July 1,
Recap of 2019
LCD
Activities
Projector
Unfreezing Proceed
Activities All Wide Session Hall 8:00 AM to the
Feedback of Trainees Screen of training to 8:30 work
Training Speakers center AM area.
Rejoinder/
Motivation Amplifier
Microphone
Create portable 1) Mejia, PPE Practical July 1, observati
Bootable Devices Jade Anti-static work Area 2019 ons on
Arriann wrist strap the
e Goggles/ progress
2) Milano, glasses 8:30 AM of each
Anti-static
Leo to trainee
mat
Anthon 9:30 AM for the
Anti-static
y gloves day will
3) Minor, Equipment be
Dharid Laptop written
4) Pangani Desktop here
ban, Computer
Micah Keyboard
Mae Mouse
5) Regil, DVD – Disk
Chloe AVR / UPS
Anne Tools
6) Dinglas Flash Drive
a, Screwdriver
Catleah Flash light
Mae
7) Doming
o,
Dwayne
Prepare Installer 8) Rozal, PPE Practical July 1, observati
and Install Alissa Anti-static work Area 2019 ons on
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
Opearating 9) Sanche wrist strap the
System z, Dirk Goggles/ progress
Allen glasses 9:30 AM of each
10) Sier Anti-static to trainee
mat
da, 12:00 for the
Anti-static
Guille Noon day will
gloves
11) Tan Equipment be
ay, Laptop written
Chris Desktop here
Paul Computer
12) Tin Keyboard
o, Mouse
Julian DVD – Disk
Raimon AVR / UPS
Tools
Flash Drive
Screwdriver
Flash light
Install computer 1) Bayos, PPE Practical July 1, observati
system Utility Jade Anti-static work Area 2019 ons on
software Monica wrist strap the
2) Bombit Goggles/ progress
a, glasses 1:00 PM of each
Anti-static
Shaira to trainee
mat
Meille 3:00 PM for the
Anti-static
3) Brione gloves day will
s, Rich Equipment be
Alfred Laptop written
4) Dingla Desktop here
sa, Computer
Catlea Keyboard
h Mae Mouse
5) Domin DVD – Disk
go, AVR / UPS
Dwayn Tools
e Flash Drive
6) Llonar Screwdriver
do, Flash light
John
Philip
7) Lumaa
d,
Jeanne
Installation 1) En PPE Practical July 1, observati
application rique, Anti-static work Area 2019 ons on
software Samant wrist strap the
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
ha Goggles/ progress
2) Fav glasses 3:00 PM of each
or, Dan Anti-static to trainee
Christop mat 5:00 PM for the
Anti-static
her day will
gloves
3) Fra be
Equipment
nco, written
Laptop
David here
Desktop
4) Huf
Computer
ancia,
Keyboard
Hamuel
Mouse
5) Lab
DVD – Disk
rador,
AVR / UPS
Nash
Tools
Flash Drive
Screwdriver
Flash light