0% found this document useful (0 votes)
32 views8 pages

01 Training Activity Matrix Updated...

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views8 pages

01 Training Activity Matrix Updated...

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

TRAINING ACTIVITY MATRIX

Computer System Servicing NC - II

Venue
Training Facilities/Tools Date &
Trainee (Workst Remarks
Activity and Equipment Time
ation/
Area)

Day 1
 Prayer  Laptop/PC June 30, Proceed to
 Recap of 2019 the station
 LCD Projector
Activities assigned
 Wide Screen Session 8:00 AM to you.
 Unfreezing
   Speakers Hall of to  
Activities All Trainees  training 8:30 AM  
 Feedback    Amplifier center      
of Training    Microphone    
 Rejoinder/    
Motivation
Plan and 1. Bayos, PPE June 30, 1. Bayos,
Prepare OHS Jade Anti-static 2019 jade
and Monica wrist strap Monica
Procedure 2. Bombita, Goggles/ 1hour
Shaira glasses Since you
Meille Anti-static are the
3. Briones, mat first to
Rich Anti-static finish the
Alfred gloves Learning task and
4. Dinglasa, Equipment Resiurce completed
Catleah  Laptop s Area you are
Mae  Desktop required to
5. Domingo, Computer transfer to
Dwayne  Keyboard next work
6. Llonardo,  Mouse station.
John  AVR / UPS
Philip  LCD Projector 2. Bombita
7. Lumaad,  Wide Screen , Shaira
Jeanne  Speaker Meille
   Amplifier   Since you
 Microphone are finish
and
Tools completed
 Screwdriver the task
 Brush given to
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
 Wrenches you are
 Special tools required to
 Soldering transfer to
iron / gun next work
 Flash light station
 Magnifying
Glass 3. Briones,
Multi-meter/te Rich
ster Alfred
 LAN tester
Since you
are finish
and
completed
the task
given to
you are
required to
transfer to
next work
station

4. Dinglasa
Catleah

Since you
are second
one to
finish and
completed
the task
given to you
are
required to
transfer to
next work
station

5. Doming
o,
Dwayne

Since you
are finish
and
completed
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
the task
given to you
are
required to
transfer to
next work
station

6. Llonard
o, John
Philip
Since you
are finish
and
completed
the task
given to
you are
required to
transfer to
next work
station

7. Lumaad
, Jeanne

Since you
are finish
and
completed
the task
given to
you are
required to
transfer to
next work
station
Tools, 1.  Enrique, PPE Comput June 30, 1) Enriqu
Equipment Samantha Anti-static er 2019 e,
and devices 2. Favor, wrist strap Laborato   Samant
Dan Goggles/ ry Area   ha
Christoph glasses 10:00 AM
Anti-static
er to You are
mat
3. Franco, 12:00 completed
Anti-static
David gloves Noon this
4. Hufancia, Equipment activity
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
Hamuel  Laptop you can
5. Labrador,  Desktop proceed for
Nash Computer the next
 AVR / UPS Learning
 Keyboard outcome.
 Mouse
 Printer
 Scanner observatio
 Router ns on the
 Switch Hub progress of
 Modem each
 Patch Panel trainee for
 LCD Projector the day
 Wide Screen will be
 Speaker written
 Amplifier here
 Microphone

Tools
 Screwdriver
 Brush
 Wrenches
 Special tools
 Soldering iron /
gun
 Soldering Pump
Flash light
Magnifying
Glass
Multi-meter/
tester
 LAN tester
Assemble /   PPE Pratical June 30, observatio
Disassemble 1. Mejia, Anti-static Work 2019 ns on the
Computer Jade wrist strap Area progress of
Hardware Arrianne Goggles/ each
2. Milano, glasses 1:00 PM trainee for
Anti-static
Leo to the day
mat
Anthony 3:00 PM will be
Anti-static
3. Minor, gloves written
Dharid Equipment here
4. Panganib  Laptop
an, Micah  Desktop
Mae Computer
5. Regil,  Monitor
Chloe  AVR / UPS
Anne  Keyboard
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
6. Dinglasa,  Mouse
Catleah
Mae Tools
7. Domingo,  Screwdriver
Dwayne  Brush
 Wrenches
 Special tools
Flash light
Magnifying
Glass
Multi-meter/
tester
BIOS) Basic 1.  Rozal, PPE June 30, observatio
Input Output Alissa Anti-static 2019 ns on the
System 2. Sanchez, wrist strap progress of
Configuratio Dirk Allen Goggles/ each
n 3. Sierda, glasses Practical trainee for
Anti-static Work
Guille 3:00 PM the day
mat
4. Tanay, Area to will be
Anti-static
Chris gloves 5:00 PM written
Paul Equipment here
5. Tino,  Laptop
Julian  Desktop
Raimon Computer
 Keyboard
 Mouse
 AVR / UPS
Tools
 Screwdriver
 Brush
 Wrenches
 Special tools
Flash light

Date Developed: Document No.


Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
TRAINING ACTIVITY MATRIX
Computer System Servicing NC - II

Facilities/ Venue
Date &
Training Activity Trainee Tools and Remarks
(Workstatio Time
Equipment
n/ Area)

Day 2
 Prayer    Laptop/PC   July 1,  
 Recap of 2019  
 LCD
Activities  
Projector
 Unfreezing    Proceed
Activities All  Wide Session Hall 8:00 AM to the
 Feedback of Trainees  Screen of training to 8:30 work
Training    Speakers center   AM area.
 Rejoinder/        
Motivation    Amplifier    
 
 Microphone
Create portable 1)  Mejia, PPE Practical July 1, observati
Bootable Devices Jade Anti-static work Area 2019 ons on
Arriann wrist strap the
e Goggles/ progress
2) Milano, glasses 8:30 AM of each
Anti-static
Leo to trainee
mat
Anthon 9:30 AM for the
Anti-static
y gloves day will
3) Minor, Equipment be
Dharid  Laptop written
4) Pangani  Desktop here
ban, Computer
Micah  Keyboard
Mae  Mouse
5) Regil,  DVD – Disk
Chloe  AVR / UPS
Anne Tools
6) Dinglas  Flash Drive
a,  Screwdriver
Catleah Flash light
Mae
7) Doming
o,
Dwayne
Prepare Installer 8)   Rozal, PPE Practical July 1, observati
and Install Alissa Anti-static work Area 2019 ons on
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
Opearating 9) Sanche wrist strap   the
System z, Dirk Goggles/   progress
  Allen glasses 9:30 AM of each
10) Sier Anti-static to trainee
mat
da, 12:00 for the
Anti-static
Guille Noon day will
gloves
11) Tan Equipment   be
ay,  Laptop written
Chris  Desktop here
Paul Computer
12) Tin  Keyboard
o,  Mouse
Julian  DVD – Disk
Raimon  AVR / UPS
Tools
 Flash Drive
 Screwdriver
Flash light
Install computer 1)  Bayos, PPE Practical July 1, observati
system Utility Jade Anti-static work Area 2019 ons on
software Monica wrist strap the
2) Bombit Goggles/ progress
a, glasses 1:00 PM of each
Anti-static
Shaira to trainee
mat
Meille 3:00 PM for the
Anti-static
3) Brione gloves day will
s, Rich Equipment be
Alfred  Laptop written
4) Dingla  Desktop here
sa, Computer
Catlea  Keyboard
h Mae  Mouse
5) Domin  DVD – Disk
go,  AVR / UPS
Dwayn Tools
e  Flash Drive
6) Llonar  Screwdriver
do, Flash light
John
Philip
7) Lumaa
d,
Jeanne
Installation 1)   En PPE Practical  July 1, observati
application rique, Anti-static work Area 2019 ons on
software Samant wrist strap the
Date Developed: Document No.
Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution
ha Goggles/ progress
2) Fav glasses 3:00 PM of each
or, Dan Anti-static to trainee
Christop mat 5:00 PM for the
Anti-static
her day will
gloves
3) Fra be
Equipment
nco, written
 Laptop
David here
 Desktop
4) Huf
Computer
ancia,
 Keyboard
Hamuel
 Mouse
5) Lab
 DVD – Disk
rador,
 AVR / UPS
Nash
Tools
 Flash Drive
 Screwdriver
Flash light

Date Developed: Document No.


Issued by:
Trainers Date Revised:
Logo of Qualification Page __ of __
Institution and Developed by:
Institution
Name of (Your Name)
Revision # 01
Institution

You might also like