To Floorfinish, KN/M: Specified Floor
To Floorfinish, KN/M: Specified Floor
Solution
Assuming each beam to be 300 wide, the clear spacing between
mm
beams is equal to (14.5 -0.3 x 3)/4=3.4 m. Each slab panel (with clear
spans 3.4 mx 8.0 m) has an L/B ratio greater than 2.0, and hence may
be treated as one-way (continuous) [refer Section 1.5.1].
mm,/= 3400 mm (clear span) for the interior span- as per CI. 22.2(b)
of Code.
For the endspan, I = 3400 + d/2 3400 + 125/2 3463 mm
modification factor k, corresponding to p, = 0.4 and f = 240 N/mm* [refer Section 5.4.2].
Distributed load due to self-weight
0.16 4.0 kN/m?
Aw25 kN/m* x
=
WuLL
sections
Factored Moments at critical loaded and more than three in
As the spans are equal, uniformly
almost
moment coeficients [Table 12 of
analysis using
number, the simplified
Code] can be applied [Fig. 5.4(b)]
For end span (/ 3.463 m),
=
at end support
wM.DL+Wu,LL |12=-7.12 kNm/m
24
M= uDL4
16
"u,lL |2==+11.74 kNm/m
12
at midspan
190 mm.
1000 x 50.3
Alternatively, for 8 obars (4,= 50.3 mm2), spacing reqd. =
= 122 mm
413
[Note: maximum spacing allowed 3x 125 375 mm (> 300mm)].
.For convenience, the results for all (A).. at the various sections are
tabulated in Table 5.5, after performing appropriate calculations (as
shown for M, =
17.6 kNm/m). The Table also shows the details of
the actual steel provided (assuming the arrangement of bars shown in
Fig. 5.5(a)).
Distribution bars: (A).=0.0012bD
st min =192 mm/m. Provide 8 mm o@
250c/c
continuous slab
Table 5.5 Calculation of A. at critical locations ofa one-way
system-Example 5.3
0.0012x x
0.00126D =
4 min
mm/m)
= p =100
P x
189.6 N/mm2
k =1.76 [Table 5.2]
1.76 x (20+ 26)/2
=
40.4
(l/d) max
=