Maximize, Z 300x1 + 500x2
Maximize, Z 300x1 + 500x2
x1, x2>=0
Decision Variable,
c1 c2
obj. fn. Coeff 300 500 Range of optimality
Model
X1 X2
Decision Variable - 700.00 Optimal Solution
LHS RHS
Constrain1 5,600 <= 5600 7X1+8X2<=5600 B6*$B$16+C6*$C$16
Constrain2 10,500 <= 18000 12X1+15X2<=18000B7*$B$16+C7*$C$16
o through the painting shop and assembly shop. If the painting shop were
e painted; if the painting shop were completely devoted to painting Type 2
mpletely devoted to assembling truck 1 engines, then 1,500 per day could be
truck 2 engines, then 1,200 per day could be assembled. Each Type 1 truck
te an LP that will maximize Truckco’s profit.
300X1+500X2
st
7X1+8X2<=5600
12X1+15X2<=18000
X1, X2≥ 0
B6*$B$16+C6*$C$16
B7*$B$16+C7*$C$16