Cimec Technologies Private Limited: Shree Vinayak Concrete Solution
Cimec Technologies Private Limited: Shree Vinayak Concrete Solution
Cimec Technologies Private Limited: Shree Vinayak Concrete Solution
CIN : U29100GJ2011PTC064482
Regd. Office & Lab 23 / H Meldi Estate, Nr. Gota Railway Crossing, Gota,
ACCREDITED Ahmedabad - 382481, Gujarat P +91 2717 241209 E [email protected]
ISO 9001 : 2015 Cerlillcd Company Technical Queries +91 99250 28369 Customer Care +91 75679 55968 www.cimec.in
To,
Mr. Ravindra Gajjar
SHREE VINAYAK CONCRETE SOLUTION
Survey No. 165/3, FP No. 668, Wagjipura Road
Ahmedabad-Rajkot Highway, Vill. Navapura,
Ahmedabad, Gujarat.
Dear Sir,
With Reference to above subject, we are enclosing herewith our quotation vide ANNEXURE-I for your ready reference along
with Terms & Condition.
Should you need any further information/ clarifications, please feel free to revert. We look forward to receive your valued orders
and assure you of our best co-operation and services.
Thanks Is
$
| I---
A. K. DA' 7
Director (crSaffty)
CIMEC TECHNOLOGIES PVT. LTD.
23/H Meldi Estate, Nr. Gota Railway Crossing
Gota, Ahmedabad-382481, Gujarat
Contact: +91-99250-28369, 02717-241209
Web: www.cimec.in
E-mail: [email protected]
Su Accepted By
CIMEC Technologies Pvt. Ltd. SHREE VINAYAK CONCRETE SOLUTION.
QTN/21-22/0427
Page 1 of 3
ANNEXURE-I
Note: Minimum work value charges are applicable per day in each site visit as below
3. SITE CONDITION: Site shall be workable approachable & free from any dispute. Written confirmation that access
permission has been given by the relevant Government Departments, statutory authorities, maintenance parties,
owners and/or occupiers to enter the site and to carry out the works must be provided in writing. Work execution at
this particular location is subject to site clearance or shifting of given location to nearby accessible point.
4. A meeting should be held jointly between the representatives from Clients CIMEC to assess the site conditions,
confirmation of locations of the investigation will be done by measurement by tape any survey demarcation of points
will be charged extra.
5. The rates quoted above are valid for total of 8 working hours (excluding travel time) per day. Additional working hours
shall be charged separately as per rates mentioned.
6. ISSUE OF WORKS ORDERS/SERVICES ORDERS: A draft copy of WO/SO shall be discussed with CIMEC before
finalization. Confirm work order shall be required as your confirmation of OFS and further processing of mobilization
and carrying out Test in accordance with Work Order.
7. INSTRUCTIONS UNDER THE CONTRACT: All instructions to the term/service contractors should be made in
writing. No verbal instructions from the client/consultant on even minor variations in the specification of works as
^QLOG/,
Accepted By
CIMEC Tec SHREE VINAYAK CONCRETE SOLUTION.
QTN/21-22/0427
Page 2 of 3
above unless the instructions are confirmed in Written. For major variations to the works/service, i.e. those that
significantly increase or decrease the value of a WO/SO, the ER/IO must always be consulted.
8. SUBMISSION OF PRELIMINARY RECORDS AND FINAL REPORTS: Reports forwarded to Client shall be reviewed
within seven working days of receipt of each set of records/report. If there is no comment, within the prescribed
period. It would assume that there is no comment.
9. TAXES: GST will be charged extra upon the quoted rates as per Govt. Norms. Any exemption in GST will have to be
provided in writing along copy of exemption certificate.
10. IDLE CHARGES: Idling shall be charged (Mobilization + minimum testing charges per day as per clause 11) in
case testing team returns without test due to reasons associated to site clearance or non-availability of site
person.
11. MINIMUM WORK VALUE: Minimum work value per day each site visit shall be charged as under:
Within the Municipal Limits of Rs. 7,500/- or Actual value of tests/locations/ points/ cores
Ahmedabad whichever is higher
12. PAYMENT TERMS: Bill shall be raised after completion of field work and Payment of entire bill shall be made against
before issuance of report. Report shall be issued only after the payment.
PAN NO AAECC3401C
GSTIN 24AAECC3401C1ZJ
Bank Name HDFC BANK LIMITED
Branch Name NARANPURA
Bank Address 1 DIVYA SADBHAV- GROUND FLOOR, 6 DIPAK COLONY
Bank Address 2 MIRAMBIKA RD, AHMEDABAD - 380013
Acc Type CASH CREDIT ACCOUNT
Acc Number 50200061868800
IFSC/NEFT Code HDFC0000383
MICR Code 380240012
SWIFT Code HDFCINBBXXX
13. QUOTATION VALIDITY: The Quotation is valid for 60 days from the date of Issuance.
14. PROJECT COMPLETION CERTIFICATE: Project Completion certificate must be provided by client upon submission
of draft report.
15. Any/All disputes subjected to AHMEDABAD jurisdiction only.
Accepted By
CIMEC Tech SHREE VINAYAK CONCRETE SOLUTION.
QTN/21-22/0427
Page 3 of 3