HAMAD BIN KHALIFA MEDICAL CITY CONSTRUCTION PACKAGE CP-300B


HOSPITAL FIT OUT PROJECT

RISK ASSESSMENT FORM


Task: offloading of AHU Date of assessment: 20/01/2013 Page: 1/4 Reference No. HSE/RA/AAC/061
Items that are considered to be Medium and High Risks shall be controlled by plans to eliminate or reduce the impact
QD - Quality in Design, QC - Quality in Construction, E-Environment, S-Safety

Risk Rating

Risk Rating
Probability
Probability
QD,QC,E,S

Severity

Severity
L/M/H

L/M/H
WHO/WHAT MAY BE
Activity HAZARD CONTROLS
EXPOSED

S  Drivers shall have valid driving license.


1. Mobilization of AHU’s Material Transport in Pedestrians QD  Drivers and other newcomers shall complete site
QC
to site in Truck Trailer. public movement areas. Banks man safety Induction.
 Crush General Work force 3 3 9 H  A competent banks man wearing fluorescent 2 1 2 L
 Collision Visitors jacket shall be deployed.
Improper stacking of Driver  Use appropriate capacity vehicle as per the load .
Load  Vehicle condition is to be good/proper
 Falling objects, maintenance.
 Damage to property  Reversing Horn /Alarm must be in place and in
and equipment working order.
Environmental Hazards  Drive observing all traffic rules, speed limits, road
 Vehicle Fuel Spillage signs.
 Proper parking and surveillance to drivers to be
arranged..
 AHU’s to be securely stacked in vehicles to avoid
material falling.
 Care should be taken while offloading and storing
to avoid damage.

2.Use of Hand tools  Pinch points Supervisor S 2 2 4 M  Access and egress shall be kept free of 2 1 2 L
Technicians obstruction.
 sharp edges Store Helpers  Barricade to be provided and signs posted against
HDEC-HSE-F004.Risk Assessment Form 1|Page4
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
HAMAD BIN KHALIFA MEDICAL CITY CONSTRUCTION PACKAGE CP-300B
HOSPITAL FIT OUT PROJECT

falling materials.
 Damaged tools  Observe correct manual material handling
technique.
 Ergonomic hazard  Use right tools for the job.
 Tools shall be maintained in good condition
 Defective tools shall not be used
 Hand to be away to avoid pinch point.
 Hacksaw blade shall be use with appropriate
frame and work bench shall be used for hacksaw
operation.
 Keep tools in boxes or racks when not in use.
 Use PPEs including appropriate gloves & glass
while using hand tools.
2. Use of Fork Lift Trucks&  The forklift truck  Supervisor S 3 2 6 H  Relevant PTW system is to be in place. 2 1 2 L
Fabricated cart trolley for crashing into other  Technician QD  Tool Box Talk must be conducted relevant to
QC
offloading AHU’s from vehicles and/or other  Helpers activity
Truck Trailer. objects;  Banks man  Forklift and fabricated cart trolley condition is to be
 Forklift mechanical  General good/ proper maintenance.
failure Workforce  Reversing Horn /Alarm shall be in place and in
 Employees being hit
by lift trucks; working order.
 AHU ‘s falling from lift  Only competent & certified drivers may operate lift
trucks trucks.
 Lift truck tipping over.  Ensure 3rd Party certificate for Fork lift and Lifting
 Incompetent gears.
Operatives  Ensure the insurance coverage for the Fork lift.
 Lack of  Operators should be instructed to keep keys with
supervision ,planning them at all times.
& communication  Check the lifting gears for its SWL
 Gangways and aisles of sufficient space to enable
lift load and unload safely.
 Assign certified riggers for rigging.
 Ensure pre-use inspection is done with check list.
 Assign trained Banks man to control vehicle
movement
HDEC-HSE-F004.Risk Assessment Form 2|Page4
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
HAMAD BIN KHALIFA MEDICAL CITY CONSTRUCTION PACKAGE CP-300B
HOSPITAL FIT OUT PROJECT

 Over loading in any form shall not be allowed.


 No personnel shall work or stand under suspended
load
 Fuel refilling operation must be at designated
area.
 Forklift should not be left unattended while in
operation.
 System in place to keep forklift and pedestrians
separated, where practicable. .
 Floor condition is maintained on a regular basis,
housekeeping
 Take a trial lift by inching the load off the ground
before hosting any further.
 Standards are to be maintained.
 Warning signs posted where required.
 Trucks have seat belts and used by operator
 Ensure truck drivers check trucks each day before
starting.
 Separate pedestrian access is to be provided
where applicable.
 Close supervision to be ensured during offloading
and mobilizing AHU’s.
4.Use of heavy duty  Personnel falling from  Supervisor S 3 2 6 H 2 1 2 L
 Inspect the working platform before commencing
working platform for height.  Technician
offloading AHU’s from  Helpers the task and in regular interval.
truck trailer  Falling of AHU’s on
 Proper barricade and signages shall be posted in
personnel working
the work location in order to avoid unauthorized
near by working
personnel entry.
platform.
 Working Platform  Personnel shall stand/and work only in safe area
collapse of working platform.
 Improper handling
 Personnel shall keep distance form AHU’s while

HDEC-HSE-F004.Risk Assessment Form 3|Page4


HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
HAMAD BIN KHALIFA MEDICAL CITY CONSTRUCTION PACKAGE CP-300B
HOSPITAL FIT OUT PROJECT

 Over loading,
mobilizing through the heavy duty working
platform.

 Proper stopper/wedge must be placed in the


platform to avoid over reaching/falling of AHU’S
from the working platform.

 Don’t over load the working platforms, Load by


comply with the SWL.

 Proper access and egress must be maintained


always.
 Access shall be maintained free of materials
(Require Control Measures)1-2:Low 3-4:Medium 5-9:High
Prepared By : Swami Charan       Signature         Date :              
Position : Site HSE Manager -AAC                                      
Approved By : Nizam Meerasahib       Signature         Date :              
Position : HSE Manager - HDEC                                      