Hyundai Engineering & Construction Co., Ltd. Hamad Bin Khalifa Medical City Construction Package Cp-300B Hospital Fit Out Project
Hyundai Engineering & Construction Co., Ltd. Hamad Bin Khalifa Medical City Construction Package Cp-300B Hospital Fit Out Project
Hyundai Engineering & Construction Co., Ltd. Hamad Bin Khalifa Medical City Construction Package Cp-300B Hospital Fit Out Project
Risk Rating
Risk Rating
Probability
Probability
QD,QC,E,S
Severity
Severity
L/M/H
L/M/H
WHO/WHAT MAY BE
Activity HAZARD CONTROLS
EXPOSED
2.Use of Hand tools Pinch points Supervisor S 2 2 4 M Access and egress shall be kept free of 2 1 2 L
Technicians obstruction.
sharp edges Store Helpers Barricade to be provided and signs posted against
HDEC-HSE-F004.Risk Assessment Form 1|Page4
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
HAMAD BIN KHALIFA MEDICAL CITY CONSTRUCTION PACKAGE CP-300B
HOSPITAL FIT OUT PROJECT
falling materials.
Damaged tools Observe correct manual material handling
technique.
Ergonomic hazard Use right tools for the job.
Tools shall be maintained in good condition
Defective tools shall not be used
Hand to be away to avoid pinch point.
Hacksaw blade shall be use with appropriate
frame and work bench shall be used for hacksaw
operation.
Keep tools in boxes or racks when not in use.
Use PPEs including appropriate gloves & glass
while using hand tools.
2. Use of Fork Lift Trucks& The forklift truck Supervisor S 3 2 6 H Relevant PTW system is to be in place. 2 1 2 L
Fabricated cart trolley for crashing into other Technician QD Tool Box Talk must be conducted relevant to
QC
offloading AHU’s from vehicles and/or other Helpers activity
Truck Trailer. objects; Banks man Forklift and fabricated cart trolley condition is to be
Forklift mechanical General good/ proper maintenance.
failure Workforce Reversing Horn /Alarm shall be in place and in
Employees being hit
by lift trucks; working order.
AHU ‘s falling from lift Only competent & certified drivers may operate lift
trucks trucks.
Lift truck tipping over. Ensure 3rd Party certificate for Fork lift and Lifting
Incompetent gears.
Operatives Ensure the insurance coverage for the Fork lift.
Lack of Operators should be instructed to keep keys with
supervision ,planning them at all times.
& communication Check the lifting gears for its SWL
Gangways and aisles of sufficient space to enable
lift load and unload safely.
Assign certified riggers for rigging.
Ensure pre-use inspection is done with check list.
Assign trained Banks man to control vehicle
movement
HDEC-HSE-F004.Risk Assessment Form 2|Page4
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
HAMAD BIN KHALIFA MEDICAL CITY CONSTRUCTION PACKAGE CP-300B
HOSPITAL FIT OUT PROJECT
Over loading,
mobilizing through the heavy duty working
platform.