8th Sem Final Report Format

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 12

Internship/UDP Project Title

An Internship/A Project (UDP) Report

Submitted By
Student’s Name (Enrollment Number)

Under Subject of

Internship/Project
(3180701)
B.E. - IV, Semester - VIII

(Department of Computer Engineering)

SILVER OAK COLLEGE OF ENGINEERING AND TECHNOLOGY


Opp. Bhagwat Vidyapith, Near Gota Cross Road, Ahmedabad- 382481
PMMS Completion Certificate
Silver Oak College of Engineering & Technology
Department of Computer Engineering
2021 - 2022

CERTIFICATE

This is to certify that the project entitled “XYZ” has been carried out by “Student’s Name
(Enrollment No)” under my guidance in fulfillment of the Internship/Project (3180701) Subject
of Bachelor of Engineering in Computer Engineering– 8th Semester of Gujarat Technological
University, Ahmedabad during the academic year 2021- 2022.

Name of Guide Head of Department


A/Prof. Dr. Satvik Khara
(Computer Engineering) (Computer Engineering)
Candidate’s Declaration

I hereby declare that the Summer Internship report titled “XYZ” submitted towards the
completion of Internship/Project in 8th semester of Bachelor of Computer Engineering in Silver
Oak College of Engineering & Technology, Ahmedabad is an authenticate record of mine
work carried out.

I further declare that to the best of my knowledge the report of C.E. 8th semester.

Candidate’s Name :

Branch :

Enrollment Number :

Candidate’s Signature :

Candidate’s Name :

Branch :

Enrollment Number :

Candidate’s Signature :

Submitted to:

Silver Oak College of Engineering & Technology, Ahmedabad

Affiliated to:

Gujarat Technological University


Abstract
Acknowledgment
Annexure-I (Scanned copy of each week with guide signature-
Minimum 12 Scanned copies)
Annexure-II (Applicable only in Internship Scanned copy of each
week with guide signature)
Industry Certificate (Applicable only for internship/IDP)
TABLE OF CONTENT
Title Page No.
Title Page i
PMMS Completion Certificate of each candidate certificate ii
Candidate’s Declaration iii
Abstract iv
Acknowledgment v
Annexure-I (Scanned copy of each week with guide signature- vi
Minimum 12 Scanned copies)
Annexure-II (Applicable only in IDP/Internship Scanned copy of vii-xix
each week with guide signature)
Industry Certificate (Applicable only for internship/IDP) xx-xxx
Table of Content xxxi
List of Figures xxxii
List of Tables xxxiii
1. Introduction 1
1.1 Project Summary 2
1.2 Project Scope 3
1.3 Objective 4
1.4 Literature Review/Background Study 5

2. Software Project Management 6


2.1 Project Planning And 7
Scheduling
2.1.1 Project Planning 7
2.1.2 Project Scheduling 7
2.2 Project Development Approach 8
2.3 Project Plan 9
2.3.1 Milestone And Deliverables 9
2.3.2 Roles And Responsibilities 9
2.3.3 Gantt Chart 10
2.3.4 Cost Estimation 11

3. System Requirement Study 12


3.1 User Characteristics 13
3.2 Hardware And Software Characteristics 13
3.3 Constraints 14
3.3.1 Regularities Policy 14
3.3.2 Hardware Limitation 14

4. System Analysis 15
4.1 Study Of Current System And Requirement Of This System 16
4.2 Operational Feasibility 17
4.3 Technical Feasibility 17
4.3.1 Functional Requirement 17
4.3.2 Non-Functional Requirement 17
4.4 Schedule Feasibility 18
4.5 Economic Feasibility 18
4.6 Function Of The System 19
4.7 Use Case 20
4.8 Activity Diagram 21
4.9 Sequence Diagram 22
4.10 Data Modeling 23
4.11 E-R Diagram 24
4.12 Class Diagram 25
4.13 Data Dictionary 26
4.14 Modules And Their Description Of System 27

5. System Design 28
5.1 Database Design/Database Structure Design 29
5.2 System Procedural Design 30
5.2.1 Design Pseudocode Or 30
Algorithm For Method Or Operation
5.2.2 Flow Chart Diagram 31
5.3 Data Modeling 32
5.3.1 State Transition Diagrams 32

6. Implementation Planning And Details 33


6.1 Technologies & Implementation Environment 34
6.2 Program / Modules Specification 35
6.3 Security Features 36
6.4 Coding Standards 37
6.5 Coding Screenshots 38

7. Testing 39
7.1 Testing Plan 40
7.2 Testing Strategy 41
7.3 Testing Methods 42
7.4 Test Cases 43

8. Screenshots 44
8.1 Frontend/Client/End User Side Screenshots 45
8.2 Backend/Admin Side Screenshots 50
8.3 Other Screenshots 55

9. Conclusion And Future Work 57

PLAGIARISM CERTIFICATE (Minimum 85% unique) 58


REFERENCES 59

You might also like