ANNEX III-Site Components Drawings Set

Download as pdf or txt
Download as pdf or txt
You are on page 1of 96

JENIN CORRECTIONAL FACILITY

(JCF)
PACKAGE TOW WORKS

SITE COMPONENTS DRAWINGS SET

Beneficiary: Client: Supported & Funded by: Design & Implementation:

PALESTINIAN CIVIL POLICE PALESTINIAN NATIONAL AUTHORITY THIS PROJECT IS FUNDED BY UNOPS , JMPC
CORRECTIONS AND REFORM CENTERS MINISTRY OF INTERIOR THE EUROPEAN UNION Alami Building, Near Rosary School
Beit Hanina, Jerusalem
DEPARTMENT (MOI)
(CRCD)
FO
R
TE
NDE
R
ON
LY
ARCHITECTURAL DRAWINGS LIST JCF-SITE COMPONENTS-STR-ELEC&TRANS ROOM MECHANICAL DRAWINGS LIST ELECTRICAL DRAWINGS LIST

Drawing No. Drawing Name "Scale STRUCTURAL DRAWINGS LIST Drawing No. Drawing Name "Scale Drawing No. Drawing Name "Scale
" Date Revision 20/3/2014 " Date Revision 20/3/2014 " Date Revision 20/3/2014
GE CS 000 COVER - 20/3/2014 00 Drawing No. Drawing Name "Scale ME DR 01-01 ELECTRICAL ROOM -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL 01 ELECTRICAL ROOM 1:100 20/3/2014 00
GE DL 0001 LIST OF DRAWINGS - 20/3/2014 00 " Date Revision 20/3/2014 ME DR 01-01 GATE - 1GROUND FLOOR -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL 02 ELECTRICAL ROOM 1:100 20/3/2014 00
AR GN 0100 ARCHITECTURAL GENERAL NOTES -SHEET 1 - 20/3/2014 00 STR STR 000 GENERAL NOTES AND DETAILS N.T.S 20/3/2014 00 GATE - 1ROOF TOP FLOOR -DRAINAGE SYSTEM EL LV 03 GATE - 1CCTV &ACS 1:100 20/3/2014 00
ME DR 01-02 1:100 20/3/2014 00
LAYOUT
AR GN 0101 ARCHITECTURAL GENERAL NOTES -SHEET 2 - 20/3/2014 00 STR STR 001 GENERAL DETAILS N.T.S 20/3/2014 00 GATE - 2GROUND FLOOR -DRAINAGE SYSTEM EL L 04 GATE - 1LIGHTING SYSTEM 1:100 20/3/2014 00
ME DR 01-03 1:100 20/3/2014 00
AR GN 0102 ARCHITECTURAL GENERAL NOTES -SHEET 3 - 20/3/2014 00 STR STR 002 GENERAL DETAILS N.T.S 20/3/2014 00 LAYOUT EL FA 05 GATE - 1FIRE ALARM 1:100 20/3/2014 00
GATE - 2ROOF TOP FLOOR -DRAINAGE SYSTEM
AR GL 100 GATE - 1GROUND FLOOR PLAN 1:100 20/3/2014 00 COLUMN LAYOUT &DETAILS+S.O.G+FOUNDATION ME DR 01-04 1:100 20/3/2014 00 EL PDS 06 GATE - 1POWER &DATA SYSTEMS 1:100 20/3/2014 00
STR STR 120 1/100 20/3/2014 00 LAYOUT
LAYOUT
AR GL 101 GATE - 2GROUND FLOOR PLAN 1:100 20/3/2014 00 ME DW 02-01 GATE - 1GROUND FLOOR -WATER SYSTEM LAYOUT 1:100 20/3/2014 00 EL P 07 GATE - 1POWER FOR MECHANICAL 1:100 20/3/2014 00
STR STR 131 S.O.G DETAILS&FOUNDATION DETAILS 1/25 20/3/2014 00
AR GL 200 GATE - 1ROOF TOP FLOOR PLAN 1:100 20/3/2014 00 ME DW 02-02 GATE - 2GROUND FLOOR -WATER SYSTEM LAYOUT 1:100 20/3/2014 00 EL L 08 GATE - 2LIGHTING SYSTEM 1:100 20/3/2014 00
STR STR 140 SLAB LAYOUT &DETAILS 1/100 20-3-2014 00
AR GL 201 GATE - 2ROOF TOP FLOOR PLAN 1:100 20/3/2014 00 ME AC 03-01 GATE - 1GROUND FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL FA 09 GATE - 2POWER &DATA SYSTEMS 1:100 20/3/2014 00
COLUMN LAYOUT &DETAILS (Plant Room) 00
AR LV 100 GATE - 1ELEVATIONS 1:100 20/3/2014 00 ME AC 03-02 GATE - 1ROOF TOP FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL LV 10 GATE - 2CCTV &ACS 1:100 20/3/2014 00
AR LV 101 GATE - 2ELEVATIONS 1:100 20/3/2014 00 ME AC 03-03 GATE - 2GROUND FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL FA 11 GATE - 2FIRE ALARM 1:100 20/3/2014 00
AR SE 100 GATE - 1SECTIONS 1:100 20/3/2014 00 JCF-SITE COMPONENTS -STR-PLANT ROOM EL PDS 12 GATE - 2POWER FOR MECHANICAL 1:100 20/3/2014 00
ME AC 03-04 GATE - 2ROOF TOP FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00
AR SE 101 GATE - 2SECTIONS 1:100 20/3/2014 00 ME DR 01-01 SURVEILLANCE TOWER -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL PU 13 SURVEILLANCE TOWER -POWER &UPS 1:100 20/3/2014 00
AR WL 100 GATES -SCHEDULE OF DOORS &WINDOWS 1:50 20/3/2014 00 STRUCTURAL DRAWINGS LIST ME DW 02-01 SURVEILLANCE TOWER -WATER SYSTEM LAYOUT 1:100 20/3/2014 00 EL DS 14 SURVEILLANCE TOWER -DATA &CCTV 1:100 20/3/2014 00
AR GL 300 SURVEILLANCE TOWER -PLANS 1:100 20/3/2014 00 20/3/2014 ME AC 03-01 SURVEILLANCE TOWER -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL L 15 SURVEILLANCE TOWER -LIGHTING 1:100 20/3/2014 00
AR LV 200 SURVEILLANCE TOWER -ELEVATIONS &SECTIONS 1:100 20/3/2014 00 STR STR 120 COLUMN LAYOUT &DETAILS 1/100 20/3/2014 00 ME DR 01-01 TRANSFORMER ROOM -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL 16 TRANSFORMER ROOM 1:100 20/3/2014 00
SURVEILLANCE TOWER -SCHEDULE OF DOORS & PLANT ROOM -GROUND FLOOR -DRAINAGE SYSTEM EL PL 17 PLANT ROOM &WATER TANK -EARTHING SYSTEM 1:100 20/3/2014 00
AR WL 200 1:50 20/3/2014 00 STR STR 130 FOUNDATION LAYOUT 1/100 20/3/2014 00 ME DR 01-01 1:100 20/3/2014 00
WINDOWS LAYOUT PLANT ROOM &WATER TANK -POWER &LIGHTING
AR 3D 100 SURVEILLANCE TOWER 3 -D - 20/3/2014 00 STR STR 131 FOUNDATION DETAILS 1/100 20/3/2014 00 PLANT ROOM -ROOF TOP FLOOR -DRAINAGE SYSTEM EL PL 18 1:100 20/3/2014 00
ME DR 01-02 1:100 20/3/2014 00 SYSTEM
WATER TANK &PLANT ROOM -UNDERGROUND LAYOUT PLANT ROOM &WATER TANK -UNDERGROUND POWER
AR GL 400 1:100 20/3/2014 00 STR STR 140 GROUND SLAB LAYOUT 1/100 20/3/2014 00 EL P 19 1:100 20/3/2014 00
FLOOR PLAN PLANT ROOM -UNDERGROUND FLOOR -WATER &F.F . SYSTEM
STR STR 141 GROUND SLAB DETAILS 1/100 20/3/2014 00 ME DW 02-01 1:100 20/3/2014 00
WATER TANK &PLANT ROOM -GROUND FLOOR SYSTEMS LAYOUT PLANT ROOM &WATER TANK -UNDERGROUND
AR GL 401 1:100 20/3/2014 00 PLANT ROOM -GROUND FLOOR -MIDICAL GASES EL L 20 1:100 20-3-2014 00
PLAN STR STR 150 SLAB LAOUT 1/50 20/3/2014 00 ME MG 03-01 1:100 20-3-2014 00 LIGHTING SYSTEM
WATER TANK &PLANT ROOM -ROOF TOP FLOOR SYSTEM LAYOUT
AR GL 402 1:100 20/3/2014 00 STR STR 151 SLAB DETAILS 1/50 20-3-2014 00
PLAN
WATER TANK &PLANT ROOM -ELEVATIONS -
AR LV 400 1:100 20/3/2014 00
SHEET 1
WATER TANK &PLANT ROOM -ELEVATIONS - JCF-SITE COMPONENTS -STR-WATER CISTERN
AR LV 401 1:100 20/3/2014 00
SHEET 2
WATER TANK &PLANT ROOM -SECTIONS -
AR SE 400 1:100 20/3/2014 00 STRUCTURAL DRAWINGS LIST
SHEET 1
WATER TANK &PLANT ROOM -SECTIONS - 20/3/2014
AR SE 401 1:100 20/3/2014 00
SHEET 2
WATER TANK &PLANT ROOM -SCHEDULE OF STR STR 120 COLUMN LAYOUT &DETAILS 1/100 20/3/2014 00
AR WL 400 1:50 20/3/2014 00
DOORS &WINDOWS STR STR 130 FOUNDATION LAYOUT 1/100 20/3/2014 00
AR GL 500 ELECTRICAL ROOM -PLANS 1:100 20/3/2014 00
STR STR 131 FOUNDATION DETAILS 1/50 20/3/2014 00
AR LV 500 ELECTRICAL ROOM -ELEVATIONS 1:100 20/3/2014 00
STR STR 140 SLAB LAYOUT 1/100 20-3-2014 00
AR SE 500 ELECTRICAL ROOM -SECTIONS 1:100 20/3/2014 00
ELECTRICAL ROOM -SCHEDULE OF DOORS &
AR WL 500 1:100 20/3/2014 00
WINDOWS JCF-TOWER+BOUNDARY WALL
AR GL 600 TRANSFORMER ROOM -PLANS 1:100 20/3/2014 00
AR LV 600 TRANSFORMER ROOM -ELEVATIONS 1:100 20/3/2014 00
NOTES
STRUCTURAL DRAWINGS LIST
AR SE 600 TRANSFORMER ROOM -SECTIONS 1:100 20/3/2014 00
20/3/2014
TRANSFORMER ROOM -SCHEDULE OF DOORS &
AR WL 600 1:100 20-3-2014 00 STR STR 000 GENERAL NOTES AND DETAILS NTS 20/3/2014 01
WINDOWS
STR STR 100 WALL LAYOUTS 1:50 20/3/2014 01
STR STR 110 FLOORS/SLABS LAYOUTS 1:50 20/3/2014 01
Rev.: Date: Description: Approved
STR STR 210 SECTIONS 1:50 20/3/2014 00 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
STR STR 510 RETAINING WALL DETAIL AND MAIN GATE DETAILS SHOWN 20/3/2014 01 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
STR STR 511 MAIN GATE DETAILS SHOWN 20-3-2014 00 AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

LIST OF DRAWINGS
ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 GE DL 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 N/A 23/03/2014
GENERAL NOTES: DOCUMENT IDENTIFICATION:
1. GENERAL, Architectural
1.1) These General Notes are instructions to the Contractor and apply generally to all the work unless more specific 62699 03 00 AR GE 0010
information is shown in drawings or written in the specifications, standards and/or contracts. A B C D E F
1.2) All construction works shall be in accordance with the most current DWG's, spec's and standards as modified by the Sequence No: 4 digits
Subject: 2 letters
Architect/Engineer.
Discipline: 2 letters
1.3) An approved set of plans shall be maintained on the job site at all times. UNOPS Sub No: 2 digits
1.4) All works shall be conform to the best practice of each trade. Unless shown or noted otherwise, construction details UNOPS No: 4 digits
or practices are common to the standard of the trade. Project No: Digits (6+4)
1.5) All works shall be conform to the applicable codes and authority rules.
1.6) The Contractor shall obtain the necessary permits required for the works shown on these drawings prior to the Reference Document: 0000-00-AL-SP-9100 PIDU Standard File Names
start of the construction. LEGEND,
1.7) The Contractor shall locate and uncover all the underground utilities in advance of the construction in order the
A - Project No: Building Department Project No given by UNOPS Building Dept
B - UNOPS No: UNOPS Project No generated from UNOPS Database.
Architect/Engineer. C - UNOPS Sub No: Indicates the Sub section of project; for example, multiple locations.
1.8) Backfilling shall not be started until newly installed underground equipment is checked and approved by the engineers 00: No Sub section, default
to verify their identity and their correct position. 01: Sub section 01
02: Sub section 02
1.9) Backfill shall be installed in accordance with the relevant ruling standards. D - Discipline: Indicates the discipline or Department concerned.
1.10) Disposal of/and stockpiling of excess material within the planning area shall be done in such a way that it will not
create a nuisance to the ongoing works in general and the neighboring surrounding. AC: Air Conditioning, HVAC GE: General
AD: Administration ME: Mechanical
1.11) The Contractor shall not trespass beyond the project boundary lines unless a permit or written authorization has AL: All disciplines PR: Process Piping
been obtained from the neighboring property owners involved. AR: Architectural QS: Quantity Survey
1.12) Any damage on public area and/or on the clients premises caused by the ongoing project works shall be restored in DT: Data & Telecom ST: Structural
its original condition, with no additional cost implication to the owners involved, as per following requirements: EL: Electrical WS: Water Services (Supply & Sewers )

1.12.1) All trees impacted by the ongoing construction works shall be replaced with the E - Subject: Indicates the subject of the drawing.
same size and type of tree at the same location or at a new location given by
BD: Border Drawing
the local authorities or by the client.
BH: Soil Test Bore Hole Plan
1.12.2) All irrigation systems shall be restored to fully functioning status. BQ: Bill of Quantity
1.12.3) Any road or street cuts are to be coordinated with the local authorities, CP: Ceiling Plan
CS: Cover Sheet
backfilled according standards and repaired to its original status. CT: Contract
1.13) All dimensions and levels are in millimeters (mm) unless mentioned otherwise. DD: Details, non standard
DL: Drawing List
1.14) The Contractor shall check and verify all dimensions and levels on site (both new and existing) and report
DP: Demolition Plan
discrepancies to the Architect/Engineer prior to proceeding of works. DR: Drawing Register
1.15) The drawing shall not be scaled. Only written dimensions shall be followed. The Contractor shall request, from the GA: General Arrangement
Architect, necessary dimensions not shown on the drawings. GL: Layout (only planviews)
GM: Layout Mixed (plans, sect's & elev's)
1.16) All Architectural drawings shall be read in conjunction with the Structural, Services drawings and specifications for GN: General Notes
proper coordination. Any discrepancies shall be brought to the attention of the Engineer. LM: Elevations & Sections Mixed (sect's & elev's)
1.17) All dimensions other than levels are given to structural elements. Dimensions are taken from and to centerlines of LV: Elevations (only elevations)
columns, beams, and other structural elements; from faces of walls and edges of openings unless shown otherwise. MF: Master File or Model File (no drawing)
PC: Procedures NOTES
1.18) All levels shown in the drawing are finished floor levels. Contractor shall allow adequate changes in the structural PI : Piling Plan
floor to achieve indicated floor levels. PL: Project Planning or program
1.19) Contractor shall submit shop drawings "For Approval" prior to fabrication where required by Architect/Engineer. PM: Project Manual
PN: Preamble Notes
PP: Site Plan, Plot Plan (existing, new, proposed) Rev.: Date: Description: Approved
RP: Reports All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
SC: Schematics, diagrams PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
SF: Safety/Fire Escape Plan MINISTRY OF INTERIOR
CORRECTIONS AND REFORM
CENTERS DEPARTMENT

SK: Sketch (MOI) (CRCD)

SN: Sections (only sections)


SP: Specifications, Project Drafting Standard
SV: Survey Plan
TC: Tender Document, Conditions Funded by:
THIS PROJECT IS FUNDED BY

TO: Details, typical (standard) THE EUROPEAN UNION

TR: Transmittal
WL: Schedule of Openings (Door & Windows) Project Name: Design & Implementation:
UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem

F - Sequence No: Indicates the actual drawing serial number. JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

ARCH GENERAL NOTES-SHEET 1


ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR GN 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 N/A 23/03/2014
2. REFERENCE DOC'S:
2.1) Reference Documents as listed on the individual drawings.

ABBREVIATIONS:
A.B. - Anchor Bolt CONN. - Connection FIN. - Finish JST. - Joist O.H.W.T. - Overhead Water Tank STD. - Standard W.I. - Wrough Iron
ABV. - Above CONSTR. - Construction FITT. - Fitting, Fitted JT. - Joint OPNG. - Opening STIFF. - Stiffener W.I.C. - Walk in Closet
A.C. - Asphalt Concrete CONT. - Continuation FLO. - Field OPT. - Optional STL. - Steel W.M. - Washing Machine
A/C - Air Conditioning CONTR. - Contractor FLR - Floor K.O. - Knock out OR - Outside Radius SPEC. - Specification W 10 - With out
A.D. - Access Door CONC. - Concrete F.O.C - Face of Concrete KVA - Kilo Volt Ampere OSB - Oriented Strand Board SO. - Square W.P. - Working Point
ADD. - Additional CORR. - Corrigated F.O.W. - Face of Wall KW - Kilo Watt SQ.FT. - Square feet W.R. - Water Resistant
ADJ. - Adjust C/P - Car Port FLUOR. - Fluorescent P. - Pump SQ.IN. - Square inch W.T. - Water Tank
A.F.F. - Above Finished Floor C.S. - Carbon Steel F.P. - Fire Proof, Fire proofing L. - Length PART. - Partition SQ.YD. - Square yard WTR. - Water
A.F.G. - Above Finished Grade CSK. - Countersink FRM. - Frame LAB. - Laboratory PAV. - Pavement, paving SQ.M. - Square Meter
A.G. - Above Ground CSMNT. - Casement F.S. - Far Side LAM. - Laminate P.B. - Permanent Building SQ.CM. - Square Centimeter YO. - Yard
A.H.U. - Air Handling Unit C.T. - Ceramic Tile FT - Feet LA 1. - Lateral P&B. - Post and Beam STR. - Storage
ALT. - Alternative C.W. - Cold Water FURN. - Furnace LAV. - Lavatory PC.CONC. - Pre-Cast Concrete STRUCT. - Structural ZN. - Zink
ALU. - Aluminum F.W. - Fire Water L/B - Load Bearing PCH. - Porch SUSP. - Suspended
ANCH. - Anchor D. - Door FWD. - Forward L:B - Land to Build ratio PERF. - Perforated SYM. - Symmetrical
APP'O. - Approved DBL. - Double LD. - Lead PLST. - Plaster SYS. - System
APPROX. - Approximative DET. - Detail GA. - Gauge L.F. - Life Fence PL T. - Plate SZ. - Size
APT. - Apartment D.F. - Drinking Fountain GALV. - Galvanized LG. - Large PLAS. - Plastic
ARCH. - Architect DEMO. - Demolition GAR. - Garage L.HD. - Left Hand PL YWO. - Plywood T.B. - Trough bolt
ASPH. - Asphalt DIA. - Diameter G.C. - General Contractor LIN. - Linear PORC. - Porcelain T&B - Top and Bottom
ASSY, - Assembly DIM. - Dimension GEN. - General L1NO. - Linoleum PRE-ENG. - Pre-Engineering T.B.D. - To be determined
ATT. - Attached DISCH - Discharge GL. - Glass L.P. - Low Point P.S.F. - Pounds per square foot TEL. - Telephone
AUX. - Auxiliary ON. - Down G.M. - Grade Mark LS. - Loudspeaker P.S.1. - Pounds per square inch T&G - Tongue and groove
AVG. - Average DR. - Drain GOVT. - Government LT. - Light PS.L. - Passengers lift TH. - Threshold
D.S. - Down Spout GR. - Grille LTG. - Lighting P.V.C. - Polyvinyl chloride THK. - Thick
B.D. - Board D.W. - Dry wall, plaster board GRE. - Glass fiber Reinf. Epoxy LVL. - Level P.W. - Potable Water THRD. - Threaded
B.L. - Building Line D&W - Door and Window G.T. - Glazed Tile PWR. - Power T.O. - Top of
BLDG. - Building DIW - Dishwasher GYP. - Gypsum M. - Male T.O.B. - Top of Beam
BLK. - Block DWG - Drawing MAR. - Marble QTY. - Quantity T.O.C. - Top of Concrete
BM. - Beam H. - Hose MAS. - Masonry T.O.F. - Top of footing
B.O. - Bottom of E. - East H.C. - Hose Connection MAX. - Maximum RAD. - Radius T.O.J. - Top of joist
B.O.C. - Bottom of Concrete EA. - Each HCP. - Handicapped Accessible M.B. - Machine Bolt R.C. - Reinforced Concrete T.O.H. - Top of masonry
B.O.S. - Bottom of Steel E.F. - Exhaust Fan HDBD. - Hardboard MBR. - Membrane R.D. - Roof Drain T.O.W. - Top of wall
B.O.W. - Bottom of Wall E.J. - Expansion Joint HOW. - Hardware MDF - Medium Density Fiber Board REF. - Reference T.S. - Tube steel
BRG. - Bearing EL. - Elevation HGT. - Height MECH. - Mechanical REFG. - Refrigerator TY. - Temporary Building
BRK. - Brick ELECT. - Electric, Electrical HOR. - Horizontal MED. - Medium REINF. - Reinforced TYP. - Typical
BRKT. - Bracket EMERG. - Emergency H.P. - High Point MEZZ. - Mezzanine RET. - Return
B.S. - Boundary Stone ENTR. - Entrance H.RAIL - Hand railing MFD. - Manufacturing REV. - Revision U. - Undefined
BSMNT. - Basement E.P. - Electrical Post H.R. - Hose Reel M.H. - Man Hole RHD. - Right Hand U.G. - Under Ground
NOTES
BTW. - Between ETL - Etcetera HTR - Heater MIN. - Minimum R.L. - Road Line UNF - Unfinished
B.U. - Built up Ea. - Equal H.W. - Hot Water M.O. - Masonry opening RM. - Room U.N.O. - Unless noted otherwise
B.W. - Boundary Wall EQUIP, - Equipment H.W.B. - Hand Wash Basin MOD. - Modular RMV. - Remove UNT - Unit
EST. - Estimate H.WD. - Hard Wood MODIF. - Modification R.O. - Rough Opening UTIL - Utility
Rev.: Date:
CABT. - Cabinet E.W. - Each Way HYD. - Fire Hydrant M/S - Multiple Storey R.O.W. - Right of way Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
Approved
but in this project without prior written consent of UNOPS.

C.B. - Catch Basin EXH. - Exhaust HVAC - Heating, Venting & Air Condit. MTL. - Material R.W. - Rain Water VA. - Voltage Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
C/C - Center to Center EXIST. - Existing V.B. - Vapor Barrier AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
C.D. - Construction Document EXP, - Expansion I.D. - Inside Diameter N. - North S. - South V.C.T. - Vinyl Composite Tile (MOI) (CRCD)

CEH. - Cement EXT. - Exterior I.E. - Invert Elevation N.A. - Not Applicable SAN. - Sanitary VERT. - Vertical
C.F. - Cubic foot I.F.A. - Issued for Approval N.F.C. - Not for construction S.C. - Self-closing V.I.F. - Verify in field
CH. - Channel F. - Female I.F.C. - Issued for Construction NLR. - Nailer SCHED. - Schedule V.P. - Valve Pit Funded by:

CHANG. - Changing F.A. - Fire Alarm I.F.T. - Issued for Tender NO. - Number SCHEM. - Schematic V.1.R. - Vent trough Roof THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

C.1. - Cast Iron FAB. - Fabrication I.F. - Inside Face NOH. - Nominal S.D. - Smoke Detector
C.J. - Construction Joint F.C.O. - Floor Clean out INCL. - Inclusive, including N.T.S. - Not to scale SECT. - Section W. - West, Window Project Name: Design & Implementation:

C.L. - Center Line F.D. - Floor Drain IND. - Industrial SHT. - Sheet W/ - With UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem

CLG. - Ceiling FDN. - Foundation INV. - Invert O.A. - Over All SHT'G. - Sheeting W.B. - Wash Basin JCF Site Components
FO

CNTRL. - Central F.E. - Fire Extinguisher INSUL. - Insulation OIC - On Center SIM. - Simular W.C. - Toilet, water closet
R

Title:
TE

C.O. - Clean Out F.E.C. - Fire Extinguisher Cabinet INT. - Interior 0.0. - Outside Diameter SO.P. - Soakage Pit WD. - Wood ARCHITECTURAL
ND

COL. - Column F.F. - Finished Floor OFC. - Office S.P. - Septic Pit W.F. - Wired Fence ARCH GENERAL NOTES-SHEET 2
ER

COMPO - Composition FIF - Face to Face J.B. - Junction Box O.H. - Overhead SS. - Stainless Steel WGT. - Weight
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

CONDO - Condition F.H.C. - Fire hose Cabinet JCT. - Junction O.HD. - Opposite Hand STA. - Station W.H. - Wall Height 85788 01 01 AR GN 101
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 N/A 23/03/2014
SYMBOLS:
1. GENERAL SYMBOLS

SECTION ARROW Glass Blocks Sliding or automatic door


A TOP - Section Identification letter DPC, Damp Proof Course (Membrane)
102 Window
BOTT - Dwg on which Section is drawn
Insulation
VIEW ARROW Lockers Reference Point
B TOP - View Identification letter
105 BOTT - Dwg on Which View is drawn
Cabinet, built in closet
Tree
DETAIL Lighting fixture, recessed rectangular
1 TOP - Detail Identification number
106 BOTT - Dwg on with Detail is drawn
Lighting fixture, recessed square Exsisting Tree
GRID
HOR - Grid Identification letter Lighting fixture, recessed round
VERT - Grid Identification number Cooker
(NOTE: When multiple Bldg's add. Bldg No in front of Grid 101) Diffuser, pulsion

+3950 Elevation Identification in Plan


Diffuser, extraction REFG Refrigirator
+3950
Elevation Identification in Section and Elevation SD Smoke detector
LS Loudspeaker, intercom D/W Dish Washer
ROOM Room Identification number or name
lift
D&W Identification number, D=door, W=window Usage: Usage:
WM Washing machine
GD1 Additional Identification letter: G=Ground Floor, F=First Floor, BDL: Bed lift
S=Second Floor, R=Roof level GDL: Goods lift
PSL: Passengers lift
HDL: Hydraulic lift Kitchen sink, double
2. OTHER SYMBOLS
Entry, Exit Kitchen sink, single
STONE

REINFORCED COLUMNS Service sink


Single Ieaf door
REINFORCED CONCRETE Hinge side Wash basin, Hand wash basin

LEAN CONCRETE Door sash in elevation


Shower
Sash opening direction
CONCRETE HOLLOW BLOCKS

Hinge side Bath Tub


GYPSUM WALLS NOTES
4 UP Staircase
SAND / MORTAR 3
2 Indication Up Floor Drain
GRASS 1
Rev.: Date: Description: Approved
No. of Steps All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
WC, Water Closet Partners:
ASPHALT, BITUMEN SURFACE PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
PAVING
HP Wall Mounted Water Closet
RUBBLE Ramp
Squat Pan Funded by:
THIS PROJECT IS FUNDED BY
COMPACTED FILL OR NATURAL GROUND THE EUROPEAN UNION

Grid, center line LP


Urinal
Match line, M.l. SLOPE
Slope Direction Project Name: Design & Implementation:
UNOPS , JMPC
Hidden, object ilbove or beyond Shaft, duct Alami Building, Near Rosary School
Beit Hanina, Jerusalem

Floor level drop JCF Site Components


FO

Revision cloud
R

Title:
TE

ARCHITECTURAL
Exterior Wall Composition
ND

Folding door or gate ARCH GENERAL NOTES-SHEET 3


ER

Curtain wall
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

Glass Wall Double leaf door 85788 01 01 AR GN 102


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 N/A 23/03/2014
A B C D

-120
+240.10

G02

-220 -80
+239.10 +240.50
2
D02
UP
D01
-245
D03
+238.85 -205 NOTES
W01
+239.25 Opening Bottom Level

+238.35 3
G01
W02
Rev.: Date: Description: Approved

4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
-280 (MOI) (CRCD)

+238.50

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 1
ER

GROUND FLOOR PLAN


ON

GATE 1: PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY

85788 01 01 AR GL 100
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D

-140
+239.90

G04

-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50
D02 D02
UP
D01
+240.80
D02 -177 -195 -177
-45 D03
+239.53 +239.35 +239.53 -155 NOTES
+240.85 W01
-135 -210 +239.75 Opening Bottom Level

+239.95 +239.20 +239.20 3


G03
W02
Rev.: Date: Description: Approved

4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
-200 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM

+239.30 -210 MINISTRY OF INTERIOR


(MOI)
CENTERS DEPARTMENT
(CRCD)

-220 +239.20
+239.10
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 2
ER

GROUND FLOOR PLAN


ON

GATE 2: PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY

85788 01 01 AR GL 101
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D

2
UP

+99
+242.29
NOTES

3
Rev.: Date: Description: Approved

4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 1
ER

ROOF TOP PLAN


ON

GATE 1: ROOF PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY

85788 01 01 AR GL 200
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D

2
UP

+149
+242.79
NOTES

3
Rev.: Date: Description: Approved

4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 2
ER

ROOF TOP PLAN


ON

GATE 2: ROOF PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY

85788 01 01 AR GL 201
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D

+245.83 +245.78

+244.48
+244.22

+243.18
+242.92

+238.50

NOTES

GATE 1: FRONT ELEVATION


SCALE = 1:100 Rev.: Date: Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Approved

Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 1
ER

ELEVATIONS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR LV 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D

+246.53 +246.48

+245.18
+244.92

+244.14
243.62

+239.20

NOTES

GATE 2: FRONT ELEVATION


SCALE = 1:100 Rev.: Date: Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Approved

Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 2
ER

ELEVATIONS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR LV 101
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D

+245.78 +245.83

+245.14

+242.49 +242.54
+242.29

+242.09

+240.10

+239.25 +239.23
+239.03
+238.85
+238.50

GATE 1: SECTION A-A


SCALE = 1:100

1 2 3 4

+245.78 +245.83

+245.14

+244.48 NOTES

+244.22

Rev.: Date: Description: Approved


+242.54 +242.49 All information in this document is the property of UNOPS and cannot be copied anywhere
+242.29 but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
+242.09 (MOI) (CRCD)

+240.10 Funded by:


THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

+239.25
+238.85 Project Name: Design & Implementation:
UNOPS , JMPC
+238.50 Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 1
ER

SECTIONS
GATE 1: SECTION B-B
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR SE 100
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D

+246.48 +246.53

+244.97

+242.99 +243.04
+242.79

+242.59

+240.80 +240.85

+239.90 +239.75 +239.73


+239.53 +239.53
+239.35 +239.20

GATE 2: SECTION A-A


SCALE = 1:100

1 2 3 4

+246.48 +246.53

+244.97 NOTES
+244.92

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
+243.04 +242.99 but in this project without prior written consent of UNOPS.

+242.79 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
+242.59

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

+239.90 +239.75
Project Name: Design & Implementation:
+239.35 UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATE 2
ER

SECTIONS
GATE 2: SECTION B-B
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR SE 101
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (K) DOOR TYPE (J) DOOR TYPE (A)
DOOR 1 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 2 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 3 : WOODEN DOOR, W.C. DOORS
90 90 100 100
75 75

190
222

222

222

222

222

222

215

215

215
242

242

235
5
20 20
F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L

20

20

20
20

20
S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L

75
90 100

WINDOW 1 : ALUMINUM SLIDING WINDOW C.S.L WINDOW 2 : ALUMINUM TILT WINDOW C.S.L
640

640
1000 600
NOTES
580

580
630
1200

1200
1250

50

50 Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
50

50

MINISTRY OF INTERIOR CENTERS DEPARTMENT


(MOI) (CRCD)
1570
950

Funded by:
F.F.L F.F.L
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

GATES
ER

SCHEDULE OF DOORS & WINDOWS


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR WL 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B A B A B

1 1 1

D02
D01
W01

2 2 2

FIRST FLOOR @ +360 SECOND FLOOR @ +720


SCALE 1:100 SCALE 1:100 SCALE 1:100

A B
A B

W02

+1340
NOTES

1 1
W02
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.

2 W02 2 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
+1080 AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

W02

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

THIRD FLOOR @ +1080 ROOF FLOOR @ +1340


SCALE 1:100 SCALE 1:100 Project Name:

JCF Site Components


Design & Implementation:
UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
FO
R

Title:
TE

ARCHITECTURAL
ND

SURVEILLANCE TOWER
ER

PLANS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR GL 300
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B 1 2 1 2

+1360 +1360 +1360


+1340 +1340 +1340

+1170 +1170 +1170

+1080 +1080 +1060

+853

+720
+685

+568

+493

+360 +360

NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

SECTION A-A SECTION B-B FRONT ELEVATION


SCALE 1:100 SCALE 1:100 SCALE 1:100 Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

SURVEILLANCE TOWER
ER

ELEVATIONS & SECTIONS


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR LV 200
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (K) DOOR TYPE (A)
DOOR 1 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 2 : WOODEN DOOR, W.C. DOORS
90 90
75 75

190
222

222

222

215

215

215
234

245
5
30 20
F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L

30
12

12
S.F.L S.F.L S.F.L
S.F.L S.F.L S.F.L

75
90

WINDOW 1 : ALUMINUM TILT WINDOW WINDOW 2 : ALUMINUM SLIDING WINDOW


4900 3900

500
NOTES
730

730
780

1450

1450
50

50

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
1200

(MOI) (CRCD)

3900

3900
900
F.F.L 510 3880 510

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
+1080 JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

SURVEILLANCE TOWER
ER

SCHEDULE OF DOORS & WINDOWS


3900
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR WL 200
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

SURVEILLANCE TOWER
ER

3D
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR 3D 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C B A

UP

-430

NOTES
Water Tank
-390
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School

5 JCF Site Components


Beit Hanina, Jerusalem
FO
R

Title:
TE

ARCHITECTURAL
ND

WATER TANK & PLANT ROOM


ER

UNDERGROUND FLOOR PLAN


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR GL 400
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C B A

1
-52
D2

-16 UP

-106
+241.80

W1 W1

D2 UP
2

W1 W1

Medical Gas Maintenance Office


Store
W1 -18
+242.86 A.S.L. D1
+242.86 A.S.L.

4
W1

NOTES
Water Tank
-16 Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School

5 JCF Site Components


Beit Hanina, Jerusalem
FO
R

Title:
TE

ARCHITECTURAL
ND

WATER TANK & PLANT ROOM


ER

GROUND FLOOR PLAN


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR GL 401
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C B A

1
+260 -052

Plant Room UP

-16 -106
+241.80

UP
2

Maintenance Office
+322

-018
3

NOTES
Water Tank
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
-16 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School

5 JCF Site Components


Beit Hanina, Jerusalem
FO
R

Title:
TE

ARCHITECTURAL
ND

WATER TANK & PLANT ROOM


ER

ROOF TOP FLOOR PLAN


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR GL 402
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C

PARAPET LEVEL
19 +322 +322
18 GROUND S.F.L.
17
16
15
14
13
12
11
10 +088
9
8 +041
7
SLAB ON GRADE F.L. 6
5
4
3
2
1

SOUTH ELEVATION
SCALE = 1:100

PARAPET LEVEL +379


+322 19 +322 +322 NOTES
18 GROUND S.F.L.
17 +275
16
15 +218
14
13 +260
Rev.: Date: Description: Approved
12 All information in this document is the property of UNOPS and cannot be copied anywhere
11 but in this project without prior written consent of UNOPS.
Partners:
10 +088 +088 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
9 AUTHORITY
CORRECTIONS AND REFORM
+041 8 MINISTRY OF INTERIOR
(MOI)
CENTERS DEPARTMENT
(CRCD)
7 +015
SLAB ON GRADE F.L. 6
5 -042
4
3
2 Funded by:

1 THIS PROJECT IS FUNDED BY


THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
WEST ELEVATION
FO
R

Title:
TE

SCALE = 1:100 ARCHITECTURAL


ND

WATER TANK & PLANT ROOM


ER

ELEVATIONS - SHEET 1
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR LV 400
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
PARAPET LEVEL
19
18
17 +260
16
15 S.F.L. +218
14
13
12
11
10
9
8
7 +015 +015
6
5 -052
4
3
2
1

NORTHERN ELEVATION
SCALE = 1:100

PARAPET LEVEL
19 +322 NOTES
18 GROUND S.F.L.
17 +260
16
15 S.F.L.
14
13 +166 Rev.: Date: Description: Approved
12 All information in this document is the property of UNOPS and cannot be copied anywhere
11 but in this project without prior written consent of UNOPS.
Partners:
10 +088 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
9 AUTHORITY
CORRECTIONS AND REFORM
8 +036 MINISTRY OF INTERIOR
(MOI)
CENTERS DEPARTMENT
(CRCD)
7 +015
SLAB ON GRADE F.L. 6 -018
5 -052
4
3
2 Funded by:

1 THIS PROJECT IS FUNDED BY


THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
EAST ELEVATION
FO
R

Title:
TE

SCALE = 1:100 ARCHITECTURAL


ND

WATER TANK & PLANT ROOM


ER

ELEVATIONS - SHEET 2
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR LV 401
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
+374 +379

+322

+260

+218 +218

+184

+91

+88
+24 +24

-16 -16
-34
-56 Over flow bottom level
-81 Ventilation bottom level

-91 common Water Level level

-380 Balancing bottom level


-390

-430

SECTION A-A
SCALE = 1:100

E D C B A

NOTES
+24

-16

-81 Ventilation bottom level


Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
-91 common Water Level level Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
-380 Balancing bottom level
-390 THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

-450 -450 -450

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

WATER TANK & PLANT ROOM


ER

SECTION B-B SECTIONS - SHEET 1


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

SCALE = 1:100 85788


Drawn: Checked:
01
Approved:
01
Size:
AR
Scale: Date:
SE
Rev.:
400

0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C

+260

+24

-16 Adjacent Water Tank Finish Slab Level

-52

Adjacent Water Tank Bottom Level

-430

SECTION C-C
SCALE = 1:100

E D C

+260

NOTES
+24

-16 Adjacent Water Tank Finish Slab Level

-52

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:

Adjacent Water Tank Bottom Level THIS PROJECT IS FUNDED BY


THE EUROPEAN UNION

-430

-490 Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

-590 Title:
TE

ARCHITECTURAL
ND

WATER TANK & PLANT ROOM


ER

SECTIONS - SHEET 2
SECTION D-D
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR SE 401
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (J) DOOR TYPE (W)
DOOR 1 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 2 : METAL TYPE, EXTERNAL LOUVER DOORS
100 100 100
74

159
222

222

222

222
242

50
F.F.L F.F.L F.F.L
F.F.L F.F.L

20

20
S.F.L S.F.L S.F.L

100 100

WINDOW 1 : ALUMINUM Tilt WINDOW WITH FIXED PANEL WINDOW 2 : STEEL LOUVER WINDOW
800

1000
NOTES

50
420
520

520
INSIDE OUTSIDE
1250
1250
1300

50
Rev.: Date: Description: Approved
INSIDE
450

All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
50
50

PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE


AUTHORITY
CORRECTIONS AND REFORM
1000 MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
OUTSIDE
870

F.F.L
Funded by:
THIS PROJECT IS FUNDED BY
F.S.L INSIDE THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

WATER TANK & PLANT ROOM


ER

SCHEDULE OF DOORS & WINDOWS


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR WL 400
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
B A B A

A
--

C
--

450

1 1
PIT
G-01

Electrical Room

550
B A
-- --

0.00
--

--
B

B
-60

2 2
NOTES
D
--

--
A
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

ELECTRICAL ROOM
ER

PLANS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR GL 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B B A

+317 +317 +317


PARAPET LEVEL +286
12
11
10
9
+156 8
7
6
5
4
3
2
1

ELEVATION-A ELEVATION-B
SCALE = 1:50 SCALE = 1:50

1 2 2 1

+317 +317 +317


PARAPET LEVEL +286
12
+234 11
10
9 NOTES
8
7
6
5
4
3
2 Rev.: Date: Description: Approved
1 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
ELEVATION-C ELEVATION-D MINISTRY OF INTERIOR
CORRECTIONS AND REFORM
CENTERS DEPARTMENT
(MOI) (CRCD)
SCALE = 1:50 SCALE = 1:50

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

ELECTRICAL ROOM
ER

ELEVATIONS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR LV 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
B A 2 1

+317 +317 +317


PARAPET LEVEL +286
+317 PARAPET LEVEL +286
+286
12 12
11
+240
11 +234
10 10
9 9
8 8
7 7
6 6
5 5
4 4
3 3
2 +22 2
1 1
-60 -60 -60

-120, Pit bottom level

SECTION A-A SECTION B-B


SCALE = 1:50 SCALE = 1:50

NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

ELECTRICAL ROOM
ER

SECTIONS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR SE 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (T) WINDOW 2 : STEEL LOUVER WINDOW
DOOR 1 : METAL TYPE, EXTERNAL LOUVER DOORS
1000

50
200
79 79

780

680

780
INSIDE OUTSIDE

50
INSIDE

159
1000

218
OUTSIDE

INSIDE

46
F.F.L F.F.L
200

NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

ELECTRICAL ROOM
ER

SCHEDULE OF DOORS & WINDOWS


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR WL 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
B A B A

B
--

A
W01 -- W01

1 1
-120 -60
PIT

W01
--

--

A A

+286
D
C
-- D01 G-01 --

Transformer Room
W01

2 2
B
-- NOTES

B
--

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

TRANSFORMER ROOM
ER

PLANS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR GL 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B B A

+317 +317 +317


PARAPET LEVEL +286
12
11
10
9
+156 8
7
6
5
4
3
2
1

ELEVATION-A ELEVATION-B
SCALE = 1:50 SCALE = 1:50

1 2 2 1

+317 +317 +317


PARAPET LEVEL +286
12
+234 11
10
9 NOTES
8
7
6
5
4
3
2 Rev.: Date: Description: Approved
1 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
ELEVATION-C ELEVATION-D MINISTRY OF INTERIOR
CORRECTIONS AND REFORM
CENTERS DEPARTMENT
(MOI) (CRCD)
SCALE = 1:50 SCALE = 1:50

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

TRANSFORMER ROOM
ER

ELEVATIONS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR LV 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
B A 2 1

+317 +317 +317


PARAPET LEVEL +286
+317 PARAPET LEVEL +286
+286
12 12
11
+240
11 +234
10 10
9 9
8 8
7 7
6 6
5 5
4 4
3 3
2 +22 2
1 1
-60 -60 -60

-120, Pit bottom level

SECTION A-A SECTION B-B


SCALE = 1:50 SCALE = 1:50

NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

TRANSFORMER ROOM
ER

SECTIONS
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR SE 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (T) WINDOW 2 : STEEL LOUVER WINDOW
DOOR 1 : METAL TYPE, EXTERNAL LOUVER DOORS
1000

50
200
79 79

780

680

780
INSIDE OUTSIDE

50
INSIDE

159
1000

218
OUTSIDE

INSIDE

46
F.F.L F.F.L
200

NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R

Title:
TE

ARCHITECTURAL
ND

TRANSFORMER ROOM
ER

SCHEDULE OF DOORS & WINDOWS


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 01 AR WL 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
GENERAL : DAMP PROOFING & WATERPROOFING :
1- ALL OF THE STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION SYMBOLS :
WITH THE PERTINENT ARCHITECTURAL, ELECTRICAL, MECHANICAL, 1 - ALL VERTICAL CONCRETE SURFACES IN CONTACT WITH SOIL SHALL
SANITARY AND OTHER STRUCTURAL DRAWINGS. BE PAINTED WITH NITOPROOF 30 OR EQUIVALENT 1) TOP OF CONCRETE LEVEL IN PLAN.
+ PROTECTION BOARD .
2- SLEEVES ARE TO BE PROVIDED AND INSTALLED IN ACCORDANCE WITH
MECHANICAL AND ELECTRICAL DRAWINGS OR AS DIRECTED BY THE ENGINEER. ALL HORIZONTAL CONCRETE SURFACES IN CONTACT WITH 2) TOP OF CONCRETE LEVEL IN SECTION
SOIL SHALL BE PROTECTED BY: OR ELEVATION.
3- DO NOT SCALE DIMENSIONS FROM DRAWINGS, ALL DIMENSIONS ARE - 500 MICRON POLYEHTYLENE SHEETS FOR SLAB ON GRADES
TO BE READ OR COMPUTED FROM THE DRAWINGS. - PAINTED BY NITOPROOF 30 OR EQUIVALENT FOR OTHER SURFACES
4- UNLESS OTHERWISE INDICATED ON DRAWINGS ELEVATIONS ARE IN 3) OPENING.
METERS, DISTANCES IN cm., REINFORCEMENT BAR SIZES IN mm.
BLOCKWORK WALLS :
5- REFER TO ARCHITECTURAL DRAWINGS FOR POSITIONS AND DIMENSIONS 5) COLUMN NUMBER.
OF OPENINGS IN WALLS AND COORDINATE WITH THOSE SHOWN 1 - ALL INTERNAL BLOCK WALLS SHALL BE HOLLOW:
ON STRUCTURAL DRAWINGS. * CONCRETE BLOCKS WITH MAXIMUM DENSITY NOT TO EXCEED 1200Kg/m3
LEGEND
2- MINIMUM CONCRETE BLOCK UNIT STRENGTH OF LOAD BEARING BLOCKWORK. 6) 1st FLOOR INDICATION OF FIRST FLOOR MEANS
DESIGN : WALLS SHALL BE NOT LESS THAN 100kg/cm2. EXPRESSED AS FORCE PER UNIT THE FLOOR SLAB AT FIRST FLOOR.

1- FOUNDATION DESIGN FOR (4) FLOORS OF NET CROSS-SECTIONAL AREA. 7) CR CROSS RIB
IN ACCORDANCE TO BEARING CAPACITY = 4.0 Kg/cm2 FOR SHALLOW 3- MORTAR BED JOINTS SHALL NOT EXCEED 10mm. THICKNESS.
FOUNDATIONS FOR THE WHOLE SITE. 8) N.T.S NOT TO SCALE
THE CONTRACTOR IS RESPONSIBLE TO CONFIRM/REACH THIS VALUE ON 14)
4- A REINFORCED CONCRETE BOND BEAM HAVING A DEPTH OF 20cm.
SITE, BY APPOINTING CERTIFIED GEOTECHNICAL LAB ON HIS EXPENSES. 9) T.O.C TOP OF CONCRETE LENGTH OF BARS
AND WIDTH EQUAL TO THE WIDTH OF THE WALL REINFORCED
DIA. OF BARS
2- DESIGN AND CONSTRUCTION ARE IN ACCORDANCE WITH THE
10) V VERTICAL NUMBER OF BARS
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE HEIGHT OF THE OPENINGS, THIS BEAM MUST BE ANCHORED
ACI 318-08 LOCATION OF BAR
IN ADJACENT COLUMNS/WALLS. SEE DETAIL "A" BELOW. REFER 11) H HORIZONTAL T:TOP - B:BOTTOM
3- STRUCTURAL MEMBERS ARE DESIGNED TO RESIST THE TOTAL DEAD TO SPECIFICATIONS.
LOADS ACTING ON THEM PLUS THE FOLLOWING LIVE LOADS: 12) GR GROUND BEAM Ribbed Slab
5- A REINFORCED CONCRETE BOND COLUMN HAVING A WIDTH OF 20cm. 15)
25+7cm Thick
- OFFICES - 300kg/m2 G SECTION NAME
13)
- STAIRS AND CORRIDORS - 400kg/m2 THICKNESS OF SOLID SLAB
- OTHER AREAS - 300kg/m2 BLOCK THICKNESS
A SPACING OF 6ms. THIS COLUMN MUST BE ANCHORED IN UPPER
SHORING/SUPPORTING SYSTEM : & LOWER SLABS. SEE DETAIL "A" BELOW. REFER TO SPECIFICATIONS.

THE CONTRACTOR MUST SUBMIT DETAILED GENERAL HATCH AS INDICATED HOLLOW CONCRETE BLOCK
SHOP-DRAWINGS SHOWING THE SHORING/SUPPORTING LENGTH IN CONCRETE IS 10CM WITH EPOXY.
SYSTEM FOR THE SITE/BUILDING/SLABS OF THE PROJECT
AND TO BE SUBMITTED EMBEDMENT IS 10CM WITH EPOXY. REINFORCED CONCRETE STONE
TO THE CONSULTANT FOR REVIEW AND APPROVAL.
PLAIN CONCRETE

REINFORCED CONCRETE : TOP REINFORCEMENT

1- a) REINFORCED CONCRETE SHALL HAVE A MINIMUM 28 DAYS CUBE CRUSHING


STRENGTH OF 300 kg/cm2 FOR ALL MEMEBERS
d

b) PLAIN CONCRETE IN BLINDING, SCREEDS AND ELSEWHERE SHALL


HAVE A MINIMUM 28 DAYS CYLINDER CRUSHING STRENGTH OF 200 kg/cm2.
BOTTOM REINFORCEMENT
2- ALL REINFORCED CONCRETE SHALL BE VIBRATED 20 CLEAR SPAN 20
MIN. MIN.
3- MINIMUM CEMENT CONTENT TO BE USED FOR ANY REINFORCED
CONCRETE WORK SHALL BE 350kg/m3.
FLOOR SLAB
4- ORDINARY PORTLAND CEMENT TO ASTM C150 TYPE-1 OR TO BS12
SHALL BE USED FOR ALL CONCRETE WORKS SCHEDULE OF LINTELS REINFORCEMENT
LINTEL WIDTH
(b) b=10cm. b=15cm. b=20cm. b=30cm.
DEPTH
BE DEFORMED HIGH GRADE STEEL HAVING A MINIMUM YIELD BOND BEAM
(d)

COLUMN/WALL
TOP BOTTOM TOP BOTTOM TOP BOTTOM TOP BOTTOM
CLEAR SPAN REINF. REINF. REINF. REINF. REINF. REINF. REINF. REINF. OPENING

BOND COLUMN
STRENGTH OF 4200 kg/cm2.

MAX. 400
< 200 1T10 1T14 2T10 2T12 2T10 2T12 3T10 3T12 20

BOND COLUMN
BOND COLUMN
6- LAP LENGTHS OF REINFORCEMENT BARS SHALL BE AS SHOWN ON
THE DRAWINGS BUT NOT LESS THAN 50 BARS DIAM. FOR PLAIN 200-300 1T10 1T16 2T10 2T14 2T10 2T16 3T10 3T16 25 CORRECTIONS AND REFORM
CENTERS DEPARTMENT
(CRCD)
AND DEFORMED BARS.
301-400 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 30
7- MINIMUM CLEAR CONCRETE COVER TO STEEL REINFORCEMENT SHALL
BE AS SHOWN ON DRAWINGS. WHERE NOT SHOWN, IT SHALL BE AS 401-500 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 40
FOLLOWS :
501-600 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 50 Funded by:
FLOOR SLAB THIS PROJECT IS FUNDED BY
75mm. FOR FOUNDATIONS IN CONTACT WITH SOIL, BLINDING, THE EUROPEAN UNION

OR WATERPROOFING 601-700 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 50
50mm. WHEN IN CONTACT WITH WATER
50mm. WHEN EXPOSED TO EARTH OR WEATHER MAX. 500 Project Name: Design & Implementation:
UNOPS , JMPC
40mm. IN DROP BEAMS & COLUMNS
, ( TO STIRRUPS & TIES ) Jenin Correctional Alami Building, Near Rosary School

30mm. IN SLABS, RIBS EMBEDDED BEAMS AND WALLS NOT


DETAIL-A Facility Beit Hanina, Jerusalem
FO

EXPOSED TO EARTH. TYPICAL DETAIL OF BOND BEAMS AND (JCF)


R

Title:
BOND COLUMNS IN BLOCKWORK WALLS SITE COMPONENTS
TE

8- THE CONTRACTOR SHALL PREPARE FULL BAR BENDING SCHEDULE


ND

FOR ENGINEER'S APPROVAL. GENERAL NOTES


ER

AND DETAILS
ON

Seq No.:
LY

85788 01 01 STR STR 000


Rev.:
0
M.S. I.M. I.M. N.T.S 04/02/2014
MINIMUM SPLICE LENGTHS (mm)
DETAIL AROUND OPENING IN R.C.
BAR SIZE TENSION SPLICE (mm) COMPRESSION SPLICE (mm) WALLS AND SLABS (UNLESS
(mm)
SHOWN OTHERWISE ON DRWGS.)
500 300
600 400
700 500 LEGEND
800 500 ON EACH FACE (TYP.) ON EACH FACE
900 600
1000 600 IUS
RAD
1100 750
60 MIN. (TYP.)
1250 750
1950 1000

NOTE :
MULTIPLY BY 1.30 THE SPLICE LENGTH
OF TOP TENSION REINFORCEMENT OF BAR SIZES MORE
THAN 20mm IN CAPS AND SLABS OF MORE THAN 40cm THICKNESS.

A/C VENTILATION & PIPE SHAFT DETAIL


(UNLESS SHOWN OTHERWISE ON DRAWINGS)
(FOR FLOOR NUMBERS, EXACT LOCATIONS & DIMENSIONS TYP. CORNER DETAIL OF R. C. WALLS
REFER TO ARCHITECTURAL & MECHANICAL DRAWINGS) (UNLESS SHOWN OTHERWISE ON DRAWINGS)
RADII OF BENDING
REFER TO WALLS REINF.
Minimum Radius of Bend for L Bars and U Bars shall be
as follows. For other bars, minimum radius of bend shall
BUT
REFER TO ARCHITECTURAL

equal to 3 times bar size for High-yield Steel.


NOT LESS THAN
VERTICAL WALL REINF.
10

BAR MINIMUM r
X If sufficient room does not exist
AND MECHANICAL

DIAMETER r
10 10 VAR. 10 10 for L Bars to extend 25 times
(mm) (mm)
the bars size beyond the bend,
10mm TIES@60cm FOR 15cm SPACING OF REINF. 8 55 a 180 degree hook shall be made.
DRWGS.

10mm TIES@80cm FOR 20cm SPACING OF REINF. 10 70


HORIZONTALLY & VERTICALLY 12 85
(STAGGERED). (TYP.)
14 100 r
16 120 U Bars shall have legs of equal
18 140 length, unless indicated otherwise.
30 30 20 160
CORRECTIONS AND REFORM
TYP. EDGE DETAIL OF R. C. WALLS 22 180 CENTERS DEPARTMENT
(CRCD)

(UNLESS SHOWN OTHERWISE ON DRAWINGS) 25 215 r


32 300
REFER TO WALLS REINF.
20 Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

BUT
20

NOT LESS THAN


VERTICAL WALL REINF. Project Name: Design & Implementation:
UNOPS , JMPC
10mm TIES@60cm FOR 15cm SPACING OF REINF. Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
SECTION-X 10mm TIES@80cm FOR 20cm SPACING OF REINF.
FO

(JCF)
R

HORIZONTALLY & VERTICALLY Title:

SITE COMPONENTS
TE

(STAGGERED). (TYP.)
ND

GENERAL DETAILS
ER
ON

Seq No.:
LY

85788 01 01 STR STR 001


Rev.:
0
M.S. I.M. I.M. N.T.S 04/02/2014
PLACEMENT RULES FOR BEAM REINFORCEMENT
LINKS
JOINT

JOINT LINKS @20cm


otherwise:
Placement of bars shall be as follows, unless indicated

1-Top bars at interior supports shall be placed centrally


COLUMN LINKS

on the support axis lines.


@10cm

2-Bottom bars in interior spans shall be placed to LEGEND


h

extend equal lengths beyond support centerlines at


both left and right.

3-Bottom bars in exterior spans shall be placed such


that they extend a length equal to 12 times bar size
beyond the centerline of the exterior support. This
length may include a 90 degree bend if sufficient
COLUMN LINKS SEE SCHEDULE
CLEAR COLUMN HEIGHT Lc

LAPS TO BE STAGGERED room does not exist.


4-L bars as top reinforcement at exterior supports shall
TENSION LAP SPLICE OF CLEAR
COLUMN HEIGHT ONLY WITHIN

extend 25 times the bar size beyond the bend. NOTE:


FOR ALL WALLS USE U TIE SPACERS STAGGERED
2 No. ADDITIONAL LINKS
ONE AT EACH END OF

5-A=0.4L ( THE GREATEST OF THE TWO ADJACENT SPANS)


CENTRAL PART

SPLICE BAR

6-B=0.25L ( THE GREATEST OF THE TWO ADJACENT SPANS


AND TO BE OVERLAPPED TO NEXT BAR BY X )
7-K= SUPPORT WIDTH
ADDITIONAL LINK AT
END OF SPLICE BAR
COLUMN LINKS

4
@10cm

LAP
SINGLE SPAN BEAM

A A

2.5
B
1 X 1
4
X
STARTER BARS
COLUMN JUNCTION 3 2 2
kk kk
JOINT LINKS @20cm 30 30
CONTINUOUS BEAM
NOTE: L 2L
h = LARGEST OF (1) 'x' 4
(2) 0.16 Lc
CORRECTIONS AND REFORM
3 2 CENTERS DEPARTMENT
(3) 500mm COLUMN SUPPORTED ON FOOT (CRCD)

kk
WHERE `x' IS THE LARGER COLUMN PLAN DIMENSION. CANTILEVER BEAM NOTE:
1. TYPICAL DETAILS TO BE READ IN CONJUNCTION WITH COLUMN SCHEDULE.
Funded by:
THIS PROJECT IS FUNDED BY
2. FOR LAP LENGTHS REFER TENSION LAP SPLICE SCHEDULE. THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:

SITE COMPONENTS
TE
ND

GENERAL DETAILS
ER
ON

Seq No.:
LY

85788 01 01 STR STR 002


Rev.:
0
M.S. I.M. I.M. N.T.S 04/02/2014
B A

20 420 20
COLUMN DETAILS TABLE

40

40
1

20

20
SCALE 1:20
C1 C1
10 10
C1 (4 COLUMNS)

500
10
35

10
15
LEGEND
40

20 20 2.5

20
40

40
2
20

20
C1 C1
10 10 COLUMN DETAIL-C1
SCALE 1:20

B A
B A
B A
A
131

420 STONE
420 STONE
420 STONE
1
-120 T.O.C. 1
0.00 T.O.C. -120 T.O.C. 1
20 20 0.00 T.O.C.

S.O.G TH.:15 cm S.O.G TH.:15 cm


500

500

500
-60 T.O.C.
60 -60 T.O.C.

B
131 B
131

2 CORRECTIONS AND REFORM

2 CENTERS DEPARTMENT
(CRCD)

2
ELECTRICAL ROOM
FOUNDATION LAYOUT
Funded by:
THIS PROJECT IS FUNDED BY
TRANSFORMER ROOM THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

COLUMN LAYOUT & DETAILS+


E

S.O.G+FOUNDATION LAYOUT
R
ON

Seq No.:
L

85788 01 01 STR STR 120


Y

Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND

REFER TO ARCH DETAILS


REFER TO ARCH DETAILS

IN OUT
IN OUT
SLAB ON GRADE 150mm
POLYETHYLENE MEMBRANE 500 micron SLAB ON GRADE 150mm
COMPACTED BASECOURSE LAYER 200mm
POLYETHYLENE MEMBRANE 500 micron
COMPACTED SELECTED FILL
SOG REFER TO ARCH. COMPACTED BASECOURSE LAYER 200mm
12@20 COMPACTED SELECTED FILL REFER TO ARCH.
20

20
10
10

60
MIN. 50

8@20
12@20 8@20
10@20 12@20
10@20
DAMP PROOF MEMBRANE
12@20 DAMP PROOF MEMBRANE
12@20
4 12
4 12
40

4 12
BLINDING CONCRETE 100mm 4 12
10

BLINDING CONCRETE 100mm

10 20 20 20 10
60 10 20 20 20 10 CORRECTIONS AND REFORM
CENTERS DEPARTMENT
(CRCD)
60
A SECTION A
1:25 B SECTION B
1:25 Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

S.O.G DETAILS
ER

&FOUNDATION DETAILS
ON

Seq No.:
LY

85788 01 01 STR STR 131


Rev.:
0
M.S. I.M. I.M. 1/25 04/02/2014
A
B A
420

B A

420

1
SOLID SLAB LEGEND
25cm
BEAM - B1
T.O.C.
SCALE 1:50

500
B
2 1
2 520

BEAM - B2
SCALE 1:50

STONE

25
STONE
25

50
50

CORRECTIONS AND REFORM


CENTERS DEPARTMENT

25
25

(CRCD)

25 25 Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:

SECTION-A /B1 SECTION-B /B2 Jenin Correctional


Facility
UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
FO

SCALE 1:20 SCALE 1:20 (JCF)


R

Title:
TE
ND

SLAB LAYOUT & DETAILS


ER
ON

Seq No.:
LY

85788 01 01 STR STR 140


Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

COLUMN LAYOUT & DETAILS


ER
ON

Seq No.:
LY

85788 01 01 STR STR 120


Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

FOUNDATION LAYOUT
ER
ON

Seq No.:
LY

85788 01 01 STR STR 130


Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

FOUNDATION DETAILS
ER
ON

Seq No.:
LY

85788 01 01 STR STR 131


Rev.:
0
M.S. I.M. I.M. 1/50 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

GROUND SLAB LAYOUT


ER
ON

Seq No.:
LY

85788 01 01 STR STR 140


Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

GROUND SLAB DETAILS


ER
ON

Seq No.:
LY

85788 01 01 STR STR 141


Rev.:
0
M.S. I.M. I.M. 1/50 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

SLAB LAOUT
ER
ON

Seq No.:
LY

85788 01 01 STR STR 150


Rev.:
0
M.S. I.M. I.M. 1/50 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

SLAB DETAILS
ER
ON

Seq No.:
LY

85788 01 01 STR STR 151


Rev.:
0
M.S. I.M. I.M. 1/50 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

COLUMN LAYOUT
ER

& DETAILS
ON

Seq No.:
LY

85788 01 01 STR STR 120


Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

FOUNDATION LAYOUT
ER
ON

Seq No.:
LY

85788 01 01 STR STR 130


Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

FOUNDATION DETAILS
ER
ON

Seq No.:
LY

85788 01 01 STR STR 131


Rev.:
0
M.S. I.M. I.M. 1/50 04/02/2014
LEGEND

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND

SLAB LAYOUT
ER
ON

Seq No.:
LY

85788 01 01 STR STR 140


Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
KEY MAP:

GENERAL : SYMBOLS :
1- ALL OF THE STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE PERTINENT ARCHITECTURAL, ELECTRICAL, MECHANICAL, 1) TOP OF CONCRETE LEVEL IN PLAN.
A/C VENTILATION & PIPE SHAFT DETAIL
SANITARY AND OTHER STRUCTURAL DRAWINGS. (UNLESS SHOWN OTHERWISE ON DRAWINGS) TYP. CORNER DETAIL OF R. C. WALLS
2- SLEEVES ARE TO BE PROVIDED AND INSTALLED IN ACCORDANCE WITH (FOR FLOOR NUMBERS, EXACT LOCATIONS & DIMENSIONS (UNLESS SHOWN OTHERWISE ON DRAWINGS)
MECHANICAL AND ELECTRICAL DRAWINGS OR AS DIRECTED BY THE ENGINEER. 2) TOP OF CONCRETE LEVEL IN SECTION REFER TO ARCHITECTURAL & MECHANICAL DRAWINGS)
OR ELEVATION.
REFER TO WALLS REINF.
3- DO NOT SCALE DIMENSIONS FROM DRAWINGS, ALL DIMENSIONS ARE
TO BE READ OR COMPUTED FROM THE DRAWINGS.

REFER TO ARCHITECTURAL
3) OPENING. BUT
4- UNLESS OTHERWISE INDICATED ON DRAWINGS ELEVATIONS ARE IN NOT LESS THAN

10
METERS, DISTANCES IN cm., REINFORCEMENT BAR SIZES IN mm.
X VERTICAL WALL REINF.

AND MECHANICAL
5) COLUMN NUMBER. LEGEND
5- REFER TO ARCHITECTURAL DRAWINGS FOR POSITIONS AND DIMENSIONS 10 10 VAR. 10 10
OF OPENINGS IN WALLS AND COORDINATE WITH THOSE SHOWN
ON STRUCTURAL DRAWINGS.

DRWGS.
6) 1st FLOOR INDICATION OF FIRST FLOOR MEANS
10mm TIES@60cm FOR 15cm SPACING OF REINF.
THE FLOOR SLAB AT FIRST FLOOR. 10mm TIES@80cm FOR 20cm SPACING OF REINF.
DESIGN :
7) CR CROSS RIB HORIZONTALLY & VERTICALLY
1- FOUNDATION DESIGN IS DONE FOR TOWER AND BOUNDARY WALL (STAGGERED). (TYP.)
IN ACCORDANCE TO BEARING CAPACITY 4.0 Kg/CM2
THE CONTRACTOR IS RESPONSIBLE TO CONFIRM/REACH THIS VALUE ON 8) N.T.S NOT TO SCALE 14)
SITE, BY APPOINTING CERTIFIED GEOTECHNICAL LAB ON HIS EXPENSES.
9) T.O.C TOP OF CONCRETE LENGTH OF BARS 20
DIA. OF BARS
2- DESIGN AND CONSTRUCTION ARE IN ACCORDANCE WITH THE TYP. T-CONNECTION DETAIL OF R. C. WALLS
NUMBER OF BARS
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE 10) V VERTICAL
LOCATION OF BAR (UNLESS SHOWN OTHERWISE ON DRAWINGS)

20
ACI 318-08 T:TOP - B:BOTTOM
11) H HORIZONTAL BUT
3- STRUCTURAL MEMBERS ARE DESIGNED TO RESIST THE TOTAL DEAD
NOT LESS THAN
LOADS ACTING ON THEM PLUS THE FOLLOWING LIVE LOADS: 12) GR GROUND BEAM 15) Solid Slab SECTION-X VERTICAL WALL REINF.
2 20+7cm Thick
- GENERAL LIVE LOAD - 300kg/m
13) G SECTION NAME THICKNESS OF SOLID SLAB
BLOCK THICKNESS

SHORING/SUPPORTING SYSTEM : RADII OF BENDING 10mm TIES@60cm FOR 15cm SPACING OF REINF.
Minimum Radius of Bend for L Bars and U Bars shall be 10mm TIES@80cm FOR 20cm SPACING OF REINF.
THE CONTRACTOR MUST SUBMIT DETAILED as follows. For other bars, minimum radius of bend shall HORIZONTALLY & VERTICALLY
SHOP-DRAWINGS SHOWING THE SHORING/SUPPORTING (STAGGERED). (TYP.)
SYSTEM FOR THE SITE/BUILDING/SLABS OF THE PROJECT equal to 3 times bar size for High-yield Steel.
MINIMUM SPLICE LENGTHS (mm)
AND TO BE SUBMITTED
TO THE CONSULTANT FOR REVIEW AND APPROVAL. BAR MINIMUM r
BAR SIZE If sufficient room does not exist
TENSION SPLICE (mm) COMPRESSION SPLICE (mm) DIAMETER r
(mm) for L Bars to extend 25 times
REINFORCED CONCRETE : (mm) (mm) the bars size beyond the bend,
500 300
8 55 a 180 degree hook shall be made.
1- a) REINFORCED CONCRETE SHALL HAVE A MINIMUM 28 DAYS CUBE CRUSHING 600 400 10 70
STRENGTH OF 300 kg/cm2 FOR ALL MEMEBERS IN TOWER AND 250kg/cm2
700 500 12 85
FOR WALLS, MAIN GATES AND WC. TYP. EDGE DETAIL OF R. C. WALLS
b) PLAIN CONCRETE IN BLINDING, SCREEDS AND ELSEWHERE SHALL 14 100 r
800 500 (UNLESS SHOWN OTHERWISE ON DRAWINGS)
HAVE A MINIMUM 28 DAYS CYLINDER CRUSHING STRENGTH OF 200 kg/cm2. 16 120 U Bars shall have legs of equal
900 600 18 140
2- ALL REINFORCED CONCRETE SHALL BE VIBRATED length, unless indicated otherwise. REFER TO WALLS REINF.
1000 600 20 160
3- MINIMUM CEMENT CONTENT TO BE USED FOR ANY REINFORCED
CONCRETE WORK SHALL BE 350kg/m3. 22 180
1100 750 BUT
25 215
r NOT LESS THAN
4- ORDINARY PORTLAND CEMENT TO ASTM C150 TYPE-1 OR TO BS12 1250 750 32 300 VERTICAL WALL REINF.
SHALL BE USED FOR ALL CONCRETE WORKS 10mm TIES@60cm FOR 15cm SPACING OF REINF.
1950 1000
10mm TIES@80cm FOR 20cm SPACING OF REINF.
NOTE : HORIZONTALLY & VERTICALLY
BE DEFORMED HIGH GRADE STEEL HAVING A MINIMUM YIELD MULTIPLY BY 1.30 THE SPLICE LENGTH (STAGGERED). (TYP.)
STRENGTH OF 4200 kg/cm2.
OF TOP TENSION REINFORCEMENT OF BAR SIZES MORE
6- LAP LENGTHS OF REINFORCEMENT BARS SHALL BE AS SHOWN ON
THAN 20mm IN CAPS AND SLABS OF MORE THAN 40cm THICKNESS.
THE DRAWINGS BUT NOT LESS THAN 50 BARS DIAM. FOR PLAIN
AND DEFORMED BARS.
EACH WAY
7- MINIMUM CLEAR CONCRETE COVER TO STEEL REINFORCEMENT SHALL 300x300x16mm
BE AS SHOWN ON DRAWINGS. WHERE NOT SHOWN, IT SHALL BE AS PLATE
FOLLOWS : 30
DETAIL AROUND OPENING IN R.C.
WALLS AND SLABS (UNLESS

MIN
75mm. FOR FOUNDATIONS IN CONTACT WITH SOIL, BLINDING,

15
OR WATERPROOFING SHOWN OTHERWISE ON DRWGS.)
50mm. WHEN IN CONTACT WITH WATER

MAX
10
50mm. WHEN EXPOSED TO EARTH OR WEATHER
40mm. IN DROP BEAMS & COLUMNS, ( TO STIRRUPS & TIES )
30mm. IN SLABS, RIBS EMBEDDED BEAMS AND WALLS NOT 15 16 DIA MS ROD FULL
EXPOSED TO EARTH. MAX. STRENGTH BUTT WELD TO
ON EACH FACE PLATE.
8- THE CONTRACTOR SHALL PREPARE FULL BAR BENDING SCHEDULE
FOR ENGINEER'S APPROVAL. CORRECTIONS AND REFORM
ON EACH FACE (TYP.) TYPICAL LIFTING HOOK DETAIL CENTERS DEPARTMENT
(CRCD)
S
DAMP PROOFING & WATERPROOFING : RAD
IU

1 - ALL VERTICAL CONCRETE SURFACES IN CONTACT WITH SOIL SHALL NOTES:


BE PAINTED WITH NITOPROOF 230 OR EQUIVALENT
60 MIN. (TYP.) 1- REFER TO ARCHITECTURAL DRAWINGS FOR LIFTING HOOK
+ PROTECTION BOARD .
2- THE ABOVE DETAIL IS TO BE USED UNLESS OTHERWISE
ALL HORIZONTAL CONCRETE SURFACES IN CONTACT WITH SPECIFIED Funded by:

SOIL SHALL BE PROTECTED BY: 3- LOCATION TO BE TO THE APPROVAL OF THE ENGINEER. THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
- 500 MICRON POLYEHTYLENE SHEETS FOR SLAB ON GRADES
- PAINTED BY NITOPROOF 230 OR EQUIVALENT FOR OTHER SURFACES
MAX CAPACITY 500kg. SUITABLE
NOTE:
FOR ALL WALLS USE U TIE SPACERS STAGGERED @ 100cm FOR VERTICAL LOADS ONLY
Project Name: Design & Implementation:
UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
(JCF)
Title:

STRUCTURAL
GENERAL NOTES AND
DETAILS
Seq No.:

85788 01 01 STR STR 000


Rev.:
0 1
I.H. I.M. K.H. NTS 17/02/2014
KEY MAP:

A B A B A B
175 175 175

LEGEND

200 200 200


12.5 12.5 12.5 12.5 12.5 12.5
12.5

12.5

12.5
12.5

12.5

12.5
1 1 1
150 150 150
A A A
S210 S210 S210
STOPPING WALL
200

200

200
150

150

150
175

175

175
2
S110
12.5

12.5

12.5
2 2 2
12.5

12.5

12.5
12.5 12.5 12.5 12.5 12.5 12.5
S210

S210

S210
B

B
WALL LAYOUT @ LEVEL (0.00) WALL LAYOUT @ LEVEL (3.60) WALL LAYOUT @ LEVEL (7.20)

A B A B
175 175

165 200 165

165
STOPPING WALL
50 50
1 1
25

25

C1 C1 COLUMN C1
A A
S210 S210
10

200
175

175
50

10
20
45
C1 C1
2.5

25
2 2
25

25

50 50
10
CORRECTIONS AND REFORM

20

10
CENTERS DEPARTMENT
20 (CRCD)
165

COLUMN DETAIL-C1
SCALE 1:20
S210

S210
B

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
WALL LAYOUT @ LEVEL (10.80) WALL LAYOUT @ LEVEL (13.40)

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
(JCF)
Title:

STRUCTURAL
WALL LAYOUTS
Seq No.:

85788 01 01 STR STR 100


Rev.:
0 1
I.H. I.M. K.H. 1:50 17/02/2014
KEY MAP:

A B
175 LEGEND

15
15
1 POLYETHYLENE
SHEET 500 MICRO THICK
S.O.G TH.:15 cm COMPACTED SELECTED MATERIAL
A
S210
95% Modified Proctor Test

175
2

S210
B

SLAB ON GRADE @ LEVEL (0.00)

115

10
10

50
A B
19
175
10
95

20
+7.00

15
80 200 80

FORM WORK SHALL NOT BE DISMANTLED UNTIL


FLOOR LEVEL 10.80 IS CAST AND CURED FOR 14 DAYS
80

A 60
60

S210
200

175

DROP
BEAM

2
80

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

25

Slab clear depth


S210
B

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
WALL LAYOUT @ LEVEL (10.80)
25
25

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
A CHAIR DETAIL Facility Beit Hanina, Jerusalem

SCALE 1:20
(JCF)
Title:

STRUCTURAL
FLOORS/SLABS LAYOUTS
Seq No.:

85788 01 01 STR STR 110


Rev.:
0 1
I.H. I.M. K.H. 1:50 17/02/2014
KEY MAP:

1 2 1 2
175 175

530 530
LEGEND
15 210 8 60 8 214 15 15 177 8 60 8 247 15
+13.6 +13.6

25

25
+13.4 +13.4

20

20
45

45
50 50 50 50
390 390
15 360 15 15 360 15
110

110

110

110
STIRRUPS
+10.80 +10.80

50 50 50 50
FAIRFACE
95 25 150 25 95 95 25 150 25 95

FAIRFACE FAIRFACE

STAGGERED
U-TIE@100
19

STAGGERED
U-TIE@100
19

FAIRFACE FAIRFACE

DOOR OPENING

POLYETHYLENE COMPACTED BASE COURSE POLYETHYLENE COMPACTED BASE COURSE


SHEET 500 MICRO 98% Modified Proctor Test SHEET 500 MICRO 98% Modified Proctor Test
THICK THICK COMPACTED SELECTED MATERIAL
95% Modified Proctor Test
REFER TO ARCH REFER TO ARCH
-0.15 -0.15
1515

1515
CORRECTIONS AND REFORM
COMPACTED SELECTED MATERIAL CENTERS DEPARTMENT
95% Modified Proctor Test (CRCD)
MIN.

MIN.
150

150

DAMP PROOF MEMBRANE DAMP PROOF MEMBRANE


10 50

10 50

30 30 30 30
Funded by:
THIS PROJECT IS FUNDED BY
10 400 10 10 400 10 THE EUROPEAN UNION

SCALE: 1/50
SCALE: 1/50
Project Name: Design & Implementation:
UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
(JCF)
Title:

STRUCTURAL
SECTIONS
Seq No.:

85788 01 01 STR STR 210


Rev.:
0 1
I.H. I.M. K.H. 1:50 17/02/2014
A B C D KEY MAP:

335 740 335

ARCH BEAM

30
1

55 600 55

NOTE: EXPANSION JOINT


(2cm) EVERY 10m

LEGEND

350
950

950

945
930
SPACERS
STAGGERED
@100cm c/c

30 30

70
REFER TO ARCH

REFER TO BOUNDARY REFER TO BOUNDARY


WALL SECTION -S510 EXPANSION EXPANSION WALL SECTION -S510

MAX.150
JOINT 2cm 385 DOOR OPENING JOINT 2cm
385
2
30

30
60 20 60 DAMP PROOF
30 20 20 30 MEMBRANE
320 15 710 15 320
REFER TO ARCH

280
260

MIN. 70
2
S510 40 20 60

30
20

30
C2
90

ARCH BEAM

105
LIMESTONE FORMATION

10
10 120 10
20

4
BOUNDARY WALL SECTION
SCALE- 1:25
CONCRETE BACKING
B200
STONE
S510
1

SCALE: 1/50

C D

335

20 10 20

1 2 3 4
20 315 CORRECTIONS AND REFORM
CENTERS DEPARTMENT
945 280 105 +12.68 (CRCD)

40

20
ARCH
SHAPE 20 10 20
30

ARCH STEEL MESH


SHAPE Funded by:
COLUMN-C2
THIS PROJECT IS FUNDED BY

285
THE EUROPEAN UNION
156

STIRRUPS STIRRUPS STEEL MESH

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
+9.63 Facility Beit Hanina, Jerusalem

20 15 15
(JCF)
Title:
SECTION 1-1
POLYETHYLENE MEMBRANE 500 micron
COMPACTED BASECOURSE LAYER 150mm
STRUCTURAL
COMPACTED SELECTED FILL RETAINING WALL DETAIL
AND MAIN GATE DETAILS
Seq No.:
SCALE: 1/50
85788 01 01 STR STR 510
Rev.:
0 1
I.H. I.M. K.H. SHOWN 17/02/2014
KEY MAP:

A B C D

70
335 740 335
REFER TO ARCH REFER TO ARCH

185 500 185 DAMP PROOF

MIN. 70
MEMBRANE
50 50 LEGEND
30

130

130

30
1
LIMESTONE FORMATION

10
55 50 50 55
10 130 10

SECTION 3-3
SCALE- 1:25

50 50 50 50

30 30
950

950

945

70
950

950

REFER TO ARCH REFER TO ARCH

3 3
S511 S511 DAMP PROOF

MIN. 70
MEMBRANE
50 60
20

30
LIMESTONE FORMATION

10
335 335
10 130 10

SECTION 4-4
SCALE- 1:25
50
20

20
2
30

50

20
4

280
S511
60 50 335
170

250

20
4 45 90 225 50 60
250
510

510
S511
80

105
130

130

CORRECTIONS AND REFORM


CENTERS DEPARTMENT
(CRCD)

490 560 490


COLUMN C2

SCALE: 1/50 30 Funded by:


10 THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

20

10
15
25

Project Name: Design & Implementation:


COLUMN DETAIL-C2 UNOPS , JMPC
SCALE 1:20 Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
(JCF)
Title:

STRUCTURAL
MAIN GATE DETAILS
Seq No.:

85788 01 01 STR STR 511


Rev.:
0 1
I.H. I.M. K.H. SHOWN 17/02/2014
B A

C
--

1
PIT
G-01

Electrical Room

B A
-- --

+
--

--
A

A
-60

2
W01 W01
D
--

NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND
ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
A B C D

-120
+240.10

-220 -80
+239.10 +240.50
2
UP

-245
+238.85 -205
NOTES
+239.25 Opening Bottom Level

+238.35 3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
-280 MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

+238.50

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND
ER

GATE 1: PLAN
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
UP

+99
+242.29
NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

GATE ROOM 1 - ROOF


ND

DRAINAGE SYSTEM LAYOUT


ER

GATE 1: ROOF PLAN


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-02 ME D.R. 01-02


SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
A B C D

-140
+239.90

-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50 UP
+240.80
-45 -177 -195 -177

+240.85 +239.53 +239.35 +239.53 -155 NOTES


-135 -210 +239.75 Opening Bottom Level

+239.95 +239.20 +239.20 3


Rev.: Date: Description: Approved
4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
-200 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
+239.30 -210 MINISTRY OF INTERIOR
(MOI)
CENTERS DEPARTMENT
(CRCD)

-220 +239.20
+239.10
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

GATE ROOM 2 - GROUND


ND

DRAINAGE SYSTEM LAYOUT


ER

GATE 2: PLAN
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-02 ME D.R. 01-03


SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
A B C D

2
UP

+149
+242.79
NOTES

3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

GATE ROOM 2 - ROOF


ND

DRAINAGE SYSTEM LAYOUT


ER

GATE 2: ROOF PLAN


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-02 ME D.R. 01-04


SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
A B C D

REF. DESCRIPTION LOCATION QTY TYPE CAPACITY POWER (WATT) VOLTAGE NOTES

EWH‐2 ELECTRIC WATER HEATER GATE 1 & 1 WC 2 HORIZONTAL 30 L 2500 220 ENAMEL INNER FINISH

-120
+240.10

-220 -80
+239.10 +240.50
2
UP

-245
+238.85 -205
NOTES
+239.25 Opening Bottom Level

+238.35 3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
-280 MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Equipment
+238.50 Pipe Connection
Collector H.S. W.C. W.B. Sh. Sk. Total Manifold Size Notes

No. C.W. C.W. C.W. H.W. C.W. H.W. C.W. H.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W.
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
DC:‐GA‐1 1 1 1 1 0 0 0 0 0 0 0 3 1 0 3/4" 3/4" ‐ 3/4" 3/4" ‐ Manifolds are in G.S. Cabinet

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND
ER

GATE 1: PLAN
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
A B C D

-140
+239.90

-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50 UP
+240.80
-45 -177 -195 -177

+240.85 +239.53 +239.35 +239.53 -155 NOTES


-135 -210 +239.75 Opening Bottom Level

+239.95 +239.20 +239.20 3


Rev.: Date: Description: Approved
4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
-200 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
+239.30 -210 MINISTRY OF INTERIOR
(MOI)
CENTERS DEPARTMENT
(CRCD)

-220 +239.20
H.S. W.C. W.B.
+239.10 Equipment Pipe Connection Notes
Collector Sh. Sk. Total Manifold Size
Funded by:
No. C.W. C.W. C.W. H.W. C.W. H.W. C.W. H.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

DC:‐GA‐1 1 1 1 1 0 0 0 0 0 0 0 3 1 0 3/4" 3/4" ‐ 3/4" 3/4" ‐ Manifolds are in G.S. Cabinet


Project Name: Design & Implementation:
UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

GATE ROOM 2 - GROUND


ND

D. WATER SYSTEM LAYOUT


ER

GATE 2: PLAN
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-02 ME D.W. 02-02


SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
AIR
EXTERNAL POWER
REF. DESCRIPTION LOCATION SERVED AREA QTY FLOW TYPE RPM
ST. PR. (Pa) (WATT) VOLTAGE NOTES
(L/S)

WEF ‐ GA01 WALL EXTRACT FAN GATE A 1&2  WC WC's  ROOM 2 35 35 WALL TYPE EXTRACT FAN WITH ALUMINUM EXHAUST LOUVER 1450 25 220

A B C D
 COOLING DATA INDOOR UNIT OUTDOOR UNIT

AC LOCATION NOMINAL TYPE EXTERNAL QUANTITY NOTES


ELEC ELEC
INDOOR DESIGN TEMERATURE COOLING STATIC AIR FLOW VOLTAGE
POWER POWER
CAPACITY PRESS.

UNIT NO. dbt wbt (kw) (Pa) (L/S) (kw) (kw) V NO

IU‐GA‐01 & OU‐GA‐01 GATE ROOM 1 &2 24.0 17.1 3.52 SIDE WALL DECORATIVE ‐ 155 0.20 1.25 230 2 REF:410A, DC INVERTED, WALL TYPE, COOLING & HEATING OPERATION

-120
+240.10

NOTES

-220 -80
+239.10 +240.50
2 Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
UP Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
-245 MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

+238.85 -205
+239.25 Opening Bottom Level

+238.35 3 Funded by:


THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

4 Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
-280
FO

(JCF)
R

Title:
+238.50
TE
ND
ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
UP

+99
+242.29
NOTES

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

GATE ROOM 1- ROOF


ND

A.C. SYSTEM LAYOUT


ER

GATE 1: ROOF PLAN


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-02 ME A.C. 03-02


SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
A B C D

-140
+239.90

-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50 UP
+240.80
-45 -177 -195 -177

+240.85 +239.53 +239.35 +239.53 -155 NOTES


-135 -210 +239.75 Opening Bottom Level

+239.95 +239.20 +239.20 3


Rev.: Date: Description: Approved
4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
-200 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
+239.30 -210 MINISTRY OF INTERIOR
(MOI)
CENTERS DEPARTMENT
(CRCD)

-220 +239.20
+239.10
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE
ND
ER

GATE 2: PLAN
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
A B C D

2
UP

+149
+242.79
NOTES

3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

GATE ROOM 2- ROOF


ND

A.C. SYSTEM LAYOUT


ER

GATE 2: ROOF PLAN


ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-02 ME A.C. 03-04


SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
A B A B A B

1 1 1

2 2 2

GROUND FLOOR @ ±0.00 FIRST FLOOR @ +360 SECOND FLOOR @ +720


SCALE 1:100 SCALE 1:100 SCALE 1:100

A B
A B

± 0.00 Tower 1 = +241.00


+1340

1 1
± 0.00 Tower 2 = +238.20
NOTES

± 0.00 Tower 3 = +240.80


2 2 ± 0.00 Tower 4 = +241.00 Rev.: Date: Description: Approved
+1080 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

THIRD FLOOR @ +1080 ROOF FLOOR @ +1340 Funded by:


THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

SCALE 1:100 SCALE 1:100


Project Name: Design & Implementation:
UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

Surveillance Towers
ND

DRAINAGE SYSTEM LAYOUT


ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-03 ME D.R. 01-01


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
A.M. A.M. A.A. A3 1:100 15/03/2014
A B A B A B

1 1 1

2 2 2

GROUND FLOOR @ ±0.00 FIRST FLOOR @ +360 SECOND FLOOR @ +720


SCALE 1:100 SCALE 1:100 SCALE 1:100
Collector H.S. W.C. W.B. Sh. Sk. Equipment Total Pipe Connection Manifold Size Notes

No. C.W. C.W. C.W. H.W. C.W. H.W. C.W. H.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W.

DC:‐TS‐1 1 1 1 1 0 0 0 0 0 0 0 3 1 0 3/4" 3/4" ‐ 3/4" 3/4" ‐ Manifolds are in G.S. Cabinet

A B
A B

± 0.00 Tower 1 = +241.00


+1340

1 1
± 0.00 Tower 2 = +238.20
NOTES

± 0.00 Tower 3 = +240.80


2 2 ± 0.00 Tower 4 = +241.00 Rev.: Date: Description: Approved
+1080 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

THIRD FLOOR @ +1080 ROOF FLOOR @ +1340 Funded by:


THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

SCALE 1:100 SCALE 1:100


Project Name: Design & Implementation:
UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

Surveillance Towers
ND

D. WATER SYSTEM LAYOUT


ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-03 ME DW 02-01


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
A.M. A.M. A.A. A3 1:100 15/03/2014
A B A B A B

1 1 1

2 2 2

GROUND FLOOR @ ±0.00 FIRST FLOOR @ +360 SECOND FLOOR @ +720


SCALE 1:100 SCALE 1:100 SCALE 1:100

A B
A B

± 0.00 Tower 1 = +241.00


+1340

1 1
± 0.00 Tower 2 = +238.20
± 0.00 Tower 3 = +240.80 NOTES

2 2 ± 0.00 Tower 4 = +241.00


+1080

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

THIRD FLOOR @ +1080 ROOF FLOOR @ +1340


SCALE 1:100 SCALE 1:100 Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

COOLING ELEC DATA ELEC DATA


Title:
TE

REF. DESCRIPTION LOCATION SERVED AREA QTY NOTES Surveillance Towers


CAPACITY (Kw) INDOOR KW OUTDOOR KW
ND

A/C SYSTEM LAYOUT


ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:

S.U. T01 SPLIT AIR CONDITIONING THIRD FLOOR TOWER ROOM 4 7.30 0.10 2.30 HEAT PUMP, REF:410A, FLOOR TYPE


LY

85788 01 05-03 ME AC 03-01


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
A.M. A.M. A.A. A3 1:100 15/03/2014
B A

A
--

A
--

1
-120 -60
PIT

± 0.00 = +238.70 A.S.L. D


C
-- G-01 --

Transformer Room

2
B
--

NOTES
A
--

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

TRANSFORMER ROOM
ND

DRAINAGE SYSTEM LAYOUT


ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-04 ME D.R. 01-01


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
-52

-16 UP

-106
+241.80

UP

± 0.00
-18
± 0.00 +242.86 A.S.L.
+242.86 A.S.L.

NOTES

-16 Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

PLANT ROOM - GROUND


ND

DRAINAGE SYSTEM LAYOUT


ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-05 ME D.R. 01-01


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
1

Plant Room UP

UP
2

Maintenance Office

NOTES
Water Tank
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School

5 Facility Beit Hanina, Jerusalem


FO

(JCF)
R

Title:
TE
ND
ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
E D C B A

UP

NOTES

Water Tank Rev.: Date: Description:


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
Approved

AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

PLANT ROOM - BASEMENT


ND

WATER &FF SYSTEMS LAYOUT


ER

5
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-05 ME D.W. 02-01


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A3 1:100 15/03/2014
-52

-16 UP

-106
+241.80

UP

Medical Gas Maintenance Office


Store ± 0.00
-18
± 0.00 +242.86 A.S.L.
+242.86 A.S.L.

Water Tank
NOTES
-16

Rev.: Date: Description: Approved


All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)

Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION

Project Name: Design & Implementation:


UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
FO

(JCF)
R

Title:
TE

PLANT ROOM - GROUND


ND

MEDICAL GASES SYS. LAYOUT


ER
ON

Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:


LY

85788 01 05-05 ME M.G. 03-01


Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.T. A.M. A.A. A2 1:100 15/03/2014