ANNEX III-Site Components Drawings Set
ANNEX III-Site Components Drawings Set
ANNEX III-Site Components Drawings Set
(JCF)
PACKAGE TOW WORKS
PALESTINIAN CIVIL POLICE PALESTINIAN NATIONAL AUTHORITY THIS PROJECT IS FUNDED BY UNOPS , JMPC
CORRECTIONS AND REFORM CENTERS MINISTRY OF INTERIOR THE EUROPEAN UNION Alami Building, Near Rosary School
Beit Hanina, Jerusalem
DEPARTMENT (MOI)
(CRCD)
FO
R
TE
NDE
R
ON
LY
ARCHITECTURAL DRAWINGS LIST JCF-SITE COMPONENTS-STR-ELEC&TRANS ROOM MECHANICAL DRAWINGS LIST ELECTRICAL DRAWINGS LIST
Drawing No. Drawing Name "Scale STRUCTURAL DRAWINGS LIST Drawing No. Drawing Name "Scale Drawing No. Drawing Name "Scale
" Date Revision 20/3/2014 " Date Revision 20/3/2014 " Date Revision 20/3/2014
GE CS 000 COVER - 20/3/2014 00 Drawing No. Drawing Name "Scale ME DR 01-01 ELECTRICAL ROOM -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL 01 ELECTRICAL ROOM 1:100 20/3/2014 00
GE DL 0001 LIST OF DRAWINGS - 20/3/2014 00 " Date Revision 20/3/2014 ME DR 01-01 GATE - 1GROUND FLOOR -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL 02 ELECTRICAL ROOM 1:100 20/3/2014 00
AR GN 0100 ARCHITECTURAL GENERAL NOTES -SHEET 1 - 20/3/2014 00 STR STR 000 GENERAL NOTES AND DETAILS N.T.S 20/3/2014 00 GATE - 1ROOF TOP FLOOR -DRAINAGE SYSTEM EL LV 03 GATE - 1CCTV &ACS 1:100 20/3/2014 00
ME DR 01-02 1:100 20/3/2014 00
LAYOUT
AR GN 0101 ARCHITECTURAL GENERAL NOTES -SHEET 2 - 20/3/2014 00 STR STR 001 GENERAL DETAILS N.T.S 20/3/2014 00 GATE - 2GROUND FLOOR -DRAINAGE SYSTEM EL L 04 GATE - 1LIGHTING SYSTEM 1:100 20/3/2014 00
ME DR 01-03 1:100 20/3/2014 00
AR GN 0102 ARCHITECTURAL GENERAL NOTES -SHEET 3 - 20/3/2014 00 STR STR 002 GENERAL DETAILS N.T.S 20/3/2014 00 LAYOUT EL FA 05 GATE - 1FIRE ALARM 1:100 20/3/2014 00
GATE - 2ROOF TOP FLOOR -DRAINAGE SYSTEM
AR GL 100 GATE - 1GROUND FLOOR PLAN 1:100 20/3/2014 00 COLUMN LAYOUT &DETAILS+S.O.G+FOUNDATION ME DR 01-04 1:100 20/3/2014 00 EL PDS 06 GATE - 1POWER &DATA SYSTEMS 1:100 20/3/2014 00
STR STR 120 1/100 20/3/2014 00 LAYOUT
LAYOUT
AR GL 101 GATE - 2GROUND FLOOR PLAN 1:100 20/3/2014 00 ME DW 02-01 GATE - 1GROUND FLOOR -WATER SYSTEM LAYOUT 1:100 20/3/2014 00 EL P 07 GATE - 1POWER FOR MECHANICAL 1:100 20/3/2014 00
STR STR 131 S.O.G DETAILS&FOUNDATION DETAILS 1/25 20/3/2014 00
AR GL 200 GATE - 1ROOF TOP FLOOR PLAN 1:100 20/3/2014 00 ME DW 02-02 GATE - 2GROUND FLOOR -WATER SYSTEM LAYOUT 1:100 20/3/2014 00 EL L 08 GATE - 2LIGHTING SYSTEM 1:100 20/3/2014 00
STR STR 140 SLAB LAYOUT &DETAILS 1/100 20-3-2014 00
AR GL 201 GATE - 2ROOF TOP FLOOR PLAN 1:100 20/3/2014 00 ME AC 03-01 GATE - 1GROUND FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL FA 09 GATE - 2POWER &DATA SYSTEMS 1:100 20/3/2014 00
COLUMN LAYOUT &DETAILS (Plant Room) 00
AR LV 100 GATE - 1ELEVATIONS 1:100 20/3/2014 00 ME AC 03-02 GATE - 1ROOF TOP FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL LV 10 GATE - 2CCTV &ACS 1:100 20/3/2014 00
AR LV 101 GATE - 2ELEVATIONS 1:100 20/3/2014 00 ME AC 03-03 GATE - 2GROUND FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL FA 11 GATE - 2FIRE ALARM 1:100 20/3/2014 00
AR SE 100 GATE - 1SECTIONS 1:100 20/3/2014 00 JCF-SITE COMPONENTS -STR-PLANT ROOM EL PDS 12 GATE - 2POWER FOR MECHANICAL 1:100 20/3/2014 00
ME AC 03-04 GATE - 2ROOF TOP FLOOR -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00
AR SE 101 GATE - 2SECTIONS 1:100 20/3/2014 00 ME DR 01-01 SURVEILLANCE TOWER -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL PU 13 SURVEILLANCE TOWER -POWER &UPS 1:100 20/3/2014 00
AR WL 100 GATES -SCHEDULE OF DOORS &WINDOWS 1:50 20/3/2014 00 STRUCTURAL DRAWINGS LIST ME DW 02-01 SURVEILLANCE TOWER -WATER SYSTEM LAYOUT 1:100 20/3/2014 00 EL DS 14 SURVEILLANCE TOWER -DATA &CCTV 1:100 20/3/2014 00
AR GL 300 SURVEILLANCE TOWER -PLANS 1:100 20/3/2014 00 20/3/2014 ME AC 03-01 SURVEILLANCE TOWER -A.C .SYSTEM LAYOUT 1:100 20/3/2014 00 EL L 15 SURVEILLANCE TOWER -LIGHTING 1:100 20/3/2014 00
AR LV 200 SURVEILLANCE TOWER -ELEVATIONS &SECTIONS 1:100 20/3/2014 00 STR STR 120 COLUMN LAYOUT &DETAILS 1/100 20/3/2014 00 ME DR 01-01 TRANSFORMER ROOM -DRAINAGE SYSTEM LAYOUT 1:100 20/3/2014 00 EL 16 TRANSFORMER ROOM 1:100 20/3/2014 00
SURVEILLANCE TOWER -SCHEDULE OF DOORS & PLANT ROOM -GROUND FLOOR -DRAINAGE SYSTEM EL PL 17 PLANT ROOM &WATER TANK -EARTHING SYSTEM 1:100 20/3/2014 00
AR WL 200 1:50 20/3/2014 00 STR STR 130 FOUNDATION LAYOUT 1/100 20/3/2014 00 ME DR 01-01 1:100 20/3/2014 00
WINDOWS LAYOUT PLANT ROOM &WATER TANK -POWER &LIGHTING
AR 3D 100 SURVEILLANCE TOWER 3 -D - 20/3/2014 00 STR STR 131 FOUNDATION DETAILS 1/100 20/3/2014 00 PLANT ROOM -ROOF TOP FLOOR -DRAINAGE SYSTEM EL PL 18 1:100 20/3/2014 00
ME DR 01-02 1:100 20/3/2014 00 SYSTEM
WATER TANK &PLANT ROOM -UNDERGROUND LAYOUT PLANT ROOM &WATER TANK -UNDERGROUND POWER
AR GL 400 1:100 20/3/2014 00 STR STR 140 GROUND SLAB LAYOUT 1/100 20/3/2014 00 EL P 19 1:100 20/3/2014 00
FLOOR PLAN PLANT ROOM -UNDERGROUND FLOOR -WATER &F.F . SYSTEM
STR STR 141 GROUND SLAB DETAILS 1/100 20/3/2014 00 ME DW 02-01 1:100 20/3/2014 00
WATER TANK &PLANT ROOM -GROUND FLOOR SYSTEMS LAYOUT PLANT ROOM &WATER TANK -UNDERGROUND
AR GL 401 1:100 20/3/2014 00 PLANT ROOM -GROUND FLOOR -MIDICAL GASES EL L 20 1:100 20-3-2014 00
PLAN STR STR 150 SLAB LAOUT 1/50 20/3/2014 00 ME MG 03-01 1:100 20-3-2014 00 LIGHTING SYSTEM
WATER TANK &PLANT ROOM -ROOF TOP FLOOR SYSTEM LAYOUT
AR GL 402 1:100 20/3/2014 00 STR STR 151 SLAB DETAILS 1/50 20-3-2014 00
PLAN
WATER TANK &PLANT ROOM -ELEVATIONS -
AR LV 400 1:100 20/3/2014 00
SHEET 1
WATER TANK &PLANT ROOM -ELEVATIONS - JCF-SITE COMPONENTS -STR-WATER CISTERN
AR LV 401 1:100 20/3/2014 00
SHEET 2
WATER TANK &PLANT ROOM -SECTIONS -
AR SE 400 1:100 20/3/2014 00 STRUCTURAL DRAWINGS LIST
SHEET 1
WATER TANK &PLANT ROOM -SECTIONS - 20/3/2014
AR SE 401 1:100 20/3/2014 00
SHEET 2
WATER TANK &PLANT ROOM -SCHEDULE OF STR STR 120 COLUMN LAYOUT &DETAILS 1/100 20/3/2014 00
AR WL 400 1:50 20/3/2014 00
DOORS &WINDOWS STR STR 130 FOUNDATION LAYOUT 1/100 20/3/2014 00
AR GL 500 ELECTRICAL ROOM -PLANS 1:100 20/3/2014 00
STR STR 131 FOUNDATION DETAILS 1/50 20/3/2014 00
AR LV 500 ELECTRICAL ROOM -ELEVATIONS 1:100 20/3/2014 00
STR STR 140 SLAB LAYOUT 1/100 20-3-2014 00
AR SE 500 ELECTRICAL ROOM -SECTIONS 1:100 20/3/2014 00
ELECTRICAL ROOM -SCHEDULE OF DOORS &
AR WL 500 1:100 20/3/2014 00
WINDOWS JCF-TOWER+BOUNDARY WALL
AR GL 600 TRANSFORMER ROOM -PLANS 1:100 20/3/2014 00
AR LV 600 TRANSFORMER ROOM -ELEVATIONS 1:100 20/3/2014 00
NOTES
STRUCTURAL DRAWINGS LIST
AR SE 600 TRANSFORMER ROOM -SECTIONS 1:100 20/3/2014 00
20/3/2014
TRANSFORMER ROOM -SCHEDULE OF DOORS &
AR WL 600 1:100 20-3-2014 00 STR STR 000 GENERAL NOTES AND DETAILS NTS 20/3/2014 01
WINDOWS
STR STR 100 WALL LAYOUTS 1:50 20/3/2014 01
STR STR 110 FLOORS/SLABS LAYOUTS 1:50 20/3/2014 01
Rev.: Date: Description: Approved
STR STR 210 SECTIONS 1:50 20/3/2014 00 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
STR STR 510 RETAINING WALL DETAIL AND MAIN GATE DETAILS SHOWN 20/3/2014 01 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
STR STR 511 MAIN GATE DETAILS SHOWN 20-3-2014 00 AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
LIST OF DRAWINGS
ER
ON
85788 01 01 GE DL 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 N/A 23/03/2014
GENERAL NOTES: DOCUMENT IDENTIFICATION:
1. GENERAL, Architectural
1.1) These General Notes are instructions to the Contractor and apply generally to all the work unless more specific 62699 03 00 AR GE 0010
information is shown in drawings or written in the specifications, standards and/or contracts. A B C D E F
1.2) All construction works shall be in accordance with the most current DWG's, spec's and standards as modified by the Sequence No: 4 digits
Subject: 2 letters
Architect/Engineer.
Discipline: 2 letters
1.3) An approved set of plans shall be maintained on the job site at all times. UNOPS Sub No: 2 digits
1.4) All works shall be conform to the best practice of each trade. Unless shown or noted otherwise, construction details UNOPS No: 4 digits
or practices are common to the standard of the trade. Project No: Digits (6+4)
1.5) All works shall be conform to the applicable codes and authority rules.
1.6) The Contractor shall obtain the necessary permits required for the works shown on these drawings prior to the Reference Document: 0000-00-AL-SP-9100 PIDU Standard File Names
start of the construction. LEGEND,
1.7) The Contractor shall locate and uncover all the underground utilities in advance of the construction in order the
A - Project No: Building Department Project No given by UNOPS Building Dept
B - UNOPS No: UNOPS Project No generated from UNOPS Database.
Architect/Engineer. C - UNOPS Sub No: Indicates the Sub section of project; for example, multiple locations.
1.8) Backfilling shall not be started until newly installed underground equipment is checked and approved by the engineers 00: No Sub section, default
to verify their identity and their correct position. 01: Sub section 01
02: Sub section 02
1.9) Backfill shall be installed in accordance with the relevant ruling standards. D - Discipline: Indicates the discipline or Department concerned.
1.10) Disposal of/and stockpiling of excess material within the planning area shall be done in such a way that it will not
create a nuisance to the ongoing works in general and the neighboring surrounding. AC: Air Conditioning, HVAC GE: General
AD: Administration ME: Mechanical
1.11) The Contractor shall not trespass beyond the project boundary lines unless a permit or written authorization has AL: All disciplines PR: Process Piping
been obtained from the neighboring property owners involved. AR: Architectural QS: Quantity Survey
1.12) Any damage on public area and/or on the clients premises caused by the ongoing project works shall be restored in DT: Data & Telecom ST: Structural
its original condition, with no additional cost implication to the owners involved, as per following requirements: EL: Electrical WS: Water Services (Supply & Sewers )
1.12.1) All trees impacted by the ongoing construction works shall be replaced with the E - Subject: Indicates the subject of the drawing.
same size and type of tree at the same location or at a new location given by
BD: Border Drawing
the local authorities or by the client.
BH: Soil Test Bore Hole Plan
1.12.2) All irrigation systems shall be restored to fully functioning status. BQ: Bill of Quantity
1.12.3) Any road or street cuts are to be coordinated with the local authorities, CP: Ceiling Plan
CS: Cover Sheet
backfilled according standards and repaired to its original status. CT: Contract
1.13) All dimensions and levels are in millimeters (mm) unless mentioned otherwise. DD: Details, non standard
DL: Drawing List
1.14) The Contractor shall check and verify all dimensions and levels on site (both new and existing) and report
DP: Demolition Plan
discrepancies to the Architect/Engineer prior to proceeding of works. DR: Drawing Register
1.15) The drawing shall not be scaled. Only written dimensions shall be followed. The Contractor shall request, from the GA: General Arrangement
Architect, necessary dimensions not shown on the drawings. GL: Layout (only planviews)
GM: Layout Mixed (plans, sect's & elev's)
1.16) All Architectural drawings shall be read in conjunction with the Structural, Services drawings and specifications for GN: General Notes
proper coordination. Any discrepancies shall be brought to the attention of the Engineer. LM: Elevations & Sections Mixed (sect's & elev's)
1.17) All dimensions other than levels are given to structural elements. Dimensions are taken from and to centerlines of LV: Elevations (only elevations)
columns, beams, and other structural elements; from faces of walls and edges of openings unless shown otherwise. MF: Master File or Model File (no drawing)
PC: Procedures NOTES
1.18) All levels shown in the drawing are finished floor levels. Contractor shall allow adequate changes in the structural PI : Piling Plan
floor to achieve indicated floor levels. PL: Project Planning or program
1.19) Contractor shall submit shop drawings "For Approval" prior to fabrication where required by Architect/Engineer. PM: Project Manual
PN: Preamble Notes
PP: Site Plan, Plot Plan (existing, new, proposed) Rev.: Date: Description: Approved
RP: Reports All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
SC: Schematics, diagrams PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
SF: Safety/Fire Escape Plan MINISTRY OF INTERIOR
CORRECTIONS AND REFORM
CENTERS DEPARTMENT
TR: Transmittal
WL: Schedule of Openings (Door & Windows) Project Name: Design & Implementation:
UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
F - Sequence No: Indicates the actual drawing serial number. JCF Site Components
FO
R
Title:
TE
ARCHITECTURAL
ND
85788 01 01 AR GN 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 N/A 23/03/2014
2. REFERENCE DOC'S:
2.1) Reference Documents as listed on the individual drawings.
ABBREVIATIONS:
A.B. - Anchor Bolt CONN. - Connection FIN. - Finish JST. - Joist O.H.W.T. - Overhead Water Tank STD. - Standard W.I. - Wrough Iron
ABV. - Above CONSTR. - Construction FITT. - Fitting, Fitted JT. - Joint OPNG. - Opening STIFF. - Stiffener W.I.C. - Walk in Closet
A.C. - Asphalt Concrete CONT. - Continuation FLO. - Field OPT. - Optional STL. - Steel W.M. - Washing Machine
A/C - Air Conditioning CONTR. - Contractor FLR - Floor K.O. - Knock out OR - Outside Radius SPEC. - Specification W 10 - With out
A.D. - Access Door CONC. - Concrete F.O.C - Face of Concrete KVA - Kilo Volt Ampere OSB - Oriented Strand Board SO. - Square W.P. - Working Point
ADD. - Additional CORR. - Corrigated F.O.W. - Face of Wall KW - Kilo Watt SQ.FT. - Square feet W.R. - Water Resistant
ADJ. - Adjust C/P - Car Port FLUOR. - Fluorescent P. - Pump SQ.IN. - Square inch W.T. - Water Tank
A.F.F. - Above Finished Floor C.S. - Carbon Steel F.P. - Fire Proof, Fire proofing L. - Length PART. - Partition SQ.YD. - Square yard WTR. - Water
A.F.G. - Above Finished Grade CSK. - Countersink FRM. - Frame LAB. - Laboratory PAV. - Pavement, paving SQ.M. - Square Meter
A.G. - Above Ground CSMNT. - Casement F.S. - Far Side LAM. - Laminate P.B. - Permanent Building SQ.CM. - Square Centimeter YO. - Yard
A.H.U. - Air Handling Unit C.T. - Ceramic Tile FT - Feet LA 1. - Lateral P&B. - Post and Beam STR. - Storage
ALT. - Alternative C.W. - Cold Water FURN. - Furnace LAV. - Lavatory PC.CONC. - Pre-Cast Concrete STRUCT. - Structural ZN. - Zink
ALU. - Aluminum F.W. - Fire Water L/B - Load Bearing PCH. - Porch SUSP. - Suspended
ANCH. - Anchor D. - Door FWD. - Forward L:B - Land to Build ratio PERF. - Perforated SYM. - Symmetrical
APP'O. - Approved DBL. - Double LD. - Lead PLST. - Plaster SYS. - System
APPROX. - Approximative DET. - Detail GA. - Gauge L.F. - Life Fence PL T. - Plate SZ. - Size
APT. - Apartment D.F. - Drinking Fountain GALV. - Galvanized LG. - Large PLAS. - Plastic
ARCH. - Architect DEMO. - Demolition GAR. - Garage L.HD. - Left Hand PL YWO. - Plywood T.B. - Trough bolt
ASPH. - Asphalt DIA. - Diameter G.C. - General Contractor LIN. - Linear PORC. - Porcelain T&B - Top and Bottom
ASSY, - Assembly DIM. - Dimension GEN. - General L1NO. - Linoleum PRE-ENG. - Pre-Engineering T.B.D. - To be determined
ATT. - Attached DISCH - Discharge GL. - Glass L.P. - Low Point P.S.F. - Pounds per square foot TEL. - Telephone
AUX. - Auxiliary ON. - Down G.M. - Grade Mark LS. - Loudspeaker P.S.1. - Pounds per square inch T&G - Tongue and groove
AVG. - Average DR. - Drain GOVT. - Government LT. - Light PS.L. - Passengers lift TH. - Threshold
D.S. - Down Spout GR. - Grille LTG. - Lighting P.V.C. - Polyvinyl chloride THK. - Thick
B.D. - Board D.W. - Dry wall, plaster board GRE. - Glass fiber Reinf. Epoxy LVL. - Level P.W. - Potable Water THRD. - Threaded
B.L. - Building Line D&W - Door and Window G.T. - Glazed Tile PWR. - Power T.O. - Top of
BLDG. - Building DIW - Dishwasher GYP. - Gypsum M. - Male T.O.B. - Top of Beam
BLK. - Block DWG - Drawing MAR. - Marble QTY. - Quantity T.O.C. - Top of Concrete
BM. - Beam H. - Hose MAS. - Masonry T.O.F. - Top of footing
B.O. - Bottom of E. - East H.C. - Hose Connection MAX. - Maximum RAD. - Radius T.O.J. - Top of joist
B.O.C. - Bottom of Concrete EA. - Each HCP. - Handicapped Accessible M.B. - Machine Bolt R.C. - Reinforced Concrete T.O.H. - Top of masonry
B.O.S. - Bottom of Steel E.F. - Exhaust Fan HDBD. - Hardboard MBR. - Membrane R.D. - Roof Drain T.O.W. - Top of wall
B.O.W. - Bottom of Wall E.J. - Expansion Joint HOW. - Hardware MDF - Medium Density Fiber Board REF. - Reference T.S. - Tube steel
BRG. - Bearing EL. - Elevation HGT. - Height MECH. - Mechanical REFG. - Refrigerator TY. - Temporary Building
BRK. - Brick ELECT. - Electric, Electrical HOR. - Horizontal MED. - Medium REINF. - Reinforced TYP. - Typical
BRKT. - Bracket EMERG. - Emergency H.P. - High Point MEZZ. - Mezzanine RET. - Return
B.S. - Boundary Stone ENTR. - Entrance H.RAIL - Hand railing MFD. - Manufacturing REV. - Revision U. - Undefined
BSMNT. - Basement E.P. - Electrical Post H.R. - Hose Reel M.H. - Man Hole RHD. - Right Hand U.G. - Under Ground
NOTES
BTW. - Between ETL - Etcetera HTR - Heater MIN. - Minimum R.L. - Road Line UNF - Unfinished
B.U. - Built up Ea. - Equal H.W. - Hot Water M.O. - Masonry opening RM. - Room U.N.O. - Unless noted otherwise
B.W. - Boundary Wall EQUIP, - Equipment H.W.B. - Hand Wash Basin MOD. - Modular RMV. - Remove UNT - Unit
EST. - Estimate H.WD. - Hard Wood MODIF. - Modification R.O. - Rough Opening UTIL - Utility
Rev.: Date:
CABT. - Cabinet E.W. - Each Way HYD. - Fire Hydrant M/S - Multiple Storey R.O.W. - Right of way Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
Approved
but in this project without prior written consent of UNOPS.
C.B. - Catch Basin EXH. - Exhaust HVAC - Heating, Venting & Air Condit. MTL. - Material R.W. - Rain Water VA. - Voltage Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
C/C - Center to Center EXIST. - Existing V.B. - Vapor Barrier AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
C.D. - Construction Document EXP, - Expansion I.D. - Inside Diameter N. - North S. - South V.C.T. - Vinyl Composite Tile (MOI) (CRCD)
CEH. - Cement EXT. - Exterior I.E. - Invert Elevation N.A. - Not Applicable SAN. - Sanitary VERT. - Vertical
C.F. - Cubic foot I.F.A. - Issued for Approval N.F.C. - Not for construction S.C. - Self-closing V.I.F. - Verify in field
CH. - Channel F. - Female I.F.C. - Issued for Construction NLR. - Nailer SCHED. - Schedule V.P. - Valve Pit Funded by:
CHANG. - Changing F.A. - Fire Alarm I.F.T. - Issued for Tender NO. - Number SCHEM. - Schematic V.1.R. - Vent trough Roof THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
C.1. - Cast Iron FAB. - Fabrication I.F. - Inside Face NOH. - Nominal S.D. - Smoke Detector
C.J. - Construction Joint F.C.O. - Floor Clean out INCL. - Inclusive, including N.T.S. - Not to scale SECT. - Section W. - West, Window Project Name: Design & Implementation:
C.L. - Center Line F.D. - Floor Drain IND. - Industrial SHT. - Sheet W/ - With UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
CLG. - Ceiling FDN. - Foundation INV. - Invert O.A. - Over All SHT'G. - Sheeting W.B. - Wash Basin JCF Site Components
FO
CNTRL. - Central F.E. - Fire Extinguisher INSUL. - Insulation OIC - On Center SIM. - Simular W.C. - Toilet, water closet
R
Title:
TE
C.O. - Clean Out F.E.C. - Fire Extinguisher Cabinet INT. - Interior 0.0. - Outside Diameter SO.P. - Soakage Pit WD. - Wood ARCHITECTURAL
ND
COL. - Column F.F. - Finished Floor OFC. - Office S.P. - Septic Pit W.F. - Wired Fence ARCH GENERAL NOTES-SHEET 2
ER
COMPO - Composition FIF - Face to Face J.B. - Junction Box O.H. - Overhead SS. - Stainless Steel WGT. - Weight
ON
CONDO - Condition F.H.C. - Fire hose Cabinet JCT. - Junction O.HD. - Opposite Hand STA. - Station W.H. - Wall Height 85788 01 01 AR GN 101
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 N/A 23/03/2014
SYMBOLS:
1. GENERAL SYMBOLS
Revision cloud
R
Title:
TE
ARCHITECTURAL
Exterior Wall Composition
ND
Curtain wall
ON
-120
+240.10
G02
-220 -80
+239.10 +240.50
2
D02
UP
D01
-245
D03
+238.85 -205 NOTES
W01
+239.25 Opening Bottom Level
+238.35 3
G01
W02
Rev.: Date: Description: Approved
4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
-280 (MOI) (CRCD)
+238.50
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
GATE 1
ER
GATE 1: PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY
85788 01 01 AR GL 100
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D
-140
+239.90
G04
-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50
D02 D02
UP
D01
+240.80
D02 -177 -195 -177
-45 D03
+239.53 +239.35 +239.53 -155 NOTES
+240.85 W01
-135 -210 +239.75 Opening Bottom Level
4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
-200 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
-220 +239.20
+239.10
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
GATE 2
ER
GATE 2: PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY
85788 01 01 AR GL 101
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D
2
UP
+99
+242.29
NOTES
3
Rev.: Date: Description: Approved
4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
GATE 1
ER
GATE 1: ROOF PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY
85788 01 01 AR GL 200
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D
2
UP
+149
+242.79
NOTES
3
Rev.: Date: Description: Approved
4 All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
GATE 2
ER
GATE 2: ROOF PLAN Project No.: Phase: Subject No.: Discipline: Subject: Seq No.:
LY
85788 01 01 AR GL 201
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D
+245.83 +245.78
+244.48
+244.22
+243.18
+242.92
+238.50
NOTES
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
GATE 1
ER
ELEVATIONS
ON
85788 01 01 AR LV 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D
+246.53 +246.48
+245.18
+244.92
+244.14
243.62
+239.20
NOTES
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
GATE 2
ER
ELEVATIONS
ON
85788 01 01 AR LV 101
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D
+245.78 +245.83
+245.14
+242.49 +242.54
+242.29
+242.09
+240.10
+239.25 +239.23
+239.03
+238.85
+238.50
1 2 3 4
+245.78 +245.83
+245.14
+244.48 NOTES
+244.22
+239.25
+238.85 Project Name: Design & Implementation:
UNOPS , JMPC
+238.50 Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R
Title:
TE
ARCHITECTURAL
ND
GATE 1
ER
SECTIONS
GATE 1: SECTION B-B
ON
85788 01 01 AR SE 100
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B C D
+246.48 +246.53
+244.97
+242.99 +243.04
+242.79
+242.59
+240.80 +240.85
1 2 3 4
+246.48 +246.53
+244.97 NOTES
+244.92
+242.79 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
+242.59
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
+239.90 +239.75
Project Name: Design & Implementation:
+239.35 UNOPS , JMPC
Alami Building, Near Rosary School
Beit Hanina, Jerusalem
JCF Site Components
FO
R
Title:
TE
ARCHITECTURAL
ND
GATE 2
ER
SECTIONS
GATE 2: SECTION B-B
ON
85788 01 01 AR SE 101
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (K) DOOR TYPE (J) DOOR TYPE (A)
DOOR 1 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 2 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 3 : WOODEN DOOR, W.C. DOORS
90 90 100 100
75 75
190
222
222
222
222
222
222
215
215
215
242
242
235
5
20 20
F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L
20
20
20
20
20
S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L S.F.L
75
90 100
WINDOW 1 : ALUMINUM SLIDING WINDOW C.S.L WINDOW 2 : ALUMINUM TILT WINDOW C.S.L
640
640
1000 600
NOTES
580
580
630
1200
1200
1250
50
50
Funded by:
F.F.L F.F.L
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
GATES
ER
85788 01 01 AR WL 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B A B A B
1 1 1
D02
D01
W01
2 2 2
A B
A B
W02
+1340
NOTES
1 1
W02
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
2 W02 2 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
+1080 AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
W02
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
SURVEILLANCE TOWER
ER
PLANS
ON
85788 01 01 AR GL 300
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B 1 2 1 2
+853
+720
+685
+568
+493
+360 +360
NOTES
Title:
TE
ARCHITECTURAL
ND
SURVEILLANCE TOWER
ER
85788 01 01 AR LV 200
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (K) DOOR TYPE (A)
DOOR 1 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 2 : WOODEN DOOR, W.C. DOORS
90 90
75 75
190
222
222
222
215
215
215
234
245
5
30 20
F.F.L F.F.L F.F.L F.F.L F.F.L F.F.L
30
12
12
S.F.L S.F.L S.F.L
S.F.L S.F.L S.F.L
75
90
500
NOTES
730
730
780
1450
1450
50
50
(MOI) (CRCD)
3900
3900
900
F.F.L 510 3880 510
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
SURVEILLANCE TOWER
ER
85788 01 01 AR WL 200
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
SURVEILLANCE TOWER
ER
3D
ON
85788 01 01 AR 3D 100
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C B A
UP
-430
NOTES
Water Tank
-390
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
85788 01 01 AR GL 400
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C B A
1
-52
D2
-16 UP
-106
+241.80
W1 W1
D2 UP
2
W1 W1
4
W1
NOTES
Water Tank
-16 Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
85788 01 01 AR GL 401
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C B A
1
+260 -052
Plant Room UP
-16 -106
+241.80
UP
2
Maintenance Office
+322
-018
3
NOTES
Water Tank
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
-16 Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
85788 01 01 AR GL 402
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C
PARAPET LEVEL
19 +322 +322
18 GROUND S.F.L.
17
16
15
14
13
12
11
10 +088
9
8 +041
7
SLAB ON GRADE F.L. 6
5
4
3
2
1
SOUTH ELEVATION
SCALE = 1:100
Title:
TE
ELEVATIONS - SHEET 1
ON
85788 01 01 AR LV 400
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
PARAPET LEVEL
19
18
17 +260
16
15 S.F.L. +218
14
13
12
11
10
9
8
7 +015 +015
6
5 -052
4
3
2
1
NORTHERN ELEVATION
SCALE = 1:100
PARAPET LEVEL
19 +322 NOTES
18 GROUND S.F.L.
17 +260
16
15 S.F.L.
14
13 +166 Rev.: Date: Description: Approved
12 All information in this document is the property of UNOPS and cannot be copied anywhere
11 but in this project without prior written consent of UNOPS.
Partners:
10 +088 PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
9 AUTHORITY
CORRECTIONS AND REFORM
8 +036 MINISTRY OF INTERIOR
(MOI)
CENTERS DEPARTMENT
(CRCD)
7 +015
SLAB ON GRADE F.L. 6 -018
5 -052
4
3
2 Funded by:
Title:
TE
ELEVATIONS - SHEET 2
ON
85788 01 01 AR LV 401
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
+374 +379
+322
+260
+218 +218
+184
+91
+88
+24 +24
-16 -16
-34
-56 Over flow bottom level
-81 Ventilation bottom level
-430
SECTION A-A
SCALE = 1:100
E D C B A
NOTES
+24
-16
Funded by:
-380 Balancing bottom level
-390 THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
E D C
+260
+24
-52
-430
SECTION C-C
SCALE = 1:100
E D C
+260
NOTES
+24
-52
Funded by:
-430
-590 Title:
TE
ARCHITECTURAL
ND
SECTIONS - SHEET 2
SECTION D-D
ON
85788 01 01 AR SE 401
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (J) DOOR TYPE (W)
DOOR 1 : SECURITY TYPE, STEEL SINGLE DOORS DOOR 2 : METAL TYPE, EXTERNAL LOUVER DOORS
100 100 100
74
159
222
222
222
222
242
50
F.F.L F.F.L F.F.L
F.F.L F.F.L
20
20
S.F.L S.F.L S.F.L
100 100
WINDOW 1 : ALUMINUM Tilt WINDOW WITH FIXED PANEL WINDOW 2 : STEEL LOUVER WINDOW
800
1000
NOTES
50
420
520
520
INSIDE OUTSIDE
1250
1250
1300
50
Rev.: Date: Description: Approved
INSIDE
450
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
50
50
F.F.L
Funded by:
THIS PROJECT IS FUNDED BY
F.S.L INSIDE THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
85788 01 01 AR WL 400
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
B A B A
A
--
C
--
450
1 1
PIT
G-01
Electrical Room
550
B A
-- --
0.00
--
--
B
B
-60
2 2
NOTES
D
--
--
A
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
ELECTRICAL ROOM
ER
PLANS
ON
85788 01 01 AR GL 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B B A
ELEVATION-A ELEVATION-B
SCALE = 1:50 SCALE = 1:50
1 2 2 1
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
ELECTRICAL ROOM
ER
ELEVATIONS
ON
85788 01 01 AR LV 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
B A 2 1
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
ELECTRICAL ROOM
ER
SECTIONS
ON
85788 01 01 AR SE 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (T) WINDOW 2 : STEEL LOUVER WINDOW
DOOR 1 : METAL TYPE, EXTERNAL LOUVER DOORS
1000
50
200
79 79
780
680
780
INSIDE OUTSIDE
50
INSIDE
159
1000
218
OUTSIDE
INSIDE
46
F.F.L F.F.L
200
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
ELECTRICAL ROOM
ER
85788 01 01 AR WL 500
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
B A B A
B
--
A
W01 -- W01
1 1
-120 -60
PIT
W01
--
--
A A
+286
D
C
-- D01 G-01 --
Transformer Room
W01
2 2
B
-- NOTES
B
--
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
TRANSFORMER ROOM
ER
PLANS
ON
85788 01 01 AR GL 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
A B B A
ELEVATION-A ELEVATION-B
SCALE = 1:50 SCALE = 1:50
1 2 2 1
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
TRANSFORMER ROOM
ER
ELEVATIONS
ON
85788 01 01 AR LV 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
B A 2 1
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
TRANSFORMER ROOM
ER
SECTIONS
ON
85788 01 01 AR SE 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:100 23/03/2014
DOOR TYPE (T) WINDOW 2 : STEEL LOUVER WINDOW
DOOR 1 : METAL TYPE, EXTERNAL LOUVER DOORS
1000
50
200
79 79
780
680
780
INSIDE OUTSIDE
50
INSIDE
159
1000
218
OUTSIDE
INSIDE
46
F.F.L F.F.L
200
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ARCHITECTURAL
ND
TRANSFORMER ROOM
ER
85788 01 01 AR WL 600
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
0
M.A.A. A.A. J.G. A3 1:50 23/03/2014
GENERAL : DAMP PROOFING & WATERPROOFING :
1- ALL OF THE STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION SYMBOLS :
WITH THE PERTINENT ARCHITECTURAL, ELECTRICAL, MECHANICAL, 1 - ALL VERTICAL CONCRETE SURFACES IN CONTACT WITH SOIL SHALL
SANITARY AND OTHER STRUCTURAL DRAWINGS. BE PAINTED WITH NITOPROOF 30 OR EQUIVALENT 1) TOP OF CONCRETE LEVEL IN PLAN.
+ PROTECTION BOARD .
2- SLEEVES ARE TO BE PROVIDED AND INSTALLED IN ACCORDANCE WITH
MECHANICAL AND ELECTRICAL DRAWINGS OR AS DIRECTED BY THE ENGINEER. ALL HORIZONTAL CONCRETE SURFACES IN CONTACT WITH 2) TOP OF CONCRETE LEVEL IN SECTION
SOIL SHALL BE PROTECTED BY: OR ELEVATION.
3- DO NOT SCALE DIMENSIONS FROM DRAWINGS, ALL DIMENSIONS ARE - 500 MICRON POLYEHTYLENE SHEETS FOR SLAB ON GRADES
TO BE READ OR COMPUTED FROM THE DRAWINGS. - PAINTED BY NITOPROOF 30 OR EQUIVALENT FOR OTHER SURFACES
4- UNLESS OTHERWISE INDICATED ON DRAWINGS ELEVATIONS ARE IN 3) OPENING.
METERS, DISTANCES IN cm., REINFORCEMENT BAR SIZES IN mm.
BLOCKWORK WALLS :
5- REFER TO ARCHITECTURAL DRAWINGS FOR POSITIONS AND DIMENSIONS 5) COLUMN NUMBER.
OF OPENINGS IN WALLS AND COORDINATE WITH THOSE SHOWN 1 - ALL INTERNAL BLOCK WALLS SHALL BE HOLLOW:
ON STRUCTURAL DRAWINGS. * CONCRETE BLOCKS WITH MAXIMUM DENSITY NOT TO EXCEED 1200Kg/m3
LEGEND
2- MINIMUM CONCRETE BLOCK UNIT STRENGTH OF LOAD BEARING BLOCKWORK. 6) 1st FLOOR INDICATION OF FIRST FLOOR MEANS
DESIGN : WALLS SHALL BE NOT LESS THAN 100kg/cm2. EXPRESSED AS FORCE PER UNIT THE FLOOR SLAB AT FIRST FLOOR.
1- FOUNDATION DESIGN FOR (4) FLOORS OF NET CROSS-SECTIONAL AREA. 7) CR CROSS RIB
IN ACCORDANCE TO BEARING CAPACITY = 4.0 Kg/cm2 FOR SHALLOW 3- MORTAR BED JOINTS SHALL NOT EXCEED 10mm. THICKNESS.
FOUNDATIONS FOR THE WHOLE SITE. 8) N.T.S NOT TO SCALE
THE CONTRACTOR IS RESPONSIBLE TO CONFIRM/REACH THIS VALUE ON 14)
4- A REINFORCED CONCRETE BOND BEAM HAVING A DEPTH OF 20cm.
SITE, BY APPOINTING CERTIFIED GEOTECHNICAL LAB ON HIS EXPENSES. 9) T.O.C TOP OF CONCRETE LENGTH OF BARS
AND WIDTH EQUAL TO THE WIDTH OF THE WALL REINFORCED
DIA. OF BARS
2- DESIGN AND CONSTRUCTION ARE IN ACCORDANCE WITH THE
10) V VERTICAL NUMBER OF BARS
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE HEIGHT OF THE OPENINGS, THIS BEAM MUST BE ANCHORED
ACI 318-08 LOCATION OF BAR
IN ADJACENT COLUMNS/WALLS. SEE DETAIL "A" BELOW. REFER 11) H HORIZONTAL T:TOP - B:BOTTOM
3- STRUCTURAL MEMBERS ARE DESIGNED TO RESIST THE TOTAL DEAD TO SPECIFICATIONS.
LOADS ACTING ON THEM PLUS THE FOLLOWING LIVE LOADS: 12) GR GROUND BEAM Ribbed Slab
5- A REINFORCED CONCRETE BOND COLUMN HAVING A WIDTH OF 20cm. 15)
25+7cm Thick
- OFFICES - 300kg/m2 G SECTION NAME
13)
- STAIRS AND CORRIDORS - 400kg/m2 THICKNESS OF SOLID SLAB
- OTHER AREAS - 300kg/m2 BLOCK THICKNESS
A SPACING OF 6ms. THIS COLUMN MUST BE ANCHORED IN UPPER
SHORING/SUPPORTING SYSTEM : & LOWER SLABS. SEE DETAIL "A" BELOW. REFER TO SPECIFICATIONS.
THE CONTRACTOR MUST SUBMIT DETAILED GENERAL HATCH AS INDICATED HOLLOW CONCRETE BLOCK
SHOP-DRAWINGS SHOWING THE SHORING/SUPPORTING LENGTH IN CONCRETE IS 10CM WITH EPOXY.
SYSTEM FOR THE SITE/BUILDING/SLABS OF THE PROJECT
AND TO BE SUBMITTED EMBEDMENT IS 10CM WITH EPOXY. REINFORCED CONCRETE STONE
TO THE CONSULTANT FOR REVIEW AND APPROVAL.
PLAIN CONCRETE
COLUMN/WALL
TOP BOTTOM TOP BOTTOM TOP BOTTOM TOP BOTTOM
CLEAR SPAN REINF. REINF. REINF. REINF. REINF. REINF. REINF. REINF. OPENING
BOND COLUMN
STRENGTH OF 4200 kg/cm2.
MAX. 400
< 200 1T10 1T14 2T10 2T12 2T10 2T12 3T10 3T12 20
BOND COLUMN
BOND COLUMN
6- LAP LENGTHS OF REINFORCEMENT BARS SHALL BE AS SHOWN ON
THE DRAWINGS BUT NOT LESS THAN 50 BARS DIAM. FOR PLAIN 200-300 1T10 1T16 2T10 2T14 2T10 2T16 3T10 3T16 25 CORRECTIONS AND REFORM
CENTERS DEPARTMENT
(CRCD)
AND DEFORMED BARS.
301-400 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 30
7- MINIMUM CLEAR CONCRETE COVER TO STEEL REINFORCEMENT SHALL
BE AS SHOWN ON DRAWINGS. WHERE NOT SHOWN, IT SHALL BE AS 401-500 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 40
FOLLOWS :
501-600 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 50 Funded by:
FLOOR SLAB THIS PROJECT IS FUNDED BY
75mm. FOR FOUNDATIONS IN CONTACT WITH SOIL, BLINDING, THE EUROPEAN UNION
OR WATERPROOFING 601-700 1T10 1T20 2T10 2T16 2T10 2T20 3T10 3T20 50
50mm. WHEN IN CONTACT WITH WATER
50mm. WHEN EXPOSED TO EARTH OR WEATHER MAX. 500 Project Name: Design & Implementation:
UNOPS , JMPC
40mm. IN DROP BEAMS & COLUMNS
, ( TO STIRRUPS & TIES ) Jenin Correctional Alami Building, Near Rosary School
Title:
BOND COLUMNS IN BLOCKWORK WALLS SITE COMPONENTS
TE
AND DETAILS
ON
Seq No.:
LY
NOTE :
MULTIPLY BY 1.30 THE SPLICE LENGTH
OF TOP TENSION REINFORCEMENT OF BAR SIZES MORE
THAN 20mm IN CAPS AND SLABS OF MORE THAN 40cm THICKNESS.
BAR MINIMUM r
X If sufficient room does not exist
AND MECHANICAL
DIAMETER r
10 10 VAR. 10 10 for L Bars to extend 25 times
(mm) (mm)
the bars size beyond the bend,
10mm TIES@60cm FOR 15cm SPACING OF REINF. 8 55 a 180 degree hook shall be made.
DRWGS.
BUT
20
(JCF)
R
SITE COMPONENTS
TE
(STAGGERED). (TYP.)
ND
GENERAL DETAILS
ER
ON
Seq No.:
LY
SPLICE BAR
4
@10cm
LAP
SINGLE SPAN BEAM
A A
2.5
B
1 X 1
4
X
STARTER BARS
COLUMN JUNCTION 3 2 2
kk kk
JOINT LINKS @20cm 30 30
CONTINUOUS BEAM
NOTE: L 2L
h = LARGEST OF (1) 'x' 4
(2) 0.16 Lc
CORRECTIONS AND REFORM
3 2 CENTERS DEPARTMENT
(3) 500mm COLUMN SUPPORTED ON FOOT (CRCD)
kk
WHERE `x' IS THE LARGER COLUMN PLAN DIMENSION. CANTILEVER BEAM NOTE:
1. TYPICAL DETAILS TO BE READ IN CONJUNCTION WITH COLUMN SCHEDULE.
Funded by:
THIS PROJECT IS FUNDED BY
2. FOR LAP LENGTHS REFER TENSION LAP SPLICE SCHEDULE. THE EUROPEAN UNION
(JCF)
R
Title:
SITE COMPONENTS
TE
ND
GENERAL DETAILS
ER
ON
Seq No.:
LY
20 420 20
COLUMN DETAILS TABLE
40
40
1
20
20
SCALE 1:20
C1 C1
10 10
C1 (4 COLUMNS)
500
10
35
10
15
LEGEND
40
20 20 2.5
20
40
40
2
20
20
C1 C1
10 10 COLUMN DETAIL-C1
SCALE 1:20
B A
B A
B A
A
131
420 STONE
420 STONE
420 STONE
1
-120 T.O.C. 1
0.00 T.O.C. -120 T.O.C. 1
20 20 0.00 T.O.C.
500
500
-60 T.O.C.
60 -60 T.O.C.
B
131 B
131
2 CENTERS DEPARTMENT
(CRCD)
2
ELECTRICAL ROOM
FOUNDATION LAYOUT
Funded by:
THIS PROJECT IS FUNDED BY
TRANSFORMER ROOM THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
S.O.G+FOUNDATION LAYOUT
R
ON
Seq No.:
L
Rev.:
0
M.S. I.M. I.M. 1/100 04/02/2014
LEGEND
IN OUT
IN OUT
SLAB ON GRADE 150mm
POLYETHYLENE MEMBRANE 500 micron SLAB ON GRADE 150mm
COMPACTED BASECOURSE LAYER 200mm
POLYETHYLENE MEMBRANE 500 micron
COMPACTED SELECTED FILL
SOG REFER TO ARCH. COMPACTED BASECOURSE LAYER 200mm
12@20 COMPACTED SELECTED FILL REFER TO ARCH.
20
20
10
10
60
MIN. 50
8@20
12@20 8@20
10@20 12@20
10@20
DAMP PROOF MEMBRANE
12@20 DAMP PROOF MEMBRANE
12@20
4 12
4 12
40
4 12
BLINDING CONCRETE 100mm 4 12
10
10 20 20 20 10
60 10 20 20 20 10 CORRECTIONS AND REFORM
CENTERS DEPARTMENT
(CRCD)
60
A SECTION A
1:25 B SECTION B
1:25 Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
S.O.G DETAILS
ER
&FOUNDATION DETAILS
ON
Seq No.:
LY
B A
420
1
SOLID SLAB LEGEND
25cm
BEAM - B1
T.O.C.
SCALE 1:50
500
B
2 1
2 520
BEAM - B2
SCALE 1:50
STONE
25
STONE
25
50
50
25
25
(CRCD)
25 25 Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
Title:
TE
ND
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
FOUNDATION LAYOUT
ER
ON
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
FOUNDATION DETAILS
ER
ON
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
SLAB LAOUT
ER
ON
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
SLAB DETAILS
ER
ON
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
COLUMN LAYOUT
ER
& DETAILS
ON
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
FOUNDATION LAYOUT
ER
ON
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
FOUNDATION DETAILS
ER
ON
Seq No.:
LY
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
SLAB LAYOUT
ER
ON
Seq No.:
LY
GENERAL : SYMBOLS :
1- ALL OF THE STRUCTURAL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE PERTINENT ARCHITECTURAL, ELECTRICAL, MECHANICAL, 1) TOP OF CONCRETE LEVEL IN PLAN.
A/C VENTILATION & PIPE SHAFT DETAIL
SANITARY AND OTHER STRUCTURAL DRAWINGS. (UNLESS SHOWN OTHERWISE ON DRAWINGS) TYP. CORNER DETAIL OF R. C. WALLS
2- SLEEVES ARE TO BE PROVIDED AND INSTALLED IN ACCORDANCE WITH (FOR FLOOR NUMBERS, EXACT LOCATIONS & DIMENSIONS (UNLESS SHOWN OTHERWISE ON DRAWINGS)
MECHANICAL AND ELECTRICAL DRAWINGS OR AS DIRECTED BY THE ENGINEER. 2) TOP OF CONCRETE LEVEL IN SECTION REFER TO ARCHITECTURAL & MECHANICAL DRAWINGS)
OR ELEVATION.
REFER TO WALLS REINF.
3- DO NOT SCALE DIMENSIONS FROM DRAWINGS, ALL DIMENSIONS ARE
TO BE READ OR COMPUTED FROM THE DRAWINGS.
REFER TO ARCHITECTURAL
3) OPENING. BUT
4- UNLESS OTHERWISE INDICATED ON DRAWINGS ELEVATIONS ARE IN NOT LESS THAN
10
METERS, DISTANCES IN cm., REINFORCEMENT BAR SIZES IN mm.
X VERTICAL WALL REINF.
AND MECHANICAL
5) COLUMN NUMBER. LEGEND
5- REFER TO ARCHITECTURAL DRAWINGS FOR POSITIONS AND DIMENSIONS 10 10 VAR. 10 10
OF OPENINGS IN WALLS AND COORDINATE WITH THOSE SHOWN
ON STRUCTURAL DRAWINGS.
DRWGS.
6) 1st FLOOR INDICATION OF FIRST FLOOR MEANS
10mm TIES@60cm FOR 15cm SPACING OF REINF.
THE FLOOR SLAB AT FIRST FLOOR. 10mm TIES@80cm FOR 20cm SPACING OF REINF.
DESIGN :
7) CR CROSS RIB HORIZONTALLY & VERTICALLY
1- FOUNDATION DESIGN IS DONE FOR TOWER AND BOUNDARY WALL (STAGGERED). (TYP.)
IN ACCORDANCE TO BEARING CAPACITY 4.0 Kg/CM2
THE CONTRACTOR IS RESPONSIBLE TO CONFIRM/REACH THIS VALUE ON 8) N.T.S NOT TO SCALE 14)
SITE, BY APPOINTING CERTIFIED GEOTECHNICAL LAB ON HIS EXPENSES.
9) T.O.C TOP OF CONCRETE LENGTH OF BARS 20
DIA. OF BARS
2- DESIGN AND CONSTRUCTION ARE IN ACCORDANCE WITH THE TYP. T-CONNECTION DETAIL OF R. C. WALLS
NUMBER OF BARS
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE 10) V VERTICAL
LOCATION OF BAR (UNLESS SHOWN OTHERWISE ON DRAWINGS)
20
ACI 318-08 T:TOP - B:BOTTOM
11) H HORIZONTAL BUT
3- STRUCTURAL MEMBERS ARE DESIGNED TO RESIST THE TOTAL DEAD
NOT LESS THAN
LOADS ACTING ON THEM PLUS THE FOLLOWING LIVE LOADS: 12) GR GROUND BEAM 15) Solid Slab SECTION-X VERTICAL WALL REINF.
2 20+7cm Thick
- GENERAL LIVE LOAD - 300kg/m
13) G SECTION NAME THICKNESS OF SOLID SLAB
BLOCK THICKNESS
SHORING/SUPPORTING SYSTEM : RADII OF BENDING 10mm TIES@60cm FOR 15cm SPACING OF REINF.
Minimum Radius of Bend for L Bars and U Bars shall be 10mm TIES@80cm FOR 20cm SPACING OF REINF.
THE CONTRACTOR MUST SUBMIT DETAILED as follows. For other bars, minimum radius of bend shall HORIZONTALLY & VERTICALLY
SHOP-DRAWINGS SHOWING THE SHORING/SUPPORTING (STAGGERED). (TYP.)
SYSTEM FOR THE SITE/BUILDING/SLABS OF THE PROJECT equal to 3 times bar size for High-yield Steel.
MINIMUM SPLICE LENGTHS (mm)
AND TO BE SUBMITTED
TO THE CONSULTANT FOR REVIEW AND APPROVAL. BAR MINIMUM r
BAR SIZE If sufficient room does not exist
TENSION SPLICE (mm) COMPRESSION SPLICE (mm) DIAMETER r
(mm) for L Bars to extend 25 times
REINFORCED CONCRETE : (mm) (mm) the bars size beyond the bend,
500 300
8 55 a 180 degree hook shall be made.
1- a) REINFORCED CONCRETE SHALL HAVE A MINIMUM 28 DAYS CUBE CRUSHING 600 400 10 70
STRENGTH OF 300 kg/cm2 FOR ALL MEMEBERS IN TOWER AND 250kg/cm2
700 500 12 85
FOR WALLS, MAIN GATES AND WC. TYP. EDGE DETAIL OF R. C. WALLS
b) PLAIN CONCRETE IN BLINDING, SCREEDS AND ELSEWHERE SHALL 14 100 r
800 500 (UNLESS SHOWN OTHERWISE ON DRAWINGS)
HAVE A MINIMUM 28 DAYS CYLINDER CRUSHING STRENGTH OF 200 kg/cm2. 16 120 U Bars shall have legs of equal
900 600 18 140
2- ALL REINFORCED CONCRETE SHALL BE VIBRATED length, unless indicated otherwise. REFER TO WALLS REINF.
1000 600 20 160
3- MINIMUM CEMENT CONTENT TO BE USED FOR ANY REINFORCED
CONCRETE WORK SHALL BE 350kg/m3. 22 180
1100 750 BUT
25 215
r NOT LESS THAN
4- ORDINARY PORTLAND CEMENT TO ASTM C150 TYPE-1 OR TO BS12 1250 750 32 300 VERTICAL WALL REINF.
SHALL BE USED FOR ALL CONCRETE WORKS 10mm TIES@60cm FOR 15cm SPACING OF REINF.
1950 1000
10mm TIES@80cm FOR 20cm SPACING OF REINF.
NOTE : HORIZONTALLY & VERTICALLY
BE DEFORMED HIGH GRADE STEEL HAVING A MINIMUM YIELD MULTIPLY BY 1.30 THE SPLICE LENGTH (STAGGERED). (TYP.)
STRENGTH OF 4200 kg/cm2.
OF TOP TENSION REINFORCEMENT OF BAR SIZES MORE
6- LAP LENGTHS OF REINFORCEMENT BARS SHALL BE AS SHOWN ON
THAN 20mm IN CAPS AND SLABS OF MORE THAN 40cm THICKNESS.
THE DRAWINGS BUT NOT LESS THAN 50 BARS DIAM. FOR PLAIN
AND DEFORMED BARS.
EACH WAY
7- MINIMUM CLEAR CONCRETE COVER TO STEEL REINFORCEMENT SHALL 300x300x16mm
BE AS SHOWN ON DRAWINGS. WHERE NOT SHOWN, IT SHALL BE AS PLATE
FOLLOWS : 30
DETAIL AROUND OPENING IN R.C.
WALLS AND SLABS (UNLESS
MIN
75mm. FOR FOUNDATIONS IN CONTACT WITH SOIL, BLINDING,
15
OR WATERPROOFING SHOWN OTHERWISE ON DRWGS.)
50mm. WHEN IN CONTACT WITH WATER
MAX
10
50mm. WHEN EXPOSED TO EARTH OR WEATHER
40mm. IN DROP BEAMS & COLUMNS, ( TO STIRRUPS & TIES )
30mm. IN SLABS, RIBS EMBEDDED BEAMS AND WALLS NOT 15 16 DIA MS ROD FULL
EXPOSED TO EARTH. MAX. STRENGTH BUTT WELD TO
ON EACH FACE PLATE.
8- THE CONTRACTOR SHALL PREPARE FULL BAR BENDING SCHEDULE
FOR ENGINEER'S APPROVAL. CORRECTIONS AND REFORM
ON EACH FACE (TYP.) TYPICAL LIFTING HOOK DETAIL CENTERS DEPARTMENT
(CRCD)
S
DAMP PROOFING & WATERPROOFING : RAD
IU
SOIL SHALL BE PROTECTED BY: 3- LOCATION TO BE TO THE APPROVAL OF THE ENGINEER. THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
- 500 MICRON POLYEHTYLENE SHEETS FOR SLAB ON GRADES
- PAINTED BY NITOPROOF 230 OR EQUIVALENT FOR OTHER SURFACES
MAX CAPACITY 500kg. SUITABLE
NOTE:
FOR ALL WALLS USE U TIE SPACERS STAGGERED @ 100cm FOR VERTICAL LOADS ONLY
Project Name: Design & Implementation:
UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
(JCF)
Title:
STRUCTURAL
GENERAL NOTES AND
DETAILS
Seq No.:
A B A B A B
175 175 175
LEGEND
12.5
12.5
12.5
12.5
12.5
1 1 1
150 150 150
A A A
S210 S210 S210
STOPPING WALL
200
200
200
150
150
150
175
175
175
2
S110
12.5
12.5
12.5
2 2 2
12.5
12.5
12.5
12.5 12.5 12.5 12.5 12.5 12.5
S210
S210
S210
B
B
WALL LAYOUT @ LEVEL (0.00) WALL LAYOUT @ LEVEL (3.60) WALL LAYOUT @ LEVEL (7.20)
A B A B
175 175
165
STOPPING WALL
50 50
1 1
25
25
C1 C1 COLUMN C1
A A
S210 S210
10
200
175
175
50
10
20
45
C1 C1
2.5
25
2 2
25
25
50 50
10
CORRECTIONS AND REFORM
20
10
CENTERS DEPARTMENT
20 (CRCD)
165
COLUMN DETAIL-C1
SCALE 1:20
S210
S210
B
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
WALL LAYOUT @ LEVEL (10.80) WALL LAYOUT @ LEVEL (13.40)
STRUCTURAL
WALL LAYOUTS
Seq No.:
A B
175 LEGEND
15
15
1 POLYETHYLENE
SHEET 500 MICRO THICK
S.O.G TH.:15 cm COMPACTED SELECTED MATERIAL
A
S210
95% Modified Proctor Test
175
2
S210
B
115
10
10
50
A B
19
175
10
95
20
+7.00
15
80 200 80
A 60
60
S210
200
175
DROP
BEAM
2
80
25
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
WALL LAYOUT @ LEVEL (10.80)
25
25
SCALE 1:20
(JCF)
Title:
STRUCTURAL
FLOORS/SLABS LAYOUTS
Seq No.:
1 2 1 2
175 175
530 530
LEGEND
15 210 8 60 8 214 15 15 177 8 60 8 247 15
+13.6 +13.6
25
25
+13.4 +13.4
20
20
45
45
50 50 50 50
390 390
15 360 15 15 360 15
110
110
110
110
STIRRUPS
+10.80 +10.80
50 50 50 50
FAIRFACE
95 25 150 25 95 95 25 150 25 95
FAIRFACE FAIRFACE
STAGGERED
U-TIE@100
19
STAGGERED
U-TIE@100
19
FAIRFACE FAIRFACE
DOOR OPENING
1515
CORRECTIONS AND REFORM
COMPACTED SELECTED MATERIAL CENTERS DEPARTMENT
95% Modified Proctor Test (CRCD)
MIN.
MIN.
150
150
10 50
30 30 30 30
Funded by:
THIS PROJECT IS FUNDED BY
10 400 10 10 400 10 THE EUROPEAN UNION
SCALE: 1/50
SCALE: 1/50
Project Name: Design & Implementation:
UNOPS , JMPC
Jenin Correctional Alami Building, Near Rosary School
Beit Hanina, Jerusalem
Facility
(JCF)
Title:
STRUCTURAL
SECTIONS
Seq No.:
ARCH BEAM
30
1
55 600 55
LEGEND
350
950
950
945
930
SPACERS
STAGGERED
@100cm c/c
30 30
70
REFER TO ARCH
MAX.150
JOINT 2cm 385 DOOR OPENING JOINT 2cm
385
2
30
30
60 20 60 DAMP PROOF
30 20 20 30 MEMBRANE
320 15 710 15 320
REFER TO ARCH
280
260
MIN. 70
2
S510 40 20 60
30
20
30
C2
90
ARCH BEAM
105
LIMESTONE FORMATION
10
10 120 10
20
4
BOUNDARY WALL SECTION
SCALE- 1:25
CONCRETE BACKING
B200
STONE
S510
1
SCALE: 1/50
C D
335
20 10 20
1 2 3 4
20 315 CORRECTIONS AND REFORM
CENTERS DEPARTMENT
945 280 105 +12.68 (CRCD)
40
20
ARCH
SHAPE 20 10 20
30
285
THE EUROPEAN UNION
156
20 15 15
(JCF)
Title:
SECTION 1-1
POLYETHYLENE MEMBRANE 500 micron
COMPACTED BASECOURSE LAYER 150mm
STRUCTURAL
COMPACTED SELECTED FILL RETAINING WALL DETAIL
AND MAIN GATE DETAILS
Seq No.:
SCALE: 1/50
85788 01 01 STR STR 510
Rev.:
0 1
I.H. I.M. K.H. SHOWN 17/02/2014
KEY MAP:
A B C D
70
335 740 335
REFER TO ARCH REFER TO ARCH
MIN. 70
MEMBRANE
50 50 LEGEND
30
130
130
30
1
LIMESTONE FORMATION
10
55 50 50 55
10 130 10
SECTION 3-3
SCALE- 1:25
50 50 50 50
30 30
950
950
945
70
950
950
3 3
S511 S511 DAMP PROOF
MIN. 70
MEMBRANE
50 60
20
30
LIMESTONE FORMATION
10
335 335
10 130 10
SECTION 4-4
SCALE- 1:25
50
20
20
2
30
50
20
4
280
S511
60 50 335
170
250
20
4 45 90 225 50 60
250
510
510
S511
80
105
130
130
20
10
15
25
STRUCTURAL
MAIN GATE DETAILS
Seq No.:
C
--
1
PIT
G-01
Electrical Room
B A
-- --
+
--
--
A
A
-60
2
W01 W01
D
--
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
ER
ON
85788 01
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
A B C D
-120
+240.10
-220 -80
+239.10 +240.50
2
UP
-245
+238.85 -205
NOTES
+239.25 Opening Bottom Level
+238.35 3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
-280 MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
+238.50
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
ER
GATE 1: PLAN
ON
85788 01
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
UP
+99
+242.29
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
-140
+239.90
-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50 UP
+240.80
-45 -177 -195 -177
-220 +239.20
+239.10
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
GATE 2: PLAN
ON
2
UP
+149
+242.79
NOTES
3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
-120
+240.10
-220 -80
+239.10 +240.50
2
UP
-245
+238.85 -205
NOTES
+239.25 Opening Bottom Level
+238.35 3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
-280 MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Equipment
+238.50 Pipe Connection
Collector H.S. W.C. W.B. Sh. Sk. Total Manifold Size Notes
No. C.W. C.W. C.W. H.W. C.W. H.W. C.W. H.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W.
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
DC:‐GA‐1 1 1 1 1 0 0 0 0 0 0 0 3 1 0 3/4" 3/4" ‐ 3/4" 3/4" ‐ Manifolds are in G.S. Cabinet
(JCF)
R
Title:
TE
ND
ER
GATE 1: PLAN
ON
85788 01
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
A B C D
-140
+239.90
-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50 UP
+240.80
-45 -177 -195 -177
-220 +239.20
H.S. W.C. W.B.
+239.10 Equipment Pipe Connection Notes
Collector Sh. Sk. Total Manifold Size
Funded by:
No. C.W. C.W. C.W. H.W. C.W. H.W. C.W. H.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
GATE 2: PLAN
ON
A B C D
COOLING DATA INDOOR UNIT OUTDOOR UNIT
IU‐GA‐01 & OU‐GA‐01 GATE ROOM 1 &2 24.0 17.1 3.52 SIDE WALL DECORATIVE ‐ 155 0.20 1.25 230 2 REF:410A, DC INVERTED, WALL TYPE, COOLING & HEATING OPERATION
-120
+240.10
NOTES
-220 -80
+239.10 +240.50
2 Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
UP Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
-245 MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
+238.85 -205
+239.25 Opening Bottom Level
(JCF)
R
Title:
+238.50
TE
ND
ER
ON
85788 01
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
UP
+99
+242.29
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
-140
+239.90
-150
-70 +10
-40 +239.65
+240.60 +241.40
+240.90
+10 -40
-130
+241.40 +240.90
+239.80
2
-50 UP
+240.80
-45 -177 -195 -177
-220 +239.20
+239.10
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
ER
GATE 2: PLAN
ON
85788 01
SCALE = 1:100 Drawn: Checked: Approved: Size: Scale: Date: Rev.:
A B C D
2
UP
+149
+242.79
NOTES
3
Rev.: Date: Approved
4 Description:
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
1 1 1
2 2 2
A B
A B
1 1
± 0.00 Tower 2 = +238.20
NOTES
(JCF)
R
Title:
TE
Surveillance Towers
ND
1 1 1
2 2 2
No. C.W. C.W. C.W. H.W. C.W. H.W. C.W. H.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W. C.W. H.W. S.W.
A B
A B
1 1
± 0.00 Tower 2 = +238.20
NOTES
(JCF)
R
Title:
TE
Surveillance Towers
ND
1 1 1
2 2 2
A B
A B
1 1
± 0.00 Tower 2 = +238.20
± 0.00 Tower 3 = +240.80 NOTES
(JCF)
R
A
--
A
--
1
-120 -60
PIT
Transformer Room
2
B
--
NOTES
A
--
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
TRANSFORMER ROOM
ND
-16 UP
-106
+241.80
UP
± 0.00
-18
± 0.00 +242.86 A.S.L.
+242.86 A.S.L.
NOTES
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
Plant Room UP
UP
2
Maintenance Office
NOTES
Water Tank
Rev.: Date: Description: Approved
All information in this document is the property of UNOPS and cannot be copied anywhere
but in this project without prior written consent of UNOPS.
Partners:
PALESTINIAN NATIONAL PALESTINIAN CIVIL POLICE
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
ND
ER
ON
85788 01
Drawn: Checked: Approved: Size: Scale: Date: Rev.:
E D C B A
UP
NOTES
AUTHORITY
CORRECTIONS AND REFORM
MINISTRY OF INTERIOR CENTERS DEPARTMENT
(MOI) (CRCD)
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE
5
ON
-16 UP
-106
+241.80
UP
Water Tank
NOTES
-16
Funded by:
THIS PROJECT IS FUNDED BY
THE EUROPEAN UNION
(JCF)
R
Title:
TE