Site Test Procedure and Report For Transformer: Commissioning Form
Site Test Procedure and Report For Transformer: Commissioning Form
Equipment:
Panel Ref: -
Page:
Date:
COMMISSIONING FORM
CONSULTANT
TANESCO
1. Date of Erection :
2. Equipment Details :
MAKE :
H.V
IMPULSE VOLTAGE
KV PEAK
L.V
H.V
P.F. VOLTAGE
KV PEAK
L.V
REF. I. S
RATING
MAXIMUM AMB. TEMP.
H.V
NO LOAD
MAX. TEMP. RISE WDG
VOLTAGE
L.V
IMPEDANCE VOLTAGE
H.V
CORE AND WINDINGS Kg
CURRENT
L.V
TOTAL WEIGHT Kg
PHASE
PROTECTION CLASS
FREQUENCY
TYPE OF INSALLATION
COOLING
YEAR OF MANUFACTURE
INSULATION CLASS
SERIAL NO. JNC:
DIAGRAM OF CONNECTIONS
CUSTOMER’S REF.NO.
a. HV Windings to earth
1) Connect the line terminal of the Megger (5OOOV) to HV winding (s) of the Transformer.
2) Connect the Earth terminal of the Megger to the earth stud provided at the equipment.
3) Switch on the Megger.
4) Take down the readings (It should be in Mega Ohms).
b. LV Windings to earth
1) Connect the line terminal of the Megger (5OOV) to L V winding (s) of the Transformer.
2) Connect the Earth terminal of the Megger to the earth stud provided at the equipment.
3) Switch on the Megger.
4) Take down the readings (It should be in Mega Ohms).
c. Between Windings
1) Connect the line terminal of the Megger (5OOOV) to one winding of the Transformer.
2) Connect the Earth terminal of the Megger to the other winding of Transformer
3) Switch on the Megger.
4) Take down the readings (It should be in Mega Ohms).
HV to Earth
LV to Earth
HV to LV
HV Side
LV Side
5. WINDING RESISTANCE
TEST Aim:
To find the value of the winding resistance and ensure that the values are similar to the
factory test reports.
Equipment Required:
o Transformer winding resistance meter.
o Test leads.
Test Procedure:
a) Connect the kit across the one phase of the HV windings. Measure the resistance.
b) Then connect the kit across the other phase of HV windings. Measure the
resistance.
c) Repeat the test for all taps provided in the transformer.
d) Connect the Kit across one Phase of the IV Windings. (Only for Autotransformer)
e) Connect the kit across the other phases of the IV
windings.
F) Repeat the Test for LV Windings also.
Compare with the test results obtained at the manufacturer test report (If Available).
1
2
3
4
5
Applied Volts
Measured Volts
Inference
Magnetizing current.
b) Repeat the test for other phases of the HV windings & other (IV & LV) windings of
the transformers.
c) The readings to be similar for all the phases of the windings.
8. RATIO TEST
Aim:
To calculate the value of the turns ratio and compare it with the name plate details
and approve it, if the values are found to be satisfactory.
Equipment Required:
o Ratio test kit.
o Test
Leads. Test Procedure:
a) Connect the Ratio Test kit across the primary terminals (Pl, P2)
b) Apply 415V (For220 KV), 4000V (For 400 KV)
c) Note down the corresponding Secondary Voltage at various cores
d) Compare the ratio with Factory Test Reports (If available)
Ratio Test Value :
Position 1U1V 1V1W 1W1U 2U2V 2V2W 2W2U 1U2V 1V1W 1W1U Actual
Aim:
To ensure that the percentage impedance given in the factory test report is similar to
that measured value.
Equipment Required:
o Multi meter.
o Clamp meter.
o Test leads.
Test Procedure:
a) Apply Single Phase voltage across one phase of HV windings. Short the IV side
winding of that phase. Measure the Current at IV side. Note down the voltage applied.
b) Apply Single Phase voltage across one phase of IV windings. Short the LV side
winding of that phase. Measure the Current at LV side. Note down the voltage applied.
c) Apply Single Phase voltage across one phase of HV windings. Short the LV side
winding of that phase. Measure the Current at LV side. Note down the voltage applied.
This Test should be done at Nominal Tap, Minimum & Maximum Tap positions
● Measure all the phase to phase voltages and line currents as per the table below
Acceptance Criteria:
Guaranteed value of %Z = 5%
Remarks :-