0% found this document useful (0 votes)
110 views1 page

Pump Head Calculation - 1

The document details the transfer of material from a vessel to a tanker. It provides information on flow rate, material properties, pipe dimensions, head losses from fittings and valves, and calculates total dynamic head and net positive suction head. The summary includes key parameters like flow rate, material density and viscosity, pipe sizes, total dynamic head, and available net positive suction head.

Uploaded by

Thiru Ananth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views1 page

Pump Head Calculation - 1

The document details the transfer of material from a vessel to a tanker. It provides information on flow rate, material properties, pipe dimensions, head losses from fittings and valves, and calculates total dynamic head and net positive suction head. The summary includes key parameters like flow rate, material density and viscosity, pipe sizes, total dynamic head, and available net positive suction head.

Uploaded by

Thiru Ananth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DUTY / CASE Duty 1: Transfer of

to Tanker Loading
CONDITIONS Information highlighted in BLUE are required entries
Material Pumped Solution Values Highlighted in GREEN are calculated values
P.T=Pumping Temperature (C) 20
Q=Flowrate (m3/h) Design 11.0 Normal # 11
Density (kg/m3) 1585
u=Viscosity (cP) 0.64 Pvp*=Vapour Pressure (mbar) 131
Vessel Press (barA) Suction 1 Discharge 1
Ctrl Vlv Loss (bar) 0.00 Equip.Loss (bar) 0
Orifice (mm) 1000
Pipe (Material) CS Schedule 40
Nominal Size (ins) Suction 2 Discharge 1.5
d,Actual ID (mm) Suction 52.5 Discharge 40.89 See notes for Actual pipe diameters
* At Pumping Temperature

SUCTION FITTINGS & VALVES


TYPE FACTOR NB " No. HEAD(m)
* Plug Valve 0.46 2 3 2.76
* 90 deg Elbow 0.76 2 4 6.08
FRICTION HEAD LOSS ON SUCTION * Std T Side 1.52 2 1 3.04
Fluid Velocity (m/s) = 1.413 * 2 0
Reynolds No. = 1.837E+05 * 2 0
Friction Factor = 0.021 - See notes for Calculation Method Total Suct. Val&Fit Eq. Lengths (m) 11.88
Pressure Drop - m fluid / 100m eq. length = 4.095
* Length of Suct. straight pipe (m) 8
Total Friction Head loss (including 15% safety factor) = 0.936 (m) Total Equivalent Suct. length (m) 19.88

DISCHARGE FITTINGS & VALVES


FRICTION HEAD LOSS ON DISCHARGE TYPE FACTOR NB " No. HEAD(m)
Fluid Velocity (m/s) = 2.329 * Plug Valve 0.46 1.5 4 2.76
Reynolds No. = 2.358E+05 * 90 deg Elbow 0.76 1.5 20 22.8
Friction Factor = 0.022 - See notes for Calculation Method * Std T S-Thru 0.52 1.5 4 3.12
Pressure Drop - m fluid / 100m eq. length = 14.835 * Flowmeter 0.46 1.5 1 0.69
* 1.5 0
Total Friction Head loss (including 15% safety factor) = 18.830 (m) Total Disch. Val&Fit Eq. Lengths (m) 29.37

* Length of Disch. straight pipe (m) 81


Total Equivalent Disch. length (m) 110.37
SUCTION & DISCHARGE HEADS SUCTION DISCHARGE
Vessel Pressure m 6.435 6.435 SYSTEM POWER
Liq. Level (above pump +; below -) m 2.000 * Efficiency(note4)= 0.6 (<1)
Stat Head (above pump+ ;below -) m 3.000 Estimated Power= 1.67 (KW)
Total Fric. Head Loss(plus Vel Head)m -1.038 19.106
Control Valve (see notes 1 and 2) m 0.000 0.000 NOTES
Orifice (see note 2 and 3) m 0.000 0.000
Equipment (see note 2) m 0.000 0.000 1.Assume control valve loss to be 70% to 100%
Suc. Head Sum,metres of Fluid,abs. 7.397 of piping plus equipment friction loss for initial
Dis. Head Sum,metres of Fluid,abs. 28.541 calculation. Consult instrument engineer for
final selection.
DYNAMIC HEAD
Discharge Head Sum 28.54 m 2.All suction side values to be input negatively,
Suction Head Sum -7.40 m and discharge side values to be input positively
TDH=Total Dynamic Head 21.14 m
3.Control valves and orifices not normally used
NPSH in pump suction.
Suction Head Sum 7.40 m
Pvp -0.84 m 4.Use combined efficiency of pump and drive.
NPSH Available 6.55 m