Asamera (South Sumatra) LTD Mechanical Status Production Engineering Department RB-22a
Asamera (South Sumatra) LTD Mechanical Status Production Engineering Department RB-22a
Tubing string
-Tbg collar
-2.21"ID cup type s.nipple
Rod string : -2-1/2"x2-1/4"x18' p.bbl c/w 2 ea 2' ext
- 2-1/4"x4' plunger w/o puller -94 jts 2-7/8" tbg
- 2 jts 5/8"s. rod +1 ea rod wheel -(10'+6')x2-7/8" pup jt
- 2 jts 5/8"s. rod + 1 ea rod wheel -1 jt 2-7/8" tbg
- 52 jts 5/8" s. rod + 52 jts 3/4"s.rod
- (4'+ 6' + 8') pup jts.
- 1-1/4"x22' Polished rod
846.0 - 847.0 mMD(BRF)
856.5 - 857.5 mMD (BRF)
TD @ 949 mMD
Remarks : Last service (SR-4) on Mar 25,1997. PROD.ENG Date : Mar 26, 1997
Well service to change out 13' pp bbl to 18' pp bbl GROUP File : RB-22a.xls
Well on prod w/SL-186,SPM-8 RAMBA Prepared by : wid
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-22a
PUJ : B.C456-305-168
KBE : 16.00 m PUE : ARROW C-255
GLE : 10.60 m
Tubing string
- 2-7/8" tbg collar
- 2.21" ID S. nipple
- 2-1/2"x2-1/4"x18' p.bbl c/w 2 ea ext.nipple
- Tubing Anchor
- 93 jts 2-7/8" tbg
Rod string : - (10'+4'+4')x2-7/8" pup jt
- 2-1/4"x4' plunger
- 5 jts 7/8" Hubber rod
- 67 jts 3/4" Hubber rod
- 45 jts 7/8" Hubber rod
- (4'+4') x 7/8" pony rod
- 1-1/4"x22' polished rod
TD @ 949 mMD
Remarks : Last service (SR-2) on Jul 27,1997. PROD.ENG Date : Aug 08,1997
DHP service Cement sqzd 887.5-899 m. Converted from GROUP File : RB-22a.xls
SGL to pumping RAMBA Prepared by : RFK
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-22a
PUJ : B.C456-305-168
KBE : 16.00 m PUE : ARROW C-255
GLE : 10.60 m
TD @ 949 mMD
Remarks : Last service (SR-2) on Setember 04,1997. PROD.ENG Date : Oct. 21, 1997
DHP service, replaced w/ new pp.bbl. Acid wash using GROUP File : RB-22a.xls
PPI wash tool. RAMBA Prepared by : Joko S
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-22a
PUJ : B.C456-305-168
KBE : 16.00 m PUE : ARROW C-255
GLE : 10.60 m
TD @ 949 mMD
Remarks : Last service (SR-1) on Aug 20,1999. PROD.ENG Date : Aug 26, 1999
DHP service due to unscrew GROUP File : Rb-022a.xls
RAMBA Prepared by : DK
GULF RESOURCES (RAMBA) LTD. MECHANICAL STATUS
PRODUCTION ENGINEERING DEPARTMENT RB-22a
PUJ : B.C456-305-168
KBE : 16.00 m PUE : ARROW C-255
GLE : 10.60 m
TD @ 949 mMD
PUJ : B.C456-305-168
KBE : 16.00 m PUE : ARROW C-255
GLE : 10.60 m
TD @ 949 mMD
KBE : 16.00 m
GLE : 10.60 m
TD @ 949 mMD
Remarks : Last service by SR-01on Oct 16, 2000, PROD.ENG Date : 20-Oct-00
POOH w/ plunger on rod string, L/D. Well suspended GROUP File : RB-22a.xls
RAMBA Prepared by : TS
MECHANICAL STATUS
RB-22A
TD @ 949 mMD
Remarks : Last service by Rig BJ on Feb 27-Mar 02,2014.Reopening BHP Date : 2-Mar-14
cabut rangkaian pompa banyak parafin di dalam barrel,masuk 5-1/2" csg SURVEY File : RB-22a.xls
sampai di 875 m,swab dan PBU survey (EMR)12 jam.Masuk RPP RAMBA Prepared by : Syaugie
MECHANICAL STATUS
Tubing string
KOP @ 284 m - 5 jts 2-7/8” Tbg
TD @ 949 mMD
Remarks : Last service by Rig PEP-01 on Jan 27 2015. BHP Date : 27-Jan-15
Cabut rangk S.rod + steel plunger ( kondisi bagus), Cabut RPP + P.Bbls,
SURVEY File : RB-22a.xls
Masuk kill String. RAMBA Prepared by : Yosse