0% found this document useful (0 votes)
64 views21 pages

Deriviation of Quantities

The document is a variation order from the Department of Public Works and Highways to contractor RJIR Enterprises for repair work along a road in Leyte, Philippines. It details removal of damaged concrete and preparation of the subgrade in sections of the road totaling over 4,000 square meters, and provides stationing coordinates and dimensions for each area of work. The contractor submitted calculations of removal and subgrade quantities for approval and payment under the contract.

Uploaded by

Drew B Mrtnz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views21 pages

Deriviation of Quantities

The document is a variation order from the Department of Public Works and Highways to contractor RJIR Enterprises for repair work along a road in Leyte, Philippines. It details removal of damaged concrete and preparation of the subgrade in sections of the road totaling over 4,000 square meters, and provides stationing coordinates and dimensions for each area of work. The contractor submitted calculations of removal and subgrade quantities for approval and payment under the contract.

Uploaded by

Drew B Mrtnz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 21

AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 100(3)a3

DESCRIPTION OF WORK : Removal of Actual Structures / Obstruction (0.23m thick PCCP)

UNIT : Sq.M.

VARIATION QUANTITY CALCULATION

Stationing Length Width Area


Remarks
From To (m) (m) (sq.m.)

K1011+486 K1011+504 18.00 6.10 109.80 Both Side


K1011+504 K1011+509 5.00 3.05 15.25 Left Lane
K1011+540 K1011+545 5.00 6.10 30.50 Both Side
K1011+545 K1011+558 13.00 3.05 39.65 Left Lane
K1011+834 K1011+852 18.00 3.05 54.90 Right Lane
K1011+870 K1011+875 5.00 6.10 30.50 Both Side
K1011+875 K1011+884 9.00 3.05 27.45 Left Lane
K1011+893 K1011+897 4.00 3.05 12.20 Left Lane
K1011+897 K1012+000 103.00 6.10 628.30 Both Side
K1012+000 K1012+007 7.00 3.05 21.35 Right Lane
K1012+012 K1012+021 9.00 6.10 54.90 Both Side
K1012+021 K1012+025 4.00 3.05 12.20 Left Lane
K1012+048 K1012+099 51.00 6.10 311.10 Both Side
K1012+212 K1012+217 5.00 6.10 30.50 Both Side
K1012+217 K1012+222 5.00 3.05 15.25 Left Lane
K1012+231 K1012+235 4.00 3.05 12.20 Left Lane
K1012+235 K1012+262 27.00 6.10 164.70 Both Side
K1012+262 K1012+267 5.00 3.05 15.25 Right Lane
K1012+322 K1012+330 8.00 6.10 48.80 Both Side
K1012+330 K1012+335 5.00 3.05 15.25 Left Lane
K1012+394 K1012+407 13.00 6.10 79.30 Both Side
K1012+407 K1012+412 5.00 3.05 15.25 Left Lane
K1012+425 K1012+657 232.00 6.10 1415.20 Both Side
K1012+657 K1012+661 4.00 3.05 12.20 Left Lane
K1012+666 K1012+675 9.00 6.10 54.90 Both Side
K1012+688 K1012+706 18.00 6.10 109.80 Both Side
K1012+706 K1012+711 5.00 3.05 15.25 Left Lane

3,351.95

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 100(3)a3

DESCRIPTION OF WORK : Removal of Actual Structures / Obstruction (0.23m thick PCCP)

UNIT : Sq.M.

VARIATION QUANTITY CALCULATION

Stationing Length Width Area


Remarks
From To (m) (m) (sq.m.)

K1012+743 K1012+761 18.00 3.05 54.90 Left Lane


K1012+788 K1012+797 9.00 6.1 54.90 Both side
K1012+797 K1012+811 14.00 3.05 42.70 Left Lane
K1012+838 K1012+842 4.00 3.05 12.20 Right Lane
K1012+919 K1012+923 4.00 3.05 12.20 Right Lane
K1015+050 K1015+059 9.00 3.05 27.45 Left Lane
K1016+096 K1016+101 5.00 6.1 30.50 Both side
K1016+101 K1016+110 9.00 6.1 54.90 Both side
K1016+110 K1016+115 5.00 3.05 15.25 Left Lane
K1016+239 K1016+253 14.00 6.1 85.40 Both side
K1016+430 K1016+458 28.00 3.05 85.40 Right Lane
K1016+458 K1016+467 9.00 3.05 27.45 Left Lane
K1016+467 K1016+485 18.00 6.1 109.80 Both side
K1016+553 K1016+571 18.00 3.05 54.90 Right Lane
K1016+672 K1016+676 4.00 3.05 12.20 Right Lane
K1016+676 K1016+695 19.00 6.1 115.90 Both side
K1016+804 K1016+809 5.00 6.1 30.50 Both side
K1021+796 K1021+814 18.00 3.05 54.90 Right Lane

TOTAL 4,233.40
SAY 4,234.00

ORIGINAL QUANTITY 3,747.00 Sq.M.


V.O. 1 QUANTITY - 4,234.00 Sq.M.
UNDERRUN QUANTITY 487.00 Sq.M.
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 105(1)a

DESCRIPTION OF WORK : Subgrade Preparation (Common Materials)

UNIT : Sq.M.

VARIATION QUANTITY CALCULATION

Stationing Length Width Area


Remarks
From To (m) (m) (sq.m.)

K1011+486 K1011+504 18.00 6.10 109.80 Both Side


K1011+504 K1011+509 5.00 3.05 15.25 Left Lane
K1011+540 K1011+545 5.00 6.10 30.50 Both Side
K1011+545 K1011+558 13.00 3.05 39.65 Left Lane
K1011+834 K1011+852 18.00 3.05 54.90 Right Lane
K1011+870 K1011+875 5.00 6.10 30.50 Both Side
K1011+875 K1011+884 9.00 3.05 27.45 Left Lane
K1011+893 K1011+897 4.00 3.05 12.20 Left Lane
K1011+897 K1012+000 103.00 6.10 628.30 Both Side
K1012+000 K1012+007 7.00 3.05 21.35 Right Lane
K1012+012 K1012+021 9.00 6.10 54.90 Both Side
K1012+021 K1012+025 4.00 3.05 12.20 Left Lane
K1012+048 K1012+099 51.00 6.10 311.10 Both Side
K1012+212 K1012+217 5.00 6.10 30.50 Both Side
K1012+217 K1012+222 5.00 3.05 15.25 Left Lane
K1012+231 K1012+235 4.00 3.05 12.20 Left Lane
K1012+235 K1012+262 27.00 6.10 164.70 Both Side
K1012+262 K1012+267 5.00 3.05 15.25 Right Lane
K1012+322 K1012+330 8.00 6.10 48.80 Right Lane
K1012+330 K1012+335 5.00 3.05 15.25 Left Lane
K1012+394 K1012+407 13.00 6.10 79.30 Both Side
K1012+407 K1012+412 5.00 3.05 15.25 Left Lane
K1012+425 K1012+657 232.00 6.10 1415.20 Both Side
K1012+657 K1012+661 4.00 3.05 12.20 Left Lane
K1012+666 K1012+675 9.00 6.10 54.90 Both Side
K1012+688 K1012+706 18.00 6.10 109.80 Both Side
K1012+706 K1012+711 5.00 3.05 15.25 Left Lane

3,351.95

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 105(1)a

DESCRIPTION OF WORK : Subgrade Preparation (Common Materials)

UNIT : Sq.M.

VARIATION QUANTITY CALCULATION

Stationing Length Width Area


Remarks
From To (m) (m) (sq.m.)

K1012+743 K1012+761 18.00 3.05 54.90 Left Lane


K1012+788 K1012+797 9.00 6.1 54.90 Both side
K1012+797 K1012+811 14.00 3.05 42.70 Left Lane
K1012+838 K1012+842 4.00 3.05 12.20 Right Lane
K1012+919 K1012+923 4.00 3.05 12.20 Right Lane
K1015+050 K1015+059 9.00 3.05 27.45 Left Lane
K1016+096 K1016+101 5.00 6.1 30.50 Both side
K1016+101 K1016+110 9.00 6.1 54.90 Both side
K1016+110 K1016+115 5.00 3.05 15.25 Left Lane
K1016+239 K1016+253 14.00 6.1 85.40 Both side
K1016+430 K1016+458 28.00 3.05 85.40 Right Lane
K1016+458 K1016+467 9.00 3.05 27.45 Left Lane
K1016+467 K1016+485 18.00 6.1 109.80 Both side
K1016+553 K1016+571 18.00 3.05 54.90 Right Lane
K1016+672 K1016+676 4.00 3.05 12.20 Right Lane
K1016+676 K1016+695 19.00 6.1 115.90 Both side
K1016+804 K1016+809 5.00 6.1 30.50 Both side
K1021+796 K1021+814 18.00 3.05 54.90 Right Lane

TOTAL 4,233.40
SAY 4,234.00

ORIGINAL QUANTITY 3,747.00 Sq.M.


V.O. 1 QUANTITY - 4,234.00 Sq.M.
UNDERRUN QUANTITY 487.00 Sq.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 311(1)c1

DESCRIPTION OF WORK : Portland Cement Concrete Pavement (0.23m thick-14 days)

UNIT : Sq.M.

VARIATION QUANTITY CALCULATION

Stationing Length Width Area


Remarks
From To (m) (m) (sq.m.)

K1011+486 K1011+504 18.00 6.10 109.80 Both Side


K1011+504 K1011+509 5.00 3.05 15.25 Left Lane
K1011+540 K1011+545 5.00 6.10 30.50 Both Side
K1011+545 K1011+558 13.00 3.05 39.65 Left Lane
K1011+834 K1011+852 18.00 3.05 54.90 Right Lane
K1011+870 K1011+875 5.00 6.10 30.50 Both Side
K1011+875 K1011+884 9.00 3.05 27.45 Left Lane
K1011+893 K1011+897 4.00 3.05 12.20 Left Lane
K1011+897 K1012+000 103.00 6.10 628.30 Both Side
K1012+000 K1012+007 7.00 3.05 21.35 Right Lane
K1012+012 K1012+021 9.00 6.10 54.90 Both Side
K1012+021 K1012+025 4.00 3.05 12.20 Left Lane
K1012+048 K1012+099 51.00 6.10 311.10 Both Side
K1012+212 K1012+217 5.00 6.10 30.50 Both Side
K1012+217 K1012+222 5.00 3.05 15.25 Left Lane
K1012+231 K1012+235 4.00 3.05 12.20 Left Lane
K1012+235 K1012+262 27.00 6.10 164.70 Both Side
K1012+262 K1012+267 5.00 3.05 15.25 Right Lane
K1012+322 K1012+330 8.00 6.10 48.80 Right Lane
K1012+330 K1012+335 5.00 3.05 15.25 Left Lane
K1012+394 K1012+407 13.00 6.10 79.30 Both Side
K1012+407 K1012+412 5.00 3.05 15.25 Left Lane
K1012+425 K1012+657 232.00 6.10 1415.20 Both Side
K1012+657 K1012+661 4.00 3.05 12.20 Left Lane
K1012+666 K1012+675 9.00 6.10 54.90 Both Side
K1012+688 K1012+706 18.00 6.10 109.80 Both Side
K1012+706 K1012+711 5.00 3.05 15.25 Left Lane

3,351.95

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 311(1)E1

DESCRIPTION OF WORK : Portland Cement Concrete Pavement (0.23m thick-14 days)

UNIT : Sq.M.

VARIATION QUANTITY CALCULATION

Stationing Length Width Area


Remarks
From To (m) (m) (sq.m.)

K1012+743 K1012+761 18.00 3.05 54.90 Left Lane


K1012+788 K1012+797 9.00 6.1 54.90 Both side
K1012+797 K1012+811 14.00 3.05 42.70 Left Lane
K1012+838 K1012+842 4.00 3.05 12.20 Right Lane
K1012+919 K1012+923 4.00 3.05 12.20 Right Lane
K1015+050 K1015+059 9.00 3.05 27.45 Left Lane
K1016+096 K1016+101 5.00 6.1 30.50 Both side
K1016+101 K1016+110 9.00 6.1 54.90 Both side
K1016+110 K1016+115 5.00 3.05 15.25 Left Lane
K1016+239 K1016+253 14.00 6.1 85.40 Both side
K1016+430 K1016+458 28.00 3.05 85.40 Right Lane
K1016+458 K1016+467 9.00 3.05 27.45 Left Lane
K1016+467 K1016+485 18.00 6.1 109.80 Both side
K1016+553 K1016+571 18.00 3.05 54.90 Right Lane
K1016+672 K1016+676 4.00 3.05 12.20 Right Lane
K1016+676 K1016+695 19.00 6.1 115.90 Both side
K1016+804 K1016+809 5.00 6.1 30.50 Both side
K1021+796 K1021+814 18.00 3.05 54.90 Right Lane

TOTAL 4,233.40
Say 4,234.00

ORIGINAL QUANTITY 3,747.00 Sq.M.


V.O. 1 QUANTITY - 4,234.00 Sq.M.
UNDERRUN QUANTITY 487.00 Sq.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 100(1)

DESCRIPTION OF WORK : Clearing and Grubbing

UNIT : Ha.

VARIATION QUANTITY CALCULATION

Stationing Length Width Area


Remarks
From To (m) (m) (sq.m.)

1012+220 1012+270 50.00 10 500.00 LS


1012+385 1012+420 35.00 10 350.00 LS
1016+030 1016+070 40.00 10 400.00 RS
1016+300 1016+357 57.00 10 570.00 RS
1820.00
SAY 0.18 Ha.

ORIGINAL QUANTITY 0.17 Ha.


V.O. 1 QUANTITY - 0.18 Ha.
UNDERRUN QUANTITY 0.01 Ha.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 200(1)

DESCRIPTION OF WORK : Aggregate Subbase Course

UNIT : Cu.M.

VARIATION QUANTITY CALCULATION

TOTAL AREA FOR REBLOCKING 4,234.00 sq.m.


Thk. of Aggregate Subbase Course x 0.20 m
846.80
SAY 847.00 Cu.M.

ORIGINAL QUANTITY 750.00 Cu.M.


V.O. 1 QUANTITY - 847.00 Cu.M.
UNDERRUN QUANTITY 97.00 Cu.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 104(2)a

DESCRIPTION OF WORK : Embankment from Borrow, Common Soil

UNIT : Cu.m.

VARIATION QUANTITY CALCULATION

Station Length Area Volume


Cut Fill Cut Fill
1012+220 0.00 18.96
20.00 0.00 375.10
1012+240 0.00 18.55
20.00 0.00 349.60
1012+260 0.00 16.41
10.00 0.00 164.10
1012+270 0.00 16.41
10.00 0.00 82.05
1012+280 0.00 0.00
0.00 0.00
1012+385 0.00 39.00
15.00 0.00 673.80
1012+400 0.00 50.84
20.00 0.00 1005.60
1012+420 0.00 49.72
20.00 0.00 497.20
1012+440 0.00 0.00
10.00 0.00 0.00
1012+450 0.00 0.00
0.00 0.00 0.00

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 104(2)a

DESCRIPTION OF WORK : Embankment from Borrow, Common Soil

UNIT : Cu.m.

VARIATION QUANTITY CALCULATION

Station Length Area Volume


Cut Fill Cut Fill
1016+030 0.00 54.56
10.00 0.00 380.00
1016+040 0.00 21.44
20.00 0.00 615.00
1016+060 0.00 40.06
10.00 0.00 392.30
1016+070 0.00 38.40
10.00 0.00 192.00
1016+080 0.00 0.00

1016+300 0.00 29.79


20.00 0.00 714.20
1016+320 0.00 41.63
20.00 0.00 821.40
1016+340 0.00 40.51
17.00 0.00 671.59
1016+357 0.00 38.50
10.00 0.00 192.50
1016+367 0.00 0.00
10.00 0.00 0.00
1016+377 0.00 0.00
0.00

Total 7126.44
SAY 7126.00

ORIGINAL QUANTITY 4,514.00 Cu.M.


V.O. 1 QUANTITY - 7,126.00 Cu.M.
UNDERRUN QUANTITY 2,612.00 Cu.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 515(2)

DESCRIPTION OF WORK : Select Granular Backfill

UNIT : Cu.m.

VARIATION QUANTITY CALCULATION

Station Length Area Volume Station Length Area Volume


1012+220 1.25 1016+030 3.53
20.00 25.00 10.00 29.55
1012+240 1.25 1016+040 2.38
20.00 25.00 20.00 47.6
1012+260 1.25 1016+060 2.38
10.00 12.50 10.00 23.8
1012+270 1.25 1016+070 2.38
10.00 6.25 10.00 11.9
1012+280 0.00 1016+080 0.00

1012+385 2.38 1016+300 2.01


15.00 35.70 20.00 40.2
1012+400 2.38 1016+320 2.01
20.00 47.60 20.00 40.2
1012+420 2.38 1016+340 2.01
0.00 0.00 17.00 34.17
1016+357 2.01
10.00 10.05
1016+367 0

Total 389.52
SAY 390.00

As-Stake QUANTITY 390.00 Cu.M.


V.O. 1 QUANTITY - 390.00 Cu.M.
UNDERRUN QUANTITY - Cu.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 405(1)a2

DESCRIPTION OF WORK : Structural Concrete, 20.68 Mpa. Class A, 28 days

UNIT : Cu.M.

VARIATION QUANTITY CALCULATION

Structure Height Width Area Length Volume


Pile Cap 0.6 0.5 0.3 182 54.60
Parapet Foundation 0.3 0.6 0.18 182 32.76
Facing, Berm, Wall See attached computation 642.50
Total 729.86
Say 730.00

ORIGINAL QUANTITY 558.00 Cu.M.


V.O. 1 QUANTITY - 730.00 Cu.M.
UNDERRUN QUANTITY 172.00 Cu.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 405(1)a2

DESCRIPTION OF WORK : Structural Concrete, 20.68 Mpa. Class A, 28 days

UNIT : Cu.m.

VARIATION QUANTITY CALCULATION

Station Length Area Volume Station Length Area Volume


1012+220 2 1016+030 3.75
20.00 40.00 10.00 37.5
1012+240 2.00 1016+040 3.75
20.00 40.00 20.00 75
1012+260 2.00 1016+060 3.75
10.00 20.00 10.00 37.5
1012+270 2.00 1016+070 3.75
10.00 10.00 10.00 18.75
1012+280 0.00 1016+080 0.00

1012+385 3.75 1016+300 3.75


15.00 56.25 20.00 75
1012+400 3.75 1016+320 3.75
20.00 75.00 20.00 75
1012+420 3.75 1016+340 3.75
0.00 0.00 17.00 63.75
1016+357 3.75
10.00 18.75
1016+367 0

Concrete Facing
Total Volume 642.50 Cu.m.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 506(1), 501(1)a3, 103(6)a, 507(1), 1001(3)

DESCRIPTION OF WORK : Stone Masonry, Pipe Culvers,910mm Dia. Class II-RCPC,


Pipe Culverts and Drain Excavation, Rubble Concrete, Concrete Canal
UNIT :

VARIATION QUANTITY CALCULATION

Stone Masonry

Surface
Station Structure Thick. No. Volume
Area

Sta. 1016+300 Headwall 1.63 3.83 3 18.73


Less volume of pipe 1.91
Total 16.82
Say 17.00 CuM.
Pipe Culverts, 910mm Dia. Class II-RCPC

Station Structure Length No. Total L.


Sta. 1012+300 RCPC 7 1 7.00
Sta. 1016+300 RCPC 7 1 7.00
Total 14.00 Lm.

Pipe Culverts and Drain Excavation

Station Length Width Depth No. Volume


Sta. 1012+260 7.00 2.00 1.90 1 26.60
Sta. 1016+300 (Head wall) 1.50 4.50 1.10 2 14.85
Sta. 1016+300 (Pipe Culvert) 7.00 2.00 1.90 1 26.60
Total 68.05
Say 68.00 CuM.
Rubble Concrete

Structure Length Width Depth No. Volume


Rubble Concrete 1.2 0.6 0.8 138 79.49
Total 79.49
Say 80.00 CuM.
Concrete Canal

Structure Lined Canal


From To Locatoion Length(m)
1012+360 1012+523 Rightside 161 M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 509(1)b1

DESCRIPTION OF WORK : Steel Sheet Pile, Slope Protection

UNIT :

VARIATION QUANTITY CALCULATION

Station 1012+220 to 1012+270 Left Side Length = 50 meters

Width of Steel Sheet Piles = 0.40 m


Length of Structure = 50.00 m
Number of Sheet Piles = 125 pcs.
Length of Structure = 12.00 m
Sub-total Length of Sheet Piles = 1500.00 m

Station 1012+385 to 1012+420 Left Side Length = 35 meters

Width of Steel Sheet Piles = 0.40 m


Length of Structure = 35.00 m
Number of Sheet Piles = 87.5 pcs.
Length of Structure = 12.00 m
Sub-total Length of Sheet Piles = 1050.00 m

Station 1016+030 to 1016+070 Right Side Length = 40 meters

Width of Steel Sheet Piles = 0.40 m


Length of Structure = 40.00 m
Number of Sheet Piles = 100 pcs.
Length of Structure = 12.00 m
Sub-total Length of Sheet Piles = 1200.00 m

Station 1016+300 to 1016+357 Right Side Length = 57 meters

Width of Steel Sheet Piles = 0.40 m


Length of Structure = 57.00 m
Number of Sheet Piles = 142.5 pcs.
Length of Structure = 12.00 m
Sub-total Length of Sheet Piles = 1710.00 m
5,460 meters

ORIGINAL QUANTITY 2,550.00 L.M.


V.O. 1 QUANTITY - 5,460.00 L.M.
UNDERRUN QUANTITY 2,910.00 L.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
AGENCY : DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE 8

PROJECT : Repair and Restoration of Slope Protection and Damage PCCP along
Libungao - Matag-ob - Palompon Road, K1011+280 - K1021+820
Matag-ob, Leyte

CONTRACTOR : RJIR ENTERPRISES

ITEM NO. : 404(1)a

DESCRIPTION OF WORK : Reinforcing Steel, Grade 40

UNIT :

VARIATION QUANTITY CALCULATION

See attached Computation 20,199.35 KG.

ORIGINAL QUANTITY 15,232.00 L.M.


V.O. 1 QUANTITY - 20,199.35 L.M.
UNDERRUN QUANTITY 4,967.35 L.M.

Prepared by: Checked and Submitted by:

RICARDO K. OGARIO, JR. TORIBIO R. ODTUHAN


Proprietor/General Manager Project Engineer
Contract No. : 15IO0053
Contract Name : Construction of Palo Public Market, Palo, Leyte

DERIVATION OF TIME EXTENSION FOR VARIATION ORDER NO.2

I. ITEM 1002 - PLUMBING WORKS


Original Quantity = 36.00 set
Original Duration = 25.00 days

New Quantity = 50.00 set


New Duration = (50/36)(25 days)
New Duration = 34.72 say 35 days
Additional No. of Days= 10.00 days

II. ITEM 1003 - CARPENTRY AND JOINERY WORKS

Original Quantity = 8,978.00 sq.m.


Original Duration = 60.00 days

New Quantity = 7,582.24 sq.m.


New Duration = (7,582.24/8,978) X 60 days
New Duration = 50.67 say 51 days
Decreased No. of Days= 9.00 days

III. ITEM 1014 - PREPAINTED ROOFING SHEETS

Original Quantity = 5,250.00 sq.m.


Original Duration = 60.00 days

New Quantity = 5,691.10 sq.m.


New Duration = (5,691.10/5,250) X 60 days
New Duration = 65.04 say 65 days
Additional No. of Days= 5.00 days

IV. ITEM 1016 - WATER PROOFING

Original Quantity = 5,320.00 sq.m.


Original Duration = 36.00 days

New Quantity = 830.48 sq.m.


New Duration = (830.48/5,320) X 36 days
New Duration = 5.62 say 6 days
Decreased No. of Days= 30.00 days

V. ITEM 1018 - CERAMIC TILES


Original Quantity = 10,900.00 sq.m.
Original Duration = 120.00 days

New Quantity = 6,928.20 cu.m.


New Duration = (6,928.20/10,900) X 120 days
New Duration = 76.27 say 76 days
Decreased No. of Days= 44.00 days

VI. ITEM 1032 - PAINTING WORKS


Original Quantity = 28,000.00 sq.m.
Original Duration = 150.00 days

New Quantity = 28,507.39 sq.m.


New Duration = (28,507.39/28,000) X 150 days
New Duration = 152.72 say 153 days
Additional No. of Days= 3.00 days

VII. ITEM 1100 - CONDUITS, BOXES, AND FITTINGS


Original Quantity = 5,509.00 pcs.
Original Duration = 60.00 days

New Quantity = 6,883.00 pcs.


New Duration = (6883/5,509) X 60 days
New Duration = 74.96 say 75 days
Additional No. of Days= 15.00 days

VIII. ITEM 1100 - WIRES AND WIRING DEVICES


Original Quantity = 55,499.20 l.m.
Original Duration = 60.00 days

New Quantity = 84,590.00 l.m.


New Duration = (84,590/55,499.20) X 60 days
New Duration = 91.45 say 91 days
Additional No. of Days= 31.00 days

IX. ITEM 1102 - SWITCH GEAR AND PANEL BOARDS


Original Quantity = 7.00 set
Original Duration = 28.00 days

New Quantity = 22.00 set


New Duration = (7/7) X 30 days
New Duration = 88.00 say 88 days
Additional No. of Days= 60.00 days

X. ITEM 403 - METAL STRUCTURES


Original Quantity = 158,359.61 kgs.
Original Duration = 120.00 days

New Quantity = 192,095.25 kgs.


New Duration = 192,095.25/158,359.61) X 120 days
New Duration = 145.56 say 146 days
Additional No. of Days= 26.00 days
XI. ITEM 404 - REINFORCING STEEL
Original Quantity = 618,589.99 kgs.
Original Duration = 160.00 days

New Quantity = 657,940.28 kgs.


New Duration = (657,940.28/618,589.99) X 160 days
New Duration = 170.18 say 170 days
Additional No. of Days= 10.00 days

XII. ITEM 405 - STRUCTURAL CONCRETE


Original Quantity = 618,589.99 cu.m.
Original Duration = 160.00 days

New Quantity = 657,940.28 cu.m.


New Duration = (657,940.28/618,589.99) X 160 days
New Duration = 170.18 say 170 days
Additional No. of Days= 10.00 days

XIII. ITEM 704 - MASONRY UNITS


Original Quantity = 17,716.86 sq.m.
Original Duration = 160.00 days

New Quantity = 8,318.87 sq.m.


New Duration = (8,318.87/17,716.86) X 160 days
New Duration = 75.13 say 75 days
Decreased No. of Days= 85.00 days

XIV. ITEM Spcl IV - STONE CLADDING


Original Quantity = 210.00 sq.m.
Original Duration = 21.00 days

New Quantity = 439.68 sq.m.


New Duration = (439.68/210) X 21 days
New Duration = 43.97 say 44 days
Additional No. of Days= 23.00 days

XV. ITEM 1027 (1) - CEMENT PLASTER FINISH


Original Quantity =
Original Duration =

New Quantity = 22,019.51 sq.m.


New Duration = 39 days
Additional No. of Days= 39.00 days

XVI. ITEM 1027 (1) - PWD LIFT


Original Quantity =
Original Duration =

New Quantity = 1.00 unit


New Duration = 30 days
Additional No. of Days= 30.00 days

TOTAL ADDITIONAL NUMBER OF DAYS = 10 days - 9 days + 5 days - 30 days - 44 days + 3 days + 15 days
+ 31 days + 60 days + 26 days + 10 days + 10 days - 85 days +
23 days + 39 days + 30 days

TOTAL ADDITIONAL NUMBER OF DAYS = 94 days

PREPARED BY : CHECKED BY :

EDGAR A. TIU TORIBIO R. ODTUHAN


Proprietor Project Engineer
B.M. MARKETING DPWH - Region VIII

Contract No. : 15IO0053


Contract Name : Construction of Palo Public Market, Palo, Leyte

DERIVATION OF TIME EXTENSION FOR VARIATION ORDER NO.1

V. SPCL IX - Construction of Sump Pump

Original Quantity =
Original Duration =

New Quantity = 1.00 l.s.


New Duration = 8 days
Additional No. of Days= 8.00 days

Total Additional Days = #REF! days