1. Removing Old Controller
a. Change Mode From 1 (normally module should be in 1) to 3(stop
mode)
b. Press Res(reset) button and P0 should come in status display.
c. Remove the module.
AT ENGINEERING STATION
3. Procedure to load firmware to new PM665 controller
a. Choose the COM port , preferably COM1 connect normal
communication cable to COM1(preferred COM port) of Engineering
station laptop(ES3)
b. Choose the AC160 base software file from ES03 >Local Disk( C)
>AC160_BASE_SW_2p2s6_3 (back up is kept in RAFB1 external hard
disk-2 kept in Fire safe locker in door#63, planning room) Refer
Annexure-1.
c. Double click on file LOAD665_COM1.cmd, command prompt window
will open
d. It will ask to connect normal communication cable to be connected
between ES3 COM1 and Controller (COM A)
e. Message” press any key to continue..” will appear
f. After pressing any key various steps will follow and finally PL will be
displayed in controller. Note: if Eb is displayed in controller
programming has failed and controller need to repair.
g. If PL is displayed in controller continue with next step
h. Now in command prompt , it will be asked to connect the special CS
cable between ES3 COM1 and Controller (COM A)
i. Message” press any key to continue..” will appear
j. After pressing any key communication software will be loaded
k. Now you will be will ask to connect normal communication cable to
be connected between ES3 COM1 and Controller (COM A)
l. Message” press any key to continue..” will appear
m. After pressing any key Base software will be loaded
n. Finally controller display should show P3
4. Programme Loading
a. Connect the serial cable in COM1 or COM2
b. Log in Advant Engineering Station Laptop
c. Open ABB Start Menu from desktop
d. Open CBA application Builder 4.3.0
e. Open the required Programme (eg: GT61 P1)
f. Go to file and confirm online preparation mode is not selected
g. Go to target- connect- select COM1 or COM2 as per serial cable
connection
h. Report window will open, see for any programme in PROM
i. If any programme available in PROM Clear it
i. Go to target- Clear PROM
j. Go to target – disconnect
k. Go to file – generate target code
l. Window will open-keep all default selections and click OK
m. Output window will open which will display warning 0 and error 0
n. Go to target – connect
GT71-P1 _ _
AT CRC PANEL
AT ENGINEERING STATION
3. Procedure to load firmware to new PM665 controller
a. Choose the COM port , preferably COM1 connect normal
communication cable to COM1(preferred COM port) of Engineering
station laptop(ES3)
a. Choose the AC160 base software file from ES03 >Local Disk( C)
>AC160_BASE_SW_2p2s6_3 (back up is kept in RAFB1 external hard
disk-2 kept in Fire safe locker in door#63, planning room) Refer
Annexure-1.
b. Double click on file LOAD665_COM1.cmd command prompt window
will open
c. It will ask to connect normal communication cable to be connected
between ES3 COM1 and Controller (COM A)
d. Message” press any key to continue..” will appear
e. After pressing any key various steps will follow and finally PL will be
displayed in controller. Note: if Eb is displayed in controller
programming has failed and controller need to repair.
f. If PL is displayed in controller continue with next step
g. Now in command prompt , it will be asked to connect the special CS
cable between ES3 COM1 and Controller (COM A)
h. Message” press any key to continue..” will appear
i. After pressing any key communication software will be loaded
j. Now you will be will ask to connect normal communication cable to
be connected between ES3 COM1 and Controller (COM A)
k. Message” press any key to continue..” will appear
l. After pressing any key Base software will be loaded
m. Finally controller display should show P3
AT ENGINEERING STATION
4. Programme Loading
a. Connect the serial cable in COM1 or COM2
b. Log in Advant Engineering Station Laptop
c. Open ABB Start Menu from desktop
d. Open CBA application Builder 4.3.0
e. Open the required Programme (eg: GT61 OLC)
f. Go to file and confirm online preparation mode is not selected
g. Go to target- connect- select COM1 or COM2 as per serial cable
connection
h. Report window will open, see for any programme in PROM
i. If any programme available in PROM Clear it
i. Go to target- Clear PROM
j. Go to target – disconnect
k. Go to file – generate target code
l. Window will open-keep all default selections and click OK
m. Output window will open which will display warning 0 and error 0
n. Go to target – connect
o. Status report should display like
GT71-OLC _ _
AT ENGINEERING STATION
4. Procedure to load firmware to new PM665 controller
a. Choose the COM port , preferably COM1 connect normal
communication cable to COM1(preferred COM port) of Engineering
station laptop(ES3)
b. Choose the AC160 base software file from ES03 >Local Disk( C)
>AC160_BASE_SW_2p2s6_3 (back up is kept in RAFB1 external hard
disk-2 kept in Fire safe locker in door#63, planning room) Refer
Annexure-1.
c. Double click on file LOAD665_COM1.cmd command prompt window
will open
d. It will ask to connect normal communication cable to be connected
between ES3 COM1 and Controller (COM A)
e. Message” press any key to continue..” will appear
f. After pressing any key various steps will follow and finally PL will be
displayed in controller. Note: if Eb is displayed in controller
programming has failed and controller need to repair.
g. If PL is displayed in controller continue with next step
h. Now in command prompt , it will be asked to connect the special CS
cable between ES3 COM1 and Controller (COM A)
i. Message” press any key to continue..” will appear
j. After pressing any key communication software will be loaded
k. Now you will be will ask to connect normal communication cable to
be connected between ES3 COM1 and Controller (COM A)
l. Message” press any key to continue..” will appear
m. After pressing any key Base software will be loaded
n. Finally controller display should show P3
AT ENGINEERING STATION
5. Programme Loading
a. Connect the serial cable in COM1 or COM2
b. Log in Advant Engineering Station Laptop
c. Open ABB Start Menu from desktop
d. Open CBA application Builder 4.3.0
e. Open the required Programme (eg: GT61 OLC)
f. Go to file and confirm online preparation mode is not selected
g. Go to target- connect- select COM1 or COM2 as per serial cable
connection
h. Report window will open, see for any programme in PROM
i. If any programme available in PROM Clear it
i. Go to target- Clear PROM
j. Go to target – disconnect
k. Go to file – generate target code
l. Window will open-keep all default selections and click OK
m. Output window will open which will display warning 0 and error 0
n. Go to target – connect
o. Status report should display like
GT71-OLC _ _
AT CRC PANEL