LIST OF THERMAL POWER PROJECTS UNDERTAKEN BY

MM PAKISTAN (PVT) LTD.


Fee Value Completion
Project Client Description
Million Million

213 MW Reciprocating HUBCO HUBCO intends to extend its power Rs. 47.5 2010
Engines based Combined Generation facility by installing a new (MMP)
cycle power project at 213 MW RFO power project at Narowal
Narowal , Punjab , Punjab. The EPC contract between Euro 0.8
HUBCO and MAN Germany has been m (Mott
concluded 29th April , 2008. This Pettit,
project will add 213 MW to PEPCO Dublin
System to meet the power demand of UK)
GEPCO, LESCO and FESCO
Distribution Companies which are now a
days in severe grip of power crisis.
HUBCO (The Owner) has awarded the
design, engineering and procurement,
contract to MANN Germany,
responsible for supply and delivery of
the Diesel Engines RFO Based
Combined cycle power project with all
BOP, while the construction agreement
for main civil works , erection, start up ,
commissioning and testing of the project
is awarded to M/S Man Diesel Pakistan
(pvt), 16 KM Raiwind Road Lahore on
18th June ,2008..

The set up of this project consists of the


following main components.

ƒ 11 Diesel Engines Generators.sets


ƒ 11 HRSGs and One Aux: Boiler.
ƒ One Steam Turbine.
ƒ RFO system including storage
Tanks and Decanting arrangements
ƒ Cooling Water System.
ƒ Chemical Water Treatment Plant
ƒ Compressed Air System
ƒ 132 KV Substation
ƒ MV/LV Power systems.
ƒ DC system and DC batteries.
ƒ DCS/ PLC Control systems and
Field Instruments.
ƒ Balance of Plant.

Advisory Project DHA Cogen Ltd. DHA have planned to install a combined 2007
Management Services for (DCL) power and desalination plant (CPDP) in
DHA Power and one of its constitute residential /
Desalination Plant commercial sector Phase VIII. An
Karachi independent company DHA Cogen Ltd.
has been established.
DHA’s estimated current requirement of
potable water is 7.5 mgd. KWSB
sanctioned 4.5 mgd. Alternative source
for 3.0 mgd is (CPDP). For the purpose a
power plant of 94 MW is established to
run Desalination Plant. Surplus power
after making full requirement will be
sold to KESC.
Main components are:
1. One Gas Turbine (GT)
2. One dual capacity heat recovery
steam generator (HRSG)
3. One Steam Turbine (ST)
4. Two Desalination Plants
ƒ SIEMENS AG Power Generation
Germany supply power plant of 94
LIST OF THERMAL POWER PROJECTS UNDERTAKEN BY
MM PAKISTAN (PVT) LTD.
Fee Value Completion
Project Client Description
Million Million

MW capacity.
ƒ Alfa Laval of Germany supply two
desalination plants of total capacity
of 3 mgd
ƒ Lincas (Germany) supply gas
supply system.
ƒ Erection and commissioning
Siemens Pakistan

KESC’s Korangi Thermal Karachi Electric Karachi City’s electric power demand is 2007
Power Station – Supply Corporation around 2,300 MW. Karachi Electric
Extension Project Supply Corporation (KESC) has its own
power generation and acquires the
electric supply from other sources. It is
still 300 MW to 500 MW short of
requirement. To overcome this shortfall,
KESC has planned to increase the power
generation capability of existing Korangi
Thermal Power Station (KTPS) by
installing additional generators KESC,
now a duly provatized utility, intends to
first extend the present Simple Cycle
Gas Turbine (SCGT) generation capacity
and subsequently establish a combined
cycle power plant at KTPS.

KESC has engaged MM Pakistan (Pvt.)


Limited (MMP) in Owner’s Engineer
role to provide consultancy for Advisory
Project Management Services in this
Project. International expert staffing will
be arranged. (2007)

Tapal Energy 160 MW Tapal Energy Tapal Energy (Pvt) Limited (TEL) is one 2006
Diesel Power Plant of the first generation of Independent
Power Plants (IPP) set up in Pakistan
under the 1994 Power Policy. It installed
a 126 MW Power Plant which was
commissioned in June, 1997. The plant
is operating successfully since then.
TEL is now in the process of preparing a
proposal for 160 MW power plant to
operate on Residual Fuel Oil (RFO) or
Combined Cycle Power Generation
technology. On TEL’s invitation, EPC
contractors submitted the bids for this
plant.
The Client approached MM Pakistan
(Pvt.) Limited to provide consultancy
services alongwith Mott MacDonald
Group of United Kingdome, as Owner’s
Engineer.

The first phase of review and evaluation


of EPC contractors, specifications and
scope of supply as well as the
recommendations Owner’s Engineer has
been completed.
135 MW Japan Diesel National Bank of Detailed inspection of the power station 0.28 2003
Power Station near Pakistan was done as Lender’s Independent
Raiwind Engineers. Its report covered:
ƒ Details of any events of default,
potential event of default or Forced
Majeure.
ƒ Details of any material dispute
ƒ Details of forecasted / projected
LIST OF THERMAL POWER PROJECTS UNDERTAKEN BY
MM PAKISTAN (PVT) LTD.
Fee Value Completion
Project Client Description
Million Million

amount against actual expenditure on


operating the plant.
ƒ Comparison between revenue forecast
and actual received by the company
along with variance, if any.
ƒ Details of maintenance and costs, fuel
purchases / consumed etc.
ƒ Net operating output, no. of cold
starts, hot starts and other details as
required under the agreement.
ƒ Environmental compliance &
defaults, if any.

117 MW SEPCOL Diesel National Bank of The Lender of funds, National Bank of Rs. 0.46 2003
Power Station – Lender’s Pakistan Pakistan appointed MM Pakistan in + £3,000
Independent Engineer association with Mott MacDonald Ltd of
UK, as Independent Engineer to examine
and review the operation and
maintenance of SEPCOL’s Raiwind
Diesel Power Station, every six months.
The independent Engineer reviews
SEPCOL’s quarterly operating reports,
carried out site inspection, holds
discussions with the Client and operation
staff and submitted a detailed report to
National Bank of Pakistan, covering
Operation and Maintenance activities,
Staffing, Financial Analysis, Health,
Safety and Environmental aspects etc.
117 MW Diesel Power National Consultants physically visited the plant Rs. 2.0 + 2001
Plant Monitoring as Development Finance and reported on: £4500
Lender’s Engineer for Corporation (NDFC), ƒ Details of any events of default,
SEPCOL Karachi potential event of default or Forced
Majeure.
ƒ Details of any material dispute
ƒ Details of forecasted / projected
amount against actual expenditure on
operating the plant.
ƒ Comparison between revenue forecast
and actual received by the company
along with variance, if any.
ƒ Details of maintenance and costs, fuel
purchases / consumed etc.
ƒ Net operating output, no. of cold
starts, hot starts and other details as
required under the agreement.
ƒ Environmental compliance &
defaults, if any.

Review of environmental monitoring


plan.