MES Schedule Rate List
MES Office
Dining Hall
PO's Mess
NPM Staff
Building 1
Building 2
MT Office
Training
Security
Mosque
Aviation
Building
Building
Barrack
Barrack
JCO'S
JCO's
Sailor
Block
Utility
Utility
Mess
Area
RCC (1:1.25:2.5) - Column (Ground Floor) 21071 21138 21138 21138 21138
RCC (1:1.25:2.5) - Column (1st Floor) 21304 21371 21371 21371 21371
RCC (1:1.25:2.5) - Column (2nd Floor) 21537 21604 21604 21604 21604
RCC (1:1.25:2.5) - Column (3rd Floor) 21770 21837 21837 21837 21837
RCC (1:1.25:2.5) - Column (4th Floor) 22003 22070 22070
RCC (1:1.25:2.5) - Column (5th Floor) 22236 22303 22303
RCC (1:1.25:2.5) - Column (6th Floor) 22546 22613 22613
RCC (1:1.25:2.5) - Column & Lift Wall (Ground Floor) 21138 21138
RCC (1:1.25:2.5) - Column & Lift Wall (1st Floor) 21371 21371
RCC (1:1.25:2.5) - Column & Lift Wall (2nd Floor) 21604 21604
RCC (1:1.25:2.5) - Column & Lift Wall (3rd Floor) 21837 21837
RCC (1:1.25:2.5) - Column & Lift Wall (4th Floor) 22070 22070
RCC (1:1.25:2.5) - Column & Lift Wall (5th Floor) 22303 22303
RCC (1:1.25:2.5) - Column & Lift Wall (6th Floor) 22613 22613
RCC (1:1.5:3) - Beam, Stair, Posts, Struts, Piers, Lintel (Ground Floor) 20230 20299 20299 20299 20299 20299 20299
RCC (1:1.5:3) - Beam, Stair, Posts, Struts, Piers, Lintel (1st Floor) 20463 20532 20532 20532 20532 20532 20532
RCC (1:1.5:3) - Beam, Stair, Posts, Struts, Piers, Lintel (2nd Floor) 20696 20765 20765 20765 20765 20765 20765
RCC (1:1.5:3) - Beam, Stair, Posts, Struts, Piers, Lintel (3rd Floor) 20929 20998 20998 20998 20998 20998
RCC (1:1.5:3) - Beam, Stair, Posts, Struts, Piers, Lintel (4th Floor) 21162 21231 21231 21231 21231
RCC (1:1.5:3) - Beam, Stair, Posts, Struts, Piers, Lintel (5th Floor) 21395 21464 21464 21464 21464
RCC (1:1.5:3) - Beam, Stair, Posts, Struts, Piers, Lintel (6th Floor) 21705 21774 21774 21774 21774
RCC (1:1.5:3) - Column, Beam, Stair, Lintel (Ground Floor) 20299 20299 20299 20299 20299 20299
RCC (1:1.5:3) - Column, Beam, wall, Lintel, Stair, Landing (1st Floor) 20532 20532 20532 20532 20532 20532
RCC (1:1.5:3) - Column, Beam, wall, Lintel, Stair, Landing (2nd Floor) 20765 20765 20765 20765 20765 20765
RCC (1:1.5:3) - Column, Beam, wall, Lintel, Stair, Landing (3rd Floor) 20998 20998 20998 20998 20998 20998
RCC (1:1.5:3) - Column, Beam, wall, Lintel, Stair, Landing (4th Floor)
RCC (1:1.5:3) - Column, Beam, wall, Lintel, Stair, Landing (5th Floor)
RCC (1:1.5:3) - Column, Beam, wall, Lintel, Stair, Landing (6th Floor)
RCC (1:1.5:3) - Roof, Slab, Sunshade, Shelf (Ground Floor) 20291 20291 20291 20222 20291 20291 20291 20291 20291 20291 20291
RCC (1:1.5:3) - Roof, Slab, Sunshade, Shelf (1st Floor) 20524 20524 20524 20455 20524 20524 20524 20524 20524 20524 20254
RCC (1:1.5:3) - Roof, Slab, Sunshade, Shelf (2nd Floor) 20757 20757 20757 20688 20757 20757 20757 20757 20757 20757 20757
RCC (1:1.5:3) - Roof, Slab, Sunshade, Shelf (3rd Floor) 20990 20990 20990 20921 20990 20990 20990 20990 20990 20990
RCC (1:1.5:3) - Roof, Slab, Sunshade, Shelf (4th Floor) 21154 21223 21223
RCC (1:1.5:3) - Roof, Slab, Sunshade, Shelf (5th Floor) 21387 21456 21456
RCC (1:1.5:3) - Roof, Slab, Sunshade, Shelf (6th Floor) 21697 21766 21766
Project name: JCO's Training Block
Name Of Work: RCC Casting (Column + Lift Wall)
Quantity
Location MB No Page No Item No
(Cum)
Column upto PL 79 18 15 35.51
Column above PL 79 23 19 44.60
(Ground Floor)
Column (1st Floor) 80 61 35 44.60
Column (2nd Floor) 80 68 43 38.93
Column (2nd Floor) 80 70 45 5.67
Column (3rd Floor) 110 6 5 5.67
RCC Casting (Column) Total= 174.98
Quantity
Location MB No Page No Item No
(Cum)
Column upto PL 15 21 12 21.12
Lift Wall upto PL 15 23 14 4.60
Column + Lift Wall
above PL (Ground 15 35 18 30.62
Floor)
Column + Lift Wall (1st
15 41 23 30.62
Floor)
Column + Lift Wall (2nd
15 69 11 30.62
Floor)
Column + Lift Wall (3rd
15 69 12 30.62
Floor)
Column + Lift Wall (3rd
75 62 15 -3.08
Floor)
Column + Lift Wall (4th
15 69 13 30.62
Floor)
Column + Lift Wall (4th
75 79 20 -3.07
Floor)
Column + Lift Wall (5th 15 69 14 30.62
Floor)
Column + Lift Wall (5th
76 10 24 -7.18
Floor)
Lift machine Room 76 31 34 25.51
RCC Casting Column + Lift Wall) Total= 221.62