Transition Audit Checklist For Requirement Process
Transition Audit Checklist For Requirement Process
Item(s) Referred
Auditor(s) Name
Deviation Approval
Approval Status Approved By
Required
Page 1 of 4
Tranisiton Audit checklist for Requirements process
DO-178B
# Checklist Point Conformance Evidence / Justification
Reference
8.1b
1 Are the software plans available as mentioned in SDP? 5.1.2
A-9:2
8.1b
Are the software plans reviewed as mentioned in SVP and appropriate
2 4.6
action evidenced?
A-9:2
8.1b
3 Are the software plans under configuration control as mentioned in SCMP? 7.2.1d
A-9:2
8.1b
4 Is the software requirement standard available as mentioned in SDP ? 5.1.2
A-9:2
8.1b
Is the software requirement standard reviewed as mentioned in SVP and
5 4.6
appropriate action evidenced?
A-9:2
8.1b
Is the software requirement standard under configuration control as
6 7.2.1d
mentioned in SCMP?
A-9:2
8.1b
Is the system requirements document (including hardware interface and
7 5.1.2
system architecture) available as mentioned in SDP?
A-9:2
Is the system requirements document (including hardware interface and 8.1b
8 system architecture) examined for use in the project and clarifications 5.0
raised? A-9:2
8.1b
Is the system requirement document (including hardware interface and
9 7.2.1d
system architecture) under configuration control as mentioned SCMP?
A-9:2
8.1b
Is software requirement development environment & tools available as
10 4.4.1
mentioned in SDP?.
A-9:2
Page 2 of 4
DO-178B
# Checklist Point Conformance Evidence / Justification
Reference
8.1b
11 Are any other input documents / criteria available as mentioned in SDP? 4.3b
A-9:2
Page 3 of 4
Audit Findings
Checkpoint
# Audit Item Issue Location Issue Description Action taken Status Remarks
Reference
Page 4 of 4