0% found this document useful (0 votes)
424 views1 page

Ultima Condominium Association: Electricity Bill

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

ULTIMA CONDOMINIUM ASSOCIATION

The Ultima, Garden City, Sector 81, Gurugram, Haryana-122004 (India)


Phone: 0124-4030964, Email: [email protected]
PAN: AABAU3480C GSTIN : 06AABAU3480C1ZR
ELECTRICITY BILL
Property No. : UTS062 Bill No. : E/2021/MAY/616
Name : MODE CIRCLE COSMETICS (P) LTD THRU MR. GURNAM Bill Date : 08-Jun-2021
SINGH (DIRECTOR)
Billing Upto : 28-Jun-2021
Address : C-158,NARAINA IND AREA PHASE-1 NEW DELHI-110028 Due Date : 25-Jul-2021
DELHI-INDIA
Area
Sanc. Load : 9.00 kW
GSTIN : Bill Type : Tax Invoice

Billing Cycle Grid Reading (Units) DG Reading (Units)


From Upto From To Consumed From To Consumed
08-Jun-2021 28-Jun-2021 1324.00 2675.00 1351.00 0.00 0.00 0.00

No. Particulars SAC Rate (Rs.) Units Consumed Amount Payable (Rs.)
1 Electricity Charges - Grid 6.89 1351.00 9,308.00
2 DG Power Generation Charges 999598 0.00 0.00 0.00
3 Fixed Charges @ Rs. 0.00 per kW 0.00
4 Rebate On Fixed Charges 999598 @ Rs. 0.00 per KW 0.00
A TOTAL CURRENT CHARGES 9,308.00
5 Previous Dues/Advance 0.00
6 Interest On Previous Dues @24.00% annum 0.00
Central Goods & Services Tax On No. 2 & 6 @9.00% 0.00
State Goods & Services Tax On No. 2 & 6 @9.00% 0.00
0.00
TOTAL PAYABLE (BEFORE DUE DATE) 9,308.00

Notes:
For Bank transfer: "ULTIMA CONDOMINIUM ASSOCIATION"
Payment BANK NAME ACCOUNT No. (ACCOUNT TYPE) IFSC CODE
Through Net
ICICI Bank Ltd. 739201000001 (Savings) ICIC0007392
Banking
Post net banking transfer, please write apartment details, bill details and net transfer details mail to
[email protected]
Cheque or Payment can be made by crossed account payee cheque or bank draft drawn in favour of “ULTIMA
Demand CONDOMINIUM ASSOCIATION” payable at Gurgaon. Cheque is to be sent on above address. No cash payment
Draft (DD) will be accepted in any circumstances.
For any Dishonored cheque, a charge of Rs 200 + GST OR applicable Bank charges for the dishonored cheque
Dishonored
+ GST, whichever is higher will be levied. Post dishonoring of cheque, cheques will NO longer be accepted for
cheques the said payment. User needs to administer the payment for the failed transaction either through Demand Draft
or Net Banking transactions
In case user fails to pay the bill on or before due date indicated in the bill, this will be deemed to be a notice and
the electricity / utilities supply to the premises, the user shall without prejudice to the right of the “ULTIMA
Delayed CONDOMINIUM ASSOCIATION” to recover such charges as of bill by suit, be discontinued after the expiry of the
Payments seven days of due date mentioned in the bill without any further notice to the user. Supply shall not be reconnected
unless and until the amount shown in the bill together with interest @24.00% annum for the billing period and
reconnection charges of Rs. 500.00 are paid by the user.
All services are delivered at The Ultima, Garden City, Sector 81, Gurugram, Haryana 122004 (India)

RECEIPT FOR ELECTRICITY BILL


Net Receivable : Rs. 9,308.00 Due Date : 25-Jul-2021
Received with thanks a sum of Rs.______________ towards Electricity Bill for Property no. UTS062 in ULTIMA CONDOMINIUM

ASSOCIATION vide Cheque/DD No. ___ ____ _____ Dated __ ___ _____ drawn on __________ ________ ___________
Received on ___ ___ _______ by representative Name___________________ with signature _____________

For your query/clarification kindly contact on [email protected] (Office Timing 10AM to 06PM).
This is a system generated document and does not require signature. Any unauthorized usage, disclosure or copying of this document is strictly prohibited by law

You might also like