Hazard Analysis and Risk Control Record: Schlumberger-Private
Hazard Analysis and Risk Control Record: Schlumberger-Private
Hazard Analysis and Risk Control Record: Schlumberger-Private
Likelihood
Likelihood
Risk Level
Risk Level
Activity / Process Steps Population
Severity
Severity
and Worst Case Consequences with
(Max 500 chars) Hazard Loss Affected Current and Planned Prevention Current and Planned Mitigation
no Prevention or Mitigation Measures
Category Category (Max 200 Measures to reduce Likelihood Measures to reduce Severity
in Place
chars) (Max 200 chars) (Max 200 chars)
(Max 200 chars)
Clean out operation Machinery/ Operation failures. Worst case : Loss Other-- Schlumberg ACTive Tool as real time BHP monitoring CTS FE onboard with update coilCADE
(Penetrating Sand) Equipment/ reputation >Reputation er reputation
Hand Tools
All personnel deemed competent by
management
Competent tools specialist will be on
board and will supervise and responsible
for the tools performance
Medium (-9)
Low (-2)
Medium
Design job with PowerCLEAN WBS with
Major
Light
Low
100% sand to surface. Limit the bite for
70 ft and penetration speed of maximum
3 ft/min. to ensure the sand loading is
less than 10% at one time
Machinery/ CT cannot penetrate, return line Non- Schlumberg External breaker pumping line install at Have a JetBLASTER job program as a
Equipment/ plugged. Worst case : Job delay Productive er reputation return flow path (to be installed at contingency plan
Hand Tools Time-- and assets chemical injection line) and injected
>Schlumber during cleanout operation
ger
Have a dedicated personnel to monitor Sets of JetBLASTER tool as a
WHP and returns contingency plan (in case hard sand)
Have a flush line up from pump on CTS FE onboard with update coilCADE
flowback line, in case return line is
plugged to that no need to stop pumping
during job
Medium (-9)
Low (-2)
Medium
Major
Light
diverted to mud pit (only use when
Low
contingency plan)
Have pressure gauge installed at the
choke manifold to monitor return at all
time
Return line physical observation
(sampling point available)
Using gel to assist sand suspension
especially in casing section
Two way radio communication between
CT supervisor and production crew for
observer returns at all time
Machinery/ Return pump fails during cleanout. Non- Schlumberg Follow the agreed job program (pumping If fluid pump fails, continue pumping
Equipment/ Worst case : Job delay Productive er reputation schedule) nitrogen and POOH CT safely
Hand Tools Time-- and assets
Have a double pump (CPS 361) during Using nitrogen to nitrified the fluid
>Schlumber
the job with one pump stand-by and system velocity for carrying solids
ger
readily primed up in case 1st pump
failure
Low (-2)
Medium
up
Major
Light
Low
Physically monitor diesel fluid stock
available on board at all time and to be
reported to client representative. To put
on order when 40% of stock has been
used for the job
Machinery/ CT stuck. Worst case : Job delay, Loss Non- Schlumberg Whenever use drop balls, ball size to be BHA with disconnect capability (MHA
Equipment/ of BHA Productive er reputation identified before launch available)
Hand Tools Time-- and assets
Competent tool specialist to maintain Chemical cutter at last contingency
>Schlumber
continuous communication with Client
ger
Representative, especially on tool
performance and demonstrate
competency as a part of risk assessment
process
QA/QC chemical gel on location prior CTS FE onboard with update coilCADE
pumping
Tool function test with Client If CT stuck but there is no
Representative presence and approval circulation/returns - pump fluid from
gas lift activation to lower BHP during backside and CT with hard shut down to
cleanout operation rock the well
Major
Light
Low
Schlumberger-Private
#
Perform regular pull test and pull test
connector done prior RIH
Well known and discussed
Maintain circulation, nonstop pumping
Medium (-9)
Perform pre job meeting and understood Prepare maintenance tool
Low (-2)
Medium
Major
Light
by all crews, Report if any deviation as
Low
MOC
Perform STEM I / SL - 0 prior job and Prepare back up tools prior job
ensure STEM II and III of equipment is
valid
All employees have the right to stop a job
if they feel that the job is unsafe
Schlumberger-Private
#