Rap Report Twente

Download as pdf or txt
Download as pdf or txt
You are on page 1of 238

Framework Resettlement Action Plan for

Twente Canal Improvement Project, Myanmar

July 2019
Department of Water Resources and Improvement of River Systems (DWIR)
Ministry of Transport and Communication

i
CONTENT
Chapter 1: Introduction……….……………………………………………………………………...1
Chapter 2: Project Descriptions………………….…………………………………………………..2
2.1 Objectives and Main Components…………………………………………………12
2.2 Implementation Schedules…………………………………………………………12

2.3 Expected Benefits………………………………………………………………….13

2.4 Executing Agency………………………………………………………………….15

Chapter 3: Applicable National and Local Laws, Regulations and Policies


3.1 Government of Myanmar………………………………………………………….17
3.2 International Good Practices and EDCF Safeguard Policy………………………..21
3.3 Policy Gap between EDCF (and International Safeguard Standards)......................21
and Government of Myanmar
3.4 Objectives, Policies and Principles of the Framework RAP for the Proposed…….24
Project

Chapter 4: Planning and Implementation Process


4.1 Setting the Study Limits (AoI) for Land Acquisition and Resettlement............... ...33
4.2 Land Conformation Survey.......................................................................................37
4.3 Socio-economic Survey for Potentially Affected Persons/Households....................42
4.4 Detailed Measurement Survey (DMS)………………………………………….….58
4.5 Replacement Cost Survey (RCS)..............................................................................60
4.6 Entitlement Matrix…………………………………………………………….…...62
4.7 Assistance for Livelihood Restoration of the PAPs/PAFs and the affected…….…70
communities
4.8 Information Disclosure, Consultation & Grievance Redress Mechanism (GRM)...71
4.9 Monitoring, reporting and Evaluation……………………………………………...84
4.10 Institutional Arrangements…………………………………………………………89
4.11 Budgets and Financing……………………………………………………………..96
4.12 Implementation Schedules…………………………………………………………96

Annex 1. (Initial) Inventory of PAFs

ii
CHAPTER 1

INTRODUCTION
The Twente (Twantay) Canal is an artificial waterway connecting between the Ayeyawrady delta area
and the Yangon River in Myanmar, which was completed by British Government in 1883 over the
length of 34 km. Over a century, the Twente (Twantay) Canal has been changed and improved by
shortcutting, widening and deepening, reverting, etc. However, due to lack of regular maintenance, it
has become irregular by local erosion and deposition, which is threatening safe and smooth ship
navigation. Aware of the necessity of systematical improvement and management of the Twente
(Twantay) Canal, Ministry of Transport and Communications (MOTC) instructed the Directorate of
Water Resources and Improvement of River Systems (DWIR) under the MOTC to deliberate how to
effectively improve the Twente (Twantay) Canal and to systematically manage it even with foreign aids
in 2012.
Twente (Twantay) Canal Improvement project was conducted by cooperation between Directorate of
Water Resources and Improvement of River Systems (DWIR) of the Ministry of Transport of the Union
of Myanmar and the ISAN Cooperation from the Republic of Korea. The first stage of implementation
of the Twente (Twantay) Canal Improvement Project will be carried out by the loan of Economic
Development Cooperation Fund (EDCF) form the Korean Government and the project will be
benefitted for local people in the region and people using the canal by providing safe navigation, smooth
flow of cargos, bank protection, flood protection and development in tourism.
TOR for EIA of the proposed project has been issued by MONREC-ECD on 08 May 2019, with the
following provision:
“…(e) To include resettlement action plan for the affected persons from proposed project including loss
of land, magnitude, type of lands, number of affected houses and livelihood restoration plans in the
assessment report.”
In addition, the EDCF Safeguard Policy, of the Export-Import Bank of Korea, donor of the ODA
concessionary loan for the project implementation, ensures the borrower " shall prepare RP, if the
proposed project will have involuntary resettlement impacts, RP aims to restore or improve the quality
of life of displaced persons to or above pre-project levels, and its level of details and comprehensiveness
shall be commensurate with the significance of involuntary resettlement impacts." (Art 26 of the Policy)
The preliminary assessment of the project, based on the assumption of ROW to be within the 30 m
range from the boundary of the construction site (and 30 m from boundaries of the shipyards in
Kanaungto), about 2,697 households (with 669 lots and 2,697 structures) were identified to be subject
to the land acquisition and involuntary resettlement. Based on the international safeguard standards
such as ADB Safeguard Policy Statement (2009), the rule of thumbs in good international practices is
that over the 40 households subject to involuntary resettlement triggers the need for establishment of
the Resettlement (Action) Plan.
Therefore, the proposed project is required to develop a separate resettlement action plan (RAP) from
the ESIA.

1
CHAPTER 2

PROJECT DESCRIPTIONS

2.1 Objectives and Main Components


The Twente (Twantay) Canal water improvement Project was designed to address the current river
erosion and frequent flooding that have hampered the use of safe inland waterways and affected the
lives of residents near the canal. It is essential to improve the condition of canal for regional
development and safe inland waterway by reducing the damage from floods.
The proposed project is divided into two phases taking into consideration of the urgency and scale of
the project: Phase 1: Channel Training and Flood Embankment, and Phase 2: Multi-Purpose Barrage
Development. Project components at Phase 1 comprise measures to resolve urgent and serious problems
such as bed and bank erosion and flood damages. Channel training measures are designed to reduce the
flow velocity due to the tidal flow and to stabilize the flow field in the Twente (Twantay) Canal. Flood
embankment measures are to secure to prevent the inundation of the canal water above the designed
flood level during the largest spring tide. This project components at phase 1 will ensure less physical,
social, and environmental damages due to bed and bank erosion and flood and protect lives, properties,
and livelihood of affected persons.

The project area, part of the Twante Canal (between 0 mile and 6.5 mile) and part of the yangon river
(the right bank of a river) is located in the Yangon South District of Yangon Region. The geographical
coverage of the area is part of the Dala Township, SeikkyiKhanaungto Township, Kyimyindaing
Township and Twante Township. The location map of the project components phase 1 is shown in
Figure 2-1 below. Explanation of each of the components at phase 1 are presented in the following.

2
Figure 2-1: Location Map of Proposed Project Components at Phase 1

3
◼ Component 1: Waterway Maintenance
Component 1 consists of two sub-components such as 1.1-Bank Protection and 1.2 -Bed Scour
Prevention as shown in Figure 2-2. The main purpose of Sub-Component 1.1-Bank Protection is to
mitigate channel contraction reducing the flow velocity and erosion risk near ‘0’ mile junction. Major
work items include as below:
1) To remove 4 groynes on both sides at 0.5 mile,
2) To improve the channel alignment near 0.5 mile, and
3) To install the bank protection near ‘0’ mile junction area (L=5,880m).

Figure 2-2: Location Map of Component 1

Sub-component 1.1 was designated to protect the bank from erosion due to tidal flows near ‘0’ mile
junction and to regulate the velocity field. Particularly, it aims to reduce the maximum flow velocity at
0.5 mile, that is, the maximum velocity of 2.37 m/s decreases to 1.19 m/s during the flood tide while
the maximum velocity of 3.23 m/s decreases to 1.46 m/s during the ebb tide. It is encouraged that this
sub-component affects negligibly the flow field at 3.5 mile inducing 3~4% increase of flow velocity as
shown in Table 2-1. However, it is noticeable that there is potential of bed change near the junction at
0 mile showing low velocity field near the junction of the Khanaungto Creek, recapping that multi-
purpose barrages at Phase 2 are required as permanent measure against the bed change. Based on the
soil investigation results near the Project site, it was found that the Twente (Twantay) Canal is on the

4
weak foundation and so the following factors shall be considered for the design of bank protection:
1) Weight reduction using lightweight materials,
2) Soil improvement by replacement, and
3) Frame formation by piling.

Basically, the original silty soil is required to be replaced by sandy soil for stability of the bank
protection, which was considered for the design in the Study. The bank protection proposed in the Study
consists of slope protection and toe protection. First, the slope protection is to protect the bank erosion
from tractive force of tidal flow and wave action from shipping and its type can be classified into hard
and flexible surface types. The hard surface type may cover the bank using brick, concrete block, cement
grouted rock, etc. while the flexible surface type may use gabion mattress, hand-placed, dry rubble
facing, dumped riprap, Reno mattress, etc. Main features of slope protection type can be compared as
seen in Table 2-2. As seen in the table, each type has both strong and weak points and with regard to
weak foundation of the Project site, the rip-rap type was found to be unsuitable for slope protection
while two types of environmental block and gabion mattress were considered in the Study.

Table 2-1: Summary of Flow Velocity Distribution at 0 and 3.5 Miles


Division Original Case1 Case2 Case3 Case4 Case5 Case6 Case7
Max. 2.37 1.19 1.93 1.66 1.24 1.03 1.74 1.06
0.5 mile Avg. 1.53 1.14 1.60 1.37 1.18 0.99 1.46 1.01
Flood Min. 0.93 1.04 1.05 0.85 1.07 0.91 0.89 0.92
Tide Max. 1.43 1.46 1.40 1.28 1.48 1.26 1.28 1.26
3.5 mile Avg. 1.25 1.29 1.24 1.12 1.31 1.12 1.12 1.12
Min. 1.00 1.06 1.02 0.91 1.07 0.93 0.91 0.93
Max. 3.23 1.46 3.49 3.13 1.50 1.47 3.47 1.51
0.5 mile Avg. 1.80 1.19 2.03 1.81 1.24 1.18 2.01 1.24
Ebb Min. 0.66 0.80 0.92 0.64 0.87 0.79 0.70 0.86
Tide Max. 1.55 1.63 1.53 1.56 1.62 1.63 1.55 1.63
3.5 mile Avg. 1.38 1.43 1.37 1.38 1.42 1.43 1.37 1.43
Min. 0.76 0.85 0.87 0.76 0.84 0.85 0.76 0.85

Table 2-2: Main Features of Major Slope Protection Type


Environmental
Evaluation Items Rip-Rap Gabion Mattress Remarks
Block
1. Strength +++ +++ +++
2. Weight (light) + ++ ++ Key
3. Flexibility +++ + ++
4. Economical View ++ ++ ++

5
5. Landscape ++ +++ ++
Note) +++: excellent, ++: fair, +: poor
The toe protection serves as the foundation of slope protection against falling down of the back-fill and
slope covering materials preventing from scouring at the foundation of slope protection. In general,
dumping rip-rap, gabion box or piling with filling stones is applicable for the toe protection, which was
considered for the design in the Study. Two types of bank protection are proposed as seen in Table 2-3
and Figure 2-3.

Table 2-3: Structures of Bank Protection Type


Division Type 1 Type 2 Remarks

Slope · Environmental block · Gabion mattress


· Geotextile · Geotextile
Protection · Sand replacement · Sand replacement
· 1:2 slope · 1:2 slope
Toe · Gabion box · Gabion box
· Sand and rubble · Sand and rubble
Protection · Piling · Piling
Bottom · Stone pouch · Stone pouch
Protection

Photographs

6
(a) Type 1

(b) Type 2
Figure 2-3: Typical Section of Bank Protection

The main purpose of Sub-Component 1.2 Bed Scour Prevention is to mitigate irregularity in flow depth
and to regulate the stream wise flow field near ‘0’ mile junction raising the minimum bed level from
El.-27.6m to El.-15.0m. In principal, the deep pool near ‘0’ mile junction will be filled with sand
materials and the channel bed can be armored by riprap, gabion mattress, concrete block, etc. for
scouring prevention whose dimension can be determined based on flow characteristics.

Referring to HEC11 from U.S. Department of Transportation Federal Highway Administration, and
Design Guidelines by the Ministry of Land, Infrastructure and Transport (MOLIT) of Republic of Korea,
the armoring countermeasures are designated as shown in Table 2-4. In the Study, the main features for
each countermeasure were seriously reviewed and finally the stone gabion with fiber pocket was
adopted for bed armoring in the Project as shown in Figure 2-4.

Table 2-4: Main Features of Armoring Countermeasures


Division Riprap Stone Gabion (wire) Stone Gabion (fiber)

Requirements · Riprap size (0.3 m) · Riprap size (80~150 · Riprap size (80~150
· Thickness (0.5 m) mm) mm)
· Thickness (0.3 m) · Thickness (0.3 m)
Constructability · Not easy to acquire · Easy to acquire stone · Easy to acquire stone
stone materials materials (recycled) materials (recycled)
· Non-uniform size · Regular · Regular
· Not easy for laying · Not easy for laying · Easy for laying
Maintenance · Loss of materials · No loss of materials · No loss of materials
· Not flexible

7
· Corrosion of wire · Proper for soft
mesh ground (flexible)
· No corrosion of fiber
Cost · US$ 54 per m3 · US$ 98 per m3 · US$ 136 per m3

Photographs

Adoption O

Figure 2-4: Typical Section of Bed Scour Protection


◼ Component 2: Flood Embankment
The main purpose of this component is to secure not to over the flood level during the largest spring
tide in Khanaungto, Dala, and Twente (Twantay) Townships. This component is divided into three sub-
components according to the sections as shown in Figure 2-5. Major work item is to embank along
canals with drainage facility and concrete pavement as shown in Figure 2-6.

In this study, the levee crest was designed to be 1.5m higher than high water level considering freeboard
covering concrete pavement for traffic. The crest width of at least 7m was set up for two-lane road. For
slope protection, seeding mattress and sodding were designed on the river and land sides, respectively,
and the slope is adjustable from 1:2 to 1:3 according to the density of residential area land use. It was
found from the site investigation that the dense residential area approximately corresponds with the
bank protection site by Component 1. Based on design criteria and preliminary design as described
above, the typical cross-sections are section by section drawn in Figure 2-7 and the work quantities for

8
Phase 1: Channel Training and Flood Embankment were estimated as seen in Table 2-5.

Figure 2-5: Location Map of Component 2

Figure 2-6: Typical Section of Flood Embankment

9
(a) 0 mile

(b) K0

(c) 2 mile
Figure 2-7: Cross-sectional Maps of Project Components at Phase 1

10
Table 2-5: Work Quantities for Project Components at Phase 1

Work Items Description Units Quantity Remarks

Component 1. Channel Training

1.1 Bank Protection

· Removal of Groynes Near 0.5 mile LS 1

· Bank Protection Near 0 mile junction M 5,880

1.2 Bed Scour Prevention Near 0 mile junction

· Stone Gabion El.-15.3 ~ -15.0m m3 16,000

· Sandbag El.-27.6 ~ -15.3m m3 224,000

Component 2. Flood Embankment

2.1 Khanaungto Section L=11.5km

· Embankment W=7.0m, H=2.0m m3 300,000

· Slope Protection Both sides (Sodding) M 23,000

· Concrete Pavement W=7.0m, T=0.2m M 11,500

· Drainage Facility M 11,500

2.2 Dala Section L=12.2km

· Embankment W=7.0m, H=2.0m m3 320,000

· Slope Protection Both sides (Sodding) M 24,400

· Concrete Pavement W=7.0m, T=0.2m M 12,200

· Drainage Facility M 12,200

2.3 Twente Section L=15.8km

· Embankment W=7.0m, H=2.0m m3 410,000

· Slope Protection Both sides (Sodding) M 31,600

· Concrete Pavement W=7.0m, T=0.2m M 15,800

· Drainage Facility M 15,800

2.2 Implementation Schedules

Project implementation schedule was established while considering similar projects in Korea and
Myanmar, construction quantities, climate conditions (dry and wet seasons) in the Project site. Total 6
years are required for the Project including 3 months for Consultant selection, 9 months for detailed
design and tender service, and 60 months for construction and supervision as seen in Figure 2-8 and

11
Table 2-6 shows the annual investment plan based on construction quantities.

Year1 Year2 Year3 Year4 Year5 Year6


Activities
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Selection of Consultant &
Detailed Design

Bidding

Land Acquisition &


Compensation

Contractor Selection

Construction &
Supervision

Figure 2-8: Project Implementation Schedule

Table 2-6: Annual Investment Plan


Annual Investment (1,000 US$)
Items 1st 3rd 4th 5th 6th Total
2nd Year
Year Year Year Year Year
1. Direct Construction Cost - 7,618 13,121 13,808 12,856 5,503 52,906
2. Consulting Services 1,813 1,189 736 538 453 792 5,521
3. Direct Investment (1+2) 1,813 8,807 13,857 14,346 13,309 6,295 58,427
EDCF
4. Contingencies 1 185 754 869 910 93 2,812
5. Service Charge 2 9 14 15 14 7 61
Subtotal 1,816 9,001 14,625 15,230 14,233 6,395 61,300
1. Commercial Tax 276 2,645 - - - - 2,921
2. Customs - 105 - - - - 105
Myanmar 3. Project Management Cost 35 76 139 145 135 57 587
4. Compensation 3,247 1,082 - - - - 4,329
Subtotal 3,558 3,908 139 145 135 57 7,942
Total 5,374 12,909 14,764 15,375 14,368 6,452 69,242

2.3 Expected Benefits

A. Better and Safer Access to Inland Water Transport

Before 2009, there was a deep pool at 3.5 mile of Twente (Twantay) Canal and it generated high speed
flow and vortices there during the ebb tide, which caused to reduce the traffic volume. Since channel
widening in 2009, the traffic through the Twente (Twantay) Canal was recovered and became normal
as of now.

Presently, there is a deep pool at 0 mile of Twente (Twantay) Canal, which is similar to previous one at
3.5 mile, it is also causing high speed flow and vortices at 0 mile during the ebb tide. The pool is getting
deeper with time and it generates more unstable flow at 0 mile. This motivates the Project to secure the
safe navigation.

12
Based on the previous experiences, it is reasonable to assume that the freight transport by inland
waterways will be reduced due to the unstable waterway at 0 mile without the Project and then the
reduced traffic will be transported by the second-best way (railway). The transport unit cost of inland
waterway is 20.60 Kyats/ton-mile lower than that of railway. Therefore, the difference in unit prices of
freight transport between inland waterway and railway causes the increase of the transport cost, which
can be considered as the project benefits. Also, as of now, toll fee of Twente (Twantay) Canal are 35
Kyats/ton for vessels over 100 ton, and 50 Kyats/ton for vessels below 100 ton. When using railway
instead of Twente (Twantay) Canal, the toll fee for railway will be collected, even though the Project
will prevent reduction of the number of vessels and secure the toll fee of Twente (Twantay)

B. Prevention of Land Loss

From official interview in the F/S, it was found that land loss occurs by bank erosion along the Twente
(Twatay) Canal and lost area reaches 128 and 1,115 m2 per annum in Khanaungto and Dala townships,
respectively. The estimated benefits from prevention of land loss become US$ 0.225 million after the
completion of channel training.

C. Prevention of Flood Damages

It was found in the F/S that total 6,821 ha can be protected from flood damages during the largest spring
tide. From the official interview in the F/S, the unit price of flood damages was estimated as shown in
Table 1.7 Houses, other buildings, farmland, etc. damaged by the flood are estimated using flood
inundation map during the largest spring tide prepared in the F/S.

In the F/S, urbanization according to the new town development plan of Yangon was assumed causing
the increase of houses, buildings, and other infrastructures. In July 2015, Yangon Regional Government
invited tender for development of the new town expansion project after the parliament’s approval
indicating the new town development has been realized as the plan. Consequently, the estimated flood
damages are considered as the annual project benefits from the flood protection.

Table 2-7: Unit Price of Flood Damages


Unit Price
Classification Unit Seikkyi
Dala Twente Adopted
Khanaungto
House Kyats/EA 1,130,000 61,670,000 23,680,000 1,130,000
House Property Kyats/EA 750,000 74,000,000 24,630,000 750,000
School Kyats/EA 3,229,095 179,394,145 68,887,352 3,229,095
Market Kyats/EA 13,118,197 728,788,713 279,854,866 13,118,197
Market Property Kyats/EA 1,500,000,000 3,000,000,000 300,000,000 300,000,000

13
Office Kyats/EA 14,369,471 798,303,945 306,548,715 14,351,532
Office Property Kyats/EA 70,000,000 75,000,000 150,000,000 70,000,000
Crops Kyats/ha - - - 448,975
Buffalo Kyats/EA - 300,000 - 300,000
Cow Kyats/EA 300,000 400,000 - 300,000
Pig Kyats/EA 200,000 200,000 - 200,000
Goat Kyats/EA 100,000 - - 100,000
Chicken Kyats/EA - 3,600 - 3,600
Source: Official Interview with Local Offices and Statistical Yearbook (CSO, 2011)

Compensation Costs
Items Unit Price Quantities Cost (US$) Remarks
A. Affected Subjects 4,115,688
(1) Lands 15,630 m2 3,176,846
Dala Township 172 US$/m2 1,192 m2 205,289
2 2
Seikkyi Khanaungto Township 251 US$/m 8,356 m 2,098,675
Twente Township 144 US$/m2 6,082 m2 872,881
(2) Buildings 20,000 US$/building 39 buildings 780,000
(3) Other Infrastructures - - 158,842 5% of (1)
B. Additional Support 100 US$/month·HH 117 month·HH 11,700
C. Management Cost 41,157 1% of A
D. Subtotal (A+B+C) 4,168,545
E. Contingencies 160,455 4% of D
Total 4,329,000

2.4 Executing Agency

Waterways Department was organized and founded in 1972 by combining Dredging and River
Conservancy sections of Department of Marine Administration and parts of Hydrographic Surveying
section of Port Corporation under Ministry of Transport and Communication. In 1999, the Department
was extended and reorganized as the DWIR. The DWIR has been expended and reorganized with the
increase of international attention, aids, and investment on water resources in Myanmar (see Figure 2-
9).

14
Director General

Deputy Director General(Work) Deputy Director General(Admin)

Hydrological Research Waterways Conservation Waterways Conservation


Administration Marine and Equipment
and Planning (Upper Myanmar) (Lower Myanmar)

River Eng(Upper) River Eng(Lower)


Admin Marine & Equipment
Research and Planning
Survey(Upper) Survey(Lower)
Accounts Marine Maintenance
Dredging(Upper) Dredging(Lower)
Planning
Navigation(Upper) Navigation(Lower) Stores Machinery

(12) Regionals offices


Regional Offices Sub Regional Offices
(1) Region (1), Yangon (1) Sub Region (1), Maubin
(12) Sub Regionals offices
(2) Region (2), Ayeyarwaddy (2) Sub Region (2), Hinthada
(3) Region (3), Bago (3) Sub Region (3), Pyay
(4) Region (4), Magway (4) Sub Region (4), Taungu
(5) Region (5), Mandalay (5) Sub Region (5), AungLan
(6) Region (6), Sagaing (6) Sub Region (6), Nyaungoo
(7) Region (7), Rakhine (7) Sub Region (7), Katha
(8) Region (8), Mon (8) Sub Region (8), Kalaywa
(9) Region (9), Tanintharyi (9) Sub Region (9), Homemalin
(10)Region (10), Kachin (10)Sub Region (10), Bate
(11)Region (11), Kayin (11)Sub Region (11), Bamaw
(12)Region (12), Shan (12)Sub Region (12), Musal

Figure 2-9: Organizational Structure of DWIR

The DWIR has implemented river training works in the Twente Canal, which are small-scaled works
financed by the Myanmar Government.

15
CHAPTER 3
APPLICABLE NATIONAL AND LOCAL LAWS, REGULATIONS AND POLICIES

3.1 Government of Myanmar


Relevant laws and regulations related to land tenure, land use, land acquisition, compensation of assets
and losses in Myanmar are summarized in Table 3-1.

A. Types and Classes of Land in Myanmar


Virtually all land in Myanmar is owned by the State and with the exception of some freehold
titles mainly in urban areas, the remaining land parcels in the country (except Forest Land,
Grazing Land, land held in Cantonment and Monasteries) are rented out to individuals and
companies through Grant, Lease or License, government’s in considerations of how land is
used for and who uses it and for how long. From the administrative point of view, land can be
classified into the following eleven categories.

1. Freehold Land
2. Grant Land
3. Agricultural Land
4. Garden Land
5. Grazing Land
6. Cultivable Land, Fallow Land and Waste Land
7. Forest Land
8. Town Land
9. Village Land
10. Cantonments and
11. Monastery

B. Laws relating to Land Acquisition and Resettlement in Myanmar


Laws and regulations related to the land acquisition, compensation and resettlement in Myanmar are
summarized as follows:
Table 3-1: Relevant Laws and Regulations on Land Acquisition and Resettlement
Policy, Law and Description
Regulation
The Constitution of the  The Constitution identifies that state is owner of all lands as well as natural
Union of Myanmar resources above and below the ground, above and beneath the water and in the
(2008) Union's atmosphere. Citizens and organizations are allocated land use rights but
do not own the land.

16
Policy, Law and Description
Regulation
 State has a right to enact necessary law to supervise extraction and utilization of
State-owned natural resources by economics forces
Land Acquisition Act  The Act is still the legal basis for land acquisition which is consideration for
No. 1/1894 calculating a suitable amount of compensation is to be made as quick as possible
for affected person when the land is acquired by the government.
 Government has authority to acquire the land under this Act not only for public
purpose but also for business reasons for the companies at that time:
◼ Whenever it appears to the President of the Union that land in any
locality is needed or is likely to be needed for any public purposes, a
notification to that effect, shall be published in the Gazette, and the
Collector shall cause public notice of the substance of such
notification to be given at convenient places in the said locality.
(Article 4)
◼ Relevant procedures, including notice periods, procedures for
objections to acquisition (Art. 5),
◼ Method of valuation of land, the process for taking possession of land
(Arts. 16 and 17)
◼ Court processes and appeals (Arts. 18 and 24)
◼ Procedures for the temporary occupation of land (Art. 35) and the
acquisition of land for companies (Art. 38).
◼ Compensation 'at market value' is provided to those from whom land
is acquired (Art. 23).
The Conservation of  The aims of this law are as follows: (a) to conserve and protect the water
resources and river system for the beneficial utilization of the public; (b) to
Water Resources and
enable smooth and safe waterways navigation along rivers and creeks; (c) to
Rivers Law (2006) contribute to the development of the state economy through improving water
resources and river system; and (d) to protect environmental impact.
 The law is under the jurisdiction of the Ministry of Transport. This law focuses
on transportation safety and its development. However, it lacks actual numerical
criterion for natural environment.
Underground Water  This act prohibits sinking of a tube for the purpose of obtaining underground
water except under and in accordance with the terms of a license granted by the
Act (1930)
water officer. Township Officer or sub-divisional officer had power to close a
license tube after exercising jurisdiction over the local area concerned and the
expense of such closure shall be recoverable from the owner of the tube as if it
were an arrear of land-revenue.
Canal Act (1905)  The Burma Canal Act was enacted by the Authority of the Government of the
Union of Burma in 1905, and amended by Burma Act in 1914, 1924, 1928, and
1934, which has the aim to use and control for public purposes the water of all
rivers and streams flowing in natural channels and of all lakes and other natural
collections of water, and to control and undertake in whole or in part the
maintenance of any work designed for irrigation, drainage, navigation or
protection against floods or erosion.
 Canal Act has components enacted as below:
◼ Application of water for public purposes
◼ Construction and maintenance of works
◼ Supply of water
◼ Water rates
◼ Village canal and village drainage works
◼ Canal navigation and drainage

17
Policy, Law and Description
Regulation
◼ Obtaining labor for canals and drainage works
◼ Jurisdiction, offences and penalties, and
◼ Supplementary provisions
 All river facilities such as bank protection, flood embankment, etc. proposed by
the Project for smooth inland navigation and flood protection of Twente Canal
shall be complied with the Canal Act.
Embankment Act  The Burma Embankment Act was enacted by the Authority of the Government
of the Union of Burma in 1905, and amended by Burma Act in 1923, and 1931
(1905)
 The embankment is defined as any embankment constructed for the purpose of
excluding, regulating or retaining water, and includes all earthen walls, dams,
canals, drains, piers, groins, sluices, buildings, water-gauges, bench-marks and
other works subsidiary to any such embankment.
 Embankment Act stipulates clauses regarding embankment and embankment
works such as duties of Embankment-officer, obtaining labor and material,
payment and compensation, offences and penalties, etc.
Forest Law 8/92  The law includes the classification of type of land belonging to Forestry
Department.
 The law supports conservation, sustainable forestry and socio-economic
benefits.
 In addition, the law decentralizes forest management to some degree and
encourages the private sector and community participation in forest management
Union Government  On the application of right to use land owned by government, government
Notification No. departments, organization, citizens.
39/2011
Myanmar Special  The developer shall bear the expenses of transferring and compensation of
Economic Zone Law, houses, buildings, farms and gardens, orchards/ fields, plantation on land
2011 permitted by the Central Body if these are required to be transferred
Farmland Law 11/2012  The law introduces right to use the land to farmers through land use certificate
and acquiring the farmland for other purpose
Farmland Rules  The Rules details the eligibility of farmer or organization for the process of
62/2012 acquiring land use certificate, the role and responsibility of farmland committee
in various level and the application process of land use certificate.
 And regulating the requirement of indemnity and compensation to the affected
person when it comes to the case of confiscating farms in the interests of nation.
Vacant, Fallow &  Stipulation of claiming unused land to usable in form of agriculture, livestock,
Virgin Lands mining & government allowable other purpose.
Management Law
10/2012
Vacant, Fallow &  The Rules introduces the process of application and approval of the unused land
Virgin Lands for various purposes;
Management Rules
1/2012
National Land Use  The most updated guidance notes on land acquisition, but no procedures or laws
Policy (2016) have been defined.
Draft Guidelines on  This is a draft version issued by MONREC on 31 May 2017
Public Participation in  Provide more specific guidelines conducting public consultations related to EIA
Myanmar's EIA procedures.
Processes (2017)  While not yet officially adopted, the EIA team was encouraged to refer to it as
in draft version.

18
Policy, Law and Description
Regulation
Transfer of Property  Property of any kind may be transferred, expect as otherwise provided by this
Act (1882) Act or by any other law for the time being in force.
 Transfer of property may be made without writing in every case in which a
Land and Revenue Act  This Act extends to Lower Burma and the Thayetmyo District of Upper Burama
(1879)  The President of the Union may, by notification, expect any area form the
operation of this Act.
 Nothing contained in this Part shall apply to the following:
(a) Land included in any forest constituted a “reserved forest” under the law
for the time being in force;
(b) Land included in any fishery demarcated under the Fisheries Act;
(c) The soil of any public road, canal, drain or embankment;
(d) Land included within the limits of any town;
(e) Land appropriated to the dwelling-places of any town or village;
(f) Land included in any military cantonment;
(g) Land included in any civil station;
The Lower Burma  This Act extends to Lower Burma and the Thayetmyo District of Upper Burma
Town and Village Land  The provisions of this Act shall apply only to land in towns and villages.
Act (1899)  A landholder’s right in respect of any land shall cease if the landholder abandons
of the land for two years continuously
The Partition Act  Nothing herein contained shall be deemed to affect any local law providing for
(1893) the partition of immoveable property paying revenue to Government.
Procedures conferring  The Central Committee for the Management of Culturable Land, Fellow land
the Right to Cultivate and waste land may grant to citizens for agriculture and livestock breeding
Land (1991) purposes the right to cultivate/right to utilize culturable land, fallow land and
waste land up to the extent mentioned below:
1. Agriculture
2. Livestock, Poultry Farming and Aquaculture
 If an application is submitted by organization consisting of foreigners for the
right to cultivate/ right to utilize land, the matter is to be referred to the Foreign
Investment Commission

Procedures for the land acquisition and compensation in the content of the public purpose infrastructure
development by the government is articulated in the Land Acquisition Act (1894). To list:
Sections Key provisions of the LAA (1894)
Section 4(1) Requires publication of preliminary notification and conducting survey
Section 5A (1) Allows for payment for all damages to the assets surveyed.
and 5A (2) Identifies filing of objections to the acquisition of any land in writing and opportunity to be
heard.
Provides for objections in writing to be heard by the Collector either in person or by pleader
and further enquiry as necessary.
Section 6(1) Requires the Government to make a more formal declaration of intent to acquire land
following hearing of objections received under Section 5.
Section 7 Allows the Senior Officer to be authorized by the President of the Union to direct the
Collector
to take order for the acquisition of the land.
Section 8 Grants the Collector to organize the land to be acquired to be physically marked out,
measured and plans.

19
Section 9(2) Requires the Collector to give notice to all affected persons (APs) that the
Government intends to take possession of the land and if they have any claims for
compensation then these claims are to be made at an appointed time.
Section 10(1) Allows the Collector to record statements of APs in the area of land to be acquired or any
part thereof as co-proprietor, sub-proprietor, mortgagee, and tenant or otherwise.
Section 11 Requires the Collector to make enquiries into the measurements, value and claim and then
issue the final award. The award includes the land's marked area and the valuation of
compensation. Although the LAA requires payment of compensation, Myanmar lacks any
specific methodology for determining compensation for affected land and other assets.
Section 16 After award under Section 11, authorizes the Collector to take possession of land free from
all encumbrances.
Section 17 Allows acquisition of land under emergency situations
Section 18(1) In case of dissatisfaction with the award, permits APs to request the Collector to refer the
case onward to the court for a decision. This does not affect the Government taking
possession of the land.
(Source: Land Acquisition and Resettlement Framework: Myanmar Climate-Friendly Agribusiness Value Chains Sector
Project (Mar 2018))

3.2 International Good Practices and EDCF Safeguard Policy


EIA Procedure (2014) of Myanmar does not address specific matters in relation to resettlement.
According to the Article 7 of the Procedure, projects involving resettlement shall additionally comply
with separate procedures issued by responsible ministries, and in the absence of such procedures all
such, Projects shall adhere to international best practice on Involuntary Resettlement (as accepted by
international financial institutions including the World Bank Group and Asian Development Bank) on
Involuntary Resettlement and Indigenous Peoples).

EDCF Safeguard Policy (2016) also requires the Project Proponent refer to the international practices,
in case the national legislation and regulations are less stringent (Art. 18 of the Safeguard Policy 1).
Thus, the Project will also need to be consistent with international lender’s safeguards policies,
specifically World Bank ESS 5 and Guidance Note as well as ADB's Safeguard Policy Statements (2009)
on the related issues, in addition to the EDCF Safeguard Policy (2016).

3.3 Policy Gap between EDCF (and International Safeguard Standards) and
Government of Myanmar
The EDCF Safeguard Policy on land acquisition and involuntary resettlement is on par with the
international safeguard good practices and principles including the ADB SPS (2009). This section

1
" 18. A proposed project must comply with the borrowing country’s environmental and social requirements, and may refer
to internationally recognized standards, when appropriate. If the relevant requirements of the borrower’s country
regulations and laws are more stringent than the requirements of the EDCF Safeguard Policy or internationally recognized
standards, it is required that the project may comply with more stringent requirements."

20
summarise major equivalence analysis and gap filling measures between the ADB SPS (2009) and the
Myanmar country safeguard policies:

ADB Safeguard Policy Myanmar Country Equivalence Gap filling measures


Statement (2009) Safeguard System

I. Info disclosure, The Rangoon Partial equivalence RAP shall strengthen


consultation (“Meaning Development Trust Act (-) Consultation and the policy on par with
participation”) (1920)info participation procedures the EDCF Safeguard
dissemination (-) Vulnerability Policy Principle &
Farmland Law (2012) – consideration ADB recommended
dispute/grievance setting procedures for
procedures PEA(DWIR)’s
adoption
II. GRM LAA (1894)_ Part II_ Partial equivalence
Acquisition (-) No appeal to court
Objection_final decision (No external
by the Union president accountability)
Farmland Law (2012)_
Referral system (track-
township- district – State
farmland mgt body)

III. Livelihood restoration Constitution (1984)_ Partial equivalence Subject to PEA


_ (1) land-based rst for land ownership by state (+) Replacement cost (DWIR) decision ►
land based PAFs + user right by citizens compensation of land
(otherwise: cash LAA (1894) Part II: and damaged crops at
compensation at Acquisition_ Enquiry market value
replacement value for into Measurements, (+) Compensation
land) Value and Claims and mechanism (in
(2) Prompt replacement of Award by the Collector Farmland Law)
assets with access to LAA (1894) Part III (-) Prompt asset
assets of equal of higher Reference to Court and replacement
value Procedure thereon (-) Income restoration
(3) Additional revenue (-) Access to other
and services thorough benefits
benefit sharing schemes “Farmers without land
where possible entitlements (incl.
minority) not protected
as their lots categorized
as “vacant” under the
VFVM law.”(*)

ADB Safeguard Policy Myanmar Country Equivalence Gap filling measures


Statement (2009) Safeguard System

IV. Provide compensation Farmland Law (2012), Partial equivalence in Core international
and other RST entitlement Chap IX. Section 26 the determination of the safeguard principle
date due for

21
before physical or Rangoon Development compensation of Subject to PEA
economic displacement Trust Act (1922), Chap expropriated land in (DWIR) decision ►
IV. Section 56 RDTA (1992): 3 months
upon announcement of
compensation
(-) “Compensation prior
to displacement” not
mentioned.

V. Timely disclosure of LAA (1894) Part VII, Partial Equivalence RAP shall strengthen
draft R(A)P, incl. Section 42_ Every such (-) Law are not specific the policy on par with
documentation of agreement, as soon as to R(A)P disclosure as in the EDCF Safeguard
consultation process, with may be after its FIR (2014) Policy Principle &
accessibility (location, execution, be published ADB recommended
language) to affected in the Gazette […] procedures for
persons and stakeholders PEA(DWIR)’s
& Disclosure final R(A)P adoption
with required updates

ADB Safeguard Policy Myanmar Country Equivalence Gap filling measures


Statement (2009) Safeguard System

VI. Ensure displaced Constitution (2008)_ Partial Equivalence Core international


persons without titles to Chapter 1, Section 37 Constitution accord safeguard principle
land or any recognizable LAA (1894) Part I, rights over land (to use Subject to PEA
legal rights to land are Preliminary (b)” persons or cultivate etc.) (DWIR) decision ►
eligible for RST interested” (women, exclusively subject to
assistance and minors, “lunatics or the approval of local
compensation for loss of idiots, if free from government bodies that
non-land assets disability”…); are appointed by the
10 (1): The Collector central government
[…] sub-proprietor, “Currently, people do
mortgages, tenant or not have entitlement to
otherwise.” their land are not
protected in
expropriating their land
their lots are categorized
as “vacant” under the
VFVM law.”
(*)
LAA (1894),
mentioning “person
interested” does not
mention whether titled,
with other legal rights or
not.

22
VII. Monitor and assess Foreign Investment Gap. RAP shall strengthen
the RAP outcome with Rules (2014) Chapter No law existent the policy on par with
indicators based on 22/Services08: FIR (2014) only covers the EDCF Safeguard
baselines & Disclosure Publishing and disclosure but not Policy Principle &
the results. publication of monitoring. ADB recommended
periodicals in ethnic procedures for
languages including PEA(DWIR)’s
Myanmar adoption.

3.4 Objectives, Policies and Principles of the Framework RAP for the Proposed
Project
A. Objectives
The project has prepared this LARF to lay out the purpose, principles, and procedures to be used in
screening, planning, preparing LARPs as required, and implementing resettlement for any subproject
or component of the Project with resettlement or land acquisition impacts. The project’s entitlements,
assistance and benefits presented below are determined by the laws and regulations of the government
and EDCD Safeguard Policy (2016) and take into account the extent of losses incurred by affected
households resulting from acquisition of assets. The objectives of this LARF are to ensure that the
following objectives are met:
1. Adverse social and physical impacts of sub-projects are avoided, minimized, and or mitigated;
2. All affected households are provided with appropriate compensation and assistance for lost
assets which will contribute to an improvement of, or at least maintain, their pre-project
quality of life;
3. Nobody will be disadvantaged because of the project;
4. Improve, or at least restore the livelihoods of severely affected persons and vulnerable
affected households; and
5. Assistance to vulnerable groups.

B. Principles
In order to achieve the above objectives, the project will adhere to the following resettlement policies
and principles:
1. Involuntary resettlement and impacts on land, structures and other fixed assets will be
minimized where possible by exploring all alternative options and identifying the option with
the least impact on the population;
2. No land acquisition or site clearing will be done inside the Right-of-Way (ROW) in
anticipation or ahead of it being considered for implementation under the Project. Similarly,
no land acquisition or site clearing will be done inside the ROW until and after the updated
resettlement plan has been agreed upon by government, and until all compensation and/or

23
assistance due to the affected households are provided;
3. Compensation will be based on the principle of full replacement cost and market value,
whichever is appropriate and most favorable to the affected household for the asset concerned;
4. All the affected households without any discrimination confirmed to be residing in, doing
business, or cultivating land or having rights over resources within the project affected area
or land to be acquired or used for the project during the conduct of inventory of losses (IOL)
and census of affected households (prior to the cut-off date) are entitled to compensation for
affected assets, incomes and businesses at replacement cost as specified in the entitlement
matrix, and, depending on the severity of impact on their livelihood and income capacity, will
be provided with livelihood restoration measures to improve or restore their pre-project living
standards, income-earning capacity and production levels;
5. There will be no deductions in compensation payments for land, structures or other affected
assets for salvage value, depreciation, taxes, stamp duties, fees or other transaction costs;
6. If ownership over any affected asset is under dispute, the compensation for the same will be
held in a court designated bank until its lawful owner is decided by competent legal
authorities;
7. Affected persons who are asset owners but allow others to use those assets are compensated
for losses of those assets. Users of the assets would be compensated for loss of standing crops,
loss of income from the asset for the course of the lease or rental agreement;
8. Affected households that lose only part of their physical assets but will not be left with a
portion that will be inadequate to sustain their current standard of living as determined by
affected households together with project engineers during detailed design. If not adequate to
sustain current standard of living, the entire asset will be considered as totally affected and
will be acquired by the project.
9. Affected shop owners, if any, will be assisted in gradually dismantling and setting up their
shops in a new location to be agreed with the PMU. If no other alternative exists, the affected
person may temporarily move the shop to a residual area of the right of way (ROW) and in a
way, that will allow them to gradually phase out their operation in their present location place
and gradually begin their operation in their temporary new place within the ROW until a
permanent location is confirmed during detailed design. Under this arrangement, disruption
in the operation of shop owners will be minimized, thereby averting severe impact on the
affected households’ livelihood. Public land and no individual household will have tenure
over any land within the ROW. However, affected households presently cultivating plots
inside the ROW will be allowed to continue cultivating the residual area of their cultivated
plots in the ROW.
10. Temporarily affected land and communal infrastructure will be restored to pre-project
conditions;

24
11. Meaningful consultation will be carried out with affected households, affected communities
and concerned groups to ensure participation throughout the resettlement process, from
planning, implementation and operation of the project. Plans for the acquisition of land and
other assets will be carried out in consultation with affected households who will receive prior
information of the compensation, relocation and other assistance available to them. The
comments and suggestions of affected households and communities will be taken into
account;
12. Any acquisition of, or restriction on access to, resources owned or managed by the affected
households as a common property, e.g., communal forest, communal farm, will be mitigated
by arrangements that will ensure access of those affected households to equivalent resources
on a continuing basis;
13. There shall be an effective mechanism for hearing and resolving project-related grievances
during the planning, updating and implementation of the resettlement plan;
14. The approved Framework Resettlement Action Plan (RAP) and Resettlement Action Plan
(RAP) will be disclosed to affected households and indigenous households in a form and
language(s) understandable to them.;
15. Resettlement identification, planning and management will ensure that gender concerns are
incorporated;
16. Provide all affected households requiring relocation with required support including
assistance and allowances, secure tenure to the relocated land, and improve living conditions
at resettlement sites;
17. Special measures will be incorporated in the Framework RAP/RAP to protect socially and
economically vulnerable groups. Appropriate assistance will be provided to help affected
households belonging to any of these vulnerable groups improve their socio-economic status;
18. Existing cultural and religious practices will be respected and, to the maximum extent possible,
preserved;
19. Adequate resources will be identified and provided during the preparation and updating of the
RAP, including sufficient budgetary support in a timely manner to cover resettlement costs
within the agreed implementation period; and adequate human resources for supervision,
liaison and monitoring of land acquisition, resettlement and rehabilitation activities;
20. Civil works will not take place for any segment of the subproject, until (a) compensation has
been fully paid to affected households; (b) agreed livelihood restoration and resettlement
measures are in place, and (c) the acquired land is free from all encumbrances. Civil works
contractors will not be issued notice of site possession for any section or segment until these
conditions are fulfilled. The schedule of the start of civil works in any section or segment of
the project will be coordinated and planned with the executing agency, implementing agency
and other related local bodies.

25
Related to the preparation and the execution of the RAP at the later stage, following principles are
recommended abiding by.

① (Full) Replacement Cost Principle

Based on the gap (equivalence) analysis between the Myanmar's current status of its own related laws
and regulations and the international safeguard principles including the EDCF Safeguard Policy, the
Committee is expected to establish a valuation criteria for each of the affected assets due to the project
implementation, in the form of an entitlement matrix.

In calculating the full replacement costs for compensation, the World Bank provides the following
guidances:

<Box 3.4> World Bank's Defitnion and Recommended Approach in Calculation


(Source: WB ESS 5 Guidance Note Foonote 5 of ESS 5 Para 31)

""Replacement cost"is defined as a method of valuation yielding compensation sufficient to replace


assets, plus necessary transaction costs associated with asset replacement."
"When functioning markets exist, replacement cost is the marke tvalue as established through
independent and competent real estate valuation, plus transaction costs."
"Where functioning markets do not exist, replacement cost may be determined thorugh alternative
means, such as calculation of ouput value for land or productive assets, or the undepreciated value of
replacement material and labor for construction of structures or other fixed assets, plus transaction
costs. "
"Transaction costs include administrative charges, registration or title fees,reasonable moving
expenses,and any similar cost imposed on affected persons."
"In all instances where physical displacement results in loss of shelter, replacement cost must at least
be sufficient to enable purchase or construction of housing that meets acceptable minimum
community standards of quality and safety."
"The valuation method for determing replacement cost should be documented and included in
relevant resettlement planning documents."
"To ensure compensation at replacement cost, planned compensation rates may require updating in
project areas where inflation is high or the period of time between calculation of compensation
rates and delivery of compensation is extensive."

EDCF Safeguard Policy (2016) articulates the following principles 2:

2
LAA (1894) Part II: Acquisition_ Enquiry into Measurements, Value and Claims and Award by the
Collector

26
"The rate of compensation for acquired land or other assets shall be calculated at full replacement
costs, as much as possible. The calculation of full replacement costs should reflect market prices,
transaction costs, interest, transitional and restoration costs, and other applicable costs." (Art 26 of
the EDCF Safeguard Policy (2016)), and;
"The borrower will ensure that no physical displacement or economic displacement will occur until i)
compensation at full replacement cost has been paid to each displaced person for project components
or sections that are ready to be constructed; (ii) other entitlements listed in the resettlement plan have
been provided to displaced persons; and iii) a comprehensive income and livelihood rehabilitation
program, supported by an adequate budget, is in place to help displaced persons improve, or at least
restore, their incomes and livelihoods.[...]" (Art 30 of the EDCF Safeguard Policy (2016))
In accordance with the LAA (1894), the compensation amount will be based on market value or the
replacement cost principle. For details of the calculation, further specification is required as concrete
methodology for market value assessment for land and other asset items are not specified in Myanmar's
laws and regulations. In the course of market survey and the replacement cost study (RCS) it is
recommended that the assessment methodology is reviewed in view of the key compensation principle
of the EDCF Safeguard Policy (2019) and international good practices of ADB and WB (whose key
approach is explained in the Section 4.5 on Replacement Cost Survey(RCS) of this report below.)

For loss of social service facility such as a monastery, the structure will be rebuilt to original or better
condition in size and quality in the vicinity. Reconstruction management plan shall be carried out and
details of the plan shall be determined by clarifying current use of facilities through consultation with
representatives of the social facility manager.

② Consideration of vulnerable groups among PAPs/PAFs

Any vulnerable households and especially vulnerable affected households and those with women
headed households, low-income households, elderly-headed households with no additional support and
people with physical disabilities will be entitled to participate in any project sponsored livelihood
development and restoration activities.

Preliminary survey on the above has been carried out in initial socio-economic survey to determine
demand and needs, as part of the ESIA. Vulnerable groups were identified in all four townships of the
study area as shown in the Table below:

27
Table 3-2: Vulnerable Groups of the Study Area

Old Persons without


Women-headed
Township family support Disabled persons
households
(> 75 years)
Twante 60 34 19
Dala 197 111 44
Seikgyi Kanaungto 54 56 143
Kyimyindaing 10 12 25
Total 321 213 231

The majority of them are household heads who are over seventy-five years old. According to key-
informants, there is no special program or activity to support these vulnerable people in this area. By
social structure, they are taken care of by relatives and neighbors and are living in the communities
without difficulties. The Myanmar Poverty and Living Condition Survey (2017) indicates that the
national poverty line for 2017 is 1,590 kyat per adult equivalent per day (in 2017 quarter 1 kyat) 3. In
the later socio-economic census for the PAPs/PAFs identified based on the detailed engineering design,
it is recommended that all the four types of the vulnerable groups within the PAPs/PAFs to be identified
and integrated into the updated RAP as target groups for vulnerable people allowance:

<Target groups eligible for Vulnerable People Allowance>


Group 1: Women headed households
Group 2: Low-income households (persons/households with below the national poverty line)
Group 3: Elderly-headed households with no additional support and,
Group 4: People with physical disabilities

It is recommended that vulnerable households will receive assistance equivalent to minimum wages
(Kyat 4,800/day4) for a period of three months, apart from their entitlement for assets lost and the
income restoration program. In addition, female-headed households who are subject to physical
relocation shall be provided transitional assistance, including consultation support for identifying the
relocation location. PAPs that are identified as vulnerable group will be prioritized in receiving the
benefits of the income restoration and livelihood program.

3
https://www.worldbank.org/en/country/myanmar/publication/poverty-report-myanmar-living-
conditions-survey-2017
4
Based on official daily minimum wage of 2018, by the Minimum Wage Committee of Myanmar
(https://tradingeconomics.com/myanmar/minimum-wages)

28
Vulnerable households will also be encouraged to participate in the decision-making process for
selection of appropriate income restoration measures and skill training programs based on their needs
and preferences. During the meetings to selection of income restoration measures and skill training
programs, all eligible vulnerable households shall be invited for discussions.

③ Gender Consideration

Although works and businesses of the fishery have traditionally been dominated by males, especially
for large-scaled ones in offshore and deep-seas, women have carved a niche of the fishery industry in
Myanmar by engaging in inland water fisheries, including aquaculture and small-scale fishery, in
addition to the sale of fish harvested. This linkage to the fishery industry has provided women, not just
with job opportunities, but also practical ways of supporting their families by providing protein nutrition
(subsistence fishery) as well. Female-heads of the families may resort to the small-scale fishery along
the Twente Canal for nutritional sustenance of their families, if not selling them for income-generation.
Female merchants from poor households also tend to utilize informal mobile peddlers, because they
find it hard to obtain permanent places or to have large-scale businesses. In addition, potential disruption
of the irrigation from the Twente Canal and Yangon river may disproportionately disadvantage the
female-headed and other vulnerable affected households if they resort to the canal and river for their
daily source of water, portable and otherwise.

In a nutshell, female population among the affected groups have a high stake in relation of the
implementation of the proposed project. Therefore, it is necessary that due representation and
participation of the female PAPs and female-headed PAFs in all course of the information disclosure
and consultation process. In particular, PEA(DWIR-PMU) is recommended to ensure the following
during resettlement planning and implementation:

1. During updating the RAP, both men and women regardless of ethnicity, including informal and
unregistered settlers and tenants, are invited to and fully participate in the information disclosure
and consultation sessions, providing inputs to DMS, RCS and consultations on compensation and
assistance. Participation rates of the male and female PAPs shall be counted and duly documented.

2. Women will be invited to discuss and finalize the income restoration measures and implementation
schedule - and will be the persons to receive the income restoration assistance and implement the
income restoration measures.

3. Any committees and local-level decision-making bodies on the resettlement and compensation of
the proposed project shall be equally represented both by male and female citizens.

4. Performance/Progress monitoring report on the compensation, resettlement and livelihood and


income restoration program shall have disaggregated indicators by gender. Post-project evaluation

29
of the project, if/when conducted, will also have gender-disaggregate indicators in terms of the
figures of the total recipients of the compensation, assistance and livelihood programs.

④ Livelihood Restoration Plan

TOR for EIA of the proposed project which was issued by MONREC-ECD on 08 May 2019 requires
establishment of RAP including livelihood restoration plans. Thus, a livelihood restoration for all
severely affected households will be implemented as part of RAP implementation. Livelihood
restoration activities and or support will be identified through a participatory process with each affected
household. This consultation can take place during the conducting of the SES and DMS. It is important
that both husband and wife are part of this participatory consultation, and following individual affected
household consultations, a meeting of all affected households should be called to discuss the findings
and needs for the livelihood restoration support. Results of the consultation shall be duly documented
in the form of the information disclosure/consultation monitoring report and reported to the PEA, the
Land Compensation and Resettlement Negotiations Committees (LCRNC). PEA (DWIR-PMU) is
expected to regularly report to the Export-Import Bank of Korea, on the progress of the implementation
of the livelihood restoration program as part of the environmental and social monitoring reporting.

⑤ Other Supports

Other supports will include:


- Transitional Assistance for all PAPs subject to physical relocation: Moving Support will include one-
time cash compensation (based on the distance and other factors). In case the relocation site is not ready
for moving by the time of relocation, the they will also be entitled to the transitional allowance (in cash),
(all PAPs subject to physical relocation shall be eligible to). The case compensation amount should be
sufficient to meet temporary rental expenses and other costs until occupancy is available. (WB ESS 5
Article 18)

- Income loss of the laborer based on land-based economic activities: One-time income compensation
for 1 month shall be compensated to the worker/laborer before they are economically displaced. In
assessing the amount of the monthly wage, documentary evidence would need to be presented. If
presenting the document to prove the monthly wage is not possible. the minimum wage shall be
provided.

30
CHAPTER 4
PLANNING AND IMPLEMENTATION PROCESS OF LAND ACQUISITION,
COMPENSATION AND RESETTLEMENT

Land acquisition requires the finalization of the detailed design, based on which Detailed Measuremtn
of Study (DMS) is carried out. Actual land acquistion and compensation takes place when the
inventorizatoin of the loss assets are finalized based on the results of the DMS and extensive
consultations with the public and the affected households and communities. This RAP suffices as an
initial framework for RAP. At the later stage, separate procedures related to this process shall be issued
by responsible ministries. As of now, the relevant procedural laws and regulations to the land acquisition
and compensation and resettlement are largely lacking, thus per EIA Procedure of Myanmar (2018), the
suggested RAP will adhere to international practice and core principles on involuntary resettlements.

For the planning of the RAP it is noted that the current stage of the project preparation enables only an
initial(framwork) approach of the RAP and the concrete and final RAP need to be developed at the later
stage upon the completion of the detailed design of the proposed project. Thus the presented results in
the sections below, such as findingsof the socio-economic survey,and inventory of loss (IOL) are only
rough estimations and subject to revisions and finalization at the later phase of the project
implementation.

4.1 Setting the Study Limits (AoI) for Land Acquisition and Resettlement
A. Spatial boundary for direct social impact assessment - Land acquisition and Involuntary
Resettlement
Direct impacts include land acquisition (both public and private-owned land) for construction and
temporary or permanent access road building. Right-of-ways of the embankment and other canal
improvement works are designated to be as follows:

31
1. Area 1: ROW in Twante Section and Dala Section- Areas along, adjacent to Twante Canal,
within 30 meter (Tentatively supposed 30-meter ROW before confirming AoI) from the limit
of the construction site (canal improvement and embankments)

Twante Section
(L=15.80km)

Dala Section
(L=12.20km)

Light blue line


: 30m ROW (Tentative)

2. Area 2: ROW in Seikkyi Khanungto Section: As of May 2015, it was reported that there are
29 officially registered shipyards located along the Twante canal in Seikkyi Khanaungto
Township (DWIR Data-2015-2016). The area is reported to cover 2,190 acres (8,962,616 sqm).
In order to minimize the impacts on the shipyard business during the construction, ROW is to be
drawn outskirt from the limits of the shipyard area inward to the landside, not cross-cutting the
existing facilities. (The exact alignment of the ROW shall be determined later.)

32
Red line: Tentative ROW

B. Spatial boundary for other types of direct and indirect social impact assessment
3. Area 3: ROW in Yangon River(MPA in charge, Kanungto, Dala, and Kyimyindaing Section) :
ROW is tetative supposed to 30meter from the limit of the construction site of embankments.

Blue line: Tentative ROW


30m line

33
C. Spatial boundary for social impact assessment in Yangon River Section MPA in charge
In addition, geographical scopes are set for study along the administrative boundaries of the affected
three Township for the social impacts such as:

➢ Long-term income and livelihood and general improvement of living condition


(including traffic, health and sanitation conditions etc): While the primary beneficiaries of
the project would be the inland water transport industry and the residents along the canal, the
spill-over and ripple effects are expected to reach the broader community including the other
residents of the affected Township. Thus the study would include the residents of the three
affected Township as secondary level of beneficiaries and include them in the study as part of
stakeholder engagement.
➢ Temporary nuisances and disturbance in livelihood due to the noise generation, water
and air and other pollution and construction-related waste generations: While actual
scope of influence may differ from item and item, the study suggest to lump the entire
tboundaries of the affected four townships as the limits of this study for the convenience of
assessment as well as due to the jurisdictional/administrative governance mechanism.
➢ Temporary disturbance of shipyard operation businesses in SeikkyiKhanaungto
Township: The study assumes that the owners and the employees of the shipyard business in
SeikkyiKhanaugto Township as part of the SeikkyiKhanaungto Township business
community, regardless of their actual residential locations. Special consideration shall be
given to reflect their particular concerns and socio-economic baseline conditions through the
survey design and the arrangement of a focused group discussion (FGD).

34
➢ Temporary disturbance of fishery and inland water transport business during
construction: The study assumes that the affected persons and households engaged in the
fishery and inland water transport business (e.g. mini passenger boats (mini bus type business
with the vessel capacity of about 20 passengers and taxi type boats (small engine boats hosting
max. less than 5 passengers) and associated business holders as part of the business community
of the three affected Township, regardless of their actual residential locations. Special
consideration shall be given to reflect their particular concerns and socio-economic baseline
conditions through the survey design and the arrangement of targeted interviews.

The following figure shows the Administrative Boundaries of the Four Affected Townships (Twante
Township, SeikkyiKhanaungto Township, Kyimyindaing Township and Dala Township).

35
Figure 4-1: The Administrative Boundaries of the Four Affected Townships
(Twante, SeikkyiKhanaungto, Dala and Kyimyindaing)

4.2 Land Conformation Survey


◼ Land Use Status in Study Townships
Land use status of the study townships are as shown Table 4.1. Large area is allocated for agricultural
land in Twente, Dala and Kyinmyindaing Twonships. The largest ratio of agricultural land in total area
is 83.8 % in Dala Township, followed by 57.4 % in Kyimyindaing Township, and 5.01 % in Twente
Township. Apart from agricultural land, about 1~5 % of land is allocated for the residential area in

36
Twente and Dala Township while 34.4 % and 42.6 % of land is allocated for the residential area in
Sekikyi Khanaungto and Kyimyindaing Township respectively.

Table 4.1 : Land Use in the Study Townships


Townships Total Agricultura Settlemen Forest Industria Unuse Other
Area l Land t Land and l Land d Land Fallow (Acres
(Acres) (Acres) (Acres) Natura (Acres) (Acres (Acres )
l Area ) )
(Acres
)
Twente 236711 118523 3456 868 102 58462 1283 54017
(%) 50.1 1.5 0.4 * 24.7 0.5 22.8
Dala 55368 46384 2696 - 340 5688 260 -
(%) 83.8 4.9 - 0.6 10.3 0.5 -
Seikkyi 1949.4 87 670.47 - 324 - - 868
Khanaungto 7
(%) 4.5 34.4 16.6 - - 44.5
Kyimyindain 3077 1767 1310 - - - - -
g (%) 57.4 42.6 - - - - -
Source: General Administrative Department, 2017
Note: * Less than 0.1%

◼ Land Confirmation Survey

According to land confirmation survey, there are 6 ward/village in Twente, 6 wards in Dala, 9 ward/
village in Seikkyi Kanaungto and 3 wards in Kyimyindaing which are to be affected by the project
implementation.

Township Affected Ward/Village


Dala 1. Kyaung Su
2. Tar Gyi
3. Sarbarchaung
4. Hmawset
5. Kamarkasit
6. Settmyay
Seikgyi Seikkyi 1. Seikgyi East
Kanaungto 2. Seikgyi West
3. Seikkyi Kanaungto East
4. Seikkyi Kanaungto West
5. ThakhinBaThaung
6. AuTunAoe
7. PanPinChaung
8. SamarDuWar
9. ChaungWineLay
Kyimyindaing 1. Seik Kyi
2. U Myar
3. Nga Zin

37
Kyimyindaing
Section

Figure 4-2: Affected Structure and Land within the ROW in the Entire Project Area (Blue
lines: ROW Boundary & Black Dots: Locations of the Structures)

Figure 4-3: Affected Structure and Land within the ROW at the Yangon River-Twente Canal
junction and from Point 0 mile to Point 3.5 mile (Blue lines: ROW boundary & Red
dots: locations of the structures)

38
Figure 4-4: Affected Structure and Land within the ROW in Twente and Seikkyi Kanaungto
(Blue Lines: ROW Boundary & Red Dots: Locations of the Structures)

Figure 4-5: Affected Structure and Land within the ROW in Twente ((Blue lines: ROW Boundary
& Red dots: Locations of the Structures)

Following table shows the results of the preliminary counting of the affected households, number of the
structure and land ownership type by township. In total, as many as 2,697 households are found to be
affected in the four affected townships with 2,028 structures (including residential and economic
buildings and structures). In total about 120 hectare in is expected to be affected.

39
Table 4-2: Affected Households, Structures and Landowners in Project 30 m ROW
Households
No. Township Structures Landowners
(PAFs)
1. Twente 479 203 276
2. Dala 646 490 156
3. Seikkyi Kanaungto 1220 1034 186
4. Kyimyindaing 352 301 51
Total 2,697 2,028 669

According to the findings, Seikkyi Kanaungto Township has a highest number of affected households,
structures, with biggest portion of the land (about 120 ha) subject to land acquisition. The least affected
in terms of the scale of the land acquisition and relocation impact is Twente Township.

The entire list of the PAFs subject to land acquisition is attached in Annex 1 of this report.

◼ Living Environment in the Project Area

Since some part of the project area is currently used by illegal settlers, plantation and business
operations such as shipyards. The PAPs living or farming in the canal area can easily take their pass
ways to access to other areas for their living. Also, they can live and work without any environmental
nuisance generated by human economic activity including noise and vibration. However, once
construction and operations of the canal start, the everyday pass ways will be controlled for safety
reason and there would be negative impact of noise and vibration nuisance generated from the
construction and operation area comparing with previous living environment. Without proper control
and mitigation measures to be conducted by DWIR, it is difficult to secure their safety and ensure their
quality of life. In other words, incompletion of resettlement gives significant negative impacts towards
both operation/management side and the PAPs who keep living in the airport area, whereas it would be
better for the PAPs to seek their new life out of the canal area with receiving proper livelihood
restoration measures and a positive economic effect triggered by the Twente (Twantay) canal
improvement project as well as other correlated projects. Some people used canal land for their living,
cultivation, access roads and other activities.

4.3 Socio-economic Survey for Potentially Affected Persons/Households


Socio-economic survey as part of the ESIA also included the basic profiling of the potentially affected
persons and households in the four affected Townships, includingthe following survey items:

40
The ESIA team will engaged key local stakeholders including the affected communities through
quantitative and qualitative baseline study, focus group discussions and other participatory exercise as
follows:

 Data collection including acquirement of the location map with updated demarcation of the
household and land use/ownership type within the AOI ("social maps") at Township level
 Individual household interview (Questionnaire-based household survey)
 Semi-structured in-depth interviews with key informants, including community leaders and
head of villages/wards
 Focused group discussions (FGD) of particular interest groups among the project affected
people, including: Shipyard business community, fishing community and women
 Review activities conducted in the field and initial analysis of findings and feedbacks from
key stakeholders and Project affected persons and other key local stakeholders
 Data analysis including data entry, data cleaning, data processing, recording, feedback to key
project staff

a. Secondary Data Collection: Baseline data gathered from the regional government (YRG) and
other appropriate government and public organizations, academics and other experts in relevant
fields, etc. The secondary data sources included reports, field documents, monographs,
information leaflets/booklets, manuals, written order and instruction, statement of the
government organization, among others.

b. Primary data Collection: Primary data collection through direct observations, interviews,
individual/target group consultation (FGDs)to collect and verify the socio-economic conditions
(demography/residence), economic status (by age, sex, education, occupation, ethnical group
and income, expenditure, loan and household assets and poverty status). The social survey will
be participatory in nature and carry out a series of focus group discussion (FGDs). The survey
tools and methodologies considered will be developed by the Local consultant (REM) and
reviewed by the Isan consortium before implementation. The study also reflects the comments
and concerns in the ESIA raised by the survey respondents, participants in FGDs, interviews
and other consultation activities (including the public consultation workshops).

c. A questionnaire-based initial survey for socio-economic conditions will be carried out


during field surveys. 353 households was be selected as sample for the study with sufficient
representation of each of the four affected Township sections (i.e. Dala, Twante, Kyimyindaing
and SeikkyiKhanaungto), on the basis of the sampling method (Total 13% sampling out of the
total potentially affected households(2,697 PAFs)) . Even representation of women and various
occupational group (including shipyard, fishing and commerce communities etc.) will be
ensured in setting the respondent targets.

41
◼ Population of Twente, Dala, Seikkyi Khanaungto, and Kyimyindaing Township

The lack of publicly available demographic data for 2018 at township level is a major impediment to
detailed analysis. The extensive, annually-collected, demographic data is not readily available for 2018
and the last countrywide data shared is for 2014. Figure 3.1 shows the population of Twente, Dala, Seikkyi
Khanaungto, Kyimyindaing townships.

Figure 4-6: Population Map for Study Townships


Table 4-3 shows the population by sex, annual growth rate and population density of Twente, Dala,
Seikkyi Khanaungto, and Kyimyindaing Townships. It indicates that the population of females exceeds
the population of males in Twente, Dala, and Kyimyindaing Townships. In terms of sex ratio, the
township Twente and Dala have the highest sex ratio in the region at 96 males per 100 females. The
lowest sex ratio of the population is 89 males per 100 females which is lower than that of Nationwide
and Yangon Region.

42
Table 3-1 and Figure 3-2 provide that the annual growth rate in Twente Township is 1.36% which is
higher than nationwide annual growth rate of 0.88%. Kyimyindaing Township has the lowest annual
growth rate at 0.30 which is lower than the national growth rate. In Seikkyi Khanaungto and Kyimyindaing
Township, all populations live in urban areas.

Table 4-3: Population by Sex, Annual Growth Rate, and Population Density of Study
Townships
Population
Total Male Female Annual Sex Ratio Population
Average (the number of Density
Growth Rate males per 100 (/km2)
females)
Twente 226,836 111,251 115,585 1.36* 96 312.9
Dala 172,857 84,671 88,186 0.75* 96 771.5
Seikkyi 34,003 17,068 16,935 0.78* 101 4,313.3
Khanaungto
Kyimyindaing 111,514 52,627 58,887 0.30* 89 8,955.4
Source: a. Census Report, 2014,
b. * General Administrative Department, 2017

Annual Average Growth Rate


2.5

1.5

0.5

0
Union of Yangon Region Twente Dala Seikkyi Kyimyindaing
Myanmar Khanaungto

Annual Average Growth Rate

Figure 4.7: Annual Average Growth Rate


◼ Initial Household Survey Results

The Twente Canal Project is located in Twente, Dala, SeikkyiKhanaungto and Kyimyindaing
Townships and the household surveys were undertaken across 19wards/villages in four townships
(Table 4.4) out of total 24 ward/villages that would be affected by the project. Selection of the
wards/villages were made mainly based on the accessibility and limited time during the survey.353
households (out of total 2,696 PAFs: about 13% sampling) responded to the survey, with 125 male

43
(35%) and 228 female (65%) respondents respectively. .More females responded than male as the most
part of the survey was carried out during daytime when many males, the household heads or
breadwinners, were outside for work.The following table shows the detail information of the village
tracts and villages in the survey area.

Table 4-4: Respondents Profile of the Village/Ward in Survey Areas


Township Study Ward/Village Respondents Sampling Ratio
(Out of the expected
project affected
households of the
Township) (%)
Male Female Total -
Twente 1. Pathein 57 36 93 19.4%
2. Sat Ka Lay (52%) (48%) (100%) (93/479)
3. Thar Si
4. Sat San
5. PyawBwal
Lay
Dala 7. Hmaw Set 16 61 77 11.9%
8. KyaungSu (21%) (79%) (100%) (77/646)
9. Tar Gyi
Seikkyi 10. U Tun Oh 45 115 160 13.1%
Khanaungto 11. Pan Pin (28%) (72%) (100%) (160/1,220)
Chaung
12. Samar Du
War
13. ThaKhin Ba
14. Thaung
15. Ka Naungto
(east)
16. Seikkyi
(west)
17. Seikkyi
(east)
Kyimyindaing 4. Seik Kyi 7 16 23 6.5%
5. U Myar (30%) (70%) (100%) (23/352)
6. Nga Zin
Total - 125 228 353 13.08%
(35%) (65%) (100%) (353/2,697)
Source: Household Survey, 2018

The respondents were divided into four broad age groups, those less than 18 years (Minors), 19-35 years
(Young adults), 36-50 years (Mature adults), and over 50 years (Elders). Figure 4-8 shows that
Population by broad age groups in study Townships.

44
Table 4-5: Age Group of Respondents (%)

Mature
Minors Young adults Elders
Township Adults
(18 years) (19-35) ( >50)
(36-50)
Twente 2% 42% 41% 15%
Dala 1% 19% 38% 42%
Seikkyi Khanaungto 0% 19% 37% 44%
Kyimyindaing 0% 45% 35% 30%

50

40

30
percentage

20

10

0
Twente Dala Seikkyi Kyimyindaing
Khanaungto

Minor(18 years) Young adult(19-35)


Mature Adult (36-50) Elder( >50)

Figure 4.8: Respondent comparison by Age Group in the Four Study Townships

The following table shows that the majority of survey participants were family members, while 25 %,
35 %, 22 %, and 23 % of respondents were head of households in Twante, Dala, SeikkyiKhanaungto,
and Kyimyindaing Township respectively.

Table 4-6: Respondent Percentage


Township Head of household Family member Total
(%) (%)
Twente 25 75 100
Dala 35 65 100
SeikkyiKhanaungto 22 78 100
Kyimyindaing 23 77 100
Source: ESIA Team's Household Survey, 2018

45
[Duration of Residence among Survey Respondents]

The following table indicates the duration of living in current location. 195 out of total 353 respondents
(55%) reported to have lived in their current location more than 25 years while 27 respondents (7.5%)
reported to live less than five years. In general, in all the four townships, the residents are long stayers
in their respective locations.

Table 4-7: Duration of Living in the Location (Total respondents: 353 HHs)
Township <5years 5-15 years 16-25 years >25 years
Twente 7 11 14 61
Dala 7 16 19 35
SeikkyiKhanaungto 12 25 35 88
Kyimyindaing 1 7 4 11
Total 27 59 (16.7%) 72 (20.4%) 195 (55.2%)
(7.6%)

[Property Ownership Types of the Survey Respondents]


The survey asked respondents about the ownership status of their current residence. The survey results
are shown in Table 4.8-12. Most of the households (323 out of 353 respondents. 91.5%) reported that
they own their home, while 20 respondents (5.6%) rent and seven respondents neither own their home
nor pay rent. Three respondents replied that their homes were provided by their employers. While
verification by the documentary evidence is required, it is surmised that the majority of the respondents
are owners of their residential land or the housing structure or both.

Table 4-9: Ownership Status of Respondents’ Current Residence (Total respondents: 353
HHs)
Township Owner Renter Provided by Other I don't know
employer
Twente 93 0 0 0 0
Dala 68 3 1 5 0
SeikkyiKhanaungto 142 14 2 2 0
Kyimyindaing 20 3 0 0 0
Total 323 20 (5.7%) 3 (0.8%) 7 (2%) 0
(91.5%)
Source: Household Survey, 2018

[Debt Status of the Survey Respondents]


The survey also asked respondents about their debt status. It was found that about half of the respondents
have a type of debt.

Table 4-10: Household Debt (%)


Township Yes No
Twente 44% 54%
Dala 51% 49%

46
SeikkyiKhanaungto 53% 47%
Kyimyindaing 52% 48%
Source: Household Survey, 2018
[Poverty]

In Myanmar, poverty has steadily declined since early 2000s. Myanmar is in a transition from a centrally
directed economy to a market-oriented economy. This has been supported by a reform program
launched by the government in 2011.Household expenditure, on average, has been increased by 15%
over the past decade, enhancing the living standards of Burmese people. This can be shown in various
well-being indicators, such as sales of consumer goods. For example, more than 42% of households had
motorcycles in 2015, about 4 times more than that in 2009.5Still, 37% of the population lives near or
below the national poverty line in 2015, which means that a large portion of people continue to remain
vulnerable to poverty. The country’s gross domestic product (GDP) was estimated to be $56.8 billion
in 2014, approximately $1,505 of the GDP per capital – one of the lowest in Southeast Asia (World
Bank 2015).

The situation is generally worse in rural regions, 38.8% of its population in 2015, whereas only 14.5%
of those in towns and cities was regarded as poor in the same year. Sectoral growth figures can explain
reasons why rural poverty had been alleviated at a slower pace. Manufacturing and service sector were
more rapidly grown than agricultural industry during the same period.6 The same pattern applies in the
four affected townships: Dala and Twente Tonwnship, with a level of rural population still residing,
marks the less socio-economic development level compared with 100% urbanized SeikkyiKanaungto
and Kyimingtine Township. With the advancement of the SUDP and Yangon City Development Plan,
the former Township are expected to mark visible socio-economic development with higher income
levels with rapid urbanization in the future.

Households in poverty tend to make their livings through agriculture, in most cases either as laborers
or as small farmers. Even when they are farming, most of them do not have their own land. Besides,
poor people are likely to be distant from the formal economy, including public credit services or market
transactions. They are also less likely to be highly educated, both household heads and working age
members. All of these factors are closely correlated with low income levels.

Identification of low income group of PAPs/PAFs would need to be made at the later stage once the
IOL is validated and finalized upon the completion of design of the project. It is recommended that PEA

5
The World Bank (2017) Myanmar Poverty Assessment
6
The World Bank (2017) Myanmar Poverty Assessment

47
(DWIR-PMU) establish a special mitigation measures for this group of vulnerability, such as extending
the vulnerability allowances and/or income and livelihood restoration.

[Ethnicity and Religion]

Household Survey Results indicates that the majority of the respondents are Bamar while 13
respondents are Kayin (Table 4-11and Figure 4-9).

Table 4-11: Respondents by Ethnicity in Study/Focus Areas


Township Bamar Mon Shan Kayin Others
Twente 369 0 0 9 0
Dala 341 3 0 0 16
SeikkyiKhanaungto 714 1 0 4 0
Kyimyindaing 97 0 0 0 3
Total 1521 4 0 13 19
Source: Household Survey, 2018

800

700

600

500 Others

400 Kayin
Shan
300
Mon
200
Bamar
100

0
Twente Dala Seikkyi Kyimyindaing
Khanaungto

Source: Household Survey, 2018


Figure 4-9: Respondents by Ethnicity in Study/Focus Areas

[Literacy and Education]

The following table indicates that the literacy rate of respondents in Dala Township is 90% while the
literacy rate of respondents in SeikkyiKhanaungto Township is 68%. Twente, SeikkyiKhanaungto, and
Kyimyindaing Township have lower literacy rate than that of national average (89.5 %).

48
Table 4-12: Respondents by Literacy Rate in Study/Focus Areas
Literate Male (%)
Township Female (%)
(%)
Myanmar 89.5 - -
Twente 88 45 43
Dala 90 48 42
Seikkyi Khanaungto 68 36 32
Kyimyindaing 81 41 40
Source: Household Survey, 2018

Table 4-13 shows the education facilities in study townships. Twente has eight state high schools, 22
state middle schools, 183 state primary schools, two preschools, and one monastery education center.
There are no universities and colleges in Twente.

Dala has four state high schools, seven state middle schools, 53 state primary schools, three preschool
and three monastery education centers.

Seikkyi Khanaungto has two state high schools, one state middle school, 14 state primary schools, and
one preschool.

Kyimyindaing has seven state high schools, five state middle schools, 11 state primary schools, 13
preschools, and two monastery education centers.

There are no universities and colleges in those four townships.

Table 4-13: The Education Facilities in the Four Affected Townships


Name of No.of No.of High No. of No.of No.of Monastery
Township University/ School Middle Primary Pre School Education
College School School School
Twente 0 8 22 183 2 1
Dala 0 4 7 53 3 3
Seikkyi 0 2 1 14 1 0
Khanaungto
Kyimyindain 0 7 5 11 13 2
g Source: General Administrative Department, 2017

The total population in study townships is 517,747(the proportion of aged 15 and over is 374,622) and
the number of educational facilities is 330, which means that the number of educational facilities is
insufficient compared to the total population. In particular, with the exception of primary schools in
Twente, the total number of educational facilities is 147, which means that more educational facilities
are expected to be needed as a proportion of the population in study townships.In the case of Seikkyi
Khanaungto and Kyimyindain, the proportion of children aged 14 and below who need basic education
is 3,286 and 25,076 with the number of pre-schools, primary school and middle school in each township
is 16 and 19.

49
According to the household survey, the literacy rate of Seikkyi Khanaungto is 68 percent and that of
Kyimyindain is 81 percent, which is lower than 88 percent in Twente and 90 percent in Dala. The
average literacy rate of Myanmar is 89.5%. While further study is required to clarify the reason for
visibly low rate of the reported literacy rates among the respondents in Seikki Kanaungto and
Kyimyindain of our household survey, it is possible that adult family members may have been absent
during the household survey due to their work outside - being 100% urban population there are no
farmers whose presence at residence areas are more likely during the work days, that junior population
may have responded.

[Income Level]

The following Table 4-14 indicates that the highest average individual annual income is estimated as
2,632,255.9 Kyats for Kyimyindaing Township and Dala Township has lowest average individual
annual income.

Table 4-14: The Average Individual Annual Income Status of Study Townships (Unit:
Kyat)
Township 2014-15 2015-16 2016-17
Twente 1,651,514 1,688,712 1,725,910
Dala 443,442 558,776 674,110
SeikkyiKanaungto 786,032 857,994 1,091,608
Kyinmyindaing 1,882,711.6 2,014,485.7 2,632,255.9
Source: General Administrative Department, 2017

Household Survey Results


As can be seen in the following table, most of the households (196 out of 353 households) reported an
income of between 1,100,000-3,600,000 Kyats. Four households reported an income of less than
1,000,000 Kyats and 56 households reported an income of more than 6,000,000 Kyats.

Table 4-15: Annual Income of Survey Results (Total respondents: 353 HHs)

Income Rate Unit: Kyat


Township <1000000 1100000- 3700000- >6000000
3600000 6000000
Twente 0 54 26 13
Dala 0 37 23 17
Seikkyi Khanaungto 3 90 43 24
Kyimyindaing 1 15 5 2
Total 4(1.1%) 196(55.5%) 97(27.5%) 56(15.9%)
Source: Household Survey, 2018

50
According to the household surveys, Table 4.16 indicates that 28 out of 353 households reported an
annual expenditure of more than 5,000,000 Kyats while 201 households reported an annual expenditure
between 1,000,000-3,000,000 Kyats.

Table 4-16: Annual Expenditure of Survey Results (Total respondents: 353 HHs)
Unit: Kyat
Township <100000 100000-300000 310000-500000 >500000
Twente 2 61 27 3
Dala 0 43 20 14
Seikkyi Khanaungto 3 86 62 9
Kyimyindaing 1 11 9 2
Total 6 (1.7%) 201 (57%) 118 (33.4%) 28 (7.9%)
Source: Household Survey, 2018
In term of income sources, agriculture, including livestock and fishery is most important sector for
Myanmar’s economy. As can be seen from the following Table 4-17, the main sources of income in
Study Townships are agriculture, fishery and official employment of the government.

Table 4-17: Existing Status of Local Livelihoods in Townships


Township Working-
Livestock (%)
Service Staff

Odd Job (%)


Government

Fishery (%)
age
Agriculture

Trader (%)

Other (%)
Sales (%)
Staff (%)

Population
(aged 15+)
(%)

(%)

Twente 144013 2.1 4.5 50.1 0. 3.7 1.5 28.0 9.0 1


1
Dala 177497 2.9 13.6 2.3 0. 13.6 0.2 - 11.6 55.8
1
SeikkyiKanaungto 14613 3.4 6.0 0.4 0. 10.5 0.4 59.5 - 19.5
3
Kyinmyindaing 76661 17.6 8.6 0.4 0. 25.2 6.5 - 13.0 28.6
2
Source: General Administrative Department, 2017

[Economic Infrastructure by Township]

Twente Township is located in Yangon region and is an economically developing township. Township
local people tend to operate mainly for agriculture. In addition, has the breeding business. Twente
Township can transport to other township by road, by water and waterway and good transportation. The
main township’s main products are rice and exported to other parts. The economic status, occupational
status, income status and other social infrastructures are shown in Table 4-18.

51
Table 4-18: The Economic Facilities of Twente Township (as of April 2017)
No. Name of No. of No. of No. of Small scale/ Total
Township factories Workshops domestic enterprises

1 Twente 68 2 (car repair 55 125


shops)

Source: General Administrative Department, Twente Township (2017)

Dala Township located in Yangon region and is also the commercial city. The local people are mainly
doing agriculture and services. The economic status, occupational status, income status and other social
infrastructures are shown in Table 4-19.

Table 4-19: The Economic Facilities of Dala Township (as of March 2017)
No. Name of No. of No. of No. of Small scale/ Total
Township factories Workshops domestic enterprises
1 Dala 2 14 (Wet 27 43
shipyards)
Source: General Administrative Department, Dala Township (2017)

Seikkyi Khanaungto is located in Yangon Township and that economic growth is slowing Township
local people mainly work agriculture and causal. Township only use transportation for water, if create
for employment opportunities and services the residents could be living the high living standard and
will be developed faster. The economic status, occupational status, income status and other social
infrastructures are shown in Table 4-20.

Table 4-20: The Economic Facilities of SeikkyiKhanaungto Township (as of March 2017)
No. Name of Township No. of No. of No. of Small scale/ Total
factories Workshops domestic enterprises
1 Seikkyi Khanaungto 1 41 (Lunn) 63 105
Source: General Administrative Department, SeikkyiKhanaungto Township (2017)

Kyimyindaing Township has a relatively small scale of economy. Township is also located on the
intersection of the road and water access and good transportation. Most workers are either casual
workers. The economic status, occupational status, income status and other social infrastructures are
shown in Table 4-21.

Table 4-21: The Economic Facilities of Kyimyingdaing Township (as of April 2017)
No. Name of No. of No. of Workshops No. of Small scale/ Total
Township factories domestic enterprises
1 Kyimyindaing 2 6 (unidentified) 16 24
Source: General Administrative Department, Kyimyindaing Township (2017)

52
◼ Disturbance of Shipyard business operations in Seikkyi Kanaungto Section
As of 2015, 29 shipyards are found to be registered in Seikkyi Kanaungto Section. The shipyards in
Seikkyi Kanaungto section serve to build, repair and disintegrate the vessels for inland water transport.
The shipyard facilities have been established in this region since 1960s and the FGD in December 2018
with the shipyard operation community reported that it is reported that there are about 40 shipyards
currently in operation, out of which 32 shipyards are owned and run by private owners and the 8
shipyards by MPA. On the average one shipyard company is hiring about 10 employees based on a
daily labor basis (with 12,000~15,000 kyat for daily wage).
Although the shipyard operations are recognized de facto by the Myanmar government, de jure
recognition is not clear: According to the Kanaungto Shipyard Association, an interest group of the
shipyard business owners and operators, the Association has been paying the "fees" to the Myanmar
government according to The Canal Act [BURMA ACT II. 1905]. With the new civilian government
taking the power in 2015, they stopped paying the fees. It is found that formal licenses have not been
issued to the shipyard owners.

While the official mandate for the canal management for inland water transport lies with the DWIR, the
Shipyard association claimed that regular canal maintenance (such as regular sedimentation clearing
through dredging etc.) have been carried out by the shipyard operators themselves on their own costs.

According to the land confirmation survey, the large portion of the areas (1.1286 ha with 29 shipyards)
where the shipyard facilities are located belong to the category of canal land under the DWIR
ownership.

Typical structure of the shipyard facilities includes a machine shop, a pipe and boiler shop, warehouse
plate, carpenter shop and slipways (see the picture below). The shipyards in Kanagungto Section are
relatively of small scale (with 1.1286 ha occupancy on the average) which deals with the small and
medium size vessels. It was observed that in Twente canal area, painting and repairing of the vessels
are often done at the slipway or dry dock in an open air. (See the pictures below.)

53
Figure 4-10: Images of shipyard operations in Dala Township
(source: alamy stock photo, www.alamy.com)

The size and structures of each of the shipyards are shown in the following table:

Table 4-22: List of Shipyards in Affected Areas


No. Location (Ward/Township) Size (ha)
1 Seikkyi Kanaungto 0.0248
2 Seikkyi Kanaungto 0.0248
3 Seikkyi Kanaungto 0.0414
4 Seikkyi Kanaungto 0.0248
5 Seikkyi Kanaungto 0.0248
6 Seikkyi Kanaungto 0.0248
7 Seikkyi Kanaungto 0.0248
8 Seikkyi Kanaungto 0.0248
9 Seikkyi Kanaungto 0.0248
10 Seikkyi Kanaungto 0.0644
11 Seikkyi Kanaungto 0.0248
12 Seikkyi Kanaungto 0.0248
13 Seikkyi Kanaungto 0.0644
14 Seikkyi Kanaungto 0.0248
15 Seikkyi Kanaungto 0.0414
16 Seikkyi Kanaungto 0.0414
17 Seikkyi Kanaungto 0.0414
18 Seikkyi Kanaungto 0.0248
19 Seikkyi Kanaungto 0.0248
20 Seikkyi Kanaungto 0.0414

54
21 Seikkyi Kanaungto 0.0368
22 Seikkyi Kanaungto 0.248
23 Seikkyi Kanaungto 0.0248
24 Seikkyi Kanaungto 0.0248
25 Seikkyi Kanaungto 0.0248
26 Seikkyi Kanaungto 0.0248
27 Seikkyi Kanaungto 0.0248
28 Seikkyi Kanaungto 0.0248
29 Seikkyi Kanaungto 0.0368
Total 1.1286

Concerns have been raised during FGD and public consultations sessions regarding potential
disturbance of the shipyard operations by the project implementation. Currently, DWIR holds a position
that the shipyard facilities would not be disturbed, and their business operations should be able to
continue during construction without stoppage, as ROW for the construction would not be drawn to
dissect the shipyard areas. However, until now DWIR has not determined the exact demarcation of the
ROW in Seikkyi Kanaungto Section.

◼ Loss of Income and Business Opportunities


Another group to be affected by the project implementation includes those whose source of income and
livelihood are significantly dependent upon the Twente Canal and the adjacent land to the canal subject
to acquisition. This include, among others, owners of crops and fruit (and other commercial) trees,
agricultural workers (sharecroppers and sustenance farmers), people running small boat crossing
enterprises (mini boat bus and taxis) and their employees, etc.

First of all, total 92 ha of the affected land are farming land (mostly rice and small farming). Owners of
crops and fruit (and other commercial) trees and other resources that are attached to the land that are to
be taken for construction and ROW, would need to be compensated based on the replacement cost
principle (which includes both the current market price of the assets and the transaction costs).
Agricultural workers based on labor contract, be it sharecroppers with or without any written (legal)
contractual documents, whose livelihood is predominantly dependent upon the sharecropping on the
affected land, are likely to lose their means of livelihood, constituting the primary vulnerable group,
during the detailed measurement study (DMS), the project proponent would need to count the number
of the sharecropping households on the affected land, provide disturbance allowances to minimize the
negative impacts upon the group. Compensation should be made in accordance with relevant laws and
regulations in Myanmar and the EDCF Safeguard Policy and other internationally recognized safeguard
policies (such as WB OP/BP 4.12).

55
Small boat business community include small boat owners, boat minibus and taxi operators and their
employees (staff onboard, ticket-office clerk, etc.) along the canal and Yangon river (project area).
According to information source from DWIR, a number of boat taxis and boat buses are being operated
a day along the Twente Canal, catering about a huge number of passengers a day. Currently, there are
about 15 boat bus and taxi stops along the Yangon river and the Canal (project area) (See the map
below).
Table 4-23: Inland Water Transport Services Routes in Myanmar
Sr. Division/Route Schedule
1. Yangon – Dala Daily (46) trips
2. Wadan – Dala Daily (19) trips & 9 trips in Sunday
3. Yangon – Seikkyi Kanaungto Daily (8) trips & 6 trip in Sunday
4. Sintohtan – Sarparchaung Suspended
5. Wadan – Saikgyi Suspended

While commercial fishing is not officially allowed in Yangon River and Twente Canal, it is reported
that about several hundred people are still practicing fishing in the river and the canal. In effect, fishing
practice is condoned by the authority and a significant number of households are making a living
partially, if not entirely, from fishing. There is no existent data on the actual scale of the fishing
community in Yangon River or Twente canal.

This project is, however, unlikely to make significant impacts on the fishing community as the
construction work is largely focused on the canal side, not the canal itself. Fishing is a mobile activity,
in bed scouring area, fishermen could simply move to alternative location for fishing as the fish swam
would also alter their movement tracks away from the construction site.

During the focused group discussion with farmers, it was also found that some farming lands are using
the river and canal water for irrigation through pumping and piping. In case their waterway is
temporary/permanent blocked due to the construction work, alternative channel and water way would
need to be provided by the project proponent/contractor to ensure continued farming activities.

Negative impacts on their income and business opportunities, however, are judged to be locally
contained and temporary. One way to minimize the disturbance due to the construction is to sequentially
sectioning out area by area for construction work. In this way, those whose passage to the river is
blocked by construction, could make avail of alternative passages during construction. Project
proponent may need to arrange for alternative route to access the canal, in case any pier or boat bus/taxi
stops are to be closed due to construction work.

56
4.4 Detailed Measurement Survey (DMS)
A. Inventory of Losses (IOL)
The IOL for the proposed project listed below is based on the preliminary design and the socio-
economic survey of the potential affected persons/households based on the preliminary design and
ROW assumption as of the date of writing this plan. Finalization of the IOL will be made upon the
completion of the DED and DMS (which will be explained in the sections below).

The IOL should cover all fixed assets (i.e. land used for residence, commerce, agriculture including
ponds; dwelling units; stalls and shops; miscellaneous structures such as fences, tombs, and wells; tress
with commercial value; crops; etc.), which are located in the project construction area. These will be
identified, tagged, measured and their owners, and users if a different party, identified. International
Safeguard Standards, such as ADB SPS, stipulate that when asset owners and asset users are different
people and both are affected, it is possible that both are entitled to some compensation. Socio-economic
conditions of the identified households including source of livelihood, income level, and ownership of
productive assets will also be gathered as part of the IOL. Final IOL is to be conducted by staff of the
provincial and district departments of agriculture (PAFO and DAFO) and local authorities with support
of village representatives and in collaboration with the feasibility study consultants.

B. Detailed Measurement Study (DMS)


Once the detailed engineering design(DED) is approved, the detailed measurement study (DMS)
finalizes and validates the results of the Inveontory of loss(IOL), severity of impacts and list of
affected households due to the project implementation. The final cost of resettlment for the project will
be determinedfollowing the completion of DMS.

Cut-off date for eligibility is the date after which people will not be eligible for compensation or
assistance. As a rule of thumb, the cut-off date for eligibility is set by the PEA as a date when the first
offical information disclosure of the project to the public is made. In the proposed project, the official
cut-off date has been originally set to be 31 July 2018.

During the DMS, data will be collected on the followingassets from100% of PAP/PAFs following DED.
The data collected during DMS constitute a formal basis for determining the PAP/PAFs entitlement to
compensation and other types of assistance and levels of compensation. For each of PAP/PAF,the scope
of the data will include:
(i) Total and affected areas of land, by type of land assets,
(ii) Total and affectedareas of structures, by type of structure (main or secondary)
(iii) Legal status of affected land and structure assets,and duration of tenure and ownership

57
(iv) Quantity and types of affecged crops and trees
(v) Quantiy of other losses, e.g.business or other income,jobs or other productive assets,estimated
daily net income from informal shops
(vi) Quantity/area of affected community property,community or public assets, by type
(vii) Summary data on PAP/PAF households,by ethnicity, gender hf head of household, household
size, primary and secondary data source of household income viz-a-viz poverty line, income
level,whether household is headed by women, elderly, disabled, poorer indigenous peoples
(viii) Identify whether affected land or source of income is primary source of income;and
(ix) PAP/PAF knoleldge of the proposed project and their preferences for compensation and, as
required,relocation sites and rehabilitation measures

4.5 Replacement Cost Survey (RCS)


A. Market survey
According to the market survey, REM Team went to collected the market survey in each townships on
12th to 14th December 2018.

(D)
(A) Land (E) (I)
(C) Price Location
Sr. Township category (B) Size Structure Year of
(Lakh) of land
(*) or not (*) price
(*)
900 -
2 1 Acre 1000 1 1 2018
500 -
1 Dala
1 20'x50' 1000 1 3 2018
1 20'x50' 200 - 400 2 2 2018
1 20'x50' 150 - 200 3 2 2018
2 1 Acre 200 - 500 1 1 2018
4 1 Acre 100 - 150 1 1 2018
4 1 Acre 70 - 100 2 1 2018
2 Twente 500 -
1 40'x60' 1000 1 3 2018
1 40'x60' 200 - 500 2 2 2018
1 40'x60' 70 - 200 3 2 2018
1 25'x50' 200 - 400 1 3 2018
Seikgyi 1 25'x50' 150 - 200 2 2 2018
3
khanaungto 1 25'x50' 80 - 150 3 2 2018
4 300'x300 500 - 800 4 1 2018
1 10'x20' 50 – 70 3 2 2018
4 Kyimyindaing 1 20'x40' 70 - 150 3 3 2018
1 40'x60' 150 - 250 3 3 2018
[*Code]
(A) Land category: 1. Residential land, 2. Paddy field, 3. Dry field, 4. Orchard land, 5. Others
(specify)
(D) Location of land:
1. Facing the main road , 2. Not facing road but near the main road, 3. Inside the village area,
4.Others (specify)

58
(E) Structure or not
1. No structure, 2. with 1 story house, 3. With 2 stories house, 4. With more than 3 stories house, 5.
Others (specify)

Figure 4.11: Images of Market Survey Activities carried out by Local Assessment
Team (REM)

B. Replacement Cost Survey (RCS)


The replacement cost survey (RCS) will be carried out in parallel with DMS and SES activities by
collecting information from both secondary and primary sources (direct inverviews with people in the
affected area, material suppliers, house contractors), and from both those affected and those not
affected. Government rates baesd on the market survey shall be adjusted , as necessary,in order to
reflect the full replacement cost as much as possible.

Land Acquisition Act of Myanmar (1894) does not mention explicitly the adoption of the replacement
cost compensation but the Section 23(1) indicates that various other factors need to be taken into
account in addition to the market value for land and damaged crops. To specify:

Sections Key provisions of the LAA (1894)


Section 23(1) [Calculation of the Compensation Amount]
Requires the award of compensation for owners for acquired land to be determined at its
market value taking into consideration:

i) market value of the land at the date of publication of the notice;


ii) damages caused to any standing crops or trees;
iii) adverse impacts due to severance of the affected land from other land;
iv) adverse impacts on other assets, moveable or immoveable;
v) causing displacement of residence or place of business due to acquisition; and
vi) loss of profits due to the time lag between the notice served under section 6 and time of
Section 23(2) taking possession of the land.

Provides an additional 15% on the assessed market value in view of the compulsory nature
of the acquisition for public purposes.

59
Section 11 [Enquiry into Measurements, Value and Claims, and Award by the Collector]

11. On the day so fixed, or on any other day to which the enquiry has been adjourned, the
Collector shall proceed to enquire into the objections (if any) which any person interested
has stated pursuant to a notice given under section 9 to the measurements made under
section 8, and into the value of the land at the date of the publication of the notification
under section 4, sub-section (1) and into the respective interests of the persons claiming the
compensation, and shall make an award under his hand of:

(i) the true area of the land;


(ii) the compensation which in his opinion should be allowed for the land; and
(iii) the apportionment of the said compensation among all the persons known or believed to
be interested in the land, of whom, or of whose claims, he has information, whether or not
they have respectively appeared before him

Although the LAA requires payment of compensation and illustrate a list of considerations (i)~Vi) of
the Section 22(1) of the LAA (1894)) in determining the market value, any specific methodology for
determining compensation for affected land and other assets are lacking (See Section 11 of the LAA
(1894)). Calculation of the market value of lands and other assets for the project, once carried out by
the valuer, will need to be reviewed and validiated by Land Compensation and Resettlement
Negotiations Committees (LCRNC).

In principle. compensation will be based on the principle of full replacement cost and market value for
all affected properties of land and non-land types, whichever is appropriate and most favorable to the
affected household for the asset concerned.

With the possible time laspe between the timefor initial survey and the actual time for compensation,
updates are required to realize the actual replacement cost at the time of compensation to individual
PAPs/PAFs.

4.6 Entitlement Matrix


Entitlement refers to a range of measures (i.e. compensation and/or other assistances as set forth and
agreed in the Entitlement Matrix), which are provided to affected households, depending on the type
and severity of their losses, to restore their economic and social base (ADB definition). Below is a
suggestive matrix for the proposed project for the DWIR's consideration for adoption:

Type of Loss Entitled Persons Entitlement Implementation Issues Implementation


Institution

Permanent Loss

A. Loss of Land and Land Use Right

60
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

Loss of Land Legal title • For more than 10% (Evaluation,


(A1)
holder/owner of of the farming land Payment)
residential, ·Cash compensation at and if more than
agricultural, or replacement cost for 20% of the YRG
commercial land purchase of land in residential land are (Land to Land
similar condition to the taken (severely Compensation)
lost land will be provided. affected
PAPs/PAFs), YRG
·Replacement land compensation for the
compensation (similar entire lot shall be
condition) will be compensated.
provided if requested. • If less than 10% of
agricultural land and
less than 20% of
residential land are
taken ("partial loss
of land"), partial
compensation shall
be made based on
the actual size of the
lots that are to be
taken. In case of
partial loss of land,
if the remaining land
is no longer viable
for continued use,
compensation for
entire land holding
at replacement cost.
• For acquisition of
the (esp. farming)
land, land-for-land
compensation option
shall be provided as
a top priority if
available in the area,
as much as possible
in addition to the
cash compensation
so that the affected
farming family can
freely choose.
 In case of
replacement land
compensation,
infrastructure such as
power, gas, water,
access road etc. shall
be facilitated before
actual relocation.
• An additional 15%
on the assessed
market value will be
paid as required by
national law for

61
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

compulsory nature
of the acquisition.
• Exemption from
paying tax on
compensation and
administrative cost
for the affected land.
• The project will
assist affected
people in getting the
residual land
registered.
• Severely affected
households will be
entitled to a
transition allowance
(allowance for
severely affected
households (Refer to
Row 9 of this
entitlement matrix)
 Severely affected or
vulnerable household
will be entitled to
receive livelihood
restoration support
Unauthorized Xxx
(A2) - Assistance of livelihood
occupants of
restoration will be
residential, ·No compensation for loss
provided to unauthorized
agricultural, or of land will be provided to
occupants.
commercial land unauthorized occupants of
public land. ·Included are
unauthorized occupants
who received previous
compensation yet continue
to occupy the land.
(Illegal Squatter)
Loss of Land Land users with (Evaluation,
(A3) ·Eligibility of certificate
Use Right legal land use Payment)
holder will be determined
certificate or ·Cash compensation at
by either legal registration YRG
equivalent right original cost to obtain the
document for land use
to use residential, land use right will be
right or tax certificate.
agricultural, or provided.
commercial land ·In case original cost for
·New land use right will
the land use right cannot
be provided that assures
be established, registration
livelihood or business
fee for land use right in
environment similar to
the applicable region will
lost land, if requested.
be provided.

62
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

Unauthorized Xxx
(A4) ·Assistance of livelihood
land user of
restoration will be
residential, ·No compensation for loss
provided to unauthorized
agricultural, or of land use right will be
land users.
commercial land provided to unauthorized
users of public land. ·Included are
unauthorized land users
who received previous
compensation for land use
rights yet continue to use
the land.
B. Loss of Structure

Loss of Owner of (Evaluation,


(B1) ·In determining the
structures structures Payment)
compensation of
including • ·Cash
structures, depreciation of
residential compensation at YRG
the asset and the value of
houses, replacement cost
salvageable materials will (Removal)
commercial based on actual
not be taken into account.
office, or market price of
accompanying materials and cost ·Removal of affected DWIR
structures such of labor for structures will be
as retaining dismantling, conducted by DWIR. This
walls transfer, and does not apply in case that
rebuild. No entitled persons remove
deduction for the structures, either
depreciation or the partial or a whole, at their
remaining values own expenses.
of salvageable
-No compensation will be
materials. Or
provided to the ones who
where structure
have previously received
can be moved,
appropriate compensation
cash and/or in-
for the structures.
kind assistance to
move and repair -Assistance of livelihood
affected structure. restoration will be
provided to those
·Reconstruction of lost
ineligibles for
structures in similar
compensation.
condition will be provided
if requested. • For partially
affected main
structures (with
less than 10% of
their total
productive
assets are lost),
in addition to
compensation
for affected part
of the structures,
entitled to
allowance to
repair remaining
portion of
structure.

63
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

• In addition 15% on
the assessed market
value will be paid
as required by
national law for
compulsory nature
of the acquisition
• Affected people
assisted in getting
necessary approvals
for re-installation of
any affected utilities
like electricity,
telephone, and/or
water connections or
compensation paid in
cash based on
prevailing cost of
disconnection and
re-installation
• For partially
affected main
structures (with
less than 10% of
their total
productive
assets are lost),
in addition to
compensation
for affected part
of the structures,
entitled to
allowance to
repair remaining
portion of
structure.
• In addition 15% on
the assessed market
value will be paid
as required by
national law for
compulsory nature
of the acquisition
• Affected people
assisted in getting
necessary approvals
for re-installation of
any affected utilities
like electricity,
telephone, and/or
water connections or
compensation paid in
cash based on
prevailing cost of
disconnection and
re-installation

64
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

Loss of social Representative of (Evaluation,


(B2) ·Details of compensation
service facility facility manager Reconstruction)
shall be determined by
such as ·Social service facility
clarifying current use of YRG
monastery such as a monastery will
facility through
be rebuilt to original or
consultation with
better condition in size
representative of the
and quality in the vicinity.
facility manager.
C. Other Loss (Crops, Trees etc.)

Loss of crops Representative of (Evaluation、


(C1) ·Compensation will be
farm land user Payment)
paid regardless of legal or
·Cash compensation at
(both legal and unauthorized land owner YRG
whole sale prices of crops
unauthorized) and user.
before harvest on the
affected agricultural land ·In case of animal
will be provided. husbandry, no loss of
livestock is applicable
Or Alternatively:
since livestock is not
• For annual crops, immovable. Provision of
affected people will the right to operate animal
be given 4 months’ husbandry as in ‘A3’.
notice to pick crops
prior to clearance.
For crops that cannot
be harvested,
affected people will
be awarded the full
market value of
production lost.
• Cash assistance
equivalent to 6 years
value of paddy in
areas which affected
people can no longer
cultivate.
• Other possible forms
of assistance, if
needed, in
consultation with
government
authorities and
households during
updating of the
resettlement plan to
• support restoration of
livelihoods.
Loss of Owners of • Cash • Replacement of YRG
Perennial Crops affected trees: compensation at saplings up to a
and Trees (i) Rubber, market price for factor of 15 new
timber, and loss of to one old tree
fruit trees crops/fruits included in the
(ii) Private shade calculated as compensation.

65
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

trees number of years Wood value


needed to bear considered for
fruit. applicable trees.

D. Assistance for Restoration Livelihood

Assistance for Household head (Evaluation,


(D1) ·Cash assistance for a
moving cost of PAPs who Payment)
single moving activity
needs physical ·Cash assistance for
will be provided. YRG
relocation moving cost estimated on
required moving expenses ·Estimation arrangement
will be provided. in an early stage with
PAPs will be required
since the assistance
amount depends on the
distance to a relocation
site.
Assistance for Household head (Evaluation,
(D2) ·Cash assistance will be
income loss of PAPs who Payment)
provided regardless of
associated with loses agricultural ·Cash assistance
legal or unauthorized land YRG
loss of land or income equivalent to the price of
owner and user.
land use right 2 crop yields on the
affected agricultural farm ·No assistance will be
at whole sale prices will applied for livestock
be provided. industry since no
significant loss or damage
·Consultation support in
resulted in income loss is
finding new destination
expected for livestock
for agricultural farm will
relocation.
be provided.
·Livelihood restoration
assistance will be
implemented through
income
restoration/improvement
programs including
vocational training if
needed.
Employee who (Evaluation,
(D3) ·Attention must be paid
loses income Payment)
that entitled persons are
from farm work ·Cash assistance
eligible to severance pay YRG
or other job equivalent to 1 month (30
per Myanmar’s Labor
days) income, monthly
Laws.
amount of annual net
income of the year before ·Document certifying
displacement, will be employee’s income will
provided. be examined in evaluating
cash assistance.
·In case above document
is not available, cash
assistance will be
evaluated based on

66
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

minimum wage with


consultation with the
entitled person.

Assistance to Head of (Evaluation,


(D4) ·A disabled person is
vulnerable household with a Payment)
defined as one with
persons disabled member ·Cash assistance
physical disability or with YRG
equivalent to 1 month (30
difficulties due to old age.
days) of minimum wage
will be provided. ·Assistance amount would
be estimated from the
minimum wage of
Myanmar of 2018,
4,800MMK/day.7
Female-headed (Evaluation,
(D5) ·Poverty household is
household or Consultation,
defined as the household
head of ·Cash assistance Payment)
which is below the
household below equivalent to 1 month (30
poverty YRG
poverty line days) of minimum wage
line8(431,795MMK/year
will be provided.
for average adult
·Consultation support in individual income)
finding new relocation
·Assistance amount will
destination will be
be estimated from the
provided.
minimum wage of
·Livelihood restoration Myanmar of 2018,
assistance will be 4,800MMK/day.
implemented through
income
restoration/improvement
programs including
vocational training.
6. Loss of Owner Cash allowance • The allowance may YRG
business with or equivalent to 1-month be extended
incomes without title income9. monthly for the
transitional period
up to 6 months in
cases where the
business needs to
relocate to another
location.

7Reference: the Minimum Wage Committee of Myanmar


(https://tradingeconomics.com/myanmar/minimum-wages)
8 An ADB Land Acquisition and Resettlement Framework for Myanmar: Climate-Friendly Agribusiness Value Chains Sector
Project, published in 2018, defines the minimum subsistence as MMK1,183 per day or monthly MMK 35,490 based on
poverty rate of $1.25 per day per person.
9
As reflected in tax receipts. For those without tax receipts, the income of similar proxy businesses will be
used for shop owners.

67
Type of Loss Entitled Persons Entitlement Implementation Issues Implementation
Institution

7. Loss of Employees • Cash allowance • If an affected YRG


employment of equivalent to 1- household is
Businesses month income in severely affected,
(incl. project areas. entitled to receive
shipyard livelihood
workers), restoration support
affected (See Section F) and
agricultural transition allowance
workers, (See Row 9)
• If possible, job
trainings (related to
construction of the
project etc.) for the
laid-offs

Temporary Loss
Loss type Entitled Entitlement Implementation Issues Implementation
Persons Institution
Temporary Affected people • Monthly cash • Affected asset to be •
acquisition or or affected compensation to cover fully restored within 1 YRG
easement household with income opportunity lost month of return to
during formal legal and restoration of land owner.
construction rights or (leveling, drainage, • DWIR-PMU will inform
or for camp/ recognizable fertilizer etc.) of land the public at least 45 days
storage, etc. rights under and/or structures to pre- before the start of civil
the law project levels. works/excavation
activities.
• The contractor will ensure
that the excavation of
trenches and other civil
work activities are carried
in a systematic manner and
least inconvenience to
general public and roadside
property owners.
Contractors will make
arrangements to minimize
traffic obstructions and
facilitate smooth flow of
traffic.
Users without • Cash compensation for . •
formal rights to non-land assets (standing
the land crops, trees, structures) at
replacement cost

4.7 Assistance for Livelihood Restoration of the PAPs/PAFs and the affected communities

Although the proposed project aims to avoid negative impacts on the livelihood of the PAPs/PAFs and
the affected community, it is possible that some households could be severely affected by losing 10%

68
or more of their productive land or other assets, or impacts affect vulnerable households. If so, an
income improvement program needs to be designed and provided. The income improvement program
will be designed in a participatory manner during RAP preparation and will include, among others, any
of the following measures: (i) alternative livelihood; (ii) improved agricultural production; (iii)
appropriate skills training, and (iv) preferred consideration for rehabilitation and construction work
related job opportunities.

A. Project-related employment.
Priority will be given to at least one working age member of the affected households in jobs generated
by the project during the construction phase. Depending upon the skills required, contractors will be
required to give first option of such jobs to the affected people rather than bringing labor from outside
the project areas. The construction-related employment policy needs to be developed by the DWIR-
PMU and imposed upon the contractors through contractual agreement. DWIR-PMU's construction-
related employment policy would need to be stipulated as part of the RAP and informed to the
PAPs/PAFs in a timely manner. DWIR-PMU is recommended regularly monitor the implementation.

B. Agricultural Production Support


Priority will be given to the entitled households to participate in the agricultural production support
activities that are part of the project. Affected people will be from households whose livelihoods are
mainly agriculture oriented and land based. DWIR-PMU's construction-related employment policy
would need to be stipulated as part of the RAP and informed to the PAPs/PAFs in a timely manner as
part of the entitled PAPs/PAFs compensation package.

C. Other types of Livelihood Restoration Program


For affected households whose livelihoods are not agriculture-based, other support for instance in
business generation (such as vocational planning, small business planning, financial planning, and the
accessing and use of credit) and vocational training (through government or private sector programs)
can be considered on a case by case basis.

4.8 Information Disclosure, Consultation & Grievance Redress Mechanism (GRM)


A. Identification of Stakeholders
The project is located in the south-western Yangon Region and the townships that are to be directly
affected are Dala, Seikkyi Khanaungto, Kyimyindaing and Twante. The stakeholders include the local
communities, PAPs/PAFs, local government authorities, CBOs, civil society and business associations
in the affected localities. Regarding the PAPs/PAFs, more than 2,000 households and about 40 shipyard
business entities were identified during the preliminary site survey in areas that are subject to be

69
affected by the project implementation, which may require land acquisition and involuntary
resettlement.

A list of stakeholders of the proposed project are mapped in Table 4.24 below, with respective
engagement plan:

Table 4-24: Preliminary Stakeholder Mapping with Engagement Strategies

Organizational Analysis & Engagement


No. Stakeholders Strategies
(Inform/Consult/Involve/Collaborate)
I. Ministry

1. Ministry of Natural - Director, ECD (Nay - EIA Administrator


Resources and Pyi Taw)
Environmental
- Director, ECD -> Consult /Involve
Conservation
(MONREC) (Yangon Region)

- Forest Department

2. Ministry of Transport - Directorate of - Project Proponent (& Supervisor of the overall


and Communications Water Resources project implementation)
(MOTC) and Improvement
of River Systems
(DWIR)

3. Ministry of Transport - Department of -> Consult/Involve/Collaborate


and Communications Meteorology and
(MOTC) Hydrology
- Marine
Administration
Department
- Myanmar
Shipyards
- Myanmar Port
Authorities
- Inland Water
Transport
4. Ministry of - Department of - Other responsible agencies (who contribute
Agriculture, Livestock Agriculture Land relevant information about specific issues and
and Irrigation Management and matters within their jurisdiction. This information
may include specific legislative requirements,
Statistics
policy objectives, standards, technical knowledge
- Irrigation and Water and expertise, and experience with similar projects
Utilization or local conditions. Certain agencies also may have
Management the role of providing licenses, permits, approvals or
Department leases.)
- Department of
Fisheries - >Consult/Involve/Collaborate
- Department of Rural
Development
5. Ministry of Social - Department of
Welfare, Relief and Relief&
Resettlement Resettlement
6. Ministry of Religious - Department of

70
Affairs and Culture Archeology and
National Museum
7. Ministry of Health and - Department of
Sports Health

II.Region/District/Township Level

1. Land compensation Daw Nilar Kyaw,


and Resettlement Minister of
Committee Electricity, Industry, -> Consult/Involve/Collaborate
Transport and
Communication

2. South Yangon District South Yangon


General District Administrator
Administration
Department

3 Twante, Dala and


Seikkyi-Khanaungto
Township
Development
Committee

4 Development U Nyein Chan Myint


Committee

5 Dala GAD U Yin Htwe

6 Seikkyi Khanaungto -
GAD

7 Kyimyindaing GAD

8 Twante GAD

III.Village (Quarter) Level

1. Village Tract and Wider community


Village Administrator

2. Communities living in
and around the project -> Inform/Consult/Involve
area (residents in the
Dala, Twante,
Kyimyindaing and
Seikkyi Khanaungto
Township)

3. Vulnerable Groups Identification and list Affected groups (have a significant role in
(e.g the elderly of the group by identifying concerns and issues, and in providing
without family category among the local knowledge and information. Their views
support, the physically PAPs shall be should be taken into account in choosing among
disabled, ethnic identified during the alternatives, in deciding on the relative importance
minorities, female- EIA investigation of issues, and in identifying mitigation measures,
headed households, (PAP profiling) compensation provisions and the objectives of
etc.) /Women environmental management plans)

4. Representatives from
local businesses

71
(shipyard owners, ->Inform/Consult/Involve/Collaborate
boat/ship owners,
farmers, fishermen
and employees in the
associated businesses
etc.)

5. Directly affected Land


Owner and
House/Structure
Owners and tenants in
the land that are to be
affected

B . Initial Consultations with Potentially Affected Persons/Households Carried Out So


Far
B-1. Stakeholder Consultatation Meetings at Township Level
As part of the ESIA procedure, two rounds of public consultation sessions took place in the four affected
Townships(Twante, Dala, Seikkyi - Kanaungto and Kyimyindaing) as part of the ESIA procedure -first round
at the scopingstageand the second during the ESIA investigation stage.The estimated nature and scale
of the land acquisition and involuntary resettlement was presented to the participants at these sessions:

Table 4-25: Overview of Public Consultation Meetings


Session Township Date & Time Participants Contents
(Venue: respective Township
halls)
Twante 20 Sept. ‘18 85 persons
 Project overview
Dala 21 Sept. ‘18 72 persons  Briefing on EIA
1st
Seikkyi-Kanaungto 21 Sept. ‘18 63 persons  Key expected impacts
 Q& A
Kyimyingdaing 15 Nov. ‘18 24 persons
Twante 28 Jan. ‘19 178 persons
 Project plan
Dala 28 Jan. ‘19 119 persons
 Key expected impacts from draft EIA
2nd
Seikkyi-Kanaungto 26 Jan. ‘19 139 persons results/findings
 Q& A
Kyimyingdaing 29 Jan. ‘19 42 persons

The PCMs disclosed relevant information on the project plan, EIA procedure, schedule, and its interim findings
including the approximate scope of the land acquisition (with assumption of the ROW demarcating at the FS stage)
and results to the potentially affected households and the communities. The presentations invited questions and
concerning voices from the public around the topics summarized as below:

Questions & Concerns raised from the 1st PCM


▪ Land compensation for affected person;
▪ Potential impacts to agriculture sector affected by the salt water from Yangon and Tow Rivers;
▪ Concerns about salt water level which can damage to the river bank;
▪ Request to guarantee of the construction quality control and maintenance of the project;

72
▪ Request for plantation of mangrove at the bank of the canal area;
▪ Request to government to control under the Rules and Regulations of using boats in Canal;
▪ Suggest making sure for the accurate ESIA survey
▪ The other side of Kyimyindaing is still weak development and there have land related issue.
So, be careful when the project implementation. We are welcome the project, we would like to
help and cooperate as much as we can.

Questions & Concerns raised from the 2nd PCM


▪ Land compensation for affected persons;
▪ To relocate the houses even before the project starts;
▪ Concerns about discharge sewage into the creek directly;
▪ Request to announce the project information in DWIR Facebook page;
▪ Request for repairing the houses in rainy season before the project implementation;
▪ Request to DWIR for using and repairing the village roads;
▪ Suggest they want to promote their livelihood;
▪ To grow the mangrove trees along the Twente Canal;
▪ They relocate to other place if arrangement is near the old places;
▪ The other side of Kyimyindaing is quite poor and there have health, education and bank erosion
issues. Thus, it is needed to consider about their opportunities and embankment. As
summarized, they welcomed the project and are willing to help and cooperate as much as they
can.

A-2. Focused Group Discussions (FGDs)


FGD is a information disclosure, communication and consultation tool targeting a particular group of
affected communities and individual who has collectively distinctive interests or types of the projects
due to their occupation/geological locations and other socio-cultural and economic attributes. In the
case of this project, a shipyard community in Kanagungto constitutes a particular and distinctive
interests as their day-to-day shipyard operation may be affected due to the project implementation.
While the DWIR decided not to disturb their business interest by delineating a ROW without disturbing
the boundaries of the facilities, it was reported that there are felt concerns from the Kanaungto
Community related to the project.

Another FGD targeting the Dala farmers and resident representative has been decided to be carried out
during this mission, with the recommendation by the DWIR/PMU.

Two rounds of FGDs with the shipyard operators' community in Seikyi Kanaugto Township and
affected farmers in Dala Township (24 Dec 2018).

A series of focus group meetings had been accomplished as described in Table below:

Table 4-26: Focus Group Discussion in the Study Area


Dates
Participants Background /Objectives
/Venue Key Findings
24th December▪ -Shipyard [Operation Status]
Association (19 [Background]
2018/ Taung Thu
people)

73

Gyi Restaurant, Most residents are considered • 40 registered shipyard

SeikkyiKhanaungto -DWIR-PMU: to be involved in shipyard- business entities in
Township 2 Personnel related business (including
incl. Mr. operation (32 private & 8
operation and management). MPA-owned enterprises)
Maung Maung
Thus, this community has
Lwin _ • Oldest with more than 60
Assistant particular interests, i.e.
years' operation
Director operation of shipyard
▪ business. The affected groups • Paying taxes ("fees") to
▪ -ESIA include both the management the government (before
consultants and the workers (and their the current
respective families) administration) but the
business license has not
[Objectives/Program] been officially issued.
1) Info gathering (Socio- • Profit has been declined
economic profiling & business
since 2013/2014.
activity status)
2) Checking their engagement • Minimum 10 workers
status (on the project per operation
implementation esp. on (12,000~15,000kyat
determining the ROW)
daily wage on average)
3) Identification of their
concerns about + expectation • Sedimentation problem
from the project is hampering the
4) Group discussions on the shipyard operation:
raised concerns and (ideally) companies are financing
finding agreed solutions
their regular dredging
(collectively)
activities by themselves
for 30,000 kyat for one
time dredging)
• Both wet dock (not
available for full tide)
and dry dock in
operation

[Opinions &Requests]
• Timely project progress
information disclosure
(with concrete project
location) is required
• Concerns about
potential disruption of
the operation and loss of
income and economic
activities, resultant
layoff of the workers
• Design consideration
and ROW demarcation
is required to minimize
the disruption
• Compensation needs to
include the taxes and the

74
future loss of incomes
during construction
• Relocation of the
shipyard is "simply not
possible" due to the lack
of the available area
• GRM to be established
[Findings]
• Majority of the affected
land are private rain-fed
rice paddies (not CN
land), partially irrigated
from the canal water
(daily 8-hour pumping
to 8 acre paddy through
double-pipe from the
canal)
[Background] • Portable water drawn
Project activities will be from the village pond.
highly likely to have No water shortage so far
significant impacts on the & 50 % of the
lives of farmers along the households in the
river: their farmlands could village has artesian
- Farmers (19 be subject to land acquisition wells within their
people) and they might have to be residential area
relocated and resettled in
▪ -DWIR-PMU: other places. [Opinions & Requests]
24th December 2 Personnel
incl. Mr. • Partial (less than 50%)
2018/ Hpayar Gyi [Objective/Program]
Maung Maung of the land to be
Village, Twente 1) Info gathering (Socio-
Lwin _ acquired and the
Township economic profiling & business
Assistant residual lots the farmers
activity status)
Director 2) Checking their engagement wish to continue to

status (on the project farm: Income loss due
-ESIA implementation esp. on to partial land
consultants determining the ROW) acquisition is concerned.
3) Identification of their
concerns about + expectation • Timely relocation
from the project assistance and
4) Group discussions on the compensation: Cash
raised concerns and (ideally) compensation for agri
finding agreed solutions
land and land-for-land
(collectively)
for the residence is
preferred. (Land-for-
land for agri land is "not
feasible in this area due
to the unavailability of
land)
• Relocation is preferred
during dry seasons.
• Potential disruption of
the agricultural

75
irrigation needs to be
managed by the
Contractor (e.g.
identifying and
providing alternative
flow and irrigation
channel in advance of
the construction)

Figure 4-11: Focus Group Discussion with Shipyard Association in SeikkyiKhanaungto


Township

Figure 4-12: Focus Group Discussion with Affected Farmers in Twente Township

Recommendations based on the major stakeholders for the RAP establishment are summarised as
follows:
• Provide options for land-for-land/cash compensation/relocation assistance options for the
PAPs/PAFs subject to land compensation

• Provide alternative irrigation options through designing especially for the affected farmers along
the canal.
• Public consultation activities should be conducted throughout all the stages of the project.

76
The establishment and operation of GRM (Grievance Redress Mechanism) is highly recommended as
a vital consultation activity.

Monitoring by the project proponent (DWIR) and external agents should include both regular and ad-
hoc consultations and discussions with diverse stakeholders of the project, especially project-affected
people, in order to supervise environmental and social performance and to manage unexpected impacts.

Installation of comment boxes at GAD offices of each township could be a good means of collecting
opinions, concerns, and feedback from local communities, with timely delivery to the project proponent
(DWIR), the local government (YRG), and the Contractor for construction.

Public consultation during the project is to be carried out and improved in accordance with RAP, which
will be established in more detail after the detailed design.

B-3. Information Disclosure Activities so far


The Project Proponent (DWIR) posted posters at the major public locations in the affected Townships
(including Twente, Dala, Seikkyi Kanaungto and Kyimyindaing also publicized on the overview of the
project and invitation to the PCM in major local newspapers including New Light of Myanmar
(Myanmar Ah Lin), the Mirror (Kyaymon) and Daily Eleven (See Figure 8.4-6) between 20~21
September 2018 (during ESIA scoping stage) and in the National and Private Newspaper such as New
Light of Myanmar (Myanma Ah Lin), the Mirror (Kyaymon) and public disclosure plan in each
township office on 22nd January 2019 (during ESIA investigation stage).

C. Suggeted Furure Information Disclosure and Consultation Activities


International safeguard standards recommend that key information on the land acquisition,
compensation and resettlement need to be communicated earliery in the decisio-making proess in ways
that are meaningful and accessible through the project cycle. Thus the updates of the RAP, with reivsed
and updated impact scales, and accordingly adjusted resettlement action plans need to be disclosed to
and major decisions regarding the relocation and resettlement packages (including the compensation
and other assistance packages) need to be made thourgh timely and sufficient consultation process with all
the key stakeholders including the PAPs/PAFs in a timely manner. Following is the suggetsed action
plan for furture information disclosure and consultation activities for the proposed project:

Project Stage Information Disclsoure & Consultation Activities Agent


Detailed Engineering • At least one time public consultation workshop PEA (DWIR-PMU)
Design (DED) shall be carried out during the detailed with the support of the

77
engineering designing stage. All the potential DED Consutlant
PAPs/PAFs, representatives of the affected
communities (four affected Townships) and
relevant local government agencies shall be
invited, informed and consulted through the
sessions.
Appoval of DED • Approved design witll be shared with the PEA (DWIR-PMU)
PAP/PAFs, affected communities and the with the support of the
relevant agencies. DED Consutlant

Detailed • Plan for DMS and RCS will be publicly PEA (DWIR-PMU)
Measurement Study announced by Relevant ward authorities. The with the support of the
(DMS) & plan need to be clearly informed to the DED Consutlant and
Replacement Cost PAPs/PAFs in particular with the specific dates RCS Team
Study(RCS) and the concrete schedules.
Updating RAP • All the identified PAPs/PAFs and relevant PEA (DWIR-PMU)
(Prior to /during agencies need to be consulted during updating with the support of the
construction) the RAP following the approved DED. The RAP Consultant
opinions, suggestions and concerns of the
PAPs/PAFs and the representatives of the
affected communities will be incorporated in the
updated RAP.

• Outline of the updated RAP include (In


accoranec with the EDCF Safeguard Policy10):
Executive Summary/ Project Description/Scope
of Land Acquisition and Resettlement/ Socio-
economic Survey of the PAPs/PAFs/
Information Disclosure, Consultatation and
Participation/ Grievance Redress Mechanisms/
Legal Framework/ Entitlements, Assitancec and
Benefits/ Income Restoration/ Budget and
Financing Plan/ Implementation Schedule/
Monitoring and Reporting

• The updated RAP need to include the future


information disclosure/consultation plan and
RAP updating plan, if applicable.

• PEA(DWIR-PMU) will upload the final design


on its organizational or project website in a
timely manner.

10
For details of the outlines and content of the RAP, see [Appendix 5] Outline of Resettlement
Plan of the EDCF Safeguard Policy
(https://www.edcfkorea.go.kr/site/homepage/menu/viewMenu?menuid=005001006003)

78
D. Grievance Redress Mechanism (GRM)
Part II of the Land Acquisition Act of Myanmar (1894) stipulates the affected persons' rights to object
for the proposed acquisition for the public purpose project initiated by the government of the Myanmar:
According to the Section 5 (A): Any person interested in any land which has been notified under section
4 as being needed or likely to be needed for a public purpose or for a company may object to the land
acquisition within 30 days of notification, object to the acquisition of any land in the locality, as the
case may be.

Objections need to be made to the Collector in writing. The Collector gives the objector an opportunity
of being heard either in person then after making inquiries will submit the case for the decision of the
Governor, who assigned the Collector, The decision of the Governor on the objections is final. In
addition, anybody who raises objections on the matter of land acquisition and compensation could
request the Collector to refer the case to the Court.

The EDCF Safeguard Policy also recommends the EDCF-financed project shall include the local
grievance redress mechanism for ESIA and the grievance redress mechanism for the Resettlement
Action Plan (RAP).

According to the EDCF Safeguard Policy, the GRM needs to be established based on the following
principles:

- Systematic and appropriate scale to the anticipated risk of the project: Due to the
potentially significant social impacts of the project, it is highly important to establish a fully
developed GRM Mechanism in a timely manner.

- Gender consideration: It is desirable that the focal point of the GRM also include a designated
person in charge to deal with the grievances related to women.

- GRM operation in a culturally acceptable way of the recipient country: Most GRM process
are related with land acquisition and compensation plan about the loss of assets and lands. Thus,
the government body such as GAD office or the project related government department will
stand as the administrator.

- Application of project-specific procedures & presentation of all content of complaints required

For the proposed project, in case of any objection to the compensation offered by the PEA(DWIR)
through the administration of the YRG, the concerned PAP can file PAPs file a complaint to the general
administration of the YRG within 30 days after the notification. Then YRG(GAD) will undertake the
review and carry out mediation. If the grievances cannot be resolved, relevant committees
(investigation, compensation, or relocation committees) established internally in the YRG will examine
and decide to accept or reject them, to propose solutions. If agreement cannot be reached despite this, a

79
court will decide the legitimacy of the grievances. For the work period of each process, relevant
institution or person is responsible for confirming the period of processing works and inform it all the
relevant. The grievance redress mechanism is presented in the diagram below.

For the grievances related to the resettlement and other types of complaints related to the project
implementation, it is recommended that the PAP makes avail of the local grievance redress mechanism
(GRM) institutionalized by the PEA(DRIW-PMO). For more details, see the ESIA Report Chapter 9
on Grievance Redress Mechanism.

80
PAPs YRG + DWIR Court

Disagreement on YRG (GAD): Examine the


File a
the compensation grievance Mediate and explain
Grievance

Agree Disagree
Land Compensation and
Resettlement Negotiations
File a Committees
Prepare alternatives Grievance Review the grievance

Present Examine alternatives

alternative
s
DWIR
Review the grievance
Examine alternatives
Review and determine the
content of redressal

Agree Disagree refile a DWIR Litigation Examine the grievance,


Grievance Prepare profile for the judge the legitimacy of
court case for complaints
appropriate grievance
redressal

Court decision

Begin preparation DWIR


for resettlement Start the compensation
In case that DWIR’s procedures
In case that PAP’s
petition is approved petition is approved

Conceptual Model of Grievance Procedure

81 | P a g e
4.9 Monitoring, reporting and Evaluation

The monitoring and evaluation shall be carried out during and after relocation or resettlement activities by
DWIR and YRG.

The effects of a RAP are tracked against the baseline conditions of the population before resettlement. This
baseline is established through the census, assets inventories, land-use assessments, and socioeconomic
studies of the population and the area affected by the Project.

Monitoring and Evaluation (M&E), including reporting, will be regularly carried out as a major element of
the management of the RAP implementation throughout the period of RAP implementation. The RAP
implementation has to be efficiently managed to ensure that:

(i) the RAP implementation will be completed as scheduled and within the budget;

(ii) the outputs and outcomes will meet the quality specifications; and

(iii) the effects will meet the expectations of the RAPs. The M&E task will provide feedback information
to enable the management to determine:

1. Whether the resettlement activities that are on the critical paths of the Project will cause any delay to
the Project implementation schedule.

2. Whether the mitigation measures are effective and adequate.

3. Whether the PAPs are further affected and placed under severe hardship.

4. Whether the management is alerted to the delays and problems and takes effective corrective actions.

The Project will establish systems for internal and external M&E to support the management of RAP
implementation. The monitoring mechanism would include both international and external monitoring
activities:

A. Internal Monitoring

Internal monitoring will be done by DWIR and YRG, if possible, PAHs or PAH representatives shall also
beincluded.

The specific objectives of the internal monitoring are to:

1. Verify that the baseline information of all Project Affected People (PAPs) have been carried out and
that the valuation of assets lost or damaged, and the provision of compensation, has been carried out in
accordance with the approved Resettlement Action Plan;

82 | P a g e
2. Oversee that the RAP is implemented as designed and approved; and

3. Verify that funds for implementation of the RAP are provided by the DWIR and YRG in a timely
manner and in amounts sufficient for their purposes, and such funds are used in accordance with the
provisions of the RAP.

The main indicators to be monitored regularly are:

1. The entitlements of PAPs are in accordance with the entitlement matrix mentioned in and that the
assessment of compensation is carried out in line with agreed procedures;

2. Payment of compensation to the affected people in the various categories according to the level of
compensation described in the RAP;

3. Public information and public consultation and grievance procedures as described in the RAP;

4. Consultation and participation of PAPs in designing and implementing livelihood support program.

B. External Monitoring

External monitoring shall be carried out by NGOs or independent groups.

External monitoring should be periodically carried out by an independent monitoring agency to provide an
independent view on the achievement of the RAP. The external monitoring will focus on the outcomes and
results of compensation and livelihood support such as the changes in living standards and livelihoods of
the PAPs, the effectiveness, impact and sustainability of entitlements, the need for further mitigation
measures if any, and to learn strategic lessons for future policy formulation and planning.

The external monitoring can adopt some of the following indicators:

5. Full payment to be made to all affected persons sufficiently before land acquisition.

6. Completion of land acquisition before the construction starts.

7. Public consultation and awareness of compensation policy: (a) All PAPs should be fully informed and
consulted about land acquisition and compensation, and livelihood support; (b) Ongoing of public
consultation meeting each month regarding problem, issue or grievance related to the compensation and
livelihood support.

8. The operation of the mechanisms for grievance redress, and the speed of grievance redress will be
monitored.

9. The level of satisfaction of PAPs with various aspects of the livelihood support program will be

83 | P a g e
monitored and recorded.

10. Throughout the implementation process, the trends of living standards will be observed and surveyed.
Any potential problems in the restoration of living standards will be reported, and recommendation for
further adjustment of the plan and approach should be made if necessary.

The following activities are the standard functions of the external monitors:

1. Verification of internal monitoring reports, by field check of the following:

• payment of compensation including its levels and timing

• livelihood restoration

• satisfaction of PAPs towards the RAP implementation

2. Interview random samples of PAPs to assess their knowledge and concerns regarding the compensation
process, their entitlements and rehabilitation measures.

3. Check the type of grievance issues and the functioning of grievance redress mechanisms by reviewing
processing of appeals at all levels and interviewing aggrieved PAPs.

4. Survey the standards of living of PAPs to assess whether they have been improved or maintained.

5. Advise Project management regarding possible improvements in the implementation of the RAP.

6. Regular external monitoring should begin along with implementation activities and carry on until the
end of the RAP and Project phasing out.

In addition, based on the agreement between the PEA and the Export-Import Bank of Korea, PEA will
report the RAP performances to the Bank on a regular basis, or upon request.
Following are the suggested monitoring framework for the land acquisition, compensation and
resettlement:
Impact Performance Responsible Reporting to Frequency EDCF
Indicators Entities Safeguard
Policy
Pre-Construction

Land Develop Team/Focal DWIR-PMU & Upon the DWIR submit


acquisition Resettlement point in Land completion of the the final RAP
and Policy, Framework charge of land Compensation policy, framework to KEXIM
involuntary & Resettlement Acquisition, and and the RAP
resettlement Action Plan (RAP) Compensation Resettlement
(for land and
Negotiations In case of update of
clearing, Resettlement
Committees each, within 15 days
equipment of DWIR-
(LCRNC) after the completion
mobilization PMU

84 | P a g e
Impact Performance Responsible Reporting to Frequency EDCF
Indicators Entities Safeguard
Policy

and access of the updates


road Land acquisition, Team/Focal DWIR-PMU & Quarterly DWIR submit
development compensation and point in Land the
(if resettlement charge of land Compensation performances
applicable) progress report Acquisition, and on info
Compensation Resettlement disclosure,
and consultation
Negotiations
Resettlement and GRM (as
of DWIR-
Committees part of
PMU (LCRNC) environmental
and social
monitoring
report) to
KEXIM on a
regular
basis (as
agreed
between
DWIR and
KEXIM:
either
annually or
biweekly)
Info Include info Team/Focal DWIR-PMU & With 15 days after DWIR submit
disclosure, disclosure, point in Land carrying out the the
consultation consultation and charge of info Compensation consultation session performances
& GRM GRM Plan as part disclosure, and with the on info
of the Resettlement consultation Resettlement stakeholders disclosure,
Action Plan (RAP), and GRM of Negotiations including consultation
Submit DWIR-PMU. Committees PAPs/PAFs and GRM (as
implementation (LCRNC) including affected part of
progress (incl. In case for the communities environmental
GRM grievance PAPs/PAFs' [For and social
case management) objection to compensation Within xx (TBC) monitoring
as part of the proposed objection case] days after receiving report) to
Environmental and compensation from the the KEXIM on a
social Monitoring amount, Collector to the objection/grievances regular basis
Report objection Senior Officer (as agreed
Operationalize received in authorized by between
GRM logbook due course as the President of DWIR and
stipulated in Myanmar KEXIM:
the LAA either
(1894) shall [For farmland annually or
be referred to acquisition bi-annually)
the Collector related dispute]
and the Senior case referred to
Officer Track/Ward ->
authorized by Township ->

85 | P a g e
Impact Performance Responsible Reporting to Frequency EDCF
Indicators Entities Safeguard
Policy

the President District ->


of the Union State
of Myanmar, management
shall refer the body
case to the
Collect to
further
examine the
case. If
deemed
necessary, the
case is
referred to the
court.
For farmland
Track/Ward-
Township-
District-State
level
management
body to
receive any
related
grievances,
adjudicate
and in case
the solution is
not sought for
an d settled,
refer the case
to the
immediate
upper level of
body. level
GRM focal
point liaising
with the
DWIR-PMU
Construction (after issuance of ECC)
Land acquisition, Team/Focal DWIR-PMU & Quarterly DWIR submit
Land compensation and point in Land the
acquisition resettlement charge of land Compensation performances
(Ongoing). progress report Acquisition, and (as part of
Compensation Compensation Resettlement environmental
& and and social
Negotiations
Resettlement Resettlement monitoring
of DWIR-
Committees report) to
(LCRNC)

86 | P a g e
Impact Performance Responsible Reporting to Frequency EDCF
Indicators Entities Safeguard
Policy

PMU KEXIM on a
regular basis
(as agreed
between
DWIR and
Team/Focal DWIR-PMU & KEXIM:
Income and point in Land either
livelihood Livelihood and charge of Compensation annually or
restoration other assistance livelihood & and bi-annually)
Quarterly
and other program progress other Resettlement
assistance report assistance Negotiations
program program of Committees
DWIR-PMU (LCRNC)
Info Submit Team/Focal DWIR-PMU & With 15 days after DWIR submit
disclosure, implementation point in Land carrying out the the
consultation progress (incl. charge of info Compensation consultation session performances
& GRM GRM grievance disclosure, and with the on info
case management) consultation Resettlement stakeholders disclosure,
as part of and GRM of Negotiations including consultation
Environmental and DWIR-PMU. Committees PAPs/PAFs and GRM (as
social Monitoring (LCRNC) including affected part of
Report In case for the communities environmental
Operationalize PAPs/PAFs' [For and social
GRM logbook objection to compensation Within xx (TBC) monitoring
the proposed objection case] days after receiving report) to
compensation from the the KEXIM on a
amount, Collector to the objection/grievances regular basis
objection Senior Officer (as agreed
received in authorized by between
due course as the President of DWIR and
stipulated in Myanmar KEXIM:
the LAA either
(1894) shall [For farmland annually or
be referred to acquisition bi-annually)
the Collector related dispute]
and the Senior case referred to
Officer Track/Ward ->
authorized by Township ->
the President District ->
of the Union State
of Myanmar, management
shall refer the body
case to the
Collect to
further
examine the
case. If

87 | P a g e
Impact Performance Responsible Reporting to Frequency EDCF
Indicators Entities Safeguard
Policy

deemed
necessary, the
case is
referred to the
court.
For farmland
Track/Ward-
Township-
District-State
level
management
body to
receive any
related
grievances,
adjudicate
and in case
the solution is
not sought for
an d settled,
refer the case
to the
immediate
upper level of
body. level
GRM focal
point liaising
with the
DWIR-PMU
Operation

Info OperationalizeGRM Team/Focal DWIR-PMU & Within xx (TBC) DWIR submit


disclosure, logbook point in Land days after receiving ad hoc GRM
consultation charge of info Compensation the report to
& GRM disclosure, and objection/grievances KEXIM
consultation Resettlement should there
and GRM of Negotiations be any
DWIR-PMU. Committees unexpected
(LCRNC) GRM case of
significance
occur.

4.10 Institutional Arrangements


A. General Project Management
The Ministry of Planning and Finance (MOPF) is the official representative of the government as the
borrower and recipient of funds. It is the responsibility of this Ministry to (i) fulfil government fiduciary
and financial management oversight; (ii) to provide sufficient counterpart contribution for project activities

88 | P a g e
in a timely manner; and (iii) ensure delays are not encountered in project procurement. Funds flow will be
the responsibility of MOPF and will work closely with the executing agency.

DWIR will be the project executing agency and will be responsible for overall project management,
coordination and reporting. DWIR has established a PMU. The PMU will have the responsibility for the
day to day management, coordination and supervision of the project, as well as consultant recruitment,
financing and fund flow and the oversight of safeguard issues and measures and implementation of the
RAP.

The national level coordination will also be assisted by a project steering committee which will be co-
chaired by a representative of the DWIR and one representative from the MOPF and relevant ministries
and organizations(TBC). The steering committee may invite persons and agencies to discuss specific
agenda items, when required. The committee shall determine the quorum for effective decision-making.

B. RAP Institutional and Implementation Arrangement


The government institutions are involved in land acquisition, including Ministry of Agriculture, Livestock
and Irrigation (MOALI), State Land Records Department (SLRD), Farmland Management Bodies (FMB),
Ministry of Natural Resources and Environmental Conservation (MONREC), Central Committee for the
Management of Vacant, Fallow and Virgin Lands (CCVFV) and Department of Human Settlement and
Housing Development (DHSHD), City Development Committees and important institution is General
Administration Department (GAD). DWIR is project owner and responsible for coordination among
institutions and collaboration with relevant institutions not only government but also civil societal
organizations.

DWIR has established PMU for the proposed project. The PMU will assume day-to-day management of
the project and will be responsible for coordinating and implementing project activities, including
procurement, recruitment, disbursement, contract administration, monitoring and reporting and
implementation of the RAP. The PMU will be headed by a project manager and will comprise full-time
core staff.

For RAP preparation and implementation, the PMU will procure the services of qualified social
specialists, internally or externally as appropriate, who will be responsible for RAP preparation and guiding
and monitoring RAP implementation, as well as a land valuer.

89 | P a g e
Based in the PMU, the social specialist will work with the land valuer, and relevant district, township and
community officials to implement training and capacity building related to the land acquisition approach
and other requirements of this Framework RAP and RAP. The social specialist will carry out their roles
and responsiblities in accordance with both the laws and regulatory requirements of Myanmar and the
EDCF Safeguard Policy. As required, the social specialists shall provide orientation to the land valuer and
implementing ageng staff (including contractors (and sub-contractor, as approrpirate)) to ensure they
understand the basis of market value and the replacement cost survey (RCS) and requirements for
negotiated settlement in undertaking the DMS,RCS and the socio-economic survye needed in preparing
RAP. The land valuer will help document consultations and negotiations and provide any related
information for the resettlement database.
As of July 2019, the Land Compensation and Resettlement Negotiations Committees (LCRNC) has been
established at eacd of the four affected Townships with the following member composition.

Regarding projects involved with involuntary resettlement and land acquisition in Myanmar, a proponent
(DWIR) of project will prepare Resettlement Action Plan (RAP) cooperated with relevant regional
government and implement activities related with resettlement and land acquisition.

About preparation of RAP for the Twente (Twantay) Canal Improvement project, the ad-hoc committees
such as Land Compensation and Resettlement Negotiations Committee(LCRNC), Relocation
Committee and sub-committees are to be established under primary committee called Steering Committee
for negotiation with project affected persons (PAPs) and preparation of supporting materials for the
negotiation.

Land Compensation and Resettlement Negotiations Committee (LCRNC) was formed in September 2018
with each of the four Township-level subcommittee. LCRNC mainly takes a role of determination of a
scope of compensation and determination of compensation entitlement. Compensation Committee (a sub-
committee within LCRNC) studies unit price of affected crops and lands through confirmation of a market
price and decide total amount of compensation cost, as well as analysis of assistance for living restructure.
LCRNC also takes the responsibilities for in charge of assurance of land for land-to-land compensation,
implementation of re-construction for affected structures, and demolish of affected structures after
relocation.

90 | P a g e
Actual finalization, implementation of grievance management and monitoring will be done by DWIR and
YRG. Overview of roles Land Compensation and Resettlement Negotiations Committee and other relevant
agencies are shown on Table 4-24- 4-29 below:
Table 4-24: Overview of Roles for Land Compensation and Resettlement Negotiations By
Relevant Agency (TBC)
Responsibl
e
Task Team Members Roles
Organizati
on
LCRNC
Negotiations Tasks Chairperson: Minister of • Supervise implementation status of YRG
Team Electricity, Industry, RAP in collaboration with DWIR
Transport and • Ensure that laws and standards to
Communication comply with are facilitated
Secretary: Division • Prepare information materials to
Officer, DWIR disclose regarding projects and RAP
• Review and approve investigation
Members: 13 persons reports regarding the scope of compensation
(from YRG/YCDC/ • Review and approve compensation
MOTC/MPA) agreement
Sub-committees per • Review and approve compensation
payment reports and requests.
Township (in Dala,
• Supervise investigation activities of
Twente,
grievance redress system
SeikkyiKanaungto and
• Consult and coordinate with
Kyimingdaing): 38 stakeholders regarding cases required to advance
persons (from YRG/ projects
Township GAD • Supervise grievance redress and
Departments/Farmland monitoring after completion of compensation-
and Saved Land related activities
Investigation Verification Committee/ • Grasp the scope of impact YRG
Tasks Team Yangon Township • Grasp land prices of affected lands by
Electricity Supply obtaining the land certificates
Cooperation etc.) • Set up the unit price of compensation
through investigating the market values of
affected lands and structures
• Prepare investigation reports regarding
the scope of compensation
• Request signatures from concerned
parties on investigation reports

91 | P a g e
Compensation • Examine and determine the prices of YRG
Tasks Team affected lands and structures
• Examine the content of compensation
in RAP
• Examine and propose the content of
assistance other than land and structure for
resolution of difficulties
• Receive complaints
(dissatisfaction/disagreement) regarding
compensation amount from PAPs
• Request approval from Steering
Committee regarding the examined content of
compensation
• Notify PAPs of affected assets
• Organize resident briefings
• Negotiate the content of compensation
with PAPs
• Draft compensation agreement
• Request signatures on compensation
agreement from entitled persons
• Examine compensation payment
reports
• Examine grievance claims, decide
acceptance or rejection
Relocation Tasks • In case of compensation by YRG
Team replacement land, select replacement land and
negotiate with PAPs
• Undertake the procedure to transfer the
title of replacement land
• In case of reconstruction of affected
structure, determine the details of reconstruction,
negotiate with PAPs
• Carry out reconstruction of affected
structure
• Undertake the procedures to transfer
the title of reconstructed structure
• Remove residual structure after
relocation
District Law Office
Officers : 1 • Prepare legal document and undertake YRG
the procedures required for compensation
• Provide feedback to related committees
about required procedures
Ministry of Planning and Finance
Officers : 2 • Prepare compensation payment reports, YRG
submit compensation payment requests to DCA.
• Prepare for compensation payment,
prepare proof of payment after payment is
complete
• Receive checks from DCA for the
amount based on payment requests
• Deliver the checks to entitled persons,
receive receipts
Department of Water Resources and Improvement of River Systems (DWIR)

92 | P a g e
DWIR Officer: U Sein Lwin • Within the department, investigate DWIR
considerations given by related committees,
reflect the result on RAP.
• Prepare a final RAP
• In case of compensation by
replacement land, work with related committees
to select replacement land, confirm the finalized
replacement land
• In case of reconstruction of affected
structure, confirm the details and status of
reconstruction
• Attend the negotiation for the content
of compensation with PAPs
• Examine grievance claims, determine
acceptance or rejection, prepare profiles in case
of taking legal actions
• Examine and authorize compensation
payment reports and requests received from
Steering Committee
• Issue checks for compensation
• Deliver checks for compensation to
Ministry of Planning and Finance

The composition of the members of the LARNC and its subcommittees at Township level are as follows:

Table 4-25: Land Compensation and Resettlement Negotiations Committees, Yangon Region:
Member Composition
No. Name Institution Position
1 Daw Nilar Kyaw Minister of Electricity, Industry, Transport and Communication Chairman
Head of Department, City Planning and Land Management
2 U Thitsar Member
Department, Yangon City Development Committee
Chief Executive Officer, Yangon Township Electricity Supply
3 U Thant Zin Member
Corporation,
U Kyi Tin
4 Director, Yangon Regional Development Committee Member
U Zaw Moe Regional Officer, Agricultural Land Management and Statistic
5 Member
Aung Department,
6 U Kyaw Kyaw Regional Officer, Agricultural Department Yangon Region Member
Daw Soe Sint
7 Director, Planning Department Yangon Region Member
Win
U Nay Win District Administrator, Yangon (South) District General Member
8
Aung Administrative Department,
9 U Bo Soe Yangon Region, In Charge, Myanma Port Authority Member
U Maung Maung Assistant Director, Directorate of Water Resources and Improvement
10 Member
Lwin of River Systems, Yangon Region
U Htay Lwin Assistant Director, Directorate of Water Resources and Improvement
11 Member
of River Systems, Yangon Region
U Aung Kyaw Division Officer, Directorate of Water Resources and Improvement of Secretary
12
Mu River Systems, Yangon Region
U Kyaw Soe Deputy Director, Directorate of Water Resources and Improvement of Joint
13
River Systems, Yangon Region Secretary

93 | P a g e
Table 4-26: Land Compensation and Resettlement Negotiations Sub-committee, Twente Township
No. Name Institution Position
Deputy Director, Directorate of Water Resources and
1 U Kyaw Soe Team Leader
Improvement of River Systems, Yangon Region

Assistant Director, Agricultural Land Management and Deputy-Team


2 U Myint Kyaing
Statistic Department, Yangon (South) District Leader
Township Administrator, General Administrative
3 U Moe Khine Tun Member
Department, Twantay Township
Farmland and others Lands, Saved and Verification
4 Member
Committee Members, Twantay Township

Township Administrator, Township Development


5 U Thein Htoo Member
Committee, Twantay Township

Township Manager, Electricity Supply Corporation,


6 U Nyein Chan Zaw Member
Twantay Township
Township Manager, Agricultural Department Twantay
7 U Khin Maung Oo Member
Township
Township Officer, Irrigation Department, Twantay
8 U Than Maung Member
Township
Township Officer, Agricultural Land Management and
9 U Phyo Wai Kyaw Secretary
Statistic Department Twantay Township

Staff Officer, Directorate of Water Resources and


10 U Thein Zaw Joint Secretary
Improvement of River Systems

Table 4-27: Land Compensation and Resettlement Negotiations Sub-committee, Dala Township
No. Name Institution Position
Deputy Director, Directorate of Water Resources and
1 U Kyaw Soe Team Leader
Improvement of River Systems, Yangon Region
Assistant Director, Agricultural Land Management and Deputy-Team
2 U Myint Kyaing
Statistic Department, Yangon (South) District Leader
Township Administrator, General Administrative
3 U Yin Htwe Member
Department, Dala Township
Farmland and Others Lands, Saved and Verification
4 Member
Committee Members, Dala Township
Township Officer, Township Development Committee,
5 U Khin Maung Kywe Member
Dala Township
Township Manager, Twonship Electricity Supply
6 U Mya Shwe Member
Corporation, Dala Township
Township Manager, Agricultural Department, Dala
7 U Myo Thu Member
Township
Township Officer, Irrigation and Water Management Member
8 U Yan Moe Oo
Department, Dala Township
Township Officer, Agricultural Land Management and Secretary
9 U Myo Min Khaing
Statistic Department, Dala Township

94 | P a g e
Assistant Director, Directorate of Water Resources and
10 U Htay Lwin Joint Secretary
Improvement of River Systems, Yangon Region

Table 4-28: Land Compensation and Resettlement Negotiations Sub-committee, Seikkyi Kanaungto
Township
No. Name Institution Position
Deputy Director, Directorate of Water Resources and
1 U Kyaw Soe Team Leader
Improvement of River Systems, Yangon Region
Assistant Director, Agricultural Land Management and Deputy-Team
2 U Myint Kyaing
Statistic Department, Yangon (South) District Leader
Township Administrator, General Administrative
3 U Zaw Thein Member
Department, Seikkyi Kanaungto Township
Farm Land and Others Lands, Saved and Verification
4 Committee Members, Seikgyikhanaungto Township Member

Township Officer, Township Development Committee,


5 U Aung Zaw Moe Member
SeikgyiSeikkyi KanaungtoTownship
Township Manager, Township Electricity Supply
6 U Mya Hlaing Member
Corporation, Seikkyi Kanaungto Township
Township Officer, Agricultural Department, Seikkyi
7 U Hla Htay Member
Kanaungto Township
Township Officer, Agricultural Land Management and Secretary
8 U Khin Phay
Statistic Department, Seikkyi Kanaungto Township
Assistant Director, Directorate of Water Resources and
9 U Htay Lwin Joint Secretary
Improvement of River Systems, Yangon Region

Table 4-29: Land Compensation and Resettlement Negotiations Sub-committee, Kyimyindaing


Township
No. Name Institution Position
Deputy Director, Directorate of Water Resources
1 U Kyaw Soe and Improvement of River Systems, Yangon Team Leader
Region
Assistant Director, Agricultural Land
Deputy-Team
2 U Myint Kyaing Management and Statistic Department, Yangon
Leader
(West) District
Township Administrator, General Administrative
3 U Zar Ni Win Member
Department, Kyimyindaing Township
FarmLand and Other Lands, Saved and
4 Verification Committee Members, Kyimyindaing Member
Township
Township Officer, Township Development
5 U Zan Shin Kam Member
Committee, Kyimyindaing Township
Township Manager, Yangon Township Electricity
6 U Aung Thein Member
Supply Corporation, Kyimyindaing Township

95 | P a g e
Township Officer, Agricultural Department,
7 U Hla Htay
Kyimyindaing Township
Township Officer, Agricultural Land Management
8 U Wai Phyo Kyaw and Statistic Department, Kyimyindaing Member
Township
Assistant Director, Directorate of Water Resources
9 U Htay Lwin and Improvement of River Systems, Yangon Member
Region

4.11 Budgets and Financing


The PMU through the social specialist and land valuer will be responsible for formulating the resettlement
and or land acquisition budget based upon information obtained from affected household and field surveys
(DMS, RCS) conducted by the project consultants and implementing agency field staff. The costs of
resettlement for the project will be calculated based on the RCS applied to the confirmed DMS, and the
entitlements set out in the entitlement matrix of RAP (based on the suggested entitlement matrix presented
in this Framework RAP). A contingency of 2% of the total project infrastructure investment costs for access
road and other additional provisionary items will be included in total project cost estimates for land
acquisition compensation to be used as required during implementation of RAP. A total amount for
compensation under the project shall be determined later.

All costs for resettlement, including compensation and allowances, staff training and operational and RAP
administrative costs, monitoring and reporting and income restoration will be financed by the Myanmar
government. MOPF will provide the budget directly to the township DOF who will then coordinate with
the PMU and compensation committee to disburse payments of compensation and allowances to affected
households.

4.12 Implementation Schedules


Concrete RAP implementation schedules will be developed upon the formulation of the RAP once the
DED is complete.

96 | P a g e
Twente Township

Annex 1. (Initial) Inventory of PAFs


1. Twente Township
Type of
Within
Sr Owner Address building/land/ Bilding/ land Area GPS number Latitude Longitude Remarks
ROW (%)
plot
1.5
1 U Thein Tun PyawBweLay Canal Land Acres/5 20% 1022 16.74840 96.10304 Farm/ Paddy 1.67
Acres
Roof-Dhani,Wall-Dhani, Floor-
2 U Tin Thein PyawBweLay Canal Land 10×10 100% 1023 16.74814 96.10199
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
3 U Zayyar Maung PyawBweLay Canal Land 10×10 100% 1024 16.74816 96.10189
Bamboo
Roof-Plastic, Wall_Plastic,Floor-
4 U San Nyein PyawBweLay Canal Land 10×10 100% 1026 16.74820 96.10178
Bamboo
Roof-Zinc, Wall_Bamboo,Floor-
5 Daw May Zin Moe PyawBweLay Canal Land 10×10 100% 1027 16.74815 96.10179
Bamboo
6 Daw Yu Khaing PyawBweLay Canal Land 15×25 100% 1028 16.74815 96.10173 Plot

7 U Kyaw Win Tun PyawBweLay Canal Land Roof-Zinc, Wall_Zinc,Floor-wood 10×15 100% 1029 16.74811 96.10161

8 U Thein Myint PyawBweLay Canal Land Roof-Zinc, Wall-Wood,Floor-Wood 12×12 100% 1030 16.74815 96.10162
Roof-Zinc, Wall-Bamboo,Floor-
9 Daw Shout Kyaung PyawBweLay Canal Land 12×12 100% 1031 16.74810 96.10156
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
10 U Phar Saung Yone PyawBweLay Canal Land 12×12 100% 1032 16.74808 96.10152
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
11 U Win Kyaing PyawBweLay Canal Land 12×12 100% 1033 16.74808 96.10149
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
12 U Than Naing PyawBweLay Canal Land 12×15 100% 1034 16.74811 96.10137
Bamboo
13 U Kan Myint PyawBweLay Canal Land 20×40 100% 1035 16.74811 96.10135 Plot
Roof-Zinc, Wall-Bamboo,Floor-
14 U Than Sein PyawBweLay Canal Land 10×10 100% 1036 16.74805 96.10131
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
15 U Kyi Than PyawBweLay Canal Land 15×15 100% 1037 16.74809 96.10122
Bamboo
Roof-Dhani,Wall-Dhani, Floor-
16 U Thet Aung PyawBweLay Canal Land 10×10 100% 1038 16.74811 96.10113
Bamboo
17 U Myo Myint PyawBweLay Canal Land 20×40 100% 1039 16.74811 96.10103 Plot

1
Twente Township

Roof-Zinc, Wall-Bamboo,Floor-
18 Daw Nyein Tin PyawBweLay Canal Land 10×20 100% 1040 16.74806 96.10098
Bamboo
U Kyaw Gyi / U
19 PyawBweLay Canal Land 10% 1041 16.74802 96.10097 Plot
Shan Gyi
Daw Than Than Roof-Zinc, Wall-Bamboo,Floor-
20 PyawBweLay Canal Land 12×15 100% 1042 16.74812 96.10090
Ngwe Bamboo
21 Saw Soe Moe PyawBweLay Canal Land 20×30 100% 1043 16.74813 96.10081 Plot
Roof-Zinc, Wall_Plastic,Floor-
22 U Kyaw Htwe PyawBweLay Canal Land 12×15 100% 1044 16.74809 96.10078
Bamboo
Roof-Zinc, Wall_Zinc,Floor-
23 U Kyaw Win PyawBweLay Canal Land 10×10 100% 1045 16.74811 96.10075
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
24 U Than Lwin PyawBweLay Canal Land 15×20 100% 1046 16.74811 96.10067
Wood
Roof-Zinc, Wall-Bamboo,Floor-
25 Daw Tin Ngwe PyawBweLay Canal Land 10×10 100% 1047 16.74811 96.10066
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
26 U Chit Ko PyawBweLay Canal Land 10×10 100% 1048 16.74808 96.10062
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
27 U Myo Thet PyawBweLay Canal Land 10×10 100% 1049 16.74810 96.10058
Bamboo
Roof-Zinc, Wall_Plastic,Floor-
28 U Zaw Lin Htut PyawBweLay Canal Land 10×10 100% 1050 16.74809 96.10055
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
29 U Tin Win PyawBweLay Canal Land 12×15 100% 1051 16.74807 96.10050
Bamboo
30 Daw Kyi Ohn PyawBweLay Canal Land Roof-Zinc, Wall_Plastic,Floor-wood 10×10 100% 1052 16.74808 96.10047
Roof-Dhani,Wall-Dhani, Floor-
31 U Myint Thein PyawBweLay Canal Land 10×15 100% 1053 16.74808 96.10042
Bamboo
Roof-Dhani,Wall-Dhani, Floor-
32 Daw Ta Mar PyawBweLay Canal Land 10×10 100% 1054 16.74807 96.10041
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
33 U Han Htay PyawBweLay Canal Land 10×10 100% 1055 16.74807 96.10037
Bamboo
34 U Soe Thiha PyawBweLay Canal Land 10% 1056 16.74799 96.10037 Plot
Roof-Zinc, Wall-Bamboo,Floor-
35 U Thein Shwe Oo PyawBweLay Canal Land 12×15 100% 1057 16.74806 96.10034
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
36 U Tin San PyawBweLay Canal Land 12×15 100% 1058 16.74806 96.10031
Bamboo
Roof-Dhani,Wall-Dhani, Floor-
37 U Hlaing Win PyawBweLay Canal Land 10×10 100% 1059 16.74806 96.10029
Bamboo
Roof-Dhani, Wall_Plastic,Floor-
38 U Cho PyawBweLay Canal Land 10×10 100% 1060 16.74805 96.10023
Bamboo

2
Twente Township

Roof-Zinc, Wall-Dhani,Floor-
39 U Tun Nay Lin PyawBweLay Canal Land 10×10 100% 1061 16.74805 96.10022
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
40 U Zayyar Win PyawBweLay Canal Land 10×10 100% 1062 16.74804 96.10015
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
41 U Tin Lin zaw PyawBweLay Canal Land 10×10 100% 1063 16.74803 96.10012
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
42 U Zaw Min Tun PyawBweLay Canal Land 10×10 100% 1064 16.74804 96.10007
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
43 U Zaw Htike PyawBweLay Canal Land 10×12 100% 1065 16.74803 96.10005
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
44 U Hein Thet Wai PyawBweLay Canal Land 12×15 100% 1066 16.74801 96.10003
Wood
Roof-Dhani,Wall-Dhani, Floor-
45 U Zaw Oo PyawBweLay Canal Land 12×12 100% 1067 16.74802 96.09999
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
46 U Aung Phyo Oo PyawBweLay Canal Land 10×15 100% 1068 16.74802 96.09996
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
47 U Soe Lwin PyawBweLay Canal Land 10×10 100% 1069 16.74802 96.09991
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
48 U Thein Min Soe PyawBweLay Canal Land 10×12 100% 1070 16.74799 96.09990
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
49 U Min Chit Oo PyawBweLay Canal Land 10×12 100% 1071 16.74799 96.09986
Bamboo
U Min Chit Oo/
50 PyawBweLay Canal Land Wall-Plastic,Floor-Wood 4×4 100% 1072 16.74803 96.09986
Coop
U Min Chit Oo/
51 PyawBweLay Canal Land 6×6 100% 1073 16.74807 96.09986
Pigsty
Roof-Zinc, Wall-Bamboo,Floor-
52 U Ye Min PyawBweLay Canal Land 10×12 100% 1074 16.74800 96.09982
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
53 U Thein Kyaw Oo PyawBweLay Canal Land 10×15 100% 1075 16.74799 96.09979
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
54 U Thein Than Soe PyawBweLay Canal Land 10×10 100% 1076 16.74797 96.09976
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
55 U Naing Lin Aung PyawBweLay Canal Land 12×15 100% 1077 16.74796 96.09973
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
56 U Than Aung PyawBweLay Canal Land 10×10 100% 1078 16.74795 96.09970
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
57 U Zin Min Aung PyawBweLay Canal Land 15×15 100% 1079 16.74796 96.09966
Plywood
U Zin Min Roof-Dhani,Wall-Wood, Floor-
58 PyawBweLay Canal Land 10×10 100% 1080 16.74801 96.09963
Aung/Pigsty Wood
59 U Than Oo PyawBweLay Canal Land Roof-Zinc, Wall-Bamboo,Floor- 12×10 100% 1081 16.74796 96.09963

3
Twente Township

Bamboo

Roof-Zinc, Wall-Dhani,Floor-
60 U Than Soe PyawBweLay Canal Land 12×15 100% 1082 16.74794 96.09959
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
61 U Soe Aung PyawBweLay Canal Land 15×12 100% 1083 16.74796 96.09955
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
62 U Aung Lin Tun PyawBweLay Canal Land 10×10 100% 1084 16.74796 96.09953
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
63 U Aung Naing PyawBweLay Canal Land 10×10 100% 1085 16.74795 96.09950
Bamboo
U Chit Ko/Father U Roof-Zinc, Wall-Bamboo,Floor-
64 PyawBweLay Canal Land 10×10 100% 1086 16.74794 96.09944
Than zaw Bamboo
Roof-Dhani, Wall_Bamboo,Floor-
65 U Ngwe Ya PyawBweLay Canal Land 10×10 100% 1087 16.74795 96.09941
Bamboo
Roof-Dhani, Wall_Bamboo,Floor-
66 U Nay Min Htet PyawBweLay Canal Land 10×10 100% 1088 16.74796 96.09938
Bamboo
Roof-Dhani, Wall_Bamboo,Floor-
67 U Aung Thu PyawBweLay Canal Land 10×10 100% 1089 16.74794 96.09934
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
68 U Hla Myint Oo PyawBweLay Canal Land 10×15 100% 1090 16.74795 96.09933
Wood
Roof-Dhani,Wall-Dhani, Floor-
69 U Aung Khant PyawBweLay Canal Land 10×10 100% 1091 16.74794 96.09929
Bamboo
Roof-Plastic, Wall_Plastic,Floor-
70 U Myo Win PyawBweLay Canal Land 10×10 100% 1092 16.74796 96.09923
Bamboo
Roof-Zinc, Wall-Plastic,Floor-
71 U Twal Tar PyawBweLay Canal Land 10×12 100% 1093 16.74794 96.09922
Bamboo
U Kyaw Roof-Zinc, Wall-Plastic,Floor-
72 PyawBweLay Canal Land 4×5 100% 1094 16.74791 96.09918
Zayya/Shop Bamboo
U Kyaw Zayya/ Roof-Zinc, Wall-Dhani,Floor-
73 PyawBweLay Canal Land 10×12 100% 1095 16.74794 96.09915
House Bamboo
Roof-Dhani,Wall-Dhani, Floor-
74 U Zaw Win San PyawBweLay Canal Land 12×15 100% 1096 16.74790 96.09915
Bamboo
Roof-Dhani,Wall-Dhani, Floor-
75 U Soe Thu Aung PyawBweLay Canal Land 10×10 100% 1097 16.74792 96.09910
Bamboo
Roof-Zinc, Wall-Dhani,Floor-
76 U Than Lwin PyawBweLay Canal Land 15×15 100% 1098 16.74792 96.09905
Bamboo
Roof-Dhani, Wall_Bamboo,Floor-
77 U Than Lwin PyawBweLay Canal Land 15×15 100% 1099 16.74791 96.09899
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
78 U Win Aung Kyaw PyawBweLay Canal Land 18×15 100% 1100 16.74793 96.09897
Bamboo
79 U Than Zaw Myint PyawBweLay Canal Land Roof-Zinc, Wall-Wood,Floor-Wood 12×15 100% 1101 16.74789 96.09889

4
Twente Township

Roof-Zinc, Wall-Dhani,Floor-
80 U Nay Lin Aung PyawBweLay Canal Land 12×15 100% 1102 16.74791 96.09883
Bamboo
81 U San Win PyawBweLay Canal Land Roof-Zinc, Wall-Zinc,Floor-Bamboo 12×15 100% 1103 16.74792 96.09876
Roof-Zinc, Wall-Bamboo,Floor-
82 Daw Su Hnin Thu PyawBweLay Canal Land 10×10 100% 1104 16.74789 96.09866
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
83 Daw Lo Dar PyawBweLay Canal Land 12×15 100% 1105 16.74788 96.09865
Wood
Daw Win Mar
Roof-Zinc, Wall-Bamboo,Floor-
84 /Brother U Hlaing PyawBweLay Canal Land 10×20 100% 1106 16.74787 96.09854
Wood
Oo
Roof-Dhani,Wall-Dhani, Floor-
85 U Kyaw Myo Oo PyawBweLay Canal Land 12×10 100% 1107 16.74789 96.09850
Wood
86 DWIR PyawBweLay Canal Land 100% 1108 16.74788 96.09838 Plot
Roof-Zinc, Wall-Bamboo,Floor-
87 U Kyaw Kyaw PyawBweLay Canal Land 10×10 100% 1109 16.74788 96.09828
Bamboo
88 U Aung Myint PyawBweLay Canal Land Roof-Zinc, Wall-Dhani,Floor-Wood 15×12 100% 1110 16.74788 96.09821

89 U Tin Wai Zaw PyawBweLay Canal Land Roof-Zinc, Wall-Zinc,Floor-Bamboo 15×15 100% 1111 16.74788 96.09818
Roof-Dhani,Wall-Dhani, Floor-
90 U Myo Hla Tun PyawBweLay Canal Land 12×15 100% 1112 16.74787 96.09811
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
91 U Tin Tun PyawBweLay Canal Land 12×10 80% 1113 16.74787 96.09808
Bamboo
92 U Mya Win/ Pigsty PyawBweLay Canal Land Roof-Zinc, Wall-Dhani,Floor-Wood 20×30 70% 1114 16.74784 96.09790
Roof-Dhani,Wall-Dhani, Floor-
93 U Ohn Myint / Store PyawBweLay Canal Land 20×30 80% 1115 16.74784 96.09776
Bamboo
94 U Ohn Myint / Store PyawBweLay Canal Land Roof- Zinc 20×30 80% 1116 16.74786 96.09774

95 U Than Oo/ Store PyawBweLay Canal Land Roof- Zinc 10×20 30% 1117 16.74782 96.09765
U Nyunt Win/
96 PyawBweLay Canal Land Roof- Dahni 10×10 100% 1118 16.74787 96.09747
Pigsty
U Myint Thein/
97 PyawBweLay Canal Land Roof- Dahni 10×10 100% 1119 16.74783 96.09724
Pigsty
Roof-Dhani,Wall-Zinc, Floor-
98 U Nyo Win PyawBweLay Canal Land 10% 1120 16.74781 96.09703
Bamboo
99 U Zin ko PyawBweLay Canal Land Roof-Zinc, Wall-Brick,Floor-Wood 10×10 100% 1121 16.74780 96.09691

100 U Win Nyo/ Pigsty PyawBweLay Canal Land Roof- Plastic 6×10 100% 1122 16.74784 96.09691

101 U Zaw Zaw PyawBweLay Canal Land Roof- Plastic 7×7 100% 1123 16.74782 96.09681

5
Twente Township

Aung/Pigsty

Roof-Zinc, Wall-Bamboo,Floor-
102 U Hla Aye PyawBweLay Canal Land 10×30 30% 1124 16.74787 96.09024
Wood
Roof-Zinc, Wall-Bamboo,Floor-
103 U Tin Soe PyawBweLay Canal Land 15×30 50% 1125 16.74788 96.09021
Wood
104 U Myo Win PyawBweLay Canal Land Roof-Zinc, Wall-Brick,Floor-Wood 15×15 100% 1126 16.74789 96.09015
Roof-Zinc, Wall-Bamboo,Floor-
105 U Tin Thein Oo PyawBweLay Canal Land 15×20 100% 1127 16.74786 96.09010
Wood
U Tin Thein Oo/ Roof-Plastic, Wall_Plastic,Floor-
106 PyawBweLay Canal Land 5×7 100% 1128 16.74786 96.09008
Store Bamboo
107 U Phoe Hla/ store PyawBweLay Canal Land Roof-Zinc, Wall-Bamboo 7×10 100% 1129 16.74783 96.09001
Roof-Zinc, Wall_Plastic,Floor-
108 U Sein Tun PyawBweLay Canal Land 5×7 100% 1130 16.74782 96.08998
Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
109 U Nyunt Win PyawBweLay Canal Land 12×15 100% 1131 16.74787 96.08994
Wood
U Myint Shwe/ Roof-Dhani, Wall_Bamboo,Floor-
110 PyawBweLay Canal Land 5×7 100% 1132 16.74788 96.08988
Firewood Hut Bamboo
U Myint Shwe/ Roof-Zinc, Wall-Bamboo,Floor-
111 PyawBweLay Canal Land 12×20 100% 1133 16.74783 96.08984
House Bamboo
Roof-Zinc, Wall-Bamboo,Floor-
112 U San Tint PyawBweLay Canal Land 12×20 100% 1134 16.74784 96.08977
Bamboo
U Than Hlaing/ Roof-Dhani,Wall-Bamboo, Floor-
113 PyawBweLay Canal Land 5×7 100% 1135 16.74784 96.08973
Coop Bamboo
U Than Hlaing/ Roof-Dhani,Wall-Bamboo, Floor-
114 PyawBweLay Canal Land 10×12 100% 1136 16.74786 96.08969
House Bamboo
U Than Hlaing/ Roof-Dhani,Wall-Bamboo, Floor-
115 PyawBweLay Canal Land 5×7 100% 1137 16.74785 96.08967
Store Bamboo
Roof-Dhani,Wall-Bamboo, Floor-
116 U Aung Than Zaw PyawBweLay Canal Land 7×7 100% 1138 16.74788 96.08965
Bamboo
117 Hut/ common PyawBweLay Canal Land 100% 1139 16.74776 96.08981
Pyi Htaung Su Aung
118 PyawBweLay Canal Land 5% 1140 16.74777 96.08992
Pagoda
119 U Aung Kyaw Tun PyawBweLay Canal Land 0.38 Acres 100% 1141 16.74776 96.08956 Plot
Roof-Zinc, Wall-Bamboo,Floor-
120 U Moe Aung PyawBweLay Canal Land 12×10 100% 1142 16.74748 96.08900
Wood
121 U Kyaw Tun PyawBweLay Canal Land 0.24 Acres 100% 1143 16.74741 96.08874 Plot

122 Yan aung Marn PyawBweLay Canal Land 100% 1144 16.74732 96.08799

6
Twente Township

Aung Pagoda

123 Religious Hall PyawBweLay Canal Land 100% 1145 16.74727 96.08790

124 Religious Hall PyawBweLay Canal Land 40% 1146 16.74712 96.08780

125 U Thar Ohn PyawBweLay Canal Land 0.15 Acres 10% 1148 16.74707 96.08686 Plot

126 U Thike Tun PyawBweLay Canal Land 10% 1147 16.74709 96.08736 Plot

127 U Ne To PyawBweLay Canal Land 60% 1149 16.74704 96.08635 Plot

128 U Kan Tun PyawBweLay Canal Land 50% 1150 16.74704 96.08599 Plot

129 U Phyo Phyo PyawBweLay Canal Land 80% 1151 16.74705 96.08559 Plot

130 U Myo Win PyawBweLay Canal Land 5% 1153 16.74700 96.08467 Plot

131 Bridge PyawBweLay Canal Land 1152 16.74702 96.08491

132 Bridge PyawBweLay Canal Land 1154 16.74701 96.08359

133 DWIR Office PyawBweLay Canal Land 10% 1155 16.74706 96.08211

134 DWIR / Store PyawBweLay Canal Land 10% 1156 16.74711 96.08191

135 Shrine PyawBweLay Canal Land 1157 16.74716 96.08187


Roof-Dhani,Wall-Dhani, Floor-
136 U Myat Ko PyawBweLay Canal Land 20×30 100% 1158 16.74715 96.08172
Bamboo
Roof-Zinc,Wall-Dhani, Floor-
137 U Aung Ngwe PyawBweLay Canal Land 25×30 10% 1159 16.74712 96.08169
Bamboo
138 U Ko Shine PyawBweLay Canal Land 10% 1160 16.74707 96.08158
Roof-Zinc,Wall-Plastic, Floor-
139 U Khin PyawBweLay Canal Land 10×20 1161 16.74716 96.08151
Bamboo
Daw Khat Khat Roof-Dhani,Wall-Dhani, Floor-
140 PyawBweLay Canal Land 10×10 1162 16.74714 96.08149
Khaing/Fire Place Bamboo
Roof-Zinc,Wall-Bamboo, Floor-
141 U Lwan Ko PyawBweLay Canal Land 15×20 1163 16.74714 96.08140
Wood
Daw Khat Khat Roof-Zinc,Wall-Bamboo, Floor-
142 PyawBweLay Canal Land 15×20 1164 16.74712 96.08137
Khaing/ House Wood
Roof-Zinc,Wall-Bamboo, Floor-
143 U Htein Lin PyawBweLay Canal Land 10×15 1165 16.74714 96.08135
Wood
Roof-Zinc,Wall-Bamboo, Floor-
144 U Thein Zaw Oo PyawBweLay Canal Land 15×15 1166 16.74711 96.08129
Wood

7
Twente Township

145 U Thar Tun PyawBweLay Canal Land 0.15 Acres 30% 1167 16.74703 96.08108 Plot

146 U Myint Naing Win PyawBweLay Canal Land 10% 1168 16.74693 96.08047 Plot

147 U Win Oo PyawBweLay Canal Land 0.05 Acres 50% 1169 16.74673 96.08021 Plot

148 U Hla Kyaing PyawBweLay Canal Land 0.50 Acres 70% 1170 16.74631 96.07891 Plot
Roof-Zinc,Wall-Bamboo, Floor-
149 U Hla Tin PyawBweLay Canal Land 30×25 50% 1171 16.74610 96.07861
Bamboo
DWIR/ Workshop Roof-Dhani,Wall-Bamboo, Floor-
150 PyawBweLay Canal Land 30×20 1172 16.74611 96.07843
store Bamboo
Roof-Dhani,Wall-Bamboo, Floor-
151 DWIR/ Hall PyawBweLay Canal Land 30×30 1173 16.74617 96.07836
Bamboo
Roof-Dhani,Wall-Bamboo, Floor-
152 DWIR/ Hall PyawBweLay Canal Land 30×30 20% 1174 16.74596 96.07807
Bamboo
153 U Thar Tun PyawBweLay Canal Land 1.70 Acres 80% 1175 16.74602 96.07799 Plot

154 DWIR workshop PyawBweLay Canal Land 1176 16.74590 96.07716

U Kalar/U Than
155 PyawBweLay Canal Land Roof-Zinc,Wall-Dhani, Floor-Wood 25×20 1177 16.74548 96.07523
Nyunt
156 U Aye Kyaw PyawBweLay Canal Land Roof-Zinc,Wall-Dhani, Floor-Wood 12×10 1178 16.74544 96.07511
Roof-Dhani,Wall-Dhani, Floor-
157 Daw Myint Sein PyawBweLay Canal Land 10×12 1179 16.74545 96.07504
Wood
Roof-Dhani,Wall-Dhani, Floor-
158 U Than Nyunt Oo PyawBweLay Canal Land 12×12 1180 16.74544 96.07499
Wood
Roof-Dhani,Wall-Dhani, Floor-
159 U Han Thein PyawBweLay Canal Land 12×20 1181 16.74534 96.07471
Wood
Roof-Dhani,Wall-Dhani, Floor-
160 U Tin Win Tun PyawBweLay Canal Land 12×20 40% 1182 16.74527 96.07447
Wood
161 U San Tin Paikswel Farm farm 1.5 acre 75% 1183 16.74516 96.07382

162 U Thein Win Aung Paikswel Farm 0.18 acre 100% 1184 16.74450 96.07133

163 DWIR Paikswel Farm hut 15x15 100% 1185 16.74442 96.07090

164 Daw Mya Khin Paikswel Farm 0.66 acre 0% 1186 16.74439 96.07075

165 U Saw Hla Htun Paikswel Farm 1.2 acre 80% 1187 16.74433 96.07023

166 DWIR Paikswel hut 15x15 100% 1188 16.74371 96.06833

167 DWIR Paikswel hut 15x15 100% 1189 16.74369 96.06822

8
Twente Township

168 U Thein Win Paikswel Farm 3.5 acre 80% 1190 16.74360 96.06782

169 DWIR Paikswel hut 15x15 80% 1191 16.74351 96.06759


Daw Khin Thida
170 Paikswel Farm 2.27 acre 80% 1192 16.74200 96.06257
Win
171 DWIR Paikswel hut 20x20 80% 1193 16.74183 96.06215

172 U Win Htun Paikswel Farm 1.5 acre 80% 1194 16.74158 96.06143

173 DWIR Paikswel hut 15x30 100% 1195 16.74133 96.06080

174 DWIR Paikswel hut 15x30 100% 1196 16.74109 96.06022

175 Daw San San Htay Paikswel Farm 0.85 acre 80% 16.74091 96.05995
1197

176 DWIR Paikswel hut 15x30 100% 1198 16.74078 96.05957

177 DWIR Paikswel hut 15x30 100% 1199 16.74063 96.05922

178 DWIR Paikswel hut 10x15 100% 1200 16.74055 96.05901

179 DWIR Paikswel hut 15x30 100% 1201 16.74054 96.05885

180 U Zaw Tun Paikswel hut 15x15 100% 1202 16.74047 96.05865

181 U Soe Gyi Paikswel Roof - Zinc, Wall - bamboo 20x30 100% 1203 16.74040 96.05870

182 U Zaw Tun Paikswel Roof - Danni, Wall - danni 10x10 100% 1204 16.74046 96.05850
representative of
183 Paikswel Roof - Danni, Wall - danni 15x15 100% 1205 16.74040 96.05840
owner
184 U Nay Hteik Paikswel Roof - wood, Wall - danni 15x15 100% 1206 16.74004 96.05781

185 DWIR Paikswel hut 20x30 100% 1207 16.74003 96.05766

186 Daw Kyi Saw Paikswel Farm 1.54 acre 80% 1208 16.73972 96.05683

187 DWIR Paikswel hut 20x40 100% 1209 16.73938 96.05614

188 DWIR Paikswel hut 20x20 100% 1210 16.73934 96.05593

189 DWIR Paikswel hut 20x20 100% 1211 16.73923 96.05596

190 DWIR Paikswel hut 15x20 100% 1212 16.73922 96.05592

191 DWIR Paikswel hut 15x15 100% 1213 16.73916 96.05596

9
Twente Township

192 DWIR Paikswel hut 15x20 100% 1214 16.73915 96.05590

193 U Hla Naing Paikswel Farm 1.45 acre 100% 1215 16.73922 96.05585

194 U Kyi Soe Oo Paikswel Farm 1.39 acre 100% 1216 16.73858 96.05399

195 Daw Aye Aye Win Paikswel Farm 1.68 acre 100% 1217 16.73815 96.05236

196 U Zaw Oo Paikswel Farm 0.86 acre 100% 1218 16.73764 96.05031
Daw Khin San
197 Paikswel Farm 1.48 acre 100% 1219 16.73739 96.04924
Myint
198 U Thein Ein Paikswel Farm 1.55 acre 100% 1220 16.73697 96.04751

199 U Khin Soe Paikswel hut 15x15 100% 1221 16.73694 96.04737

200 U Myo Aye Paikswel Farm 1.74 acre 100% 1222 16.73648 96.04553

201 U Thiha Myo Aung Paikswel Farm 1.85 acre 100% 1223 16.73560 96.04190
representative of
202 Tharsi Farm 5 acres 30% 1183 16.74617 96.06258
owner
representative of
203 Tharsi Farm 3.5 acres 60% 1184 16.74677 96.06446
owner
204 U Min Aung Tharsi Farm 1 acre 80% 1185 16.74730 96.06598

205 U Min Aung Tharsi Roof-Zinc,Floor-Wood 65x25 40% 1186 16.74754 96.06633 Rice Meal
Roof-Zinc,Wall-Bamboo, Floor-
206 U Min Aung Tharsi 30x30 100% 1187 16.74759 96.06661
Wood
Roof-Danni, Wall-Danni,Floor-
207 U Tin Aung Moe Tharsi 20x20 100% 1188 16.74770 96.06677
Wood
Roof-Zinc,Wall-Flagstone,Foor-
208 U Myo Ko Tharsi 15×20 5% 1189 16.74778 96.06684
Brick
Roof-Danni, Wall-Danni,Floor-
209 U Aye Lwin Tharsi 12x12 100% 1190 16.74773 96.06686
Wood
Roof-Danni, Wall-Danni, Floor-
210 U Aye Lwin Tharsi 30x25 100% 1191 16.74769 96.06687
Wood
211 U Tun Naing Oo Tharsi Roof-Zinc, Wall-Danni,Floor-Wood 25x25 80% 1192 16.74779 96.06694 50x120 Farm 50%

212 U Zaw Min Naing Tharsi Roof-Zinc, Wall-Danni,Floor-Wood 20x20 100% 1193 16.74769 96.06702

213 U Kyaw Sein Tharsi 50x120 80% 1194 16.74779 96.06704 Farm
Roof-Zinc, Wall-Bamboo, Floor-
214 U Nyein Chan Aye Tharsi 20x20 100% 1195 16.74773 96.06719
Wood

10
Twente Township

215 U Zaw Lwin Tharsi Roof-Danni,Wall-Danni-Wood 10x10 100% 1196 16.74780 96.06720
Roof-Zinc,Wall-Flagstone,Floor-
216 U Zaw Lwin Tharsi 15x15 100% 1197 16.74781 96.06724
Wood
Roof-Danni,Wall-Bamboo,Floor-
217 U Moe Lwin Tharsi 15x15 100% 1198 16.74778 96.06726
Wood
218 U Myat Tun Tharsi Roof-Zinc,,Floor-Wood 30x30 20% 1199 16.74792 96.06726

Roof-Danni,Wall-Bamboo ,Floor-
219 Daw Hnin Yee Tharsi 15x20 100% 1200 16.74786 96.06730
Wood

Roof-Zinc,Wall-Bamboo,Floor-
220 U Kyaw Zin Oo Tharsi 15x15 100% 1201 16.74777 96.06733
Wood

Daw Moe Moe Roof-Zinc, Wall- Bamboo, Floor-


221 Tharsi 15x15 100% 1202 16.74780 96.06739
Than Wood

222 U Kyaw Sein Tharsi Roof-Zinc,Wall-Danni ,Floor-Wood 15x15 70% 1203 16.74797 96.06736

223 U Aung Lwin Tharsi Roof-Zinc,Wall-Danni ,Floor-Wood 20x30 90% 1204 16.74799 96.06746

224 U Saw Htun Tharsi Roof-Zinc,Wall-Danni,Floor- Wood 15x15 100% 1205 16.74791 96.06742
Roof-Zinc,Wall-Flagstone,Floor-
225 U Saw Tun Tharsi 20x30 100% 1206 16.74785 96.06749 40x60 Farm Shop
Wood
226 U Kyaw Thura Tharsi Roof-Zinc,Wall-Danni,Floor-Wood 15x15 100% 1207 16.74779 96.06745

227 U Zaw Min Soe Tharsi Roof-Zinc,Wall-Danni,Floor-Wood 15x15 100% 1208 16.74779 96.06750

228 U Saw Rain Kyal Tharsi Roof-Zinc,Wall-Danni,Floor-Wood 15x15 100% 1209 16.74790 96.06755
Daw Khin Malar
229 Tharsi Roof-Zinc,Wall-Danni,Floor- Wood 15x15 100% 1210 16.74801 96.06756
Tun
230 U Min Thura Nyein Tharsi Roof-Zinc, Wall- Wood,Floor-Wood 10x15 100% 1211 16.74793 96.06763

231 Daw Yee Yee Tint Tharsi Roof-Zinc, Wall-Wood, Floor-Wood 15x15 100% 1212 16.74793 96.06768

232 U Saw Htee Fhae Tharsi Roof-Zinc,Wall-Zinc,Floor-Wood 18x20 100% 1213 16.74794 96.06777

233 U Aung Than Tharsi Roof-Zinc, Wall-Wood,Floor-Wood 30x40 40% 1214 16.74804 96.06771

234 U Kyaw Naing Tharsi Roof-Zinc,Wall-Danni,Floor- Wood 20x20 100% 1215 16.74806 96.06789
Roof-Zinc,Wall-Bamboo,Floor-
235 U Mya Soe Naing Tharsi 20x20 100% 1216 16.74798 96.06790
Wood

11
Twente Township

Roof-Zinc,Wall-Bamboo, Floor-
236 U That Khaing Tharsi 20x20 100% 1217 16.74814 96.06804
Bamboo

representative of Roof-Zinc,Wall-Bamboo,Floor-
237 Tharsi Land Plot 40x60 60% 1218 16.74817 96.06815 Farm
owner Bamboo

Roof-Zinc,Wall-Bamboo,Floor-
238 Daw San San Win Tharsi 25x25 90% 1219 16.74820 96.06827
Wood
Roof-Zinc Wall-Bamboo,Floor-
239 U Aye Lwin Tharsi 80x60 70% 1220 16.74823 96.06835 Farm
Wood
240 U Aung Tin Win Tharsi Roof-Zinc,Wall-Zinc,Floor- Wood 25x25 95% 1221 16.74828 96.06855
Roof-Zinc,Wall-Bamboo,Floor-
241 U Myint Oo Tharsi 25x30 40% 1222 16.74832 96.06865
Wood
Roof-Danni,Wall-Danni,Floor-
242 U Aung Phyo Than Tharsi 15x15 100% 1223 16.74830 96.06873
Wood
Roof-Zinc, Wall-Danni , Floor-
243 U Myint Zaw Tharsi 20x20 100% 1224 16.74830 96.06880
Wood
Roof-Zinc, Wall-Danni ,Floor-
244 U Aung Gyi Myint Tharsi Farm 1.5 acres 70% 1225 16.74840 96.06898
Wood
Roof-Zinc, Wall-Danni ,Floor-
245 U Aung Kyaw Lwin Tharsi Farm 1.8 acres 80% 1226 16.74851 96.06937
Wood
246 Daw Khin San Yee Tharsi Farm Roof-Zinc,Wall-Danni,Floor- Wood 0.6 acres 50% 1227 16.74884 96.07091
Roof-Danni,Wall-Danni,Floor-
247 U Zaw Linn Tharsi 10x15 100% 1228 16.74888 96.07098
Wood
Roof-Danni,Wall-Danni, floor-
248 U Tin Ngwe Tharsi 10x15 100% 1229 16.74890 96.07104
Wood
Roof-Danni,Wall-Danni, floor-
249 U Tin Ngwe Tharsi 15x30 100% 1230 16.74897 96.07102
Wood
Roof-Danni,Wall-Danni, floor-
250 U Tin Ngwe Tharsi 10x15 100% 1231 16.74901 96.07106
Wood
Roof-Danni,Wall-Danni, floor-
251 U Tin Ngwe Tharsi Farm 0.5 acre 100% 1232 16.74896 96.07109
Wood
Roof-Danni,Wall-Danni, floor-
252 Daw Khin San Yee Tharsi Farm 5 acres 20% 1233 16.74906 96.07112
Wood
Roof-Danni,Wall-Danni, floor-
253 U Aung Kyaw Lwin Tharsi Farm 10.60 acres 20% 1234 16.74971 96.07385
Wood
Roof-Danni,Wall-Danni, floor-
254 Daw Nyo Mar Oo Tharsi Farm 12.80 acres 15% 1235 16.75018 96.07583
Wood
255 U Khin Tharsi Farm Roof-Danni,Wall-Danni, floor- 0.5 acres 10% 1236 16.75044 96.07916

12
Twente Township

Wood

Roof-Danni,Wall-Danni, floor-
256 U Win Thein Tharsi Farm 0.51 acres 50% 1237 16.75051 96.07964
Wood
257 Daw Mya Myint Zu SatKalay Hut Roof-Zinc,Wall-Zinc,Floor- Wood 0 100% 1238 16.75032 96.07953

258 Daw Mya Myint Zu SatKalay Roof-Zinc,Wall-Wood,Floor- Wood 40x60 100% 1239 16.75022 96.07998 2 Floor

259 Daw Mya Myint Zu SatKalay Farm Roof-Zinc,Wall-Wood,Floor-Wood 6.5 acres 20% 1240 16.75033 96.08026

260 U Nyunt Lwin SatKalay Roof-Zinc,Wall-Brick,Floor- Cement 40x60 100% 1241 16.75110 96.08230 17 acres 20% farm
Roof-Zinc,Wall-Bamboo, Floor-
261 U Nyein Chan SatSam 15x28 95% 1242 16.75217 96.08432
Wood
Roof-Zinc,Wall-Bamboo,Floor-
262 Daw Aye Myint SatSam Land Plot 30x60 70% 1243 16.75219 96.08437
Wood
263 U Than Htay SatSam Roof-Zinc, Wall-Danni,Floor- Wood 15x28 90% 1244 16.75225 96.08442

264 U Toe Aung SatSam Land Plot Roof-Zinc, Wall-Danni,Floor-Wood 50x60 100% 1245 16.75234 96.08450
Roof-Dhani,Wall-Danni ,Floor-
265 U Toe Aung SatSam Land Plot 50x90 5% 1246 16.75229 96.08446
Wood
266 U Aye Than SatSam Roof-Zinc, Wall-Wood,Floor-Wood 20x30 100% 1247 16.75232 96.08458

267 U Aung Thura SatSam Land Plot Roof-Zinc, Wall-Wood,Floor-Wood 30x70 15% 1248 16.75237 96.08456

268 U Myint Lwin SatSam Land Plot Roof-Zinc, Wall-Wood,Floor-Wood 30x70 40% 1249 16.75244 96.08463

269 U Win Thu Aung SatSam Roof-Danni, Wall-Danni,Floor- 15x15 100% 1250 16.75237 96.08470

Roof-Zinc, Wall-Flagstone,Floor-
270 U Thein Win SatSam 10x30 60% 1251 16.75250 96.08471 50x65 (70%)
Wood

271 U Yan Naing Soe SatSam Roof-Zinc, Wall-Zinc,Floor-Bamboo 25x40 80% 1252 16.75258 96.08485
Roof-Danni, Wall-Danni, Floor-
272 U Soe Myint SatSam 15x15 100% 1253 16.75252 96.08490
Wood
Roof-Danni, Wall-Danni,Floor-
273 U Khin Mg Aye SatSam 15x30 80% 1254 16.75262 96.08489
Bamboo
Roof-Danni, Wall-Danni,Floor-
274 U Aung Oo SatSam Land Plot 14x60 60% 1255 16.75266 96.08495
Bamboo
Roof-Danni, Wall-Danni,Floor-
275 U Soe Myint Shwe SatSam Land Plot 15x60 70% 1256 16.75270 96.08501
Bamboo
276 U Aung Kyaw Soe SatSam Roof-Zine, Wall-Danni,Floor-Wood 20x25 60% 1257 16.75273 96.08506

13
Twente Township

Roof-Zinc, Wall-Flagstone, Floor-


277 Daw Khin San SatSam 30x25 20% 1258 16.75282 96.08513
Wood

Roof-Zinc, Wall-Wood, Floor--


278 Daw Hnin Gyi SatSam 30x30 10% 1259 16.75297 96.08527
Wood
279 U Hlaing Win SatSam Shop 8x8 100% 1260 16.75292 96.08535

280 U Hla Than SatSam Roof-Zinc, Wall-Wood, Floor-Wood 25x25 10% 1261 16.75301 96.08534
Roof-Zinc, Wall-Wood, Floor-
281 U Zaw Min Naing SatSam 20x20 20% 1262 16.75307 96.08538
Wood
282 U Than Htwe SatSam Roof-Zinc, Wall-Zinc,Floor- Wood 12x20 20% 1263 16.75311 96.08543
Roof-Zinc, Wall-Wood, Floor -
283 U Mya Twin SatSam 15x30 40% 1264 16.75315 96.08549
Wood
Roof-Zinc,Wall-Flagstone, Floor- 74x125.21 10%
284 KaMaDa15 Satetoe SatSam 15x20 60% 1265 16.75327 96.08560
Brick Farm

Roof-Zinc, Wall-Flagstone, Floor-


285 U Myo Nyunt SatSam Land Plot 100x40 100% 1266 16.75327 96.08573
Brick

286 U Tin Ko Latt SatSam Roof-Zinc, Wall-Wood, Floor-Wood 20x40 60% 1267 16.75331 96.08568
Roof-Zinc, Wall-Danni, Floor-
287 U Tin Ko Lat SatSam Shop 25x40 100% 1268 16.75333 96.08577
Bamboo
288 Daw Mya Sein SatSam Roof-Zinc, Wall-Wood,floor- Wood 25x25 10% 1269 16.75341 96.08576 40x80 10% Farm
Roof-Zinc, Wall-Bamboo,Floor-
289 U Aung Thu SatSam 20x40 100% 1270 16.75335 96.08581
Wood
Roof-Zinc,Wall-Bamboo,Floor-
290 Daw Than Mya SatSam 15x20 100% 1271 16.75336 96.08585
Wood
Roof-Zinc, Wall-Bamboo, Floor-
291 U Sein Win Than SatSam Land Plot 20x80 10% 1272 16.75345 96.08580
Wood
Roof-Zinc,Wall-Bamboo,Floor-
292 U Kyaw Win SatSam 20x50 100% 1273 16.75340 96.08591
Wood

Roof-Zinc, Wall-Bamboo, Floor-


293 Daw Saw Gyi SatSam 20x30 50% 1274 16.75348 96.08584
Wood

294 Daw Win Win Maw SatSam Roof-Zinc, Wall-Wood,Floor- Wood 20x25 100% 1275 16.75344 96.08597

295 U Myiint Zaw SatSam Roof- Zinc, Wall- Flagstone 16x35 40% 1276 16.75352 96.08588

296 U ToeToe Win SatSam Roof-Zinc, Wall-Wood,Floor- Wood 15x20 100% 1277 16.75349 96.08597

14
Twente Township

297 Daw Thein Myint SatSam Roof-Zinc, Wall-Wood,Floor-Wood 20x30 10% 1278 16.75356 96.08593

298 U Aung Myo Htet SatSam Land Plot Roof-Zinc, Wall-Wood,Floor- Wood 20x30 100% 1279 16.75350 96.08602

299 U Kyaw Swar Htike SatSam Roof-Zinc, Wall-Wood,Floor- Wood 20x20 100% 1280 16.75353 96.08607
Roof-Zinc, Wall-Wood ,Floor-
300 Daw Hla Myint SatSam Land Plot 50x50 30% 1281 16.75363 96.08605
Wood
Daw Than Than
301 SatSam Land Plot Roof-Zinc, Wall-Wood,Floor- Wood 20x25 100% 1282 16.75358 96.08612
Ngwe
302 U Zaw Zaw SatSam Roof-Zinc, Wall-Danni,Floor-Wood 20x25 40% 1283 16.75368 96.08608
Roof-Zinc, Wall-Bamboo,Floor-
303 U Than Htwe SatSam 15x25 100% 1284 16.75364 96.08616
Wood
304 U Aung Ko Latt SatSam Roof-Zinc, Wall-Wood,Floor-Wood 20x25 5% 1285 16.75373 96.08612
Roof-Zinc, Wall-Bamboo,Floor-
305 U Kyaw Shein Win SatSam 60x25 100% 1286 16.75369 96.08625 60x40 farm
Wood
306 U Aung Naing Min SatSam Roof-Zinc, Wall-Wood, Floor-Wood 20x30 30% 1287 16.75375 96.08617
Roof-Zinc, Wall-Danni, Floor-
307 U Myint Than SatSam 20x30 100% 1288 16.75376 96.08629
Bamboo
Roof-Zinc,Wall-Bamboo,Floor-
308 Daw Tin Aye SatSam 15x20 5% 1289 16.75381 96.08623
Wood

Roof-Zinc, Wall-Bamboo ,Floor-


309 Daw Than May SatSam 20x30 100% 1290 16.75379 96.08634
Bamboo

Roof-Zinc, Wall-Wood ,Floor-


310 U Naing Win SatSam 20x25 20% 1291 16.75387 96.08630
Wood
Roof-Zinc,Wall-Bamboo,Floor-
311 Daw Kyi Than SatSam 15x15 100% 1292 16.75383 96.08639
Wood
312 U Thura SatSam Roof-Zinc, Wall-Wood,Floor- Danni 20x20 10% 1293 16.75393 96.08637

Roof-Zinc,Wall-Flagstone,Floor-
313 Daw Hnin Shwe SatSam 15x20 100% 1294 16.75386 96.08644
Wood

314 U Myint Wai SatSam Land Plot 0 30x30 100% 1295 16.75394 96.08647

315 U Nyunt SatSam Roof-Zinc,Wall-Zinc, Floor- Wood 15x15 10% 1296 16.75400 96.08641
Myittha PaungKue
316 SatSam Wood 7x65 100% 1297 16.75405 96.08655 Bridge
Bridge
317 U Myo Thant SatSam Land Plot 0 30x60 20% 1298 16.75415 96.08662

15
Twente Township

318 U Aye Than SatSam Roof-Zinc, Wall-Danni,Floor- Wood 25x25 100% 1299 16.75408 96.08666

319 U San Myint Thein SatSam Land Plot Roof-Zinc, Wall-Wood,Floor- Wood 30x60 20% 1300 16.75419 96.08667
Roof-Zinc,Wall-Wood, Floor -
320 Daw San Ngwe SatSam Land Plot 25x30 100% 1301 16.75414 96.08671
Wood
321 U Thant Zin Htun SatSam Land Plot Roof-Zinc,Wall-Danni,Floor- Wood 20x25 100% 1302 16.75417 96.08675

322 U Thein Lu SatSam Land Plot 30x60 20% 1303 16.75423 96.08673

Roof-Zinc,Wall-Bamboo,Floor-
323 Daw Aye Mu Htwe SatSam 12x12 100% 1304 16.75421 96.08680
Bamboo

Roof-Zinc,Wall-Bamboo,Floor-
324 U Phyo Aung Linn SatSam 25x30 100% 1305 16.75426 96.08685
Wood
325 Daw Mar Lar Soe SatSam Land Plot 15x10 100% 1306 16.75423 96.08682

326 U Gyi Nyunt SatSam Land Plot 50x70 100% 1307 16.75432 96.08683

327 U Mya Aung SatSam Land Plot 50x100 100% 1308 16.75432 96.08690

328 U Mya Aung SatSam Land Plot 50x25 100% 1309 16.75436 96.08696
Roof-Zinc, Wall-Danni, Floor-
329 U Kyaw Win Nyunt SatSam Land Plot 25x30 100% 1310 16.75440 96.08699
Bamboo
330 Daw Gyi Sein SatSam Land Plot 40x100 5% 1311 16.75449 96.08702
Daw Khin Myint
331 SatSam Land Plot 55x30 100% 1312 16.75446 96.08708
Shwe
332 U Kyaw San Win SatSam Land Plot 40x60 10% 1313 16.75455 96.08710

333 U Than Lwin SatSam Land Plot 70x100 10% 1314 16.75456 96.08719

334 U Myint Lwin SatSam Land Plot 70x100 10% 1315 16.75477 96.08735

335 U Htay Aung SatSam Zinc 20x30 10% 1316 16.75481 96.08738 Tea

336 KueToeSate SatSam Zinc 10x15 100% 1317 16.75481 96.08743


Daw Khin Win
337 SatSam Land Plot 90x100 10% 1318 16.75489 96.08747 SatSam (lose)
Shwe
338 U Thein Naing Pathein Land Plot 250x80 3% 1319 16.75558 96.08821

Roof-Zinc, Wall-Danni, Floor- Rent house U Aung


339 U Kyaw Htut Pathein 10×20 35% 1320 16.75559 96.08816
Bamboo Myo Oo

16
Twente Township

Roof-Dhani, Wall-Bamboo ,Floor-


340 U Kyaw Htut Pathein 10x20 90% 1321 16.75562 96.08824 block of land 80x80
Bamboo

341 U Khin Thein Pathein Roof-Zinc, Wall-Floor-Bamboo 10x20 90% 1322 16.75568 96.08831
Roof-Zinc, Wall-Zinc,Floor-
342 U Aung Myo Thu Pathein 10x20 100% 1323 16.75565 96.08834
Bamboo

Roof-Zinc, Wall-Bamboo, Floor-


343 U Tin Win Pathein 10x20 100% 1324 16.75562 96.08838
Bamboo

Daw Khin Aye Roof-Zinc, Wall-Danni, Floor- Rent house U Ngwe


344 Pathein 10x12 100% 1325 16.75571 96.08839
Maw Bamboo Lwin

345 U Han Htun Pathein Land Plot 12x60 100% 1326 16.75575 96.08841

346 U Ohn Myint Pathein Roof-Zinc, Wall-Danni,Floor- Wood 15x15 100% 1327 16.75575 96.08847

Roof-Zinc, Wall-Bamboo, Floor-


347 U Aung Win Pathein 15x20 100% 1328 16.75583 96.08850
Wood

Daw Khin Aye


348 Pathein Land Plot 10x60 100% 1329 16.75585 96.08853
Maw

Roof-Zinc, Wall-Flagstone, Floor -


349 U Tint Zaw Pathein 10x90 90% 1330 16.75586 96.08857
Wood

Daw Khin Aye


350 Pathein Land Plot 14x60 70% 1331 16.75589 96.08860
Maw
351 U Tin Htut Pathein Roof-Zinc,Wall-Zinc, Floor-Wood 15x20 70% 1332 16.75594 96.08864
Ma Thinzar Wint Roof-Zinc,Wall-Bamboo, Floor-
352 Pathein 15x15 100% 1333 16.75590 96.08868
Htut Wood
353 U Than Lwin Pathein Land Plot 25x70 70% 1334 16.75598 96.08870
Roof-Zinc,Wall-Danni, Floor-
354 U Than Tin Pathein 12x15 90% 1335 16.75605 96.08875
Bamboo
Roof-Zinc,Wall-Danni,Floor-
355 U Hlaing Min Pathein 10x10 100% 1336 16.75600 96.08879
Bamboo
Daw Khin Aye
356 Pathein Land Plot 15x70 30% 1337 16.75601 96.08873
Maw
Roof-Zinc,Wall-Bamboo, Floor-
357 Daw Ei Ei Aung Pathein 15x20 80% 1338 16.75607 96.08880
Wood

17
Twente Township

Roof-Zinc, Wall-Danni,Floor-
358 U Myo Ko Ko Pathein 12x20 90% 1339 16.75610 96.08885
Bamboo
359 U Kyaw Htut Pathein Land Plot 15x70 70% 1340 16.75612 96.08889

Roof-Zinc,Wall-Bamboo,Floor-
360 U Kyaw Htut Pathein 12x20 90% 1341 16.75615 96.08892
Bamboo

Daw Khin Aye


361 Pathein Land Plot 15x70 70% 1342 16.75618 96.08896
Maw
Roof-Zinc,Wall-Bamboo,Floor-
362 U Kyaw Nyunt Pathein 12x20 90% 1343 16.75622 96.08901
Wood

Roof-Zinc,Wall-Flagstone,Floor-
363 U Kyaw Tin Oo Pathein 25x70 95% 1344 16.75628 96.08909
Wood

U Kyaw Zay Yar


364 Pathein Land Plot 15x70 70% 1345 16.75625 96.08904
Oo
365 U Win Sein Pathein Land Plot 25x70 70% 1346 16.75632 96.08915
Roof-Zinc,Wall-Danni,Floor-
366 U Than Lwin Pathein Land Plot 20x25 10% 1347 16.75640 96.08923
Bamboo
367 Taman Sate Pathein Roof-Zinc,Wall-Wood,Floor- Wood 15x20 100% 1348 16.75644 96.08930

368 U Khin Shwe Pathein Land Plot 20x60 100% 1349 16.75647 96.08933

369 Daw Myint Khaing Pathein Land Plot 20x60 100% 1350 16.75652 96.08936

370 U Tin Win Pathein Land Plot 35x60 100% 1351 16.75655 96.08939
Daw Aye Aye
371 Pathein Land Plot 25x60 100% 1352 16.75657 96.08945
Myint

Roof-Zinc,Wall-Bamboo,Floor-
372 U Naing Win Pathein 20x30 100% 1353 16.75659 96.08952
Bamboo

Daw Khin Aye


373 Pathein Land Plot 15x60 100% 1354 16.75664 96.08955
Maw
Roof-Zinc,Wall-Danni,Floor-
374 U Win Nyunt Pathein 25x30 100% 1355 16.75665 96.08960
Bamboo
Daw Nyein Nyein
375 Pathein Roof-Zinc,Wall-Zinc,Floor- Bamboo 15x15 100% 1356 16.75668 96.08969 15x60 block of Land
Soe
Roof-Zinc,Wall-Bamboo,Floor-
376 Daw Baby Pathein 15x18 100% 1357 16.75672 96.08974 20x60 block of Land
Bamboo

18
Twente Township

Daw Phyu Phyu Roof-Zinc,Wall-Bamboo,Floor-


377 Pathein 15x25 100% 1358 16.75675 96.08981 22x70 block of Land
Win Bamboo
Roof-Zinc,Wall-Bamboo,Floor-
378 U Mg Win Pathein 10×10 100% 1359 16.75680 96.08985 25x70
Bamboo
Roof-Zinc,Wall-Bamboo,Floor-
379 U Win Kyi Pathein 20x20 100% 1360 16.75687 96.08991 60x70 block of Land
Bamboo
Roof-Zinc,Wall-Bamboo,Floor-
380 Daw Nyunt Pathein 15x20 100% 1361 16.75694 96.08997 60x70 block of Land
Bamboo
Roof-Zinc,Wall-Bamboo,Floor-
381 U Aye Min Pathein 15x20 100% 1362 16.75695 96.09001 20x70 block of Land
Bamboo
Roof-Zinc,Wall-Danni, Floor-
382 U Than Kyaw Htay Pathein 20x15 100% 1363 16.75698 96.09004 25x70 block of Land
Bamboo
Roof-Zinc,Wall-Bamboo, Floor-
383 U Zaw Linn Pathein 20x20 100% 1364 16.75703 96.09010 25x70 block of Land
Bamboo
Roof-Zinc,Wall-Danni,Floor-
384 U Aung Tin Myint Pathein 15x20 100% 1365 16.75706 96.09013 15x70 block of Land
Bamboo
385 Daw Thin Thin Pathein Land Plot 15x70 100% 1366 16.75708 96.09017 15x70 block of Land
Roof-Zinc,Wall-Bamboo,Floor-
386 U Sein Linn Soe Pathein 15x20 100% 1367 16.75710 96.09020
Wood
Daw Hnin Yu Roof-Zinc,Wall-Danni,Floor-
387 Pathein 10x15 100% 1368 16.75715 96.09023 20x70 block of Land
Hlaing Bamboo
388 U Chit Thu Aung Pathein Roof-Zinc,Zinc, Wood,Floor-Wood 13x15 100% 1369 16.75716 96.09024 20x70 block of Land
Roof-Zinc,Wall-Bamboo,Floor-
389 U Ohn Than Pathein 15x20 100% 1370 16.75715 96.09026
Wood
Roof-Danni,Wall-Bamboo,Floor-
390 Daw Ma Cho Pathein 10x10 100% 1371 16.75720 96.09027
Wood

Roof-Zinc,Wall-Bamboo,Floor-
391 U Mya Thein Pathein 15x40 100% 1373 16.75720 96.09031
Bamboo

392 U Myo Aung Pathein Roof-Danni,Wall-Danni,Floor-Wood 10x13 100% 1374 16.75722 96.09034

393 Daw Thi Thi Maw Pathein Land Plot 15x60 100% 1375 16.75725 96.09035

394 U Thet Lwin Pathein Land Plot 20x60 100% 1376 16.75726 96.09036 block of Land 15x60
Roof-Danni,Wall-Danni,Floor-
395 U Aung Zaw Latt Pathein 10x20 100% 1377 16.75729 96.09039 block of Land 15x60
Bamboo

19
Twente Township

Roof-Zinc,Wall-Bamboo,Floor-
396 U Pyae Sone Aung Pathein 10x15 100% 1378 16.75730 96.09042
Bamboo

U Phyo Wai Yan


397 Pathein Land Plot 15x60 100% 1379 16.75733 96.09046 block of Land 15x60
Htun

Roof-Zinc,Wall-Bamboo,Floor-
398 U Zaw Zaw Aung Pathein 12x15 100% 1380 16.75736 96.09049
Bamboo

399 U Mya Thaung Pathein Land Plot 40x60 100% 1381 16.75741 96.09056 block of land 15x60

400 U Soe Naing Pathein Roof-Danni,Wall-Danni,Floor-Wood 15x12 100% 1382 16.75749 96.09059
Daw Khin Aye
401 Pathein Land Plot 20x60 100% 1383 16.75753 96.09064
Maw
402 U Thura Kyaw Pathein Land Plot 20x60 100% 1384 16.75756 96.09069

403 U Soe Thein Pathein Land Plot 70x70 3% 1385 16.75764 96.09076

404 U Tun Tun Win Pathein 5% 1386 16.75779 96.09090 Yard

405 U Aye Thein Pathein Land Plot 25x100 1387 16.75544 96.08810

406 U Aye Kuu KalarTan Farm 5 Acres 50% 1388 16.74590 96.06177 PaikSwel
Roof-Danni,Wall-Danni,Floor-
407 U Wai Yan KalarTan 15x10 100% 1389 16.74562 96.06130
Bamboo
Roof-Danni, Wall-Danni,Floor-
408 U Chit Thae Maung KalarTan 5x5 100% 1390 16.74556 96.06108 Chicken hut
Bamboo
409 U San Aung KalarTan Roof-Zinc,Wall-Wood,Floor-Wood 15x30 10% 1391 16.74558 96.06082
Roof-Danni,Wall-Bamboo,Floor-
410 U Ye Linn Tun KalarTan 15x25 40% 1392 16.74557 96.06088
Wood
Roof-Danni,Wall-Bamboo,Floor-
411 U San Shwe KalarTan 20x25 50% 1393 16.74561 96.06096
Wood
Roof-Danni,Wall-Danni,Floor-
412 U Chit Thae Maung KalarTan 15x20 100% 1394 16.74563 96.06108
Bamboo

Roof-Zinc,Wall-Bamboo,Floor-
413 U Aye Ko KalarTan 20x25 50% 1395 16.74567 96.06110
Bamboo

Land Plot 0.25


414 U Ye Ni Tun KalarTan Roof-Zinc,Wall-Wood,Floor-Wood 30x30 5% 1396 16.74537 96.06060 PaikSwel
acres
415 U Tun Shwe KalarTan Farm 2 acres 40% 1397 16.74526 96.06029 PaikSwel 17 acres

20
Twente Township

416 U Tun Shwe KalarTan Farm 3 acres 60% 1398 16.74496 96.05958

417 U Tin Soe KalarTan Farm 2 acres 40% 1399 16.74446 96.05855

418 U Aung Kyaw Lwin KalarTan Farm 2 acres 20% 1400 16.74415 96.05792

419 U Mg Mg Aye KalarTan Farm 2 acres 25% 1401 16.74378 96.05705

420 U Hla Kyu KalarTan Land Plot 1.5 acres 20% 1402 16.74353 96.05646

421 U Myo Win KalarTan Land Plot .50 acres 20% 1403 16.74343 96.05624

422 U San Naing KalarTan Land Plot .50 acres 25% 1404 16.74326 96.05562

423 U Mya Thein KalarTan Land Plot 5 Acres 25% 1405 16.74301 96.05502

424 U Mya Thein KalarTan Hut 8x8 100% 1406 16.74280 96.05454

425 U Aung Kyaw Lwin KalarTan Land Plot 5 Acres 30% 1407 16.74273 96.05415

426 U Sein Hlaing KalarTan Land Plot 3 acres 50% 1408 16.74223 96.05237
Roof-Zinc, Wall-Bamboo, Floor-
427 U Thant Zin KalarTan 30x30 40% 1409 16.74209 96.05178
Wood
428 U Than Zaw KalarTan Land Plot 1 acre 40% 1410 16.74195 96.05155

429 U Than Soe KalarTan Land Plot 1 acre 40% 1411 16.74186 96.05117

430 U Myo Aung KalarTan Land Plot 2 acres 30% 1412 16.74168 96.05063
Lake, Dhamma
431 KalarTan 2 acres 30% 1413 16.74148 96.04975
Thukha
Dhamma Thukha
432 KalarTan 4 acres 15% 1414 16.74144 96.04952
Monestry
433 U Than Nyein KalarTan Lake 80x60 100% 1415 16.74124 96.04886
Roof-Danni, Wall-Bamboo, Floor-
434 U Than Nyein KalarTan 12x12 100% 1416 16.74129 96.04899
Bamboo
Roof-Zinc, Wall-Kansa, Floor-
435 U Than Nyein KalarTan 30x20 100% 1417 16.74132 96.04894
Bamboo
436 U Mg Gyi KalarTan Farm 13 acres 20% 1418 16.73756 96.03935 6.5 miles

437 U Mg Gyi KalarTan 15x15 100% 1419 16.73745 96.03923

438 U Aung Kyaw Lwin KalarTan Farm 1420 16.73791 96.04053

439 U Myint Soe KalarTan Farm 6 acres 20% 1421 16.73808 96.04114

21
Twente Township

440 U Myo Aung KalarTan Farm 6 acres 20% 1422 16.73894 96.04335

441 U Soe Myint KalarTan Farm 2 acres 25% 1423 16.73910 96.04347

442 U Myo Aung KalarTan Farm 6 acres 20% 1424 16.73929 96.04387

443 U Lam Bar KalarTan Farm 20% 1425 16.73961 96.04472

444 U Gyi Win KalarTan Land Plot 0.40 acre 50% 1426 16.74017 96.04590
Roof-Danni, Wall-Danni, Floor-
445 U Myint Lwin KalarTan 10x10 20% 1427 16.74027 96.04595
Bamboo
Roof-Danni, Wall-Bamboo, Floor-
446 U Tin Nyunt KalarTan 15x10 100% 1428 16.74025 96.04603
Bamboo
Roof-Zinc, Wall-Bamboo, Floor-
447 U Myint Lwin KalarTan 20x20 30% 1429 16.74033 96.04600
Bamboo
Roof-Danni, Wall-Bamboo, Floor-
448 U Kyi Win KalarTan 30x30 80% 1430 16.74035 96.04610
Bamboo
449 U Tun Min Soe KalarTan Land Plot 80x80 70% 1431 16.74041 96.04622

450 U Tin Soee KalarTan Yard 40x60 5% 1432 16.74048 96.04639


Roof-Danni, Wall-Danni, Floor-
451 U San Ngwe KalarTan 15x20 5% 1433 16.74051 96.04646 (120x64) 20%
Bamboo
Roof-Danni, Wall-Danni, Floor-
452 U Aung Chit Oo KalarTan 12x15 100% 1434 16.74046 96.04666
Bamboo
Roof-Zinc, Wall-Bamboo, Floor- (20x60) 20% U
453 U San Thaung KalarTan 10x30 5% 1435 16.74057 96.04661
Bamboo Kyaw (Asset)
Roof-Danni, Wall-Bamboo, Floor-
454 U Aung Thu Kha KalarTan 30x30 10% 1436 16.74061 96.04670 30x30 30%
Bamboo
Roof-Danni, Wall-Danni, Floor-
455 Daw Win Win Maw KalarTan 15x20 90% 1437 16.74062 96.04677 block of land 30x30
Wood
Roof-Danni, Wall-Wood, Floor-
456 U Ye Win Tun KalarTan 15x25 100% 1438 16.74060 96.04685
Wood
Roof-Zinc, Wall-Bamboo, Floor-
457 U Zun KalarTan 12x12 100% 1439 16.74065 96.04688
Bamboo
Roof-Zinc, Wall-Danni, Floor-
458 U Myint Oo KalarTan 10x10 10% 1440 16.74070 96.04688
Bamboo
459 Ywar Lake KalarTan 0.70 acre 30% 1441 16.74075 96.04708

460 U Lin Lin KalarTan Land Plot 40x60 30% 1442 16.74088 96.04748

461 U Myint Lwin KalarTan Land Plot 30x60 30% 1443 16.74091 96.04753

22
Twente Township

Roof-Danni, Wall-Danni, Floor-


462 U Than Tun KalarTan 15x15 30% 1444 16.74092 96.04758 block 25x60 40%
Bamboo
463 Spirit Houuse KalarTan Brick 5x5 100% 1445 16.74086 96.04766
Roof-Danni/Zinc, Wall-Danni,
464 U Kyaw Win KalarTan 15x20 40% 1446 16.74092 96.04764
Floor-Bamboo
Roof-Danni, Wall-Bamboo, Floor-
465 Daw Aye Myint KalarTan 15x30 80% 1447 16.74097 96.04777 (30x60) 90%
Bamboo
Roof-Zinc, Wall-Bamboo, Floor-
466 U Win Tin KalarTan 15x20 95% 1448 16.74095 96.04787 (40x120) 30%
Bamboo
Roof-Danni, Wall-Danni, Floor-
467 U Win Tin KalarTan 15x15 10% 1449 16.74099 96.04783
Bamboo
468 Daw San Aye KalarTan Pig Yard 15x20 100% 1450 16.74098 96.04792 (30x60) 80%
Roof-Zinc, Wall-Bamboo, Floor-
469 U Kyaw Lin Oo KalarTan 12x12 100% 1451 16.74103 96.04799 (30x60) 90%
Wood
Roof-Zinc, Wall-Bamboo, Floor-
470 U Zaw Linn Htike KalarTan 18x20 10% 1452 16.74109 96.04815 (45x80) 35%
Bamboo
471 U Myint Sein KalarTan Land Plot 20x20 100% 1453 16.74112 96.04820
Roof-Zinc, Wall-Bamboo, Floor-
472 U Win Htay KalarTan 15x30 3% 1454 16.74113 96.04827 (50x80) 50%
Wood
Roof-Zinc, Wall-Flagstone, Floor-
473 U Win Htay KalarTan 15x25 20% 1455 16.74115 96.04833
Wood
Roof-Zinc, Wall-Bamboo, Floor-
474 U Thein Hlaing KalarTan 20x30 50% 1456 16.74116 96.04839 20x80 50%
Wood
Roof-Zinc, Wall-Flagstone, Floor-
475 U Win Htike KalarTan 20x30 80% 1457 16.74118 96.04847 (40x120) 90%
Wood
Roof-Zinc, Wall-Bamboo, Floor-
476 U Kyaw Kyaw Wai KalarTan 15x20 50% 1458 16.74119 96.04853 (20x80) 50%
Bamboo
477 U Aung San KalarTan Roof-Zinc, Wall-Wood, Floor-Wood 30x50 95% 1459 16.74120 96.04860 (40x120) 90%
Roof-Zinc, Wall-Flagstone, Floor-
478 U Tun Than KalarTan 15x20 100% 1460 16.74122 96.04868 (30x120) 80%
Wood
Roof-Zinc, Wall-Flagstone, Floor-
479 U Than Nyein KalarTan 20x30 100% 1461 16.74125 96.04875 (0.20 acre) 80%
Wood

23
Dala Township

2. Dala Township
Type of Within GPS
Sr Owner Address Building/ land Area Latitude Longitude Latitude
building/land/plot ROW (%) number
1 ThaMan Gate Kyaung Su CN House 30*50 100% D1 16.75882 96.12410 Office

2 U Aung Min Oo Kyaung Su CN Shop 100% D2 16.75880 96.12412

3 U Aye Lwin Kyaung Su CN Shop 20*15 100% D3 16.75871 96.12419

4 U Khin Mg Lay Kyaung Su CN Shop 30*20 100% D4 16.75871 96.12418

5 U Sein Shwe Kyaung Su CN Shop 30*15 100% D5 16.75867 96.12401

6 U Hla Kyine Kyaung Su CN Shop 15*15 100% D6 16.75860 96.12393

7 Market Kyaung Su CN Market 30*100 100% D7 16.75828 96.12367

8 Tha Ma Shop Kyaung Su CN Shop 15*20 100% D8 16.75826 96.12353


Public Water
9 Donate by AMI Kyaung Su Permit Roof-Zinc 10*15 100% D9 16.75822 96.12338
Tank
10 Daw Khin Thet Mu Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D10 16.75821 96.12330

11 Daw Than Than Sint Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D11 16.75820 96.12325

12 Daw Nyunt Sein Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D12 16.75818 96.12324

13 Daw San Myint Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D13 16.75816 96.12322

14 U Hla Tun Oo Kyaung Su Permit Roof-Zinc, Wall-Brick 10*50 100% D14 16.75812 96.12318

15 Daw Moe Moe Khine Kyaung Su Permit 20*50 100% D15 16.75810 96.12315

16 Ko Lin Lin Kyaung Su Permit 20*50 100% D16 16.75808 96.12312


Daw Kyin Aye / Daw
17 Kyaung Su Permit Roof-Zinc, Wall-bamboo 10*50 100% D17 16.75806 96.12310
PyoneYe
18 U Hla Thwn Kyaung Su Permit Roof-Zinc, Wall-Zinc 20*50 100% D18 16.75802 96.12308

19 Ko Shine Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D19 16.75798 96.12305

20 Marine Office Kyaung Su Permit Roof-Zinc, Wall-Zinc 50*20 100% D20 16.75800 96.12296

21 Daw Thaung Thaung Ye Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D21 16.75795 96.12300

22 U Kyi Hlaing Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D22 16.75794 96.12297

23 U Htay Win Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D23 16.75791 96.12294

24
Dala Township

U Pan Mya/ Aung Si Thu


24 Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D24 16.75783 96.12289
Phyo

25 U Than Tun Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D25 16.75780 96.12287

26 Daw Than Than Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D26 16.75777 96.12284

27 Unknow Name Kyaung Su Permit 20*50 100% D27 16.75775 96.12281

28 U Nay Myo Thu Kyaung Su Permit 20*50 100% D28 16.75772 96.12277
Daw Pyone Ye/ Daw Kyin
29 Kyaung Su Permit Roof-Zinc, Wall-bamboo 10*50 100% D29 16.75768 96.12273
Aye
30 U Khin Aung Kyaung Su Permit Roof-Zinc, Wall Wood 10*50 100% D30 16.75765 96.12268

31 Ko Shine Kyaung Su Permit 20*50 100% D31 16.75762 96.12264

32 U Win Win Kyaung Su Permit Roof-Zinc, Wall Wood 20*50 100% D32 16.75757 96.12259

33 U Kyi Tun Kyaung Su Permit Roof-Zinc, Wall Wood 20*50 100% D33 16.75756 96.12253

34 U Myat Kyaw Oo Kyaung Su Permit Roof-Zinc, Wall Wood 20*50 100% D34 16.75752 96.12248

35 U Aye Khine Kyaung Su Permit Roof-Zinc, Wall Bamboo 20*50 100% D35 16.75750 96.12244

36 U Chit San Kyaung Su Permit Roof-Zinc, Wall Wood 10*50 100% D36 16.75747 96.12242

37 Daw Thaung Thaung Ye Kyaung Su Permit Roof-Zinc, Wall-Zinc 10*50 100% D37 16.75744 96.12238

38 Ko Shine Kyaung Su Permit 20*50 100% D38 16.75741 96.12235

39 Ko Shine Kyaung Su Permit 20*50 100% D39 16.75738 96.12231

40 Ko Shine Kyaung Su Permit 20*50 100% D40 16.75735 96.12228

41 Ko Shine Kyaung Su Permit 20*50 100% D41 16.75731 96.12223

42 Ko Shine Kyaung Su Permit 20*50 100% D42 16.75730 96.12219

43 U Tin Sein Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D43 16.75725 96.12216

44 Daw War Nu Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D44 16.75722 96.12213

45 Daw Lae Lae Win Kyaung Su Permit 10*50 100% D45 16.75719 96.12210

46 U Thein Tun Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D46 16.75715 96.12208

47 U Zaw One Kyaung Su Permit Roof-Zinc, Wall-Brick 20*50 100% D47 16.75709 96.12205

48 U Mya Than Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D48 16.75706 96.12192

25
Dala Township

49 Daw Myint Myint Aye Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D49 16.75703 96.12187

50 U Sein Pan Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D50 16.75702 96.12185

51 U Khin Mg Htay Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D51 16.75699 96.12184

52 Daw Khin Mar Myint Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D52 16.75698 96.12179

53 Daw Khin Aye Myint Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D53 16.75695 96.12177

54 U Nay Win Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D54 16.75691 96.12173

55 U Win Htike Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 40% D55 16.75687 96.12170
Rain Water Receivor
56 Kyaung Su Permit Roof-Zinc, Wall-Wood 20*10 20% D56 16.75687 96.12165
(AMI)
57 U Thar Khin Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D57 16.75682 96.12164

58 Daw Moe Moe Khine Kyaung Su Permit 10*50 100% D58 16.75678 96.12163

59 U San Ye Kyaung Su Permit 10*50 100% D59 16.75679 96.12160

60 U Than Aung Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D60 16.75676 96.12159

61 Daw San San Pyone Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D61 16.75672 96.12158

62 Daw Sandar Aye Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D62 16.75668 96.12156

63 U Zaw Lwin Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D63 16.75668 96.12151

64 U Thet Htwe Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D64 16.75662 96.12149

65 Daw Ohne Ye Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D65 16.75662 96.12143

66 U Win Maung Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D66 16.75659 96.12140

67 U Htay Aung Kyaung Su Permit Roof-Zinc, Wall-bamboo 10*50 100% D67 16.75656 96.12137

68 Daw Yin Hla Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D68 16.75651 96.12135

69 U Hla Shwe Kyaung Su Permit Roof-Zinc, Wall-Zinc 10*50 100% D69 16.75650 96.12133

70 Daw Khin Saw Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D70 16.75648 96.12130

71 Daw Tin Tin Win Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 100% D71 16.75647 96.12125

72 U Khin Hlaing Kyaung Su Permit Roof-Zinc, Wall-Concret 20*50 100% D72 16.75640 96.12119

73 U Than Tun Kyaung Su Permit Roof-Zinc, Wall-Brick 20*50 100% D73 16.75638 96.12115

74 Pon Nyar Thar Ya Kyaung Su Roof-Zinc, Wall-Brick 50*40 100% D74 16.75857 96.12406

26
Dala Township

75 Funeral Service OfficeK Kyaung Su Roof-Zinc, Wall-Wood 20*15 100% D75 16.75846 96.12400

76 U Myint Lwin Kyaung Su Permit Roof-Zinc, Wall-Wood 40*50 100% D76 16.75801 96.12342

77 U Min Lwin Soe Kyaung Su Permit Roof-Zinc, Wall-Concret 40*60 60% D77 16.75796 96.12326

78 U Par Kyaung Su Permit Roof-Zinc, Wall-Wood 30*50 20% D78 16.75793 96.12312

79 Daw Aye Mu Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 20% D79 16.75791 96.12304

80 U Than Win Kyaung Su Permit 40*50 20% D80 16.75789 96.12296

81 U Khin Mg Zaw Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 50% D81 16.75758 96.12288

82 U Than Kyaw Htay Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D82 16.75755 96.12284

83 U Than Aung Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D83 16.75755 96.12281

84 Daw Hmwe Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D84 16.75753 96.12279

85 U Hlaing Kyi Kyaung Su Permit 10*50 100% D85 16.75751 96.12285

86 Daw Kyi Htay Kyaung Su Permit Roof-Zinc, Wall-Wood 10*50 100% D86 16.75747 96.12277

87 U Ye Min Zaw Kyaung Su Permit Roof-Zinc, Wall-Wood 10*13 100% D87 16.75752 96.12272

88 U Htay Naing Kyaung Su Permit Roof-Zinc, Wall-Wood 10*30 100% D88 16.75746 96.12274 40*60

89 representative of owner Kyaung Su Permit 40*50 100% D89 16.75743 96.12269

90 U Soe Min Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 30% D90 16.75739 96.12260

91 U Si Thu Kyaung Su Permit Roof-Zinc, Wall-Wood 40*50 30% D91 16.75699 96.12213

92 U Tun Tun Win Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 70% D92 16.75688 96.12203

93 U Hla Tun Zaw Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 30% D93 16.75685 96.12195

94 Daw Than Win Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 80% D94 16.75662 96.12162

95 U Thein Min Zaw Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 20% D95 16.75656 96.12159

96 Daw Tin Tin Htay Kyaung Su Permit Roof-Zinc, Wall-Brick 20*50 20% D96 16.75652 96.12155

97 Daw Khin May Thein Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 20% D97 16.75648 96.12150

98 Daw Than Hla Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 20% D98 16.75645 96.12146

99 representative of owner Kyaung Su Permit 20*50 20% D99 16.75641 96.12141

100 U Tun Shein Kyaung Su Permit Roof-Zinc, Wall-Wood 20*50 20% D100 16.75641 96.12144

27
Dala Township

101 U Thank Zin Hway Kyaung Su Roof-Zinc, Wall-bamboo 100% DS 1 16.75656 96.12120
Roof-Zinc, Wall-
102 U Thaung Sein Kyaung Su 100% DS 2 16.75662 96.12119
Zinc/plastic
Roof-Dha Ni , Wall-Dha
103 Daw Sandar Hlaing Kyaung Su 100% DS 3 16.75661 96.12126
Ni
Roof-Dha Ni , Wall-Dha
104 U Zaw Htat Kyaw Kyaung Su 100% DS 4 16.75666 96.12121
Ni
Roof-Dha Ni , Wall-Dha
105 U Aung Shwe Kyaung Su 100% DS 5 16.75664 96.12127
Ni
U Phoe Ni /U Khin Zaw
106 Kyaung Su Roof-Zinc, Wall-Wood 100% DS 6 16.75666 96.12129
Win
107 U Myo Zaw Kyaung Su Roof-Zinc, Wall-Zinc 100% DS 7 16.75674 96.12123

108 U Zaw Linn Kyaung Su Roof-Zinc, Wall-Zinc 100% DS 8 16.75668 96.12134


Roof-Dha Ni, Wall-Dha
109 Daw Ma Ni Mar Kyaung Su 100% DS 9 16.75674 96.12128
Ni
110 Daw Dar Ma Kyee Kyaung Su Roof-Zinc, Wall-bamboo 100% DS 10 16.75675 96.12131
Roof-Dha Ni, Wall-
111 Daw Hla Hla Ngwe Kyaung Su 100% DS 11 16.75679 96.12133
bamboo
Roof-Dha Ni, Wall-
112 U Ye Linn Kyaung Su 100% DS 12 16.75682 96.12136
bamboo
Roof-Dha Ni, Wall-Dha
113 U Myo Aung Kyaung Su 100% DS 13 16.75690 96.12135
Ni
Roof-Dha Ni, Wall-
114 U Aye Zaw Ko Kyaung Su 100% DS 14 16.75683 96.12153
bamboo
Roof-Dha Ni, Wall-
115 U Kyaw Swar Soe Kyaung Su 100% DS 15 16.75693 96.12163
bamboo
Roof-Dha Ni, Wall-
116 U Han Min Aung Kyaung Su 100% DS 16 16.75695 96.12167
bamboo
117 U Khin Maung Thein Kyaung Su Roof-Zinc, Wall-Wood 100% DS 17 16.75701 96.12169

118 U Win Myint Kyaung Su Roof-Zinc, Wall-Wood 100% DS 18 16.75703 96.12173

119 U Than Soe Kyaung Su Roof-Zinc, Wall-Wood 100% DS 19 16.75707 96.12178

120 Liberty Kyaung Su Roof-Zinc, Wall-Brick 100% DS 20 16.75713 96.12192


Roof-Dha Ni, Wall-Dha
121 U Thein Myint Kyaung Su 100% DS 21 16.75719 96.12192
Ni
122 U Pyie Phyo Maung Kyaung Su Roof-Plastic, Wall-Dha Ni 100% DS 22 16.75722 96.12192

28
Dala Township

123 U Hlaing Win Kyaung Su Roof-Zinc, Wall-bamboo 100% DS 23 16.75718 96.12198

124 U Maung Maung Khine Kyaung Su Roof-Zinc, Wall-Wood 100% DS 24 16.75721 96.12204

125 U Win Soe Kyaung Su Roof-Zinc, Wall-Wood 100% DS 25 16.75724 96.12208

126 Daw Tin Hla Kyaung Su Roof-Zinc, Wall-bamboo 100% DS 26 16.75727 96.12212

127 U Nay Myo Lwin Kyaung Su Roof-Zinc, Wall-bamboo DS 27 16.75757 96.12240

128 Daw Yin Kyi Kyaung Su Roof-Zinc, Wall-bamboo DS 28 16.75762 96.12243

129 U San Aung Kyaung Su Roof-Zinc, Wall-bamboo DS 29 16.75764 96.12247

130 U Phyo Ko Ko Win Kyaung Su Roof-Zinc, Wall-Wood DS 30 16.75767 96.12250

131 U Nyi Nyi Kyaung Su Roof-Zinc, Wall-Wood DS 31 16.75770 96.12254

132 U Myat Thu Kyaung Su Roof-Zinc, Wall-Wood DS 32 16.75772 96.12258

133 U Kyaw Khine Oo Kyaung Su Roof-Zinc, Wall-Wood DS 33 16.75776 96.12246


Roof-Dha Ni, Wall-Dha
134 U Ye Min Htet Kyaung Su DS 34 16.75773 96.12248
Ni
135 U Myo Min Aung Kyaung Su Roof-Zinc, Wall-bamboo DS 35 16.75775 96.12255

136 Daw Aye Thein Kyaung Su Roof-Zinc, Wall-Concret DS 36 16.75774 96.12259

137 U Si Thu Lwin Kyaung Su Roof-Zinc, Wall-Zinc DS 37 16.75781 96.12251


Roof-Dha Ni, Wall-
138 U Than Ko Ko Kyaung Su DS 38 16.75775 96.12261
bamboo
Roof-Dha Ni, Wall-
139 U Hla Kyine Kyaung Su DS 39 16.75777 96.12264
bamboo
Roof-Dha Ni, Wall-Dha
140 Daw Thinn Thinn Yu Kyaung Su DS 40 16.75782 96.12260
Ni
Roof-Dha Ni, Wall-
141 Daw Khin San Win Kyaung Su DS 41 16.75780 96.12266
bamboo
Roof-Dha Ni, Wall-
142 U Chit Ko Ko Win Kyaung Su DS 42 16.75782 96.12269
bamboo
143 Daw Zar Ni Win Kyaung Su Roof-Zinc, Wall-Zinc DS 43 16.75783 96.12272

144 Daw Than Htay Kyaung Su Roof-Zinc, Wall-Zinc DS 44 16.75792 96.12269

145 U Myo Min Aung Kyaung Su Roof-Zinc, Wall-Zinc DS 45 16.75785 96.12274

146 U Min Thi Ha Kyaung Su Roof-Zinc, Wall-Zinc DS 46 16.75787 96.12279

29
Dala Township

147 U Sein Shwe Kyaung Su Roof-Zinc, Wall-Zinc DS 47 16.75790 96.12281

148 U Aung Min Swe Kyaung Su Roof-Zinc, Wall-Zinc DS 48 16.75792 96.12284


Roof-Dha Ni, Wall-
149 U Aung Tun Myaing Kyaung Su DS 49 16.75794 96.12287
bamboo
Roof-Dha Ni, Wall-
150 Daw Pyine Yee Kyaung Su DS 50 16.75796 96.12290
bamboo
Roof-Dha Ni, Wall-
151 U Tat Zaw Ko Kyaung Su DS 51 16.75799 96.12297
bamboo
152 U Zaw Lin Moe Tar Gyi Roof-Zinc, Wall-Plywood 30*80 100% DS52 16.75635 96.12091

153 U Kyaw Thu Tar Gyi Roof-Zinc, Wall-Zinc 50*80 100% DS53 16.75633 96.12089

154 U Soe Than Win Tar Gyi Roof-Zinc, Wall-Wood 20*70 100% DS54 16.75629 96.12086

155 U Zaw Tun Tar Gyi Roof-Zinc, Wall-Plyood 20*40 100% DS55 16.75629 96.12084

156 Daw Khin May Thein Tar Gyi Roof-Zinc, Wall-Wood 15*25 100% DS56 16.75626 96.12081

157 U Thein Hla Tar Gyi Roof-Zinc, Wall-Brick 15*20 100% DS57 16.75633 96.12072

158 U Tun Min Myat Tar Gyi Roof-Zinc, Wall-Concret 15*20 100% DS58 16.75637 96.12069

159 Daw Thin Thin Oo Tar Gyi Roof-Zinc, Wall-Concret 13*24 100% DS59 16.75622 96.12083

160 U Tin Win Tar Gyi Roof-Zinc, Wall-Wood 10*25 100% DS60 16.75619 96.12083

161 U Nay Myo Aung Tar Gyi Roof-Zinc, Wall-bamboo 15*20 100% DS61 16.75621 96.12077

162 U Tin Min Oo Tar Gyi Roof-Zinc, Wall-bamboo 15*16 100% DS62 16.75618 96.12077

163 U Soe Htike Tar Gyi Roof-Zinc, Wall-Zinc 15*18 100% DS63 16.75617 96.12075

164 Daw Than Dar Oo Tar Gyi Roof-Zinc, Wall-Concret 14*18 100% DS64 16.75614 96.12073

165 U Maung San Tar Gyi Roof-Zinc, Wall-bamboo 15*20 100% DS65 16.75612 96.12071

166 Daw Khin Mi Tar Gyi Roof-Plastic, Wall-Dha Ni 10*15 100% DS66 16.75618 96.12063

167 U Naing Tun Tar Gyi Roof-Zinc, Wall-Wood 15*30 100% DS67 16.75613 96.12068

168 U Tat Tat Tar Gyi Roof-Zinc, Wall-bamboo 15*20 100% DS68 16.75607 96.12067

169 Daw Marri Tar Gyi Roof-Zinc, Wall-Wood 15*20 100% DS69 16.75605 96.12069
Roof-Dha Ni, Wall-Dha
170 U Pho Thar Aung Tar Gyi 25*30 100% DS70 16.75606 96.12061
Ni
171 Daw Tin Tin Htwe Tar Gyi Roof-Zinc, Wall-Zinc 10*15 100% DS71 16.75595 96.12061

30
Dala Township

172 U Thein Tan Tar Gyi Roof-Dha Ni, Wall-Zinc 10*15 100% DS72 16.75590 96.12055

173 U Thein Myint Tar Gyi Roof-Zinc, Wall-Concret 10*20 100% DS73 16.75590 96.12065

174 U Kyaw Soe Tar Gyi 15*20 100% DS74 16.75590 96.12069

175 U Maung Win Tar Gyi Roof-Dha Ni 10*15 100% DS75 16.75589 96.12074

176 Daw Than Myine Tar Gyi Roof-Zinc, Wall-Concret 15*25 100% DS76 16.75596 96.12070
Roof-Dha Ni, Wall-
177 Daw San San Win Tar Gyi 10*10 100% DS77 16.75598 96.12073
Bamboo
178 Daw Hla Maw Tar Gyi Roof-Zinc, Wall-bamboo 20*25 100% DS78 16.75595 96.12075

179 U Min Aung Tar Gyi Roof-Zinc, Wall-bamboo 20*40 100% DS79 16.75600 96.12076

180 U Thura Maung Tar Gyi Roof-Zinc, Wall-Dha Ni 10*20 100% DS80 16.75595 96.12082

181 U Kyaw Myint Tar Gyi 15*25 100% DS81 16.75598 96.12080
Roof-Plastic, Wall-
182 U Aung Kyaw Moe Tar Gyi 10*10 100% DS82 16.75593 96.12082
Bamboo
Roof-Dha Ni, Wall-Dha
183 U Myint Oo Tar Gyi 8*10 100% DS83 16.75595 96.12082
Ni
184 Daw Nawe Nawe Thin Tar Gyi Roof-Zinc, Wall-Dha Ni 10*15 100% DS84 16.75598 96.12092

185 Daw Thiha Tun Tar Gyi Roof-Zinc, Wall-Concret 11*20 100% DS85 16.75600 96.12090

186 Daw Tin Tin Khine Tar Gyi Roof-Zinc, Wall-Zinc 12*20 100% DS86 16.75601 96.12091

187 U Nay Lin Tun Tar Gyi Roof-Zinc, Wall-Concret 11*30 100% DS87 16.75603 96.12091

188 U Yan Naing Soe Tar Gyi Roof-Zinc, Wall-Brick 13*25 100% DS88 16.75603 96.12087

189 U Pyae Son Aung Tar Gyi Roof-Zinc, Wall-Concret 20*25 100% DS89 16.75605 96.12087

190 U Kyaw Lin Aung Tar Gyi Roof-Zinc, Wall-Concret 15*30 100% DS90 16.75607 96.12088

191 representative of owner Tar Gyi Roof-Zinc, Wall-Wood 12*15 100% DS91 16.75611 96.12087

192 Daw San San Maw Tar Gyi Roof-Zinc, Wall-Wood 15*25 100% DS92 16.75611 96.12081

193 Daw Than Than Hla Tar Gyi Roof-Zinc, Wall-Wood 30*90 100% DS93 16.75609 96.12121

194 representative of owner Tar Gyi Roof-Zinc, Wall-Wood 20*60 100% DS94 16.75606 96.12119

195 representative of owner Tar Gyi Roof-Zinc, Wall-Wood 20*60 100% DS95 16.75603 96.12114

196 Daw Hla Lay Tar Gyi Roof-Zinc, Wall-bamboo 15*60 100% DS96 16.75600 96.12111

31
Dala Township

197 U Ye Myint Tar Gyi Roof-Zinc, Wall-Brick 15*55 100% DS97 16.75595 96.12109

198 U Hla Htay Tar Gyi Roof-Zinc, Wall-Zinc 15*30 100% DS98 16.75593 96.12105

199 Daw Tin Htay Tar Gyi Roof-Zinc, Wall-Brick 15*55 100% DS99 16.75589 96.12101

200 U Aung Kyaw Soe Tar Gyi Roof-Zinc, Wall-Brick 30*40 100% DS100 16.75586 96.12096

201 U Kyaw Zin Win Tar Gyi Roof-Zinc, Wall-Wood 15*40 100% DS101 16.75584 96.12091

202 U Kyaw Oo Tar Gyi Roof-Zinc, Wall-Wood 15*40 100% DS102 16.75580 96.12088

203 U Thein Win Tar Gyi Roof-Zinc, Wall-Zinc 20*60 50% DS103 16.75577 96.12086

204 U Than Htike Tar Gyi Roof-Zinc, Wall-Zinc 15*30 50% DS104 16.75575 96.12081

205 U Myint Lwin Tar Gyi Roof-Zinc, Wall-Brick 40*40 30% DS105 16.75573 96.12075

206 U San Kyaw Tar Gyi 15*25 20% DS106 16.75570 96.12067

207 Daw Khin Myint Oo Tar Gyi 12*20 10% DS107 16.75567 96.12058

208 U Aung Tin Myint Tar Gyi Roof-Zinc, Wall-bamboo 30*82 20% DS108 16.75554 96.12041

209 U Naing Lin / Shwe Lin Tar Gyi Roof-Zinc, Wall-Wood 25*32 20% DS109 16.75550 96.12034

210 U Myat Kyaw Oo Tar Gyi Roof-Zinc, Wall-Zinc 16*17 100% DS110 16.75578 96.12076

211 Daw Myint Kyi Tar Gyi Roof-Zinc, Wall-bamboo 15*20 100% DS111 16.75579 96.12071

212 U Kyi Thein Tar Gyi Roof-Zinc, Wall-Zinc 10*20 100% DS112 16.75581 96.12069

213 U Thet Swe Tar Gyi Roof-Zinc, Wall-Concret 15*30 100% DS113 16.75586 96.12062

214 U Kyaw San Tar Gyi Roof-Zinc, Wall-Zinc 12*60 100% DS114 16.75584 96.12057

215 U Aung Myo Chit Tar Gyi Roof-Zinc, Wall-Wood 20*50 100% DS115 16.75582 96.12057

216 Daw Myint Sein Tar Gyi Roof-Zinc, Wall-bamboo 25*55 100% DS116 16.75579 96.12052
Roof-Plastic, Wall-
217 U Hnit Oo Tar Gyi 10*15 100% DS117 16.75579 96.12049
Bamboo
218 U Hla Myint Tar Gyi Roof-Zinc, Wall-Zinc 20*20 100% DS118 16.75579 96.12048

219 Daw Sanay Ma Tar Gyi Roof-Zinc, Wall-bamboo 10*15 100% DS119 16.75576 96.12043

220 U Moe Oo Tar Gyi Roof-Zinc, Wall-bamboo 20*30 100% DS120 16.75571 96.12046

221 U Hla Thein Tar Gyi Roof-Zinc, Wall-bamboo 20*10 100% DS121 16.75573 96.12042

32
Dala Township

222 U Kyi Khin Tar Gyi 15*25 100% DS122 16.75567 96.12042

223 Daw Aye Tar Gyi Roof-Zinc, Wall-Wood 15*30 100% DS123 16.75566 96.12038

224 U Lu Zaw Tar Gyi Roof-Zinc, Wall-bamboo 15*50 100% DS124 16.75560 96.12028

225 U Tin Aye Tar Gyi Roof-Zinc, Wall-Concret 20*50 100% DS125 16.75559 96.12024

226 Daw Aye Soe Khing Tar Gyi Hut 15*50 100% DS126 16.75555 96.12024

227 Daw Khing Myo Aye Tar Gyi Roof-Zinc, Wall-Wood 15*50 100% DS127 16.75553 96.12021

228 Daw Chit Tar Gyi Roof-Zinc, Wall-Brick 12*60 100% DS128 16.75553 96.12019

229 U Aung Shine Tar Gyi Roof-Zinc, Wall-Wood 15*50 100% DS129 16.75550 96.12018

230 U Ohne Myint Tar Gyi Roof-Zinc, Wall-bamboo 40*60 100% DS130 16.75540 96.12017

231 U Aung Min Oo Tar Gyi Roof-Zinc, Wall-bamboo 20*20 50% DS131 16.75535 96.12026

232 U Aung Win Tar Gyi Roof-Zinc, Wall-bamboo 15*20 50% DS132 16.75535 96.12026

233 U San Aung Tar Gyi Roof-Zinc, Wall-Wood 30*60 100% DS133 16.75535 96.12007

234 Daw Myint Than Tar Gyi Hut 10*15 100% DS134 16.75539 96.12004
Roof-Dha Ni, Wall-Dha
235 U Hla Kyi Tar Gyi 10*20 100% DS135 16.75536 96.11994
Ni
236 U Moe Kyaw Tar Gyi 30*60 100% DS136 16.75533 96.11999

237 U Zayar Tar Gyi Roof-Zinc, Wall-Concret 10*20 100% DS137 16.75531 96.11995

238 U Zaw Min Oo Tar Gyi Roof-Zinc, Wall-Concret 20*60 100% DS138 16.75524 96.11998

U Aung Myint Kyaw/ Roof-Dha Ni, Wall-Dha


239 Tar Gyi 10*20 100% DS139 16.75525 96.11992
Daw War Ni

240 Daw Myint Tar Gyi Roof-Zinc, Wall-Wood 40*80 100% DS140 16.75510 96.11986

241 U Kyaw Naung Tar Gyi 25*80 100% DS141 16.75518 96.11991

242 U Nay Dun Tar Gyi Roof-Zinc, Wall-Wood 40*80 100% DS142 16.75501 96.11982

243 Daw Thu Zar Kyi Tar Gyi Roof-Zinc, Wall-bamboo 40*80 100% DS143 16.75496 96.11979

244 U Tin Htay Tar Gyi Roof-Zinc, Wall-Wood 20*80 100% DS144 16.75499 96.11968

245 Daw Khin Myo Aye Tar Gyi Roof-Zinc, Wall-Wood 40*80 50% DS145 16.75484 96.11968

246 U Naing Lin Zaw Tar Gyi Roof-Zinc, Wall-bamboo 15*30 50% DS146 16.75478 96.11964

33
Dala Township

247 U Maung Myint Tar Gyi Roof-Zinc, Wall-bamboo 20*40 100% DS147 16.75491 96.11960

248 Daw Cho Cho Mar Tar Gyi Roof-Zinc, Wall-Wood 40*50 50% DS148 16.75475 96.11957

249 U Hla Yi Tar Gyi Roof-Zinc, Wall-Wood 20*30 100% DS149 16.75482 96.11956

250 Daw Myint Aye Tar Gyi Roof-Zinc, Wall-Wood 40*50 20% DS150 16.75469 96.11949

251 U Aye Min Zaw Tar Gyi Roof-Zinc, Wall-Wood 20*30 100% DS151 16.75470 96.11944

252 U Hla Htway Tar Gyi Roof-Zinc, Wall-Wood 40*80 100% DS152 16.75463 96.11943
Roof-Dha Ni, Wall-
253 U Aung Win Tar Gyi 10*20 100% DS153 16.75470 96.11927
Bamboo
254 U Thin Ngwe Tar Gyi Roof-Zinc, Wall-Concret 12*13 100% DS154 16.75465 96.11925

255 U Kyaw Kyaw Naing Tar Gyi Roof-Zinc, Wall-Wood 14*15 50% DS155 16.75455 96.11928

256 U Ye Win Naing Tar Gyi Roof-Zinc, Wall-Concret 12*13 20% DS156 16.75453 96.11934

257 U Maung Maung Myint Tar Gyi Roof-Zinc, Wall-Concret 20*40 50% DS157 16.75449 96.11926

258 Daw Htay Htay Win Tar Gyi Roof-Zinc, Wall-Wood 15*16 100% DS158 16.75454 96.11924

259 U Kyaw Kyaw San Tar Gyi Roof-Zinc, Wall-Zinc 13*14 100% DS159 16.75456 96.11912

260 U Nain Lin Tun Tar Gyi Roof-Zinc, Wall-Wood 9*10 100% DS160 16.75448 96.11914

261 U Than Aye Tar Gyi Roof-Zinc, Wall-Brick 12*13 100% DS161 16.75447 96.11914

262 Daw Than Than Maw Tar Gyi Hut 13*14 50% DS162 16.75443 96.11918

263 U Nyunt Hlaing Tar Gyi Roof-Zinc, Wall-Concret 12*13 100% DS163 16.75449 96.11909

264 U Aung Phyo Tar Gyi Roof-Zinc, Wall-Concret 11*12 100% DS164 16.75444 96.11907 2 floors

265 Daw Aye Mar Oo Tar Gyi Roof-Zinc, Wall-Concret 10*12 100% DS165 16.75445 96.11908 2 floors

266 U Kyaw Min Khing Tar Gyi Roof-Zinc, Wall-bamboo 9*10 100% DS166 16.75452 96.11901

267 U Kyaw Win Tar Gyi Roof-Zinc, Wall-bamboo 14*15 100% DS167 16.75445 96.11900
Roof-Dha Ni, Wall-Dha
268 U Kyaw Ye Lwin Tar Gyi 12*13 100% DS168 16.75449 96.11897
Ni
Roof-Dha Ni, Wall-
269 Daw Hla Thein Tar Gyi 10*12 30% DS169 16.75431 96.11905
Concret
270 representative of owner Tar Gyi Roof-Zinc, Wall-Concret 12*13 100% DS170 16.75441 96.11894

271 U Tin Win Tar Gyi Roof-Zinc, Wall-Concret 15*18 100% DS171 16.75439 96.11890

34
Dala Township

272 U Nyine Chan Htay Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS172 16.75437 96.11885
273 Daw Soe Ngwe Ngwe Oo Tar Gyi Roof-Zinc, Wall-bamboo 10*11 100% DS173 16.75430 96.11879
274 U Tint Lwin Tar Gyi Roof-Zinc, Wall-Dha Ni 10*11 100% DS174 16.75432 96.11878

275 U Aung Thein Tar Gyi Roof-Zinc, Wall-Dha Ni 11*12 100% DS175 16.75424 96.11878
Roof-Dha Ni, Wall-Dha
276 Daw Zar Chi Myo Tar Gyi 9*10 100% DS176 16.75431 96.11878
Ni
277 U Pan Kyi Tar Gyi Roof-Zinc, Wall-Wood 13*14 50% DS177 16.75418 96.11875

278 U Myint Soe Lay Tar Gyi Roof-Zinc, Wall-Wood 8*9 100% DS178 16.75423 96.11871

279 U Lin Lin Naung Tar Gyi Roof-Zinc, Wall-bamboo 13*14 50% DS179 16.75415 96.11870
280 Daw Soe Soe/ U Zaw Tun Tar Gyi Roof-Zinc, Wall-bamboo 10*11 100% DS180 16.75416 96.11860
281 U Kyi San Tar Gyi Roof-Zinc, Wall-bamboo 11*12 100% DS181 16.75416 96.11857

282 Daw Khin San Win Tar Gyi Roof-Zinc, Wall-Wood 12*13 100% DS182 16.75399 96.11848

283 U Nay Win Tar Gyi Roof-Zinc, Wall-Wood 12*12 100% DS183 16.75395 96.11833

284 U Thein Soe Tar Gyi Roof-Zinc, Wall-Dha Ni 11*12 100% DS184 16.75390 96.11829

285 U Myint Shwe Tar Gyi Roof-Zinc, Wall-Wood 13*14 100% DS185 16.75389 96.11818

286 U Than Htay Tar Gyi Roof-Zinc, Wall-Wood 13*14 100% DS186 16.75383 96.11812

287 U Thein Htay Win Tar Gyi Roof-Zinc, Wall-bamboo 11*12 100% DS187 16.75381 96.11809

288 U Thein Phay Tar Gyi Roof-Zinc, Wall-Wood 12*13 100% DS188 16.75378 96.11809
Roof-Dha Ni, Wall-Dha
289 U Myo Lin Aung Tar Gyi 11*12 100% DS189 16.75378 96.11805
Ni
Roof-Dha Ni, Wall-
290 Daw Than Oo Tar Gyi 10*10 100% DS190 16.75376 96.11804
Bamboo
Roof-Dha Ni, Wall-Dha
291 U Than Htay Tar Gyi 9*10 100% DS191 16.75381 96.11799
Ni
292 U Kyaw Naing Oo Tar Gyi Roof-Dha Ni, Wall-Wood 15*16 100% DS192 16.75372 96.11790
Roof-Dha Ni, Wall-Dha
293 U Than Lwin Oo Tar Gyi 10*11 100% DS193 16.75374 96.11787
Ni
294 U Kyaw Lwin Tar Gyi Roof-Zinc, Wall-Dha Ni 15*16 100% DS194 16.75368 96.11787

295 U Myint Aung Tar Gyi 25*90 100% DS195 16.75388 96.11838

296 U Tint Lwin Tar Gyi 20*60 100% DS196 16.75380 96.11820

35
Dala Township

297 representative of owner Tar Gyi Roof-Zinc, Wall-concret 12*13 20% DS197 16.75355 96.11769

298 U Aung Min Tar Gyi Roof-Zinc, Wall-Zinc 11*12 50% DS198 16.75351 96.11754

299 Daw San San Myint Tar Gyi Roof-Dha Ni, Wall-Wood 10*11 100% DS199 16.75354 96.11755

300 U Zaw Lin Tar Gyi Roof-Dha Ni, Wall-Wood 10*10 100% DS200 16.75354 96.11752

301 U Thein Lwin Tar Gyi Roof-Zinc, Wall-Concret 11*12 50% DS201 16.75349 96.11750

302 U Zaw Min Tar Gyi Roof-Zinc, Wall-bamboo 11*12 100% DS202 16.75352 96.11748

303 Daw San San Yin Tar Gyi Roof-Zinc, Wall-Zinc 9*10 50% DS203 16.75348 96.11747

304 U Myat Min Zaw Tar Gyi Roof-Zinc, Wall-Zinc 10*11 50% DS204 16.75348 96.11743

305 U Than Lwin Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 100% DS205 16.75347 96.11737

306 U Tin Win Tar Gyi Roof-Zinc, Wall-bamboo 10*11 50% DS206 16.75341 96.11730

307 U Htay Lwin Tar Gyi Roof-Zinc, Wall-Wood 11*12 50% DS207 16.75339 96.11723

308 U Aye Win Htike Tar Gyi Roof-Zinc, Wall-bamboo 10*11 50% DS208 16.75340 96.11722

309 U Min Min Naing Tar Gyi 20*40 50% DS209 16.75337 96.11720

310 Daw Thiri Khine Soe Tar Gyi 20*40 50% DS210 16.75335 96.11717

311 U Chit Ko Ko Myo Tar Gyi Roof-Zinc, Wall-Wood 12*13 50% DS211 16.75336 96.11712

312 U Aung Cho Oo Tar Gyi Roof-Zinc, Wall-Dha Ni 11*12 50% DS212 16.75331 96.11705

313 Daw Khin San Naing Tar Gyi Roof-Zinc, Wall-Dha Ni 9*10 100% DS213 16.75333 96.11705

314 U Thein Myint Zaw Tar Gyi Roof-Zinc, Wall-bamboo 11*12 50% DS214 16.75330 96.11702

315 U Tun Tun Tar Gyi Roof-Zinc, Wall-Zinc 10*11 100% DS215 16.75326 96.11697

316 Daw Tin Tin San Tar Gyi Roof-Zinc, Wall-bamboo 10*11 50% DS216 16.75323 96.11693

317 Daw Hla Hla Win Tar Gyi Roof-Zinc, Wall-Zinc 10*11 50% DS217 16.75316 96.11679

318 U Myat Thein Moe Tar Gyi 10*11 50% DS218 16.75340 96.11725

319 U Than Win Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 30% DS219 16.75317 96.11679
Roof-Dha Ni, Wall-Dha
320 U Moe Min Paing Tar Gyi 10*11 100% DS220 16.75316 96.11671
Ni
321 U Than Lwin Tar Gyi Roof-Zinc, Wall-Zinc 14*15 20% DS221 16.75313 96.11672

322 U Maung Zaw Tar Gyi Roof-Zinc, Wall-Zinc 11*12 20% DS222 16.75309 96.11668

36
Dala Township

323 U Min Zaw Tar Gyi Roof-Zinc, Wall-bamboo 13*14 20% DS223 16.75306 96.11665

324 Daw Kyin Htay Tar Gyi Roof-Zinc, Wall-concret 15*16 20% DS224 16.75308 96.11660

325 U Than Tun Tar Gyi Roof-Zinc, Wall-concret 12*20 20% DS225 16.75304 96.11656
Roof-Dha Ni, Wall-Dha
326 Daw Wit Yi Tun Tar Gyi 9*10 100% DS226 16.75307 96.11651
Ni
327 Daw Naing Naing Htwe Tar Gyi Roof-Zinc, Wall-Dha Ni 10*12 20% DS227 16.75303 96.11650
328 Daw Mya Thein Tar Gyi Roof-Zinc, Wall-Brick 13*14 20% DS228 16.75302 96.11645

329 Daw Tin Aye Tar Gyi Roof-Zinc, Wall-concret 12*13 20% DS229 16.75296 96.11638
Roof-Dha Ni, Wall-Dha
330 U Ko Thet Tar Gyi 11*12 100% DS230 16.75301 96.11642
Ni
331 U Hlaing Tun Tar Gyi Roof-Zinc, Wall-Wood 12*13 10% DS231 16.75296 96.11639

332 U Phyo Wai Kyaw Tar Gyi 25*50 20% DS232 16.75295 96.11635

333 Daw Thiri Khine Soe Tar Gyi 18*60 20% DS233 16.75289 96.11619

334 U Phyone Lwin Tar Gyi Roof-Zinc, Wall-Zinc 12*13 50% DS234 16.75287 96.11614

335 Daw Ngwe Ngwe Win Tar Gyi Roof-Zinc, Wall-Wood 14*15 50% DS235 16.75282 96.11612

336 U Than Shwe Tar Gyi Roof-Zinc, Wall-bamboo 12*13 20% DS236 16.75280 96.11600

337 Daw Mya Mya Moe Tar Gyi Roof-Zinc, Wall-concret 13*14 50% DS237 16.75281 96.11595

338 U Kyaw Lwin Tar Gyi Roof-Zinc, Wall-concret 12*13 50% DS238 16.75278 96.11589

339 Daw Myint Myint Maw Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 20% DS239 16.75273 96.11583

340 U Kyaw Than Tar Gyi Roof-Dha Ni, Wall-Zinc 12*13 50% DS240 16.75265 96.11569

341 U Myint Than Tar Gyi Roof-Zinc, Wall-Wood 13*14 50% DS241 16.75259 96.11561

342 U Myint Wai Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 30% DS242 16.75248 96.11552

343 Daw Thin Thin Myat Tar Gyi 1.25 Acrea DS243 16.75229 96.11497

344 U Win Zaw Tar Gyi Roof-Zinc, Wall-Wood 12*13 100% DS244 16.75231 96.11466

345 U Myint Than Tar Gyi 3 acrea 0.5 acrea DS245 16.75184 96.11392 Mango

346 U Chit Ko Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 100% DS246 16.75173 96.11323

347 U Ba Than Tar Gyi Roof-Zinc, Wall-Dha Ni 12*12 100% DS247 16.75168 96.11316

348 U Pho Kyaw Tar Gyi Roof-Dha Ni, Wall-Dha 11*12 60% DS248 16.75163 96.11317

37
Dala Township

Ni

349 Daw Ohne Myint Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 100% DS249 16.75167 96.11310
Roof-Dha Ni, Wall-Dha
350 U Hla Kyi Tar Gyi 12*13 60% DS250 16.75159 96.11312
Ni
351 U Sein Hla Aung Tar Gyi 12*13 100% DS251 16.75158 96.11303
Roof-Dha Ni, Wall-Dha
352 U Nyi Nyi Win Tar Gyi 11*12 100% DS252 16.75155 96.11294
Ni
Roof-Dha Ni, Wall-Dha
353 Daw Tin Tin Hla Tar Gyi 10*11 100% DS253 16.75153 96.11288
Ni

U Myo Aung/ Daw Than


354 Tar Gyi Roof-Zinc, Wall-Dha Ni 10*11 100% DS254 16.75150 96.11284
Than Sint

355 U Myo Aung Tar Gyi 10*11 100% DS255 16.75152 96.11277

356 Daw Kyi Than Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 100% DS256 16.75144 96.11265
Roof-Dha Ni, Wall-Dha
357 U Kyaw Kyaw Oo Tar Gyi 10*11 100% DS257 16.75148 96.11261
Ni
358 Daw Phyo Ei San Tar Gyi 10*70 100% DS258 16.75146 96.11260

359 Daw Khin Yamin Tar Gyi 20*70 100% DS259 16.75143 96.11260

360 U Khin Hlaing Win Tar Gyi Roof-Zinc, Wall-Brick 14*15 100% DS260 16.75139 96.11251

361 U Tun Yi Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS261 16.75136 96.11246

362 Daw Htike Htike Lin Tar Gyi 30*70 100% DS262 16.75134 96.11239

363 U Khin Maung Mya Tar Gyi 30*70 100% DS263 16.75132 96.11232

364 U Zaw Win Tar Gyi 20*30 100% DS264 16.75145 96.11268
Roof-Plastic, Wall-
365 Daw Thet Thet Han Tar Gyi 12*13 100% DS265 16.75129 96.11228
Bamboo
366 U Aung Naing Tar Gyi 30*70 100% DS266 16.75127 96.11219

367 U Maung Oo Tar Gyi Roof-Zinc, Wall-bamboo 13*14 100% DS267 16.75127 96.11217
Roof-Dha Ni, Wall-Dha
368 U Win Htet Aung Tar Gyi 10*11 100% DS268 16.75127 96.11215
Ni
369 U Win Kyaw Tar Gyi 20*70 100% DS269 16.75126 96.11205

370 U Khin Maung Tun Tar Gyi 20*70 100% DS270 16.75126 96.11204

38
Dala Township

371 U Tun Kyaw Tar Gyi 20*70 100% DS271 16.75124 96.11193
Roof-Dha Ni, Wall-Dha
372 U Sein Han Tar Gyi 11*12 100% DS272 16.75121 96.11189
Ni
Roof-Dha Ni, Wall-
373 U Tun Tun Naing Tar Gyi 10*12 100% DS273 16.75115 96.11190
Bamboo
374 U Tun Lin Tar Gyi 15*20 100% DS274 16.75112 96.11184

375 U Toe Min Tar Gyi Roof-Zinc, Wall-bamboo 13*14 100% DS275 16.75109 96.11190

376 Daw Khin Khin Maw Tar Gyi Roof-Zinc, Wall-Dha Ni 9*10 50% DS276 16.75105 96.11185

377 U Myo Myint Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 100% DS277 16.75113 96.11180
Roof-Dha Ni, Wall-
378 U Zaw Aung Tar Gyi 14*15 100% DS278 16.75111 96.11173
Bamboo
Roof-Dha Ni, Wall-Dha
379 U Than Kyaw Tar Gyi 10*11 100% DS279 16.75111 96.11163
Ni
380 representative of owner Tar Gyi 12*50 100% DS280 16.75108 96.11163

381 U Mya Hlaing Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS281 16.75107 96.11160
Roof-Dha Ni, Wall-
382 U Mg Khing Win Tar Gyi 6*8 100% DS282 16.75106 96.11156
Bamboo
383 U Myo Myint Aung Tar Gyi Roof-Zinc, Wall-Wood 12*13 100% DS283 16.75108 96.11151

384 Daw San San Tar Gyi Roof-Zinc, Wall-Dha Ni 11*12 100% DS284 16.75107 96.11150

385 U Kyaw Myint Naing Tar Gyi Roof-Zinc, Wall-Brick 12*13 100% DS285 16.75103 96.11148

386 U Nyint Shwe Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS286 16.75098 96.11145

387 U Yan Naing Tar Gyi Roof-Zinc, Wall-Dha Ni 30*70 100% DS287 16.75091 96.11134

388 Daw Nan Theingi Shwe Tar Gyi 30*70 80% DS288 16.75089 96.11134

389 U Maung Myint Tar Gyi 40*70 80% DS289 16.75085 96.11133

390 U Than Aung Tar Gyi Roof-Zinc, Wall-bamboo 11*12 80% DS290 16.75089 96.11118

391 U Hla Myo Tar Gyi Roof-Zinc, Wall-Zinc 10*11 100% DS291 16.75077 96.11117

392 U Chit Ko Tar Gyi Roof-Zinc, Wall-Dha Ni 11*12 100% DS292 16.75075 96.11115

393 U Tin Thein Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS293 16.75074 96.11114
Roof-Dha Ni, Wall-Dha
394 Daw Htwe Htwe Aung Tar Gyi 9*10 100% DS294 16.75082 96.11113
Ni

39
Dala Township

Roof-Dha Ni, Wall-Dha


395 U Hlaing Cho Oo Tar Gyi 9*10 100% DS295 16.75086 96.11110
Ni
Roof-Dha Ni, Wall-Dha
396 Daw Sein Myin Tar Gyi 10*11 100% DS296 16.75085 96.11106
Ni
397 U Ohne Kyawe Tar Gyi Roof-Zinc, Wall-bamboo 13*14 100% DS297 16.75087 96.11099

398 Daw Lae Lae Win Tar Gyi 15*60 100% DS298 16.75071 96.11095

399 Daw Aye Than Tar Gyi Roof-Zinc, Wall-Wood 12*13 100% DS299 16.75083 96.11083

400 Daw Aye Aye Mar Tar Gyi Roof-Zinc, Wall-Wood 14*15 100% DS300 16.75078 96.11075
Roof-Dha Ni, Wall-Dha
401 U Win Phay Myintt Tar Gyi 10*12 100% DS301 16.75080 96.11069
Ni
402 U Thein Tun Tar Gyi 60*100 90% DS302 16.75073 96.11066

403 U Than Zaw Oo Tar Gyi 60*100 90% DS303 16.75072 96.11060

404 Daw Thet Thet Khin Tar Gyi 60*100 90% DS304 16.75068 96.11044
Roof-Dha Ni, Wall-Dha
405 U Khin Maung Tun Tar Gyi 10*11 100% DS305 16.75074 96.11056
Ni
Roof-Dha Ni, Wall-Dha
406 U Soe Myint Htay Tar Gyi 10*11 100% DS306 16.75073 96.11052
Ni
Roof-Dha Ni, Wall-Dha
407 U Nyo Win Aung Tar Gyi 9*10 100% DS307 16.75073 96.11046
Ni
Roof-Dha Ni, Wall-Dha
408 U Zaw Min Tar Gyi 12*13 100% DS308 16.75070 96.11040
Ni
Roof-Dha Ni, Wall-Dha
409 U Win Shew Tar Gyi 12*13 100% DS309 16.75057 96.11028
Ni
410 U Moe Win Tar Gyi Roof-Zinc, Wall-concret 15*16 50% DS310 16.75049 96.11027
Roof-Dha Ni, Wall-Dha
411 U Kyaw Naing Oo Tar Gyi 9*10 50% DS311 16.75045 96.11019
Ni
412 Daw Aye Aye Thin Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS312 16.75054 96.11022

413 Daw Moe Thu Zar Tar Gyi Roof-Zinc, Wall-Dha Ni 11*12 100% DS313 16.75053 96.11018

414 Daw Khin Hla Tar Gyi Roof-Dha Ni, Wall-Zinc 10*11 100% DS314 16.75058 96.11017
Roof-Dha Ni, Wall-Dha
415 U Ye Lin Oo Tar Gyi 9*10 100% DS315 16.75061 96.11020
Ni
416 U Kyaw Min Tar Gyi 50*90 100% DS316 16.75055 96.11008
Roof-Dha Ni, Wall-Dha
417 U Toe Myint Tar Gyi 9*10 100% DS317 16.75052 96.11002
Ni

40
Dala Township

418 Daw Thet Thet Khing Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS318 16.75050 96.10999

419 U Ye Min Kyaw Tar Gyi Roof-Dha Ni, Wall-Zinc 6*8 100% DS319 16.75046 96.10995

420 U Tun Myint Tar Gyi 40*60 100% DS320 16.75042 96.10986

421 U Myo Myo Tar Gyi Roof-Zinc, Wall-bamboo 13*14 100% DS321 16.75037 96.10981

422 U Tun Naing Tar Gyi 30*40 100% DS322 16.75026 96.10982

423 U Kyaw Lwin Tar Gyi 15*20 100% DS323 16.75038 96.10978

424 Daw Mya Than Tar Gyi 54*75 100% DS324 16.75039 96.10973
Roof-Dha Ni, Wall-Dha
425 U Hla Shwe Tar Gyi 11*12 100% DS325 16.75035 96.10965
Ni
426 Daw San Tar Gyi 25*40 100% DS326 16.75025 96.10970

427 U Mg Mg Aye Tar Gyi Roof-Zinc, Wall-Dha Ni 12*13 100% DS327 16.75018 96.10967

428 U Kyaw Swar Tar Gyi Roof-Zinc, Wall-concret 19*20 100% DS328 16.75019 96.10959

429 U Min Thu Tar Gyi 25*40 100% DS329 16.75032 96.10953

430 U Myint Zaw Tar Gyi 27*90 100% DS330 16.75028 96.10948

431 U Min Aung Tar Gyi Roof-Zinc, Wall-bamboo 14*15 100% DS331 16.75027 96.10937
Roof-Dha Ni, Wall-Dha
432 Daw Kyi Kyi Myint Tar Gyi 9*10 100% DS332 16.75025 96.10937
Ni
433 U Myint Zaw Oo Tar Gyi Roof-Zinc, Wall-bamboo 12*13 100% DS333 16.75011 96.10940

434 Daw Ma Khine Tar Gyi 40*80 100% DS334 16.75020 96.10933

435 U Than Tar Gyi 40*80 100% DS335 16.75017 96.10927


Roof-Dha Ni, Wall-Dha
436 U Nyan Htay Tar Gyi 10*12 100% DS336 16.74999 96.10906
Ni
437 U Tun Tun Win Tar Gyi 55*70 100% DS337 16.74997 96.10901

438 U Myo Khine Tar Gyi 60*60 100% DS338 16.74995 96.10889

439 U Zaw Gyi Tar Gyi 60*60 100% DS339 16.74989 96.10882

440 Daw Sandar Tar Gyi 60*60 100% DS340 16.74986 96.10865

441 Daw Yin Phyo Thu Tar Gyi 60*60 100% DS341 16.74979 96.10846

442 U Than Zaw Oo Tar Gyi Roof-Zinc, Wall-Dha Ni 11*12 100% DS342 16.74976 96.10835

41
Dala Township

443 U Tin Hlaing Tar Gyi 25*50 100% DS343 16.74975 96.10825

444 U Hla Win Tar Gyi Roof-Zinc, Wall-Zinc 12*13 100% DS344 16.74976 96.10821

445 U Tun Zaw Oo Tar Gyi Roof-Zinc, Wall-Wood 9*10 100% DS345 16.74975 96.10819

446 U Aung Shwe Tar Gyi Roof-Zinc, Wall-Zinc 11*12 100% DS346 16.74971 96.10815
Roof-Dha Ni, Wall-Dha
447 U Naing Win Aung Tar Gyi 100% DS347 16.74972 96.10812
Ni 10*11
448 U Moe Myint Thu Tar Gyi Roof-Zinc, Wall-bamboo 11*12 100% DS348 16.74970 96.10809

449 Daw Kyi Aung Tar Gyi Roof-Zinc, Wall-bamboo 10*11 100% DS349 16.74980 96.10804
Roof-Dha Ni, Wall-Dha
450 U Zaw Lwin Tar Gyi 100% DS350 16.74971 96.10799
Ni 10*11
451 U Hla Than Tar Gyi Roof-Zinc, Wall-bamboo 10*11 100% DS351 16.74978 96.10796

452 U Naing Lin Tun Tar Gyi Roof-Zinc, Wall-bamboo 10*11 100% DS352 16.74968 96.10795

453 U Than Lwin Tar Gyi Roof-Zinc, Wall-Zinc 13*14 100% DS353 16.74969 96.10790

454 U San Tun Aung Tar Gyi Roof-Zinc, Wall-bamboo 11*12 100% DS354 16.74967 96.10786

455 U Pyae Phyo Hlain Tar Gyi Roof-Zinc, Wall-bamboo 10*11 100% DS355 16.74965 96.10781
Roof-Dha Ni, Wall-Dha
456 U Kyaw San Tar Gyi 100% DS356 16.74962 96.10773
Ni 10*11
Roof-Dha Ni, Wall-Dha
457 Daw Than Shwe Tar Gyi 100% DS357 16.74959 96.10765
Ni 10*11
Roof-Dha Ni, Wall-
458 U Phoe Aung Tar Gyi 100% DS358 16.74957 96.10761
Bamboo 12*13
Roof-Dha Ni, Wall-
459 U Zaw Lin Tun Tar Gyi 100% DS359 16.74951 96.10747
Bamboo 11*12
460 U Maung Kyi Tar Gyi 15*20 100% DS360 16.74955 96.10749

461 U Hla Tar Gyi Roof-Zinc, Wall-bamboo 11*12 100% DS361 16.74948 96.10734
Roof-Dha Ni, Wall-Dha
462 U Soe Lin Maung Tar Gyi 100% DS362 16.74948 96.10730
Ni 9*10
463 Daw San Thwin Tar Gyi Roof-Zinc, Wall-concret 10*11 100% DS363 16.74948 96.10714

464 U Chan Aye Tar Gyi Roof-Zinc, Wall-bamboo 9*10 100% DS364 16.74946 96.10707
Roof-Dha Ni, Wall-Dha
465 U Aung Myint Thu Tar Gyi 100% DS365 16.74942 96.10701
Ni 9×10
466 Hindu Temple 1 Tar Gyi Roof-Zinc, Wall-Brick 10×13 100% DS366 16.74933 96.10670

42
Dala Township

467 Aung Daw Mu Hall Tar Gyi Roof-Zinc, Wall-concret 20×40 100% DS367 16.74932 96.10675

468 Hindu Temple 2 Tar Gyi Roof-Zinc, Wall-Zinc 10×13 40% DS368 16.74937 96.10681

469 Daw Naw Phaw War Tar Gyi Roof-Zinc, Wall-Zinc 30×60 100% DS369 16.74928 96.10634 Hall
470 Daw Naw Phaw War Tar Gyi Roof-Zinc, Wall-Wood 18×40 20% DS370 16.74929 96.10623 house
471 Daw Naw Phaw War Tar Gyi Roof-Zinc, Wall-Wood 11×12 100% DS371 16.74924 96.10612 office
472 Daw Naw Phaw War Tar Gyi Farm Farm 5 acre 0.3 acrea DS372 16.74900 96.10546

473 U Kyaw Lwin Saparchaung plot plot 20% 1463 16.75999 96.12577

474 U Nyi Myint Sarbarcaung 70x250 30% 1464 16.76052 96.12670


Roof - Zinc, Wall -
475 U Nyi Myint Sarbarcaung 20x20 100% 1465 16.76064 96.12755 home
Bamboo, Floor - wood
476 Ye Takar Sarbarcaung cement 100% 1466 16.76079 96.12777
Lwan workshop U Wai Roof - Zinc, Wall - Zinc, 30x30/30x
477 Sarbarcaung 2 100% 1467 16.76120 96.12783 180x50 (1467)
Lwin Floor - cement 40
Roof - Zinc, Wall - wood,
478 U Thant Zin Sarbarcaung 10x10 20% 1468 16.76135 96.12785
Floor - wood
Roof - Zinc, Wall - Wood,
479 U Zaw Zaw Latt Sarbarcaung 8x8 20% 1469 16.76139 96.12788
Floor - wood
Daw Lae Lae Win+Zin
Roof - Zinc, Wall - Zinc,
480 Mar Wai+Htein Win Sarbarcaung 80x30 100% 1470 16.76157 96.12800
Floor - wood
Naing
481 U Han Tin Sarbarcaung plot 30x50 5% 1471 16.76153 96.12811

482 U Nyan Myint Sarbarcaung plot 30x50 20% 1472 16.76160 96.12815
Roof - Zinc, Wall - wood,
483 U Taung Shwee Sarbarcaung 15x30 95% 1473 16.76162 96.12818 plot 30x50
Floor - wood
Roof - Zinc, Wall - Zinc,
484 U Kyaw Kyaw Khaing Sarbarcaung 10x15 50% 1474 16.76162 96.12823
Floor - wood
Roof - Zinc, Wall - Zinc,
485 Daw Than Nwae ( home) Sarbarcaung 20x30 100% 1475 16.76168 96.12827 plot 30x50
Floor - wood
Roof - Zinc, Wall - wood,
486 U Hla Htay Sarbarcaung 15x30 90% 1476 16.76172 96.12831
Floor - wood
Roof - Zinc, Wall - wood,
487 U Tin Thein Sarbarcaung 15x30 100% 1477 16.76176 96.12833 plot (95%) 30x50
Floor - wood
Roof - Zinc, Wall - wood, plot (100%)
488 U Than Htay Sarbarcaung 15x30 100% 1478 16.76181 96.12836
Floor - wood 15x50

43
Dala Township

Roof - Zinc, Wall - wood, plot (100%)


489 Daw Kyinn Aye Sarbarcaung 15x50 100% 1479 16.76181 96.12841
Floor - wood 15x50
Roof - Zinc, Wall -
490 U Thin Soe Sarbarcaung 10x10 90% 1480 16.76185 96.12843 plot 60x50
bamboo, Floor - bamboo
Roof - Zinc, Wall -
491 Daw San Sarbarcaung 10x10 100% 1481 16.76187 96.12846 U Hteik Tan
bamboo, Floor - bamboo
Roof - Zinc, Wall -
492 U Than Myint Oo Sarbarcaung 10x10 100% 1482 16.76189 96.12849
bamboo, Floor - bamboo
Roof - Zinc, Wall -
493 U Myint Aung Sarbarcaung 10x10 100% 1483 16.76193 96.12852
bamboo, Floor - bamboo
Roof - Zinc, Wall - wood,
494 U San Mya Sarbarcaung 17x35 100% 1484 16.76196 96.12856 plot (80%) 30x50
Floor - wood
Roof - Zinc, Wall - wood,
495 U Nyan Win Sarbarcaung 13x35 100% 1485 16.76198 96.12860
Floor - wood
Roof - Zinc, Wall - wood,
496 Daw San Shwe Sarbarcaung 13x350 100% 1486 16.76204 96.12860
Floor - wood
Roof - Zinc, Wall - wood,
497 U Khin Maung Htay Sarbarcaung 17x35 90% 1487 16.76200 96.12867 plot 80%
Floor - wood
Roof - Zinc, Wall - wood,
498 U Hla Win Sarbarcaung 15x35 95% 1488 16.76207 96.12868 plot (80%) 15x50
Floor - wood
Roof - Zinc, Wall - wood,
499 U Than Aye Sarbarcaung 15x35 90% 1489 16.76210 96.12871 plot (70%) 15x50
Floor - wood
Roof - Zinc, Wall - wood,
500 U Sai Lwin Soe Sarbarcaung 9x35 75% 1490 16.76213 96.12874 plot (70%) 9x50
Floor - wood
Roof - Zinc, Wall - wood,
501 U Pyone Cho Sarbarcaung 17x35 100% 1491 16.76216 96.12876 plot (70%) 21x50
Floor - wood
Roof - Danni, Wall -
502 U Aung Tan Shein Sarbarcaung 8x10 100% 1492 16.76223 96.12879 plot (60%) 15x50
bamboo, Floor - bamboo
Roof - Zinc, Wall - wood,
503 U Aye tun Sarbarcaung 15x25 100% 1493 16.76218 96.12883 plot 15x50
Floor - wood
Roof - Zinc, Wall - wood,
504 U Aye tun Sarbarcaung 13x20 100% 1494 16.76222 96.12885
Floor - wood
Roof - Zinc, Wall - wood,
505 Daw Kyi Thein Sarbarcaung 10x20 50% 1495 16.76225 96.12887 (50%) 10x50
Floor - wood
Roof - Zinc, Wall - wood,
506 U Kyaw Myaing Sarbarcaung 15x35 40% 1496 16.76228 96.12892 (50%) 20x50
Floor - wood
Roof - Zinc, Wall - wood,
507 Daw Kyi Sarbarcaung 25x35 30% 1497 16.76234 96.12897 (40%) 30x50
Floor - wood
Roof - Zinc, Wall - U Hteik Tan
508 U Chit Htun Sarbarcaung 10x20 100% 1498 16.76245 96.12900
bamboo, Floor - wood (30%) 30x50
509 U Naing Win Htun Sarbarcaung Roof - Zinc, Wall - 10x20 100% 1499 16.76247 96.12904 50%

44
Dala Township

bamboo, Floor - wood

Roof - Zinc, Wall -


510 U Zaw Zaw Aung Sarbarcaung 10x20 100% 1550 16.76248 96.12908 50%
bamboo, Floor - wood
511 brick well Sarbarcaung Roof - Zinc 10x10 100% 1501 16.76249 96.12911 40%
Roof - Zinc, Wall - wood,
512 U Tun Ya Sarbarcaung 25x35 5% 1502 16.76256 96.12918 (20%) 30x50
Floor - wood
513 U Tin Hun Sarbarcaung plot 10% 1503 16.76264 96.12923 (10%) 30x50
Roof - Zinc, Wall -
514 U Paw Kyi Sarbarcaung 10x30 5% 1504 16.76267 96.12929 (10%) 10x50
flagstone, Floor - wood
515 Daw Htwe Kyi Sarbarcaung plot 1505 16.76271 96.12932 (5%) 20x50
Roof - Danni, Wall -
516 ကြမ္းယ ာဆို္ Sarbarcaung 8x8 100% 1506 16.76334 96.12972
danni, Floor - bamboo
517 သမၺ န္ာဆပ္ Sarbarcaung Roof - Zinc 10x15 100% 1507 16.76340 96.12968
Roof - Zinc, Wall - zinc,
518 Jetty Sarbarcaung 15x20 100% 1508 16.76345 96.12962
Floor - wood
Roof - Zinc, Wall - brick,
519 သမၺ န္ရံိး Sarbarcaung 10x10 100% 1509 16.76350 96.12977
Floor - brick
Roof - Zinc, Wall - Zinc,
520 သမၺ န္ဂဆတ္ပဆတ္ Sarbarcaung 10x10 100% 1510 16.76351 96.12990
Floor - cement
Roof - Zinc, Wall -
521 သမၺ န္ဂဆတ္ပဆို္ Sarbarcaung 20x25 100% 1511 16.76356 96.12992
Flagstone, Floor - cement
Roof - Zinc, Wall - Zinc,
522 Daw Tin Tin Wai Sarbarcaung 10x10 100% 1512 16.76361 96.13007
Floor - cement
Roof - Zinc, Wall -
Not include in
523 U Myint Than Win Sarbarcaung wirenetting, Floor - 60x100 100% 1514 16.76366 96.13008
map
cement
Roof - Zinc, Wall - Zinc,
524 U Myint Than Win Sarbarcaung 10x10 100% 1513 16.76363 96.13004 New building
Floor - cement
525 Daw Lae Lae Win Sarbarcaung 60x180 100% 1515 16.76406 96.13016 Kyaut Kwin

526 jetty Land Sarbarcaung plot plot 100% 1516 16.76475 96.13090
Roof - Zinc, Wall - Zinc,
527 U Zaw Win Aung Sarbarcaung 50% 1517 16.76750 96.13574 shipyard
Floor - cement
Roof - Zinc, Wall -
528 U Zaw Win Aung Sarbarcaung wirenetting, Floor - 15x15 50% 1518 16.76746 96.13581
cement
Roof - Zinc, Wall - Zinc,
529 U Zaw Win Aung Sarbarcaung shipyard 15x15 100% 1519 16.76753 96.13591 store
Floor - cement

45
Dala Township

Roof - danni, Wall - danni,


530 U Zaw Win Aung Sarbarcaung shipyard 15x15 100% 1520 16.76754 96.13598 store
Floor - wood
Roof -plastic, Wall -
531 U Tun Tun Lin Hmawset 10x10 100% 1521 16.76753 96.13624 MPA
bamboo Floor - bamboo
Roof - Zinc, Wall - danni,
532 U Aung Myint Kyi Hmawset 15x20 100% 1522 16.76754 96.13637 MPA
Floor - wood
533 jetty Land Hmawset plot plot 100% 1523 16.76747 96.13629 MPA

534 U Aye Tun Hmawset plot plot 100x30 100% 1524 16.76738 96.13764 MPA Rent
Roof - Zinc, Wall - wood,
535 U Aye Tun Hmawset 20x30 30% 1525 16.76734 96.13810 MPA Rent
Floor - wood
536 U Aye Tun Hmawset Roof - Zinc, Wall - Zinc 90x30 30% 1526 16.76734 96.13823 shipyard
Roof - Zinc, Wall - Zinc, MPI Rent
537 U Aye Tun Hmawset 30x30 60% 1527 16.76735 96.13843
Floor - cement (6months)
Roof - plastic, Wall -
538 Daw Aye Myint Hmawset 10x15 50% 1528 16.76735 96.13863
danni, Floor - wood
Roof - Zinc, Wall - zinc,
539 U Myo Lwin Hmawset 30x20 50% 1529 16.76734 96.13872
Floor - wood
Roof - Zinc, Wall -
540 U Tan Lwin Hmawset 10x15 50% 1530 16.76741 96.13873
bamboo, Floor - bamboo
Roof - Zinc, Wall -
541 U Naung Naung Hmawset 15x20 30% 1531 16.76738 96.13884
bamboo, Floor - wood
Roof - Zinc, Wall - wood,
542 Daw Tin Nu Hmawset 10x20 100% 1532 16.76734 96.13892
Floor - wood
Roof - Zinc, Wall -
543 Daw Di Di Naing Hmawset 8x8 100% 1534 16.76743 96.13890
bamboo, Floor - wood
Roof - Zinc, Wall -
544 U Aung Aung Hmawset 8x8 40% 1535 16.76747 96.13891
bamboo, Floor - wood
Roof - Zinc, Wall -
545 U Aung Myint Kyaing Hmawset 15x15 100% 1536 16.76751 96.13890
flagstone, Floor - wood
Roof - Zinc, Wall -
546 U San Myint Hmawset 10x15 90% 1537 16.76755 96.13892
flagstone, Floor - wood
Roof - Zinc, Wall - zinc,
547 U Hla Bo Hmawset 25x30 95% 1538 16.76757 96.13897
Floor - wood
Roof - Zinc, Wall -
548 ကးတဆသ
႔ိ မ Hmawset 60x60 85% 1539 16.76768 96.13905
wirenetting
Roof - Zinc, Wall -
549 ကးတဆသ
႔ိ မ Hmawset 30x15 100% 1540 16.76778 96.13912
wirenetting
Roof - Zinc, Wall -
550 U Myo That Naing Hmawset 10x20 100% 1541 16.76774 96.13916
flagstone, Floor - wood

46
Dala Township

Roof - Zinc, Wall - wood,


551 U Tun Aung Hmawset 10x20 100% 1542 16.76773 96.13918
Floor - wood
Roof - Zinc, Wall - wood,
552 U Myo Min Thein Hmawset 10x20 100% 1543 16.76772 96.13920
Floor - wood
Roof - Zinc, Wall - wood,
553 U Myo Kyaw Hmawset 10x15 90% 1544 16.76771 96.13924
Floor - wood
Roof - Zinc, Wall - zinc,
554 Daw Khin Myint Hmawset 10x15 90% 1545 16.76769 96.13927
Floor - wood
Roof - Zinc, Wall - wood,
555 U Zaw Myo Hteik Hmawset 8x10 20% 1546 16.76767 96.13930
Floor - wood
Roof - danni, Wall - danni,
556 U Aung Ko Hmawset 8x10 100% 1547 16.76788 96.13930
Floor - wood
Roof - danni, Wall -
557 U Saw Phone Myint Hmawset 10x10 100% 1548 16.76790 96.13935
bamboo, Floor - wood
Roof - danni, Wall -
558 U That Naing Hmawset 10x10 100% 1549 16.76792 96.13938
bamboo, Floor - wood
Roof - Zinc, Wall - zinc,
559 U Tin Myint Hmawset 10x10 100% 1550 16.76787 96.13942
Floor - wood
560 Daw Than Than Zinc Hmawset Roof - danni, Wall - danni 10x10 100% 1551 16.76783 96.13940
Roof - Zinc, Wall - zinc,
561 U Naing Win Hmawset 10x10 100% 1552 16.76791 96.13946
Floor - wood
Roof - Zinc, Wall - zinc,
562 Daw Ma Kyaing Hmawset 10x10 100% 1553 16.76788 96.13950
Floor - wood
Roof - Zinc, Wall - stone,
563 U Aung Myo Thant Hmawset 12x15 60% 1554 16.76789 96.13956
Floor - wood
Roof - Zinc, Wall - zinc,
564 U Zaw Naing Hmawset 15x15 100% 1555 16.76794 96.13966
Floor - wood
Roof - Zinc, Wall -
565 U Win Lin Htun Hmawset 15x15 100% 1556 16.76794 96.13972
bamboo, Floor - wood
Roof - danni, Wall - danni
566 Daw Mu Mu Cho Hmawset 8x10 100% 1557 16.76790 96.14002
Floor - wood
Roof - danni, Wall - danni,
567 U Hla Win Hmawset 8x10 100% 1558 16.76790 96.14013
Floor - wood
568 Daw Ohnmar Hmawset plot 60x40 10% 1559 16.76754 96.14047
Roof - danni, Wall - zinc,
569 U Aung Tan Hmawset 15x30 20% 1560 16.76745 96.14052
Floor -
Roof - danni, Wall - zinc,
570 U Mg Zaw Hmawset 15x15 30% 1561 16.76739 96.14060
Floor - wood
MPA rent
571 U Mu Sar Kamarkasit Shipyard 20% 1562 16.76700 96.14104
/shipyard

47
Dala Township

Roof - Zinc, Wall -


572 U Tan Kamarkasit 8x10 100% 1563 16.76568 96.14416 Brick, sand, stone
bamboo, Floor - bamboo
Roof - Zinc, Wall -
573 U Tan Kamarkasit 8x10 100% 1564 16.76568 96.14419
bamboo, Floor - bamboo
Roof - Zinc, Wall -
574 U Tan Kamarkasit 8x10 100% 1565 16.76566 96.14424
bamboo, Floor - bamboo
575 U Tan Kamarkasit Kyaut Kwin 60x60 50% 1566 16.76562 96.14432
Roof - danni, Wall - zinc,
576 U Kyaw Moe Kamarkasit 20x10 10% 1567 16.76551 96.14446
Floor - bamboo
Roof - Danni, Wall -
577 U Tan Tun Win Kamarkasit 10x15 100% 1568 16.76556 96.14448
danni, Floor - bamboo
Roof - Zinc, Wall - danni,
578 U Ye Aung Kamarkasit 20x20 100% 1569 16.76559 96.14448
Floor - wood
Roof - Zinc, Wall - wood,
579 U Win Thein Kamarkasit 15x20 15% 1570 16.76545 96.14451
Floor - wood
Roof - Zinc, Wall - zinc,
580 U Khin Win Kamarkasit 10x10 15% 1571 16.76545 96.14455
Floor - wood
Roof - Zinc, Wall - zinc,
581 Daw Ohnmar Khin Kamarkasit 15x60 20% 1574 16.76549 96.14463
Floor - wood
Roof - Zinc, Wall - danni,
582 Daw Ye Soe Kamarkasit 15x10 100% 1575 16.76552 96.14465
Floor - bamboo
Roof - Zinc, Wall - zinc -
583 U Bo San Kamarkasit 10x10 100% 1576 16.76557 96.14467
Floor - bamboo
584 U Htay Win Kamarkasit Roof - Zinc, Wall - zinc 25x40 10% 1577 16.76547 96.14468 Industry
Roof - Danni, Wall -
585 U Aung Cho Kamarkasit 10x10 100%
danni, Floor - bamboo
Roof - Danni, Wall -
586 Daw Thidar Win Kamarkasit 10x10 100% 1578 16.76545 96.14477
bamboo, Floor - wood
Roof - Danni, Wall -
587 U Kyaw Min Oo Kamarkasit 10x10 100% 1579 16.76547 96.14480
danni, Floor - bamboo
Roof - Danni, Wall -
588 U Taung Myint Kamarkasit 10x20 100% 1580 16.76549 96.14481
danni, Floor - bamboo
Roof - Danni, Wall -
589 U That Naing Kamarkasit 10x10 100% 1581 16.76549 96.14484
danni, Floor - bamboo
Roof - Zinc, Wall - wood,
590 U That Maung Kamarkasit 15x10 100% 1583 16.76521 96.14537
Floor - wood
Roof - Zinc, Wall - wood,
591 U Hla Kyaing Kamarkasit 15x15 100% 1584 16.76526 96.14544
Floor - wood
Roof - Zinc, Wall - wood,
592 Daw Nyo Nyo San Kamarkasit 20x35 100% 1585 16.76515 96.14557
Floor - wood

48
Dala Township

Roof - Zinc, Wall - zinc,


593 U Wai Linn Kamarkasit 10x20 100% 1586 16.76518 96.14559
Floor - wood
Roof - Zinc, Wall - danni,
594 U Nyi Nyi Naing Kamarkasit 10x10 100% 1587 16.76521 96.14563
Floor - wood
Roof - Zinc, Wall -
595 Daw Khaing Soe Kamarkasit 8x15 100% 1588 16.76520 96.14565
flagstone, Floor - wood
Roof - Danni, Wall -
596 U Aung Kyaing Kamarkasit 15x15 100% 1589 16.76520 96.14577
danni, Floor - bamboo
Roof -plastic, Wall -
597 U Nang Win Kamarkasit 10x10 100% 1590 16.76520 96.14583
plastic, Floor - bamboo
598 U Aung Myo Win Kamarkasit pigsty 10x20 100% 1591 16.76514 96.14581
Daw Khin Win San / Ye Roof - Zinc, Wall - wood,
599 Kamarkasit 30x100 60% 1592 16.76510 96.14580
Wai Yan Htun Floor - wood
Roof - Zinc, Wall - danni,
600 U Kyaw Naing Kamarkasit 10x15 100% 1593 16.76507 96.14587
Floor - wood
Roof - plastic, Wall -
601 U Toe Toe Kamarkasit 8x8 100% 1594 16.76500 96.14584
plastic, Floor - bamboo
Roof - Zinc, Wall - plastic,
602 U Kyaw Settmyay 20x30 30% 1595 16.76491 96.14595
Floor - bamboo
Roof - Zinc, Wall - zinc,
603 U Aung Ko Win Settmyay 10x20 60% 1596 16.76485 96.14611
Floor - wood
Roof - Zinc, Wall - zinc,
604 U Cho Lain / U Zaw Khat Settmyay 20x30 100% 1597 16.76489 96.14613
Floor - wood
Roof - Zinc, Wall - zinc,
605 U Myint Soe Settmyay 10x10 100% 1598 16.76494 96.14615
Floor - wood
Roof - Zinc, Wall - zinc,
606 U Hla Myint Settmyay 10x20 100% 1599 16.76499 96.14616
Floor - wood
Roof - Zinc, Wall - stone,
607 Daw Ohnmar Khaing Settmyay 15x10 100% 1600 16.76497 96.14620
Floor - wood
Roof - Zinc, Wall - zinc,
608 U Myint Lwin Settmyay 10x10 100% 1601 16.76491 96.14623
Floor - wood
Daw SandarnWin / Daw Roof - Zinc, Wall - wood,
609 Settmyay 40x30 50% 1602 16.76481 96.14627
Khin Khin Mar Floor - wood
Roof - Zinc, Floor -
610 သမၺ န္ေရယ ာ္ Settmyay 20x20 100% 1603 16.76488 96.14627
cement
Roof - Zinc, Wall - wood,
611 U Hla Shwe Settmyay 10x20 100% 1604 16.76493 96.14628
Floor - wood
Roof - Zinc, Wall -
612 Ticket Offic Settmyay wirenetting, Floor - 20x15 100% 1605 16.76497 96.14631
cement

49
Dala Township

Roof - Zinc, Wall -


613 Daw Myint Myint Aye Settmyay 10x10 100% 1606 16.76496 96.14637
wirenetting Floor - wood
Roof - Zinc, Wall - wood,
614 စက္ေ မကးတဆိ႔ Settmyay 20x40 100% 1607 16.76489 96.14637
Floor - wood
Roof - Zinc, Floor -
615 သမၺ န္ေရယ ာ္ Settmyay 50x50 50% 1608 16.76481 96.14635
cement
Roof - Zinc, Wall -
616 သမၺ န္ေရယ ာ္ဂဆိေ ု္ Settmyay brick,wood, Floor - 15x20 100% 1609 16.76494 96.14643 2 floors
cement
617 အိတ္ကန္ Settmyay Wall - brick, Floor - brick 8x10 100% 1610 16.76499 96.14647
Roof - plastic,, Floor -
618 U Min Min Settmyay 15x10 100% 1611 16.76491 96.14651
cement
Roof - Zinc, Wall - wood,
619 U Ba Tun Settmyay 20x30 100% 1612 16.76485 96.14659
Floor - cement
Roof - plastic,, Wall -
620 U Ye Tun Settmyay 20x30 100% 1613 16.76480 96.14658
wood, Floor - wood
Roof - Zinc, Wall -
621 U Aung Myo Thant Settmyay 10x15 100% 1614 16.76476 96.14657
bamboo, Floor - wood
Roof - danni Wall - danni,
622 U Naing Lin Tun Settmyay 10x10 100% 1615 16.76472 96.14656
Floor - wood
Roof - Zinc, Wall - wood,
623 U Kan Myint Settmyay 20x15 100% 1616 16.76485 96.14666
Floor - wood
624 U Tun Aung Kyaw Settmyay Roof - Zinc, Wall - iron 30x30 100% 1617 16.76469 96.14674
Roof - Zinc, Wall - danni,
625 U Zaw Zaw Latt Settmyay 10x10 100% 1618 16.76464 96.14683
Floor - wood
Roof - Zinc, Wall -
626 U Myo Lwin Settmyay 30x20 5% 1619 16.76461 96.14681
wirenetting, Floor - wood
Roof - Zinc, Wall - plastic,
627 U Yu Lwin Settmyay 15x15 100% 1620 16.76460 96.14694
Floor - wood
628 U Hla Pyae Settmyay plot 30x40 30% 1621 16.76461 96.14689

629 U Yar Kyaut Settmyay Roof - danni, Floor - wood 30x20 90% 1622 16.76461 96.14704
Roof - danni, Wall - danni,
630 U Soe Aung Settmyay 10x10 100% 1623 16.76467 96.14708
Floor - wood
631 U Yar Kyaut Settmyay plot 80x80 90% 1624 16.76455 96.14712
Roof - Zinc, Wall - zinc,
632 U Maung Ngwe Settmyay 10x10 100% 1625 16.76456 96.14726
Floor - wood
633 U Yu Lwin Settmyay Roof - Zinc, Wall - zinc 25x30 100% 1626 16.76449 96.14731

50
Dala Township

Roof - Zinc, Wall - zinc,


634 U Yu Lwin Settmyay 15x30 60% 1627 16.76445 96.14728
Floor - wood
Roof - Zinc, Wall - zinc,
635 U Ko That Settmyay 14x14 100% 1628 16.76453 96.14738
Floor - wood
Roof - Zinc, Wall - zinc,
636 U Zaw Min Settmyay 20x40 50% 1629 16.76445 96.14736
Floor - wood
Roof - Zinc, Wall - zinc,
637 U Kyaw Shwe Settmyay 20x30 5% 1630 16.76437 96.14738
Floor - wood
Roof - danni Wall - wood,
638 U Kyaw Oo Settmyay 20x20 5% 1631 16.76433 96.14741
Floor - wood
Roof - danni, Wall -
639 U Taung Aye Settmyay 15x20 100% 1634 16.76442 96.14751
bamboo Floor - wood
Roof - danni, Wall - wood,
640 U Shwe Thein Settmyay 15x25 100% 1633 16.76444 96.14747
Floor - wood
Roof - Zinc, Wall - zinc,
641 U Kyaw Kyaw Oo Settmyay 10x15 100% 1632 16.76444 96.14743
Floor - wood
Roof - Zinc, Wall - wood,
642 U Tin Lwin Settmyay 10x10 100% 1635 16.76441 96.14757
Floor - wood
Roof - plastic, Wall -
643 U Zaw Win Settmyay 10x10 100% 1636 16.76440 96.14761
zinc, Floor - wood
644 U Phyo Wai Settmyay plot plot 30x40 10% 1637 16.76430 96.14754
Roof - Zinc, Wall -
645 U Zaw Myo Aye Settmyay 10x20 100% 1638 16.76438 96.14764
bamboo, Floor - wood
Roof - Zinc, Wall - zinc,
646 U Zaw Myo Aye Settmyay 15x25 50% 1639 16.76431 96.14760
Floor - wood

51
Seikkyi Kanaungto Township

3. Seikkyi Kanaungto Townshpi


Type of
Within GPS
Sr Owner Address building/la Building/ land Area Latitude Longitude Remarks
ROW (%) number
nd/plot
East Seikgyi Ward,
1 Water gate RC 40*30 100% 1 16.75983 96.12172
Seikgyi Kanaungto
East Seikgyi Ward, Roof-Zinc , Wall-
2 U Kyaw Soe Oo 40*14 100% 2 16.75985 96.12164
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc , Wall-
3 U Bo 30*20 100% 3 16.75983 96.12158
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc, Wall-
4 U Myint Aung 40*18 100% 4 16.75981 96.12154
Seikgyi Kanaungto Brick
East Seikgyi Ward, Roof-Zinc, Wall-
5 U Thiha Aung 40*10 100% 5 16.75978 96.12146
Seikgyi Kanaungto Zinc
East Seikgyi Ward, Roof-Zinc, Wall-
6 U Htun Thaung 80*20 100% 6 16.75975 96.12142
Seikgyi Kanaungto Brick
East Seikgyi Ward, Roof-Zinc , Wall-
7 trishaw gate 50*14 80% 7 16.75974 96.12138
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc , Wall-
8 U Min Thein 50*12 10% 8 16.75982 96.1213
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc , Wall-
9 U San Lwin 50*20 50% 9 16.7599 96.12123
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc , Wall-
10 U Thein Sai 50*20 100% 10 16.7598 96.12133
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc , Wall-
11 Ko Saw Kyaw Htwe 50*10 100% 11 16.75982 96.12135
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc, Wall-
12 U Thant Zin 50*10 100% 12 16.75985 96.12137
Seikgyi Kanaungto Zinc
East Seikgyi Ward, Roof-Zinc , Wall-
13 U Thein Zaw 50*10 100% 13 16.75986 96.12141
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc , Wall-
14 U Myint Aung 50*20 100% 14 16.7598 96.1215
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc, Wall-
15 Vessal Gate(Hurt) 10*7 100% 15 16.75993 96.12152
Seikgyi Kanaungto Zinc
East Seikgyi Ward, Roof-Zinc , Wall-
16 Daw War War Khaing 10*30 100% 16 16.75937 96.12123 Hire- U Ngwe Htun
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Zinc , Wall-
17 Daw War War Khaing 10*40 100% 17 16.75936 96.12126 Hire- U Thaung Sein
Seikgyi Kanaungto Wood

52
Seikkyi Kanaungto Township

East Seikgyi Ward, Roof-Zinc , Wall-


18 U Aung Myint 10*40 100% 18 16.75935 96.12129
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof- Plastic ,
19 U Thein Lwin 6*8 100% 19 16.75928 96.12134 Shop
Seikgyi Kanaungto Wall-Wood
East Seikgyi Ward, Roof-Zinc , Wall-
20 U Kan Tin 10*40 100% 20 16.7593 96.12127
Seikgyi Kanaungto Wood
Daw Khin Myo Htwe, East Seikgyi Ward,S Roof-Zinc , Wall- Hire- Daw Khin Myo
21 10*40 100% 21 16.75932 96.12123
U Sein Win eikgyi Kanaungto Wood Htwe
Mg Kyaw Naing, Daw East Seikgyi Ward, Roof-Zinc , Wall-
22 10*40 70% 22 16.75933 96.1212 Hire- Mg Kyaw Naing
Amar Kyue Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Dha Ni,
23 Vessal Gate(Hurt) 6*6 100% 23 16.75943 96.12158
Seikgyi Kanaungto Floor-Bamboo
East Seikgyi Ward, Roof-Zinc , Wall-
24 Daw Aye Win (DWIR) 40*30 100% 24 16.759 96.12127
Seikgyi Kanaungto Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
25 DWIR (Staff housing) 20*10 100% 25 16.7589 96.12115
Seikgyi Kanaungto Dha Ni
Roof-Dha Ni, Wall-
East Seikgyi Ward,
26 U Zaw Paing Dha Ni, Floor- 15*15 70% 26 16.759 96.12084
Seikgyi Kanaungto
Bamboo
Roof-Dha Ni, Wall-
East Seikgyi Ward,
27 U Win Lay Dha Ni, Floor- 15*15 100% 28 16.75895 96.12086
Seikgyi Kanaungto
Bamboo
East Seikgyi Ward, Roof-Dha Ni, Wall-
28 U Saw Ko Ko Oo 15*12 100% 29 16.75898 96.12088
Seikgyi Kanaungto Dha Ni
East Seikgyi Ward, Roof-Zinc, Wall-
29 U Aung Kyaw Myint 15*12 100% 30 16.75892 96.12087
Seikgyi Kanaungto Dha Ni
Roof-Zinc, Wall-
East Seikgyi Ward,
30 U Hein Min Zar Bamboo, Floor- 15*20 100% 31 16.75892 96.12096
Seikgyi Kanaungto
Wood
Roof-Zinc, Wall-
East Seikgyi Ward,
31 U Ye Kyi Dha Ni, Floor- 15*12 100% 32 16.75888 96.12082
Seikgyi Kanaungto
Wood
East Seikgyi Ward, Roof-Zinc, Wall-
32 U Maung Htun 10*12 50% 27 16.75901 96.1209
Seikgyi Kanaungto Zinc, Floor-Wood
East Seikgyi Ward, Roof-Zinc, Wall-
33 Daw Lae Lae Win 10*12 100% 33 16.75884 96.12077
Seikgyi Kanaungto Zinc, Floor-Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
34 Daw San San Aye 15*20 100% 34 16.75877 96.12069
Seikgyi Kanaungto Dha Ni,Floor-Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
35 U Nyan Lin 15*20 100% 35 16.75875 96.12073
Seikgyi Kanaungto Dha Ni,Floor-Wood

53
Seikkyi Kanaungto Township

East Seikgyi Ward, Roof-Dha Ni, Wall-


36 U Myo Htike 20*15 100% 36 16.75872 96.12076
Seikgyi Kanaungto Dha Ni,Floor-Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
37 U Aye Ko 20*15 100% 37 16.75865 96.12058
Seikgyi Kanaungto Dha Ni,Floor-Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
38 U Myint Thein 40*10 100% 38 16.75857 96.12059
Seikgyi Kanaungto Dha Ni,Floor-Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
39 Mg Hla Yin 10*12 100% 39 16.75854 96.12062
Seikgyi Kanaungto Dha Ni,Floor-Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
40 U Mya Ohnn 10*20 100% 40 16.7585 96.12057
Seikgyi Kanaungto Dha Ni,Floor-Wood
East Seikgyi Ward, Store of bamboo
41 U Myint Aung 20*10 100% 41 16.75703 96.11867
Seikgyi Kanaungto and Dha Ni
Roof-Dha Ni, Wall-
East Seikgyi Ward,
42 U Myint Aung Bamboo, Floor- 20*15 100% 42 16.75697 96.11867
Seikgyi Kanaungto
Wood
Roof-Dha Ni, Wall-
East Seikgyi Ward,
43 U Myint Aung Bamboo, Floor- 20*15 100% 43 16.75697 96.11864
Seikgyi Kanaungto
Wood
Roof-Dha Ni, Wall-
East Seikgyi Ward,
44 U Myint Soe Bamboo, Floor- 30*15 100% 44 16.75693 96.11858
Seikgyi Kanaungto
Wood
East Seikgyi Ward, Roof-Zinc, Wall-
45 Daw Cho 20*15 100% 45 16.75703 96.11858
Seikgyi Kanaungto Wood, Floor-Wood
East Seikgyi Ward, Roof-Zinc, Floor-
46 Ko Nyi Nyi 15*10 20% 46 16.75703 96.11849
Seikgyi Kanaungto Wood
Daw Myint Myint East Seikgyi Ward, Roof-Zinc, Floor-
47 15*10 100% 47 16.757 96.1185
Than Seikgyi Kanaungto Wood
Roof-Dha Ni, Wall-
East Seikgyi Ward,
48 U Zin Win Dha Ni, Floor- 15*12 20% 48 16.75696 96.11849
Seikgyi Kanaungto
Wood
Roof-Dha Ni, Wall-
East Seikgyi Ward,
49 Daw Hla Yi Dha Ni, Floor- 7*15 100% 49 16.75694 96.11853
Seikgyi Kanaungto
Wood
Roof-Dha Ni, Wall-
East Seikgyi Ward,
50 U Myint Htun Dha Ni, Floor- 30*50 100% 50 16.75692 96.1185
Seikgyi Kanaungto
Wood
East Seikgyi Ward,
51 U Ngwe Htun 10*30 70% 51 16.75699 96.11839
Seikgyi Kanaungto Floor-Wood
East Seikgyi Ward, Roof-Dha Ni, Wall-
52 Daw Aye Than 15*20 100% 52 16.75692 96.11837 Hire- Daw Kying
Seikgyi Kanaungto Dha Ni

54
Seikkyi Kanaungto Township

East Seikgyi Ward, Roof-Dha Ni, Wall-


53 U Aye Myint 20*20 100% 53 16.75679 96.11814
Seikgyi Kanaungto Dha Ni
East Seikgyi Ward, Roof-Dha Ni, Wall-
54 Daw Khin Than Nyunt 20*15 100% 54 16.75677 96.11807
Seikgyi Kanaungto Dha Ni
East Seikgyi Ward, 4 acre
55 Ko Htun Htun 100% 55 16.75651 96.11796
Seikgyi Kanaungto Farm
East Seikgyi Ward, 0.5 acre
56 Ko Htun Htun 100% 56 16.75566 96.11627
Seikgyi Kanaungto Water convolvulus
East Seikgyi Ward, Roof-Dha Ni, Wall-
57 Ko Htun Htun 15*20 100% 57 16.75547 96.11618
Seikgyi Kanaungto Bamboo
East Seikgyi Ward,
58 Asia (Shipyard) 20*20 100% 58 16.76349 96.1146
Seikgyi Kanaungto Staff housing
East Seikgyi Ward,
59 Asia (Shipyard) 30*40 100% 59 16.76379 96.11468
Seikgyi Kanaungto Staff housing
East Seikgyi Ward,
60 Asia (Shipyard) 4*8 100% 60 16.76425 96.11472
Seikgyi Kanaungto Hut
East Seikgyi Ward,
61 Asia (Shipyard) 4*8 100% 61 16.7647 96.1148
Seikgyi Kanaungto Staff housing
Shwe Nagar East Seikgyi Ward,
62 Lun(Goldren Dragon Seikgyi Kanaungto 40*25 100% 62 16.76697 96.11587
Shipyard) RC
Mitharsu Lun (Family
63 West Sate Kyi Dockyard 150×150 100% 70%
Shipyard)
Roof-Plastic,Wall-
64 Labour housing West Sate Kyi 35×130 100% 62 16.7624722 96.1140918
Zinc, Floor-Wood
Roof-Zinc, Wall-
65 Labour housing West Sate Kyi 20×20 100% 63 16.7625540 96.1140360 shipyard
Zinc, Floor-Wood
66 Labour housing West Sate Kyi Roof-Zinc 20×20 100% 64 16.7625560 96.1139330
Roof-Plastic(Work
67 Work shop (Store) West Sate Kyi 30×50 100% 65 16.7627207 96.1140740
shop)
Roof-Plastic(Work
68 small workshop West Sate Kyi 30×80 100% 66 16.7629743 96.1141605
shop)
Roof-Plastic(Work
69 car parking West Sate Kyi 20×20 100% 67 16.7624230 96.1139060
shop)
Roof-Zinc,Wall-
70 Work shop (Store) West Sate Kyi 20×20 100% 68 16.7623870 96.1138590
Bamboo
Roof-Plastic
71 U Win Kyi (Pigsty) West Sate Kyi 20×18 100% 69 16.7622870 96.1138270
(Dockyard)
Roof-Zinc
72 U Win Kyi (Store) West Sate Kyi 8×10 100% 70 16.7622530 96.1138790
(Dockyard)

55
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
73 U Win Kyi West Sate Kyi 20×60 100% 71 16.7622320 96.1139280
Brick
Roof-Zinc, Floor-
74 U Win Kyi West Sate Kyi 20×30 100% 72 16.7622060 96.1139560
Wood
Roof-Zinc, Wall-
75 Daw Ni Ni Aye West Sate Kyi 25×30 100% 73 16.7620499 96.1140054
Wood, Floor-Wood
Roof-Zinc, Wall-
76 Daw Ni Ni Aye West Sate Kyi 25×31 100% 74 16.7619969 96.1140420
Wood, Floor-Wood
Roof-Zinc, Wall-
77 Daw Ni Ni Aye West Sate Kyi 25×32 100% 75 16.7619554 96.1139264
Wood, Floor-Wood
Ko Htun Htun, U Tin Roof-Dhani, Wall-
78 West Sate Kyi 12×15 100% 76 16.7619270 96.1138740 Hire- Ko Htun Htun
Win Zinc, Floor-Wood
Roof-Zinc, Wall- Hire-Ko Kyaw Naing
79 U Tin Win West Sate Kyi 10×10 100% 77 16.7619290 96.1138660
Zinc,Floor-Bamboo Win
Roof-Zinc, Wall- Hire- Ko Aung Kyaw
80 U Pyae Phyo Win West Sate Kyi 10×10 100% 78 16.7619540 96.1138000
Zinc,Floor-Bamboo Moe
Roof-Zinc, Wall- Hire- Ko Kyaw Min
81 U Tin Win West Sate Kyi 10×10 100% 79 16.7619150 96.1137060
Zinc,Floor-Bamboo Oo
Roof-Dhani, Wall-
82 Daw Chaw Chaw West Sate Kyi Dhani, Floor- 10×10 100% 80 16.7619090 96.1137520
Bamboo
Roof-Dhani, Wall-
U Khaing Win, U Tin
83 West Sate Kyi Dhani, Floor- 10×10 100% 81 16.7618740 96.1137420 Hire- U Khaing Win
Win
Bamboo
Roof-Zinc, Wall-
84 U Tin Win West Sate Kyi 40×20 100% 82 16.7619280 96.1137450
Wood, Floor-Wood
Roof-Zinc, Wall-
Hire- Ko Aung Ko
85 U Kyaw Naing Win West Sate Kyi Bamboo,Floor- 15×15 100% 83 16.7618470 96.1138620
Htun
Wood
Roof-Zinc, Wall-
86 U Kyaw Naing Win West Sate Kyi Bamboo,Floor- 15×15 100% 84 16.7618950 96.1139520
Wood
Roof-Zinc, Wall-
87 U Pyae Phyo Win West Sate Kyi Bamboo, Floor- 15×15 100% 85 16.7619100 96.1139980
Wood
Roof-Zinc, Wall-
88 Daw Cho Cho Lwin West Sate Kyi Concret, Floor- 10×15 100% 86 16.7618570 96.1140110
Wood
Roof-Zinc, Wall-
89 Daw Chaw Chaw West Sate Kyi Concret, Floor- 10×16 100% 87 16.7618670 96.1139480 Hire- Ko Myo Aung
Wood

56
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
Hire- Ko Kyaw Kyaw
90 U Kyaw Naing Win West Sate Kyi Bamboo, Floor 10×17 100% 88 16.7618600 96.1139060
Oo
Bamboo
Roof-Zinc, Wall-
91 Daw Aye Thidar West Sate Kyi Bamboo, Floor- 30×10 100% 89 16.7618046 96.1140220
Wood
Roof-Zinc, Wall-
92 U Hla Phay West Sate Kyi Bamboo, Floor- 15×20 100% 90 16.7617789 96.1140052
Wood
Roof-Dhanni, Wall-
93 Daw Aye Thidar / Hire West Sate Kyi 10×10 100% 91 16.7617770 96.1139360
Dhanni
Roof-Zinc, Wall-
94 U Htun Oo West Sate Kyi 10×17 100% 92 16.7616850 96.1139290
Wood, Floor-Wood
Roof- Zinc, Wall-
95 U Win Zaw West Sate Kyi Concret, Floor- 10×15 100% 93 16.7617190 96.1137990
Wood
Roof- Zinc, Wall-
96 U Kyi Thein West Sate Kyi Concret, Floor- 10×15 100% 94 16.7617160 96.1137850 Hire- Ko San Lin Htun
Wood
Roof- Zinc,Wall-
97 U Win Naing Oo West Sate Kyi Bamboo,Floor- 15×15 100% 95 16.7617140 96.1137500
Wood
Roof-Zinc, Wall-
98 Ko Aung Min Oo West Sate Kyi 15×16 100% 96 16.7617350 96.1137050
Wood, Floor-Wood
Roof- Zinc,Wall-
99 U Win Naing West Sate Kyi Bamboo,Floor- 15×17 100% 97 16.7617110 96.1136700
Wood
Roof- Zinc,Wall-
100 Daw Myint Myint Kyi West Sate Kyi Bamboo,Floor- 10×15 100% 98 16.7616970 96.1137150 Hire- Ko Thiha Zaw
Wood
Roof- Zinc,Wall-
101 U Hla Khaing West Sate Kyi Bamboo,Floor- 10×16 100% 99 16.7617170 96.1137600
Wood
Roof-Zinc, Wall-
102 U Ngwe San West Sate Kyi Dha Ni, Floor- 10×17 100% 100 16.7617030 96.1137990 Hire- Daw Aye Myint
Wood
Roof- Zinc, Wall-
103 U Ko Ko Win West Sate Kyi 10×18 100% 101 16.7617000 96.1138460
Zinc, Floor-Wood
Roof-Zinc, Wall-
104 Daw Aye Myint West Sate Kyi 15×30 100% 102 16.7616910 96.1140040
Wood, Floor-Wood

57
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
105 Daw Khin San Tint West Sate Kyi 18×30 100% 103 16.7615520 96.1139750
Wood, Floor-Brick
Roof-Zinc, Wall-
106 U Win Zaw Myint West Sate Kyi 18×10 100% 104 16.7615800 96.1139890
Wood, Floor-Wood
Roof-Zinc, Wall-
Hire- Ko Myo Min
107 Daw Mya Thidar West Sate Kyi Bamboo, Floor- 10×15 100% 105 16.7613630 96.1140450
Htun
Wood
Roof-Zinc, Wall-
108 U Maung West Sate Kyi Bamboo, Floor- 18×15 100% 106 16.7613810 96.1140000 Hire- U Yin Win
Wood
Roof-Zinc, Wall-
109 U Myint Aung West Sate Kyi 15×15 100% 107 16.7613780 96.1139210
Wood, Floor-Wood
Roof-Zinc, Wall-
110 Ko Arkar West Sate Kyi Bamboo, Floor- 15×15 100% 108 16.7613720 96.1138720
Wood
Roof-Zinc, Wall-
111 U Myo Min Zaw West Sate Kyi 15×15 100% 109 16.7613990 96.1138190
Brick, Floor-Wood
Roof-Zinc, Wall-
112 U Than Oo West Sate Kyi Bamboo, Floor- 15×20 100% 110 16.7613880 96.1137700
Wood
Roof-Dha Ni, Wall-
113 U Min Naing West Sate Kyi Dha Ni, Floor- 10×12 100% 111 16.7613920 96.1137490
Wood
Roof-Dha Ni, Wall-
114 Daw Yamin Thu West Sate Kyi Bamboo, Floor- 10×12 100% 112 16.7614030 96.1137070
Wood
Roof-Dha Ni, Wall-
Daw Myint Myint
115 West Sate Kyi Bamboo, Floor- 10×12 100% 113 16.7614210 96.1136680
Maw
Wood
Roof- Zinc, Wall-
116 Daw Kyi Kyi Khaing West Sate Kyi 10×12 100% 114 16.7614080 96.1136690
Zinc, Floor-Wood
Roof-Zinc, Wall-
117 U Htain Lin Aung West Sate Kyi Bamboo, Floor- 10×12 100% 115 16.7614040 96.1137320
Wood
Roof- Zinc, Wall-
118 U Kyaw Oo West Sate Kyi 15×15 100% 116 16.7613890 96.1137600
Zinc, Floor-Wood
Roof-Zinc, Wall-
119 U Soe Myint West Sate Kyi Concret, Floor- 15×15 100% 117 16.7613770 96.1138200
Wood
Roof-Zinc, Wall-
120 Daw Lae Lae Win West Sate Kyi 15×15 100% 118 16.7613790 96.1138650
Bamboo, Floor-

58
Seikkyi Kanaungto Township

Wood

Roof-Zinc, Wall-
Hire- Ko Aung Kyaw
121 U Kyaw Aye West Sate Kyi Bamboo, Floor- 15×15 100% 119 16.7613780 96.1138940
Htay
Wood
Roof-Zinc, Wall-
122 U Kyaw Aye West Sate Kyi Bamboo, Floor- 15×15 100% 120 16.7613790 96.1139310 Hire- Ko Kyaw Lin Oo
Wood
Roof- Zinc, Wall-
123 Daw Yu West Sate Kyi 15×15 100% 121 16.7613800 96.1139500
Zinc, Floor-Wood
Roof-Zinc, Wall-
124 Daw Mya Thidar West Sate Kyi Bamboo, Floor- 15×15 100% 122 16.7613650 96.1140030 Hire- U Than Zaw
Wood
Roof-Zinc, Wall-
Hire- Ma Khin Mar
125 Daw Mya Thidar West Sate Kyi Bamboo, Floor- 15*15 100% 123 16.7613730 96.1140390
Win
Wood
Roof-Zinc, Wall-
126 Daw Mya Thidar West Sate Kyi Bamboo, Floor- 15*60 100% 124 16.7611865 96.1140423 Hire- Tin Moe Win
Wood
Roof-Zinc, Wall-
127 Daw Mya Thidar West Sate Kyi Bamboo, Floor- 15*60 100% 124 16.7611865 96.1140423 Hire- San Htwe
Wood
Roof-Zinc, Wall-
128 Daw Mya Thidar West Sate Kyi Bamboo, Floor- 15×60 100% 124 16.7611865 96.1140423 Hire- Daw Amar Lwin
Wood
Roof-Zinc, Wall-
Hire- Daw Yi Yi
129 Daw Mya Thidar West Sate Kyi Bamboo, Floor- 15×60 100% 124 16.7611865 96.1140423
Khaing
Wood
Roof- Zinc, Wall-
130 U San Myint West Sate Kyi 15×30 100% 125 16.7611910 96.1140070
Zinc, Floor-Wood
Roof- Zinc, Wall-
131 U Thaung Sein West Sate Kyi 15×30 100% 126 16.7612090 96.1139440
Zinc, Floor-Wood
Roof-Zinc, Wall-
Hire- Ko That Naing
132 Daw Khin Than West Sate Kyi Bamboo, Floor- 15×30 100% 127 16.7612160 96.1138730
Oo
Wood
Roof-Zinc, Wall-
133 U San Win West Sate Kyi Concret, Floor- 15*30 100% 128 16.7612310 96.1138010
Wood
Roof-Zinc, Wall-
134 Daw Yadanar Oo West Sate Kyi Concret, Floor- 10*12 100% 129 16.7612390 96.1137750 Hire- Ko Toe Myint
Wood

59
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
135 Daw Thandar Wai West Sate Kyi Concret, Floor- 10*12 100% 130 16.7612440 96.1137540 Hire- Zarni Myo Myint
Wood
Roof-Zinc, Wall-
136 U Zaw Zaw Aung West Sate Kyi Concret, Floor- 10*12 100% 131 16.7612320 96.1137030
Wood
Roof-Zinc, Wall-
137 Daw Wine Sein West Sate Kyi Dha Ni, Floor- 10×10 100% 132 16.7612850 96.1136590
Bamboo
Roof-
138 U Myo Min Zaw West Sate Kyi 15×10 100% 133 16.7611810 96.1137290
Plactic(Pigsty)
Roof-Zinc, Wall-
139 U Chit Wai West Sate Kyi 20×30 100% 134 16.7611590 96.1137520
Brick, Floor-Wood
Roof-Zinc, Wall-
140 U Saw Saw Khu West Sate Kyi Bamboo, Floor- 10×15 100% 135 16.7611970 96.1138260
Wood
Roof-Zinc, Wall-
141 U Tin Lin West Sate Kyi Bamboo, Floor- 12×15 100% 136 16.7611990 96.1138530
Wood
Roof-Zinc, Wall-
142 U Khin Win West Sate Kyi 16×25 100% 137 16.7612020 96.1139150
Wood, Floor-Wood
Roof-Zinc,Wall-
143 U Aung Soe West Sate Kyi 16×25 100% 138 16.7611840 96.1139630
Zinc,Floor-Wood
Roof-Zinc, Wall-
Hire- Daw Khin Mar
144 Daw Lae Lae Win West Sate Kyi Bamboo, Floor- 15×20 100% 139 16.7612030 96.1140200
Thet
Wood
Roof-Dha Ni, Wall-
145 Daw Zu Zu West Sate Kyi Bamboo, Floor- 15×20 100% 140 16.7611220 96.1140060
Wood
Roof-Zinc,Wall-
146 U Win Aung West Sate Kyi Dha Ni, Floor- 10×12 100% 141 16.7610910 96.1140280
Bamboo
147 U Tin Soe West Sate Kyi near lake area 15×12 100% 142 16.7610560 96.1140070 House Topple
Roof-Dha Ni, Wall-
148 U Sein Than West Sate Kyi 10×10 100% 143 16.7610230 96.1139670
Dha Ni,Floor-Wood
Roof-Dha Ni, Wall-
149 Daw Wai Lin West Sate Kyi Bamboo, Floor- 10×10 100% 144 16.7610120 96.1139520
Wood
Roof-Zinc, Wall-
150 Daw Khin Hla West Sate Kyi 15×15 100% 145 16.7609960 96.1139160
Bamboo, Floor-

60
Seikkyi Kanaungto Township

Wood

Roof-Zinc, Wall-
151 U Soe Than West Sate Kyi Concret, Floor- 18×20 100% 146 16.7610220 96.1138300
Wood
Roof-Zinc, Wall-
152 Daw Tin Nwae West Sate Kyi Bamboo, Floor- 15×20 100% 147 16.7610260 96.1137970
Wood
Roof-Zinc, Wall- Hire- Har Shin Ko
153 U Win Naing West Sate Kyi 10×15 100% 148 16.7610210 96.1137570
Zinc, Floor-Wood Htun Win
Roof-Zinc, Wall-
154 Daw Moe Moe West Sate Kyi Bamboo, Floor- 10×15 100% 149 16.7610390 96.1137140
Wood
Roof-Zinc, Wall-
155 Daw Win Mar West Sate Kyi Dha Ni, Floor- 10×15 100% 150 16.7610190 96.1137180
Bamboo
Roof-Zinc, Wall-
156 U Kyaw Zin Oo West Sate Kyi 10×15 100% 151 16.7610170 96.1137570 Hire-U Aung Myo Thu
Zinc,Floor-Wood
Roof-Zinc, Wall-
157 U Aye Kyaw West Sate Kyi 10×18 100% 152 16.7610150 96.1137970
Zinc,Floor-Wood
Roof-Zinc, Wall-
158 Kyaw Lwin 00 West Sate Kyi 10×18 100% 153 16.7610090 96.1138050
Zinc,Floor-Wood
Roof-Zinc, Wall-
159 U Aye Myint West Sate Kyi 15×18 100% 154 16.7610050 96.1138360
Zinc,Floor-Wood
Roof-Zinc, Wall-
160 U Hla Myo West Sate Kyi Bamboo,Floor- 20×15 100% 155 16.7609790 96.1138890
Wood
Roof-Zinc, Wall-
161 Aung Than Oo West Sate Kyi engraver,Floor- 15×20 100% 156 16.7610090 96.1140120
Wood
Roof-Zinc, Wall-
162 Mi San Win West Sate Kyi Bamboo,Floor- 15×20 100% 157 16.7609300 96.1139980
Wood
Roof-Zinc, Wall-
163 Daw Khin Htay West Sate Kyi Bamboo,Floor- 15×20 100% 158 16.7609250 96.1139920
Wood
Roof-Zinc, Wall-
164 U Aung Kyaw Myink West Sate Kyi 15×20 100% 159 16.7608600 96.1139970
Wood,Floor- Wood
Roof-Zinc, Wall-
165 U Soe Win West Sate Kyi Bamboo, Floor- 15×15 100% 160 16.7608270 96.1140210
Wood

61
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
166 Daw Tin Tin Aung West Sate Kyi 10×70 100% 161 16.7607890 96.1140060 U Hla Naing
Zinc,Floor-Wood
Roof-Zinc, Wall-
167 U Soe Hlaing West Sate Kyi 14×70 100% 162 16.7607720 96.1140020 U Tin Nge
Wood,Floor- Wood
Roof-Zinc, Wall-
168 U Tin Win West Sate Kyi 10×50 163 16.7607350 96.1139910
Wood,Floor-Wood
Roof-Zinc, Wall-
169 Daw Ngwe Tin West Sate Kyi 10×50 164 16.7607100 96.1139850
Wood,
Roof-Zinc, Wall-
170 U Myo Thank West Sate Kyi 20×25 165 16.7606160 96.1139310
Zinc,Floor-Wood
Roof-Zinc, Wall-
171 U Saw Kalue West Sate Kyi 10×20 166 16.7606360 96.1138680 Aung Htay Oo
Zinc,Floor-Wood
Roof-Zinc, Wall-
172 Kyaw Pyie Lwin West Sate Kyi 15×20 167 16.7606410 96.1138560
Zinc,Floor-Wood
Roof-Zinc, Wall-
173 U Tun Naing West Sate Kyi Bamboo,Floor- 12×40 168 16.7606300 96.1138210 U Ohann Than
Wood
Roof-Zinc, Wall-
174 Daw San Tink West Sate Kyi 10×20 169 16.7606520 96.1137640
Dhani ,Floor-Wood
Roof-Zinc, Wall-
175 Ma Htay Htay Win West Sate Kyi 10×20 170 16.7607240 96.1137340 Khin Moe Htway
Dhani ,Floor-Wood
Roof-Zinc, Wall-
176 U Aung Nyuint Shwe West Sate Kyi 20×15 171 16.7607930 96.1137550
Dhani ,Floor- Wood
Roof-Zinc, Wall-
177 Htay Llinn Tun West Sate Kyi 20×15 172 16.7607900 96.1137700
Dhani ,Floor- Wood
Roof-Zinc, Wall-
178 Than Than Shwe West Sate Kyi 12×20 173 16.7608200 96.1137450
Dhani ,Floor-Wood
Roof-Zinc, Wall-
179 Ma Than Nwe West Sate Kyi 12×20 174 16.7608380 96.1137510
Zinc,Floor-Wood
Roof-Zinc, Wall-
180 Ko Than Oo West Sate Kyi 12×20 175 16.7608840 96.1137450
Zinc,Floor-Wood
Roof-Dhani, Wall-
181 Daw Hla Hla win West Sate Kyi Rain Cover,Floor- 10×15 176 16.7609120 96.1137560
Wood
Roof-Dhani, Wall-
182 Pyie Phyo Aung West Sate Kyi Rain Cover,Floor- 10×15 177 16.7608630 96.1137320
Wood
Roof-Zinc, Wall-
183 Aung Zaw Min West Sate Kyi 10×15 178 16.7608180 96.1137240
Wood,Floor-Wood
Roof-Zinc, Wall-
184 Myo Min Aung West Sate Kyi 10×15 179 16.7607770 96.1137110
Wood,Floor- Wood

62
Seikkyi Kanaungto Township

185 Vessal Gate West Sate Kyi Hut, Roof-Zinc 10×10 180 16.7606268 96.1137056

186 Religious Hall West Sate Kyi RC 30×50 181 16.7606320 96.1138510
Roof-Zinc, Wall-
187 Daw Hla Hla win West Sate Kyi 20×25 182 16.7605749 96.1139293
Zinc,Floor-Wood
Roof-Zinc, Wall-
188 U Win Ko West Sate Kyi 15×15 183 16.7606110 96.1139990
Zinc,Floor-Wood
Roof-Zinc, Wall-
189 U Aung Lwin Oo West Sate Kyi 18×20 20% 184 16.7608830 96.1140350
Wood,Floor-Wood
Roof-Zinc, Wall-
190 U Bo West Sate Kyi 20×25 20% 185 16.7609360 96.1140433
Wood,,Floor-Wood
Roof-Zinc, Wall-
191 San San Win West Sate Kyi Bamboo, Floor- 80×20 20% 186 16.7604830 96.1139040
Wood
Roof-Zinc, Wall-
192 Daw San San Shwe West Sate Kyi Bamboo, ,Floor- 20×60 50% 187 16.7603880 96.1139040
Wood
Roof-Zinc, Wall-
193 Kyaw Min Tun West Sate Kyi Bamboo, ,Floor- 15×20 20% 190 16.7603720 96.1139240
Wood
Roof-Zinc, Wall-
194 Cho Mar Lwin West Sate Kyi Bamboo,Floor- 15×20 30% 188 16.7603160 96.1139030
Wood
Roof-Zinc, Wall-
195 U Min Tun West Sate Kyi Bamboo,Floor- 25×20 90% 189 16.7601868 96.1138488 Tin Shwe
Wood
Roof-Zinc, Wall-
196 Naing Ko Win West Sate Kyi Bamboo,Floor- 10×15 100% 191 16.7602174 96.1137819 khine Soe
Wood
Roof-Zinc, Wall-
197 Aung Ko Min West Sate Kyi Bamboo, Floor- 10×12 100% 192 16.7602610 96.1137540
Wood
Roof-Danni, Wall-
198 U Tun Naing/store West Sate Kyi 15×20 193 16.7603700 96.1136850
Danni
Roof-Zinc, Wall-
199 U Tun Naing West Sate Kyi Bamboo,Floor- 25×25 194 16.7603389 96.1136492
Wood
Roof-Zinc, Wall-
200 Myo Htet Aung West Sate Kyi 25×20 195 16.7602888 96.1135484
Dhani
201 Ko Linn Naing West Sate Kyi Roof-Zinc, Wall- 25×25 196 16.7601710 96.1135720

63
Seikkyi Kanaungto Township

Wood,Floor- Wood

Roof-Zinc, Wall-
202 U Aung Kyaw Myink West Sate Kyi 25×40 197 16.7601094 96.1135451
Wood,Floor- Wood
Roof-Zinc, Wall-
203 Aye Zaw Htway West Sate Kyi 25×30 198 16.7600470 96.1135624
Wood,Floor- Wood
Roof-Zinc, Wall-
204 Min Min Zaw West Sate Kyi 10×20 199 16.7599980 96.1135840
Dhani ,Floor- Wood
Roof-Zinc, Wall-
205 U Kyi Thein West Sate Kyi 10×30 200 16.7599354 96.1135758
Wood,,Floor-Wood
Roof-Zinc, Wall-
206 U Maung Nge West Sate Kyi 10×15 201 16.7598918 96.1135951
Wood,Floor-Wood
Roof-Zinc, Wall-
207 Daw Khin Lay Cho West Sate Kyi 10×15 202 16.7598650 96.1136322
Wood,Floor- Wood
Roof-Zinc, Wall-
208 U Aye Mart West Sate Kyi 20×20 203 16.7598401 96.1136851
Dhani ,Floor- Wood
Roof-Zinc, Wall-
209 Win Tun Aung West Sate Kyi 10×10 204 16.7599121 96.1137121
Dhani ,Floor- Wood
Roof-Zinc, Wall-
210 Daw Ashia Be West Sate Kyi engraver,,Floor- 10×30 205 16.7598403 96.1137309
Wood
Roof-Zinc, Wall-
211 Mg Mg Zaw West Sate Kyi engraver,,Floor- 15×20 207 16.7598282 96.1138101
Wood
Roof-Zinc, Wall-
212 U Tin Htay West Sate Kyi 15×20 206 16.7598154 96.1137658
Wood,Floor- Wood
Roof-Zinc, Wall-
213 Daw Aye Than West Sate Kyi Zinc,,Flooring- 16×24 208 16.7596887 96.1138011
Wood
Roof-Zinc, Wall-
214 Daw Khin Than West Sate Kyi 20×25 10% 209 16.7596819 96.1138236
Wood,,Floor-Brick
Roof-Zinc, Wall-
215 Daw Htay Htay Win West Sate Kyi 15×20 210 16.7597023 96.1137662
Wood,,Floor- Wood
216 Daw Zin Mar Tun West Sate Kyi Roof-Zinc 15×30 211 16.7597147 96.1137430
Daw Khi Aye Myint/U Roof-Zinc, Wall-
217 West Sate Kyi 25×50 212 16.7597289 96.1136923
Khin Maung Than Wood,,Floor- Wood
Roof-Zinc, Wall-
218 U Htay Aung West Sate Kyi 10×20 213 16.7597541 96.1136438
Zinc,,Floor- Wood
Roof-Zinc, Wall-
219 U Myint Swe West Sate Kyi 12×30 214 16.7597586 96.1135836
Zinc,,Floor-Wood

64
Seikkyi Kanaungto Township

Roof-Dhani, Wall-
220 U Than Shwe West Sate Kyi 12×10 215 16.7596070 96.1135200
Dhani ,Floor- Wood
Roof-Dhani, Wall-
221 Phyo Wai Lwin West Sate Kyi Flat Wood,Floor- 10×10 216 16.7596010 96.1135409
Wood
Roof-Dhani,Wall--
222 U Sein Htay West Sate Kyi Flat Wood,Floor- 10×10 217 16.7596100 96.1135760
Wood
Roof-Zinc,Wall-
223 Lei lei Soe West Sate Kyi Bamboo,Floor- 12×15 218 16.7595860 96.1135220
Wood
Roof-Zinc, Wall-
224 Ma Aye Win West Sate Kyi Bamboo,Floor- 10×12 219 16.7595470 96.1135020
Wood
Roof-Dhani, Wall-
225 Ko Aye Min West Sate Kyi 10×10 220 16.7595270 96.1134710
Dhani ,Floor-Wood
Roof-Zinc,Wall-
226 Daw Thaung Kyi West Sate Kyi 221 16.7594570 96.1134700
Zinc,Floor-Bamboo
Roof-Zinc, Wall-
227 Nay Myo Tun West Sate Kyi Bamboo, Floor- 12×12 222 16.7594330 96.1134720
Wood
Roof-Zinc,Wall-
228 Daw Khin Than Nyunt West Sate Kyi Wood,Floor- 30×42 223 16.7594100 96.1134660
Wood(Brinknorkle)
Roof-Dhani, Wall-
229 U Kyee Ngwe West Sate Kyi Bamboo, Floor- 12×10 225 16.7593760 96.1135040
Wood
230 Ma Khine Htay West Sate Kyi Kanpound 12×10 224 16.7593880 96.1134730
Roof-Dhani,Wall-
231 Daw Hla Shwe West Sate Kyi Bamboo, Floor- 10×12 226 16.7593580 96.1135250
Bamboo
Roof-Zinc, Wall-
232 Ma Khine Than Nyunt West Sate Kyi Bamboo, Floor- 10×15 227 16.7593730 96.1135620
Wood
Roof-Dhani, Wall-
233 U Kyee Ngwe West Sate Kyi Danni, Floor- 10×10 228 16.7593430 96.1135080
Bamboo
Roof-Zinc, Wall-
234 Daw Myint Myint Kyi West Sate Kyi Bamboo, Floor- 12×15 229 16.7593490 96.1135830
Wood

65
Seikkyi Kanaungto Township

235 Ko Kyaw Naing West Sate Kyi RC(Two Layer) 25×30 230 16.7593870 96.1136080
Roof-Zinc, Wall-
236 U Chit Tun West Sate Kyi Bamboo, Floor- 12×15 231 16.7593550 96.1136110
Wood
Roof-Zinc, Wall-
237 Ko Naing Too West Sate Kyi Bamboo, Floor- 15×15 232 16.7593110 96.1136400
Wood
Roof-Zinc, Wall-
238 Daw Khin San Win West Sate Kyi Bamboo, Floor- 25×40 233 16.7592800 96.1136740
Wood
Roof-Zinc, Wall-
239 Daw Tin Thein West Sate Kyi Bamboo, Floor- 25×40 234 16.7592490 96.1137380
Wood
Roof-Zinc, Wall-
240 Ko Naing Win West Sate Kyi Bamboo, Floor- 20×40 10% 235 16.7592280 96.1137500
Wood
Roof-Zinc, Wall-
241 Daw Thaung Kyi West Sate Kyi Bamboo, Floor- 10×20 5% 236 16.7593166 96.1137728
Wood
Roof-Zinc, Wall-
242 Daw Khon Swe West Sate Kyi Bamboo, Floor- 25×40 237 16.7593510 96.1137570
Wood
Roof-Zinc, Wall-
243 U Myint Than West Sate Kyi Bamboo, Floor- 15×40 238 16.7593949 96.1137559
Wood
Roof-Zinc, Wall-
244 Daw San San Htay West Sate Kyi 20×30 239 16.7594435 96.1137825
Wood, Floor- Wood
Roof-Zinc, Wall-
U Harshiyan/ u sein
245 West Sate Kyi Bamboo, Floor- 15×30 240 16.7594980 96.1137967
narkat
Wood
Roof-Zinc, Wall-
Daw Nyunt Nyunt
246 Daw Khin Than West Sate Kyi engraver, Floor- 13×30 241 16.7595711 96.1138126
Thein
Wood
Roof-Zinc, Wall-
247 Daw Ngwe Ni West Sate Kyi Bamboo, Floor- 13×30 50% 242 16.7596239 96.1138233 U Win Khine
Wood
Roof-Zinc, Wall-
248 U Than Nyungt Oo West Sate Kyi Bamboo, Floor- 8×10 243 16.7591630 96.1136550
Wood
249 U Hla Win West Sate Kyi Roof-Zinc, Wall- 10×50 244 16.7591730 96.1136020

66
Seikkyi Kanaungto Township

engraver, Floor-
Wood
Kanpound(Free
250 U Soe Win West Sate Kyi pond(land) 10×30 245 16.7591740 96.1136150
land)
Roof-Zinc, Wall-
251 Daw Than Than Maw West Sate Kyi 10×30 246 16.7591500 96.1136480 U August
Zinc,Floor- Wood
Roof-Zinc, Wall-
252 U Than Win Aung West Sate Kyi 247 16.7591240 96.1136290
Zinc,Floor- Wood
Roof-Zinc, Wall-
253 Daw Win Thuzar Oo West Sate Kyi 10×30 248 16.7591320 96.1135980 U Sein Win
Dhani ,Floor- Wood
Roof-Zinc, Wall-
254 U Thein Than Win West Sate Kyi 10×30 249 16.7591000 96.1135940
Zinc,Floor- Wood
Roof-Zinc, Wall-
255 U Aye Tun West Sate Kyi Dhani ,Floor- 10×20 250 16.7591210 96.1135680 Thet Ko Ko
Bamboo
Roof-Zinc,Wall-
256 Daw Thin Thin Htike West Sate Kyi 10×30 251 16.7590700 96.1135820
Zinc,Floor- Wood
Roof-Zinc,Wall-
257 U Aung Gyi West Sate Kyi Bamboo, Floor- 10×30 252 16.7590840 96.1135780 Ko Yan Naing
Wood
Roof-Zinc,Wall-
258 Daw Tin West Sate Kyi Bamboo,Floor- 10×20 253 16.7590590 96.1135570
Bamboo
Roof-Zinc, Wall-
259 U Moe Aye West Sate Kyi 10×30 254 16.7590520 96.1135680
Zinc,Floor- Wood
Roof-Zinc, Wall-
260 Daw Htay Htay Maw West Sate Kyi 10×30 255 16.7590190 96.1135350
Zinc,Floor- Wood
Roof-Zinc, Wall-
261 U Naing Linn West Sate Kyi 10×30 256 16.7590090 96.1135100
Zinc,Floor- Wood
pond(10×30 Roof-Zinc, Wall-
262 U Than Tun West Sate Kyi 10×30 257 16.7589910 96.1135260 U Myint Naing
) Zinc,Floor- Wood
Roof-Zinc, Wall-
263 Daw Khin Aye Myint West Sate Kyi Bamboo, Floor- 12×20 258 16.7590000 96.1134850
Bamboo
Roof-Zinc, Wall-
264 Daw Ye Ye Htay West Sate Kyi Dha ni ,Floor- 10×30 259 16.7589720 96.1135020
Bamboo
Roof-Zinc, Wall-
pond(11×40
265 Shoon Lei win West Sate Kyi Zinc,Floor- 11×12 260 16.7589800 96.1134910 U Myint Htay
)
Bamboo

67
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
266 U Than Lwin West Sate Kyi Bamboo, Floor - 10×30 261 16.7589330 96.1134840
Wood
Roof-Zinc, Wall-
267 U Kyaw Linn West Sate Kyi 10×30 262 16.7589340 96.1134690
Zinc,Floor- Wood
Roof-Zinc, Wall-
268 Ma Theinge West Sate Kyi Dhani, Floor - 10×30 263 16.7589250 96.1134700
Wood
Roof-Zinc, Wall-
269 U Win Htay West Sate Kyi engraver, Floor - 11×30 264 16.7589430 96.1134410
Wood
Roof-Zinc, Wall-
270 U Nyunt Tin West Sate Kyi Dhani, Floor - 10×30 265 16.7589080 96.1134410
Wood
Roof-Zinc, Wall-
271 Daw Myint Thein West Sate Kyi 10×30 266 16.7588970 96.1134150
Zinc,Floor- Wood
Roof-Zinc, Wall-
272 Daw Tin New West Sate Kyi 15×30 267 16.7588530 96.1134330
Zinc,Floor- Wood
Roof-Zinc, Wall-
273 U Bo Win West Sate Kyi Zinc,Flooring- 10×30 268 16.7588470 96.1134200
Wood
Roof-Zinc, Wall-
274 Daw Ye Myint West Sate Kyi 10×30 269 16.7588350 96.1134190
Zinc,Floor- Wood
Roof-Zinc, Wall-
275 U Thura Zaw West Sate Kyi engraver, Floor- 10×30 270 16.7588410 96.1133770
Bridge
Roof-Zinc, Wall-
276 U Khin Zaw Tun West Sate Kyi Zinc,Floor- 271 16.7588240 96.1134040
Bridge(2 Layer)
Roof-Zinc, Wall-
277 U Zaw Myo Lwin West Sate Kyi engraver, Floor - 10×30 272 16.7588040 96.1133770
Wood
Roof-Zinc, Wall-
278 Ma Ni West Sate Kyi Zinc,Floor- 10×20 273 16.7588070 96.1133930 Ko Linn Linn
Bamboo
Roof-Zinc, Wall-
279 U Zaw Win Theik West Sate Kyi 10×30 274 16.7587890 96.1133760
Zinc,Floor- Wood
Roof-Zinc, Wall-
280 Ko Thaung Tin West Sate Kyi Bamboo, Floor - 10×20 275 16.7587620 96.1133830
Wood

68
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
281 U Khin Maung Lwin West Sate Kyi 10×30 276 16.7587580 96.1133650
Zinc,Floor- Wood
Roof-Zinc, Wall-
282 Win Min Latt West Sate Kyi Dhani ,Floor- 10×15 277 16.7588110 96.1132550
Bamboo
Roof-Zinc, Wall-
283 Daw Khin Win West Sate Kyi Dhani ,Floor- 10×15 278 16.7588130 96.1132400
Bamboo
Roof-Zinc, Wall-
284 U Naing Htoo West Sate Kyi Bamboo, Floor- 10×30 279 16.7587360 96.1133360
Bamboo
Roof-Zinc, Wall-
285 Htoo Ko Ko Kyaw West Sate Kyi Bamboo, Floor - 10×20 280 16.7587380 96.1133510
Wood
Roof-Danni, Wall-
286 U Kyaw Min West Sate Kyi Dhani ,Floor- 10×12 281 16.7587410 96.1132370
Bamboo
Roof-Zinc, Wall-
287 U Min Zaw Tun West Sate Kyi 10×20 282 16.7586740 96.1133050 Si Thu Phyo
Zinc,Floor- Wood
Roof-Zinc, Wall-
288 U Myint Aung West Sate Kyi 10×15 283 16.7586780 96.1132920 Win Min Ko
WoodFloor- Wood
Roof-Zinc, Wall-
289 U Min Zaw Tun West Sate Kyi 10×20 284 16.7586330 96.1133020 Hein Zaw Latt
Zinc,Floor- Wood
Roof-Zinc, Wall-
U Myo Thant/U Mya
290 U Myint Aung West Sate Kyi Bamboo,Floor- 10×30 285 16.7586420 96.1132740
Soe
Wood
Roof-Zinc, Wall-
291 U Hla Maung West Sate Kyi Bamboo, Floor- 10×20 286 16.7586490 96.1132220 U San Myint
Wood
Roof-Danni, Wall-
292 U Hla Maung West Sate Kyi Dhani Floor- 10×10 287 16.7586790 96.1131780 U Aung Myo Thant
Bamboo
Roof-Zinc, Wall-
293 U Thein Han West Sate Kyi Dhani Floor- 15×15 288 16.7586680 96.1131700
Bamboo
Roof-Zinc, Wall-
U Myint Aung/ U Zaw
294 U Thein Han West Sate Kyi Bamboo,Floor- 10×20 289 16.7587210 96.1131450
Myit Naing
Bamboo
Roof-Dhani, Wall-
295 Linn Aung West Sate Kyi Dhani ,Floor- 10×10 290 16.7587560 96.1131410
Bamboo

69
Seikkyi Kanaungto Township

Roof-Dhani,Floor-
296 Zaw Min Naing West Sate Kyi Pigsty 10×10 291 16.7586660 96.1130530
Bamboo
Roof-Zinc, Wall-
297 Daw Yee Yee Win West Sate Kyi 20×30 292 16.7586140 96.1130630
Wood,Floor- Wood
Roof-Zinc, Wall-
298 U Myint Aung West Sate Kyi Bamboo,Floor- 10×25 10% 293 16.7590308 96.1136844
Bamboo
Roof-Zinc, Wall-
299 U Sein Aung Min West Sate Kyi Bamboo, Floor- 12×25 20% 294 16.7589866 96.1136580
Wood
Roof-Zinc, Wall-
300 Daw Yee Yee Myint West Sate Kyi engraver,Floor- 15×30 30% 295 16.7589205 96.1136390
Wood
Roof-Zinc, Wall-
301 U Kan Tun West Sate Kyi 10×30 50% 296 16.7588888 96.1135916
Zinc,Floor- Wood
Roof-Zinc, Wall-
302 Daw Khin Than Nyunt West Sate Kyi Bamboo, Floor- 10×30 40% 297 16.7588512 96.1135673 Daw Khin Nyo
Wood
Roof-Zinc, Wall-
303 U Zaw That West Sate Kyi 11×30 30% 298 16.7588172 96.1135512 U Aung Myo
Zinc ,Floor- Wood
Roof-Zinc, Wall-
304 U Zaw Oo West Sate Kyi Bamboo,Floor- 15×20 299 16.7587798 96.1135217
Wood
Roof-Zinc, Wall-
305 U Kyee Maung West Sate Kyi engraver, Floor- 15×30 300 16.7587458 96.1134967
Wood
Roof-Zinc,Wall-
306 Cooperatives Land West Sate Kyi Bamboo,Floor- 10×10 100% 301 16.7585580 96.1133170
Bamboo
Roof-Zinc,Wall-
307 Cooperatives Land West Sate Kyi Bamboo,Floor- 10×10 100% 302 16.7585540 96.1132490 Hire-Zaw Myint
Bamboo
Roof-Zinc,Wall-
308 Cooperatives Land West Sate Kyi Bamboo,Floor- 10×10 100%
Bamboo
Roof-Zinc,Wall-
Win Naing
309 Cooperatives Land West Sate Kyi Bamboo,Floor- 10×10 100%
( 40×20)
Bamboo
Roof-Zinc,Wall-
310 Cooperatives Land West Sate Kyi Bamboo,Floor- 10×10 100% Lei Lei
Bamboo

70
Seikkyi Kanaungto Township

Roof-Zinc,Wall-
311 U Soe West Sate Kyi 10×25 100% 303 16.7584350 96.1132240
Wood,Floor-Wood
Roof-Zinc,Wall-
312 U Than Htay West Sate Kyi Bamboo, Floor- 10×15 100% 304 16.7584310 96.1131930
Bamboo
Roof-Zinc, Wall-
313 Daw Yee Win West Sate Kyi 10×20 100% 305 16.7584910 96.1130800
Zinc,Floor- Wood
Roof-Zinc,Wall-
314 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 306 16.7585290 96.1129800
Wood
Roof-Zinc,Wall-
315 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 307 16.7585340 96.1129880 Daw Nyo Htway
Wood
Roof-Zinc,Wall-
316 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 308 16.7585000 96.1130170 La Pyie
Wood
Roof-Zinc,Wall-
317 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 309 16.7584760 96.1130430
Wood
Roof-Zinc,Wall-
318 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 310 16.7584380 96.1131070 Kyaw Myo Htike
Wood
Roof-Zinc,Wall-
319 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 311 16.7583900 96.1130890 Aye Aye Khine
Wood
Roof-Zinc,Wall-
320 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 312 16.7583670 96.1131020 That Mg Ng
Wood
Roof-Zinc,Wall-
321 Daw Khin Win West Sate Kyi Bamboo,Floor- 15×15 100% 313 16.7583480 96.1130350
Wood
Roof-Zinc,Wall-
322 U Tin Oo West Sate Kyi 30×30 100% 314 16.7583030 96.1129950
Wood,Floor- Wood
Roof-Zinc,Wall-
U Htay Aung/Ko Chit
323 West Sate Kyi Bamboo,Floor- 10×15 100% 315 16.7582900 96.1129450 U Chit Ko
Ko
Wood
Roof-Zinc,Wall-
324 U Than Win (store) West Sate Kyi 15×15 100% 316 16.7583090 96.1128860
Zinc,Floor- Wood
Roof-Zinc,Wall-
325 U Than Win West Sate Kyi 10×10 100% 317 16.7583380 96.1128390 Ye Myint Win
Zinc,Floor- Wood

71
Seikkyi Kanaungto Township

Roof-Zinc,Wall-
326 U Than Win West Sate Kyi 10×10 100% 318 16.7583450 96.1128450 Thiha Win
Zinc,Floor- Wood
Roof-Zinc,Wall-
327 U Than Win West Sate Kyi 10×10 100% 319 16.7582890 96.1128440 Ye Kyaw Thu
Zinc,Floor- Wood
Roof-Zinc,Wall-
328 U Kyaw Min West Sate Kyi 10×10 100% 320 16.7582580 96.1128670 Kyi Soe
Zinc,Floor- Wood
Roof-Zinc,Wall-
329 U Kyaw Min West Sate Kyi 10×10 100% 321 16.7582150 96.1128590 Aye Min Htway
Zinc,Floor- Wood
Roof-Zinc,Wall-
330 U Kyaw Min West Sate Kyi 10×10 100% 322 16.7581840 96.1128290 Khin Myo Aye
Zinc,Floor- Wood
Roof-Zinc,Wall-
331 U Kyaw Min West Sate Kyi 10×10 100% 323 16.7581810 96.1127950 Hla Myo Oo
Zinc,Floor- Wood
Roof-Zinc,Wall-
332 U Kyaw Min West Sate Kyi 10×10 100% 324 16.7582360 96.1127370
Zinc,Floor-Wood
Roof-Zinc,Wall-
333 U Than Win West Sate Kyi 10×10 100% 325 16.7582530 96.1127120
Zinc,Floor-Wood
Roof-Zinc,Wall-
334 U Than Win West Sate Kyi 10×10 100% 326 16.7582310 96.1127160
Zinc,Floor-Wood
Roof-Zinc,Wall-
335 U Than Win West Sate Kyi 10×10 100% 327 16.7581710 96.1127610
Zinc,Floor-Wood
Roof-Zinc,Wall-
336 U Win Naing West Sate Kyi 15×20 100% 328 16.7581120 96.1127560
Wood,Floor-Wood
Roof-Zinc,Wall-
337 U Than Win West Sate Kyi 10×10 100% 329 16.7580850 96.1126930 Ma Doli
Wood,Floor-Wood
Roof-Zinc,Wall-
338 U Than Win West Sate Kyi 10×10 100% Tin Oo Lwin
Zinc,Floor-Wood
Roof-Zinc,Wall-
339 Daw Aye Yee West Sate Kyi 10×10 100% 330 16.7580360 96.1126440
Zinc,Floor-Wood
Roof-Zinc,Wall-
340 Nay Myo Zaw West Sate Kyi 10×25 100% 331 16.7579930 96.1126430
Zinc,Floor-Wood
Roof-Zinc,Wall-
341 Daw Mar Lar West Sate Kyi 10×20 100% 332 16.7579700 96.1125940
Zinc,Floor-Wood
Roof-Zinc,Wall-
342 Khin Maung Cho West Sate Kyi Bamboo,Floor- 10×20 100% 333 16.7579590 96.1125600
Wood
Roof-Zinc,Wall-
343 U Han Sein West Sate Kyi 10×15 100% 334 16.7581060 96.1126560
Wood,Floor-Wood
Roof-Zinc,Wall-
344 U Kyi Aye West Sate Kyi Bamboo,Floor- 10×20 100% 335 16.7580980 96.1125350 Than Lwin
Wood

72
Seikkyi Kanaungto Township

Roof-Zinc,Wall-
345 U Aung Nyuint West Sate Kyi Zinc,Floor- 10×15 100% 336 16.7580890 96.1125120
Wood(Two Layer)
Roof-Zinc,Wall-
346 Aye Min Htay West Sate Kyi 10×15 100% 337 16.7580690 96.1125000 Wai Phyo Aung
Wood,Floor-Wood
Roof-Dhani,Wall-
347 U Aye Min Htay West Sate Kyi 10×10 100% 338 16.7581060 96.1125160 Wai Phyo Aung
Dhani,Floor-Wood
Roof-Dhani,Wall-
348 U Kyaw Than West Sate Kyi 10×10 100% 339 16.7581230 96.1125050 Myo Tun
Dhani,Floor-Wood
Roof-Dhani,Wall-
349 U Tint Lwin West Sate Kyi 10×10 100% 340 16.7581710 96.1124520
Dhani,Floor-Wood
Roof-Dhani,Wall- Daw Khin Mar
350 Mya Tha Zin New West Sate Kyi 10×30 100% 341 16.7581380 96.1124690
Dhani,Floor-Wood Swe/Aung htoo
Roof-Dhani,Wall- Tin Mg Lwin /U Moe
351 Nay Chi win West Sate Kyi 10×30 100% 342 16.7581500 96.1125560
Dhani,Floor-Wood Gyi /Aung Phyo Wai
Roof-Zinc,Wall-
352 U Kyaw Than West Sate Kyi Bamboo,Floor- 10×10 100% 343 16.7581990 96.1125980 Daw Than Myint
Wood
Roof-Zinc,Wall-
353 Soe Myat Min West Sate Kyi Bamboo,Floor- 10×20 100% 344 16.7582360 96.1126100 Mi Win
Wood
Roof-Zinc,Wall-
354 U Tin Tun Naing West Sate Kyi 15×20 100% 345 16.7582510 96.1126270 U Nge Hlaing
Zinc,Floor-Wood
Roof-Zinc,Wall-
355 U Thein Naing West Sate Kyi 15×20 100% 346 16.7582140 96.1126300
Zinc,Floor-Wood
Roof-Zinc,Wall-
356 U Kyaw Win Tun West Sate Kyi Bamboo,Floor- 15×20 100% 347 16.7582050 96.1125740
Wood
Roof-Zinc,Wall-
357 U Win Lwin West Sate Kyi Bamboo,Floor- 15×15 60% 348 16.7579420 96.1125830
Wood
Roof-Zinc,Wall-
358 San San Oo West Sate Kyi Bamboo,Floor- 15×20 50% 349 16.7579680 96.1125850
Wood
359 U Kyaw Tant West Sate Kyi Plot 30×80 30% 350 16.7579760 96.1126580
Roof-Zinc,Wall-
360 U Win Htay West Sate Kyi Bamboo,Floor- 15×25 70% 351 16.7580250 96.1126820
Wood(Two Layer)
Roof-Zinc,Wall-
361 Ma Maw Maw West Sate Kyi 10×15 60% 352 16.7580860 96.1127210
Wood,Floor-Wood

73
Seikkyi Kanaungto Township

Roof-Zinc,Wall-
362 U Kyaw Zin West Sate Kyi 15×20 60% 353 16.7580960 96.1127740
Wood,Floor-Wood
Roof-Zinc,Wall-
363 U Maung San West Sate Kyi 15×20 20% 354 16.7581150 96.1127760
Wood,Floor-Wood
Roof-Zinc,Wall-
364 U Ni Tup West Sate Kyi 15×20 40% 355 16.7581400 96.1127990
Wood,Floor-Wood
Roof-Zinc,Wall-
365 U Than Win West Sate Kyi 15×20 100% 356 16.7581770 96.1128420 Kyaw Win Tun
Wood,Floor-Wood
Roof-Zinc,Wall-
366 U Than Win West Sate Kyi 15×20 40% 357 16.7581330 96.1128760 Ko Myo
Wood,Floor-Wood
Roof-Zinc,Wall-
367 U Than Win West Sate Kyi Wood,Floor- 30×40 30% 358 16.7581790 96.1128990
Wood(Two layer)
Roof-Zinc,Wall-
368 U Kan Shane West Sate Kyi Wood,Floor- 30×40 30% 359 16.7582500 96.1129380
Wood(Two layer)
Roof-Zinc,Wall-
369 Zaw Moe West Sate Kyi Wood,Floor- 15×20 95% 360 16.7583450 96.1131020
Wood(Two layer)
Roof-Zinc,Wall-
370 EPC staff apartment West Sate Kyi 20×20 100% 361 16.7575369 96.1118495
Brick
Roof-Zinc,Wall-
371 EPC staff apartment West Sate Kyi 50×20 100% 362 16.7578538 96.1122343 apartment
Brick
Roof-Dhani,Wall-
372 U Zin Min Aung West Sate Kyi Bamboo,Floor- 15×20 100% 363 16.7544610 96.1139000
Wood
Pataukmyaing (5)
373 West Sate Kyi Transformer 5×10 100% 364 16.7546640 96.1139870
street,Transformer
U Win Oo(DWR- Bamboo and Dhani
374 West Sate Kyi 30×90 100% 365 16.7546400 96.1141080
Lodger) Faire
375 Cistern West Sate Kyi Brick Tank 10×7 100% 366 16.7548520 96.1145830
U Tun Linn Kyaw
376 West Sate Kyi Work-shop 30×40 100% 367 16.7549661 96.1148257
(Department Tenant)
Roof-Dhani,Wall-
U Tun Linn Kyaw
377 West Sate Kyi Bamboo,Floor- 25×50 100% 368 16.7550270 96.1149210
(Department Tenant)
Brick
Concrete Poles and
U Tun Linn Kyaw
378 West Sate Kyi Concrete Rings 50×30 100% 369 16.7551040 96.1150810
(Department Tenant)
Maker

74
Seikkyi Kanaungto Township

Roof-Zinc,Wall-
379 Cowshed West Sate Kyi 12×12 100% 453 16.7533400 96.1111410
Zinc
380 Vessal Gate Khanaungto (East) Roof-Zinc 10×10 20% 370 16.7585400 96.1025630
Roof-Zinc,Wall-
381 Daw Aye Than Khanaungto (East) 16.7584490 96.1035030
Zinc,Floor-Wood 15×20 70% 371
382 Vessel Gate Khanaungto (East) Roof-Zinc 10×12 100% 372 16.7585480 96.1035080
Foodball Playground
383 Khanaungto (East) 16.7585890 96.1038210
(Sideline) 10% 373
Roof-Zinc,Wall-
384 U Myint Lwin Khanaungto (East) 16.7585870 96.1036690
Zinc,Floor-Wood 10×10 100% 374
Roof-Dhani,Wall-
385 Daw Aye Moe Khanaungto (East) 16.7586330 96.1037390
Dhani,Floor-Wood 15×10 100% 375
U Khin Maung Myint
386 Khanaungto (East) 16.7586800 96.1038040 180×180
(Than Pin Loon) Roof-Zinc (Store) 60×15 100% 376
Roof-Zinc,Wall-
387 House Khanaungto (East) 16.7587910 96.1037290 Daw Tin Eu
Wood 10×10 100% 377
U Khin Maung Myint Roof-Zinc,Wall-
388 Khanaungto (East) 16.7588050 96.1036850 U Moe Naing
(Staffs Housing) Wood,Floor-Wood 10×10 100% 378
U Khin Maung Myint Roof-Zinc,Wall-
389 Khanaungto (East) 16.7587970 96.1036620 U Aung Myint
(Staffs Housing) Wood,Floor-Wood 10×19 100% 379
U Khin Maung Myint Roof-Zinc,Wall-
390 Khanaungto (East) 16.7588320 96.1036060 Ko Tin Moe Oo
(Staffs Housing) Wood,Floor-Wood 15×20 100% 380
U Khin Maung Myint Roof-Zinc,Wall- U San Ngwe(Loon
391 Khanaungto (East) 16.7589940 96.1040640
(Staffs Housing) Zinc,Two Layer 50×20 100% 381 Staff)
Roof-Zinc,Wall-
392 U Htay Myint Khanaungto (East) 16.7586460 96.1038740
Zinc,Floor-Wood 13×25 100% 382
Roof-Zinc,Wall-
393 U Thura Khanaungto (East) Bamboo,Floor- 16.7586760 96.1039110
Bamboo 13×25 100% 383
Roof-Dhani,Wall-
394 U Myint Hway Khanaungto (East) Bamboo,Floor- 16.7586930 96.1039920
Wood 13×25 100% 384
U Kyaw Htay-Daw
Cho-U Maung Gyi-U
395 Cooperative Khanaungto (East) 16.7587230 96.1040600
Roof-Zinc,Wall- Aung Nyain Chan-U
Wood,Floor-Wood 40×20 100% 385 Naing Win
Roof-Plastic,Floor-
396 Daw Khin Win Naing Khanaungto (East) 16.7587120 96.1041120 Small Shop
Bamboo 4×4 100% 386
Roof-Dhani,Wall-
397 Daw Khin Hlaing Khanaungto (East) 16.7587850 96.1041490
Dhani,Floor- 15×15 100% 387

75
Seikkyi Kanaungto Township

Bamboo

Roof-Dhani,Wall-
398 U Naing Lin Khanaungto (East) Dhani,Floor- 16.7588900 96.1040760
Bamboo 15×15 100% 388
Roof-Dhani,Wall-
399 U Than Wai Khanaungto (East) Dhani,Floor- 16.7589060 96.1040990
Bamboo 15×15 100% 389
Roof-Dhani,Wall-
400 U Sein Tun (Shop) Khanaungto (East) Wood,Floor-Square 16.7587440 96.1041400
Mesh 15×16 100% 390
401 Cooperative Khanaungto (East) 20% 391 16.7587580 96.1042370 U Saw Mya Lwin

402 Cooperative Khanaungto (East) 5% 392 16.7587620 96.1042790 Daw Htike Htike Lin
U Ko Ko Zaw-Daw
Nyo Nyo Thin-Kyaw
Win Tun-Tin Shwe-
403 Cooperative Khanaungto (East) 16.7587730 96.1042430
Myint Aye-Tin Tin
Myint-Thin Thin- Hla
393 Htay Oo
Roof-Zinc,Wall-
404 U Nyo Khanaungto (East) Bamboo,Floor- 16.7589620 96.1042610
Wood 100% 394
Roof-Zinc,Wall-
405 Win Naing Oo Khanaungto (East) Bamboo,Floor- 16.7589470 96.1042580
Bamboo 12×20 100% 395
Roof-Zinc,Wall-
406 U Aung Lwin Oo Khanaungto (East) Bamboo,Floor- 16.7589330 96.1042410 Tin Maung Htay
Wood 12×20 100% 396
Roof-Zinc,Wall-
407 Than Win Khanaungto (East) engraver,Floor- 16.7589230 96.1043020 Khine Zaw Lin
Wood 12×20 100% 397
Roof-Zinc,Wall-
408 U Tin Win Khanaungto (East) 16.7589700 96.1043170
Zinc,Floor-Wood 15×25 100% 398
Roof-Zinc,Wall-
Thain Htike Zaw-Daw
409 Daw Mya Htway Yee Khanaungto (East) Bamboo,Floor- 16.7590580 96.1043530
Mya Htway Yee
Wood 20×40 100% 399
Roof-Zinc,Wall-
410 U Than Win Khanaungto (East) engraver,Floor- 16.7591550 96.1042800 Lin Lin Tun
Wood 20×25 100% 400
Roof-Zinc,Wall-
411 Daw Aye Thain Khanaungto (East) 16.7591480 96.1041940
Bamboo,Floor- 15×25 100% 401

76
Seikkyi Kanaungto Township

Wood

Roof-Zinc,Wall-
412 U Min Aung Khanaungto (East) 16.7591250 96.1041580
Zinc,Floor-Wood 15×25 100% 402
Roof-Zinc,Wall-
413 U That Oo Khanaungto (East) Plastic,Floor- 16.7591270 96.1041910
Bamboo 10×10 100% 403
Roof-Zinc,Wall-
414 U Than win Khanaungto (East) 16.7591340 96.1042490 U Myo Min
Dhani,Floor-Wood 12×25 100% 404
Roof-Dhani,Wall-
415 U That Paine Khanaungto (East) 16.7591410 96.1042820
Zinc,Floor-Wood 10×10 100% 405
Roof-Zinc,Wall-
416 U Maung Kyaw Khanaungto (East) Bamboo,Floor- 16.7591680 96.1043210
Bamboo 10×12 100% 406
Roof-Zinc,Wall-
417 U Kyi Pine Khanaungto (East) Bamboo,Floor- 16.7589730 96.1043470
Bamboo 10×12 100% 407
Roof-Zinc,Wall-
418 U That Naung Win Khanaungto (East) 16.7589120 96.1043160
Plastic,Floor-Wood 15×10 100% 408
419 Lin Lin Htike Khanaungto (East) Plot 25×30 5% 409 16.7587660 96.1043630
U Kyaw
420 Thu(Lumberyard/Store Khanaungto (East) 16.7589310 96.1044710
) Roof-Zinc 62×200 15% 410
Roof-Zinc,Wall-
421 Daw Sandar Myint Khanaungto (East) 16.7594080 96.1045750
Zinc,Floor-Bamboo 10×10 100% 411
Roof-Zinc,Wall-
422 Phyo Wai Thu Khanaungto (East) 16.7594180 96.1045900
Zinc,Floor-Bamboo 10×12 100% 412
Roof-Zinc,Wall-
423 Daw Kyi Thar Oo Khanaungto (East) 16.7593710 96.1045860
Zinc,Floor-Wood 10×15 100% 413
Roof-Zinc,Wall-
424 Daw Khin San Hlaing Khanaungto (East) 16.7593120 96.1046170
Zinc,Floor-Wood 20×35 100% 414
Roof-Zinc,Wall-
425 Htike Naing Aung Khanaungto (East) Bamboo,Floor- 16.7592930 96.1046030
Bamboo 10×15 100% 415
Roof-Zinc,Wall-
426 U Sai Aung Aung Khanaungto (East) Zinc,Floor-Wood- 16.7593370 96.1045500
Two Layer 10×20 100% 416
Roof-Zinc,Wall-
427 U Hla Myo Khanaungto (East) Zinc,Floor-Wood- 16.7593080 96.1045410
Two Layer 15×20 100% 417
428 Zaw Zaw Lin Khanaungto (East) Roof-Zinc,Wall- 12×25 100% 418 16.7592690 96.1045680

77
Seikkyi Kanaungto Township

Zinc,Floor-Wood

Roof-Zinc,Wall-
429 Daw Kyi Myint Yee Khanaungto (East) Bamboo,Floor- 16.7591970 96.1045470
Wood 10×40 100% 419
Roof-Zinc,Wall-
430 U Ye Min Zaw Khanaungto (East) Bamboo,Floor- 16.7592030 96.1045960
Wood 10×15 100% 420
Roof-Zinc,Wall-
431 Daw Sein Than Khanaungto (East) 16.7591910 96.1045400
Zinc,Floor-Wood 15×20 100% 421
Roof-Zinc,Wall-
432 Daw Ohanmar Myint Khanaungto (East) 16.7591850 96.1045780
Zinc,Floor-Wood 15×20 100% 422
Roof-Plastic,Wall-
433 Daw Hla Hla Wai Khanaungto (East) 16.7591260 96.1045640
Plastic,Floor-Wood 10×12 100% 423
Roof-Plastic,Wall-
434 Daw Khine Maw Khanaungto (East) 16.7591130 96.1045790
Plastic,Floor-Wood 10×12 100% 424
Roof-Dhani,Wall-
435 Daw Myint Myint Aye Khanaungto (East) Bamboo,Floor- 16.7590730 96.1045750
Wood 15×20 100% 425
Roof-Zinc,Wall-
436 U Thain Saw Khanaungto (East) 16.7590290 96.1045550
Zinc,Floor-Wood 15×25 80% 426
Roof-Zinc,Wall-
437 U Myint Win Khanaungto (East) Bamboo,Floor- 16.7594790 96.1047940
Wood 13×35 100% 427
Roof-Zinc,Wall-
438 Ko Win Oo Khanaungto (East) Dhani,Floor- 16.7594480 96.1047670
Bamboo 10×15 100% 428
Roof-Zinc,Wall-
439 Myo Zaw Oo Khanaungto (East) 16.7594280 96.1047920
Zinc,Floor-Wood 25×35 100% 429
Roof-Zinc,Wall-
440 Thin Su Hlaing Khanaungto (East) 16.7594280 96.1047690
Wood,Floor-Wood 12×20 100% 430
Roof-Zinc,Wall-
441 U Kyi Myint Khanaungto (East) 16.7593920 96.1047880
Zinc,Floor-Wood 10×25 100% 431
Roof-Zinc,Wall-
442 U Khin Maung Htway Khanaungto (East) 16.7593620 96.1047930
Wood,Floor-Wood 15×40 100% 432
Roof-Zinc,Wall-
443 U Aung Myo Myint Khanaungto (East) Bamboo,Floor- 16.7593450 96.1048010
Wood 10×40 100% 433
Roof-Zinc,Wall-
444 U Zaw Lin Khanaungto (East) 16.7593270 96.1048060
Zinc,Floor-Wood 10×35 100% 434
Roof-Zinc,Wall-
445 U Moe Zaw Khanaungto (East) 16.7593200 96.1048080
Zinc,Floor-Wood 12×20 100% 435

78
Seikkyi Kanaungto Township

representative of
446 Khanaungto (East) 16.7593060 96.1047830
owner Plot 10×25 100% 436
447 Daw Than Aye Khanaungto (East) 10×35 100% 437 16.7592920 96.1047780
Roof-Zinc,Wall-
448 U Min Saung Khanaungto (East) Zinc,Floor- 16.7592690 96.1047860
Wood,Two Layer 20×40 100% 438
Roof-Zinc,Wall-
449 U Aye Than Khanaungto (East) Zinc,Floor- 16.7592520 96.1047950
Wood,Two Layer 20×40 100% 439
Roof-Zinc,Wall-
450 Daw Aye Aye Mon Khanaungto (East) 16.7592190 96.1048270
Dhani,Floor-Wood 10×40 100% 440
Roof-Zinc,Wall-
451 Daw Ma Khine Khanaungto (East) 16.7591850 96.1048250
Wood,Floor-Wood 10×40 100% 441
Roof-Zinc,Wall-
452 U Kyaw Naing Khanaungto (East) 16.7591830 96.1047910
Zinc,Floor-Wood 15×12 100% 442
Roof-Zinc,Wall-
453 Daw Than Than Aye Khanaungto (East) 16.7591490 96.1048130
Wood,Floor-Wood 12×20 100% 443
Roof-Zinc,Wall-
454 Daw Hnin Hnin Wai Khanaungto (East) Bamboo,Floor- 16.7591210 96.1048030
Wood 20×40 100% 444
Roof-Zinc,Wall-
455 Daw Mya Kyi Khanaungto (East) 16.7591170 96.1048180
Dhani,Floor-Wood 20×40 100% 445
456 Daw Thain Myint Khanaungto (East) Plot 20×40 100% 446 16.7590780 96.1047670
Roof-Zinc,Wall-
457 U Hla Tun Khanaungto (East) 16.7590700 96.1048300
Zinc,Floor-Wood 10×20 90% 447
Roof-Zinc,Wall-
458 Construction (Store) Khanaungto (East) 16.7592960 96.1052880
Zinc, 15×20 100% 448
Roof-Zinc,Wall-
459 Construction (Store) Khanaungto (East) 16.7593100 96.1052260
Zinc,Floor-Brick 15×20 100% 449
Roof-Zinc,Wall-
460 U That Myint Win Khanaungto (East) 16.7591230 96.1067640
Zinc,Floor-Wood 30×30 70% 450
Roof-Zinc,Wall-
461 Ray of Light (Library) Khanaungto (East) 16.7591690 96.1068660
Brick,Floor-Brick 15×30 40% 452
462 Vessal Gate's Roof Khanaungto (East) Roof- Zinc 15×30 10% 451 16.7591850 96.1068210
Daw Khin
463 Khanaungto (East) 16.7527470 96.1091400
Thida/Thazin Quarry 20×40 10% 454
Roof-Dhani,Wall-
464 U Myo Khine Khanaungto (East) Dhani,Floor- 16.7525360 96.1087050
Bamboo 15×20 10% 455

79
Seikkyi Kanaungto Township

Roof-Dhani,Wall-
465 U San Thain Khanaungto (East) Dhani,Floor- 16.7523450 96.1082960
Bamboo 12×15 10% 456
466 Nat Kone Sin Khanaungto (East) Brick 4×8 10% 457 16.7523270 96.1081490

467 Water Tank Khanaungto (East) Brick 4×6 10% 458 16.7523173 96.1080954
Roof-Dhani,Wall-
468 U Lin Htike(Quarry) Khanaungto (East) Bamboo,Floor- 16.7522349 96.1078496
Wood 20×40 100% 459
Roof-Dhani,Wall-
469 Daw Thin Thin Shwe Khanaungto (East) Bamboo,Floor- 16.7521710 96.1078280
Wood 20×40 460
Roof-Dhani,Wall-
470 Daw Thin Thin Shwe Khanaungto (East) Bamboo,Floor- 16.7521164 96.1078651
Wood 20×40 461
Roof-Dhani,Wall-
471 Daw Thin Thin Shwe Khanaungto (East) Bamboo,Floor- 16.7522029 96.1077419
Wood 20×40 50% 462
U Zaw Win/U Maung Roof-Dhani,Wall-
472 Khanaungto (East) 16.7519840 96.1071540
Maung Tin Dhani 20×40 50% 463
Roof-Dhani,Wall-
473 U Aung Win Khanaungto (East) Bamboo,Floor- 16.7515265 96.1063850
Wood 100% 464
474 U Kyaw Gyi Khanaungto (East) Farm Land (Rice) 80% 465 16.7517210 96.1064210 2 acre
Roof-Zinc, Wall-
475 U Aund Win Tun Khanaungto (West) engraver, Floor- 16.7601567 96.0945597
Wood 18×30 90% 466
Roof-Zinc, Wall-
476 U Win Hlaing Khanaungto (West) 16.7601079 96.0945308
Dhani, Floor-Wood 12×15 50% 467
Roof-Zinc, Wall-
477 U Sein Win Khanaungto (West) 16.7600971 96.0945149
Dhani, Floor-Wood 10×10 50% 468
Roof-Zinc, Wall-
478 U Myint Tun Khanaungto (West) Bamboo, Floor- 16.7601179 96.0944783
Wood 12×30 100% 469
Roof-Zinc, Wall-
479 U Kyaw Htay Khanaungto (West) Bamboo, Floor- 16.760165 96.094469 U Thain Tun
Wood 12×15 470
Roof-Dhani,Wall-
480 Annunciation Building Khanaungto (West) 16.760152 96.094381
Bamboo 3×6 471
Roof-Zinc, Wall-
481 Daw Thain Nwae Khanaungto (West) 16.760224 96.094403
Bamboo, Floor- 15×20 472

80
Seikkyi Kanaungto Township

Wood

Roof-Zinc, Wall-
482 Tin Moe win Khanaungto (West) 16.760214 96.094395
Zinc, Floor-Wood 15×15 473
Roof-Zinc, Wall-
483 Zaw Zaw Oo Khanaungto (West) Bamboo, Floor- 16.760218 96.09432
Bamboo 15×20 100% 474
Roof-Dhani, Wall-
484 Daw Tin Tin Yee Khanaungto (West) Dhani, Floor- 16.760219 96.094305
Bamboo 15×25 100% 475
Roof-Zinc, Wall-
485 Daw Myint Swe Khanaungto (West) Zinc, Floor- 16.760246 96.094239
Bamboo 15×20 100% 476
Roof-Zinc, Wall-
486 Daw Aye Mon Khanaungto (West) 16.76025 96.09421 U Ni Took
Zinc, Floor-Wood 12×20 100% 477
Roof-Zinc, Wall-
487 Daw Aye Mon Khanaungto (West) 16.760275 96.094184
Zinc, Floor-Wood 12×20 100% 478
Roof-Zinc, Wall-
488 Daw Phyu Khanaungto (West) 16.76019 96.094108
Dhani, Floor-Wood 12×20 100% 479
Roof-Zinc, Wall-
489 U Thain Zaw Khanaungto (West) 16.760211 96.094157
Dhani, Floor-Wood 12×20 100% 480
Roof-Zinc, Wall-
490 U Tin Aye Khanaungto (West) 16.760212 96.094205
Dhani, Floor-Wood 12×20 100% 481
Roof-Zinc, Wall-
491 Daw San San Win Khanaungto (West) 16.76017 96.094218
Dhani, Floor-Wood 12×20 100% 482
Roof-Dhani, Wall-
492 U That Aung Khanaungto (West) Dhani, Floor- 16.760103 96.094182
Bamboo 10×10 100% 483
Roof-Zinc, Wall-
493 U Naing Naing Moe Khanaungto (West) Bamboo, Floor- 16.760143 96.094291
Bamboo 12×20 100% 484
Roof-Zinc, Wall-
494 Khine Moe Swe Khanaungto (West) Bamboo, Floor- 16.76009 96.094318 Min Min Thain
Bamboo 15×10 100% 485
U Aye Phay/Daw Tin Roof-Zinc, Wall-
495 Sein (Plot) Daw Ohan Khanaungto (West) Bamboo, Floor- 16.760084 96.094354
Myint Bamboo 12×15 486
Roof-Zinc, Wall-
496 Daw Tin Sein Khanaungto (West) Bamboo, Floor- 16.760009 96.094364
Bamboo 12×15 490
Roof-Zinc, Wall-
497 Zin Mar Oo Khanaungto (West) 16.7600339 96.0944607 Aung Sein Oo
Bamboo, Floor- 12×15 95% 487

81
Seikkyi Kanaungto Township

wood

Roof-Zinc, Wall-
498 U Saw Tun Khanaungto (West) Bamboo, Floor- 16.7600058 96.0944446 U Kyaw Aye
wood 12×15 90% 488
Roof-Zinc, Wall-
499 U Aung Min Zaw Khanaungto (West) Bamboo, Floor- 16.7599666 96.0944205
wood 15×20 100% 489
Roof-Dhani, Wall-
500 Zaw Min Tun Khanaungto (West) Bamboo, Floor- 16.760027 96.094367
wood 15×20 100% 491
Roof-Zinc, Wall-
501 Daw Yee Yee Myint Khanaungto (West) Dhani, Floor- 16.7599281 96.0943981 U Phoe Chit
Bamboo 10×12 100% 492
Roof-Zinci, Wall-
502 Daw Yee Yee Myint Khanaungto (West) 16.7598831 96.0943654 Ma Hla Hla Htay
Zinc, Floor-wood 12×20 60% 493
Roof-Dhani, Wall-
503 Tun Min latt Khanaungto (West) 16.7598411 96.0943468
Dhani, Floor-wood 15×25 50% 494
Roof-Zinc, Wall-
504 U Aung Tin Khanaungto (West) Bamboo, Floor- 16.75973 96.094253
wood 12×15 90% 495
Roof-Zinc, Wall-
505 San Shwe Khanaungto (West) 16.759737 96.094185
Brick (Building) 15×25 100% 496
Roof-Zinc, Wall-
506 U Win Hlaing Khanaungto (West) Bamboo, Floor- 16.759814 96.094189
wood 12×20 100% 497
Roof-Zinc, Wall-
507 Khine Moe Swe Khanaungto (West) engraver, Floor- 16.75984 96.094086
wood 20×25 100% 498
Roof-Zinc, Wall-
508 Daw Khin Htay Khanaungto (West) Bamboo, Floor- 16.759859 96.094024
Bamboo 12×15 100% 499
Roof-Zinc, Wall-
509 U Kyaw Thyu Khanaungto (West) 16.759907 96.093982
Zinc, Floor-wood 12×20 100% 500
Roof-Zinc, Wall-
510 Daw Khin Htay Khanaungto (West) Zinc, Floor- 16.759914 96.093927
Bamboo 12×15 100% 501
Roof-Zinc, Wall-
511 Daw Khin Htay Khanaungto (West) 16.759985 96.09393 U Tun Tun
Plastic, Floor-Wood 12×15 100% 502
Roof-Dhani, Wall-
512 Daw Mar Mar Aye Khanaungto (West) Dhani, Floor- 16.759977 96.093914 U Tin Nu
Bamboo 12×15 100% 503

82
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
513 U Aye Soe Khanaungto (West) Bamboo, Floor- 16.759945 96.09389
Wood 10×12 100% 504
Roof-Zinc, Wall-
514 U Myint Zaw Khanaungto (West) Bamboo, Floor- 16.759877 96.093783
Bamboo 12×12 100% 505
Roof-Zinc, Wall-
515 Ma Paw Lay Khanaungto (West) Bamboo, Floor- 16.759801 96.093721
Bamboo 10×10 100% 506
Roof-Zinc, Wall-
516 U Soe Myint Lay Khanaungto (West) 16.759842 96.093833
Wood, Floor-Wood 12×15 100% 507
517 Khine Khine Htway Khanaungto (West) Plot 13×70 100% 508 16.7598 96.093895
Roof-Zinc, Wall-
518 Aye Thida Khanaungto (West) Bamboo, Floor- 16.759793 96.0939
Wood 10×10 100% 509
Roof-Zinc, Wall-
519 U Thain Myint Khanaungto (West) Bamboo, Floor- 16.759784 96.093919
Wood 12×15 100% 510
Roof-Dhani, Floor-
520 Ma Than Htay(Shop) Khanaungto (West) 16.759805 96.094016 San San Yin
Bamboo 6×6 100% 511
Roof-Zinc, Wall-
521 Ma Than Htay(Shop) Khanaungto (West) Zinc, Floor- 16.759786 96.094024 San San Yin
Bamboo 10×12 100% 512
Roof-Zinc, Wall-
522 Daw Khin Htay Khanaungto (West) Bamboo, Floor- 16.75975 96.094077
Bamboo 12×15 100% 513
Roof-Zinc, Wall-
523 U Min Min Aung Khanaungto (West) 16.759698 96.094065
Zinc, Floor-Wood 15×20 100% 514
Roof-Zinc, Wall-
524 U Tun Hla Khanaungto (West) Bamboo, Floor- 16.759633 96.094105
Wood 15×18 100% 515
525 Ko Hla Shin Khanaungto (West) Plot 20×40 100% 516 16.759595 96.094171
Roof-Zinc, Wall-
526 Daw Mya Thain Khanaungto (West) Bamboo, Floor- 16.7595692 96.0941131
Wood 12×20 100% 517
Roof-Dhani, Wall-
527 Daw Mya Thain Khanaungto (West) Dhani, Floor- 16.759478 96.094182 U Soe Nyunt
Bamboo 10% 518
Roof-Zinc, Wall-
528 U Zaw Zaw Naing Khanaungto (West) 16.7595039 96.0941514
Bamboo, Floor- 15×10 10% 519

83
Seikkyi Kanaungto Township

Wood

80×55×3
529 U Nyi Nyi Hlaing Khanaungto (West) 16.759354 96.094073
Plot 00 100% 520
Roof-Zinc, Wall-
530 Lin Zaw Hein Khanaungto (West) Bamboo, Floor- 16.7587767 96.0938331
Wood 10×10 100% 521
Roof-Zinc, Wall-
531 U Naing Min Htet Khanaungto (West) 16.7586149 96.0936968
Wood, Floor-Wood 20×30 100% 522
532 U Ko Ko Aung Khanaungto (West) 100% 523 16.7585655 96.0935382
Roof-Zinc, Wall-
533 Daw Ni Ni Oo Khanaungto (West) Bamboo, Floor- 16.7587861 96.0937135
Wood 5×20 100% 524
Roof-Zinc, Wall-
534 U Tin Aung Khanaungto (West) 16.7588157 96.093644
Wood, Floor-Wood 20×20 100% 525
535 Ko Hla Moe Khanaungto (West) Plot 80 100% 526 16.7588938 96.0934016
Moe Loon (wet
536 Loon)Daw Phyu Phyu Khanaungto (West) 16.758862 96.0939238
Khin Plot 30% 527
537 Majior Mg Htway Khanaungto (West) Dockyard 20%
Plot Roof-Zinc, Wall-
538 Majior Mg Htway Khanaungto (West) 16.757653 96.09308
180×168 Brick, Floor-Brick 42×30 100% 528
539 Majior Mg Htway Khanaungto (West) Brick Water-Tank 8×8 100% 529 16.7578756 96.0932501
Roof-Zinc, Wall-
540 Majior Mg Htway Khanaungto (West) Zinc, Floor-Wood 16.7579736 96.0930235
(Store) 30×15 100% 530
Roof-Dhani, Wall-
541 U Han Tun Khanaungto (West) Dhani, Floor- 16.7581767 96.0929322
Bamboo 12×15 100% 531
Brick,Sand,Stone,Pl
542 U Khin Maung Kyaw Khanaungto (West) 16.758154 96.093015
ot 80×200 30×40 100% 532
Roof-Zinc, Wall-
543 U Hthin Kyaw Win Thakhinbathaung engraver,Flow- 16.7576714 96.0927461
Brick 30×58 100% 533
544 U Min Min Thakhinbathaung land plot 20×50 100% 534 16.757619 96.092769
Roof-Zinc, Wall-
545 U Min Min Thakhinbathaung engraver,Flow- 16.7575695 96.0927297
Brick 12×40 100% 535

84
Seikkyi Kanaungto Township

546 U Khin Maung Thakhinbathaung land plot 259×110 50% 536 16.757499 96.092802

547 Daw Khay Khine Thakhinbathaung land plot 76×40 538 16.7574383 96.0927599
Roof-Zinc, Wall-
548 Daw Su Mar Win Thakhinbathaung 16.757523 96.092696
Wood,Flow-Wood 30×30 537
Roof-Zinc, Wall-
549 U Tin Htway Thakhinbathaung Bamboo,Flow- 16.757437 96.092635
Bamboo 20×20 539
550 U Chic Than Thakhinbathaung 115×86 540 16.757305 96.0926972
U Tun Win (House Roof-Zinc, Wall- U Chit Than(Land
551 Thakhinbathaung 16.757385 96.092606
Owner) Dhani,Flow-Wood 20×40 541 Owner)
552 U Win Myint Thakhinbathaung land plot 20% 542 16.7570256 96.0924333

553 U Shwe Win Thakhinbathaung land plot 35×80 100% 543 16.757003 96.092386
Roof-Zinc, Wall-
554 U Nyunt Thakhinbathaung 16.7569908 96.0923164
Wood,Flow-Wood 30×30 100% 544
Roof-Zinc, Wall-
555 U Aye Lwin Thakhinbathaung 16.7569308 96.0922244
Wood,Flow-Wood 30×40 100% 545
556 U Ye Myint Win Thakhinbathaung 30×30 100% 547 16.7568693 96.0921459

557 U Thant Zin Thakhinbathaung land plot 30% 546 16.7568049 96.0922426 Daw Than Ohann
Roof-Zinc, Wall-
558 Win Zaw Myo Thakhinbathaung 16.7567 96.092032
Dhani,Floor-Wood 10×12 100% 548
Roof-Zinc, Wall-
559 U Chit Htway Thakhinbathaung 16.756647 96.0920383
Dhani,Floor-Wood 20×30 100% 549
Roof-Zinc, Wall-
560 U Chit San Thakhinbathaung 16.7566446 96.0918839
Zinc,Floor-Wood 10×12 100% 550
Roof-Zinc, Wall-
561 Daw Soe Thandar Thakhinbathaung 16.7565922 96.0920106
Wood,Floor-Wood 25×20 60% 551
Roof-Zinc, Wall-
562 Daw Soe Thandar Thakhinbathaung Bamboo,Floor- 16.7564708 96.0920252 Lessee-Tun Tun Win
Wood 15×20 50% 553
Roof-Zinc, Wall-
563 Daw Soe Thandar Thakhinbathaung Bamboo,Floor- 16.7564503 96.0919895 U Kyaw Than
Wood 12×10 100% 554
U Thaung Shwe/Moe Roof-Zinc, Wall-
564 Thakhinbathaung 16.756561 96.091936
Moe Lwin ,Daughter Wood,Floor-Wood 25×20 100% 552
Roof-Zinc, Wall-
565 Ko Aye Ko Thakhinbathaung 16.7565307 96.0918507
Wood,Floor-Wood 25×30 100% 555
566 U Wai Phyo Aung Thakhinbathaung Shop Roof-Zinc, Wall- 15×15 100% 556 16.7564018 96.0918597

85
Seikkyi Kanaungto Township

Wood,Floor-Wood

Roof-Zinc, Wall-
567 U Soe Aung Thakhinbathaung 16.7563053 96.091859
Wood,Floor-Wood 30×40 60% 557
Roof-Zinc, Wall-
568 Daw Tin Tin Aye Thakhinbathaung 16.7564471 96.0917505
Wood,Floor-Wood 30×40 100% 558
Roof-Zinc, Wall-
569 Min Zaw Htway Thakhinbathaung 16.756371 96.091719
land plot Dhani,Floor-Wood 10×12 100% 559
Roof-Zinc, Wall-
570 U Thant Zin Zaw Thakhinbathaung Brick,Floor- 16.756243 96.0917975
Brick,Two Layer 30×30 50% 560
Roof-Zinc, Wall-
571 U Win Ngwe Thakhinbathaung 16.756255 96.09167
land plot Zinc,Floor-Wood 18×20 70% 561
572 Nay Linn Htet Thakhinbathaung 65×151 100% 562 16.756208 96.0917073
Roof-Zinc, Wall-
573 Myo Win Khine Thakhinbathaung Bamboo,Floor- 16.756246 96.091568
Wood 10×20 100% 563
Roof-Zinc, Wall-
574 Daw Mue Mue Thakhinbathaung 16.756206 96.091549
Wood,Floor-Wood 12×30 100% 564
575 Daw San Tink Thakhinbathaung land plot 35×100 100% 565 16.756236 96.091417
Roof-Zinc, Wall-
576 Cho Cho San Thakhinbathaung engraver,Floor- 16.7560679 96.0914935
Wood 59×100 95% 567
Roof-Zinc, Wall-
577 Daw Ohann Myint Thakhinbathaung Bamboo,Floor- 16.7562035 96.0913795
Wood 30×30 100% 566
Roof-Zinc, Wall-
578 Ko Myo Aung Thakhinbathaung 16.756085 96.091404
Wood,Floor-Wood 25×30 100% 568
Roof-Zinc, Wall-
579 Daw Onann Tin Thakhinbathaung Bamboo,Floor- 16.756129 96.091311
Wood 25×30 100% 569
580 U Kyi Win Thakhinbathaung land plot 25×70 100% 570 16.756115 96.091246
Pan Hlaing
581 Bridge(Thakhin Ba Thakhinbathaung 16.7559996 96.0911983
Thaung) Bridge 15×50 100% 571
Daw Yee Yee Mya Roof-Dhani, Wall-
582 Thakhinbathaung 16.75593 96.091174
(Shop) Zinc,Floor-Wood 10×12 572
Roof-Dhani, Wall-
583 U Kyaw Sein Thakhinbathaung 16.75598 96.091112
Zinc,Floor-Bamboo 10×10 100% 573

86
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
584 Daw Mya Yee Thakhinbathaung 16.755872 96.091228
Zinc,Floor-Wood 15×25 574
Roof-Zinc, Wall-
585 That Pine Soe Thakhinbathaung 16.755823 96.091288
Zinc,Floor-Wood 15×25 50% 575
Roof-Zinc, Wall-
586 U Than Myint Thakhinbathaung 16.755886 96.091127
Zinc,Floor-Wood 30×30 100% 576
Roof-Zinc, Wall-
587 Ko Oo Thakhinbathaung 16.755942 96.091059
Zinc,Floor-Wood 30×15 100% 577
Roof-Dhani, Wall-
588 Ko Myint San Thakhinbathaung Dhani,Floorw- 16.75589 96.091034
Wood 10×12 100% 578
Roof-Zinc, Wall-
589 Ko Zaw Myint Thakhinbathaung 16.755825 96.091141
Zinc,Floor-Bamboo 10×10 100% 579
Roof-Zinc, Wall-
590 Linn Htike Phyo Thakhinbathaung 16.755915 96.091015
Dhani,Floor-Wood 12×15 100% 580
Roof-Zinc, Wall-
591 U Min Than Tun Thakhinbathaung 16.755892 96.090994
Wood,Floor-Wood 30×35 100% 581
Roof-Zinc, Wall-
592 U Tin Win Hlaing Thakhinbathaung 16.755919 96.09092
Wood,Floor-Wood 20×15 100% 582
Roof-Zinc, Wall-
593 U Htin win Thakhinbathaung 16.755897 96.090937
Wood,Floor-Wood 20×50 100% 583
Roof-Zinc, Wall-
594 U Maung Maung Lwin Thakhinbathaung 16.755871 96.090891
Wood,Floor-Wood 20×50 100% 584
Roof-Zinc, Wall-
595 Su Shwe War Win Thakhinbathaung 16.755877 96.090849
Wood,Floor-Wood 10×12 100% 585
Roof-Zinc, Wall-
596 U Win Myint Thakhinbathaung 16.755819 96.090794
Wood,Floor-Wood 25×30 100% 586
Roof-Zinc, Wall-
597 U Chit Shwe Thakhinbathaung 16.755775 96.0907304
Wood,Floor-Wood 30×50 100% 587
Roof-Zinc, Wall-
598 Daw Than Myint Thakhinbathaung 16.7557367 96.0906391
Wood,Floor-Wood 30×50 100% 588
Roof-Zinc, Wall-
599 U Aye Than Thakhinbathaung Bamboo,Floor- 16.7555792 96.090684 Pyie Sone
Bamboo 20×25 589
Roof-Zinc, Wall-
600 Aye Than Thakhinbathaung Bamboo,Floor- 16.7555909 96.090748 Hla Khine
Bamboo 12×15 590
representative of
601 Thakhinbathaung 16.7555903 96.09091
owner Plot of Land 75×58 591
U Maung Maung Roof-Zinc, Wall-
602 Thakhinbathaung 16.7556424 96.0910364
Naing Bamboo,Floor- 30×30 95% 592

87
Seikkyi Kanaungto Township

Wood

603 Kyaw Linn Htet Thakhinbathaung Two Layer 15×50 50% 593 16.7556784 96.0911008
Roof-Zinc, Wall-
604 Daw Aye Myint Thakhinbathaung engraver,Floor- 16.7557023 96.0911711
Wood 15×50 20% 594
Roof-Zinc, Wall-
605 Htet Wai linn Thakhinbathaung Bamboo,Floor- 16.7554973 96.0908643
Wood 15×20 20% 595
Roof-Zinc, Wall-
606 Daw Khin Aye Thakhinbathaung Bamboo,Floor- 16.7555022 96.0908177
Wood 17×25 90% 596
Roof-Zinc, Wall-
607 Daw Thida Thakhinbathaung 16.755521 96.090801
Dhani,Floor-Wood 15×12 597
Roof-Zinc, Wall-
608 U Hla Tun Thakhinbathaung 16.75548 96.090703
Zinc,Floor-Wood 20×20 598
Roof-Zinc, Wall-
609 U Wanna Aung Thakhinbathaung 16.755432 96.090686
Zinc,Floor-Wood 20×30 599
Roof-Zinc, Wall-
610 Daw Thain Thain win Thakhinbathaung Wood,Floor- 16.7553456 96.0906277
Bamboo 50×20 50% 600
Roof-Zinc, Wall-
611 U Sein Hla Aung Thakhinbathaung Wood,Floor-Brick 16.7552634 96.0905305
( တိုက္ )
30×50 601
Roof-Zinc, Wall-
612 Daw Khin Si Thakhinbathaung 16.7551617 96.0903848
Zinc,Floor-Wood 10×10 602
Roof-Zinc, Wall-
613 U Ohann Than Thakhinbathaung 16.755134 96.090334
Zinc,Floor-Wood 12×20 603
Owner of Quarter Roof-Zinc, Wall-
614 Thakhinbathaung 16.755194 96.090326
Land Zinc,Floor-Wood 55×40 604
Roof-Zinc, Wall-
615 U Ohann Than Thakhinbathaung land Wood,Floor- 16.7550983 96.0902814
plot(75×44) Wood/Two Layer 30×40 605
Roof-Zinc, Wall-
616 U Lay Win Thakhinbathaung Bamboo,Floor- 16.755172 96.090228
Wood 25×25 606
Administrator Of Roof-Zinc, Wall-
617 Quarter Offic Thakhinbathaung Bamboo,Floor- 16.755128 96.090107
(Tamporary) Wood 30×30 607
Roof-Zinc, Wall-
618 Khin Maung Than Thakhinbathaung 16.755167 96.090064
Wood,Floor-Wood 12×30 608

88
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
619 Khin Maung Lwin Thakhinbathaung 16.755238 96.090014
Zinc,Floor-Wood 12×20 609
Roof-Zinc, Wall-
620 Phyu Phyu Aung Thakhinbathaung 16.755312 96.090016
Zinc,Floor-Wood 15×25 610
Roof-Zinc, Wall-
621 U Win Myint Thakhinbathaung 16.755344 96.090091
Zinc,Floor-Wood 15×25 611
Roof-Zinc, Wall-
622 U Aye Kyaw Min Thakhinbathaung Bamboo,Floor- 16.755369 96.090113
Wood 15×25 612
Roof-Dhani, Wall-
623 U Kyaw Min Oo Thakhinbathaung Bamboo,Floor- 16.755417 96.090104
Brick 613
U Kyaw Sein/Billiard Roof-Dhani, Wall-
624 Thakhinbathaung 16.75538 96.090133
table Bamboo, 15×30 614
U Kyaw Sein/Billiard Roof-Zinc, Wall-
625 Thakhinbathaung 16.755377 96.090179
table Dhani,Floor-Wood 10×15 615
Roof-Zinc, Wall-
626 U Ngwe Tun Thakhinbathaung 16.75541 96.090197
Zinc,Floor-Bridge 40×20 616
Roof-Zinc, Wall-
627 Library Thakhinbathaung 16.755402 96.090274
Zinc 617
628 Vessel Gate Thakhinbathaung Roof-Zinc, 10×12 618 16.755486 96.090256

629 U Aung Than Thakhinbathaung Two Layer 43×37 619 16.7554707 96.0903428
Roof-Zinc, Wall-
630 Ko Htay Naing Thakhinbathaung 16.7555499 96.0904086
Wood,Floor-Wood 30×76 620
Roof-Zinc, Wall-
631 Daw Tin Tin Moe Thakhinbathaung Brick,Floor- 16.7556364 96.0905026
Conceretes 30×77 621
Roof-Zinc, Wall-
632 U Soe Win Thakhinbathaung
Wood,Floor-Wood 32×76
Roof-Zinc, Wall-
633 U Tun Hla Oo Thakhinbathaung Bamboo,Floor- 16.7552784 96.0899371
Wood 23×30 622
Roof-Zinc, Wall-
634 U Kyi Soe Thakhinbathaung 16.755217 96.089967
Wood,Floor-Wood 35×30 623
Daw Sein Yee/ Fire Roof-Zinc, Wall-
635 Thakhinbathaung 16.7551798 96.0900015
wood hut Wood,Floor-Wood 10×10 624
Roof-Zinc, Wall-
636 Daw Sein Yee Thakhinbathaung 16.7550825 96.0900819
Wood,Floor-Wood 30×25 625
Roof-Zinc, Wall-
637 Aung Win Hlaing Thakhinbathaung 16.7549994 96.0901655
Bamboo,Floor- 25×25 95% 626

89
Seikkyi Kanaungto Township

Wood

Roof-Zinc, Wall-
638 U Myo Aung Thakhinbathaung 16.7549838 96.0901177
land plot Zinc,Floor-Wood 21×25 100% 627
Roof-Zinc, Wall-
639 Daw Khin Ngwe Thakhinbathaung 16.754969 96.09007
Zinc,Floor-Wood 30×30 628
640 Daw Sein Yee Thakhinbathaung land plot 70×60 625 16.7550825 96.0900819

641 U Sein Win Thakhinbathaung land plot 629 16.7550186 96.0899497


Roof-Zinc, Wall-
642 Daw Kalar Ma Nyunt Thakhinbathaung engraver,Floor- 16.7549800 96.0899240
Wood 20×25 630
Roof-Zinc, Wall-
643 U Min Min Oo Thakhinbathaung engraver,Floor- 16.7549515 96.0899754
Wood 16×25 631
Roof-Zinc, Wall-
644 Aung Kyaw Oo Thakhinbathaung engraver,Floor- 16.7549670 96.0898910
Wood 12×20 632
Roof-Zinc, Wall-
645 Aung Kyaw Tink Thakhinbathaung Bamboo,Floor- 16.7549390 96.0898860
Wood 12×20 633
Roof-Zinc, Wall-
646 Daw Mya Than Thakhinbathaung 16.7549330 96.0898740
Wood,Floor-Wood 35×40 634
Roof-Zinc, Wall-
647 U Win Than Thakhinbathaung 16.7549510 96.0898465
Wood,Floor-Wood 10×20 635
Roof-Zinc, Wall-
648 U Soe Kyi Thakhinbathaung 16.7549284 96.0897938
Wood,Floor-Wood 15×20 636
Roof-Zinc, Wall-
649 Aung Ko Oo Thakhinbathaung 16.7549000 96.0897280
Zinc,Floor-Wood 10×25 637
Roof-Zinc, Wall-
650 Min Min Thain Thakhinbathaung Bamboo,Floor- 16.7548990 96.0896670
Wood 20×25 638
Roof-Zinc, Wall-
651 U Tin Shwe Thakhinbathaung Bamboo,Floor- 16.7548660 96.0896570
Wood 20×25 639
Roof-Zinc, Wall-
652 Win Htike Thakhinbathaung engraver,Floor- 16.7550413 96.0897034
Wood 20×25 640
Roof-Zinc, Wall-
653 Mya Mya Thinn Thakhinbathaung 16.7550643 96.0897768
Zinc,Floor-Wood 20×25 641
Roof-Zinc, Wall-
654 Aung Lwin Thakhinbathaung 16.7551629 96.0898322
Bamboo,Floor- 20×25 642

90
Seikkyi Kanaungto Township

Wood

Roof-Zinc, Wall-
655 Soe Thu Thakhinbathaung 16.7552200 96.0898800
Zinc,Floor-Wood 20×20 643
Roof-Dhani, Wall-
656 Aye Min Thain Thakhinbathaung Dhani,Floorw- 16.7543582 96.0894066
Wood 12×20 100% 644
Roof-Zinc, Wall-
657 U Kyaw Win Thakhinbathaung 16.7544138 96.0893940
Zinc,Floor-Wood 30×30 100% 645
Roof-Zinc, Wall-
658 U Ohann Than Thakhinbathaung 16.7544119 96.0894485
Zinc,Floor-Wood 30×30 100% 646
659 Moe Kyaw Thakhinbathaung land plot 20×40 50% 647 16.7544811 96.0894860
Roof-Dhani, Wall-
660 U Soe Myint Thakhinbathaung Dhani,Floorw- 16.7544484 96.0895021
Wood 10×55 30% 648
Roof-Dhani, Wall-
661 Aung Kyaw Thu Thakhinbathaung Dhani,Floorw- 16.7544771 96.0895269
Wood 10×10 100% 649
Roof-Zinc, Wall-
662 Daw Thida Thakhinbathaung 16.7544933 96.0895438
Zinc,Floor-Bamboo 10×35 20% 650
Roof-Zinc, Wall-
663 Daw Than Than Maw Thakhinbathaung 16.7545225 96.0895777
Zinc,Floor-Bamboo 15×30 10% 651
Roof-Zinc, Wall-
664 Kyaw Ye Naung Thakhinbathaung engraver,Floor- 16.7545467 96.0896227
Wood 25×30 20% 652
665 Mg Maung Than Thakhinbathaung Plot of Land 10×51 100% 653 16.7543747 96.0893813
Roof-Zinc, Wall-
666 Daw Hla Ye Thakhinbathaung engraver,Floor- 16.7548060 96.0895900
Wood 18×30 100% 654
667 Ko Tin Aung Moe Thakhinbathaung Plot of Land 12×25 100% 655 16.7548828 96.0896096

668 Aung Min Soe Thakhinbathaung Plot of Land 25×37 100% 656 16.7546928 96.0896486
Roof-Zinc, Wall-
669 U Win Soe Thakhinbathaung 16.7548609 96.0895577
Zinc,Floor-Wood 30×35 100% 657
Roof-Zinc, Wall-
670 Daw Nyunt Kyi Thakhinbathaung 16.7548130 96.0894770
Zinc,Floor-Wood 20×30 100% 658
Roof-Zinc, Wall-
671 Daw San Myint Thakhinbathaung 16.7547620 96.0894830
Zinc,Floor-Wood 30×25 100% 659
Roof-Zinc, Wall-
672 U Zaw Oo Thakhinbathaung 16.7547950 96.0894120
Wood,Floor-Wood 20×20 100% 660

91
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
673 U Chit Ko Thakhinbathaung Bamboo,Floor- 16.7547000 96.0894090
Wood 12×15 100% 661
Roof-Zinc, Wall-
674 Ko Maung Naing Thakhinbathaung 16.7547809 96.0893443
Dhani,Floor-Wood 10×20 100% 662
675 Ma That Ngwe Thakhinbathaung Plot of Land 20×20 100% 663 16.7548239 96.0893531
Roof-Zinc, Wall-
676 U San Lwin Thakhinbathaung engraver,Floor- 16.7547190 96.0893349
Wood 18×18 100% 664
677 U Tun Tun Thakhinbathaung Plot of Land 15×20 100% 665 16.7547630 96.0892890

678 U Ohann Htway Thakhinbathaung Plot of Land 15×20 100% 666 16.7547366 96.0892389

679 Daw Than Htay Thakhinbathaung Plot of Land 20×30 100% 667 16.7547010 96.0892710
Roof-Zinc, Wall-
680 Daw Kyin Hlaing Thakhinbathaung Bamboo,Floor- 16.7546239 96.0892605
Wood 20×30 668
Roof-Zinc, Wall-
681 U Thain Zaw Oo Thakhinbathaung Bamboo,Floor- 16.7545850 96.0893470
Wood 20×20 669
Roof-Zinc, Wall-
682 U Ye Nyunt Thakhinbathaung Bamboo,Floor- 16.7546720 96.0892260
Bamboo 15×18 670
683 Daw Htay Htay Thakhinbathaung Plot of Land 20×20 671 16.7546690 96.0891880
Roof-Zinc, Wall-
684 U Aung Soe Thakhinbathaung 16.7546030 96.0892150
Wood,Floor-Wood 25×20 672
Roof-Zinc, Wall-
685 U Hla Khin Thakhinbathaung Bamboo,Floor- 16.7545720 96.0891450
Wood 18×20 673
686 Daw Cho Cho Thakhinbathaung Plot of Land 15×73 674 16.7545160 96.0891630
Roof-Zinc, Wall-
687 U Tun Shine Thakhinbathaung Bamboo,Floor- 16.7545640 96.0891170
Bamboo 12×20 675
Roof-Zinc, Wall-
688 U Hla Win Thakhinbathaung 16.7545210 96.0890810
Dhani,Floor-Wood 20×15 676
689 Daw Sein Yee Thakhinbathaung Plot of Land 118×65 90% 677 16.7545200 96.0891070
Roof-Zinc, Wall-
690 Daw Thain Myint Thakhinbathaung 16.7544940 96.0890450
Wood,Floor-Wood 15×20 678
691 Tun Tun Thakhinbathaung Plot of Land 20×25 679 16.7544650 96.0889770

92
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
692 Daw Ohanmar Thakhinbathaung Bamboo,Floor- 16.7544290 96.0889720 Myo Thant
Bamboo 680
693 Ma Htway Htway Yee Thakhinbathaung Plot of Land 112×114 681 16.7542990 96.0889670
Roof-Zinc, Wall-
694 Mg Naing Win Thakhinbathaung Dhani,Floor- 16.7541560 96.0889970
Bamboo 10×12 682
Roof-Zinc, Wall-
695 U Tink Lwin Thakhinbathaung 16.7541000 96.0889940
Dhani,Floor-Wood 15×15 683
Roof-Zinc, Wall-
696 Ye Lwin Oo Thakhinbathaung Bamboo,Floor- 16.7540480 96.0889570
Bamboo 12×10 684
Roof-Zinc, Wall-
697 U Zaw Min Thakhinbathaung 16.7539865 96.0889874
Zinc,Floor-Wood 15×25 685
698 Bamboo Bridge Thakhinbathaung 10×60 686 16.7541690 96.0885574

699 U Aung Kyaw Moe Thakhinbathaung Plot of Land 119×224 687 16.7539380 96.0884510
Roof-Zinc, Wall-
700 U Aung Kyaw Moe Thakhinbathaung 16.7537630 96.0884960
Zinc,Floor-Wood 15×20 688
Roof-Dhani, Wall-
701 U Thain Win Thakhinbathaung Bamboo,Floor- 16.7539140 96.0883970
Bamboo 15×20 689
Roof-Dhani, Wall-
702 Tun Tun win Thakhinbathaung Bamboo,Floor- 16.7538475 96.0882894
Bamboo 15×20 690
Roof-Dhani, Wall-
703 Zayar Tun Thakhinbathaung Bamboo,Floor- 16.7537200 96.0882710
Bamboo 15×20 691
704 U Aung Kyaw Moe Thakhinbathaung Plot of Land 49×105 90% 692 16.7534958 96.0883167
Roof-Zinc, Wall-
705 U Myint Aye Thakhinbathaung Bamboo,Floor- 25×30/10 16.7533224 96.0880114
Plot of Land Wood 0×214 693
Roof-Dhani, Wall-
706 Cho Thae Aye Thakhinbathaung Dhani,Floorw- 15×15/10 16.7531306 96.0878949
Plot of Land Bamboo 0×145 694
707 U Myint Aye Thakhinbathaung Plot of Land 83×225 695 16.7530670 96.0877729
85×53,128×150,42
708 U Thain Hla Thakhinbathaung ×137,96×211,20×1 16.7529109 96.0876098 5
Plot of Land 11 696

93
Seikkyi Kanaungto Township

709 Daw Ni Ni Hlaing Thakhinbathaung 63×160 697 16.7528410 96.0873190

710 Daw Tin Tin Myint Thakhinbathaung 72×90 698 16.7529550 96.0872480

711 Ko Zaw Lwin Thakhinbathaung Plot of Land 72×148 699 16.7524438 96.0871076

712 U Myo Thank Thakhinbathaung Plot of Land 76×90 90% 700 16.7525860 96.0869950

713 U Aye Thaung Thakhinbathaung Plot of Land 119×288 701 16.7522450 96.0869050

714 U Tin Win Thakhinbathaung Plot of Land 90×184 702 16.7520680 96.0867960

715 U Myint Thaung Thakhinbathaung Plot of Land 53×131 705 16.7519960 96.0864900

716 U Myint Thaung Thakhinbathaung Plot of Land 31×159 704 16.7518795 96.0866088

717 Daw Aye Aye Mar Thakhinbathaung 69×202 703 16.7518820 96.0865000

718 Daw Khin swe Myint Thakhinbathaung 125×159 706 16.7519400 96.0860560

719 U Thaung Aye Thakhinbathaung 100×159 707 16.7518050 96.0859860

720 Daw Aye Yee Thakhinbathaung Plot of Land 35×65 708 16.7517440 96.0858930
Roof-Zinc, Wall- 79×125(House of
721 Naing Lin Aung Thakhinbathaung Bamboo,Floor- 16.7516640 96.0858310 Land) Daw aye Yee
Bamboo 15×20 709 (lahd)
Roof-Zinc, Wall-
722 Zaw Win Naing Thakhinbathaung Bamboo,Floor- 16.7515097 96.0857439
Bamboo 12×30 710
Roof-Zinc, Wall-
723 Ko Ko Lwin Thakhinbathaung 16.7514643 96.0857863
Zinc,Floor-Brick 16×21 711
Roof-Zinc, Wall-
Ma Cho Cho
724 Thakhinbathaung Dhani,Floor- 16.7514030 96.0858230
Lwin(Chicken ferm)
Bamboo 10×10 712
Roof-Zinc, Wall-
725 Daw Aye Yee Thakhinbathaung 16.7513792 96.0858625
Zinc,Floor-Wood 12×18 713
726 Thandar win Thakhinbathaung Plot of Land 390×150 714 16.7512210 96.0857900

727 Village's Lake Thakhinbathaung 100×200 715 16.7497277 96.0869184

728 DWIR Thakhinbathaung Plot of Land 18×10 716 16.7494670 96.0867610


Roof-Zinc, Wall-
729 U Win Sein Thakhinbathaung 16.7495775 96.0863797 land plotWide 103×129
Zinc,Floor-Wood 20×20 717
Roof-Zinc, Wall-
730 Daw Yin Mya Thakhinbathaung Bamboo,Floor- 16.7495910 96.0862695 land plotWide 25×129
Wood 10×10 718

94
Seikkyi Kanaungto Township

Roof-Zinc, Wall- Pigsty,Chicken Ferm


731 U Tin Thain Thakhinbathaung 16.7496169 96.0861392
Zinc,Floor-Wood 25×30 719 51×129
732 DWIR Thakhinbathaung Plot of land 720 16.7495069 96.0859619

733 U Kyi Hlaing Thakhinbathaung Plot of land 37×172 721 16.7496119 96.0860795
Roof-Zinc, Wall-
734 Daw Khin Win Thakhinbathaung Bamboo,Floor- 16.7497011 96.0860032 39×50
Wood 18×30 722
Roof-Zinc, Wall-
735 Daw Khin Toe Thakhinbathaung Zinc,Floor- 16.7497264 96.0858224 44×!50
Brick/RC 30×40 70% 723
736 DWIR Store Thakhinbathaung 724 16.7496420 96.0857510

737 U Pyine Aung Thakhinbathaung Plot of Land 32×209 725 16.7497258 96.0856037

738 DWIR Store Thakhinbathaung 726 16.7496100 96.0855970 U Myo Myint


Roof-Bamboo,
739 DWIR /Workshop Thakhinbathaung Wall-Plastic,Floor- 16.7496060 96.0854920
Bamboo 40×20 727
Roof-Zinc, Wall-
740 Daw San Kyi / shop Thakhinbathaung Dhani,Floor- 16.7497586 96.0854647 land plot50×204
Bamboo 14×10 728
Roof-Zinc, Wall-
741 Daw San Kyi / shop Thakhinbathaung Bamboo,Floor- 16.7498350 96.0854740
Wood 25×20 729
Roof-Zinc, Wall-
742 U Kyi Hlaing Thakhinbathaung 16.7497820 96.0853950
Dhani,Floor-Wood 25×20 100% 730
Roof-Zinc, Wall-
743 U Sein Khaine Thakhinbathaung 16.7498778 96.0853661
Dhani,Floor-Wood 25×20 30% 731
Roof-Zinc, Wall-
744 U Than Win Thakhinbathaung 16.7497779 96.0852742
Dhani,Floor-Wood 12×25 100% 732
Roof-Zinc, Wall-
745 U Maung Maung Aye Thakhinbathaung 16.7498790 96.0852860
Dhani,Floor-Wood 10×10 30% 733
Roof-Zinc, Wall-
746 U Win Ko Thakhinbathaung 16.7497660 96.0851600
Dhani,Floor-Wood 18×20 100% 734
U Kyaw Shwe /
747 Thakhinbathaung 16.7497880 96.0850900
Mortorcicycle parking Roof-Zinc 10×10 735
748 DWIR Store Thakhinbathaung Plot of Land 736 16.7495790 96.0850060
Roof-Zinc, Wall- Plot of Land-Daw
749 Daw Ei Ei Hlaing Thakhinbathaung 16.7498144 96.0849745
Wood,Floor-Wood 50×131 80% 737 Nyain Chan-30×131

95
Seikkyi Kanaungto Township

750 Daw Lwin Lwin Mar Thakhinbathaung Plot of Land 30×131 738 16.7497556 96.0849763

751 Daw Nyain Chan Thakhinbathaung Plot of Land 31×131 739 16.7497050 96.0848790

752 Daw Hla Hla Myaine Thakhinbathaung Plot of Land 20×131 740 16.7496700 96.0848400
Roof-Zinc, Wall-
753 U Kyaw Lwin Oo Thakhinbathaung Dhani,Floor- 16.7496622 96.0846283
Plot of Land Bamboo 49×150 741
754 Aung Phyo Wai Thakhinbathaung Plot of Land 81×103 20% 742 16.7497190 96.0845890

755 Daw Win Yee Thakhinbathaung Plot of Land 160×50 20% 743 16.7496450 96.0844670

756 U Myint Than Thakhinbathaung Plot of Land 42×134 20% 744 16.7496243 96.0843537

757 DWIR Staff House Thakhinbathaung Plot of Land RC 100% 745 16.7495010 96.0842190

758 DWIR Thakhinbathaung Plot of Land 746 16.7495929 96.0841209

759 DWIR Staff House Thakhinbathaung RC 747 16.7494310 96.0838740

760 DWIR Staff House Thakhinbathaung RC 748 16.7494026 96.0835190

761 DWIR Staff House Thakhinbathaung RC 749 16.7494640 96.0832830

762 DWIR Staff House Thakhinbathaung RC 750 16.7494910 96.0830710

763 DWIR Staff House Thakhinbathaung RC 751 16.7494510 96.0827800


Roof-Zinc, Wall-
764 Ganerator house Thakhinbathaung 16.7495160 96.0824720
Zinc 752
765 DWIR Store Thakhinbathaung RC 753 16.7494090 96.0824870
Roof-Zinc, Wall-
766 DWIR Store Thakhinbathaung 16.7493630 96.0824850
Zinc 754
Roof-Zinc, Wall-
767 DWIR Store Thakhinbathaung 16.7493920 96.0823330
Bamboo 755
Roof-Bamboo,
768 DWIR Store Thakhinbathaung 16.7493450 96.0823390
Wall-Bamboo 756
Roof-Dhani, Wall-
769 DWIR Staff House Thakhinbathaung Bamboo,Floor- 16.7494630 96.0820630
Bamboo 757
770 DWIR Staff House Thakhinbathaung RC 758 16.7493190 96.0818210

771 DWIR Staff House Thakhinbathaung RC 759 16.7492920 96.0817830

772 DWIR Staff House Thakhinbathaung RC 760 16.7490730 96.0813870

96
Seikkyi Kanaungto Township

773 Police outpost Thakhinbathaung RC 761 16.7490920 96.0809550

774 DWIR Store Thakhinbathaung Wall-Bamboo 762 16.7491700 96.0809440

775 DWIR Office Thakhinbathaung RC 763 16.7490930 96.0807910


land
776 U Kyaw Shwe Thakhinbathaung 16.7502610 96.0844314 400×200
plotBanana 40% 764
Farm
777 DWIR Land Thakhinbathaung Land(Rice) 16.7497576 96.0875669 U Sein Win
4 acera 765
778 DWIR Land Thakhinbathaung 766 16.7499085 96.0918773 U Lwin Ko
Vessel Gate/ Pyaw
779 Thakhinbathaung 16.7497277 96.0944247
Phal Lay Roof-Zinc 10×10 767
780 Bridge U Tun O Ward 7×40 768 16.7632918 96.0982984
Roof-Zinc,
781 U Soe Pine U Tun O Ward Wall_Zinc,Floor- 16.7633593 96.0982397
wood 15×15 769
representative of
782 U Tun O Ward 16.7633654 96.0981848
owner Plot 20×40 770
Roof-Zinc,
783 Daw Myint Myint Aye U Tun O Ward Wall_Zinc,Floor- 16.7633776 96.0981408
wood 15×30 771
Roof-Zinc,
784 U Myo myint U Tun O Ward Wall_Zinc,Floor- 16.7633280 96.0980620
wood 15×50 772
Yay Myay Phyo/U
785 U Tun O Ward 16.7632858 96.0981693
Than Shwe Qurral 50×50 773
Roof-Zinc, Wall-
786 Aung Moe Naing U Tun O Ward Bamboo,Floor- 16.7634744 96.0980179 60×136
Wood 15×30 774
Roof-Zinc, Wall-
787 Daw Tin Ngwe U Tun O Ward 16.7634755 96.0979681 60×136
Wood,Floor-Wood 20×25 775
Roof-Zinc, Wall-
788 Daw Hla Moe Myint U Tun O Ward Bamboo,Floor- 16.7634651 96.0979102 60×136
Bamboo 776
789 Yay Myay Phyo U Tun O Ward 40×30 777 16.7633086 96.0979138 U Than Shwe
Roof-Dhani,Wall-
790 Daw Myint Yee U Tun O Ward Dhani, Floor- 16.7634015 96.0978340 Zaw Lin Htet
25×100 Bamboo 10×10 778

97
Seikkyi Kanaungto Township

Roof-Dhani,Wall-
791 Daw Myint Myint Aye U Tun O Ward Dhani, Floor- 16.7634300 96.0977520 San Myint Naing
25×100 Bamboo 10×10 779
Roof-Zinc,
792 U Moe U Tun O Ward Wall_Zinc,Floor- 16.7634170 96.0976360 U Kyaw Naing Oo
40×90 wood 15×30 780
Roof-Zinc, Wall-
793 Daw Tin Tin Latt U Tun O Ward Bamboo,Floor- 16.7634204 96.0975599 Daw Won Ni
30×90 Wood 15×31 781
794 U Hla Wai U Tun O Ward Polt Banana 78×110 70% 782 16.7634572 96.0974051
Roof-Zinc, Wall-
795 U Than Htay U Tun O Ward 16.7635352 96.0972284
49×140 Brick,Floor-Brick 21×35 783
Roof-Zinc, Wall-
796 U Khin maung Aye U Tun O Ward 16.7635032 96.0971341 San Myint Tun
30×100 Wood,Floor-Wood 15×20 784
Roof-Dhani,Wall-
797 U Myint Sein U Tun O Ward Dhani, Floor- 16.7634149 96.0970806
25×100 Bamboo 785
Roof-Zinc, Wall-
798 U Myint Sein U Tun O Ward Bamboo,Floor- 16.7634650 96.0970640
25×100 Wood 20×30 786
Roof-Dhani,Wall-
799 U Zaw Min Naing U Tun O Ward Dhani, Floor- 16.7635820 96.0970610
Bamboo 10×15 787
Roof-Zinc, Wall-
800 U Myint Shwe U Tun O Ward Bamboo,Floor- 16.7634560 96.0965050
93×77 Wood 20×20 788
Roof-Zinc,
801 U Ye Kyaw Thu U Tun O Ward Wall_Zinc,Floor- 16.7634900 96.0968730
wood 15×20 789
Roof-Zinc,
802 Daw Tin Tin Latt U Tun O Ward Wall_Zinc,Floor- 16.7634115 96.0967959
wood 30×15 790
Roof-Zinc,
803 Daw Tin Tin Latt U Tun O Ward Wall_Zinc,Floor- 16.7634203 96.0967484
25×107 wood 25×65 60% 791
Daw Htway Htway
804 U Tun O Ward 16.7634815 96.0967322
Yee Plot 23×107 50% 792
Roof-Dhani,Wall-
805 U Aye Thaung U Tun O Ward 16.7634780 96.0966780
Dhani, Floor-Wood 15×15 793
806 Vessel Gate U Tun O Ward Roof-Zinc 10×10 794 16.7634275 96.0967006

98
Seikkyi Kanaungto Township

Roof-Zinc,
807 U Myint Soe U Tun O Ward Wall_Zinc,Floor- 16.7634150 96.0966561
50×100 wood 35×50 70% 795
808 U Khin Maung Aye U Tun O Ward 50×200 100% 796 16.7635006 96.0965899 Yard
Roof-Zinc,
809 U Sein Lwin U Tun O Ward Wall_Wood,Floor- 16.7634460 96.0962700
40×100 wood 15×30 5% 797
Roof-Zinc,
810 NLD Offic U Tun O Ward Wall_Wood,Floor- 16.7634220 96.0961830
35×100 wood 15×15 798
Roof-Zinc, Wall-
811 U Thet Naing U Tun O Ward Bamboo,Floor- 16.7633647 96.0960440
60×9 Wood 25×31 799
812 Cistern U Tun O Ward 10×12 800 16.7628630 96.0951157

813 Jetty U Tun O Ward Concretes 8×35 801 16.7612678 96.0936155

814 Blue Mountain (Jetti) U Tun O Ward Concretes 20×100 802 16.7610000 96.0935240
Roof-Zinc, Wall-
815 Captain Myint Soe Pan Pin Chaung Bamboo, Floor- 10*30 803 16.7633020 96.0984900 (173*100) Ma Wai
Land Plot Wood
816 Daw Thin Thin Lat Pan Pin Chaung 30*80 20% 804 16.7633420 96.0985170
Land Plot
817 Lake Pan Pin Chaung 4*6 805 16.7634350 96.0986700

818 U Aung Kyaw Pan Pin Chaung 20*30 50% 806 16.7633917 96.0987913
Land Plot
land (sold by U Aung
819 Pan Pin Chaung 100% 807 16.7633340 96.0987420 40*100
Kyaw) Land Plot
Roof-Zinc, Wall-
U Tin Htun Aung
820 Pan Pin Chaung Concrete, Floor- 12*15 808 16.7633110 96.0988740 80*23
(owner)
Wood
Roof-Zinc, Wall-
821 Soe Maung Maung Pan Pin Chaung Concrete, Floor- 12*15 809 16.7632610 96.0989410 120*25
Wood
Roof-Zinc, Wall-
822 U Maung Maung Khin Pan Pin Chaung Bamboo, Floor- 15*15 810 16.7632190 96.0989820 120*39
Wood
823 Ko Moe Thae Pan Pin Chaung 811 16.7631575 96.0988964 15*100
Land Plot
824 U Aung Kyaw Pan Pin Chaung Roof-Zinc, Wall- 30*35 812 16.7631440 96.0990109 100*76

99
Seikkyi Kanaungto Township

Wood, Floor-Wood

Roof-Zinc, Wall-
825 U Thant Zin Pan Pin Chaung Bamboo, Floor- 15*15 813 16.7631272 96.0990373 18*120
Bamboo
Roof-Zinc, Wall-
826 U Aung Sein Pan Pin Chaung 30*25 814 16.7631010 96.0991100 34*120
Wood, Floor-Wood
Roof-Zinc, Wall-
827 U Kyi Lwin Pan Pin Chaung 30*20 815 16.7629532 96.0990818 100*66
Zinc, Floor-Wood
828 Ko Be Au Pan Pin Chaung 816 16.7630397 96.0991367 80*20
Land Plot
Roof-Zinc, Wall-
829 Shwe Ko Htun Pan Pin Chaung 13*40 817 16.7630290 96.0992060 80*13
Floor-Wood
830 Lake Pan Pin Chaung 4*8 818 16.7629710 96.0992010
Roof- Zinc, Wall-
831 Daw Khin Mya Pan Pin Chaung Bamboo, Floor- 10*35 819 16.7630102 96.0992343 12*80
Wood
832 U Khin Zaw Pan Pin Chaung 820 16.7629330 96.0992280 80*20
Land Plot
Roof-Zinc, Wall-
833 U Aung Phyo (Shop) Pan Pin Chaung 12*1 822 16.7629030 96.0992120 41*48
Zinc, Floor-Wood
Roof-Zinc, Wall-
834 U Aung Phyo (House) Pan Pin Chaung Bamboo, Floor- 20*30 823 16.7628600 96.0992040
Wood
Roof-Zinc, Wall-
835 U Tin Aung Pan Pin Chaung Bamboo, Floor- 20*30 824 16.7629172 96.0992987 27*80
Wood
Roof-Zinc, Wall-
836 U Kyaw Htun Pan Pin Chaung 15*20 825 16.7627748 96.0992683 50*31
Zinc, Floor-Wood
Roof-Zinc, Wall-
837 U Mya Thein Pan Pin Chaung 15*20 826 16.7628568 96.0993137 13*65
Zinc, Floor-Wood
Roof-Zinc, Wall-
838 U Myo Win Pan Pin Chaung 10*40 827 16.7628770 96.0993950 80*15
Zinc, Floor-Wood
Roof-Zinc, Wall-
839 U Tin Aung Pan Pin Chaung Bamboo, Floor- 12*15 828 16.7629830 96.0994090 35*40
Wood
840 U Kyi Lwin Pan Pin Chaung 829 16.7630429 96.0994557
Land Plot
Roof-Zinc, Wall-
841 Kyaw Kyaw Htun Pan Pin Chaung Bamboo, Floor- 15*25 830 16.7628470 96.0994270 80*25
Wood

100
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
842 U Sein Win Pan Pin Chaung 13*40 831 16.7627312 96.0993156
Zinc, Floor-Wood
Roof-Zinc, Wall-
owned by
843 Pan Pin Chaung Bamboo, Floor- 832 16.7626900 96.0993590 12*40
Hlaingtharyar
Wood
Roof-Zinc, Wall-
844 Daw Thin Thin Pan Pin Chaung 12*40 833 16.7626120 96.0992990 45*70
Zinc, Floor-Wood
Roof-Zinc, Wall-
845 U Ping Pan Pin Chaung 17*25 834 16.7628010 96.0994850 80*31
Zinc, Floor-Wood
Roof-Zinc, Wall-
846 Daw Kyi Myint Pan Pin Chaung Bamboo, Floor- 15*20 835 16.7626564 96.0994075 50*21
Bamboo
Roof-Zinc, Wall-
847 U Kyaw Myint Pan Pin Chaung 15*30 836 16.7627865 96.0995404 15*80
Floor-Wood
Roof-Zinc, Wall-
848 U Win Hlaing Pan Pin Chaung 10*35 837 16.7626266 96.0994407 50*19
Wood, Floor-Wood
849 Daw Thin Thin Pan Pin Chaung 838 16.7626490 96.0995260 50*20.5
Land Plot
850 Maung Zaw Pan Pin Chaung 839 16.7626120 96.0995650 50*24
Land Plot
Roof-Zinc, Wall-
851 U Win Myint Pan Pin Chaung Bamboo, Floor- 20*20 840 16.7627050 96.0995820 110*47
Bamboo
Roof-Zinc, Wall
852 U Myo Myint Pan Pin Chaung 841 16.7626630 96.0997010 110*42
Floor-Wood
Roof-Zinc, Wall-
853 U Myo Thant Pan Pin Chaung 842 16.7626980 96.0997800 110*22
Zinc, Floor-Wood
854 U Myo Myint Pan Pin Chaung 843 16.7626190 96.0997860 50*73.5
Roof-Zinc, Wall-
855 Daw Kyi Nyunt Pan Pin Chaung Bamboo, Floor- 25*30 844 16.7627340 96.0998510 30*110
Wood
856 U Kyaw Han Pan Pin Chaung 845 16.7625615 96.0999684 50*73.5
Land Plot
Roof-Zinc, Wall-
857 U Ye Htun Pan Pin Chaung Dha Ni, Floor- 30*30 846 16.7625434 96.1000706 170*60
Bamboo
Roof-Zinc, Wall-
858 U Ye Htun Pan Pin Chaung Dha Ni, Floor- 6*6 847 16.7626485 96.1000831
Bamboo
Daw Khin Nyein Roof-Zinc, Wall-
859 Pan Pin Chaung 20*30 848 16.7626905 96.1000359 60*40
Nyein Zinc, Floor-Wood

101
Seikkyi Kanaungto Township

860 Lake Pan Pin Chaung 4*8 849 16.7627450 96.1000700


Roof-Zinc, Wall-
861 Daw Su Mar Htwe Pan Pin Chaung 17*30 850 16.7627460 96.1000140 60*17
Wood, Floor-Wood
Roof-Zinc, Wall-
862 U Kyi Lwin Pan Pin Chaung 60% 851 16.7627830 96.0999797 60*17
Wood, Floor-Wood
Roof-Zinc, Wall-
863 Ko Aung Naing Myo Pan Pin Chaung 11*22 10% 852 16.7628180 96.0999465 30*60
Zinc, Floor-Wood
Roof- Zinc, Wall-
864 U Thein Kyi Pan Pin Chaung Bamboo, Floor- 10*11 10% 853 16.7628497 96.0998165
Wood
Zaw Ti Ka Yar Ma
865 Pan Pin Chaung 60% 854 16.7618967 96.1006089
monastery
Roof- Zinc, Wall-
866 Aung Zaw Pyae Pan Pin Chaung Bamboo, Floor- 855 16.7616410 96.1011390 100*22.5
Wood
Roof- Zinc, Wall-
867 U Sein Win Pan Pin Chaung Bamboo, Floor- 10*15 856 16.7616300 96.1011840 22*100
Wood
Roof-Zinc, Wall-
868 U Tin Shwe Pan Pin Chaung 25*30 857 16.7615660 96.1012020 35*70
Zinc, Floor-Wood
Roof- Dha Ni,
869 Ko Zaw Min Pan Pin Chaung Wall-Dha Ni, 10*10 858 16.7615730 96.1012690 70*13
Floor-Wood
Roof-Zinc, Wall- Kyaw Kyaw
870 Nay Htun Pan Pin Chaung 12*20 859 16.7615480 96.1012290
Wood,Floor-Wood (13*70)
Daw Mying Mying
871 Pan Pin Chaung 860 16.7615370 96.1012750 12*70
Aye Land Plot
Roof- Zinc, Wall-
872 U Ohnn Win Pan Pin Chaung Bamboo, Floor- 10*15 861 16.7615490 96.1012850 10*50
Wood
Roof- Zinc, Wall-
873 Myo Khin Pan Pin Chaung Bamboo, Floor- 10*10 862 16.7615440 96.1012770 10*50
Wood
Roof- Zinc, Wall-
874 Zaw min Pan Pin Chaung Bamboo, Floor- 12*15 863 16.7614820 96.1012810 22*70
Wood
Roof-Zinc, Wall-
875 Aung Naing Oo Pan Pin Chaung 15*25 864 16.7615080 96.1013160 35*13
Zinc, Floor-Wood
Roof-Zinc, Wall-
876 Daw Thay Pan Pin Chaung 865 16.7615050 96.1013490 35*13
Zinc, Floor-Wood

102
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
877 Ko Ye Naung Pan Pin Chaung Bamboo, Floor- 9*10 866 16.7615060 96.1013720 9*35
Bamboo
Roof-Zinc, Wall-
878 Zaw Zaw Pan Pin Chaung 10*20 867 16.7614780 96.1013740 15*70
Zinc, Floor-Wood
Roof-Zinc, Wall-
879 Ye Win Zaw Pan Pin Chaung 10*40 868 16.7614980 96.1013880 20*70
Zinc, Floor-Wood
Roof- Zinc, Wall-
880 Ko Hla Naing Pan Pin Chaung Bamboo, Floor- 9*20 869 16.7614830 96.1014120 9*35
Bamboo
Roof-Zinc, Wall-
881 U Win Myint Oo Pan Pin Chaung 10*15 70% 870 16.7614630 96.1014390 14*40
Zinc, Floor-Wood
Roof-Zinc, Wall-
882 U Tint Lwin Pan Pin Chaung 10*20 871 16.7614520 96.1014710 12*70
Zinc, Floor-Wood
Roof-Zinc, Wall-
883 U Kyi Win Pan Pin Chaung 40% 872 16.7614410 96.1014910 42*34
Zinc, Floor-Wood
Roof-Zinc, Wall-
884 Naing Win Htun Pan Pin Chaung 12*40 873 16.7614210 96.1014920 13*70
Zinc, Floor-Wood
Roof-Zinc, Wall-
885 U Win Khaing Pan Pin Chaung 12*40 874 16.7614100 96.1015110 12*70
Zinc, Floor-Wood
Roof-Zinc, Wall-
886 Khin Kyaw Oo Pan Pin Chaung Plastic, Floor- 10*25 875 16.7613820 96.1015500 11*50
Bamboo
Roof- Zinc, Wall-
887 U Khin Maung Kyi Pan Pin Chaung Bamboo, Floor- 15*10 876 16.7613640 96.1015570 18*50
Bamboo
Roof- Zinc, Wall-
888 Daw Mar Mar Oo Pan Pin Chaung Bamboo, Floor- 10*80 877 16.7613800 96.1016120 12*30
Wood
Roof-Zinc, Wall-
889 Than Hlaing Pan Pin Chaung 878 16.7613770 96.1016460 10*44
Zinc, Floor-Wood
Roof-Zinc, Wall-
890 Aung Htay Pan Pin Chaung 20*15 879 16.7613290 96.1016940 47*26
Zinc, Floor-Wood
Roof-Zinc, Wall-
891 Daw San Nwet Pan Pin Chaung 12*15 80% 880 16.7612558 96.1017754 47*29
Zinc, Floor-Wood
Roof-Zinc, Wall-
892 Than Hlaing Pan Pin Chaung 12*15 50% 881 16.7612085 96.1018038 10*40
Zinc, Floor-Wood
Roof-Zinc, Wall-
893 Daw Khin San Yi Pan Pin Chaung 12*15 882 16.7611751 96.1018322 50*21
Wood,Floor-Wood
Roof-Zinc, Wall-
894 U Aye Kyaw Pan Pin Chaung 90% 883 16.7609875 96.1020544 30*50
Zinc, Floor-Wood

103
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
895 Than Htay Aung Pan Pin Chaung 15*40 884 16.7609482 96.1020651 15*60
Zinc, Floor-Wood
Roof-Zinc, Wall-
896 Daw Aye Thein Pan Pin Chaung 25*40 885 16.7609037 96.1020672 24*60
Zinc, Floor-Wood
Roof- Zinc, Wall-
897 Htun Htun Oo Pan Pin Chaung Bamboo, Floor- 12*40 886 16.7608477 96.1020618 16*60
Wood
Roof-Zinc, Wall-
898 Ko Zaw Oo Pan Pin Chaung 15*40 887 16.7608018 96.1020650 17*60
Wood, Floor-Wood
Roof-Zinc, Wall-
899 Ko Min Naing Htun Pan Pin Chaung engraver, Floor- 15*40 888 16.7607450 96.1020487 43*60
Wood
Roof-Zinc, Wall-
900 U Kyaw Han Pan Pin Chaung 30*40 889 16.7606307 96.1020779 40*40
Zinc, Floor-Wood
Roof-Zinc, Wall-
901 U San Htun Pan Pin Chaung 15*20 890 16.7605590 96.1020792 28*19
Zinc, Floor-Wood
Roof-Zinc, Wall-
902 U San Thein Pan Pin Chaung engraver, Floor- 10*23 891 16.7605027 96.1020814 10*23
Wood
903 U Ye Naung Pan Pin Chaung 30*50 892 16.7606019 96.1018293
Land Plot
Roof-Zinc, Wall-
904 Aye Aye Khaing Pan Pin Chaung 10*10 893 16.7605740 96.1018660 15*30
Zinc, Floor-Wood
Roof-Zinc, Wall-
905 Daw Tint Tint Yi Pan Pin Chaung 12*40 894 16.7606391 96.1019068 20*50
Wood, Floor-Wood
Roof-Zinc, Wall-
906 Daw Theingi Win Pan Pin Chaung 15*30 895 16.7606250 96.1019488 225*50
Wood, Floor-Wood
Roof-Zinc, Wall-
907 U Thein Htun Pan Pin Chaung 16*20 896 16.7606145 96.1019764 30*10
Wood, Floor-Wood
Roof-Zinc, Wall-
908 Ko Zaw Khaing Pan Pin Chaung 18*20 897 16.7605923 96.1020125 22*50
Wood, Floor-Wood
Roof-Zinc, Wall-
909 Ko Than Zaw Pan Pin Chaung 16*25 898 16.7605107 96.1019456 16*30
Wood, Floor-Wood
Roof- Zinc, Wall-
910 Daw Khin Moe Wai Pan Pin Chaung Bamboo, Floor- 899 16.7604664 96.1019857 30*23
Wood
Roof-Zinc, Wall-
911 Ah Thay Lay Pan Pin Chaung 900 16.7604394 96.1020479 15*30
Zinc, Floor-Wood
Roof-Zinc, Wall-
912 Si Thu Pan Pin Chaung 901 16.7604245 96.1020986 11*30
Zinc, Floor-Wood

104
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
913 Ko Aye ko Pan Pin Chaung 902 16.7604123 96.1021514 50*16
Zinc, Floor-Wood
Roof-Zinc, Wall-
914 U Than Hlaing Pan Pin Chaung 903 16.7604014 96.1021958 50*16
Zinc, Floor-Wood
915 Ko Ye Naung Pan Pin Chaung 904 16.7604104 96.1022328 50*15
Land Plot
Roof-Zinc, Wall-
916 Daw Khin San Win Pan Pin Chaung 905 16.7604040 96.1022647 121*80
Zinc, Floor-Wood
Roof-Zinc, Wall-
917 Ko Tin Htwe Pan Pin Chaung engraver, Floor- 906 16.7603984 96.1023131 17*80
2 floors Wood
Roof- Zinc, Wall-
918 Ko Khin Myo Pan Pin Chaung Bamboo, Floor- 907 16.7603910 96.1023730 17*80
Wood
Roof- Zinc, Wall-
919 Daw Khin Yi Pan Pin Chaung Bamboo, Floor- 15*25 908 16.7603648 96.1024216 100*25
Wood
Roof- Zinc, Wall-
920 Daw Khin Yi(Shop) Pan Pin Chaung 10*10 909 16.7603834 96.1024648
Zinc, Floor-Brick
Roof- Zinc, Wall-
921 Kyaw Min Latt Pan Pin Chaung Bamboo, Floor- 15*25 910 16.7604086 96.1025702 27*100
Wood
922 School Pan Pin Chaung 911 16.7604870 96.1026350
Roof-Zinc, Wall-
923 U Yin Mying Pan Pin Chaung 912 16.7603238 96.1026347 65*70
Zinc, Floor-Wood
924 U Zaw Myiny Aung Pan Pin Chaung 913 16.7603370 96.1027320 54*48
Land Plot
Roof-Zinc, Wall-
925 Win Mar Pan Pin Chaung 20*25 914 16.7602555 96.1026937 20*65
Zinc, Floor-Wood
926 Cooperative Pan Pin Chaung 915 16.7601773 96.1026919 70*65
Roof-Zinc, Wall-
927 U Htay Aung Pan Pin Chaung 15*48 916 16.7601810 96.1027710 48*45
Wood, Floor-Wood
Roof-Zinc, Wall-
928 Kyaw Zay Ya Aung Pan Pin Chaung 917 16.7602192 96.1028320 48*5
Wood, Floor-Wood
Roof-Zinc, Wall-
929 U Htay Aung Pan Pin Chaung 15*25 918 16.7601733 96.1028526
Wood, Floor-Wood
Roof-Zinc, Wall-
930 U Hla Moe Pan Pin Chaung 15*15 920 16.7601202 96.1031273
Zinc, Floor-Wood
Roof-Zinc, Wall-
931 Ko Than Sein Pan Pin Chaung 25*40 921 16.7601330 96.1030010 25*60
Zinc, Floor-Wood

105
Seikkyi Kanaungto Township

932 Water Gate Pan Pin Chaung 919 16.7601078 96.1027850


Roof- Zinc, Wall-
933 Ko Than Win Pan Pin Chaung Bamboo, Floor- 922 16.7601910 96.1030200 70*16
Bamboo
Roof- Zinc, Wall-
934 Ko Htay Aung Pan Pin Chaung Bamboo, Floor- 10*12 923 16.7602350 96.1029900
Bamboo
Roof-Zinc, Wall-
935 Htoo Htoo Aung Pan Pin Chaung Dha Ni, Floor- 10*10 924 16.7602694 96.1029715
Bamboo
Roof-Zinc, Wall-
936 Ko Soe Than Pan Pin Chaung 12*15 925 16.7603260 96.1029560 20*90
Wood, Floor-Wood
937 Ko Win Maung Pan Pin Chaung 926 16.7603470 96.1028840 20*90
Land Plot
Roof-Zinc, Wall-
938 Soe Myat Thu(House) Pan Pin Chaung 927 16.7604361 96.1029268 60*90
Wood, Floor-Wood
Soe Myat Thu(Little Roof-Zinc, Wall-
939 Pan Pin Chaung 928 16.7603960 96.1029515
house) Wood, Floor-Wood
940 Lake Pan Pin Chaung 929 16.7604172 96.1027951
Roof-Zinc, Wall-
941 Ko Kyaw Kyi Pan Pin Chaung 10*15 930 16.7604859 96.1029670 40*90
Wood, Floor-Wood
Roof-Zinc, Wall-
942 Ko Kyaw Kyi Pan Pin Chaung 15*25 95% 931 16.7605450 96.1029740
Wood, Floor-Wood
Roof- Zinc, Wall-
943 Daw Thin Thin Pan Pin Chaung Bamboo, Floor- 10*15 5% 932 16.7605818 96.1029708 20*90
Wood
Rice Factory (150
944 Pan Pin Chaung Plot 933 16.7603489 96.1035995
Ton) Land Plot
Rice Factory (150
945 Pan Pin Chaung Plot 934 16.7607733 96.1055426 100 Acre
Ton)
Rice Factory (150
946 Pan Pin Chaung Plot 935 16.7602635 96.1087908
Ton)
Roof-Zinc, Wall-
947 U Aaung Htwe Samar Duu War 16.7601598 96.1098624
Wood, Floor-Wood 25*25 100% 936
Roof-Zinc, Wall-
948 Daw Khin Mu Nwet Samar Duu War 16.7600120 96.1099089
Brick, Floor-Brick 30*55 100% 937
Roof-Zinc, Wall-
949 U Aung Htun Htun Samar Duu War engraver, Floor- 16.7599433 96.1099856
Wood 12*12 938

106
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
950 U Thein Han Samar Duu War 16.7598548 96.1100079
Wood, Floor-Wood 30*35 939
Roof-Zinc, Wall-
951 U Hla Thein Samar Duu War 16.7597785 96.1100385
Wood, Floor-Wood 35*30 940
952 Public well (AMI) Samar Duu War 16.7598315 96.1101423
Roof- Zinc 10*6 941
Roof- Wall-Dha Ni,
953 Zaw Min Nyein Samar Duu War 16.7597430 96.1101393
Floor-Wood 15*15 942
Roof-Dha Ni, Wall-
954 U Than Aung Nwet Samar Duu War 16.7596879 96.1100791
Zinc, Floor-Wood 15*15 943
Roof-Zinc, Wall-
955 U Aye Kying Samar Duu War Bamboo, Floor- 16.7596955 96.1101634
Wood 16830 944
Roof-Zinc, Wall-
956 U Ni Ko Samar Duu War engraver, Floor- 16.7596490 96.1100960
Wood 15*30 945
Roof-Zinc, Wall-
957 U Khin Zaw Samar Duu War 16.7596511 96.1101969
Zinc, Floor-Wood 15*30 946
Roof-Zinc, Wall-
958 U Sein Aung Kyi Samar Duu War engraver, Floor- 16.7596200 96.1102279
Wood 20*26 947
Roof- Dha Ni,
959 U Aung Aung Samar Duu War Wall-Dha Ni, 16.7595542 96.1102183
Floor-Wood 10*10 948
960 Water Gate Samar Duu War 16.7594844 96.1103040
Roof-Zinc 10*10 949
961 Public lake Samar Duu War 16.7595466 96.1105156
30% 950
Roof- Dha Ni,
962 Daw Nyo Tint Samar Duu War Wall-Bamboo, 16.7592682 96.1108803
Floor-Wood 15*15 951
Roof-Dha Ni, Wall-
963 U Tin Hlaing Samar Duu War 16.7591400 96.1110410
Zinc, Floor-Wood 25*20 952
Roof-Dha Ni, Wall-
964 Daw Ohnn Myint Samar Duu War 16.7591750 96.1110290
Zinc, Floor-Wood 15*5 953
Roof-Zinc, Wall-
965 Daw Win Sein Samar Duu War Wood, Floor- 16.7590900 96.1110894
Bamboo 10*15 954
Roof-Zinc, Wall-
966 U Nay Aung Samar Duu War 16.7591580 96.1110100
Zinc, Floor-Wood 10*25 955
Roof-Zinc, Wall-
967 Myint Myint San Samar Duu War 16.7592000 96.1109600 Htain Lin Kyaw
Zinc, Floor-Wood 20*20 956

107
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
968 Zin Ko Samar Duu War 16.7592763 96.1109762
Zinc, Floor-Wood 20*30 957
969 Water pump Samar Duu War 16.7593240 96.1109900
Roof-Zinc 958
Roof-Zinc, Wall-
970 U Aung Hlaing Oo Samar Duu War 16.7595749 96.1110128
Zinc, Floor-Wood 25*25 50% 959
Roof-Zinc, Wall-
971 U Than Aye Samar Duu War engraver, Floor- 16.7594880 96.1110530
Wood 25*25 960
Roof-Zinc, Wall-
972 Saw Gay To Htoo Samar Duu War engraver, Floor- 16.7593333 96.1111159
Wood 15*35 961
Roof-Zinc, Wall-
973 U Ohnn Kway Samar Duu War Bamboo, Floor- 16.7593310 96.1111800
Bamboo 10*10 962
Roof-Zinc, Wall-
974 Moe Kyaw Nyein Samar Duu War engraver, Floor- 16.7591980 96.1111918
Wood 35*40 963
Roof-Dha Ni, Wall-
975 Maung San Htun Samar Duu War Dha Ni, Floor- 16.7592276 96.1112514
Wood 12*25 964
Roof- Dha Ni,
976 U Htun Htun Win Samar Duu War Wall-Bamboo, 16.7591657 96.1113120
Floor-Wood 10*10 965
977 U Min Min Samar Duu War 16.7592892 96.1113812
Land Plot 31% 966
978 U Min Min Samar Duu War 16.7597648 96.1117296
Factory 967
979 U Than Win Htun Samar Duu War 16.7598006 96.1118959
12*15 968
Roof-Dha Ni, Wall-
980 Than Htun Kyaw Samar Duu War Dha Ni, Floor- 16.7600850 96.1121510
Bamboo 12*15 969
Roof-Zinc, Wall-
981 Daw Khin San Win Samar Duu War 16.7603470 96.1121650
Wood, Floor-Wood 12*12 970
982 U Han Win Soe Samar Duu War 16.7605370 96.1122560 90*70
Land Plot 90% 971
Roof-Zinc, Wall-
983 U Kyaw Win Samar Duu War 16.7606519 96.1122551
Wood, Floor-Wood 20% 972
Roof-Zinc, Wall-
984 U Thein Win Samar Duu War 16.7607950 96.1122790 Land-20% 45*105
Wood, Floor-Wood 20% 973

108
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
985 U Aung Myint Samar Duu War 16.7609427 96.1123338
Wood, Floor-Wood 20*50 70% 974
Roof-Zinc, Wall-
986 Daw Ni Samar Duu War 16.7610089 96.1123390
Wood, Floor-Wood 20*50 90% 975
Roof-Zinc, Wall-
987 U Kyaw Tint Samar Duu War 16.7610629 96.1123523
Wood, Floor-Wood 90% 976
Roof-Zinc, Floor-
988 U Moe San Samar Duu War 16.7611290 96.1123607
Bamboo 977
Roof-Zinc, Wall-
989 Daw Khin San Win Samar Duu War 16.7611731 96.1123538
Wood, Floor-Wood 100% 978
Roof- Dha Ni,
990 Daw Mu Mu Khin Samar Duu War Wall-Bamboo, 16.7611760 96.1123960
Floor-Bamboo 979
Roof-Zinc, Wall-
991 Pyae Phyo Zaw Samar Duu War 16.7612331 96.1123977
Plastic, Floor-Wood 980
Roof-Zinc, Wall-
992 U Thein Win Samar Duu War 16.7613320 96.1124490
Plastic, Floor-Wood 981
993 Water Gate Samar Duu War 16.7613727 96.1124892
Roof-Zinc 982
994 U Myint Aung (Shop) Samar Duu War 16.7614309 96.1124495
983
995 U Myint Aung Samar Duu War 16.7614132 96.1124834 U Zaw Myo Aung
Roof-Dha Ni 10*40 984
Roof-Zinc, Wall-
996 U Zai Yar Win Samar Duu War 16.7613755 96.1123919
Wood, Floor-Brick 20*25 985
Roof-Zinc, Wall-
997 U Mya Thein Samar Duu War 16.7613064 96.1123951
Wood, Floor-Wood 20*20 986
998 U Aung Shwe Samar Duu War 16.7612980 96.1123440
Land Plot 30% 987
Roof-Zinc, Wall-
999 U Han Htun Samar Duu War 16.7612318 96.1122965
Wood, Floor-Wood 20*20 30% 988
1000 U Thein Htun Win +4 Samar Duu War 16.7619896 96.1124767
Land Plot 989
1001 Water Gate Samar Duu War 16.7624854 96.1126157
Roof-Zinc 990
Roof- Dha Ni,
1002 Khaing Zar Linn Samar Duu War Wall- Dha Ni, 16.7629260 96.1125950
Floor- Bamboo 100% 991
Roof- Dha Ni,
1003 U Tite Samar Duu War Wall- Dha Ni, 16.7629893 96.1125722 Than Zaw Oo
Floor- Bamboo 95% 992

109
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
1004 U Tite Samar Duu War engraver, Floor- 16.7630570 96.1125670
Wood 90% 993
Roof- Dha Ni,
1005 U Twit Kyi Samar Duu War Wall- Dha Ni, 16.7631260 96.1125420
Floor-Wood 10% 994
Roof-Zinc, Wall-
1006 U Khin Maung Myint Samar Duu War 16.7631730 96.1125320
Zinc, Floor-Wood 5% 995
Roof- Dha Ni,
1007 U Than Zaw Linn Samar Duu War Wall- Dha Ni, 16.7632535 96.1125781
Floor- Bamboo 10% 996
Roof-Zinc, Wall-
1008 U Than Oo Samar Duu War 16.7646420 96.1130690
Zinc, Floor-Wood 15*15 997
Roof-Zinc, Wall-
1009 U Than Oo Samar Duu War 16.7646690 96.1131360
Zinc, Floor-Wood 15*15 998
1010 owned by merchant Samar Duu War 16.7648786 96.1131392
Land Plot 999
Roof- Dha Ni,
1011 Ko Than Oo Samar Duu War Wall-Bamboo, 16.7650020 96.1130960
Floor-Wood 15*15 30% 1000
Roof-Zinc, Wall-
1012 U Zaw Htet Samar Duu War Bamboo, Floor- 16.7651939 96.1130692
Wood 15*15 1001
Roof-Zinc, Wall-
1013 U Htoo Myat Samar Duu War Bamboo, Floor- 16.7652835 96.1130453
Wood 10*20 1002
1014 Water Gate Samar Duu War 16.7653490 96.1130570
10*10 1003
1015 Htun Htun Oo Samar Duu War 16.7656621 96.1130837
Land Plot 5% 1004
Roof- Dha Ni,
1016 U Than Oo Samar Duu War Wall- Dha Ni, 16.7656990 96.1130980
Floor-Wood 15*30 5% 1005
1017 Khin Khin Oo Samar Duu War 16.7657320 96.1131160
Land Plot 10% 1006
Roof-Zinc, Wall-
1018 Daw Nwet Nwet Aye Samar Duu War 16.7657964 96.1131097
Zinc, Floor-Wood 20*20 1007
Roof-Zinc, Wall-
1019 Aung Win Samar Duu War Dha Ni, Floor- 16.7668388 96.1134501
Wood 10*20 40% 1008
Roof-Zinc, Wall-
1020 U Myint Soe Samar Duu War 16.7668874 96.1134873
Zinc, Floor-Wood 10*20 1009

110
Seikkyi Kanaungto Township

Roof- Zinc, Wall-


1021 Bo Mya Samar Duu War Dha Ni, Floor- 16.7670170 96.1135450
Bamboo 10*20 100% 1010
Roof- Dha Ni,
1022 Aung Kyi Samar Duu War Wall- Dha Ni, 16.7670620 96.1135600
Floor-Bamboo 10*20 100% 1011
Roof-Zinc, Wall-
1023 U Aung Lwin Samar Duu War 16.7671230 96.1135930
Wood, Floor-Wood 20*20 1012
1024 U Aung Lwin Samar Duu War 16.7671920 96.1136300
Land Plot 1013
1025 Ma Myint Myint Lwin Samar Duu War 16.7672464 96.1136598
Land Plot 1014
Roof-Zinc, Wall-
1026 U Myint Thein Samar Duu War 16.7673223 96.1137022
Bamboo 12*30 95% 1015
1027 Ma Chit Su Samar Duu War 16.7673783 96.1137352 30*70
Land Plot 90% 1016
1028 U Thein Win Samar Duu War 16.7676377 96.1138713
Land Plot 50% 1017
1029 Htun Lin Aung (Jetti) Samar Duu War 16.7687780 96.1147700
25*30 100% 1018
1030 guard hut Samar Duu War 16.7690923 96.1150231
4*5 100% 1019
1031 generator site Samar Duu War 16.7691195 96.1150474
10% 1020
1032 U Maung Htwe Samar Duu War 16.7693259 96.1153372 900*900
Land Plot 5% 1021
Roof-Zinc, Wall-
U Nyan Shein
1033 Samar Duu War (4) engraver, Floor- 16.7625400 96.1239080
(Yangon)
shipyard Wood 50*70 80% 2022
Roof- Zinc, Wall-
1034 U Nyan Shein Samar Duu War (4) 16.7628263 96.1244251 Store
shipyard Zinc 20*60 100% 2023
Roof-Zinc, Wall-
1035 U Aye Lwin Samar Duu War (4) engraver, Floor- 16.7620490 96.1234010 2 Layer
House Wood 20*40 10% 2024
Roof- Zinc, Wall-
1036 U Ko Htwe Samar Duu War (4) 16.7619421 96.1233986
House Dha Ni 15*20 100% 2025
Roof-Zinc, Wall-
1037 U Thet Zaw Samar Duu War (4) 16.7619173 96.1233661
House Zinc 15*25 100% 2026
Roof-Zinc, Wall-
1038 U Kyaw Hla Samar Duu War (4) 16.7618720 96.1232742
House Brick 60*40 95% 2027
Roof- Zinc, Wall-
1039 Daw Mya Samar Duu War (4) 16.7618226 96.1231946
House Wood 20*40 100% 2028

111
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
1040 U Naing Oo Samar Duu War (4) 16.7618235 96.1231262
House Bamboo 20*40 95% 2029
1041 U Aung Myint Samar Duu War (4) 16.7618418 96.1230699 Plot
20*40 60% 2030
Roof-Zinc, Wall-
1042 Daw Tin Than Samar Duu War (4) 16.7618260 96.1230150
House Bamboo 20*40 100% 2031
Roof-Zinc, Wall-
1043 U Thein Htike Samar Duu War (4) 16.7617870 96.1229740
House Zinc 10*20 10% 2032
Roof-Zinc, Wall-
1044 Daw Mya Mon Samar Duu War (4) engraver, Floor- 16.7617830 96.1229040
House Wood 20*40 10% 2033
Roof-Zinc, Wall-
1045 U Soe Aung Samar Duu War (4) 16.7617720 96.1228330
House Bamboo 20*40 20% 2034
1046 U Zaw Moe Win Samar Duu War (4) 16.7618100 96.1227830 Plot
30*60 95% 2035
1047 U Zaw Moe Win Samar Duu War (4) 16.7617520 96.1227740 Store
Roof-Zinc 15*15 95% 2036
Roof-Zinc, Wall-
1048 U Than Htun Samar Duu War (4) 16.7618393 96.1226938
Shop Bamboo 20*20 5% 2037
Roof-Zinc, Wall-
1049 U Soe Moe Kyaw Samar Duu War (4) 16.7618433 96.1226331
House Zinc 10*15 20% 2038
Roof-Zinc, Wall-
1050 Rual Health Center Samar Duu War (4) 16.7618238 96.1225691
Brick 20*40 100% 2039
Roof-Zinc, Wall-
1051 GAD office Samar Duu War (4) engraver, Floor- 16.7618197 96.1225279
Wood 10*30 100% 2040
1052 Daw Win Myint Samar Duu War (4) 16.7618710 96.1225017 Plot
40*20 100% 2041
Roof-Zinc,
1053 Daw Win Myint Samar Duu War (4) 16.7618400 96.1223960
House wirenetting 20*40 100% 2042
Roof- Zinc, Wall-
1054 Daw Win Myint Samar Duu War (4) 16.7618480 96.1224500
House Wood 20*40 100% 2043
Roof-Zinc,
1055 U Min Min Samar Duu War (4) 16.7618530 96.1224030
House wirenetting 15*30 100% 2044
Roof- Zinc, Wall-
1056 U Aung Zaw Latt Samar Duu War (4) 16.7618530 96.1223500
House Wood 15*15 100% 2045
Roof-Zinc, Wall-
1057 U Khin Hlaing Samar Duu War (4) 16.7618280 96.1223400 RC
House Brick 40*60 100% 2046
Roof-Zinc, Wall-
1058 U Khin Maung Myint Samar Duu War (4) 16.7618130 96.1223170
Shop Zinc 15*15 100% 2047
Roof- Zinc, Wall-
1059 U Khaing Htet Aung Samar Duu War (4) 16.7617500 96.1223060
House Wood 40*30 100% 2048

112
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
1060 U Min Min Paing Samar Duu War (4) 16.7616704 96.1225993
House engraver 20*40 100% 2049
Roof-Zinc, Wall-
1061 U Tint Myint Swe Samar Duu War (4) 16.7616660 96.1224630
House engraver 20*40 100% 2051
Roof-Zinc, Wall-
1062 U Maung Maung Lwin Samar Duu War (4) 16.7616670 96.1225089
House engraver 20*40 100% 2050
Roof-Zinc, Wall-
1063 U Khin Hlaing Samar Duu War (4) 16.7616770 96.1224040
Store Zinc 10*15 100% 2052
1064 Water Gate Samar Duu War (4) 16.7616696 96.1222910
Water Gate Roof-Zinc 15*15 100% 2053
Roof- Zinc, Wall-
1065 Daw Aye Maw Samar Duu War (4) 16.7617580 96.1223614
House Wood 15*20 100% 2054
Roof- Zinc, Wall-
1066 U Tin Win Samar Duu War (4) 16.7617700 96.1223340
House Wood 15*20 100% 2055
1067 U Nyi Naing Samar Duu War (4) 16.7617910 96.1223160
Shop zifnc, wood 10*12 100% 2056
Roof-Zinc, Wall-
1068 U Kyi Soe Aung Samar Duu War (4) 16.7618670 96.1222620
House engraver 20*40 100% 2057
1069 U Zaw Zaw Lwin Samar Duu War (4) 16.7618210 96.1222240 Plot
17*40 100% 2058
Roof-Zinc, Wall-
1070 U Tin Maung Samar Duu War (4) 16.7617401 96.1222076
House Bamboo 25*20 100% 2059
Roof-Zinc, Wall-
1071 U Kyaw Soe Samar Duu War (4) 16.7617932 96.1221713
House Bamboo 10*50 100% 2060
Roof-Zinc, Wall-
1072 U Win Htun Samar Duu War (4) 16.7617870 96.1221390
House Bamboo 17*25 100% 2061
Roof- Zinc, Wall-
1073 U Aung Win Samar Duu War (4) 16.7618380 96.1221360
House Wood 10*30 100% 2062
Roof-Zinc, Wall-
1074 U Lu Kar Samar Duu War (4) 16.7618210 96.1220760
House Bamboo 15*20 100% 2063
1075 cementry Samar Duu War (4) 16.7617550 96.1220810
30*20 100% 2064
Roof-Zinc, Wall-
1076 U Ye Zar Ni Samar Duu War (4) 16.7618123 96.1219761
Shop Zinc 15*40 100% 2065
Roof-Zinc, Wall-
1077 U Hla Toe Samar Duu War (4) 16.7619600 96.1218280
House engraver 20*40 100% 2066
Roof-Zinc, Wall-
1078 U Kyaw Lwin Samar Duu War (4) 16.7621591 96.1217615
House Zinc 12*20 100% 2067
Roof-Zinc, Wall-
1079 Daw Hla Kyi Samar Duu War (4) 16.7619053 96.1219663
House engraver 20*40 100% 2068
Roof- Zinc, Wall-
1080 U Than Shwe Samar Duu War (4) 16.7619931 96.1218793
House Wood 20*40 100% 2069

113
Seikkyi Kanaungto Township

1081 U Kyi Thein Samar Duu War (4) 16.7619548 96.1219770 Plot
20*40 100% 2070
Roof- Zinc, Wall- 40*40 ၿခံ
1082 U Kyaw Kyaw Htun Samar Duu War (4) 16.7620479 96.1219118
House Wood 30*40 100% 2071
Roof-Zinc, Wall-
1083 U Ka Lar Samar Duu War (4) 16.7620045 96.1220030
House Zinc 20*40 100% 2072
Roof-Zinc, Wall-
1084 U Mae Gyi Samar Duu War (4) 16.7621144 96.1219458
House Zinc 10*25 100% 2073
Roof-Zinc, Wall-
1085 U Kaung Htet Samar Duu War (4) 16.7620422 96.1220234
House Zinc 10*25 100% 2074
Roof-Zinc, Wall-
1086 U Naing Min Htet Samar Duu War (4) 16.7620857 96.1220610
House Zinc 15*30 100% 2075
Roof-Zinc, Wall-
1087 Daw Than Aye Samar Duu War (4) 16.7621855 96.1219316
House Bamboo 10*20 100% 2076
Roof-Zinc, Wall-
1088 Daw Ka Lar Ma Sein Samar Duu War (4) 16.7621746 96.1219822
House engraver 15*30 100% 2077
Roof-Zinc, Wall-
1089 U Hla Oo Samar Duu War (4) 16.7621897 96.1221217
House Zinc 15*46 100% 2078
Roof-Zinc, Wall-
1090 U Cho Cho Oo Samar Duu War (4) 16.7621070 96.1221227
House Zinc 15*40 100% 2079
Roof-Zinc, Wall-
1091 U Win Naing Samar Duu War (4) 16.7621028 96.1221701
House Zinc 12*25 100% 2080
Roof-Zinc, Wall-
1092 U Myint Than Samar Duu War (4) 16.7621137 96.1222387
House Bamboo 15*30 100% 2081
Roof-Zinc, Wall-
1093 U Thu Kha Samar Duu War (4) 16.7620718 96.1222991
House Brick 16*60 70% 2082
Roof- Zinc, Wall-
1094 U Thet Ko Oo Samar Duu War (4) 16.7622133 96.1222132
House Wood 15*40 50% 2083
Roof-Zinc, Wall-
1095 U Kyaw Than Samar Duu War (4) 16.7622728 96.1221800
House engraver 15*50 100% 2084
Roof-Zinc, Wall-
1096 Daw Myint Htwe Samar Duu War (4) 16.7621983 96.1220636
House Bamboo 15*30 100% 2085
Roof-Zinc,
1097 Daw Myint Htwe Samar Duu War (4) 16.7622049 96.1220108 Shop
Shop wirenetting 9*9 100% 2086
Roof-Zinc, Wall-
1098 U Mya Wine Samar Duu War (4) 16.7622354 96.1219624
House engraver 10*30 100% 2087
Roof- Zinc, Wall-
1099 U Than Htun Naing Samar Duu War (4) 16.7622830 96.1219700
House Wood 15*40 100% 2088
Roof- Zinc, Wall-
1100 U Myo Zaw Samar Duu War (4) 16.7622900 96.1219050
House Wood 15*30 100% 2089

114
Seikkyi Kanaungto Township

Roof-Zinc, Wall-
1101 U Newl Lin Zaw Samar Duu War (4) 16.7623239 96.1219090
House Zinc 10*10 100% 2090
1102 U Win Hlaing Samar Duu War (4) 16.7623439 96.1219908
House zinc and plywood 12*25 100% 2091
Roof-Zinc, Wall-
1103 U Soe Naing Samar Duu War (4) 16.7623671 96.1220078
House Bamboo 10*25 100% 2092
Roof-Zinc, Wall-
1104 Daw Win Win Htay Samar Duu War (4) 16.7624075 96.1220228
House Bamboo 12*40 100% 2093
Roof-Zinc, Wall-
1105 Daw Aye Kyi Samar Duu War (4) 16.7624511 96.1220468
House Bamboo 15*30 100% 2094
1106 Daw Aye Kyi Samar Duu War (4) 16.7625010 96.1220705
20*40 50% 2095
Roof-Zinc, Wall-
1107 U Aung Thet Naing Samar Duu War (4) 16.7625166 96.1220069
House Bamboo 10*25 100% 2096
Roof- Zinc, Wall-
1108 U Maung Aye Samar Duu War (4) 16.7626050 96.1220650
House Wood 20*40 5% 2097
Roof-Zinc, Wall-
1109 U Khin Maung Nge Samar Duu War (4) 16.7625542 96.1219913
House Bamboo 10*20 100% 2098
Roof- Zinc, Wall-
1110 Daw Khin Shwe Samar Duu War (4) 16.7625828 96.1219655
House Wood 12*30 100% 2099
1111 U Maung Aye Samar Duu War (4) 16.7626740 96.1220370 Plot
Plot 20*40 10% 2100
1112 Daw Khin Shwe Samar Duu War (4) 16.7626462 96.1219495 Plot
35*70 100% 2101
1113 Daw Hla Hla Myint Samar Duu War (4) 16.7627281 96.1219767
House Roof-Zinc, engraver 15*30 50% 2102
Roof-Zinc, Wall-
1114 U Thant Zin Oo Samar Duu War (4) 16.7626534 96.1219004
House engraver 10*20 100% 2103
Roof-Zinc, Wall-
1115 U Soe Thiha Samar Duu War (4) 16.7627130 96.1218940
House Bamboo 15*20 100% 2104
Roof-Zinc,
1116 U Soe Myint Samar Duu War (4) 16.7626852 96.1218654
House wirenetting 15*30 100% 2105
1117 Daw Aye Myint Samar Duu War (4) 16.7627390 96.1219140
House Roof-Zinc 15*30 100% 2106
Roof-Zinc, Wall-
1118 U Soe Naing Samar Duu War (4) 16.7624164 96.1219425
House Zinc 15*30 100% 2107
Roof-Zinc, Wall-
1119 U Zaw Zaw Oo Samar Duu War (4) 16.7623937 96.1219003
House Bamboo 12*20 100% 2108
Roof-Zinc, Wall-
1120 Daw Tin Hla Samar Duu War (4) 16.7624320 96.1218978
House Zinc 12*25 100% 2109
Roof-Zinc, Wall-
1121 U Htay Win Samar Duu War (4) 16.7624860 96.1218530
House Zinc 20*25 100% 2110

115
Seikkyi Kanaungto Township

Roof-Zinc, Wall- 30*50,30


1122 U Mya Win Samar Duu War (4) 16.7624270 96.1218125 religious building
House Zinc *40 100% 2111
15*15,
1123 U Mya Win Samar Duu War (4) 16.7624270 96.1218125 religious building
22*13 toilet 2111
Roof-Zinc, Wall-
1124 U Kyaw Kyaw Oo Samar Duu War (4) 16.7625470 96.1217310
House engraver 12*30 100% 2112
Roof- Zinc, Wall-
1125 Daw Khin Aye Samar Duu War (4) 16.7626122 96.1217317
House Dha Ni 12*40 100% 2113
Roof- Dha Ni,
1126 U Tin Hlaing Samar Duu War (4) 16.7626418 96.1216928
House Wall- Dha Ni 12*15 100% 2114
Roof-Zinc, Wall-
1127 U Zin Ko Oo Samar Duu War (4) 16.7626590 96.1215720
House Zinc 10*20 100% 2115
Roof-Zinc, Wall-
1128 U Soe Thein Samar Duu War (4) 16.7627497 96.1216696
House Bamboo 15*30 100% 2116
Roof-Zinc, Wall-
1129 Daw Aye Sandar Samar Duu War (4) 16.7627746 96.1217316
House engraver 10*30 100% 2117
Roof-Zinc, Wall-
1130 U Khin Myint Samar Duu War (4) 16.7628085 96.1218128
House Bamboo 15*30 100% 2118
Roof-Zinc, Wall-
1131 U Ar Kar Soe Samar Duu War (4) 16.7628600 96.1218496
House engraver 10*20 100% 2119
Roof-Zinc, Wall-
1132 U Moe Myint Thu Samar Duu War (4) 16.7629062 96.1218602
House Bamboo 10*30 100% 2120
Roof-Zinc, Wall-
1133 U Nyi Nyi Samar Duu War (4) 16.7629447 96.1218974
House Bamboo 10*20 100% 2121
Roof- Zinc, Wall-
1134 U Zaw Linn Samar Duu War (4) 16.7629876 96.1219109
House Wood 15*30 100% 2122
Roof-Zinc, Wall-
1135 Daw Win Tin Samar Duu War (4) 16.7630591 96.1219030
House Bamboo 15*30 100% 2123
Roof-Zinc, Wall-
1136 U Win Kyaw Samar Duu War (4) 16.7631300 96.1219140
House Bamboo 15*30 50% 2124
Roof- Zinc, Wall-
1137 U Bo Bo Samar Duu War (4) 16.7631410 96.1219510
House Dha Ni 15*30 5% 2125
pagoda
1138 ဘိရ းဝန္း Samar Duu War (4) 16.7634790 96.1219250 religious building
compound Wall-Brick 40*120 5% 2126
football
1139 Village Stadium Samar Duu War (4) 16.7633382 96.1217096
field Village Stadium 180*165 95% 2127
1140 U Myint Swe Samar Duu War (4) 16.7636121 96.1217992
Land Plot 40*40 50% 2128
Roof-Zinc, Wall-
1141 Daw Than Than Hla Samar Duu War (4) 16.7636568 96.1216178
House engraver 15*30 100% 2129

116
Seikkyi Kanaungto Township

1142 U Myint Aung Samar Duu War (4) 16.7637695 96.1216989


Land Plot 25*40 100% 2130
Roof-Zinc, Wall-
1143 U Saw Tin Samar Duu War (4) 16.7638494 96.1216899
House Bamboo 15*30 95% 2131
Roof-Zinc, Wall-
1144 Daw Saw Thein Oo Samar Duu War (4) 16.7639590 96.1215660
House Zinc 12*20 100% 2132
Roof-Zinc, Wall-
1145 U Ko Htwe Samar Duu War (4) 16.7640038 96.1215326
House engraver 12*20 100% 2133
Roof-Zinc, Wall-
1146 U Kyaw Thein Samar Duu War (4) 16.7639758 96.1215020
House Bamboo 15*25 100% 2134
1147 U Maung Maung Samar Duu War (4) 16.7639017 96.1215177
Land Plot 20*40 100% 2135
Roof-Zinc, Wall-
1148 U Khway Samar Duu War (4) 16.7639423 96.1214763
House Bamboo 25*25 100% 2136
1149 U Maung Maung Samar Duu War (4) 16.7639007 96.1214262
Land Plot 20*40 100% 2137
Roof-Zinc, Wall-
1150 U Hla Shwe Samar Duu War (4) 16.7638599 96.1213879
House Zinc 15*25 100% 2138
Roof-Zinc, Wall-
1151 U Than Lwin Samar Duu War (4) 16.7638528 96.1214909
House Bamboo 12*25 100% 2139
Daw Khin Myint Roof- Zinc, Wall-
1152 Samar Duu War (4) 16.7638039 96.1214705
Myint Oo House Wood 20*40 100% 2140
1153 Daw Mya Ohn Samar Duu War (4) 16.7637318 96.1214471
Land Plot 20*40 100% 2141
Roof-Zinc, Wall-
1154 U Khin Oo Samar Duu War (4) 16.7636736 96.1214241
House Zinc 10*20 100% 2142
Roof- Dha Ni,
1155 Daw Than Nwet Samar Duu War (4) 16.7636373 96.1213934
House Wall- Dha Ni 15*25 100% 2143
Roof-Zinc, Wall-
1156 U Win Thein Samar Duu War (4) 16.7639833 96.1213638
House Bamboo 15*30 100% 2144
Roof-Zinc, Wall-
1157 U Zaw Aung Samar Duu War (4) 16.7640415 96.1213269
House Zinc 15*30 100% 2145
Roof- Zinc, Wall-
1158 U Ohnn Khin Samar Duu War (4) 16.7641405 96.1215082
House Wood 20*30 100% 2146
Roof-Zinc, Wall-
1159 U Kyaw Thein Samar Duu War (4) 16.7641870 96.1214210
House Bamboo 15*30 100% 2147
Roof-Zinc, Wall-
1160 U Boe Samar Duu War (4) 16.7642632 96.1213923
House engraver 20*30 100% 2148
Roof- Dha Ni,
1161 U Maung Maung Samar Duu War (4) 16.7642849 96.1213833
House Wall- Dha Ni 10*10 100% 2149
Roof-Zinc, Wall-
1162 U Soe Yar Zar Samar Duu War (4) 16.7643021 96.1213488
House engraver 15*30 100% 2150

117
Seikkyi Kanaungto Township

1163 Daw Khin San Htay Samar Duu War (4) 16.7643307 96.1213436
Land Plot 20*40 100% 2151
Roof- Dha Ni,
1164 U Pho Thar Aung Samar Duu War (4) 16.7643434 96.1212337
House Wall- Bamboo 12*12 100% 2152
Roof- Zinc, Wall-
1165 U Myo Than Htay Samar Duu War (4) 16.7643661 96.1213239
House Dha Ni 10*15 100% 2153
Roof-Zinc, Wall-
1166 U Than Win Samar Duu War (4) 16.7644220 96.1212630
House Zinc 15*20 100% 2154
Roof- Zinc, Wall-
1167 U Myo Min Naing Samar Duu War (4) 16.7644502 96.1212108
House Wood 12*15 100% 2155
Roof-Zinc, Wall-
1168 Daw Tin Myint Samar Duu War (4) 16.7644674 96.1212105
House Bamboo 12*25 100% 2156
Roof- Dha Ni,
1169 Daw Thidar Aye Samar Duu War (4) 16.7644968 96.1211928
House Wall- Dha Ni 10*20 100% 2157
1170 U Aung Kyi Samar Duu War (4) 16.7645779 96.1211477
Plot 120*60 100% 2158
Roof- Dha Ni,
1171 U Aung Kyi Samar Duu War (4) 16.7645840 96.1210580
House Wall-Bamboo 20*20 100% 2159
Roof- Dha Ni,
1172 U Kyaw Hla Samar Duu War (4) 16.7646590 96.1210360
House Wall- Dha Ni 15*20 100% 2160
1173 U Than Naing Samar Duu War (4) 16.7645064 96.1212850
Land Plot 100*50 100% 2161
representative of banana
1174 Samar Duu War (4) 16.7644033 96.1213985
owner graden 400*50 100% 2162
representative of
1175 Samar Duu War (4) 16.7664671 96.1204984
owner Farm 95% 2163
representative of
1176 Samar Duu War (4) 16.7671761 96.1201705
owner Farm 2164
representative of
1177 Samar Duu War (4) 16.7675977 96.1199960
owner Farm 2165
representative of
1178 Samar Duu War (4) 16.7680744 96.1196924
owner Farm 2166
representative of
1179 Samar Duu War (4) 16.7686129 96.1194008
owner Farm 2167
representative of
1180 Samar Duu War (4) 16.7692383 96.1186578
owner Farm 2168
representative of
1181 Samar Duu War (4) 16.7696232 96.1180659
owner Farm 2169
representative of
1182 Samar Duu War (4) 16.7698407 96.1175911
owner Farm 2170
1183 representative of Samar Duu War (4) 16.7698038 96.1173412
Farm 2171

118
Seikkyi Kanaungto Township

owner

representative of
1184 Samar Duu War (4) 16.7657789 96.1207517
owner Farm 50% 2172
representative of
1185 Samar Duu War (4) 16.7651381 96.1209965
owner Farm 80% 2173
1186 Light House Samar Duu War (4) 16.7690284 96.1308403
100% 2174
1187 U Nyunt Tin Samar Duu War (4) 16.7686951 96.1289986 Company's own
Land Plot 2175
1188 U Nyunt Tin Samar Duu War (4) 16.7681027 96.1282993 Company's own
Land Plot 2176
representative of
1189 Samar Duu War (4) 16.7676715 96.1279631
owner 2177
Roof-Zinc, Wall-
1190 U Win Htun Samar Duu War (4) 16.7668065 96.1272392 shipyard
House Rock slice 40*20 100% 2178
1191 Daw Theingi Aung Samar Duu War (4) 16.7663520 96.1269117
shipyard 100% 2179
1192 Daw Theingi Aung Samar Duu War (4) 16.7657454 96.1264540
shipyard 100% 2180
1193 Jette Samar Duu War (4) 16.7646907 96.1259882
Jette 100% 2181
1194 Aung Zabu(2) Samar Duu War (4) 16.7642520 96.1256399
shipyard 100% 2182
1195 Aung Zabu(2) Samar Duu War (4) 16.7638377 96.1253190
shipyard 100% 2183
1196 Aung Zabu(2) Samar Duu War (4) 16.7636699 96.1251643
shipyard 100% 2184
1197 U Kyi Thein Samar Duu War (4) 16.7633087 96.1248053
shipyard 100% 2185
1198 Shipyard Samar Duu War (4) 16.7626240 96.1243082
shipyard 100% 2186
Roof -Zinc, Wall-
Chaung Wine Lay
1199 U Htay Hlaing Nipa, Floor- 96.11437 16.78019
Ward
Bamboo 20'*15' 100% 906
Chaung Wine Lay
1200 U Zaw Lin Soe 96.11433 16.78022
Ward Plot 60'*60' 85% 907
Chaung Wine Lay Roof- Zinc, Wall-
1201 MPA Office 96.11432 16.78029
Ward Zinc, Floor- Wood 15'*15' 100% 908
Chaung Wine Lay Roof- Zinc, Wall-
1202 U Ohn Mying 96.11432 16.78034
Ward Zinc, Floor- Wood 15'*26' 100% 909

119
Seikkyi Kanaungto Township

Roof- Nipa, Wall-


Chaung Wine Lay
1203 Ma Theint Theint Aye Nipa, Floor- 96.11428 16.7804
Ward
Bamboo 12'*15' 100% 910
Chaung Wine Lay Roof-Zinc, Wall-
1204 Ma Chaw Su 96.11421 16.78041
Ward Wood, Floor-Wood 12'*20' 80% 911
Chaung Wine Lay
1205 U Zaw Lin Soe 96.11419 16.78053
Ward Plot 100% 912
Chaung Wine Lay
1206 U Zaw Lin Soe 96.11428 16.78058
Ward Plot 100% 913
Roof -Zinc, Wall-
representative of Chaung Wine Lay
1207 Nipa, Floor- 96.11422 16.78068
owner Ward
Bamboo 10'*15' 100% 914
Roof- Zinc, Wall-
representative of Chaung Wine Lay
1208 Bamboo, Floor- 96.1142 16.78062
owner Ward
Bamboo 10'*15' 915
Chaung Wine Lay
1209 U Min Min Htun 96.11424 16.78058
Ward Plot 25'*50' 10% 916
Chaung Wine Lay
1210 U Zaw Lin Soe 96.11426 16.78068
Ward Plot 100% 917
Chaung Wine Lay
1211 U Zaw Lin Soe 96.11416 16.7807
Ward Plot 100% 918
Chaung Wine Lay Roof-Zinc, Wall-
1212 U Chit Ko Ko Oo 96.11411 16.78073
Ward Wood, Floor-Wood 15'*20' 20% 919
Roof- Zinc, Wall-
Chaung Wine Lay
1213 U Ko Ko Bamboo, Floor- 96.11408 16.78096
Ward
Bamboo 10'*15' 100% 920
Roof- Zinc, Wall-
Chaung Wine Lay
1214 U Ko Ko Kyi Zinc, Floor- 96.11411 16.78097
Ward
Bamboo 12'*15' 100% 921
Roof- Zinc, Wall-
Chaung Wine Lay
1215 U Soe Win Oo Zinc, Floor- 96.11414 16.78098
Ward
Bamboo 12'*20' 100% 922
Roof- Nipa, Wall-
Chaung Wine Lay
1216 U Htun Myint Nipa, Floor- 96.11419 16.781
Ward
Bamboo 10'*15' 100% 923
Chaung Wine Lay
1217 U Zaw Lin Soe 96.11413 16.78089 912 (U Zaw Lin Soe)
Ward 100% 924
Roof- Nipa, Wall-
Chaung Wine Lay
1218 RGCCL Nipa, Floor- 96.12217 16.77145
Ward
Tent Bamboo 8'*8' 100% 925

120
Seikkyi Kanaungto Township

Roof- Zinc, Wall-


Chaung Wine Lay
1219 RGCCL Bamboo, Floor- 96.12145 16.77197
Ward
Tent Wood 30'*20' 100% 926
Chaung Wine Lay
1220 MPA Land300 96.12132 16.77196
Ward 927

121
Kyimindaing Township

4. Kyimyindaing Township

type of
within ROW
Sr Owner Address building/l building/ land area GPS number Latitude Longitude remark
(%)
and/plot
400*
1 U Thiha Ngar Sin Ward plot 40% 550 16.78216 96.11377
400
departmen
2 ship yare Ngar Sin Ward t of 6'*6' 100% 551 16.78266 96.11363 shipyard
livestock
departmen
3 Control Room Ngar Sin Ward t of 12'*12' 100% 552 16.78265 96.11359
livestock
departmen
4 Pump House Ngar Sin Ward t of RC 12'*12' 50% 554 16.78285 96.11352
livestock
departmen
5 spirit house Ngar Sin Ward t of 6'*6' 100% 553 16.78293 96.11356
livestock
departmen
6 irrigation gate Ngar Sin Ward t of 100% 555 16.78274 96.11354
livestock
departmen
7 Jetty Ngar Sin Ward t of 200' 100% 556 16.78414 96.1139
livestock
departmen
8 Jetty Ngar Sin Ward t of 10'*20' 100% 557 16.78485 96.1136
livestock
departmen
9 brick well Ngar Sin Ward t of 7'*7' 100% 558 16.78507 96.11348
livestock
departmen
10 brick well Ngar Sin Ward t of 7'*7' 100% 559 16.78529 96.11345
livestock
departmen
Roof- Zinc, Wall- Aung Phyo Myat
11 Staff house Ngar Sin Ward t of 100% 560 16.78557 96.11351
Zinc, Floor- Wood Company
livestock
departmen
12 Jetty Ngar Sin Ward t of 100% 561 16.78571 96.11379
livestock

122
Kyimindaing Township

departmen
Roof- Zinc, Wall-
13 generator site Ngar Sin Ward t of 100% 562 16.78573 96.1136
Wood
livestock

Roof- Nipa, Wall -


14 small boat' hut Ngar Sin Ward Nipa, Floor- 10'*16 100% 563 16.78586 96.11348
Bamboo

Roof- Zinc, Wall-


15 U Shwe Htun Ngar Sin Ward Zinc and Bamboo, 14'*40 100% 564 16.78589 96.11345 15'*20'
Floor- Wood

Roof- Nipa, Wall -


16 U Hla Myo Naing Ngar Sin Ward Nipa, Floor- 10'*15' 100% 565 16.78589 96.1134
Bamboo

Roof- Zinc, Wall-


17 U Tin Tin ko Ko Ngar Sin Ward 10'*20' 100% 566 16.78588 96.11338
Zinc, Floor- Wood

Roof- Zinc, Wall-


18 Daw Yin Thein Ngar Sin Ward 20'*10' 80% 567 16.7859 96.11336
Zinc, Floor- Wood

19 U Ya Khaing Gyi Ngar Sin Ward plot 15'*20' 100% 568 16.78591 96.11335

Roof- Zinc, Wall-


20 U Kyaw Win Htun Ngar Sin Ward 10'*20' 50% 569 16.78594 96.11332
Zinc, Floor- Wood

Roof- Zinc, Wall-


21 U Zaw Ko Ko Ngar Sin Ward 40'*70' 40% 570 16.78638 96.11334
Wood, Floor- Wood

Roof- Zinc, Wall-


22 U Sein Win Ngar Sin Ward 40'*60' 50% 571 16.78645 96.11332
Wood, Floor- Wood

Roof- Zinc, Wall-


23 Daw Kyin Yone Ngar Sin Ward 40'*60' 70% 572 16.78651 96.11333
Wood, Floor- Wood

Roof- Zinc, Wall-


24 U Tin Ko Lin Ngar Sin Ward 12'*25' 100% 573 16.78656 96.11345
Zinc, Floor- Wood

123
Kyimindaing Township

Roof- Zinc, Wall-


25 Daw Aye Aye Han Ngar Sin Ward 20'*50' 90% 574 16.78665 96.11336
Wood, Floor- Wood

Roof-Zinc, Wall-
26 U Kyaw Kyaw Ngar Sin Ward Stone Slab, Floor- 10'*70' 100% 575 16.7867 96.11332
Wood

Roof- Zinc, Wall-


27 Daw Myint Myint Ngar Sin Ward 25'*30' 100% 576 16.78671 96.11338
Wood, Floor- Wood

28 Daw Myint Myint Ngar Sin Ward Shop 5'*10' 100% 577 16.78674 96.11331

Roof- Zinc, Wall-


29 U Soe Myint Ngar Sin Ward 20'*70' 100% 578 16.78677 96.11335
Wood, Floor- Wood

Roof- Zinc, Wall-


30 U Nyein Maung Ngar Sin Ward 28'* 70' 100% 579 16.78682 96.11332
Wood, Floor- Wood

Roof- Zinc, Wall-


31 U Soe Min Zaw Ngar Sin Ward 10'*15 100% 580 16.78661 96.11355
Zinc, Floor- Wood

Roof- Zinc, Wall-


32 U Khin Zaw Ngar Sin Ward 15'*20 100% 581 16.78668 96.11352
Zinc, Floor- Wood

33 Petrol store Ngar Sin Ward Floor - wood 20'*15' 100% 582 16.78672 96.11351

Roof- Zinc, Wall-


34 U Aung Min Ngar Sin Ward 25'*40' 100% 583 16.78675 96.11352
Wood, Floor- Wood

U Myo Chit Roof- Zinc, Wall-


35 Ngar Sin Ward 20'*18' 100% 584 16.78679 96.11355
Maung Zinc, Floor- Wood

Roof- Zinc, Wall-


36 Ma Nwe Nwe Win Ngar Sin Ward 15'*18' 100% 585 16.78685 96.11353
Zinc, Floor- Wood

Roof- Zinc, Wall-


37 U Htun Wai Ngar Sin Ward 18'*16' 100% 586 16.78684 96.11348
Zinc, Floor- Wood

124
Kyimindaing Township

Roof- Zinc, Wall-


38 Ma Tin Tin New Ngar Sin Ward 20'*40' 100% 587 16.7869 96.11339
Wood, Floor- Wood

Roof- Zinc, Wall-


39 U Soe Lwin Ngar Sin Ward 10'*40' 100% 588 16.78693 96.11337
Nipa, Floor- Wood

Roof- Zinc, Wall-


40 U Mya Win Ngar Sin Ward 20'*40' 100% 589 16.78695 96.11334
Zinc, Floor- Wood

Aung Taw Mu
41 Ngar Sin Ward 5% 590 16.78697 96.1133
Pagoda

Roof- Zinc, Wall- Tenant-U Zaw


42 U Min Zaw Oo Ngar Sin Ward 12'*30' 100% 591 16.78701 96.11339
Wood, Floor- Wood Lwin Oo

Roof- Zinc, Wall-


43 Daw Yi Sein Ngar Sin Ward 50'*20' 100% 592 16.78704 96.1134
Wood, Floor- Wood

U Aung Than Roof- Zinc, Wall-


44 Ngar Sin Ward 12'*50' 100% 593 16.78707 96.11342
Htike Wood, Floor- Wood

Roof- Zinc, Wall-


45 U Nyunt Shwe Ngar Sin Ward 14'*18' 95% 594 16.78705 96.11332 Shop
Wood, Floor- Wood

Roof- Zinc, Wall-


46 U Thein Han Ngar Sin Ward 17'*21 100% 595 16.7871 96.11333
Wood, Floor- Wood

Roof- Zinc, Wall-


47 U Ye Htun Ngar Sin Ward 11'*60' 100% 596 16.78709 96.1134
Wood, Floor- Wood

48 Water gate Ngar Sin Ward Roof-Zinc 100% 597 16.7871 96.11355

Roof- Zinc, Wall-


49 U Sein Hla Htay Ngar Sin Ward 17'*60' 100% 598 16.78713 96.11343
Wood, Floor- Wood

Roof- Zinc, Wall-


50 Ma Thri Ko Ko Ngar Sin Ward 20'*60' 100% 600 16.78718 96.1134
Wood, Floor- Wood

Roof- Zinc, Wall-


51 U Win Htoo Ngar Sin Ward 20'*40' 100% 599 16.78715 96.11334
Wood, Floor- Wood

125
Kyimindaing Township

Roof- Zinc, Wall-


52 U San Htwe Ngar Sin Ward 20'*40' 50% 601 16.78718 96.1134
Wood, Floor- Wood

Roof-Zinc, Wall-
53 Ma Nan Aye Lin Ngar Sin Ward Stone Slab, Floor- 12'*30' 20% 602 16.78715 96.11329
Wood

Daw Than Than Roof- Zinc, Wall-


54 Ngar Sin Ward 10'*12' 100% 604 16.78723 96.11331
Aye Zinc, Floor- Wood

Roof- Zinc, Wall-


55 Daw Shwe Ngar Sin Ward Bamboo, Floor- 10'*8' 100% 603 16.78723 96.11333
Wood

56 U Than Lwin Ngar Sin Ward plot 15'*100' 40% 605 16.78726 96.1133

Roof- Zinc, Wall-


57 U Myint Soe Ngar Sin Ward 15'*40' 100% 606 16.78722 96.11342
Wood, Floor- Wood

58 U Myo Lwin Ngar Sin Ward plot 20'*100' 40% 607 16.78727 96.11333

Roof- Zinc, Wall-


59 U Myo Min Htike Ngar Sin Ward 15'*40' 100% 609 16.78728 96.11339
Wood, Floor- Wood

Roof- Zinc, Wall-


60 Daw Than Nwet Ngar Sin Ward 14'*34' 100% 608 16.78731 96.11338
Wood, Floor- Wood

plot-40%
Roof- Zinc, Wall- House-10%
61 U Thant Sin Ngar Sin Ward 15'*100' 610 16.78732 96.11333
Wood, Floor- Wood

62 U Than Naing Ngar Sin Ward Shop 100% 611 16.78734 96.11334

Roof- Zinc, Wall-


63 U Than Naing Ngar Sin Ward 10% 612 16.78735 96.1133
Wood, Floor- Wood

Roof-Zinc, Wall-
64 U Zaw Lin Ngar Sin Ward Stone Slab, Floor- 15'*50' 100% 613 16.78734 96.11341
Wood

126
Kyimindaing Township

Roof- Zinc, Wall-


65 Daw Win Tin 614 16.78737 96.11341
Zinc, Floor- Wood

Roof- Zinc, Wall-


66 U Aung Myint 615 16.78737 96.11333
Brick,Floor- Brick

Roof- Zinc, Wall-


67 U Zaw Oo 614 16.78738 96.11329
Zinc, Floor- Wood

Roof- Zinc, Wall-


68 U Kyaw Zin Thant 617 16.78741 96.11332
Brick,Floor- Brick

U Day War Min


69 plot 618 16.78744 96.11332
Khin
70 veteran plot 619 16.78752 96.11333

Roof-Zinc, Wall-
71 U Han Htun Stone Slab, Floor- 620 16.78765 96.11336
Wood

72 Pond 621 16.78761 96.11329

73 U Soe Thura U Mya Ward Zinc, Dani,Wood 42'x44' 622 16.78768 96.11332

74 U San Aung U Mya Ward Zinc,Zinc,Wood 21'x23' 60% 623 16.78776 96.11332

75 U Hla Aung U Mya Ward Zinc,Wood,Wood 15'x34' 100% 625 16.78786 96.11335

76 U Mya Than U Mya Ward Zinc,Zinc,Wood 37'x34' 100% 627 16.78787 96.11344

77 U Kyaw Zin Htet U Mya Ward plot 20'x20' 100% 628 16.7879 96.11342

78 U Than Chaung U Mya Ward plot 20'x20' 100% 629 16.7879 96.1134

79 U Than Toe Aung U Mya Ward Zinc,Zinc,Wood 12'x16' 100% 630 16.78789 96.11335

80 Ma Yin Aye U Mya Ward Zinc,Bamboo,Wood 16'x23' 100% 631 16.7879 96.1133

Ma Khet Khet
81 Ma San Thi U Mya Ward Zinc,Zinc,Wood 10'x20' 100% 632 16.78794 96.11335
Naing(Rent)

82 Ma Su Su Mar U Mya Ward Zinc,Zinc,Wood 10'x20' 100% 633 16.78801 96.11331

83 U Aung Ko Myat U Mya Ward Zinc,Zinc,Wood 15'x12' 100% 634 16.78796 96.11331

127
Kyimindaing Township

84 U Myo Myint U Mya Ward Zinc,Zinc,Wood 13'x12' 100% 635 16.78797 96.11335

85 Ma Cho Zin Thein U Mya Ward Zinc,Zinc,Wood 12'x15' 100% 636 16.78798 96.11341

86 Mg Ko Ko Latt U Mya Ward Zinc, Dani,Wood 12'x15' 100% 637 16.78793 96.11339

87 U Thet Naing U Mya Ward Zinc,Zinc,Wood 12'x20' 100% 639 16.78802 96.11339
Ma Thaw Thaw
88 U Mya Ward Zinc,Zinc,Wood 12'x20' 100% 638 16.78799 96.11337
Aung
89 U Zayar Min U Mya Ward Zinc,Zinc,Wood 13'x20' 100% 640 16.78802 96.11339

90 U Aung Myint U Mya Ward Zinc,Zinc,Wood 13'x25' 100% 641 16.78804 96.11339

Zinc,Stone
91 Daw San Thi U Mya Ward 20'x40' 100% 642 16.78804 96.1134
Slab,Wood

Daw Than Than


92 U Mya Ward Zinc,Zinc,Wood 17'x25' 100% 643 16.78812 96.11337
Shwe

U Aung Soe U San Shwe


93 U Mya Ward Zinc,Zinc,Wood 15'x40' 100% 644 16.78815 96.11335
Hlaing Myint(Owner)

94 U San Shwe Myint U Mya Ward Zinc,Zinc,Wood 17'x25' 100% 645 16.78811 96.11333

95 Daw Than Nyunt U Mya Ward Zinc,Zinc,Wood 15'x40' 100% 646 16.7882 96.11336

Zinc,Stone
96 U Than Soe U Mya Ward 15'x45' 100% 647 16.78817 96.11331
Slab,Wood

97 Daw San Oo U Mya Ward Zinc,Zinc,Wood 17'x40' 100% 648 16.78814 96.1133

98 U Min Aung U Mya Ward Zinc,Zinc,Wood 10'x40' 100% 649 16.78828 96.11336

99 agriculture land U Mya Ward Zinc 100% 650 16.78831 96.11342

Zinc,Stone
100 Ma Chit Su U Mya Ward 10'x40' 100% 651 16.78828 96.11332
Slab,Wood

101 Pool U Mya Ward 10'x15' 100% 652 16.78837 96.11343


Daw Myo Pa Pa
102 U Mya Ward Zinc,Zinc,Wood 10'x40' 100% 653 16.78837 96.11339
Soe
Daw Thaw Thaw
103 U Mya Ward Zinc,Zinc,Wood 10'x40' 100% 654 16.78837 96.11338
Aung
104 U Soe Myint U Mya Ward Zinc,Zinc,Wood 15'x40' 100% 655 16.78839 96.11335

128
Kyimindaing Township

105 U Zaw Lwin U Mya Ward Zinc,Zinc,Wood 17'x30' 50% 656 16.78831 96.11331

106 small boat' hut U Mya Ward Zinc,Zinc,Wood 10'x30' 40% 657 16.78838 96.1133 2 layers

107 small jetty U Mya Ward Zinc,Zinc 20'x20' 100% 658 16.78856 96.11345

108 U Kyaw Swar Moe U Mya Ward Zinc,Zinc,Wood 20'x40' 100% 659 16.78857 96.11339

109 Daw Pain Thae U Mya Ward Zinc,Zinc,Wood 20'x40' 100% 660 16.78857 96.11335

110 Ko Than Win U Mya Ward Zinc,Wood,Wood 20'x50' 100% 661 16.78861 96.11334

111 Ma Hla Mying U Mya Ward Petrol Shop 5'x5' 100% 662 16.7886 96.1134

112 U Zin Bo U Mya Ward plot 17'x30' 100% 663 16.78882 96.11342
Daw Shwe
113 U Zaw Htet U Mya Ward Zinc,Zinc,Wood 13'x30' 100% 664 16.7888 96.11338
Mi(Rent)
114 U Lin Aung U Mya Ward Zinc,Zinc,Wood 17'x40' 100% 665 16.78886 96.1134
Daw Shwe
115 U Soe Min Htet U Mya Ward Zinc,Zinc,Wood 17'x30' 100% 666 16.78881 96.11333
Mi(Rent)
116 U Mya Zaw Htet U Mya Ward Zinc,Zinc,Wood 17'x50' 100% 667 16.78888 96.11335

117 Daw Thae Thae U Mya Ward Zinc,Wood,Wood 20'x40' 10% 668 16.78887 96.11332

118 Daw San Oo U Mya Ward Zinc,Dani,Wood 20'x50' 10% 669 16.78889 96.11332

119 U Hein Min Latt U Mya Ward plot 17'x40' 100% 670 16.78911 96.11348

120 U Aung Thu U Mya Ward Zinc,Wood,Wood 10'x10' 100% 671 16.78904 96.11342 2 layers
U Ohn
121 U Hla Tun U Mya Ward Zinc,Dani,Wood 12'x15' 100% 672 16.78911 96.11342
Khaing(Rent)
122 Daw Rakhine Ma U Mya Ward Zinc,Dani,Wood 10'x15' 100% 673 16.78913 96.1134

123 U San Shwe Myint U Mya Ward Zinc,Dani,Wood 10'x40' 100% 674 16.78903 96.11337

124 U Htun Win Kyaw U Mya Ward Zinc,Dani,Wood 6'x15' 100% 675 16.78904 96.11335 2 layers

125 U San Shwe Myint U Mya Ward Zinc,Wood,Wood 10'x40' 100% 676 16.7891 96.11336

126 Ma Khin Thet Wai U Mya Ward Dani,Dani,Wood 10'x40' 100% 677 16.78918 96.11334

127 U Myat Han U Mya Ward Zinc,Dani,Wood 50% 678 16.78916 96.11334
U Paing
128 U Win Htut U Mya Ward Zinc,Dani,Wood 10'x40' 100% 679 16.78908 96.11333
Paing(Rent)
129 U Than Hlaing U Mya Ward Zinc,Zinc,Wood 17'x20' 100% 680 16.78925 96.11343

129
Kyimindaing Township

U Zaw
130 U Than Hlaing U Mya Ward Zinc,Dani,Wood 15'x20' 100% 681 16.78926 96.1134
Naing(Rent)
131 U Aye Kyaw U Mya Ward plot 20'x40' 100% 683 16.78932 96.11341

132 U Soe Paing U Mya Ward plot 20'x40' 100% 682 16.78931 96.11343

133 Daw Zin Mar Aye U Mya Ward Zinc,Dani,Wood 10'x22' 100% 684 16.78931 96.1134

134 U Tin Oo U Mya Ward Zinc,Dani,Wood 10'x22' 100% 685 16.7893 96.11337

Zinc,Stone
135 U Soe Soe U Mya Ward 22'x23' 100% 686 16.78931 96.11334
Slab,Wood

Daw Myint Myint


136 U Mya Ward Zinc,Zinc,Wood 10'x22' 100% 687 16.78927 96.11335
Than
137 Ma Thida U Mya Ward plot 12'x20' 100% 688 16.78937 96.11344

138 Ma Yin Aye U Mya Ward plot 12'x20' 100% 689 16.78938 96.11341

139 Ma Khin Mar Win U Mya Ward plot 12'x20' 100% 690 16.78947 96.11345

140 Ko Ye Naing U Mya Ward plot 12'x20' 100% 691 16.78947 96.11342
Ko Pyae Phyo
141 U Mya Ward 12'x20' 100% 692 16.78949 96.11342
Chan Thar plot
Ko Saw Hla Ye
142 U Mya Ward 12'x20' 60% 693 16.78959 96.11337
Myint plot
143 Ma Phyu Lay U Mya Ward Zinc,Zinc,Wood 12'x20' 100% 694 16.78941 96.11337

144 Ko Ye Win U Mya Ward Zinc,Dani,Wood 12'x20' 100% 695 16.78942 96.11335

145 U Aung Htwe Seik Gyi Ward Zinc,Zinc,Wood 17'x30' 100% 696 16.78977 96.11352

146 Ma Kay Zin Seik Gyi Ward Zinc,Bamboo,Wood 12'x15' 100% 697 16.78973 96.11353

147 Daw Yin Thaung Seik Gyi Ward Zinc,Zinc,Wood 15'x30 100% 698 16.7899 96.11349

148 U Ko Ko Maung Seik Gyi Ward Zinc,Zinc,Wood 15'x15' 100% 699 16.78994 96.1135

149 U Khin Hlaing Seik Gyi Ward Zinc,Zinc,Wood 20'x40' 100% 700 16.78977 96.11348

150 Daw Aye Myint Seik Gyi Ward Zinc,Dani,Wood 10'x30' 100% 701 16.78986 96.11346

151 Daw Aye Myint Seik Gyi Ward 20'x40' 100% 702 16.78981 96.11348
plot

130
Kyimindaing Township

152 Seik Gyi Ward 100% 703 16.78979 96.11342


U Aun Aung Htike Zinc, Wood, Wood 15'*45'
153 Seik Gyi Ward 100% 704 16.78981 96.11341
Daw San Nyein plot 10'*45'
154 Seik Gyi Ward 100% 705 16.78984 96.11344
U Nyan Htun plot 20'*15'
155 U Aung Aung Seik Gyi Ward 100% 706 16.78987 96.11342
Myo Zinc, Wood, Wood 20'*40*
156 Seik Gyi Ward 707 16.78974 96.11338
U Myint Thaung Zinc, Wood, Wood 17'*20' 80%
157 Seik Gyi Ward 708 16.78967 96.11337
U Kyaw Min Oo Zinc, Nipa, Bamboo 12'*15' 80%
158 Seik Gyi Ward 709 16.78984 96.11337
U Htun Lwin Zinc, Wood, Wood 21'*30' 5%
159 Seik Gyi Ward 710 16.78987 96.11339
U Tint Lwin Oo Zinc, Wood, Wood 10'*10' 50%
Roof-Zinc, Wall-
160 Seik Gyi Ward Bamboo, Floor- 711 16.79015 96.11356
U MyoThein Oo Wood 20'*25' 100%
161 spirit house Seik Gyi Ward Brick 3'*3' 100% 712 16.79021 96.11359

162 Daw Khin Kyi Seik Gyi Ward plot 15'*17' 713 16.79025 96.11364

163 Daw Mya Nwal Seik Gyi Ward plot 15'*17' 714 16.79027 96.11363
Roof-Zinc, Wall-
164 U Khin Maung Seik Gyi Ward plastic, Floor- 715 16.79026 96.11358
Kyaw Bamboo 10'*15'
U Saw Ye Hla Roof-Zinc, Wall-
165 Seik Gyi Ward 716 16.79022 96.11355
Myint Wood, Floor-Wood 20'*50'
Roof- Nipa, Wall -
166 Seik Gyi Ward 717 16.79027 96.11356
U Soe Htay Nipa, Floor- Wood 10'*15'
Roof-Zinc, Wall-
167 Seik Gyi Ward 718 16.79007 96.11349
U Hnin Ngwe Wood, Floor-Wood 15'*25'
Daaw Khin May Roof-Zinc, Wall-
168 Seik Gyi Ward 719 16.79009 96.11348
Yin Zinc, Floor-Wood 10'*12' 100%
Roof-Zinc, Wall-
169 Seik Gyi Ward 720 16.79015 96.11349
U Myint Lwin Wood, Floor-Wood 20'*60' 100%
Roof-Zinc, Wall-
170 Seik Gyi Ward 721 16.7902 96.11341
U Kyaw Nyein plastic, Floor- Wood 12'*15' 100%
Roof-Zinc, Wall-
171 Seik Gyi Ward Stone Slab, Floor- 722 16.79025 96.11348
U Kyaw Ngwe Wood 20'*40' 100%
Roof- Zinc, Wall-
172 Seik Gyi Ward 723 16.79037 96.11351
U Kyaw Kyaw Zinc, Floor- Wood 15'*30' 100%

131
Kyimindaing Township

Roof- Zinc, Wall-


173 Seik Gyi Ward 724 16.79029 96.11353
U Than Aung Zinc, Floor- Wood 15'*25' 100%
Roof-Zinc, Wall-
174 Seik Gyi Ward 725 16.79029 96.11349
Daw Aye Than Wood, Floor-Wood 20'*35' 100%
Roof-Zinc, Wall-
175 Seik Gyi Ward 726 16.7903 96.11344
U Htun Lin Wood, Floor-Wood 10'*50' 95% 2 layers
Roof-Zinc, Wall-
176 Seik Gyi Ward 727 16.79025 96.11339
Daw San San Wood, Floor-Wood 40'*6'0 5% 2 layers
Roof-Zinc, Wall-
177 Seik Gyi Ward 728 16.79039 96.1134
U Aye Shwe Wood, Floor-Wood 15'*45' 80% 2 layers
Roof- Zinc, Wall-
178 Seik Gyi Ward 729 16.7905 96.1135
U Zay Yar Lin Zinc, Floor- Wood 10'*20' 100%
Roof- Zinc, Wall-
179 Seik Gyi Ward 730 16.79053 96.1135
U Kyaw Thu Win Zinc, Floor- Wood 10'*20' 100%
Roof- Zinc, Wall-
180 Seik Gyi Ward 16.7907 96.11355
U Than Myint Lay Zinc, Floor- Wood 20'*25' 100% 732
Roof- Zinc, Wall-
181 Seik Gyi Ward 16.79056 96.1135
U Htun Win Zinc, Floor- Wood 20'*40' 100% 731
182 U Phoe Tin Seik Gyi Ward plot 15'*15' 100% 733 16.79063 96.11351
Roof-Zinc, Wall-
183 Seik Gyi Ward Stone Slab, Floor- 16.79066 96.11349
U Htun Htun Hla Wood 15'*15' 100% 734
Roof- Zinc, Wall-
184 Seik Gyi Ward 16.79068 96.1135
Daw Tin Tin Hla Zinc, Floor- Wood 10'*10' 100% 735
Roof- Zinc, Wall-
185 Seik Gyi Ward 16.7907 96.11351
U Ba Thein Zinc, Floor- Wood 10'*20' 100% 736
Roof- Zinc, Wall -
186 Seik Gyi Ward 16.79074 96.11346
U Myint Aye Nipa, Floor- Wood 15'*25' 100% 737
Roof- Zinc, Wall -
187 Seik Gyi Ward 16.79072 96.11346
U Aung Min Oo Nipa, Floor- Wood 15'*15' 100% 738
Roof- Zinc, Wall-
188 Seik Gyi Ward 16.79074 96.11349
U Soe Thu Myint Zinc, Floor- Wood 15'*15' 100% 739
Roof- Zinc, Wall-
189 Seik Gyi Ward 16.79066 96.11346
U Si Thu Zinc, Floor- Wood 10'*17' 100% 740
Roof-Zinc, Wall-
190 Seik Gyi Ward 16.79054 96.11343
U Htun Htun Lwin Wood, Floor-Wood 15'*20' 100% 741
Roof-Zinc, Wall-
191 Seik Gyi Ward 16.7906 96.11342
U Shein Htun Wood, Floor-Wood 15'*20' 100% 742
Roof-Zinc, Wall-
192 Seik Gyi Ward 16.79065 96.11342
Daw Htun Kyi Wood, Floor-Wood 17'*35' 50% 743
Roof-Zinc, Wall-
193 Seik Gyi Ward 16.79073 96.11342
U Sein Hla Wood, Floor-Wood 20'*60' 50% 744
Roof-Zinc, Wall-
194 Seik Gyi Ward 16.79068 96.11342
U Wai Lwin Wood, Floor-Wood 15'*15 50% 745
Roof- Zinc, Wall-
195 Seik Gyi Ward 16.79077 96.11354
U Win Thiha Zinc, Floor- Wood 12'*15' 100% 746

132
Kyimindaing Township

Roof- Zinc, Wall- Tenant-Ma Zin


196 Seik Gyi Ward 16.79078 96.11354
U Aung Kyaw Zinc, Floor- Wood 17'*15' 100% 747 Mar Aung
Roof- Zinc, Wall-
197 Seik Gyi Ward 16.7908 96.11349
U Thein Tan Zinc, Floor- Wood 20'*40' 100% 748
198 U Nay Htun Seik Gyi Ward plot 20'*40' 100% 749 16.79087 96.11353
Roof- Zinc, Wall-
199 Seik Gyi Ward 16.79089 96.11346
U Thein Zaw Zinc, Floor- Wood 15'*20' 100% 750
Roof- Nipa, Wall-
200 Seik Gyi Ward 16.79114 96.11349
U Kyaw Win Nipa, Floor- Wood 15'*15' 100% 751
Roof- Nipa, Wall-
201 Seik Gyi Ward 16.79118 96.1135
U Theun Zaw Nipa, Floor- Wood 15'*15' 100% 752
Roof- Zinc, Wall-
202 Seik Gyi Ward 16.7912 96.11356
U Zaw Lwin Oo Zinc, Floor- Wood 15'*30' 100% 754
Roof- Zinc, Wall-
203 Seik Gyi Ward 16.79116 96.11356
U Aung Kyaw Oo Zinc, Floor- Wood 10'*15' 100% 755
204 livestock farm Seik Gyi Ward 10'*10' 100% 753 16.79121 96.11353
Roof- Zinc, Wall-
205 Seik Gyi Ward 16.79112 96.11356
U Zaw Zaw Aung Zinc, Floor- Wood 15'*25' 100% 756
Daw Myint Myint Roof- Zinc, Wall-
206 Seik Gyi Ward 16.791 96.11358
Than Zinc, Floor- Wood 15'*20' 100% 757
Roof- Zinc, Wall-
207 Seik Gyi Ward 16.79103 96.11359
Daw Mar Mar Win Zinc, Floor- Wood 15'*20' 100% 758
Daw Myint Myint Roof- Zinc, Wall-
208 Seik Gyi Ward 16.79099 96.11356
Khaing Zinc, Floor- Wood 10'*20' 100% 759
Roof-Zinc, Wall-
209 Seik Gyi Ward 16.79103 96.11355
Daw Ma Toe Nipa, Floor-Wood 12'*15' 100% 760
Roof- Nipa, Wall-
210 Seik Gyi Ward Nipa, Floor- 16.79096 96.11353
Ko Aung Zin Bamboo 15'*15' 100% 761
Roof- Nipa, Wall-
211 Seik Gyi Ward Nipa, Floor- 16.79102 96.1135
Daw Kyin Sein Bamboo 10'*15' 100% 762
Roof-Zinc, Wall-
212 Seik Gyi Ward 16.79104 96.11351
U Kyaw Soe Wood, Floor-Wood 12'*30' 100% 763 2 layers
Roof- Zinc, Wall-
213 Seik Gyi Ward 16.791 96.1135
U Myat Thu Aung Zinc, Floor- Wood 15'*10' 100% 764
Roof- Zinc, Wall-
214 Seik Gyi Ward 16.79094 96.11349
U Tin Win Zinc, Floor- Wood 20'*40' 100% 765
Roof- Zinc, Wall-
215 Seik Gyi Ward Bamboo, Floor- 16.79102 96.11348
U Kyaw Win Wood 15'*20' 100% 766
Roof- Zinc, Wall-
216 Seik Gyi Ward Bamboo, Floor- 16.79102 96.11344
Daw Amar Si Wood 20'*35' 50% 768

133
Kyimindaing Township

Roof- Zinc, Wall-


217 Seik Gyi Ward 16.79115 96.11345
U Aung Myat Zinc, Floor- Wood 15'*25' 40% 769
Daw Nyunt Nyunt Roof-Zinc, Wall-
218 Seik Gyi Ward 16.79116 96.11341
Tin Wood, Floor-Wood 25'*15' 770
Roof- Zinc, Wall-
219 Seik Gyi Ward 16.79114 96.11341
Daw Kyi Kyi Moe Zinc, Floor- Wood 16'*35' 771
Roof- Zinc, Wall-
220 Seik Gyi Ward Bamboo, Floor- 16.79112 96.11341
U Thurain Htun Wood 15'*15' 772
221 Daw Than Aye Seik Gyi Ward Shop 18' 773 16.79131 96.11358

222 livestock farm Seik Gyi Ward Roof-Zinc 774 16.79124 96.11354
Roof-Zinc, Wall-
223 Seik Gyi Ward Nipa, Floor- 16.79128 96.11357
U Myo Thu Bamboo 8'*10' 100% 775
Roof-Zinc, Wall-
224 Seik Gyi Ward 16.7913 96.11353
Daw Than Aye Wood, Floor-Wood 18'*30 100% 776
Roof-Zinc, Wall-
225 Seik Gyi Ward 16.79134 96.1136
U Zaw Lat Wood, Floor-Wood 12'*30' 100% 777
Roof-Zinc, Wall-
226 Seik Gyi Ward 16.79139 96.11359
Daw Khin Sein Wood, Floor-Wood 20'*30' 100% 778
227 Daw Khin Sein Seik Gyi Ward Shop 15'*10' 100% 779 16.79144 96.11357

228 U Cho Oo Seik Gyi Ward Shop 15'*10' 100% 780 16.79146 96.11353
Roof-Zinc, Wall-
229 Seik Gyi Ward 16.79142 96.11353
U Cho Oo Wood, Floor-Wood 17'*45' 100% 781 2 layers
Roof-Zinc, Wall-
230 Seik Gyi Ward 16.79134 96.11348
U Yan Naing Shin Wood, Floor-Wood 20'*30' 100% 782
Roof- Zinc, Wall-
231 Seik Gyi Ward 16.79145 96.11347
Daw Ni Zinc, Floor- Wood 10'*15' 5% 783
Roof- Zinc, Wall-
232 Seik Gyi Ward 16.79153 96.11348
Daw Hla Hla Win Zinc, Floor- Wood 15'*25' 100% 784
Roof-Zinc, Wall-
233 Seik Gyi Ward 16.79158 96.11348
Daw Sein Mya Wood, Floor-Wood 10'*15 100% 785
Roof-Zinc, Wall-
234 Seik Gyi Ward 16.79154 96.11352
U Hla Ngwe Wood, Floor-Wood 16'*20' 100% 786
Roof- Nipa, Wall-
235 Seik Gyi Ward Nipa, Floor- 16.79153 96.11355
U Aung Ngwe Bamboo 10'*10' 100% 787
Roof- Nipa, Wall-
236 Seik Gyi Ward Bamboo, Floor- 16.79153 96.1136
U Nyi Nyi Htwe Bamboo 10'*10' 100% 788
Drinking water
237 Seik Gyi Ward 16.79151 96.11363
pond Roof- Zinc, Brick 10'*20' 100% 790
238 Daw Lae Lae Win Seik Gyi Ward Shop 10'*10 100% 789 16.79148 96.11361

134
Kyimindaing Township

Roof-Zinc, Wall-
239 Seik Gyi Ward 16.79158 96.11364
U Aung Min Htun Wood, Floor-Wood 15'*20' 100% 792
240 access road Seik Gyi Ward Concrete 5'*120' 100% 791 16.79155 96.11364
Roof- Zinc, Wall-
241 Seik Gyi Ward 16.79162 96.11365
Daw Kyin Hlaing Zinc, Floor- Wood 13'*18' 100% 793
U Kyaw Win Roof- Zinc, Wall-
242 Seik Gyi Ward 16.79164 96.11364
Maung Zinc, Floor- Wood 10'*10' 100% 794
Roof- Zinc, Wall-
243 Seik Gyi Ward 16.79164 96.11361
U Hla Myint Plastic, Floor-Wood 12'*15' 100% 795
Roof-Zinc, Wall-
244 Seik Gyi Ward 16.79163 96.1136
U Tin Shwe(1) Wood, Floor-Wood 20'825' 100% 796
Roof- Zinc, Wall-
245 Seik Gyi Ward 16.79165 96.11357
U Tin Shwe(2) Zinc, Floor- Wood 10'*25' 100% 797
Roof- Zinc, Wall-
246 Seik Gyi Ward 16.79163 96.11353
U Htun Oo Zinc, Floor- Wood 15'*30' 100% 798
Roof-Zinc, Wall-
247 Seik Gyi Ward 16.79164 96.11348
U Aung Min Htun Wood, Floor-Wood 17'*25' 100% 799 2 layers
Roof-Zinc, Wall-
248 Seik Gyi Ward 16.79164 96.11346
U Min Min Htun Wood, Floor-Wood 12'*20' 10% 800
Roof- Nipa, Wall-
249 Daw Khin Mar Seik Gyi Ward Nipa,Floor- 16.7917 96.11347
Win Bamboo 13'*15' 50% 801
representative of Roof.Zinc, Wall-
250 Seik Gyi Ward 16.79173 96.11348
owner Wood 13'*20' 70% 802
Roof-Zinc, Wall-
251 Seik Gyi Ward 16.79171 96.11352
U Shwe Lin Wood, Floor-Wood 20'*30' 100% 803
Roof-Zinc, Wall-
252 Seik Gyi Ward 16.7917 96.11356
U Kyaw Soe Moe Wood, Floor-Wood 20'*30' 100% 804
Roof- Nipa, Wall-
253 Seik Gyi Ward Bamboo, Floor- 16.79167 96.11367
communal Bamboo 5'*5' 100% 805
254 U Chit Ko Seik Gyi Ward plot 20'*40' 100% 806 16.79168 96.11365

255 U Thae Maung Seik Gyi Ward plot 20'*40' 100% 807 16.79172 96.11366
Roof- Nipa, Wall-
256 Seik Gyi Ward 16.79175 96.11362
U San Maung Oo Zinc, Floor-Bamboo 12'*30' 100% 808
Roof- Zinc, Wall-
257 Seik Gyi Ward 16.79178 96.11363
U Zaw Zaw Lwin Zinc, Floor- Wood 15'*20' 100% 809
258 U Kyaw Htwe Seik Gyi Ward plot 10'*15' 100% 810 16.79181 96.11361
Roof- Zinc, Wall-
259 Seik Gyi Ward 16.79181 96.11358
U Naing Win Soe Zinc, Floor- Wood 10'*15' 100% 811
Roof- Nipa, Wall-
260 Daw Than Than Seik Gyi Ward Nipa,Floor- 16.79175 96.11358
Htwe Bamboo 10'*15' 100% 812

135
Kyimindaing Township

Roof-Zinc, Wall-
261 Seik Gyi Ward 16.79176 96.11354
U That Naing Wood, Floor-Wood 15'*17' 100% 813
Roof-Zinc, Wall-
262 Seik Gyi Ward 16.79176 96.1135
U Htun Lin Oo Wood, Floor-Wood 16'*18' 100% 814
Roof- Zinc, Wall-
263 Seik Gyi Ward Zinc, Floor- 16.79177 96.11347
Daw That Mar Bamboo 13'*15' 100% 815
Roof- Zinc, Wall-
264 Seik Gyi Ward 16.79181 96.11351
Daw Bu To Nipa, Floor- Wood 13'*18' 100% 816
265 Daw Cho Khaing Seik Gyi Ward plot 10'*15' 100% 818 16.79184 96.11356
Roof- Zinc, Wall-
266 Seik Gyi Ward 16.79186 96.11357
U Aung Htay Zinc, Floor- Wood 12'*15 100% 817
Roof- Zinc, Wall-
267 Seik Gyi Ward 16.7919 96.11357
U San Shwe Nipa, Floor- Wood 10'*15' 100% 819
Roof- Zinc, Wall-
268 Seik Gyi Ward Nipa,Floor- 16.79192 96.11357
Daw Ei Tha Zin Bamboo 10'*15' 100% 820
Roof- Zinc, Wall-
269 Seik Gyi Ward Bamboo, Floor- 16.79194 96.11353
U Thaw Oo Myint Bamboo 12'*17' 100% 821
Roof-Zinc, Wall- Tenant- U Htun
270 Seik Gyi Ward 16.79192 96.1135
U Yan Naing Lin Wood, Floor-Wood 15'*20' 100% 822 Ko
Roof- Zinc, Wall-
271 Seik Gyi Ward 16.79196 96.11347
U Htwar Mar Zinc, Floor- Wood 15'*20' 100% 823
Roof- Zinc, Wall-
272 Daw Htay Htay Seik Gyi Ward Zinc, Floor- 16.79197 96.1135
Myint Bamboo 15'*20' 100% 824
Roof- Zinc, Wall-
273 Seik Gyi Ward 16.79202 96.11352
U Win Soe Zinc, Floor- Wood 16'*15' 100% 825
Roof- Zinc, Wall-
274 Seik Gyi Ward 16.79198 96.11353
U Nyunt Wai Zinc, Floor- Wood 15'*25' 100% 826
Roof- Nipa, Wall-
275 U Naing Naing Seik Gyi Ward Bamboo,Floor- 16.79198 96.11356
Aung Bamboo 10'*10' 100% 827
276 U Si Thu Seik Gyi Ward plot 10'*10' 100% 829 16.792 96.11363
Roof- Zinc, Wall-
277 Seik Gyi Ward Zinc, Floor- 16.79197 96.11359
U Tin Aung Win Bamboo 10'*10' 100% 830
Roof- Zinc, Wall-
278 Seik Gyi Ward Zinc, Floor- 16.79201 96.11362
U Khaing Sein Bamboo 10'*10' 100% 828
Roof- Zinc, Wall-
279 Seik Gyi Ward Zinc, Floor- 16.79196 96.11362
U Htay Thaung Bamboo 10'*10' 100% 831

136
Kyimindaing Township

Roof- Zinc, Wall-


280 Seik Gyi Ward 16.79203 96.11367
Daw Nyo Zinc, Floor- Wood 17'*20' 100% 832
Roof- Zinc, Wall-
281 Seik Gyi Ward 16.79206 96.11367
U Myint Swe Zinc, Floor- Wood 12'*12' 100% 833
Roof- Nipa, Wall-
282 Seik Gyi Ward 16.79201 96.11359
U Tin Ko Nipa,Floor- Wood 5'*10' 100% 834
Roof- Zinc, Wall-
283 Seik Gyi Ward 16.79205 96.1136
U Ko Phyo Zinc, Floor- Wood 10'*10' 100% 835
Roof-Zinc, Wall-
284 Seik Gyi Ward 16.79211 96.11362
Daw Hla Hla Moe Wood, Floor-Wood 17'*20' 100% 836
Daw Khin Ohn Roof- Zinc, Wall-
285 Seik Gyi Ward 16.79209 96.11364
Myint Zinc, Floor- Wood 5'*10' 100% 837
286 U Than Zaw Htun Seik Gyi Ward plot 10'*15' 100% 838 16.79211 96.11366
Roof- Nipa, Wall-
287 Seik Gyi Ward 16.79215 96.11368
U Aung Moe Zinc, Floor-Wood 12'*15' 100% 839
Roof-Zinc, Wall-
288 Seik Gyi Ward 16.79219 96.11365
access road Wood, Floor-Wood 18'*25' 100% 840
Roof-Zinc, Wall-
289 Seik Gyi Ward 16.79217 96.11362
U Ko Ko Soe Wood, Floor-Wood 13'*18' 100% 841
Roof- Zinc, Wall- Tenant- U Than
290 Seik Gyi Ward 16.79214 96.11356
Daw Aye Than Zinc, Floor- Wood 8'*20' 100% 842 Nyunt
Roof-Zinc, Wall-
291 Seik Gyi Ward 16.79215 96.11354
U Thein Zaw Wood, Floor-Wood 10'*25' 100% 843
Roof- Zinc, Wall-
292 Seik Gyi Ward Nipa, Floor- 16.79219 96.11348
Daw Kyi Aye Bamboo 10'*18' 100% 844
Roof-Zinc, Wall-
293 Seik Gyi Ward 16.79216 96.11348
Daw Tin Aye Wood, Floor-Wood 15'*25' 50% 845
Roof-Zinc, Wall-
294 Seik Gyi Ward 16.79218 96.11347
U Ko Oo Wood, Floor-Wood 16'*30' 50% 846
Roof- Zinc, Wall-
295 Seik Gyi Ward 16.79218 96.11351
U Maung Kan Nipa, Floor- Wood 11'*30' 100% 847
Roof- Zinc, Wall-
296 Seik Gyi Ward 16.79225 96.11351
U Htun Htun Nipa, Floor- Wood 10'*10' 100% 848
Roof- Nipa, Wall-
297 Seik Gyi Ward 16.79207 96.11349
U Paing Chit Zinc, Floor-Wood 10'*15' 100% 849
Roof-Zinc, Wall-
298 Seik Gyi Ward 16.79222 96.11351
Daw Tin Thwal Wood, Floor-Wood 11'*30' 100% 850
Roof-Zinc, Wall-
299 Seik Gyi Ward 16.79226 96.11355
U Zaw Min Htun Wood, Floor-Wood 10'*15' 100% 851
Roof- Nipa, Wall-
300 Seik Gyi Ward 16.79223 96.11353
Daw Ohnmar Myo Zinc, Floor-Wood 10'*20' 100% 852
Roof-Zinc, Wall-
301 Seik Gyi Ward 16.79219 96.11353
U Tin Thaung Wood, Floor-Wood 13'*25' 100% 853
Roof- Zinc, Wall-
302 Seik Gyi Ward 16.79219 96.11356
U Than Zaw Oo Zinc, Floor- Wood 10'*10' 100% 854

137
Kyimindaing Township

Roof- Zinc, Wall-


303 Seik Gyi Ward 16.79222 96.11359
U Kyaw San Win Zinc, Floor- Wood 13'*20' 100% 855
Roof- Nipa, Wall-
304 Seik Gyi Ward 16.79232 96.11359
U Aung Win Soe Nipa,Floor- Wood 10'*15' 100% 856
305 access road Seik Gyi Ward Concrete 5'*800' 100% 857 16.79224 96.11363
Roof-Zinc, Wall-
306 Seik Gyi Ward 16.79233 96.11357
Daw Hla Hla Win Wood, Floor-Wood 16'*20' 100% 858
307 U Htain Lin Seik Gyi Ward plot 15'*20' 100% 859 16.7923 96.1137
Roof- Nipa, Wall-
308 Seik Gyi Ward 16.79232 96.11367
U Myo Aung Nipa,Floor- Wood 15'*15' 100% 860
Roof-Zinc, Wall-
309 Seik Gyi Ward 16.79236 96.1136
U Myint Oo Wood, Floor-Wood 15'*30' 100% 861 2 layers
Roof-Zinc, Wall-
310 Seik Gyi Ward 16.79239 96.1136
U Aung Moe Wood, Floor-Wood 11'*15' 100% 862
311 U Sis To Seik Gyi Ward plot 15'*20' 100% 863 16.79238 96.11364
Drinking water
312 Seik Gyi Ward 16.79243 96.11364
pond Concrete 10'*15' 100% 864
Roof-Zinc, Wall-
313 Seik Gyi Ward 16.79241 96.11359
U Than Aye Wood, Floor-Wood 12'*20' 100% 865
Roof- Zinc, Wall-
314 Seik Gyi Ward 16.79242 96.11357
Daw Khin Hla Nipa,Floor- Wood 10'*20' 100% 866
Roof- Zinc, Wall- Tenant- U Myint
315 Seik Gyi Ward 16.79242 96.11355
Ma Thandar Win Zinc, Floor- Wood 10'*25' 100% 867 Naing
Roof- Zinc, Wall-
316 Seik Gyi Ward 16.79246 96.11352
U Ko Win Zinc, Floor- Wood 12'*12' 100% 869
Roof-Zinc, Wall-
317 Seik Gyi Ward 16.79242 96.11353
Daw Myint Ngwe Wood, Floor-Wood 13'*30' 100% 868
Roof- Zinc, Wall-
318 Seik Gyi Ward Bamboo, Floor- 16.79238 96.11352
U Win Naing Wood 15'*15' 100% 870
Roof- Zinc, Wall-
319 Seik Gyi Ward Bamboo, Floor- 16.79243 96.11349
U Zaw Win Naing Wood 15'*30 60% 871
Roof-Zinc, Wall-
320 Seik Gyi Ward 16.79248 96.11348
U Aung Hla Wood, Floor-Wood 15'*35' 5% 872
Roof-Zinc, Wall-
321 Seik Gyi Ward 16.79247 96.11349
U Htun Min Lat Wood, Floor-Wood 15'*35' 95% 873
Roof- Zinc, Wall-
322 Seik Gyi Ward 16.79249 96.11352
U Win Naing (2) Nipa,Floor- Wood 12'*25' 100% 874
Roof-Zinc, Wall-
323 Seik Gyi Ward 16.79251 96.11354
Saw Jin Me Jet Wood, Floor-Wood 15'*30' 100% 875
Daw Kyu Kyu Roof-Zinc, Wall-
324 Seik Gyi Ward 16.79249 96.11358
Myint Wood, Floor-Wood 15'*30' 100% 876

138
Kyimindaing Township

Roof-Zinc, Wall-
325 Seik Gyi Ward 16.79247 96.11362
U Kyaw Min Soe Wood, Floor-Wood 20'*25' 100% 877
Roof-Zinc, Wall-
326 Seik Gyi Ward 16.79256 96.1136
U Thein Win Wood, Floor-Wood 16'*20' 100% 878 2 layers
Roof-Zinc, Wall-
327 Seik Gyi Ward 16.79255 96.11354
U Aye Min Wood, Floor-Wood 15'*20' 100% 879
Roof-Zinc, Wall-
328 Seik Gyi Ward 16.79255 96.1135
U Ko Ko Zaw Wood, Floor-Wood 15'*15' 100% 880
Roof-Zinc, Wall-
329 Seik Gyi Ward 16.79259 96.11352
Daw Amar Kyi Wood, Floor-Wood 15'*15' 100% 881
Roof- Zinc, Wall-
330 Seik Gyi Ward 16.79264 96.11351
Daw Khin Oo Nipa,Floor- Wood 16'*18' 100% 882
Roof-Zinc, Wall-
331 Seik Gyi Ward 16.79266 96.11352
Daw San Kyin Wood, Floor-Wood 15'*35' 100% 883 884-Delet
Roof-Zinc, Wall-
332 Seik Gyi Ward 16.79271 96.11355
U Than Htay Wood, Floor-Wood 10'*10' 100% 885
333 Daw Thein Khin Seik Gyi Ward plot 10'*10' 100% 887 16.79276 96.11357
Roof-Zinc, Wall-
334 Seik Gyi Ward 16.79274 96.11359
U Nay Lin Oo Wood, Floor-Wood 10'*10' 100% 886
Roof- Zinc, Wall-
335 Daw Hla Hla Seik Gyi Ward Bamboo, Floor- 16.79268 96.11358
Myint Bamboo 10'*10' 100% 888
Roof-Zinc, Wall-
336 Seik Gyi Ward 16.79264 96.11361
U Aung Than Win Wood, Floor-Wood 15'*18' 100% 889
Roof-Zinc, Wall- Tenant- Ko Min
337 Seik Gyi Ward 16.79264 96.11357
U Zaw Ko Ko Wood, Floor-Wood 16'*20' 100% 890 Min
Roof-Zinc, Wall-
338 Seik Gyi Ward 16.79273 96.11361
U Ye Naung Wood, Floor-Wood 15'*20' 100% 891
Roof- Zinc, Wall- Tenant- Ko That
339 Seik Gyi Ward 16.79276 96.11362
Daw Tin Tin Aye Nipa,Floor- Wood 15'*20' 100% 892 Naing Htun
Roof-Zinc, Wall- Tenant- Ko
340 Seik Gyi Ward 16.79278 96.11362
Daw Tin Tin Aye Wood, Floor-Wood 15'*20' 100% 893 Kyaw Naing Oo
Roof- Zinc, Wall- Tenant- Ma Moe
341 Seik Gyi Ward 16.79282 96.11364
Daw Tin Tin Aye Nipa,Floor- Wood 10'*20' 100% 895 Moe
Roof- Zinc, Wall-
342 Seik Gyi Ward 16.79281 96.1136
U Nyein Thu Aung Nipa,Floor- Wood 10'*15' 100% 894
Roof-Zinc, Wall-
343 Seik Gyi Ward 16.79284 96.11363
U Saw Naung Wood, Floor-Wood 15'*15' 100% 896
Roof- Zinc, Wall-
344 U Myo Chit Seik Gyi Ward Bamboo, Floor- 16.79285 96.1136 Tenant- U Ye
Maung Wood 15'*15' 100% 897 Aung
Roof- Zinc, Wall-
345 Seik Gyi Ward 16.79288 96.11363
U Myint Oo Zinc, Floor- Wood 15'*15' 100% 898
Roof -Zinc, Wall-
346 Seik Gyi Ward 16.79288 96.1136
U Kyaw Kyi Nipa, Floor- Wood 15'*15' 100% 899

139
Kyimindaing Township

Roof- Zinc, Wall-


347 Seik Gyi Ward Zinc, Floor- 16.79287 96.11358 Tenant- Daw
U Soe Moe Aung Bamboo 12'*18' 100% 900 Myint

348 Seik Gyi Ward Roof- Zinc, Wall- 16.79288


96.11356
U San Win Aung Zinc, Floor- Wood 12'*18' 50% 901 Tenant- Good Pi
Tenant- U Nyan
349 Seik Gyi Ward 16.79296 96.1136
owned by army plot 5% 902 Win
350 Daw Than Lwin Seik Gyi Ward plot 15'*15' 100% 903 16.79286 96.11356
Roof- Nipa, Wall-
351 Seik Gyi Ward Nipa, Floor- 16.79285 96.11355
U Thein Htun Win Bamboo 15'*15' 50% 904
Roof- Nipa, Wall-
352 Daw Than Than Seik Gyi Ward Nipa, Floor- 16.79281 96.11355
Nu Bamboo 15'*15' 100% 905

140