Constructors-Operators Form Foreign
Constructors-Operators Form Foreign
Applie Recommend
Company’s Name: ________________________________ Categor d ed
___________________________________________ y
_____
PCP’s Scored: _____________
No. of Engineers
Individual, Sole Proprietor, Partnership, Private Limited with the Company: ___________
Company, Public Limited Company, Statutory Body
S# Document Description Enclosed Remarks
01. Application form duly filled
02. Paid Copy of Challan
03. Covering Letter of Company on Letterhead
04. Previous Original Enlistment Certificate (For Renewal cases only)
05. Copy of Passport of Owner/Owners
06. Verified Affidavit of Foreign Engineer(s) alongwith:-
a. Covering letter from your organization (as per specimen
attached) on the official letterhead
b. Copy of degree duly verified
c. Copy of passports verified by embassy concerned
d. Application form for Registration as Professional Engineer duly
attested as per instructions printed therein on the last page of
application form
Verified Affidavit of Pakistani Engineer(s) alongwith:-
a. Copy of PEC Registration Certificate & Renewal Card
b. Copy of NIC of Engineer(s)
c. Bio-data of Engineer(s) as per specimen given with application
form
d. Copy of appointment letter issued to the Engineers
e. Certificate of Income Tax deduction from the Engineers pay
and proof of payment of salary to the engineer(s)
07. Brochure of the Company
08. Track record of the company showing projects completed and
projects in hand in Pakistan or other countries
09. Documentary evidence for Income Tax paid (tax return)
10. Copy of Joint Venture agreement (JV) with Pakistani company
registered with PEC in No Limit (C-1) category as per clause
7(2)*
11. Name of Project(s) for which licence required
12. Field of Specialization supported with track
record (add separate sheet(s) if required)
Checked by
Executive/Jr.Executive: _____________________________________________________________
Dear Sir,
(i)
(ii)
(iii)
and overleaf
3. We undertake to notify to the Council if any of above mentioned engineers leaves the
job and also undertake to inform the Council about any events taking place after grant of licence,
which render our firm ineligible for continuation of licence, and may result in reduction of
category of licence or suspension or cancellation of the licence under Bye-lawas 8(2).
Yours faithfully,
Name and Address of Constructor
( Year _____________ )
Field of specialization.
( Add pages if required)
1. Name of firm/company.
3. Mailing address.
3.2.1 Phone
3.2.2 Fax
3.2.3 E-mail
4. PARTICULARS OF DIRECTORS/PARTNERS/EXECUTIVES:
4.1
4.2
4.3
4.4
4.5
4.6
6.1
6.2
6.3
6.4
6.5
8. UNDERTAKING:
It is hereby certified that the above are true statements of facts and we take full
responsibility for the correctness and accuracy of the information supplied herein to the best of
our knowledge and belief. This is also to certify that none of the owners/partners/directors
against whose names PCP credit is claimed holds less than fifteen per cent shares in the firm /
company. This is further to certify that this application fulfills the entire requirements of PEC
Bye-laws for licensing of constructors/operators and we fully understand the provisions of the
PEC Bye-laws and agree to abide by them.
………………………………………………………………………………………………………
Chairman
Enrollment Committee
Category
- -
Registrar
Instructions for filling in Application form for new licence / renewal for constructor/operator.
1. Before filling in the application form, please see bye-laws 4 and 8 of the Construction and
Operation of Engineering Works Bye-laws, 1987
2. Please write the name of your firm or company by which name you would like it to be called and
registered. Please indicate whether you are a Pakistani firm or a Foreign firm by striking out
inapplicable.
3. Registration of Foreign firms: foreign firms can only be registered on project to project basis. The
foreign firm must also attach the joint venture or association agreement with a Pakistani
Constructor/Operator. Simultaneously, the foreign firm must also apply for registration of each
engineer who is brought into Pakistan and who performs any engineering work in Pakistan
(please refer to the Pakistan Engineering Council Act, 1976, in this connection).
4. Please give address of all your main offices and permanent branches as on the date of application.
5. The application fee for a licence, change of category of licence, or renewal of licence is as
follows, which should accompany the application:-
NOTE The amount shown below foreign applicant is for enlistment. For licence they are to
pay 50% of the said amount as processing fee.
6. For initial registration, change in category, and renewal, the applicant for the constructor’s or
operator’s licence shall submit application to the Council in the form prescribed. The application
for renewal shall be submitted to the Council by the 5 th day of November of the year based on the
constructor’s or operator’s status as on the 31 st day of October of the same year. The licence shall
stand expired on 31st day of December each year.
7. A licensee shall inform the Council of any events taking place after grant of a licence to him or
renewal thereof, which render him ineligible for continuation of licence in accordance with the
aforesaid bye-laws. On receipt of such information, the Council may decide to reduce the
category of licence or suspend or cancel the licence as it may deem fit.
Registration Categories and Specialization of Constructors/Operators
CE06 Irrigation and Flood Earth work/dredging in cancal, river and offshore.
Control System
CE09 Oil and Gas Pipe Lines Installation, maintenance and repoair of ail and
gas pipe lines.
ME10 Chiller for Power Installation, maintenance and repair of gas turban
Generation driven chiller, steam turban driven chiller and
centrifugal chiller.
EE04 Low Voltage General wiring and control system wiring works
Installation not exceeding 1 KV. Installation and maintenance
of low tension overhead lines and underground
cabling not exceeding 1KV. Also includes
installation and maintenance of generating plant
and equipment not exceeding 1 KV.
EE05 High Voltage Installation and maintenance of high voltage
Installation equipment and underground cabling, high-tension
overhead line including transmission tower
exceeding 1KV. Also includes installation and
maintenance of generator plat and equipment
exceeding 1KV neonlights.
EE06 Specialized Lighting Installation and maintenance of street lighting,
System stadium floodlighting, traffic lighting, airfield
lighting, high mast lighting installation, laser
system, stage lighting, special effect lighting,
navigational aid, underwater lighting, platform
lighting, petrochemical plant lighting, oil refinery
plant lighting, etc.
AFFIDAVIT
on oath as under:-
been issued by the Pakistan Engineering Council which has been renewed up
to ………………………….
……………………………………………………………………………………….. since
assignment with any other private firm, government agency, office or bureau of any
4. That I have enclosed my application and curriculum vitae duly signed by me.
5. That I have not ever incurred any disqualification in any manner under the Pakistan
Engineering Council Act and Bye-laws. (if in the past any disqualification was incurred
6. That the contents of the above mentioned affidavit are true to the best of my knowledge,
belief and information received and nothing material has been concealed therefrom.
DEPONENT
I.D.CARD NO._______________________
DATE: _______________________
PLACE: _______________________
To be notarized
Secondary
High Secondary
College/University
Post Graduate
Diploma
Masters
Ph.D/D.Sc.
I certify that the above information is true to the best of my knowledge and belief and that I have
expert knowledge and specialization in the following types of projects. ( List not more than
three).
12…
12…
12…
_______________________
Signature of Professional
Engineer/Allied Professional