Specific Registration Requirements For Construction Workhead (CW)

The document provides the specific registration requirements for the Construction Workhead (CW) in Singapore. It outlines two workheads - CW01 for general building and CW02 for civil engineering. For each workhead, it describes the types of projects that fall under each category. It also provides the registration requirements including financial thresholds, track record requirements, personnel requirements, and management/development standards needed to qualify for different registration grades from A1 to C3. Tables are included that outline these requirements in detail according to the different grades. Notes further explain some of the registration criteria.

Uploaded by

Jianhua Wu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
830 views4 pages

Specific Registration Requirements For Construction Workhead (CW)

The document provides the specific registration requirements for the Construction Workhead (CW) in Singapore. It outlines two workheads - CW01 for general building and CW02 for civil engineering. For each workhead, it describes the types of projects that fall under each category. It also provides the registration requirements including financial thresholds, track record requirements, personnel requirements, and management/development standards needed to qualify for different registration grades from A1 to C3. Tables are included that outline these requirements in detail according to the different grades. Notes further explain some of the registration criteria.

Uploaded by

Jianhua Wu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

CW SRR – Dec 2021 Edition

SPECIFIC REGISTRATION REQUIREMENTS FOR


CONSTRUCTION WORKHEAD (CW)
Workhead Title Description
CW01 General (a) All types of building works in connection with any structure, being built or to be built, for the
Building support, shelter and enclosure of persons, animals, chattels or movable property of any kind,
requiring in its construction the use of more than two unrelated building trades and crafts. Such
structure includes the construction of multi-storey car-parks, buildings for parks and playgrounds and
other recreational works, industrial plants, and utility plants.

(b) Addition and alteration works on buildings involving structural changes.

(c) Installation of roofs. Firms which undertake waterproofing work should register under CR13.

CW02 Civil (a) Works involving concrete, masonry and steel in bridges, sewers, culverts, reservoirs,
Engineering retaining walls, canals, drainage systems, underground structures, cutting and filling of embankment,
river banks, excavation of deep trenches, scraping of sub-soil, surface drainage works, flexible
pavement, rigid pavement or laterite roads, bus bays, open car-parks and related works such as kerbs
and footways. Firms which undertake piling works, ground support and stabilization works or site
investigation works should register under CR08, CR12 and CR15 respectively.

(b) Works involving dredging in canal, river and offshore for the purpose of deepening and
extraction of mineral or construction material. It also includes reclamation works.

(c) Works involving marine piling and the construction of marine structures such as jetties,
wharves, sea and river walls. The head does not cover the construction and fabrication of marine
crafts, pontoons and oilrigs or any floating platform.

1
CW SRR – Dec 2021 Edition
TABLE B1
REGISTRATION REQUIREMENTS
Track Record (Past 3 years) Management & Additional
Grade Financial (Notes 3–6) Personnel
(Note 14) (Notes 1–2) (Notes 7–9)
Development Requirements
CW01 CW02 (notes 10-13) (Note 15)

A1 $15m $150.0m $150.0m 24RP/P/T of which ISO9001 (SAC)


of which of which -min 8RP
-$75.0m PS -$75.0m PS -1RP/P/T with SDCP/CCPP ISO14001
-$112.5m MC -$75.0m MC -Annual CET declaration
-$37.5m SP -$37.5m SP ISO45001 /
BizSAFE Star
A2 $6.5m $65.0m $65.0m 12RP/P/T of which
of which of which -min 4RP GGBS
-$32.5m PS -$32.5m PS -1RP/P/T with SDCP/CCPP
-$48.75m MC -$32.5m MC -Annual CET declaration General
Builder
-$16.25m SP -$16.25m SP
Licence -
Class 1 (GB1)
B1 $3m $30.0m $30.0m 6RP/P/T of which ISO9001 (SAC)
of which of which -min 2RP
-$22.5m MC -$15.0m MC -1RP/P/T with SDCP/CCPP ISO14001
-$7.5m SP -$7.5m SP
ISO45001 /
B2 $1m $10.0m $10.0m 3RP/P/T of which BizSAFE Star
of which of which -min 1RP
-$7.5m MC -$5.0m MC -1RP/P/T with ACCP GGBS
-$2.5m SP -$2.5m SP

C1 $300,000 $3.0m $3.0m 1RP/P + 1T of which BizSAFE Level 3/


-1RP/P/T with BCCPE ISO45001 General
Builder
C2 $100,000 $1.0m $1.0m 1RP/P or 2T of which Licence Class
-1RP/P/T with BCCPE 1 or Class 2
(GB1 or GB2)
C3 $25,000 $100,000 $100,000 1RP/P/T with BCCPE

m stands for million, min stands for minimum

2
CW SRR – Dec 2021 Edition
Notes for Table B1

Financial
1) Both minimum paid-up capital and minimum net worth must be met separately. C3 firms are required to submit the latest
management accounts (not more than 12 months old).
2) Grades A1 to B2 firms are required to submit the following annually (not more than 4 months for SGX listed companies and
not more than 6 months for non-SGX listed companies from the accounts closing date):
i) Audited accounts and meet the financial requirement in order to retain in their respective grades.
ii) Complete and submit Annual Return of the Construction Industry conducted by BCA’s Economic Research Department.

Track Record
3) Completed projects in the past three years for all cases. For renewal, projects completed satisfactorily in the past 5 years
including ongoing and newly awarded projects are acceptable. For CW02-A1 registration, projects completed satisfactorily in
the past 5 years can be considered as track record.
4) Contractors are expected to complete:
i) PS - minimum projects executed in Singapore
ii) MC - minimum main contracts (nominated sub-contracts may be included)
iii) SP - minimum size single main contract or nominated sub-contract (if sub-contract, please refer to note 5)
Example for CW01 – A1, if you completed a project in Singapore in the past 3 years with a contract value of $150m, you will
have met the minimum requirements for PS, MC and SP
5) Percentage of sub-contract value taken into consideration shall be 50% for CW01 and 75% for CW02.
6) For CW02, only the value of the civil engineering project will be accepted. For example, if a building includes deep basement
construction, only the value of the basement construction works will be accepted.

Personnel
7) Please refer to definition of RP/P/T/CCPP/SDCP/ACCP/BCCPE/CET in Table B2.
8) A1 and A2 require at least one-third of the RP/P/T with minimum 24 months of relevant experience in Singapore. Out of the
24 months, at least 12 months of relevant experience in Singapore within the latest three years
9) First time application for A1 require every technical personnel to be interviewed by BCA

Management & Development


10) ISO 9001 must be issued from a certification body accredited by Singapore Accreditation Council (SAC) or an accreditation body
who is a signatory of International Accreditation Forum (IAF) multilateral recognition arrangement (MLA) for ISO 9001
certification. All certificates shall bear the accreditation mark of the accreditation body.
11) GGBS (Green & Gracious Builders Scheme) please refer to https://www1.bca.gov.sg/buildsg/bca-awards/green-and-gracious-
builders-scheme
12) BizSAFE Level 3 issued by WSHC (https://www.wshc.sg/bizSAFE) or ISO 45001 required for C1 and C2.

Others
13) For the tendering limits, please refer to www1.bca.gov.sg/procurement/pre-tender-stage/contractors-registration-system-
crs/crs-tendering-limits
14) For more details on GB1/GB2, please refer to www1.bca.gov.sg/regulatory-info/building-control/builder-licensing

3
CW SRR – Dec 2021 Edition
TABLE B2
PERSONNEL QUALIFICATION
Workhead Title Description and Personnel Qualifications

CW01 General Building “RP” shall mean a degree in Civil/Structural, Mechanical, Electrical Engineering recognized by PEB
or BCA, Architecture recognised by BOA. The lists can be obtained from the internet at
CW02 Civil Engineering PEB: PEB Approved Qualifications ,
BOA: BOA Approved Qualifications and
BCA: List of Acceptable Qualifications for RE Accreditation.pdf .

“P” shall mean a recognised degree in Civil/Structural, Mechanical, Electrical Engineering,


Architecture, Building or equivalent.

“T” shall mean a Technical qualification in any of the following:

i) A diploma in Civil/Structural Mechanical, Electrical Engineering, Architecture, Building or


equivalent awarded by BCA Academy, Nanyang Polytechnic, Ngee Ann Polytechnic, Republic
Polytechnic, Singapore Polytechnic or Temasek Polytechnic.

ii) A National Certificate in Construction Supervision (NCCS) or Advance National Building


Qualification (NBQ)/Specialist Diploma in M&E Coordination awarded by BCA Academy.

iii) Such other diplomas or qualifications as approved by BCA from time to time.

“CCPP” Certified Construction Productivity Professional

“SDCP” shall mean Specialist Diploma in Construction Productivity conducted by BCA Academy

“ACCP” shall mean Advanced Certificate of Construction Productivity conducted by BCA Academy

“BCCPE” shall mean Basic Concept in Construction Productivity Enhancement (Certificate of


Attendance) conducted by BCA Academy. A director with BCCPE (Certificate of Attendance) is
acceptable for one company only.

“CET” shall mean Continuing Education & Training, the minimum number of personnel required in
A1 and A2 firms must comply with the CET requirement to obtain a minimum of 14 hours of
structured training annually over a 12-month period from 1 Nov to 31 Oct (of the next calendar
year). The declaration form should reach BCA by 30 Nov each year for verification. Personnel with
Employment Pass or S-Pass will also require verification by the company’s financial auditor or legal
firm/credit rating agency incorporated in Singapore that they have remained in Singapore for at
least 183 days in the last one year at the point of CET submission. More information on the CET
requirement is available at http://www.bca.gov.sg/ContractorsRegistry/others/CET_FAQ.pdf

You might also like