ITEM DELIVERABLE TITILE DEPARTMENT SCOPE DOCUMENT NO. Rev. No DOC. TYPE PLANNED DATE SUNMITTED DATE RESPOND DATE STATUS OF DOCUMENT REMARKS
1 PROJECT SAFETY AND HEALTH PLAN (PSP) HSSE RAPID-P0014-0023-HSE-MAN-0001-0001 A MAN 20-Jun-16 25-Jun-16 15-Aug-16 REVIEW CODE 1
PROJECT SAFETY AND HEALTH PLAN (PSP) HSSE RAPID-P0014-0023-HSE-PRC-0001-0001 B PRC 20-Jun-16 26-Jun-16 2-Nov-16 APPROVAL CODE 3
PROJECT SAFETY AND HEALTH PLAN (PSP) HSSE RAPID-P0014-0023-HSE-PRC-0001-0001 0 PRC 2-Nov-16 11-Nov-16 EXECUTION
2 EMERGENCY RESPONSE PLAN HSSE RAPID-P0014-0023-HSE-PRC-0001-0002 A PRC 26-Oct-16 26-Oct-16 2-Nov-16 REVIREW CODE 2
EMERGENCY RESPONSE PLAN HSSE RAPID-P0014-0023-HSE-PRC-0001-0002 B PRC 14-Nov-16 15-Nov-16 APPROVAL
3 TRAFFIC MANAGEMENT PLAN FOR PRE-CAST TRANSPORTATION (TMP) HSSE RAPID-P0014-0023-HSE-PLN-0001-0001 A PLN 9-Nov-16 10-Nov-16 17-Nov-16 REVIREW CODE 2
4 ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL RAPID-P0403-MCSB-HSE-MAN-0001-0002 MAN 5-Dec-16
5 WASTE MANAGEMENT PLAN ENVIRONMENTAL RAPID-P0403-MCSB-HSE-PRC-0001-0003 PRC 5-Dec-16
6 MANAGEMENT OF HAZARDOUS MATERIAL ENVIRONMENTAL RAPID-P0403-MCSB-HSE-PRC-0001-0004 PRC 5-Dec-16
7 HEALTH, SAFETY, ENVIRONMENT MANAGEMENT SYSTEM HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0005 PRC 5-Dec-16
8 SECURITY PLAN HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0006 PRC 6-Dec-16
9 PILING OPERATOR HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0007 PRC 6-Dec-16
10 LIGHTNING PROTECTION FOR SOIL INVESTIGATION WORKS HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0008 PRC 6-Dec-16
11 INSPECTION / ASSESSMENT & AUDIT HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0009 PRC 6-Dec-16
12 MANAGEMENT OF CHANGE PROCEDURE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0010 PRC 7-Dec-16
13 SITE NIGHT WORKING AND EXTENDED HOURS PROCEDURE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0011 PRC 7-Dec-16
14 JOB HAZARD ANALYSIS HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0012 PRC 7-Dec-16
15 EXCAVATION, TRENCHING AND SHORING PROCEDURE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0013 PRC 7-Dec-16
16 LIFTING PROCEDURE (CRANES / RIGGING) HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0014 PRC 8-Dec-16
17 WORKING AT HEIGHT HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0015 PRC 8-Dec-16
18 ACCIDENT / INCIDENT INVESTIGATION HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0016 PRC 8-Dec-16
19 TRAFFIC MANAGEMENT PLAN HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0017 PRC 9-Dec-16
20 PORTABLE ELECTRICAL TOOLS INSPECTION & INSTALLATION (PETI) HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0018 PRC 9-Dec-16
21 MANUAL HANDLING HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0019 PRC 9-Dec-16
22 WORK HOUR CONTROL / WORKING ALONE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0020 PRC 10-Dec-16
23 PERSONAL PROTECTIVE EQUIPMENT (PPE) HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0021 PRC 10-Dec-16
24 PERMIT TO WORK HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0022 PRC 10-Dec-16
25 TRAINING & ORENTATION PROCEDURE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0023 PRC 10-Dec-16
26 HAND & PORTABLE POWER TOOLS HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0024 PRC 11-Dec-16
27 ENTRY CONFINED SPACES HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0025 PRC 11-Dec-16
28 SCAFFOLDING PROCEDURE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0026 PRC 11-Dec-16
29 BARRICADES, SIGN & TAGS HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0027 PRC 12-Dec-16
30 SITE HSE PLAN HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0028 PRC 12-Dec-16
31 INJURY MANAGEMENT & WORKERS COMPENSATION HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0029 PRC 12-Dec-16
32 WORKERS CAMP MANAGEMENT HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0030 PRC 13-Dec-16
33 SITE EMERGENCY PLAN HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0031 PRC 13-Dec-16
34 SITE SECURITY PLAN HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0032 PRC 13-Dec-16
35 FALL PROTECTION HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0033 PRC 14-Dec-16
36 FIRE PREVENTION & PROTECTION HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0034 PRC 14-Dec-16
37 HEARING PROTECTION HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0035 PRC 14-Dec-16
38 MOTORIZED HEAVY EQUIPMENT HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0036 PRC 15-Dec-16
39 LOADING & UNLODING MATETRIAL PROCEDURES HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0037 PRC 15-Dec-16
40 PORTABLE LADDERS PROCEDURE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0038 PRC 15-Dec-16
41 EARTHWORK, CONCRETE & MASONARY PROCEDURE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0039 PRC 16-Dec-16
42 MANAGEMENT OF HSSE COMPLAINTS HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0040 PRC 16-Dec-16
43 MANAGEMENT OF FATIGUE IN THE WORKPLACE HSSE RAPID-P0403-MCSB-HSE-PRC-0001-0041 PRC 16-Dec-16