Form CIDB IBS Score M1(2018)
CALCULATION FOR IBS SCORE
For office use
Project Registration
No:
Project
Category:
Project Name: Contract Value:
Contractor Name: Developer / Owner Name:
Architecture Consultant Civil/Structure Engineer Consultant Name:
List of Submitted Drawings
1) ____________________________________ 6) _______________________________
2) ____________________________________ 7) _______________________________
3) ____________________________________ 8) _______________________________
4) ____________________________________ 9) _______________________________
5) ____________________________________ 10) _______________________________
We hereby declare that the information given and the IBS Score submitted herewith is true and complete.
The total IBS Score for the proposed building / project is ____________
Date: ______________ Name & Signature of Qualified Person
Designation:
___________________________
Reg No. (Arch/PE):________________
CALCULATIONS OF OVERALL IBS SCORE
PROJECT DETAILS
Project Name : ______________________________________________________________________________________
__________________________________________________________________________________________________
__________________________________________________________________________________________________
Type/Block No : ____________________________________ Total no of Units/blocks:____________
Contract
Value:_____________
Category of Building
Residential (landed) Industrial Commercial
Residential (high rise) Institutional Others __________________
For mixed development, please indicate the area of the category:
Residential (landed) ________________ m2 Industrial ________________ m2
Residential (high rise) ________________ m2 Institutional ________________ m2
Commercial _________________ m2 Others ________________ m2
CALCULATION OF IBS SCORE
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE
PART 1: STRUCTURAL SYSTEM
1.1 FLOOR = PRECAST CONCRETE SLAB
a) Precast columns and beams 1.0
b) Precast columns and in-situ beams using reusable
0.8
formwork
c) Precast columns and in-situ beams using timber
0.7
formwork
d) Precast beams and in-situ columns using reusable
0.8
formwork
e) Precast beams and in-situ column using timber
0.7
formwork
f) In-situ column and beams using reusable system
0.6
formwork
g) In-situ column and beams using timber formwork 0.5
h) Metal columns and beams 1.0
i) Timber column and beam 1.0
j) Load bearing blocks 0.8
k) Metal framing with permanent formwork 0.7
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE
1.2 FLOOR = IN-SITU CONCRETE ON PERMANENT
FORMWORK
a) Precast columns and beams 0.8
b) Precast columns and in-situ beams using reusable
0.7
formwork
c) Precast columns and in-situ beams using timber
0.6
formwork
d) Precast beams and in-situ columns using reusable
0.7
formwork
e) Precast beams and in-situ column using timber
0.6
formwork
f) In-situ column and beams using reusable system
0.5
formwork
g) In-situ column and beams using timber formwork 0.4
h) Metal columns and beams 0.8
i) Timber column and beam 0.8
j) Load bearing blocks 0.7
k) Metal framing with permanent formwork 0.6
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE
1.3 FLOOR = IN-SITU CONCRETE USING REUSABLE
FORMWORK
a) Precast columns and beams 0.6
b) Precast columns and in-situ beams using reusable
0.5
formwork
c) Precast columns and in-situ beams using timber
0.4
formwork
d) Precast beams and in-situ columns using reusable
0.5
formwork
e) Precast beams and in-situ column using timber
0.4
formwork
f) In-situ column and beams using reusable system
0.4
formwork
g) In-situ column and beams using timber formwork 0.2
h) Metal columns and beams 0.6
i) Timber column and beam 0.6
j) Load bearing blocks 0.5
k) Metal framing with permanent formwork 0.4
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE
1.4 FLOOR = IN-SITU CONCRETE USING TIMBER
FORMWORK
a) Precast columns and beams 0.5
b) Precast columns and in-situ beams using reusable
0.4
formwork
c) Precast columns and in-situ beams using timber
0.3
formwork
d) Precast beams and in-situ columns using reusable 0.4
formwork
e) Precast beams and in-situ column using timber
0.3
formwork
f) In-situ column and beams using reusable system
0.2
formwork
g) In-situ column and beams using timber formwork 0.0
h) Metal columns and beams 0.5
i) Timber column and beam 0.5
j) Load bearing blocks 0.4
k) Metal framing with permanent formwork 0.3
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE
1.5 FLOOR = STEEL FLORING SYSTEM
a) Precast columns and beams 1.0
b) Precast columns and in-situ beams using reusable
0.8
formwork
c) Precast columns and in-situ beams using timber
0.7
formwork
d) Precast beams and in-situ columns using reusable 0.8
formwork
e) Precast beams and in-situ column using timber
0.7
formwork
f) In-situ column and beams using reusable system
0.6
formwork
g) In-situ column and beams using timber formwork 0.5
h) Metal columns and beams 1.0
i) Timber column and beam 1.0
j) Load bearing blocks 0.8
k) Metal framing with permanent formwork 0.7
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE
1.6 FLOOR = TIMBER FRAME FLORING SYSTEM
a) Precast columns and beams 1.0
b) Precast columns and in-situ beams using reusable
0.8
formwork
c) Precast columns and in-situ beams using timber
0.7
formwork
d) Precast beams and in-situ columns using reusable 0.8
formwork
e) Precast beams and in-situ column using timber
0.7
formwork
f) In-situ column and beams using reusable system
0.6
formwork
g) In-situ column and beams using timber formwork 0.5
h) Metal columns and beams 1.0
i) Timber column and beam 1.0
j) Load bearing blocks 0.8
k) Metal framing with permanent formwork 0.7
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE
1.7 FLOOR = NO SLAB
a) Precast columns and beams 1.0
b) Precast columns and in-situ beams using reusable
0.8
formwork
c) Precast columns and in-situ beams using timber
0.7
formwork
d) Precast beams and in-situ columns using reusable 0.8
formwork
e) Precast beams and in-situ column using timber 0.7
formwork
f) In-situ column and beams using reusable system
0.6
formwork
g) In-situ column and beams using timber formwork 0.5
h) Metal columns and beams 1.0
i) Timber column and beam 1.0
j) Load bearing blocks 0.8
k) Metal framing with permanent formwork 0.7
IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
FACTOR % SCORE
2.0 ROOF SYSTEM
a) Prefab timber roof trusses 1.0
b) Prefab metal roof trusses 0.8
c) Conventional timber roof trusses 0.0
TOTAL AREA 100%
Sub-total for structural system (maximum 50 points) ( A )
IBS
IBS COVERAGE CONTENT
ELEMENTS LENGTH (m)
FACTOR % SCORE
PART 2: WALL SYSTEM
a) Precast concrete panels 1.0
b) Wall cladding 1.0
c) Prefabricated timber panels 1.0
d) Full height glass panels 1.0
e) Drywall systems 1.0
f) In-situ concrete with reusable system formwork 0.4
g) In-situ concrete with permanent formwork 0.7
h) Blockwork systems 0.5
i) Common brickwalls 0.0
j) In-situ concrete with timber formwork 0.0
TOTAL AREA 100%
Sub-total for wall system (maximum 20 points) ( B )
IBS SCORE PERCENTAGE
USAGE % USAGE OF
IBS
ELEMENTS UNIT THIS
SCORE
50%≤ X < 75% 75%≤ X ≤100 PROJECT
PART 3: OTHER SIMPLIFIED CONSTRUCTION
SOLUTIONS
1.0 Utilisation of standardized components based
on MS1064
a) Beams Nos 2 4
b) Columns Nos 2 4
c) Walls m 2 4
d) Slabs m2 2 4
e) Doors Nos 2 4
f) Windows Nos 2 4
2.0 Repetition of structural layouts
a) For building more than 2 storeys
i. Repetition of floor to floor height Nos 1 2
ii. Vertical repetition of structural floor layout Nos 1 2
iii. Horizontal repetition of structural floor layout Nos 1 2
b) For building 1 or 2 storeys
iv. Horizontal repetition of structural floor layout Nos 3 6
3.0 Other productivity enhancing solutions
a) Usage of prefab bathroom units (PBU) Nos 1 2
b) Usage of prefab staircase Nos 1 2
Level 1 3
c) Usage of BIM models for IBS Score
submission
Level 2 6
d) Usage of Modular gridlines in drawings Nos 4 (for > 50% usage)
Sub-total for other simplified construction solutions (maximum 30 points) ( C )
TOTAL (maximum 100 points) (A + B + C )
SUMMARY SHEET (Multiple Building Project)
COVERAGE IBS SCORE IBS SCORE OF
BLOCK NAME AREA (m2)
AREA (%) BUILDING PROJECT
TOTAL
TOTAL IBS SCORE FOR THIS PROJECT = ______