0% found this document useful (0 votes)
449 views12 pages

Form CIDB IBS Score M1 2018

This document provides a template for calculating an Industrialized Building System (IBS) score for construction projects. The score is calculated based on the type of structural system used for various elements like floors, columns, beams, etc. Points are awarded based on the level of prefabrication and use of reusable formwork. The higher the level of off-site prefabrication and reuse, the higher the IBS score. The document requires project details, areas of different building categories, and IBS scores to be filled in order to calculate an overall IBS score for the project.

Uploaded by

nurfirdausfadzil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
449 views12 pages

Form CIDB IBS Score M1 2018

This document provides a template for calculating an Industrialized Building System (IBS) score for construction projects. The score is calculated based on the type of structural system used for various elements like floors, columns, beams, etc. Points are awarded based on the level of prefabrication and use of reusable formwork. The higher the level of off-site prefabrication and reuse, the higher the IBS score. The document requires project details, areas of different building categories, and IBS scores to be filled in order to calculate an overall IBS score for the project.

Uploaded by

nurfirdausfadzil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Form CIDB IBS Score M1(2018)

CALCULATION FOR IBS SCORE

For office use

Project Registration
No:

Project
Category:

Project Name: Contract Value:

Contractor Name: Developer / Owner Name:

Architecture Consultant Civil/Structure Engineer Consultant Name:

List of Submitted Drawings


1) ____________________________________ 6) _______________________________
2) ____________________________________ 7) _______________________________
3) ____________________________________ 8) _______________________________
4) ____________________________________ 9) _______________________________

5) ____________________________________ 10) _______________________________

We hereby declare that the information given and the IBS Score submitted herewith is true and complete.

The total IBS Score for the proposed building / project is ____________

Date: ______________ Name & Signature of Qualified Person

Designation:
___________________________

Reg No. (Arch/PE):________________


CALCULATIONS OF OVERALL IBS SCORE

PROJECT DETAILS

Project Name : ______________________________________________________________________________________


__________________________________________________________________________________________________
__________________________________________________________________________________________________

Type/Block No : ____________________________________ Total no of Units/blocks:____________

Contract
Value:_____________

Category of Building

Residential (landed) Industrial Commercial

Residential (high rise) Institutional Others __________________

For mixed development, please indicate the area of the category:

Residential (landed) ________________ m2 Industrial ________________ m2

Residential (high rise) ________________ m2 Institutional ________________ m2

Commercial _________________ m2 Others ________________ m2

CALCULATION OF IBS SCORE

IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE

PART 1: STRUCTURAL SYSTEM

1.1 FLOOR = PRECAST CONCRETE SLAB

a) Precast columns and beams 1.0

b) Precast columns and in-situ beams using reusable


0.8
formwork

c) Precast columns and in-situ beams using timber


0.7
formwork

d) Precast beams and in-situ columns using reusable


0.8
formwork

e) Precast beams and in-situ column using timber


0.7
formwork
f) In-situ column and beams using reusable system
0.6
formwork

g) In-situ column and beams using timber formwork 0.5

h) Metal columns and beams 1.0

i) Timber column and beam 1.0

j) Load bearing blocks 0.8

k) Metal framing with permanent formwork 0.7

IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE

1.2 FLOOR = IN-SITU CONCRETE ON PERMANENT


FORMWORK

a) Precast columns and beams 0.8

b) Precast columns and in-situ beams using reusable


0.7
formwork

c) Precast columns and in-situ beams using timber


0.6
formwork

d) Precast beams and in-situ columns using reusable


0.7
formwork

e) Precast beams and in-situ column using timber


0.6
formwork

f) In-situ column and beams using reusable system


0.5
formwork

g) In-situ column and beams using timber formwork 0.4

h) Metal columns and beams 0.8

i) Timber column and beam 0.8

j) Load bearing blocks 0.7

k) Metal framing with permanent formwork 0.6


IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE

1.3 FLOOR = IN-SITU CONCRETE USING REUSABLE


FORMWORK

a) Precast columns and beams 0.6

b) Precast columns and in-situ beams using reusable


0.5
formwork

c) Precast columns and in-situ beams using timber


0.4
formwork

d) Precast beams and in-situ columns using reusable


0.5
formwork

e) Precast beams and in-situ column using timber


0.4
formwork

f) In-situ column and beams using reusable system


0.4
formwork

g) In-situ column and beams using timber formwork 0.2

h) Metal columns and beams 0.6

i) Timber column and beam 0.6

j) Load bearing blocks 0.5

k) Metal framing with permanent formwork 0.4

IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE

1.4 FLOOR = IN-SITU CONCRETE USING TIMBER


FORMWORK

a) Precast columns and beams 0.5

b) Precast columns and in-situ beams using reusable


0.4
formwork

c) Precast columns and in-situ beams using timber


0.3
formwork

d) Precast beams and in-situ columns using reusable 0.4


formwork
e) Precast beams and in-situ column using timber
0.3
formwork

f) In-situ column and beams using reusable system


0.2
formwork

g) In-situ column and beams using timber formwork 0.0

h) Metal columns and beams 0.5

i) Timber column and beam 0.5

j) Load bearing blocks 0.4

k) Metal framing with permanent formwork 0.3

IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE

1.5 FLOOR = STEEL FLORING SYSTEM

a) Precast columns and beams 1.0

b) Precast columns and in-situ beams using reusable


0.8
formwork

c) Precast columns and in-situ beams using timber


0.7
formwork

d) Precast beams and in-situ columns using reusable 0.8


formwork

e) Precast beams and in-situ column using timber


0.7
formwork

f) In-situ column and beams using reusable system


0.6
formwork

g) In-situ column and beams using timber formwork 0.5

h) Metal columns and beams 1.0

i) Timber column and beam 1.0

j) Load bearing blocks 0.8

k) Metal framing with permanent formwork 0.7


IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE

1.6 FLOOR = TIMBER FRAME FLORING SYSTEM

a) Precast columns and beams 1.0

b) Precast columns and in-situ beams using reusable


0.8
formwork

c) Precast columns and in-situ beams using timber


0.7
formwork

d) Precast beams and in-situ columns using reusable 0.8


formwork

e) Precast beams and in-situ column using timber


0.7
formwork

f) In-situ column and beams using reusable system


0.6
formwork

g) In-situ column and beams using timber formwork 0.5

h) Metal columns and beams 1.0

i) Timber column and beam 1.0

j) Load bearing blocks 0.8

k) Metal framing with permanent formwork 0.7

IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
(a) FACTOR % SCORE

1.7 FLOOR = NO SLAB

a) Precast columns and beams 1.0

b) Precast columns and in-situ beams using reusable


0.8
formwork

c) Precast columns and in-situ beams using timber


0.7
formwork

d) Precast beams and in-situ columns using reusable 0.8


formwork

e) Precast beams and in-situ column using timber 0.7


formwork
f) In-situ column and beams using reusable system
0.6
formwork

g) In-situ column and beams using timber formwork 0.5

h) Metal columns and beams 1.0

i) Timber column and beam 1.0

j) Load bearing blocks 0.8

k) Metal framing with permanent formwork 0.7

IBS
AREA (m2) IBS COVERAGE CONTENT
ELEMENTS
FACTOR % SCORE

2.0 ROOF SYSTEM

a) Prefab timber roof trusses 1.0

b) Prefab metal roof trusses 0.8

c) Conventional timber roof trusses 0.0

TOTAL AREA 100%

Sub-total for structural system (maximum 50 points) ( A )


IBS
IBS COVERAGE CONTENT
ELEMENTS LENGTH (m)
FACTOR % SCORE

PART 2: WALL SYSTEM

a) Precast concrete panels 1.0

b) Wall cladding 1.0

c) Prefabricated timber panels 1.0

d) Full height glass panels 1.0

e) Drywall systems 1.0

f) In-situ concrete with reusable system formwork 0.4

g) In-situ concrete with permanent formwork 0.7

h) Blockwork systems 0.5

i) Common brickwalls 0.0

j) In-situ concrete with timber formwork 0.0

TOTAL AREA 100%

Sub-total for wall system (maximum 20 points) ( B )


IBS SCORE PERCENTAGE
USAGE % USAGE OF
IBS
ELEMENTS UNIT THIS
SCORE
50%≤ X < 75% 75%≤ X ≤100 PROJECT

PART 3: OTHER SIMPLIFIED CONSTRUCTION


SOLUTIONS

1.0 Utilisation of standardized components based


on MS1064

a) Beams Nos 2 4

b) Columns Nos 2 4

c) Walls m 2 4

d) Slabs m2 2 4

e) Doors Nos 2 4

f) Windows Nos 2 4

2.0 Repetition of structural layouts

a) For building more than 2 storeys

i. Repetition of floor to floor height Nos 1 2

ii. Vertical repetition of structural floor layout Nos 1 2

iii. Horizontal repetition of structural floor layout Nos 1 2

b) For building 1 or 2 storeys

iv. Horizontal repetition of structural floor layout Nos 3 6

3.0 Other productivity enhancing solutions

a) Usage of prefab bathroom units (PBU) Nos 1 2

b) Usage of prefab staircase Nos 1 2


Level 1 3
c) Usage of BIM models for IBS Score
submission
Level 2 6

d) Usage of Modular gridlines in drawings Nos 4 (for > 50% usage)

Sub-total for other simplified construction solutions (maximum 30 points) ( C )

TOTAL (maximum 100 points) (A + B + C )


SUMMARY SHEET (Multiple Building Project)

COVERAGE IBS SCORE IBS SCORE OF


BLOCK NAME AREA (m2)
AREA (%) BUILDING PROJECT

TOTAL

TOTAL IBS SCORE FOR THIS PROJECT = ______