Grid-Connected System: Simulation parameters


Project : Siddhant Pratap Singh 100KW
Geographical Site Delhi/Safdarjung Country India
Situation Latitude 28.58° N Longitude 77.20° E
Time defined as Legal Time Time zone UT+5.5 Altitude 212 m
Albedo 0.20
Meteo data: Delhi/Safdarjung Meteonorm 7.2 (1981-1990) - Synthetic

PVsyst TRIAL
Simulation variant :

Simulation parameters
Collector Plane Orientation
New simulation variant
Simulation date

System type
Tilt
05/10/19 21h06

No 3D scene defined, no shadings


28° Azimuth 0°
Models used Transposition Perez Diffuse Perez, Meteonorm
Horizon Free Horizon
Near Shadings No Shadings
User's needs : Unlimited load (grid)

PVsyst TRIAL
PV Array Characteristics
PV module Si-mono Model ELPS CS6P - 250MM
Original PVsyst database Manufacturer Canadian Solar Inc.
Number of PV modules In series 12 modules In parallel 2 strings
Total number of PV modules Nb. modules 24 Unit Nom. Power 250 Wp
Array global power Nominal (STC) 6.00 kWp At operating cond. 5.32 kWp (50°C)
Array operating characteristics (50°C) U mpp 324 V I mpp 16 A
Total area Module area 38.6 m² Cell area 34.4 m²

Inverter Model Solar Inverter SOLIVIA 5.0 AP G3


Original PVsyst database Manufacturer Delta Energy
Characteristics Operating Voltage 150-450 V Unit Nom. Power 5.00 kWac
Inverter pack Nb. of inverters 1 units Total Power 5.0 kWac

PVsyst TRIAL
Pnom ratio 1.20

PV Array loss factors


Array Soiling Losses Loss Fraction 3.0 %
Thermal Loss factor Uc (const) 20.0 W/m²K Uv (wind) 0.0 W/m²K / m/s
Wiring Ohmic Loss Global array res. 338 mOhm Loss Fraction 1.5 % at STC
Module Quality Loss Loss Fraction 5.0 %
Module Mismatch Losses Loss Fraction 1.0 % at MPP
Strings Mismatch loss Loss Fraction 0.10 %
Incidence effect, ASHRAE parametrization IAM = 1 - bo (1/cos i - 1) bo Param. 0.05

PVsyst TRIAL
PVsyst Evaluation mode
PVSYST V6.84 05/10/19 Page 2/4

Grid-Connected System: Main results


Project : Siddhant Pratap Singh 100KW
Simulation variant : New simulation variant
Main system parameters System type No 3D scene defined, no shadings
PV Field Orientation tilt 28° azimuth 0°
PV modules Model ELPS CS6P - 250MM Pnom 250 Wp
PV Array Nb. of modules 24 Pnom total 6.00 kWp
Inverter Solar Inverter SOLIVIA 5.0 AP G3 Pnom 5.00 kW ac

PVsyst TRIAL
User's needs Unlimited load (grid)

Main simulation results


System Production Produced Energy 9.47 MWh/year Specific prod. 1578 kWh/kWp/year
Performance Ratio PR 70.76 %

Normalized productions (per installed kWp): Nominal power 6.00 kWp Performance Ratio PR

8 1.0
Lc : Collection Loss (PV-array losses) 1.56 kWh/kWp/day PR : Performance Ratio (Yf / Yr) : 0.708
0.9
7 Ls : System Loss (inverter, ...) 0.22 kWh/kWp/day
Yf : Produced useful energy (inverter output) 4.32 kWh/kWp/day
0.8
[kWh/kWp/day]

6
0.7
Performance Ratio PR

5
0.6

PVsyst TRIAL
Energy

4 0.5

0.4
3
Normalized

0.3
2
0.2

1
0.1

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

New simulation variant


Balances and main results

PVsyst TRIAL
GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR
kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh
January 118.1 35.3 13.23 169.8 161.1 0.814 0.774 0.760
February 136.9 36.6 17.24 180.2 171.1 0.834 0.793 0.734
March 188.1 49.5 23.29 219.5 207.9 0.975 0.928 0.704
April 206.6 65.1 29.22 213.5 201.8 0.916 0.871 0.680
May 221.9 88.0 32.60 209.4 197.0 0.890 0.846 0.673
June 196.5 96.6 32.14 179.2 168.3 0.775 0.736 0.685
July 166.6 106.0 31.44 154.1 144.4 0.679 0.645 0.697
August 159.7 98.8 30.36 156.0 146.6 0.689 0.653 0.698
September 170.6 68.6 28.58 186.7 176.3 0.820 0.779 0.696
October 164.3 48.1 25.49 205.3 194.9 0.906 0.862 0.700
November 128.4 33.1 19.32 183.2 173.8 0.842 0.801 0.729
December 114.9 30.0 14.85 173.6 164.8 0.821 0.781 0.750

PVsyst TRIAL Year

Legends: GlobHor
DiffHor
T_Amb
GlobInc
1972.6 755.7

Horizontal global irradiation


Horizontal diffuse irradiation
T amb.
Global incident in coll. plane
24.85 2230.4 2107.8

GlobEff
EArray
E_Grid
PR
9.961 9.470 0.708

Effective Global, corr. for IAM and shadings


Effective energy at the output of the array
Energy injected into grid
Performance Ratio

PVsyst Evaluation mode


PVSYST V6.84 05/10/19 Page 3/4

Grid-Connected System: Special graphs


Project : Siddhant Pratap Singh 100KW
Simulation variant : New simulation variant
Main system parameters System type No 3D scene defined, no shadings
PV Field Orientation tilt 28° azimuth 0°
PV modules Model ELPS CS6P - 250MM Pnom 250 Wp
PV Array Nb. of modules 24 Pnom total 6.00 kWp
Inverter Solar Inverter SOLIVIA 5.0 AP G3 Pnom 5.00 kW ac

PVsyst TRIAL
User's needs Unlimited load (grid)

Daily Input/Output diagram

35
Values from 01/01 to 31/12
30
[kWh/day]

25
grid

20

PVsyst TRIAL
into
injected

15

10
Energy

0
0 1 2 3 4 5 6 7 8
Global incident in coll. plane [kWh/m².day]

System Output Power Distribution

PVsyst TRIAL 300

250
Values from 01/01 to 31/12
Bin]
/
[kWh

200
grid

150
into
injected

PVsyst TRIAL
100
Energy

50

0
0 1 2 3 4 5
Power injected into grid [kW]

PVsyst Evaluation mode


PVSYST V6.84 05/10/19 Page 4/4

Grid-Connected System: Loss diagram


Project : Siddhant Pratap Singh 100KW
Simulation variant : New simulation variant
Main system parameters System type No 3D scene defined, no shadings
PV Field Orientation tilt 28° azimuth 0°
PV modules Model ELPS CS6P - 250MM Pnom 250 Wp
PV Array Nb. of modules 24 Pnom total 6.00 kWp
Inverter Solar Inverter SOLIVIA 5.0 AP G3 Pnom 5.00 kW ac

PVsyst TRIAL
User's needs Unlimited load (grid)

Loss diagram over the whole year

1973 kWh/m² Horizontal global irradiation


+13.1% Global incident in coll. plane

-0.04% Global incident below threshold


-2.57% IAM factor on global
-3.00% Soiling loss factor

PVsyst TRIAL
2108 kWh/m² * 39 m² coll. Effective irradiation on collectors
efficiency at STC = 15.55% PV conversion

12.65 MWh Array nominal energy (at STC effic.)


-1.56% PV loss due to irradiance level

-13.84% PV loss due to temperature

-5.00% Module quality loss


-1.10% Mismatch loss, modules and strings
-1.20% Ohmic wiring loss
9.96 MWh Array virtual energy at MPP

-4.92% Inverter Loss during operation (efficiency)

PVsyst TRIAL
0.00% Inverter Loss over nominal inv. power
0.00% Inverter Loss due to max. input current
0.00% Inverter Loss over nominal inv. voltage
-0.01% Inverter Loss due to power threshold
0.00% Inverter Loss due to voltage threshold
9.47 MWh Available Energy at Inverter Output
9.47 MWh Energy injected into grid