Testing Checklist: 6 170 MW PHPA-II Gateway Panel (Cacb) Rev

This testing checklist summarizes tests to be performed on a Gateway Panel before factory acceptance testing (FAT). It includes checking instruments, references, pre-conditions, general checks of components and wiring, panel checks, and functional testing of equipment. The objective is to verify proper assembly, labeling, connections, dimensions, and operation of the Gateway Panel components.

Uploaded by

Jigme Tamang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views9 pages

Testing Checklist: 6 170 MW PHPA-II Gateway Panel (Cacb) Rev

This testing checklist summarizes tests to be performed on a Gateway Panel before factory acceptance testing (FAT). It includes checking instruments, references, pre-conditions, general checks of components and wiring, panel checks, and functional testing of equipment. The objective is to verify proper assembly, labeling, connections, dimensions, and operation of the Gateway Panel components.

Uploaded by

Jigme Tamang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Testing Checklist

Project/Customer 6*170 MW PHPA-II


GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

1. PURPOSE
This document must be used during the testing of Gateway Panel before FAT.
2. INSTRUMENTS REQUIRED

Sl. No. Instrument Model/Serial No.


1 Multimeter SL.41560652
2 Screwdriver set 81400500009
3 Ethernet cable
4
5

3. REFERENCE DOCUMENTS

Sl. No. DOCUMENT TITLE DOCUMENT REV


NUMBER
1 NETWORKING DIAGRAM C-011803-2020-30 03
2 CIRCUIT DIAGRAM GATEWAY C-011803-812-03-02 03
3 PART LIST GATEWAY C-011803-812-02-02 03
4 TERMINAL DRAWING GATEWAY C-011803-812-01-02 03
5 GA & DIMENSIONAL DRAWINGS- C-011803-812-11 03
GATEWAY

4. SYSTEM START-UP

Sl. NO Description Expected Result Result Remark

Pre-Conditions
OK OK Checked
 All MCB’s are off.

 Supply terminal of devices


1
should be open wherever OK OK Checked
possible.
 Continuity test
OK OK Checked

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

5. GENERAL CHECKS
Expected
Sl. No Description Result Remark
Result
Visual inspection
 Labelling of panels As per GA Not done
(name & logo) drawing
 Complete assembly of Some Surge Arrestor, OFC-
As per GA
components components RJ45 Converter and
drawing
missing Cisco Switch
As per GA OK Checked
 Labelling of components
drawing
As per OK Checked
 Ferruling of wires Circuit
diagram
1 OK Checked
 Colour coding and cross As per
section of wires Circuit
diagram
 Physical damage to Not OK Scratches on Left side
cubical if any of panel
All in good
condition
 Paint

 Devices & All in good OK Checked


Components condition

Check of cable connection


As per
Incomplete Due to some missing
 Completeness of internal Circuit
components
panel wiring diagram
2
 Tightness of termination
OK OK Checked
screw
3 Grounding check As per OK Checked

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

 Panel grounding check


 Cross section and
colour of
grounding cables
 Connection of Circuit
components to diagram
grounding system
(frames, devices,
covers, etc.)

Panel Check

 Panel dimension As per GA OK Inspected


drawing
 Base frame dimension As per GA OK Inspected
drawing
4
 Panel external colour As per GA OK Inspected
drawing
 Panel internal colour As per GA OK Inspected
drawing
 Earthing strip dimension As per GA OK Inspected
drawing
Cubicles and control panels
 Enclosure thickness OK Inspected
5  Gland plate thickness As per GA
 Paint thickness drawing

Mounting plate (Material and As per GA OK Inspected


6
thickness) drawing
Supply check at incoming OK Checked
terminals 230VAC
 230 V AC Supply
7
 220 V DC Supply
Checked
 24 V DC Supply 24VDC OK

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

6. FUNCTIONAL TEST OF EQUIPMENTS

Sl. No. Description Expected Result Result Remark

Internal Function Test

 AC/DC converter 1 check OK OK Checked

 AC/DC converter 2 check


OK OK Checked
 Redundancy module check OK OK Checked
 MCB’s check OK OK Checked
 Thermostat check OK OK Checked
 Heater check OK OK Checked
1
 Door limit switch check OK OK Checked
 Cubicle lighting check OK OK Checked
 Socket outlet check OK OK Checked
 Main controller power supply
OK OK Checked
check
 Redundant controller power
OK OK Checked
supply check
 Remote CI module power
OK OK Checked
supply check
Communication Test
 Main controller CI-8520 and
PC remote connection Remote operation
Tested
 ETH X1 established OK

2  ETH X2 Remote operation


OK Tested
established
 ETH X3 Remote operation
OK Tested
established
 ETH X4 Remote operation
OK Tested
established

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

 ETH X5 Remote operation


OK Tested
established
1. Interface Main Controller
with network Cisco Switch
(CIS-IE-3300-8T2S-E)

 CI-8520:X1 with
CACB network
switch

 CI-8520:X2 with
LDC network
switch

 Redundant controller CI-8520


and PC remote connection

 ETH X1 Remote operation


OK Tested
established
 ETH X2 Remote operation
OK Tested
established
Remote operation
 ETH X3 OK Tested
established

 ETH X4 Remote operation


OK Tested
established

 ETH X5 Remote operation


OK Tested
established
2. Interface Redundant
Controller with network
Cisco Switch (CIS-IE-
3300-8T2S-E)

 CI-8520:X1 with
CACB network
switch

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

 CI-8520:X2 with
LDC network
switch

A8000 Controller Test


 Main controller power supply
Ready
module (PS-8620) Ready
 Main controller processor
Ready OK Tested
module (CP-8050) Ready
 Main controller CI-8520
Ready OK Tested
module Ready
 Redundant controller power
supply module (PS-8620) Ready
Ready
3  Redundant controller
processor module (CP-8050) Ready OK Tested
Ready
 Redundant controller CI-8520
Ready OK Tested
module Ready
 Remote CI-8530 module
Ready OK Tested
Ready
 LED module (CM-8830)
Ready OK Tested
Ready
 Digital input module (DI-
Ready OK Tested
8110) Ready

7. INTERNAL SIGNAL TEST

Expected
Sl. NO Description Result Remark
Result
1  Check Digital Inputs LED module
glows
 220VDC-1 MCB X1:1 glows OK Tested
SUPERVISION

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

 220VDC-2 MCB
SUPERVISION X1:2 glows OK Tested

 230VAC MCB
SUPERVISION X1:3 glows OK Tested

 24VDC MCB
SUPERVISION X1:4 glows OK Tested

 NETWORK SWITCH OK X1:5 glows OK Tested


 HARDWARE
WATCHDOG_1 OK X1:6 glows OK Tested

 AC/DC CONVERTER-1 OK X1:7 glows OK Tested


 AC/DC CONVERTER-2 OK X1:8 glows OK Tested
 REDUNDANT POWER
SUPPLY OK X2:1 glows OK Tested

 LOAD BALANCE OK X2:2 glows OK Tested

 SPARE_1

 HARDWARE
WATCHDOG_2 OK X2:4 glows OK Tested

 SURGE ARRESTER-1
OPERATED X2:5 glows OK Tested

 SURGE ARRESTER-2
OPERATED X2:6 glows OK Tested

 SPARE_2

 SPARE_3

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

8. A8000 MODULE SERIAL NUMBER

SL.NO. A8000 Controller Module Serial number

1 Main controller power supply module (PS-8620) GF1910072714

2 Main controller processor module (CP-8050) GF2006064933

Inspected by Checked by Verified by

Name: Name: Name:


Testing Checklist
Project/Customer 6*170 MW PHPA-II
GATEWAY GATEWAY PANEL (CACB)
Document No: Rev:

3 Main controller CI-8520 module GF2001085090

4 Redundant controller power supply module (PS-8620) GF1910047688

5 Redundant controller processor module (CP-8050) GF2006065230

6 Redundant controller CI-8520 module GF2005032277

7 GF2006033604
Remote CI-8530 module

8 LED module (CM-8830) GF2008506844

9 Digital input module (DI-8110) GF2001023329

Inspected by Checked by Verified by

Name: Name: Name: