0% found this document useful (0 votes)
771 views13 pages

Above Ceiling Closure Check List

The document is a check list for above ceiling closure works at a project in Udaipur. It provides details of works completed on the 5th floor, including suites, rooms, corridors and lifts. Sign off is required from various contractors including Siemens, Omfire, Halcyon HVAC, Halcyon Electrical and CCTV before interior works can begin. A similar checklist is provided for the 6th floor lift lobby.

Uploaded by

Nabeel Rumani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
771 views13 pages

Above Ceiling Closure Check List

The document is a check list for above ceiling closure works at a project in Udaipur. It provides details of works completed on the 5th floor, including suites, rooms, corridors and lifts. Sign off is required from various contractors including Siemens, Omfire, Halcyon HVAC, Halcyon Electrical and CCTV before interior works can begin. A similar checklist is provided for the 6th floor lift lobby.

Uploaded by

Nabeel Rumani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Above Ceiling Closure - Check List

Project : USU Udaipur


Date - 02-06-2021

Floor / Area - Suit Lift Lobby - 5th Floor Check List Ref. No.
                                                                 

Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No.Contractors :
Name : Himanshu

1 Siemens (FA-PA) Remarks


Signed :                                                   
             
Name : Satish

2 Omfire (Fire Fighting) Remarks


Signed :                                                   
             
Name : Anirudh

3 Halycon HVAC Remarks


Signed :                                                   
             
Name : Anirudh

4 Halycon Electrical Remarks


Signed :                                                   
             
Name : Anirudh
Halycon CCTV
5 conduiting
Remarks
Signed :                                                   
             

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments 
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 10-06-2021

Check List Ref. No.


Floor / Area - Rooms - 5th Floor - 519 & 520
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No.Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Sahani
Sahani HVAC
3 Electrical Work
Remarks
Signed:                    

Name : Sahani
4 Sahani Electrical Remarks
Signed:                    

Name : Himanshu
5 CCTV conduiting Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 10-06-2021

Check List Ref. No.


Floor / Area - Small Corridor - 5th Floor
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No.Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Sahani
Sahani HVAC
3 Electrical Work
Remarks
Signed:                    

Name : Himanshu
4 Sahani Electrical Remarks
Signed:                    

Name : Himanshu
5 CCTV conduiting Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 01-06-2021

Floor / Area - Suit Lift Lobby - 6th Floor Check List Ref. No.
                                                                 

Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No.Contractors :
Name : Himanshu

1 Siemens (FA-PA) Remarks


Signed :                                                   
             
Name : Satish

2 Omfire (Fire Fighting) Remarks


Signed :                                                   
             
Name : Anirudh

3 Halycon HVAC Remarks


Signed :                                                   
             
Name : Anirudh

4 Halycon Electrical Remarks


Signed :                                                   
             
Name : Anirudh
Halycon CCTV
5 conduiting
Remarks
Signed :                                                   
             

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments 
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 25-05-2021

Check List Ref. No.


Floor / Area - Rooms - 6th Floor -
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Sahani
Sahani HVAC
3 Electrical Work
Remarks
Signed:                    

Name : Himanshu
4 Sahani Electrical Remarks
Signed:                    

Name : Himanshu
5 CCTV conduiting Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 15-06-2021

Check List Ref. No.


Floor / Area - Rooms - Ground Floor - L8 & L9 lift Lobby
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Sahani HVAC
3 Electrical Work
Remarks
Signed:                    

Name : Anirudh
4 Sahani Electrical Remarks
Signed:                    

Name : Anirudh
5 CCTV conduiting Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 10-06-2021

Check List Ref. No.


Floor / Area - Rooms - Ground Floor - Haat Bazaar Corridor
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Sahani HVAC
3 Electrical Work
Remarks
Signed:                    

Name : Anirudh
4 Sahani Electrical Remarks
Signed:                    

Name : Anirudh
5 CCTV conduiting Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 10-06-2021

Check List Ref. No.


Floor / Area - Rooms - First Floor - Haat Bazaar Corridor
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Sahani HVAC
3 Electrical Work
Remarks
Signed:                    

Name : Anirudh
4 Sahani Electrical Remarks
Signed:                    

Name : Anirudh
5 CCTV conduiting Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 25-06-2021

Check List Ref. No.


Floor / Area - Rooms - Ground Floor - L10 & L11 Suit lift Lobby
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Sahani HVAC
3 Electrical Work
Remarks
Signed:                    

Name : Anirudh
4 Sahani Electrical Remarks
Signed:                    

Name : Anirudh
5 CCTV conduiting Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 25-06-2021

Check List Ref. No.


Floor / Area - Rooms - Ground Floor - L8 & L8 Lift Lobby
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Halcyon HVAC
3 Electrical Work
Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 25-09-2021

Check List Ref. No.


Floor / Area - Rooms - Ground Floor - Female/Male/Handicap Toilet
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Halcyon HVAC
3 Electrical Work
Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 25-09-2021

Check List Ref. No.


Floor / Area - Rooms - First Floor - Female/Male/Handicap Toilet
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Halcyon HVAC
3 Electrical Work
Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments:
Above Ceiling Closure - Check List
Project : USU Udaipur
Date - 25-09-2021

Check List Ref. No.


Floor / Area - Rooms - UG Floor - Female/Male/Handicap Toilet
Subject :

All above ceiling, respective MEP works are completed and false ceiling closure works can be started.

Sr. No. Contractors :

Name : Himanshu
1 Siemens (FA-PA) Remarks
Signed:                    

Name : Satish
Omfire (Fire
2 Fighting)
Remarks
Signed:                    

Name : Anirudh
Halcyon HVAC
3 Electrical Work
Remarks
Signed:                    

Issued to Interior Contractor : Kaveri Construction Name : Nabeel Rumani


Name : Ramkishan Synergy -Colliers
(Site Incharge)
Sign : Sign :

Comments: