Trainee's Record Book
Trainee's Record Book
trainees. Be sure that the trainee will personally accomplish the task 1.4 Computer hardware is assembled in
accordance with established procedures
and confirmed by the instructor. and systems requirements
1.5 Basic-input-output-system (BIOS)
configuration is performed in accordance
It is of great importance that the content should be written with hardware requirements
legibly on ink. Avoid any corrections or erasures and maintain the
cleanliness of this record.
Seat Work
This will be collected by your trainer and submit the same to Quiz
Practical
the Training Management Unit Head (TMU) and shall form part of the
Work
permanent trainee’s document on file.
Seat Work
Quiz Seat Work
Practical Quiz
Work Practical
Work
______________________________ ______________________________
_ Trainer’s Signature
Trainee’s Signature ______________________________ ______________________________
_ Trainer’s Signature
Trainee’s Signature
CORE COMPETENCIES CORE COMPETENCIES
Unit of Competency 1: Install and configure computer systems CORE COMPETENCIES CORE COMPETENCIES
Learning Element 1: Assemble Computer Hardware Unit of Competency 1: Install and configure computer systems
Learning Element 1: Assemble Computer Hardware
Performance Criteria Task/ Date Instructors
Activity Accomplished Remarks Performance Criteria Task/ Date Instructors
Required Activity Accomplished Remarks
1.13 Unit assembly is planned and prepared Required
to ensure OH&S policies and 1.17 Unit assembly is planned and prepared
procedures are followed in accordance to ensure OH&S policies and
with systems requirements procedures are followed in accordance
1.14 Materials necessary to complete the with systems requirements
work are identified and obtained in 1.18 Materials necessary to complete the
accordance with established procedures work are identified and obtained in
and checked against systems accordance with established procedures
requirements and checked against systems
1.15 Tools, equipment and testing devices requirements
needed to carry out the installation 1.19 Tools, equipment and testing devices
work are obtained in accordance with needed to carry out the installation
established procedures and checked for work are obtained in accordance with
correct operation and safety established procedures and checked for
1.16 Computer hardware is assembled in correct operation and safety
accordance with established procedures 1.20 Computer hardware is assembled in
and systems requirements accordance with established procedures
1.5 Basic-input-output-system (BIOS) and systems requirements
configuration is performed in accordance 1.5 Basic-input-output-system (BIOS)
with hardware requirements configuration is performed in accordance
with hardware requirements
Seat Work
Quiz Seat Work
Practical Quiz
Work Practical
Work
______________________________ ______________________________
_ Trainer’s Signature
Trainee’s Signature ______________________________ ______________________________
_ Trainer’s Signature
Trainee’s Signature