MaineDOT

Three-Year
Work Plan
2022 Edition

January 2022
January 18th, 2022

Dear MaineDOT Customers and Partners,


On behalf of the nearly 1,700 dedicated employees at the Maine Department of Transportation
(MaineDOT), I am privileged to present this 2022 Edition of our Work Plan for the three
calendar years 2022, 2023, and 2024. This Work Plan includes all capital projects and programs,
maintenance and operations activities, planning initiatives, and administrative functions. This
plan contains 2,316 individual work items with a total value of $3.17 billion. It consists
principally of work to be delivered or coordinated through MaineDOT, but it also includes
funding and work by other transportation partners, including airports and transit agencies.
A year ago, when the 2021 Edition of the MaineDOT Work Plan was published, it expressed an
underlying sentiment from all of us: “This is the first – and hopefully last – Work Plan released
in the midst of a global pandemic.” Today, we must acknowledge that COVID-19 continues to
impact MaineDOT in many ways – some of them permanent. To date, MaineDOT has lost four
teammates to COVID, and we sorely miss them. Scores of infections, quarantines, close
contacts, isolations, work restrictions, and worker shortages make MaineDOT’s already tough
job even tougher. Extended snow or ice storms this season will tax our ability to maintain usual
levels of service.
I have never been prouder of the team at MaineDOT. No matter what is thrown at us, we find a
way to fulfill our mission of supporting economic opportunity and quality of life by responsibly
providing our customers the safest and most reliable transportation system possible, given
available resources.

As we look ahead, there is reason for cautious optimism. At least three developments indicate
that we soon may be able to transition from “MacGyver” mode – which is MaineDOT’s general
approach, born of fiscal necessity, of doing the best we can with what we have – toward a more
proactive approach.

First, in November 2021, the federal Bipartisan Infrastructure Law (BIL) became law. The
national discussion surrounding this bill has dramatically affected perception and expectations to
the point that the most common question MaineDOT is asked now is “What are you going to do
with all that money?” In short, once funding from the BIL begins to flow, it will be good for
transportation in Maine and could be very good depending upon the rules and policies related to
competitive discretionary grants, but it is not a panacea.

The BIL provides two main types of federal transportation funding: (1) formula funding that
MaineDOT can rely upon to build the basic elements of its Work Plan and (2) competitive
funding from discretionary grant programs, which is less reliable but represents a great
opportunity. The increase in formula funding – although significant (28%) – will be largely
offset by construction cost inflation fueled by tight labor and material markets. The dramatic
increase in competitive discretionary grant programs looks very promising but depends upon
eligibility and related policies being developed by federal agencies, a process that will take many
months or more. MaineDOT is cautiously optimistic that with the continued help of our federal
delegation, grant funding can allow us to make meaningful investments in our iconic New
England villages, connecting corridors, modal options that support the people who need them,
active transportation, and initiatives that support jobs and the environment including port
investments to support a clean energy future.
Second, Maine policymakers and voters continue to demonstrate that they understand the
tangible, foundational value that transportation has to the safety, economic opportunity, and
quality of life of all Maine people. In 2021, in Governor Mills proposed, and the Legislature
approved, two General Fund initiatives that provided nearly $106 million to MaineDOT. This
unprecedented level of General Fund support saved MaineDOT’s capital transportation program
by offsetting a state Highway Fund revenue hole caused by the reductions in fuel tax revenue
from the pandemic and high construction cost inflation. In addition, this past November, more
than 70% of voters approved a $100-million transportation bond, providing much-needed state
match for federal and other funds to support MaineDOT’s capital programs.

Third, our outreach and partnership efforts continue to grow. MaineDOT is leading a
comprehensive look at transportation system and customer needs through several interactive,
planning initiatives that will result in an update of the state’s long-term transportation goals.
These efforts include the Long-Range Transportation Plan 2050, which will synthesize the other
modally specific plans; our Statewide Strategic Transit Plan; the Maine State Rail Plan; and the
first-ever Statewide Active Transportation Plan. Further, this year we are adding a Village
Partnership Initiative to our suite of community-based partnership programs. The Village
Partnership will focus on lower-speed areas where people meet, walk, shop, and do business.
The projects can vary from small, spot improvements to larger, once-in-a-lifetime, placemaking
investments if we successfully partner to access federal discretionary funds.
All these developments point to the promise of a more optimistic, proactive future for
transportation in Maine. With that said, such a future is dependent upon further clarification
regarding goals, costs, and funding – all of which are in a state of flux right now. MaineDOT
intends to use 2022 to evaluate these and other factors, conduct a reset, and emerge from this
period of uncertainty with an updated and proactive plan for transportation in 2023.
Until then, the team at MaineDOT will continue to do what it always does – deliver for the
people of Maine.
Respectfully,

Bruce A. Van Note


Contents
Introduction

MaineDOT’s Three-Year Work Plan – 2022 Edition .................................................................................... i

A. Sources of Funds ....................................................................................................................................... ii


1. State Highway Fund Revenues ......................................................................................................... iv
2. Federal Funds ..................................................................................................................................... iv
3. General Fund Support ...................................................................................................................... ix
4. Other Bonding .................................................................................................................................... ix
5. State Multimodal Funding................................................................................................................. x
6. Municipal Matching Funds .............................................................................................................. x
7. Other Funding Sources ..................................................................................................................... x
8. Previously Programmed Funds ........................................................................................................ x
9. Adapting to Funding Uncertainty ..................................................................................................... xi

B. Uses of Funds ............................................................................................................................................. xi


1. Principles and Processes .................................................................................................................... xi
2. Breakdown of Uses of Funds ............................................................................................................. xvi

C. Unmet Need ............................................................................................................................................. xxii

Reading the Work Plan ........................................................................................................................................ 1


Work Plan Tabs ............................................................................................................................................. 1
Tips on Using This Work Plan .......................................................................................................................... 2

Counties

• Androscoggin ………………………………………………………………...……………………… 3
• Aroostook …………………………………………………………………......................................... 13
• Cumberland ………………………………………………………………......................................... 32
• Franklin …………………………………………………………………............................................ 59
• Hancock ……………………………………………………………………..……………………….. 64
• Kennebec …………………………………………………………………………………………….. 73
• Knox …………………………………………………………………………………………………. 85
• Lincoln ……………………………………………………………………………………………….. 91
• Oxford ………………………………………………………………………………………............... 97
• Penobscot …………………………………………………………………………………………….. 107
• Piscataquis …………………………………………………………………........................................ 125
• Sagadahoc ……………………………………………………………………………………………. 129
• Somerset ……………………………………………………………………………………………… 133
• Waldo ………………………………………………………………………………………………… 141
• Washington …………………………………………………………………………………............... 147
• York …………………………………………………………………………………………………... 154

Statewide Capital Programs …………………………………………………………………………… 170

Statewide Operations …………………………………………………………………………………… 187

Municipal Index …………………………………………………………………………………………. 242

Work Plan Terms and Definitions ……………………………………………………………………… 250


MaineDOT’s Three-Year Work Plan
2022 Edition

Introduction

This Work Plan describes all work planned by the Maine Department of Transportation
(MaineDOT) and its transportation partners for calendar years 2022, 2023, and 2024. Published
early each calendar year, all MaineDOT work plans since 2013 have included all capital projects
and programs, maintenance and operations activities, planning initiatives, and administrative
functions for three calendar years. 1 This Work Plan contains 2,316 work items with a total value
of $3.17 billion, consisting primarily of work delivered or coordinated through MaineDOT. It also
includes funds to be expended by transportation partners that receive federal funds directly,
including airports and transit agencies.

As 2022 begins, we need to acknowledge that the COVID-19 pandemic has affected us in
permanent ways and continues to impact everything we do. To date, MaineDOT has lost four
teammates to COVID, and we miss them. Scores of infections, quarantines, close contacts,
isolations, work restrictions, and worker shortages make MaineDOT’s already tough job even
tougher. Extended snow or ice storms this season will tax our ability to maintain usual levels of
service.

Despite these ongoing challenges, the team at MaineDOT continues to fulfill our mission of
supporting economic opportunity and quality of life by responsibly providing our customers the
safest and most reliable transportation system possible, given available resources. It is a critical
mission that affects all Maine people every day.

As was starkly demonstrated during this pandemic, life doesn’t move forward much if people and
the goods they need can’t move too. At the start of the pandemic, in the spring of 2020, vehicle-
miles traveled (VMT) in Maine and across the country plummeted by almost half, as depicted in
the red line on the graph below. Despite the ongoing pandemic, overall statewide traffic volumes
in 2021 (the black line on the graph below) have largely returned to the pre-pandemic levels of
2019 (the blue line on the graph below). Most recently, for the last ten weeks of 2021, highway
travel has been within 1% of what it was for the same ten weeks two years ago, which was then at
an all-time high.

1
MaineDOT’s Work Plan is different from its Construction Advertisement Schedule, published early each January.
The Construction Advertisement Schedule is a subset of the Work Plan; it contains only capital projects that are
advertised for construction bids from private contractors for one calendar year. The Work Plan includes all work
activities over three calendar years.

i
Although overall highway travel is back, the location and mix of travel appear to be slightly
different. Differences include increased truck traffic likely due in significant part due to home
improvement and online shopping, increased recreational travel, and decreased commuting to
offices in some urban areas. Travel by air and ferry have largely returned to normal or increased
from 2019 levels, whereas train travel is down about 25%, and intercity bus travel remains down
about 50%. How these trends play out in the long term is speculative, but MaineDOT’s job of
keeping Maine moving remains as critical as ever. Doing that job is dependent upon available
resources.

A. Sources of Funds

Any work plan requires that funding levels be estimated using reasonable assumptions.
MaineDOT makes these assumptions with humility and respect. We know that decisions regarding
funding are made by policymakers, not by us. However, the reality is that to achieve the
predictability that the public, policymakers, government officials at all levels, contractors, and
consultants want and need, we need to assemble and publish a longer-term plan, looking ahead, in
this case, three years. To prepare such a plan requires that we predict the future, including levels
of available funding. Although doing so is necessary, it can be uncomfortable, because we do not
want to look overly confident, unappreciative, or unaware of the many competing needs. We are
very aware of our situation and know that we may need to adjust this plan to meet whatever policy
decisions are made.

ii
With that understanding, the major sources of estimated funding that support this three-year Work
Plan are shown in Figure 1 and described below. 2

Figure 1

2
This Work Plan Sources of Funds chart cannot align precisely with the sources charts provided with state Highway
Fund budgets for three major reasons. The first is timing. MaineDOT work plans cover three calendar years, which
is most helpful for construction season planning, while the Maine state budget covers two state fiscal years (July 1st
to June 30th). Federal fiscal years (October 1st through September 30th) include variable schedules for budgeting and
continuing resolutions. Second, the Work Plan funding includes sources that are not part of the state budget,
principally federal FTA and FAA funds received directly by agencies other than MaineDOT and capital funds carried
forward from previous years. Third, the Work Plan includes the total value of projects and activities, even if some
amounts have already been expended (e.g. design and permitting costs).

iii
1. State Highway Fund Revenues

State Highway Fund (HF) revenue sources, shown as the two green wedges in Figure 1, are derived
largely from state per-gallon fuel fees and motor vehicle fees. Those total an estimated $882
million and represent about 28% of the total value of Work Plan items. This revenue includes
budgeted HF allocations (the dark green wedge) and funds passing through the TransCap Trust
Fund at the Maine Municipal Bond Bank after debt service reserve requirements are met (the light
green wedge), which is used for Light Capital Paving.

Highway Fund revenues are a primary, foundational funding source of MaineDOT work plans.
Article IX, Section 19 of the Maine Constitution requires that Highway Fund revenues be used for
specified highway- and bridge-related activities. Even so, these revenues provide some of
MaineDOT’s most flexible funding, allowing us to fund almost all our maintenance and operations
activities and other work without federal or bond-related restrictions. HF revenues allow us to
maintain and operate the system we have, including conducting critical operations like
snowfighting.

2. Federal Funds
This year, before we provide the usual summary of various sources of federal funds – which is
done in subsections (a) through (f) below – we must first outline the potential impacts of the biggest
thing to happen to federal transportation funding in a generation: the recently-enacted Bipartisan
Infrastructure Law.
Maine Transportation Impacts of the Bipartisan Infrastructure Law

Federal funding of infrastructure – including transportation – has been an almost constant topic of
discussion – and thankfully now action – over the last year. In November 2021, Congress passed,
and President Biden signed, the Infrastructure Investment and Jobs Act (IIJA), which has since
become known as the Bipartisan Infrastructure Law (BIL).

At the outset, MaineDOT wants to express its sincere gratitude to the President and Congress –
and especially our Maine Congressional delegation – for coming together to address infrastructure
funding nationally. It has been discussed for many years, and they got it done, thus demonstrating
the wide bipartisan support for the work that we do. This action is very much appreciated, and we
at MaineDOT vow to use this funding prudently to help as many Maine people as we can.

This national discussion has dramatically affected perception and expectations. The most common
question MaineDOT is asked now is, “What are you going to do with all that money?” The high-
level simple answer is that the BIL is good for transportation in Maine and could be very good
depending upon the rules and policies that are being developed related to competitive discretionary
grants, but the BIL is not a panacea for transportation needs in Maine.

A more complete answer requires a look beyond the headlines and to the two types of federal
transportation funding provided by the BIL: (1) formula funding that MaineDOT can rely on to
build the basic elements of its Work Plan and (2) the hugely upsized discretionary grant programs
for which we apply and compete periodically – funding that is less reliable but that provides the
opportunity for us to invest in our transportation system in new and meaningful ways. The first

iv
type of funding – formula funding – is analogous to a pay raise in a home budget. The second
type – discretionary grant programs – is more akin to a competitive bonus program that you are
confident you should be able to win occasionally, but there are no guarantees.

Formula Fund Changes in the BIL. Regarding reliable transportation formula funding, the BIL
calls for MaineDOT to eventually receive about $1.3 billion in core federal highway and bridge
program funding and an additional $225 million in dedicated bridge funding over the five-year life
of the bill. Annually, this translates into an estimated $66 million more in reliable formula funding
on average over the five-year life of the bill, representing about a 28% increase over existing levels.
That will be a welcome and healthy increase, and it could not come at a better time.

By way of context, this increase in reliable formula funds should be evaluated after making at least
three significant observations.

First, although we are confident these authorized formula fund increases will happen, and we have
built this Work Plan accordingly, they have not yet begun to flow. That will happen when an
appropriations bill passes – the second critical step needed to turn authorized funding into
spendable funding. Today, federal funding is governed by a Continuing Resolution that sets
funding levels at historical levels. This means that MaineDOT is currently receiving about 2%
less federal funding than we did last year. When an appropriations bill will pass is unclear. The
current Continuing Resolution is set to expire on February 18th, 2022. An appropriations bill could
happen any time before or after that date. This being a federal election year, history indicates that
the closer the election gets, the tougher it is to pass significant legislation.

Second, as Figure 1 above shows, this Work Plan calls for investing an average of $1 billion per
year in transportation from all sources. In this context, although this $66-million-per-year increase
in reliable formula funding is a welcome part of the largest and most reliable keystones of the
fiscal foundation of our plan, it is not a transformational increase.

Third, construction costs – fueled by tight labor and material markets – are up 30% to 40% or more
in Maine over three years and appear to be still rising. That makes this increase especially well-
timed; it is a lifeline for MaineDOT and transportation in Maine. It is much like a critically needed
cost-of-living increase in your paycheck after you have been experiencing substantially higher
costs. It is a big help in assuring that MaineDOT can perform its core function of providing for
the safe and reliable movement of people and goods over our existing system.

Regarding other modes of transportation, transit formula funding for operations received a healthy
33% increase, and airports may receive increases estimated from 30% to 100%, depending on the
size of airport, use, landings, etc. The bulk of multimodal capital funding will come from
discretionary grant programs.

Discretionary Grant Changes in the BIL. This is the potential game-changer. The BIL provides
an exciting new opportunity for transformational change in Maine through dramatic increases to
existing programs and the creation of many additional competitive discretionary grant programs.

v
Existing grant programs that MaineDOT has come to rely upon – like RAISE and INFRA on the
highway side and CRISI on the rail side – have been dramatically increased, often doubled from
previous levels. This means more opportunity to compete for these grants.

Further, the BIL created at least nine new competitive grant programs, creating more opportunities
to explore. These programs, with the five-year amounts provided nationally, are set forth below.

• Bridge Investment Program: $12.5 billion


• National Infrastructure Project Assistance: $5 billion
• Railroad Crossing Elimination: $3 billion
• Charging and Refueling Infrastructure: $2.5 billion
• Rural Surface Transportation Program: $2 billion
• Promoting Resilient Operations for Transformative, Efficient, and Cost-Saving
Transportation (PROTECT): $1.4 billion
• National Culvert Removal and Replacement: $1 billion
• Active Transportation Infrastructure Investment Program: $1 billion
• Reconnecting Communities Pilot: $1 billion
• Strengthening Mobility and Revolutionizing Transportation (SMART): $1 billion
• Healthy Streets Program: potential of $500 million

How these upsized and new competitive grant programs will impact Maine is not yet clear. Once
the federal agencies define eligibility and award criteria and related policies – a process that will
take many months or more – the potential will become clearer.

With that qualifier, MaineDOT has worked hard to seek federal dollars in the past, and we will do
so again in the future. With the continued help of our delegation, we expect grant funding could
allow us to reimagine aspects of our infrastructure without taking away from our core mobility
function. This could allow meaningful investments in the things that make Maine special: our
iconic villages and downtowns, our connecting corridors, modal options that support the people
who need them, active transportation, and investment targeted to move our economy including
port investment to support the jobs that come with a cleaner energy future. By way of example,
see the discussion on a new Village Partnership Initiative in Section B(1)(c) below.

Summary of Federal Funding

Federal funding of all types, shown in various shades of blue in Figure 1 above, are estimated to
be $1,404 million, which represents about 44% of the total value of Work Plan items. This includes
$1,274 million to be received by MaineDOT and $130 million to be received directly by other
transportation partners, including airports and transit agencies.

Federal funds consist of several types, including core formula programs from the Federal Highway
Administration (the largest segment), federal multimodal funds received by MaineDOT, federal
multimodal funds received by other transportation partners (including airports and transit
agencies), federal competitive grant funding, and assumed federal coronavirus relief funding.
Each of these federal funding types generally includes extensive rules, restrictions, and guidance
that designate and limit how the funding can be used. See Section B(1)(b) regarding Resource
Allocation below. Each type of federal funds is described below.

vi
a. Federal Highway Formula Funds. As noted above, funding for core federal highway programs
from the Federal Highway Administration (FHWA) in this Work Plan, sometimes known as
“formula funds,” is estimated at $1,009 million. It is shown as the solid darker blue wedge in
Figure 1 and represents about 32% of the value of Work Plan items delivered or coordinated by
MaineDOT. These funding sources typically require a state or local match of at least 20% of the
total cost of projects (sometimes significantly more).

b. Federal Multimodal Funds Received by MaineDOT. In addition to highway-related programs,


MaineDOT receives about $65 million of formula funding for non-highway modes over the three-
year Work Plan period from the Federal Transit Administration (FTA), Federal Railroad
Administration (FRA), Federal Motor Carrier Safety Administration, and U.S. Fish and Wildlife
Service. Those modes include transit, rail, marine, and other programs that are administered by
MaineDOT. This is shown as the solid light blue wedge in Figure 1 and represents about 2% of
the total value of Work Plan items.

c. Federal Multimodal Funds Received Directly by Transportation Partners. Our transportation


partners – largely airports and transit agencies – directly receive funding from the Federal Aviation
Administration (FAA) and the Federal Transit Administration (FTA) outside the state budget
process. These amounts total about $130 million over the three-year period of this Work Plan and
are shown as the medium blue wedge in Figure 1. These amounts are listed in the Work Plan
because MaineDOT often provides match for these funds. Such funds are required to be shown in
other federally required plans because they provide a more comprehensive overview of our
statewide transportation system investment.

d. Federal Competitive Grants. Competitive USDOT discretionary grant programs have become
a critical component of the fiscal foundation that supports basic transportation needs in Maine.
These programs include BUILD, INFRA, TIGER, FASTLANE, CRISI, AID Demonstration, and
FTA grants. This Work Plan is built upon $190 million of awarded grants, shown as the blue
polka-dotted wedge in Figure 1 and representing about 6% of the total value of Work Plan items.
The awarded grants and future successful applications are an assumed portion of the funding of
many other projects in this plan.

Due to well-prepared applications and the outstanding work of our Congressional delegation,
Maine has been very fortunate to receive a very high percentage of grant funding for which
MaineDOT has applied or endorsed. Over the years, grant projects have shifted from extraordinary
one-time projects like the Madawaska International Bridge replacement project to basic system
needs like bundles of traffic signals and smaller bridges.

Awarded grants that support the work in this Work Plan are as follows:
• $38.1-million INFRA grant to fund the Freight Reliability Actions for Maine (FRAME)
bridge replacement and intersection improvement bundle, which includes eight bridges and
one intersection on critical freight corridors around the state.
• $12.8-million FTA Section 5339 Bus and Bus Facilities grant for construction of the
Acadia Gateway Center intermodal facility and welcome center in Trenton.
• $25-million BUILD grant for the replacement of the Ticonic Bridge connecting Waterville
and Winslow.

vii
• $20-million BUILD grant to fund the Bridging the Economy of Rural Maine six-bridge
replacement/rehabilitation bundle.

• $17.5-million CRISI grant to fund upgrades to the PanAm Railways mainline from
Waterville to Royal Junction.

• $600,000 AID Demonstration grant for innovative designs in construction of the proposed
diverging diamond interchange between I-95 and Hogan Road in Bangor.

• $3.47-million ATCMTD grant Maine Advanced Signal Control and Connected Vehicle
System for Safe, Efficient and Equitable Rural Transportation (MAST) Project to fund the
installation of Advanced Traffic Controllers, remotely viewable and programmable
detectors, and Dedicated Short Range Communications (DSRC) at traffic signals around
the state.

• $45.2-million INFRA grant to fund interstate, NHS, and Freight Network bridge deck and
substructure replacements around the state.

• $16.9-million CRISI grant to fund upgrades to the mainline railway from Waterville to
Mattawmamkeag.

• $1.65-million RAISE grant to improve intersection and interstate ramps over I-95.

• $15-million RAISE grant to reconstruct Foxcroft Road in Houlton, awarded to Houlton


Band of Maliseet Indians.

• $1-million EDA grant for Sea Level Rise and Vulnerability Assessment.

e. Coronavirus Response and Relief Supplemental Appropriations Act of December 2020


(CRRSA). As Figure 1 above shows, this Work Plan includes $9.6 million of federal CRRSA
funds. This represents the undelivered portion of the $45.8 million MaineDOT received earlier
this year.

f. Congressionally Directed Spending. (a.k.a. “Earmarks”) In the 112th Congress (2011-2012),


the House and Senate began observing what has been referred to as an “earmark moratorium” or
“earmark ban.” The earmark disclosure rules in both the House and Senate, however, have
remained in place.

On April 26th, 2021, the chair of the Senate Committee on Appropriations announced an intention
to “restore” the use of Congressionally Directed Spending items in appropriations bills for the
upcoming fiscal year (FFY2022). As noted by the Committee, such Congressionally Directed
Spending items will be subject to the Senate rules and restrictions governing earmarks. Similarly,
on February 26th, 2021, the chair of the House Committee on Appropriations announced that the
committee will accept member requests for Community Project Funding in appropriations bills for
the upcoming fiscal year (FFY2022).

Accordingly, MaineDOT has included member requests made for Congressionally Directed
Spending projects in this Work Plan. These requests total $47.4 million for highway and bridge

viii
projects and $13 million in rail improvement projects. This funding is shown in the associated
federal programs from which they were requested and are treated as added funding. These requests
are currently on hold requiring a FFY2022 appropriations bill to authorize the funding for
approved requests. As with all funding sources, if these funds do not materialize, we will need to
adjust this plan.

3. General Fund Support

When it comes to support from the General Fund, there was good news in 2021. Governor Mills
proposed, and the Legislature approved, two General Fund initiatives – a one-time transfer and
cascade language – that provided nearly $106 million to MaineDOT. MaineDOT thanks Governor
Mills, the Appropriations Committee, and all policymakers who made that happen. This
unprecedented action saved the state’s transportation capital program by filling a Highway Fund
revenue hole caused by pandemic-induce reductions in fuel tax revenue and by paying for
extraordinary construction cost inflation that was exacerbated by the pandemic.

In addition, this past November, more than 70% of voters approved an annual $100-million
transportation bond, which will be used to match federal and other funds and support the capital
programs of the first year (2022) of this plan.

Looking beyond this year, this plan is again built upon an ongoing General Fund support to match
various types of federal funds to support our capital programs. Shown as the yellow in Figure 1,
General Fund support totaling $403 million is assumed over the three-year Work Plan period,
representing about 13% of the total value of Work Plan items. The nature and extent of General
Fund support is subject to policy review and could include a mix of General Fund transfers to
MaineDOT, amounts available through the cascade, wholesale liquor revenue, and/or general
obligation bonding.

4. Other Bonding

a. GARVEE Bonds. This Work Plan also assumes the availability of about $75 million in bond
funds in Grant Anticipation Revenue (GARVEE) bonding allowed by the Federal Highway
Administration. GARVEEs are revenue bonds repaid with future FHWA formula funds. Shown
in orange in Figure 1, the $75 million in proposed new GARVEE bond issuances represents about
2% of the total value of Work Plan items. Authorization for GARVEE bond issuances are typically
included in biennial Highway Fund budgets. In accordance with the transportation debt policy set
forth in 23 MRSA §1604, this level of GARVEE use assures that no more than 15% of such future
federal funds are used for debt service, and at least $25 million in GARVEE capacity is reserved
for emergency needs.

c. TransCap Revenue Bonds. At this time, this Work Plan does not rely upon any new TransCap
revenue bonds issued by the Maine Municipal Bond Bank pursuant to 30-A MRS §6006-G. Since
2008, as revenue streams have been dedicated to support bonding, there have been four TransCap
Trust Fund revenue bond issuances with a face value of $240 million and one refinancing. The
current outstanding principal balance of all TransCap bonds is $87 million.

ix
5. State Multimodal Funding

Non-highway projects are funded through the Multimodal accounts in MaineDOT’s Highway
Fund budget. These accounts rely on funding from a variety of sources, including revenues from
car rental taxes, aviation fuel taxes, island ferry service subsidies, rail taxes, rail leases, and
Penobscot Narrows Observatory fees. This state multimodal funding is shown as the purple wedge
in Figure 1. It totals about $52 million over the three-year period of this plan and represents about
2% of the total value of the Work Plan items.

6. Municipal Matching Funds

This Work Plan is also based upon the anticipated receipt of about $139 million from
municipalities. Shown as the red wedge in Figure 1, this represents about 4% of the total value of
Work Plan items. This funding is largely derived through agreements with municipalities,
reflecting the local benefit of projects and activities in the Work Plan. This includes local funding
for transit operations, local bicycle and pedestrian project funding, airports, and MaineDOT’s
popular Municipal Partnership Initiative (MPI). The MPI program is a voluntary, low-process
program in which municipalities take the lead on projects. MaineDOT acts more like a funder and
partner, providing high-level engineering guidance.

7. Other Funding Sources

This category captures less common, but important, funding from various sources, including from
governmental agencies other than municipalities. This category includes funding from private
shares including such significant projects as the Waterville to Yarmouth rail upgrades, Acadia
Gateway Center, and the Saddleback Mountain Road. This category totals $66 million over the
three-year period of this plan and is shown as the maroon wedge in Figure 1. It represents about
2% of the total value of Work Plan items.

This also includes funding from private sources pledged pursuant to MaineDOT’s Business
Partnership Initiative (BPI). In a typical BPI project, the state contribution is capped at $1 million,
with the state share being one third of the total project cost. The remaining two thirds is typically
split between a private business entity and a municipality.

8. Previously Programmed Funds

These funds represent amounts carried forward that were previously programmed, which is typical
in a long-term capital program. Shown as the white hatched area in Figure 1, this represents 5%
of the total value of Work Plan items. These amounts support projects and activities in multiple
areas listed in the plan and include federal transit and aviation funding, state multimodal funding
and bonding, and capital highway and bridge funding.

x
7. Adapting to Funding Uncertainty

As noted above, each of the sources of funds described requires assumptions and comes with risk
from macroeconomic forces, pandemic realities, competing priorities, and non-appropriation.
Even when funding seems certain, there are many factors that affect MaineDOT’s ability to access
that funding. As an example, as of the date of publication of this Work Plan, the federal BIL
recently passed calls for significant increases to federal funding, but absent an appropriations bill,
that funding is not yet flowing.

As this Work Plan is delivered, MaineDOT is ready to adapt to such changes. If construction bid
prices come in lower than anticipated or new funding becomes available, we will have projects
ready to go to supplement the plan as we did in 2020. Alternatively, if state or federal funding
does not materialize as expected or prices are higher than anticipated, we will defer projects as we
did in the spring of 2019.

In the end, MaineDOT will remain nimble so that we can put available funding to work as soon as
prudently possible.

B. Uses of Funds

1. Principles and Processes

Uses of funds are determined by several factors including data-driven technical asset management
principles, resource allocation principles arising from funding eligibility and system priorities,
goals arising from long-term planning and asset management studies, community outreach and
partnership initiatives, and project selection the input from experts on various MaineDOT
committees. Each of these factors is described below.

a. Asset Management: Rational, Data-Driven, and Customer-Focused. MaineDOT has long used
data-driven asset management strategies to allocate resources and prioritize projects. These
strategies are set forth in MaineDOT’s Transportation Asset Management Plan (TAMP) as well as
in asset-specific MaineDOT documents including its Roads Report, Keeping Our Bridges Safe
Report, Integrated Freight Strategy, Transit Asset Management Plan, Traffic and Mobility Plan,
and Interstate Operating Plan. Federal performance targets and measurements also strengthen
MaineDOT’s existing performance-driven processes. Using objective data, funding requirements,
and the committee process outlined in subsection c. below, MaineDOT allocates resources and
selects projects to maximize customer value from each available dollar. Asset management at
MaineDOT is a continuous loop of planning, delivery, and measurement, as illustrated in Figure 2
below.

xi
Figure 2

b. Resource Allocation Principles: Funding Eligibility and System Priorities. Restrictions on the
use of federal and state eligibilities largely determine the funding available for each expenditure
category in the Work Plan. For example, a specific amount is allocated by FHWA for the National
Highway Performance Program and another amount for the Congestion Mitigation and Air Quality
Program. Aviation funding provided by the FAA must be used for aviation. Funding provided by
the FTA must be used for transit. There is limited flexibility in the use of different funding sources
across programs. This largely determines how much funding there is for certain modes and for
certain uses within modes.

Within these limitations, resources are first allocated to “must-do” uses such as debt service,
federal compliance, winter plowing, and critical safety needs.
Bridges are always a high priority, due to safety concerns and the fact that the loss of a single
bridge can shut down an entire corridor.

Light Capital Paving (LCP), a low-cost-per-mile program that keeps more than half of the 8,800
miles of roads under MaineDOT jurisdiction in serviceable condition, is also always a high
priority. Funding for the LCP program is complicated by the fact that it relies on funding passing
through the TransCap Trust Fund at the Maine Municipal Bond Bank and that use of bond funds
for LCP is imprudent due to its short useful life (seven years).

Further, given the funding challenges at MaineDOT, using all federal funding by providing
required state match must also be a high priority. Failure to deliver a project funded by a past
competitive grant award jeopardizes the success of future awards.

c. Long-term Planning and Asset Management Assessments. At MaineDOT, numerous long-term


planning and assessment management studies are underway that will guide us as we update our
long-term goals.

xii
• Long-Range Transportation Plan 2050 – This plan will convey MaineDOT’s vision for an
integrated view of all modes of a statewide transportation system toward the goal of not
only providing for safe and efficient travel throughout the state, but also enhancing
economic opportunity and quality of life. This will serve as a synthesizing document that
ties together the modally-specific plans to develop a unified vision for the state’s
transportation system.

• Roads Report 2022 – This technical asset management analysis will assess the impact of
recently established capital goals for highways for which MaineDOT is responsible; review
conditions; set service levels; standardize cross section and treatment strategies consistent
with the priority of the road; and determine resulting paving, rehabilitation and
reconstruction funding needs.

• Keeping Our Bridges Safe 2022 – This will be the third edition of a technical asset
management report aimed at assessing the condition of our bridge inventory,
recommending cost-effective management strategies, and determining bridge funding
needs.

• Statewide Strategic Transit Plan – This effort will update the Maine Strategic Transit Plan
2025 considering new developments and funding opportunities. In addition to the needs
in more urban areas, MaineDOT is particularly interested in exploring new models and
approaches for providing public transportation more efficiently and effectively in Maine’s
rural areas.

• Maine State Rail Plan – This is a multi-year guide for focusing federal, state, and local
investments on a rail system that supports the vision, goals, and objectives of this plan.
New planning efforts will also include an analysis of the rail-to-trail or rail-with-trail
conversions for certain state-owned rail assets that are currently dormant.

• Specific Regional Transit Studies – Advocates for increased regional fixed-route intercity
transit, especially in the form of passenger rail, have been pushing for service extensions.
In response to this interest, MaineDOT is conducting two specific regional transit studies
to better gauge demand, costs, and benefits.

o Portland and Lewiston/Auburn. MaineDOT will conduct an economic evaluation


study for commuter and passenger train service between Portland and the
Lewiston/Auburn area. The study builds upon data and next steps included in the
Lewiston/Auburn Passenger Service Study published in May 2019. This
evaluation will incorporate two of the alignments reviewed in the 2019 study and
review potential station sites. The department will also conduct a high-level
alternatives analysis for both rail corridors identified.

o Bangor Transit Propensity Study. MaineDOT will conduct a transit propensity


study to assess the demand and viability for new or enhanced transit service,

xiii
including passenger rail, between the communities of Portland and Bangor. The
study will include a review of relevant traffic counts, recent data from the United
States Census Bureau, population figures, employment data, and all reasonably
feasible corridors of service and primary trip generators that could significantly
affect demand. The study report will include estimates of the propensity of transit
service demand, an estimated range of the incremental growth in transit service
demand, an estimated range of incremental growth in transit service, and cost
estimates of capital required for operating new or enhanced transit services.

• Statewide Active Transportation Plan – This first-ever plan will lay out a statewide vision
and goals for active transportation (a.k.a. bicycle and pedestrian travel), assess current
programs and practices, and identify implementable strategies. Additionally, this active
transportation plan will review key corridors for potential trail-until-rail options and assess
lower-priority highway corridors for potential shoulder enhancements.

• Statewide Aviation System Plan (Phase II) – Phase I was completed earlier in 2021. Areas
of focus for Phase II include maximizing investments to meet system needs, a method of
prioritization for identified needs, development of meaningful and practical metrics to track
condition and performance of the airport system, and recommendations for strategies to
best leverage public investments to generate private investments and public policies that
support a safe and efficient airport system.

d. Community Outreach and Partnership Initiatives. MaineDOT works closely with other state
agencies, counties, municipalities, regional and metropolitan planning organizations, tribal
governments, and stakeholder groups in a collaborative and coordinated manner to address the
transportation needs in communities across Maine. Sometimes these needs fall outside the scope
of MaineDOT’s essential asset management programs, which are properly focused on the need to
support our economic competitiveness by maintaining the safe and reliable regional, statewide,
and interstate movement of people and goods on our existing transportation system.

The more locally focused transportation needs can vary. They can be as basic as resurfacing a
road or as transformative as revitalizing a village, reconstructing a highway to enhance economic
vitality, building new bicycle and pedestrian facilities, or expanding or adjusting transit options.
As these needs are identified by partner groups, MaineDOT looks to partner with affected
communities to find solutions.

To make solutions more likely, MaineDOT has established a suite of partnership initiatives to help
communities meet their needs. These include our Planning Partnership Initiative, Municipal
Partnership Initiative, and Business Partnership Initiative.

This year, we are standing up a fourth partnership initiative to add to our suite of community-based
programs: a Village Partnership Initiative. As noted above, MaineDOT has traditionally focused
on rural highway mobility, mostly in areas with speed limits of at least 45 mph, thus making sure
“you can get there from here.” The Village Partnership Initiative will move beyond this traditional

xiv
and necessary function and focus on projects in lower-speed areas where people meet, walk, shop,
and do business on a human scale. Our iconic New England villages are part of who we are, part
of our brand, and a key part of our economy and quality of life. Simply put, the goal of the Village
Partnership Initiative is to make sure that once you get there, the there is a place you want to be.
In this way, these projects can be bigger than transportation; they can become placemaking.

Building on past successes in places like Naples, Bridgton, Hallowell, and Belgrade, this new
community-based initiative will allow municipalities to make their village areas more walkable,
bicycle-friendly, and business-friendly.

Subject to funding, the Village Partnership Initiative is designed to be available to all willing
communities that have or can agree upon a local vision. Village projects can vary from small, spot
improvements to large, once-in-a-lifetime investments if we can successfully partner to access
federal discretionary funds. Working with other agencies, these communities should have access
to broadband, as good internet connections are as important as physical connections are today.

We have adjusted all four of MaineDOT’s community-based initiatives to provide our municipal
partners with a seamless suite of programs to address concerns, build on a shared vision, and
reimagine our communities.

e. Project Selection Process. For assets MaineDOT controls, like the state highway and bridge
system, prioritization and selection of projects for the Work Plan is driven by MaineDOT staff
committees: the Highway Committee, the Bridge Committee, the Multimodal Committee, the
Safety and Mobility Committee, and the Management Team of the Bureau of Maintenance and
Operations (M&O). These committees are comprised of staff from relevant disciplines and
specializations. They include engineers and technicians with hundreds of years of cumulative
experience.

The committees work throughout the year in conjunction with the Bureau of Planning to identify
project candidates and prioritize them for potential inclusion in the Work Plan. Selection
methodologies for these committees vary according to asset type and transportation mode, but the
underlying asset management principles – managing the overall transportation system; using
current, reliable data and rational scoring systems; and building in flexibility for unanticipated
needs and developments – are common across all areas. In the fall of each calendar year, the
committees review the last two years of the current Work Plan and make any needed adjustments
in cost, schedule, and project scope. Once those adjustments are made, new projects are typically
added for the third year of the Work Plan.

MaineDOT’s Results and Information Office (RIO) coordinates the work of the individual
program committees, the Bureau of Planning’s public outreach efforts, and the MaineDOT
Executive Team to assemble the work activities through the Program Development Division to
produce a final Work Plan.

xv
2. Breakdown of Uses of Funds

The strategies and processes described above result in the listing and description of individual
projects and work activities in the Work Plan. Individual projects can be best found online by
searching by municipality or by work type. As shown in Figure 3 and described below, activities
in this Work Plan can be broken down into four high-level categories 3: (a) capital work including
highway and bridge capital projects and multimodal capital work, (b) operational activities
including highway and bridge maintenance and operations and multimodal operations, (c) system
management work, and (d) administration.

Figure 3

a. Capital Work

This Work Plan includes more than $2.2 billion in capital work. This represents about 70% of all
MaineDOT activities. This focus on capital production distinguishes MaineDOT from most
governmental agencies. This capital work consists of more than $1.8 billion in highway and bridge
projects and nearly $424 million in multimodal capital projects. Capital projects are major
improvement projects with defined beginning and ending dates. This work includes bridge

3
The categories of Uses of Funds for this Work Plan are based upon asset- and activity-based use categories in
MaineDOT management systems and include all funding sources for three years. They are different from the Use of
Funds pie chart categories provided with MaineDOT budget information, which include only amounts affected by the
state budget system over two state fiscal years. Major differences between the two include FTA and FAA funds
expended directly by agencies other than MaineDOT, amounts expended by municipalities, and capital funds carried
forward from previous years.

xvi
replacements, highway construction and paving, acquisition of buses and ferries, sidewalk
construction, and major improvements to airports. Most capital projects in this Work Plan have
undergone or are currently undergoing engineering and will be constructed by private contractors
selected through a competitive bidding process.

i. Highway and Bridge Capital Projects


The largest and most heavily used component of Maine’s transportation system is its 8,800-mile,
state-jurisdiction highway network. Our need to invest in the preservation of the existing highway
and bridge system is significant. This three-year Work Plan directs nearly $1.8 billion to highway
and bridge capital projects, including the following:
• 235 bridge projects – estimated cost: $631 million.
• 115 miles of highway construction and rehabilitation – estimated cost: $155 million.
• 353 highway safety and spot improvements – estimated cost: $237 million.
• 1,057 miles of preservation paving – estimated cost: $462 million.
• 2,162 miles of Light Capital Paving (LCP) – estimated cost: $111 million.

As noted above, MaineDOT manages more than half of the 8,800 miles of highway under its
jurisdiction with the Light Capital Paving (LCP) program. It is our most visible and lowest-cost-
per-mile program. As part of the ongoing quest to squeeze the most value from each exiting dollar,
MaineDOT also reviewed the state’s highway corridor priorities. This review and other policy
changes have resulted in the need to do more than 700 miles per year for 2022 and 2023 and then
hopefully settling in at 700 miles per year in the long term dependent on conditions, funding,
winter severity, etc. Funding for LCP traditionally comes from cash resources, principally funds
passing through the TransCap Trust Fund at the Maine Municipal Bond Bank after debt service
reserve requirements are met. Bonding for LCP is generally considered imprudent due to its short
useful life (seven years). This remains an ongoing challenge to meet the shortfall in cash resources
to meet the LCP need every year.

The bar charts that follow show the total cost of most highway and bridge capital projects in the
Work Plan that are funded for construction, including the costs of construction, engineering, and
right of way (property acquisition).

xvii
xviii
ii. Multimodal Capital Work
Multimodal capital work includes all other non-highway capital work. MaineDOT will invest
$424 million in multimodal capital projects in this Work Plan, including investments in the specific
modes below.

Aviation. This Work Plan provides $107 million for aviation capital needs statewide. Projects
include runway and taxiway reconstruction, safety improvements and devices, and other
enhancements to improve airport access and support economic development.

Transit. This Work Plan funds $81 million in transit capital needs. These funds provide support
to Maine’s 22 regional and local transit providers, which own and operate more than 400 transit
vehicles. MaineDOT oversees procurement and management of the state transit fleet and ensures
compliance with federal requirements and continued eligibility for federal funding.

Passenger Rail. This Work Plan includes $3.9 million of state match for the Wells Siding Project
being developed by the Northern New England Passenger Rail Authority (NNEPRA) as well as
funding for feasibility and design of the Portland Transportation Center.

Ferries. This Work Plan provides about $30.9 million for the Maine State Ferry Service (MSFS)
and Casco Bay Island Transit District (CBITD) capital projects, including funding for ferry
rehabilitation and infrastructure improvements at various locations.

xix
Ports and Other Marine Investments. This Work Plan includes $51.4 million in funding for marine
freight investments and other improvements to public marine facilities. Of this total, $16.5 million
for the Boating Infrastructure Grant (BIG) and Small Harbor Improvement Program (SHIP) is
planned for projects to make waterfront improvements in coastal communities, leveraging local
and private funds.

Freight Rail. This Work Plan provides $114 million in freight rail capital funding. The
investments will include operational improvements on state-owned rail lines, improvements at
railroad crossings, and improvements to critical rail bridges and other rail line capital projects.
Included in that total is $10.5 million for the Industrial Rail Access Program (IRAP), which
leverages private funding.

Active Transportation Capital Projects. This Work Plan includes $38.5 million in funding for
active transportation projects over a three-year period. Projects and initiatives include sidewalk
construction, active transportation shared facilities, crossing improvements, and active
transportation safety improvements.

b. Operations Work

Operational activities at MaineDOT, including administration, can be broken down into highway
and bridge maintenance and operations, multimodal maintenance and operations, and department
operations.

i. Highway and Bridge Maintenance and Operations

Maintenance and operation of Maine’s extensive highway and bridge system – a subset of the
Statewide Operations listings – accounts for a large portion of MaineDOT’s overall work
activities. This work is essential to the movement of people and goods and to the health of the
Maine economy. It is also an essential and cost-effective means of protecting the state highway
and bridge system. From year to year, and within CY2022, actual expenditures for this work will
depend on the constantly changing condition of the transportation system and, importantly, on
weather. For those reasons, overall expenditures for routine maintenance and operation of the
highway and bridge system are shown in the Work Plan as approximate, annual budget figures.
Highway and bridge maintenance and operations work accounts for $535 million in this Work
Plan, while three-year annual averages for major maintenance and operations work include:
• $10.3 million in bridge and structural maintenance.
• $5.2 million in bridge and other infrastructure inspections and inventory.
• $15.5 million in custodial maintenance.
• $22.4 million in drainage maintenance.
• $6.6 million in operational and safety maintenance.
• $9.9 million in surface and base maintenance.
• $46.4 million in winter maintenance.

xx
ii. Multimodal Operations

Multimodal operations cover maintenance and operations of all non-highway infrastructure,


including transit, passenger rail, ferry, and aviation operations. MaineDOT has included $211
million for multimodal operations in this Work Plan.

Transit Operations. Maine’s 22 transit providers provide coordinated service to users within and
between communities around the state. Transit operations work items include transit planning,
administration, and operating support for these services. This Work Plan provides $133 million
for transit operations.

Passenger Rail Operations. The Northern New England Passenger Rail Authority (NNEPRA)
manages the Downeaster passenger rail service, which runs five trains per day from Brunswick to
Boston. This Work Plan provides $13 million annually for these passenger rail operations, which
help provide greater connectivity between Mid-Coast Maine and the Greater Boston area.

Ferry Service Operations. The Maine State Ferry Service (MSFS) connects Islesboro, North
Haven, Swan’s Island, Vinalhaven, Frenchboro, and Matinicus with the mainland. This Work
Plan provides $37.5 million for MSFS operations.

Aviation Operations. This Work Plan provides $5.6 million for statewide aviation operations,
including $1.92 million for operations at one of the two state-owned airports: the Augusta State
Airport.

c. System Management Work

System management is necessary to achieve the mission of the department for the entire
multimodal transportation system. These activities include continuously monitoring the
performance and condition of transportation assets, making sure the projects and scopes selected
are the right ones. System management also involves ensuring that we are meeting customer
expectations and system needs while meeting compliance requirements and doing so within
available resources. This work includes asset management, planning, environmental work,
compliance, and safety efforts. The value of such work in this Work Plan totals $100 million, or
3% of the total value of Work Plan items.

d. Administration
Administration includes executive functions, finance and administration, human resources, most
non-crew training, legal, information technology, federal compliance activities, and other
traditional administrative activities needed to support any large and complex organization. The
value of such work in this Work Plan totals $95 million – less than 3% of the total value of Work
Plan items.
Annually recurring work items for various MaineDOT work units that perform system
management and administration work appear as three annual listings. These and other activities
are provided in the Statewide Operations tab.

xxi
C. Unmet Need: A Time to Reassess

Providing safe and reliable transportation in Maine will always be a big challenge for several
reasons: Maine’s large land area, its relatively low and widely dispersed population, its geology
and weather that – while beautiful – result in an expansive multimodal transportation system that
is a challenge to manage. All this means that transportation needs will always exceed available
funding.

That being so, a seemingly simple question is “How much is the unmet funding need for
transportation in Maine?” As explained below, the answer to that question is not simple,
especially this year.

The last time the question of unmet need was seriously analyzed was in March of 2020, just before
the pandemic impacts struck the nation. At that time, which seems much longer than 22 months
ago, the bipartisan Blue Ribbon Commission to Study and Recommend Funding Solutions for the
State’s Transportation Systems (BRC) found that Maine’s unmet capital transportation need was
about $232 million per year. That figure was calculated using estimated 2019 construction costs
and after assuming ongoing General Fund support of $100 million per year would continue –
usually in the form of general obligation bonding. If that support did not exist, the unmet need as
found by the BRC would be about $330 million per year (https://legislature.maine.gov/doc/4091).

To update an unmet funding need in any policy area, one needs to be able to responsibly estimate
at least three basic variables: goals, costs, and available funding. Simply put, one needs to know
what one is trying to achieve, what achieving those goals costs, and what funding is available. A
review of each of these three variables regarding transportation shows that they are all very much
in flux right now, making this an especially difficult time to speak with specificity.

Goals from Long-term Planning. First, transportation goals in Maine are appropriately under
review. On the federal level, policy changes and funding for new programs mean we need to adjust
to make sure Maine is securing its fair share of available federal funding. Federal and state laws
and other policy factors require that we undertake a long-term review of our transportation system
and customer needs to establish long-term goals. As summarized in section B(1)(c) above,
MaineDOT is currently leading numerous high-level, long-term planning and asset management
studies that will guide an update of long-term transportation goals. These assessments are slated
to be complete by the end of this year.

A myriad of transportation goals that affect funding will result from these planning and asset
management efforts. By way of example only, goals could arise regarding the rate of Priority 3
highway rehabilitation, the number of village projects to undertake each year, and the rate of EV
charging station installation.

In addition, other non-transportation policy goals can have a dramatic impact on unmet need. For
example, as noted above, if policymakers wanted to rely less on bonding to support MaineDOT

xxii
capital programs, the unmet need could increase by up to $100 million per year. Policy goals are
bounded only by a policymaker’s imagination. The point is that all of this is necessary to determine
the goals that define the need.

Costs. After determining goals, the next step in determining an unmet funding need is to estimate
the cost of meeting them. Unfortunately, that is another moving target. As noted above, Maine
and the nation have been experiencing a superheated construction bidding environment in recent
years. The cost of materials has skyrocketed, and Maine contractors – like contractors across the
country – continue to struggle to attract construction workers. In Maine, over three years, major
paving treatments have increased by more than 40% and bridge costs have increased by 33%. Just
applying a 20% adjustment from the 2019 estimate of the BRC referenced above would yield an
additional unmet need amount of at least $130 million.

Whether this steep climb in construction prices will continue to moderate is unknown. Most
economists think things will settle out eventually, possibly before the end of this year. Therefore,
that would be a better time to try to estimate what it will cost to meet our goals.

Available Resources. Once we estimate an overall funding need for transportation, we then must
subtract the estimated amount of funding that we reasonably expect to receive. Again, this is a
tough time to make that calculation.

On the federal front, as noted in section A(2) above, we can estimate the increase in the amount of
reliable formula funds per year ($66 million), but that won’t be enough to make up for the loss of
buying power. More importantly, the expanded and new discretionary grant programs may
provide significant influx of transportation funding – perhaps more than $100 million every year.
However, as noted above, we cannot reasonably estimate that right now, as eligibility and award
criteria and related policy surrounding these grant programs are still being defined, a process that
will take months or longer.

Moreover, we need to remember that more federal funding does not mean less need for state
funding in most cases. In fact, because federal funding almost always requires a state match, the
need for state funding will likely increase. Although that may seem counterintuitive, recall that
each additional state dollar may bring in four federal dollars, which make it a very sound
transportation investment. Again, it looks like we will know much more by the end of 2022.

So, what is the answer to the question posed earlier: How much is the unmet funding need for
transportation in Maine? The reasoned answer is that because the variables of goals, costs, and
available funding are all in flux, the question cannot be answered with a precise dollar amount
right now. However, we do know that the new federal BIL, although potentially very helpful,
certainly will not eliminate the need for ongoing state support for transportation; in fact, it could
increase that need. We also know that every dollar we spend on transportation in Maine affects
the safety, economic opportunity, and quality of life of Maine people in very tangible ways.
Infrastructure funding ensures that people can reliably get to and from work and that children can
get safely to and from school. The package on your doorstep at the end of the day was on several

xxiii
trucks, likely a ship, and perhaps a plane. Transportation connects all of us and everything we do,
and the money invested in transportation provides benefits that are tangible and immediate.

By next year, the fog currently surrounding these variables should clear, and we expect to be able
to provide a better estimate of unmet need. In the meantime, the 1,700 dedicated teammates at
MaineDOT will continue to fulfill our mission of supporting economic opportunity and quality of
life by responsibly providing our customers the safest and most reliable transportation system
possible, given available resources.

xxiv
Reading the Work Plan
Reading the Work Plan
The Work Plan describes all projects and activities of the department. Listings in the Work Plan
include projects and activities planned for Calendar Years (CYs) 2022, 2023 and 2024. CY 2022
projects that are not listed as PE-only will proceed as indicated in 2022, unless something unforeseen
occurs. The timing of CY 2023 and 2024 projects are flexible to changing needs, and schedules may
change in next year’s Work Plan. *CY 2023 and 2024 capital projects (represented as 2023/24) are
typically in some stage of pre-construction development and projected to begin sometime in 2023 or
2024, so long as the funding assumptions in the Work Plan unfold as anticipated.

Work Included in the Work Plan


The Work Plan inludes all work for the department, including capital projects, maintenance and
operations activities, and administrative efforts. Specifically, it includes such projects as Planning and
Feasibility Studies, PE-Only projects, capital efforts that have not yet advertised and should advertise
within the timeframe of the Work Plan, administration activities and most maintenance and operations
activities that will occur within the three-year timeframe of the Work Plan. Specific details about each
of these types of projects or efforts may be found in the Work Plan Terms and Definitions.

What’s Not Included in the Work Plan


The Work Plan does not include projects, activities or efforts that will advertise or have already
advertised prior to CY 2022 of the Work Plan. Thus, some projects that are currently ongoing are not
listed in this Work Plan, but may be listed in prior publications.

Work Plan Tabs


• The County Tabs contain location-specific lists - sorted alphabetically by County. Projects
and activities are ordered alphabetically by locality. Those located across municipal
boundaries are shown in an anchor community only, to avoid duplication.
• The Statewide Capital Programs tab includes capital work items that are not tied to a
specific location.
• The Statewide Operations tab describes all other department operations and
administrative activities, both internal to MaineDOT and in partnership with other
agencies.
The Statewide Capital Programs and Statewide Operations lists are displayed similarly to the location-
specific County lists. Work item listings appear as in the following graphic:

1
Tips on Using This Work Plan
This Work Plan is published on the MaineDOT website in printable and searchable formats. Visit
http://maine.gov/mdot/workplan/search/ for more information. In addition to work scheduled for the
next three years, the Work Plan web page also provides municipality-specific reports including a
summary of the highway maintenance work completed in the preceding year, current Local Road
Assistance Program (LRAP) payments, and recently completed capital projects. There is also a link
to MaineDOT’s interactive MapViewer which includes Highway Corridor Priority (HCP)
designations and other features on Maine’s transportation system.

2
Androscoggin

Androscoggin County Livermore


Falls
Population 107,679
Land Area (sq mi) 468
Livermore
Bridges 152
Highway Corridor Priority Miles
HCP 1 123
HCP 2 61

Androscoggin
HCP 3 66
HCP 4 158

Total HCP 1-4 408


Leeds

Turner

Greene

Minot
Wales

Lewiston
Mechanic
Falls
Sabattus

Poland
Auburn
Lisbon

Durham
Androscoggin
ID/Year Municipality Scope Name Description Total Project Cost

Androscoggin Transportation Resource


Policy, Planning and Research Center (ATRC) Unified Planning Work
002153.22
Program: Federally mandated program
Auburn Planning ATRC Planning
2022 associated with Maine's U.S. Census-defined $771,000
MPO Program Management metropolitan planning area in the Greater
Lewiston-Auburn region. Years 2022-2023.

Androscoggin Transportation Resource


Policy, Planning and Research Center (ATRC) Unified Planning Work
002153.24
Program: Federally mandated program
Auburn Planning ATRC Planning
2024 associated with Maine's U.S. Census-defined $771,000
MPO Program Management metropolitan planning area in the Greater
Lewiston-Auburn region. Years 2024-2025.

Policy, Planning and Research


014845.22 Androscoggin Valley Council of Governments
Planning
Auburn AVCOG RPO Support (AVCOG) Regional Planning Organization
2022 $12,500
Statewide Program support.
Development

Policy, Planning and Research


014845.23 Androscoggin Valley Council of Governments
Planning
Auburn AVCOG RPO Support (AVCOG) Regional Planning Organization $12,500
2023
Statewide Program support.
Development

Policy, Planning and Research


014845.24 Androscoggin Valley Council of Governments
Planning
Auburn AVCOG RPO Support (AVCOG) Regional Planning Organization
2024 $12,500
Statewide Program support.
Development

Highway
018651.00 Beginning 0.01 of a mile north of Mill Street
Construction/Rehabilitation
and extending southeast 0.13 of a mile to
2022 Auburn Route 136/Broad Street
Urban Highways Broad Street, and continuing on Broad Street $2,440,000
HCP 1 for 0.06 of a mile. ATRC Sponsored.
Intersection Reconstruction

Highway Safety and Spot


018658.00 Improvements
Fiber optic interconnect, vehicle detection,
2022 Auburn Urban Highways Various Locations signal upgrades, and ADA improvements at $791,000
selected intersections. ATRC Sponsored.
HCP 1, 2, 3 Intersection Improvements W/
Signal

Policy, Planning and Research


018684.05 Safety and infrastructure improvements that
Auburn-Lewiston
Auburn Airport - General may include a master plan update and
2023 Municipal Airport $309,000
obstruction analysis.
Planning Studies

System Operations by Others


020642.22 FTA Section 5307 for urban transit planning -
Auburn Transit - General Urban Transit Planning Androscoggin Valley Council of Governments
2022 $88,000
(AVCOG).
Administrative Assistance

System Operations by Others


020645.22
Urban Transit ADA FTA Section 5307 for ADA Operating -
Auburn Transit - General
2022 Operations Citylink Bus. $89,000
Operating Assistance

3
ID/Year Municipality Scope Name Description Total Project Cost

Highway
022384.00
Construction/Rehabilitation Beginning at East Hardscrabble Road and
2022 Auburn Hotel Road extending north 0.50 of a mile to Lewiston
Urban Highways $2,290,000
Junction Road. ATRC Sponsored.
HCP 3
Intersection Reconstruction

System Operations by Others


022721.22
FTA Section 5307 for Operating Assistance -
Auburn Transit - General Urban Transit Operations
2022 Citylink. $730,000
Operating Assistance

Transit Service Area


022759.22
FTA Section 5307 for Capital Assistance -
Auburn Transit - General Urban Transit Capital
2022 Citylink. $349,000
Capital-Eligible Maintenance

System Operations by Others Androscoggin Transportation Resource


023340.22 Center (ATRC), Federal Transit
Auburn Transit - General Urban Transit Planning Administration §5303 for metropolitan
2022 $94,000
planning, Fiscal Year 2022. Funds are
Administrative Assistance transferred to FHWA.

Transit Service Area Transit Capital Assistance for the


023384.21
Lewiston/Auburn, Federal Transit
Auburn Transit - General Urban Transit Capital $159,000
2022 Administration §5339 for small urban area
Capital Equipment Purchase transit.

Transit Service Area Transit Capital Assistance for the


023384.22
Lewiston/Auburn, Federal Transit
Auburn Transit - General Urban Transit Capital $159,000
2022 Administration §5339 for small urban area
Capital Equipment Purchase transit, Fiscal Year 2022.

Transit Service Area


024625.00
Western Maine Transportation Systems
Auburn Transit - General Rural Transit Capital $150,000
2022 capital for new route. CMAQ - FTA Transfer.
Capital Equipment Purchase

Transit Service Area


024627.00
Western Maine Transportation Systems
Auburn Transit - General Rural Transit Capital
2022 capital for new route. CMAQ - FTA Transfer. $150,000
Capital Equipment Purchase

System Operations by Others


024631.00
Western Maine Transportation Systems
Auburn Transit - General Rural Transit Operations
2022 starting a new route. CMAQ - FTA Transfer. $620,000
Operating Assistance

System Operations by Others


024633.00
Western Maine Transportation Systems
Auburn Transit - General Rural Transit Operations
2022 starting a new route. CMAQ - FTA Transfer. $620,000
Operating Assistance

4
ID/Year Municipality Scope Name Description Total Project Cost

System Operations by Others Transit Administrative and Operating


024651.11
Rural Transit Admin/ Assistance for Federal Transit Administration
Auburn Transit - General
2022 Operations §5311 for statewide non-urbanized transit. $2,080,000
Operating Assistance ME-2020-027.

Policy, Planning and Research Androscoggin Transportation Resource


024693.00 Center (ATRC), Federal Transit
Auburn Transit - General Urban Transit Planning Administration §5303 for metropolitan
2023 $100,000
planning, Fiscal Year 2023. Funds are
Planning Studies transferred to FHWA.

024961.00
Highway Paving
Beginning at Lewiston Junction Road and
2022 Auburn Kittyhawk Avenue
extending southeast 1.91 miles to Route 202.
Light Capital Paving
HCP 1

024961.00
Highway Paving
Beginning 0.06 of a mile north of Plummer
2022 Auburn Turner Street
Street and extending south 0.13 of a mile.
Light Capital Paving
HCP 2

024961.00
Highway Paving
Beginning at Route 4 and extending north
2022 Auburn Turner Street
1.19 miles.
Light Capital Paving
HCP 2

024961.00
Highway Paving Beginning 0.33 of a mile south of Youngs
2022 Auburn Hotel Road Corner Road and extending north 0.93 of a
Light Capital Paving mile to Whitman Spring Road.
HCP 3, 4

024961.00
Highway Paving Beginning 0.14 of a mile east of North
2022 Auburn Lake Shore Drive Auburn Road and extending east 2.56 miles
Light Capital Paving to Route 4.
HCP 4

024961.00
Highway Paving Beginning 0.34 of a mile northwest of
2022 Auburn Lake Street Colonial Way and extending northwest 0.63
Light Capital Paving of a mile to Hotel Road.
HCP 4

024961.00
Highway Paving
Beginning at Aviation Avenue and extending
2022 Auburn Lewiston Junction Road
northeast 1.02 miles to Hotel Road.
Light Capital Paving
HCP 4

Route 202:Beginning 0.07 of a mile north of


025125.00 Highway Paving Little Androscoggin River Bridge and
extending north 1.15 miles. Route 202S:
2023/24 Auburn Urban Highways Route 202 Beginning at Minot Avenue and extending
south 2.55 miles to 0.05 of a mile south of
HCP 1 Mill And Fill Chase Street. Includes crossovers and
ramps.

5
ID/Year Municipality Scope Name Description Total Project Cost

System Operations by Others Transit Administrative and Operating


025227.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Auburn Transit - General
2023 Operations §5311 for non-urbanized transit. Western $2,430,000
Operating Assistance Maine Transportation Services (WMTS).

Highway Safety and Spot


025391.00
Improvements
Large culvert (#135116) located 0.19 of a
2023/24 Auburn Route 202
Rural Highways mile north of Eastman Lane. $400,000
HCP 2
Large Culvert Replacement

Transit Service Area


025551.00
FTA Section 5339 Capital Assistance -
Auburn Transit - General Urban Transit Capital
2023/24 Lewiston/Auburn $300,000
Capital Equipment Purchase

Transit Service Area


025595.00
FTA Section 5307 for Capital Assistance -
Auburn Transit - General Urban Transit Capital
2023/24 Citylink. $350,000
Capital-Eligible Maintenance

System Operations by Others


025597.00 FTA Section 5307 for urban transit planning -
Auburn Transit - General Urban Transit Planning Androscoggin Valley Council of Governments
2024 $88,000
(AVCOG).
Administrative Assistance

System Operations by Others


025599.00
Urban Transit ADA FTA Section 5307 for ADA Operating -
Auburn Transit - General $91,000
2024 Operating Citylink Bus.
Operating Assistance

System Operations by Others


025601.00
FTA Section 5307 for Operating Assistance -
Auburn Transit - General Urban Transit Operating $732,000
2024 Citylink.
Operating Assistance

026270.00 Highway Paving


Beginning 0.01 of a mile south of Elm Street
2023/24 Auburn Urban Highways Route 202
and extending northeast 0.71 of a mile.
HCP 1 Mill And Fill

026274.00 Highway Paving


Beginning at Turner Street and extending
2023/24 Auburn Rural Highways Route 4 north 1.33 miles. Including both lanes of a
divided highway for 0.23 of a mile.
HCP 1 Mill And Fill

026276.00 Highway Paving Beginning at the Veterans Memorial Bridge


and extending north 1.43 miles. Includes
2023/24 Auburn Rural Highways Route 4
0.22 of a mile on the Center Street
HCP 1 Mill And Fill southbound lane.

6
ID/Year Municipality Scope Name Description Total Project Cost

WR 43432 Replacing wearing surface and sidewalks on


Bridge and Structural
Maintenance Iron Bridge (#3895) in Auburn which carries
2022 Auburn Main Street
Main Street over Little Androscoggin River. $300,000
HCP 1 Located 210 feet north of Route 136.

Transit Service Area Transit Capital Assistance (preventive


024699.00
Auburn, maintenance) for AVCOG, Citylink, Federal
Transit - General Urban Transit Capital
2023/24 Lewiston Transit Administration §5307 for urbanized $155,000
Capital-Eligible Maintenance area transit.

Policy, Planning and Research


024701.00 Transit Planning Assistance for AVCOG,
Auburn,
Transit - General Urban Transit Planning Federal Transit Administration §5307 for
2023 Lewiston $88,000
urbanized area transit.
Planning Studies

System Operations by Others Transit ADA Operating Assistance for


024703.00
Auburn, AVCOG, Citylink, Federal Transit
Transit - General Urban Transit Operations
2023 Lewiston Administration §5307 for urbanized area $91,000
Operating Assistance transit.

System Operations by Others


024707.00 Transit Operating Assistance for AVCOG,
Auburn,
Transit - General Urban Transit Operations Citylink, Federal Transit Administration §5307
2023 Lewiston $732,000
for urbanized area transit.
Operating Assistance

Transit Service Area


024737.00
Auburn, FTA Section 5339 Capital Assistance -
Transit - General Urban Transit Capital $159,000
2023/24 Lewiston Lewiston/Auburn.
Capital Equipment Purchase

Highway Paving
025761.00 Beginning at Turner Street and extending
Auburn, Urban Highways southeast 2.63 miles, including bridges
Russell Street/VMB
2022 Lewiston (#6260, #6331, #6383, #6384, #6385, #1370)
Ultra-Thin Bonded Wearing and various ramps.
Course

Highway Paving Beginning 0.20 of a mile south of the Auburn


025759.00
town line and extending north 3.78 miles.
Auburn, New Rural Highways
2022 Route 202/202S Continuing 0.02 of a mile south of Chasse
Gloucester
Ultra-Thin Bonded Wearing Street and extending south 2.16 miles.
HCP 1, 2
Course

Policy, Planning and Research


025979.00
Auburn, Public advisory process for future use of the
Railroad - General Berlin Subdivision
2022 Portland rail corridor between Portland and Auburn. $50,000
Feasibility Studies

023657.00
Tracy Brook Bridge (#2852) over Meadow
Highway-Bridges
2022 Durham Route 125 Brook. Located 0.17 of a mile east of $3,440,000
Bridge Replacement Brickyard Hill Road.
HCP 4

7
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


024351.00 Improvements
Installation of intersection Conflict Warning
2022 Durham Rural Highways Route 9 System. Located at the intersection of Route $95,000
9, Swamp Road, and Plummer Mill Road.
HCP 4 Intersection Improvements W/O
Signal

024969.00
Highway Paving Beginning 0.15 of a mile south of Baldwin Hill
Fayette,
2022 Route 17 Road and extending west 6.33 miles to Route
Livermore Falls
Light Capital Paving 133.
HCP 4

Highway Safety and Spot


024287.00
Improvements
Large culvert (#779960) located 0.81 of a
2023/24 Greene Sawyer Road
Rural Highways mile north of Barnard Cove Drive. $682,000
HCP 4
Large Culvert Replacement

Highway Safety and Spot


025475.00
Improvements
Large culvert (#47417) located 0.26 of a mile
2023/24 Greene Sawyer Road
Rural Highways west of Wilkins Road. $590,000
HCP 4
Large Culvert Replacement

Highway Safety and Spot


026420.00
Improvements Beginning at the intersection of Route 17 and
Jay, Livermore
2023/24 Route 133 Depot Street and extending north 0.60 of a
Falls Rural Highways $750,000
mile to Jewell Street.
HCP 3
Drainage Improvements

026166.00
Highway-Bridges Stinchfield Bridge (#5002) over Dead River.
2022 Leeds Route 106 $300,000
Located 0.72 of a mile north of Ridge Road.
Bridge Improvements - PE Only
HCP 4

Highway Paving
025727.00
Rural Highways Beginning 0.11 of a mile east of North Road
2022 Leeds, Wayne Route 219
and extending east 3.83 miles to Route 133.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Safety and Spot


018656.01 Improvements
Fiber optic interconnect, vehicle detection,
2022 Lewiston Urban Highways Various Locations signal upgrades, and ADA improvements at $895,000
selected intersections. ATRC Sponsored.
HCP 1 Intersection Improvements W/
Signal
Highway Safety and Spot
022388.00 Improvements
Beginning at Fairlawn Avenue and extending
2022 Lewiston Urban Highways East Avenue southwest 0.59 of a mile to Tampa Street. $330,000
ATRC Sponsored.
HCP 1, 4 Highway Improvement - PE
Only

Highway Safety and Spot


023667.10
Improvements
Beginning 0.01 of a mile east of Route 11
2023/24 Lewiston Route 126
Urban Highways and extending east 2.09 miles. $755,000
HCP 1
Safety Improvements

8
ID/Year Municipality Scope Name Description Total Project Cost

023669.00 Highway Paving


Beginning 0.03 of a mile east of the Auburn
2023/24 Lewiston Rural Highways Route 202 town line and extending northeast 1.44 miles
to Pettingill Street. ATRC Sponsored.
HCP 1, 2 Mill And Fill

023669.10 Highway Paving


Beginning at Pettingill Street and extending
2023/24 Lewiston Urban Highways Route 202
north 0.22 of a mile.
HCP 2 Mill And Fill

024641.14 Highway Paving


Municipal Partnership Initiative Program.
2022 Lewiston Urban Highways Alfred Plourde Parkway Beginning at Pleasant Street and extending
southwest 0.23 of a mile.
HCP 2 Mill And Fill

024641.15 Highway Paving


Municipal Partnership Initiative Program.
2022 Lewiston Urban Highways Route 126 Beginning at Golden Road and extending
northeast 1.56 miles.
HCP 1 Mill And Fill

Highway Safety and Spot


Improvements
025439.00
Lewiston Urban Highways Traffic Signals Pilot project for signal operations.
2023/24 $41,000
Install Or Replace Traffic
Signals

025621.00 Bicycle/Pedestrian Pedestrian safety improvements to three new


priority crosswalk locations on Main and
2023/24 Lewiston On-Road Sidewalk/Trail Route 126/Route 202 Sabattus Streets to include ADA $322,000
accommodations, high visibility treatments,
HCP 1, 2 Safety Improvements and RRFBs.

Communication and Outreach Minor crossing improvements plus


025623.00 community outreach and education to middle
Lewiston Bicycle/Pedestrian - General Five Corners school students to improve pedestrian
2022 $20,000
conditions around the "Five Corners"
Public Education And Outreach Intersection.

Highway Safety and Spot


025973.00 Improvements Reserved, partial construction funding for
East Avenue. Androscoggin Transportation
Lewiston ATRC Allocation $450,000
2023/24 Urban Highways Resource Center (ARTC) Capital
Improvement funding.
Highway Improvement

Highway System Operations


026146.00
Lewiston Highways - General Various Locations Pilot project for Traffic Signal Operations.
2024 $81,000
System Operations

026318.00 Bicycle/Pedestrian Installation of a new high visibility pedestrian


crossing. Beginning at Bearce Avenue and
2022 Lewiston On-Road Sidewalk/Trail Route 202
extending north 0.25 of a mile to Montello $85,000
HCP 2 Safety Improvements Street.

9
ID/Year Municipality Scope Name Description Total Project Cost

026320.00 Bicycle/Pedestrian
Installation of stamped concrete crosswalks,
2023/24 Lewiston On-Road Sidewalk/Trail Route 196 ADA upgrades, high visibility markings and $250,000
signage.
HCP 1 Safety Improvements

026322.00 Bicycle/Pedestrian
Webster Street/Central Located at the intersection of Sabattus
2023/24 Lewiston On-Road Sidewalk/Trail Avenue/Ash Street/Route Street, Webster Street, Central Avenue, and
$100,000
126 Ash Street.
HCP 1, 3, 4 Safety Improvements

Highway Safety and Spot


020290.00 Improvements
Beginning at Huston Street and extending
2022 Lisbon Urban Highways Route 125 north 0.97 of a mile to 0.19 of a mile south of $300,000
Burrough Road. ATRC Sponsored.
HCP 3, 4 Highway Improvement - PE
Only

Highway Safety and Spot


025389.00
Improvements
Beginning at Bowdoin Street and extending
2023/24 Lisbon Route 196
Rural Highways west 0.27 of a mile to Route 9. $680,000
HCP 1
Drainage Improvements

Highway Paving
025725.00
Litchfield,
Rural Highways Beginning at the Sabattus town line and
2022 Monmouth, Route 9
extending north 7.54 miles.
Wales Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Safety and Spot Beginning at the intersection of Route 133


022643.00
Improvements and Route 17 and extending north 1.11 miles
2023/24 Livermore Falls Route 17 to Route 4. Project funding is contingent on
Rural Highways $8,100,000
Congressionally Designated Spending
HCP 2, 4 approval.
Highway Improvement

025127.00 Highway Paving


Beginning at the Wayne town line and
2023/24 Livermore Falls Rural Highways Route 133
extending north 6.97 miles.
HCP 2 1 1/4" Overlay

Highway Safety and Spot


026428.00 Improvements
Located at the intersection of Route 11,
2023/24 Mechanic Falls Rural Highways Route 11 $480,000
Route 121, and Route 124.
HCP 2 Install Or Replace Traffic
Signals

025937.00
Highway Paving
Mechanic Falls, Beginning 0.73 of a mile east of North Main
2022 Route 121
Minot, Poland Street and extending southeast 2.85 miles.
Light Capital Paving
HCP 2

025285.00 Highway Paving


Beginning at the New Gloucester town line
New Gloucester,
2023/24 Rural Highways Route 122 and extending west 3.57 miles to Maine
Poland
Street. Including the off-ramp to Route 26.
HCP 2 1 1/4" Overlay

10
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025275.00
Improvements
Located at the intersection of Route 26 and
2023/24 Poland Route 26
Rural Highways Route 122. $275,000
HCP 1
Safety Improvements

WR 43462 Replacing culvert (#1051507) on Route 11 in


Drainage Maintenance
Poland Route 11 Poland. Located 0.39 of a mile north of Tripp
2022 $45,000
Lake Road.

Highway Safety and Spot


024353.00 Beginning at Holden Lane and extending
Improvements
High Street/Greene west 0.11 of a mile to Elm Street. Beginning
2023/24 Sabattus
Urban Highways Street at Hemlock Street and extending west 0.04 of $396,000
HCP 4 a mile.
Drainage Improvements

024959.00
Highway Paving
Beginning at Route 126 and extending north
2022 Sabattus Main Street
0.56 of a mile to High Street.
Light Capital Paving
HCP 4

025489.00 Highway Paving


Beginning 0.33 of a mile north of Turcotte
2023/24 Sabattus Rural Highways Route 9
Road and extending northwest 1.24 miles.
HCP 1 1 1/4" Overlay

Highway Safety and Spot


025955.01 Improvements
Located at the intersection of Route 9 and
2023/24 Sabattus Rural Highways Route 9
Route 126. $13,000
HCP 1 Intersection Improvements W/
Signal
Highway Safety and Spot
025955.02 Improvements
Located at the intersection of Route 9 and
2023/24 Sabattus Rural Highways Route 9
Route 132. $21,000
HCP 3 Intersection Improvements W/
Signal

026184.00
Sabattus River Bridge (#5393) over Sabattus
Highway-Bridges
2023/24 Sabattus Route 126 River. Located 0.14 of a mile northeast of $3,000,000
Bridge Improvements Main Street.
HCP 1

Highway
024199.00
Construction/Rehabilitation
Located at the intersection of Route 4 and
2023/24 Turner Route 4 $1,400,000
Rural Highways Route 117.
HCP 1, 3
Intersection Reconstruction

Highway Safety and Spot


024201.00
Improvements
Located at the intersection of Route 4, Bear
2023/24 Turner Route 4
Rural Highways Pond Road, and Howe's Corner Road. $2,420,000
HCP 1
Safety Improvements

11
ID/Year Municipality Scope Name Description Total Project Cost

025309.00
Turner Center Bridge (#3886) over the
Highway-Bridges
2023/24 Turner Route 117 Nezinscot River. Located 0.07 of a mile west $1,800,000
Bridge Deck Replacement of Lower Street.
HCP 3

Highway
025417.00
Construction/Rehabilitation
Beginning 0.10 of a mile south of Route 4
2023/24 Turner Route 219
Rural Highways and extending east 2.03 miles. $606,000
HCP 3
PMRAP DOT Pugmill

Highway Safety and Spot


026286.00
Improvements
Located at the intersection of Route 4 and
2023/24 Turner Route 4
Rural Highways Weston Road. $595,000
HCP 1
Safety Improvements

WR 43835 Ditching and replacing culverts on Route 219


Drainage Maintenance in Turner. Beginning at the junction of Route
2022 Turner Route 219
4 and extending east 3.85 miles to the $266,000
HCP 3 Turner-Leeds town line.

Highway Safety and Spot


026244.00
Improvements
Install backplates with yellow reflective strips
2023/24 Various Towns Route 26 $335,000
Rural Highways and supplemental signal heads.
HCP 1, 2, 3
Safety Improvements

12
Big
Twenty
Aroostook
Twp

T19 R12 T19 R11


WELS Madawask a
WELS
Frenchville
T18 Fort Grand
T18 R12 T18 R11 Saint Isle
R13
WELS WELS Kent Agatha
WELS
T18 R10 Van Van
WELS Saint T17 R4 Buren Buren
T17 R13 T17 R12 New Cross
T1 7 Saint John Plt Wallagrass
WELS WELS Canada Lake Twp WELS Cove
R1 4 Francis Twp
WELS
Cyr Plt
Allagash T16 R6 T16 R5 Hamlin
T16 R14 T16 R13 T16 R12 T16 R9 T16 R8 Eagle Madawaska Stockholm

WELS WELS WELS WELS WELS Lake WELS WELS Lake Twp

Connor Caswell
T15
Twp
R15 T15 R14 T15 R13 T15 R12 T15 R11 T15 R10 T15 R9 T15 R8 Winterville T15 R6 T15 R5 Westmanland New
WELS WELS WELS WELS WELS WELS WELS WELS Plt WELS WELS Sweden
Limestone
T14 T14 R15 T14 R14 T14 R13 T14 R12 T14 R11 T14 R10 T14 R9 T14 R8
T14 R6 T14 R5 Perham Woodland
R16 WELS WELS WELS WELS WELS WELS WELS WELS T14 R7 Caribou
WELS WELS
WELS WELS

T13 R16 T13 R15 T13 R14 T13 R13 T13 R12 T13 R11 T13 R10 T13 R9 T13 R8
T13 R7 Portage T13 R5 Wade Wash burn Fort
WELS WELS WELS WELS WELS WELS WELS WELS WELS WELS
WELS Lake Fairfield

T12 R16 T12 R15 T12 R14 T12 R13 T12 R12 T12 R11 T12 R10 T12 R9 T12 R8 T12 R7 Castle Mapleton
T12 R17 WELS Nashville Presque
WELS WELS WELS WELS WELS WELS WELS WELS WELS Hill
WELS Plt Isle
Ashland Easton
T11 R17 T11 R16 T11 R15 T11 R14 T11 R13 T11 R12 T11 R11 T11 R10 T11 R9 T11 R8 T11 R4
WELS T11 R7 Garfield Chapman
WELS WELS WELS WELS WELS WELS WELS WELS WELS WELS
WELS Plt
Mars
Westfield Hill
T10 R8 T10 R3
T10 R7 T10 R6 Masardis Scopan
WELS Twp WELS
WELS WELS Blaine
E Twp
T9 R8 Oxbow T9 R5 T9 R4

Aroostook
T9 R7 T9 R3 TD R2 Bridgewater
WELS Plt WELS WELS
WELS WELS WELS

Saint
T8 R5 T8 R3
Croix TC R2
WELS WELS Monticello
Twp WELS

T7 R5 Webbertown Dudley
WELS Twp Twp Ham mond Littleton

Moro Plt Merrill Smyrna Ludlow


Aroostook County New
Houlton
Limerick
Population 67,111 Hersey Dyer
Oakfield
Brook
Land Area (sq mi) 6,671 Linneus Hodgdon
T4 R3
Bridges 310 Crystal Island
Falls WELS TA R2 Cary Plt
WELS
Highway Corridor Priority Miles
T3 R3
Forkstown Amity
HCP 1 195 Sherman
T3 R4
WELS WELS
Twp

HCP 2 217
Silver Glenwood Orient
T2 R4
HCP 3 123 Ridge
Twp WELS
Plt Haynes ville

HCP 4 554 Upper Weston


Molunkus Twp
T1 R5
WELS
No rth Ya rm o uth
Reed Plt
Bancroft
Aca d em y
Gra nt Tw p

Total HCP 1-4 1,089 Macwahoc


Molunkus
Plt
Twp
Aroostook
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026422.00 Improvements
Cross culvert (#179682) located 1.07 miles
2022 Allagash Rural Highways Route 161
east of Carney Road. $35,000
HCP 3 Large Culvert Rehabilitation -
PE Only

WR 43344 Replacing catch basin (#267164) in Allagash.


Drainage Maintenance Located 0.55 of a mile south of the Saint
2022 Allagash Dickey Road
John River Bridge (#3909) on the Dickey $41,000
HCP 4 Road.

Communication and Outreach


025075.00 Davis Bridge (#5067) over Davis Stream.
Amity Planning Estabrook Road Located 0.42 of a mile south of the Cary Twp.
2022 $25,000
town line.
Municipal/Public Outreach

Highway Paving
025743.00
Rural Highways Beginning 0.80 of a mile north of Tracy Road
2022 Amity, Cary Twp Route 1
and extending north 4.24 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

026490.00 Highway Paving


Beginning 0.01 of a mile east of Route 11
2023/24 Ashland Rural Highways Route 163
and extending east 0.58 of a mile.
HCP 2 Mill And Fill

Paving the approach to bridge joints on Little


WR 42041 Machias Bridge (#3555) located 0.14 of a
Surface and Base Maintenance mile south of the Wrightville Road
2022 Ashland Route 11
intersection, and Aroostook Bridge (#3554) $26,000
HCP 2 located 327 feet east of the intersection of
Garfield Road and Portage Road.

WR 42412
Drainage Maintenance Replacing culvert (#110387) on Route 227 in
2022 Ashland Route 227 Ashland. Located 2.34 miles east of the $23,000
intersection of Route 11 and Route 227.
HCP 4

026488.00 Highway Paving


Ashland, Castle Beginning 0.18 of a mile west of T11 R4
2023/24 Hill, T11 R4 Rural Highways Route 163 WELS town line and extending east 3.18
WELS miles.
HCP 2 1 1/4" Overlay

024977.00
Highway Paving
Ashland, Beginning at Lagoon Road and extending
2022 Route 11
Nashville Plt north 8.60 miles.
Light Capital Paving
HCP 2

WR 41514 Ditching on Garfield Road in various


Ashland, Drainage Maintenance locations. Beginning at the intersection of
2022 Garfield Road
Masardis Route 11 in Ashland to the intersection of $136,000
HCP 4 Route 11 in Masardis.

13
ID/Year Municipality Scope Name Description Total Project Cost

WR 42822
Drainage Maintenance Ditching on Bancroft Road in Bancroft.
2022 Bancroft Twp Bancroft Road Beginning at the intersection of Hinch Road $26,000
and extending south 2.00 miles.
HCP 4

024981.00
Highway Paving
Bancroft Twp, Beginning at Ferry Road and extending east
2022 Selden/Number 9 Road
Orient, Weston 5.10 miles to Route 1.
Light Capital Paving
HCP 4

024981.00
Highway Paving
Bancroft Twp, Beginning 0.28 of a mile north of the Weston
2022 Bancroft Road
Weston town line and extending south 2.50 miles.
Light Capital Paving
HCP 4

025307.00
Casey Road/I-95 Bridge (#6165) over
Highway-Bridges
2023/24 Benedicta Twp Casey Road Interstate 95. Located 0.76 of a mile west of $650,000
Bridge Painting Aroostook Road.
HCP 1

026238.00
Casey Road/I-95 Bridge (#6165) over
Highway-Bridges
2023/24 Benedicta Twp Casey Road Interstate 95. Located 0.76 of a mile west of $4,500,000
Bridge Deck Replacement Aroostook Road.
HCP 1

WR 43862 Repairing base and surface of Pond Road in


Surface and Base Maintenance Benedicta. Beginning 100 feet from the
2022 Benedicta Twp Pond Road $100,000
intersection of Plunkett Road extending east
HCP 4 2.30 miles.

Benedicta Twp, Highway Safety and Spot


026470.00 Large Animal/Vehicle crash mitigation
Herseytown Twp, Improvements
measures. Beginning at the T2 R9 NWP town
2023/24 Medway, Interstate 95 $12,000
Interstate line and extending north 28.59 miles to the
Sherman, T1 R6
HCP 1 Crystal town line.
WELS Safety Improvements

024783.01 Whitney Brook Bridge (#2942) over Whitney


Highway-Bridges Brook. Located 0.04 of a mile north of the
2022 Bridgewater Route 1 $4,060,000
Boundary Line Road. FHWA BUILD Grant
Bridge Replacement recipient.
HCP 1

024979.00
Highway Paving
Beginning at Route 1 and extending east
2022 Bridgewater Corner Road
2.99 miles to Boundary Line Road.
Light Capital Paving
HCP 4

024979.00
Highway Paving
Beginning at Route 1 and extending
2022 Bridgewater Boundary Line Road
northeast 3.87 miles.
Light Capital Paving
HCP 4, 5

14
ID/Year Municipality Scope Name Description Total Project Cost

Communication and Outreach


025093.00 Mill Bridge (#0163) over Whitney Brook.
Bridgewater Planning Tannery Street Located 0.06 of a mile north of Boundary
2022 $25,000
Line Road.
Municipal/Public Outreach

WR 42968 Ditching on Boundary Line Road in


Drainage Maintenance Bridgewater. Beginning 0.50 of a mile from
2022 Bridgewater Boundary Line Road
the junction of Route 1 and extending east $102,000
HCP 4 3.35 miles to the Canadian Border.

Highway Safety and Spot


024557.00 Improvements Provide natural plantings to control blowing
Bridgewater, Cyr and drifting snow across the roadway at
Route 1
2022 Plt Rural Highways various locations that have not yet been $130,000
identified.
Safety Improvements

Work Program Management


017236.44
Railroad crossing (#0042) over Otter Brook.
Caribou Environmental Limestone Substation
2022 Located off Limestone Street. $340,000
Natural Resource Mitigation

Aviation
018688.04 Safety and infrastructure improvements that
Caribou Apron Caribou Municipal Airport may include design and reconstruction of the
2023/24 $642,000
apron.
Reconstruction

018984.00
Highway-Bridges Caribou Stream Bridge (#0181) over Caribou
2023/24 Caribou Bridge Street Stream. Located 0.02 of a mile south of $520,000
Bridge Substructure Water Street.
HCP 5 Rehabilitation

Highway Safety and Spot


022841.00
Improvements Beginning 1.50 miles northwest of the
2023/24 Caribou Grimes Road Murphy Road and extending north 0.16 of a $895,000
Rural Highways
mile.
HCP 4
Slope Stabilization/Protection

Highway Safety and Spot


022845.00 Improvements
Large culvert (#931080) located 1.07 miles
2022 Caribou Rural Highways Route 164 $155,000
north of Route 1.
HCP 4 Large Culvert Improvements -
PE Only

Highway
023579.00
Construction/Rehabilitation
Located 0.03 of a mile south of Buck Road
2022 Caribou Presque Isle Road $167,000
Rural Highways and extending north 0.05 of a mile.
HCP 4
Highway Rehabilitation

Communication and Outreach


025077.00 Fish Hatchery Bridge (#2284) over Limestone
Caribou Planning Limestone Street Stream. Located 0.06 of a mile south of
2022 $25,000
Route 89.
Municipal/Public Outreach

15
ID/Year Municipality Scope Name Description Total Project Cost

WR 42810
Drainage Maintenance Replacing culverts (#139219, #139223)on
West Presque Isle Road,
2022 Caribou West Presque Isle Road and McBurnie Road
McBurnie Road $16,000
in Caribou.
HCP 4

WR 43438 Department Building and Lot Replacing lights and installing generator
Caribou Maintenance Route 1 transfer switch in buildings (#35723),
2022 $41,000
(#35724). Located on Route 1 in Caribou.

Highway Safety and Spot


023739.00 Caribou, Improvements
Haynesville, Route 2A/Route
2022 Rural Highways Cable guardrail replacement.
Mapleton, 161/Route 227 $89,000
HCP 2, 4 Presque Isle Guardrail
Installation/Replacement

021696.00
Greenlaw Brook No. 2 Bridge (#5625) over
Caribou, Highway-Minor Spans
2022 West Gate Road Greenlaw Brook. Located 0.18 of a mile north
Limestone $3,410,000
Bridge Replacement of Route 89.
HCP 4

024979.00
Highway Paving
Caribou, Beginning at Route 167 and extending north
2022 Route 205
Presque Isle 10.69 miles to Route 161.
Light Capital Paving
HCP 4

024977.00
Caribou, Highway Paving Beginning 0.03 of a mile south of the
2022 Washburn, Route 164 Woodland town line and extending northeast
Woodland Light Capital Paving 2.25 miles.
HCP 4

025885.00
Castle Hill, Highway Paving Beginning 0.84 of a mile northeast of Turner
2023 Mapleton, Route 227 Road and extending northeast 10.43 miles to
Presque Isle Light Capital Paving Skyway Street.
HCP 4

024979.00
Highway Paving
Caswell, Hamlin, Beginning at Route 89 and extending north
2022 Route 1A
Limestone 17.44 miles to Route 1.
Light Capital Paving
HCP 4

Highway Safety and Spot


026404.00 Improvements
Large culvert (#179467) located 0.97 of a
2022 Connor Twp Rural Highways Emond Road
mile west of Van Buren Road. $38,000
HCP 4 Large Culvert Replacement -
PE Only

024977.00
Highway Paving
Connor Twp, Beginning at New Sweden Road and
2022 Station Road
New Sweden extending east 4.86 miles to Route 1.
Light Capital Paving
HCP 4

16
ID/Year Municipality Scope Name Description Total Project Cost

WR 43448 Sealing deck on Thoroughfare Bridge


Bridge and Structural
Maintenance (#2851) which carries Route 161 over Fish
2022 Cross Lake Twp Route 161
River Thoroughfare in Cross Lake Twp. $35,000
HCP 2 Located 0.49 of a mile south of Route 162.

Highway Safety and Spot


026027.00 Improvements
Beginning 0.33 of a mile northwest of
Cross Lake Twp,
2022 Rural Highways Route 161 Ouellette Road and extending west 5.22
New Canada $205,000
miles.
HCP 2 Highway Improvement - PE
Only

024981.00
Crystal, Island Highway Paving
Beginning at T1 R5 WELS town line and
2022 Falls, Sherman, Route 2
extending north 15.00 miles.
Silver Ridge Twp Light Capital Paving
HCP 4

WR 43680 Replacing major signs on Interstate 95 from


Crystal, Dyer Operational and Safety
Maintenance Sherman to Oakfield. Beginning 0.46 of a
2022 Brook, Island Interstate 95
mile north of Route 158 and extending north $16,000
Falls, Sherman
HCP 1 20.66 miles to the Oakfield town line.

WR 42868 Ditching on the Belvedere Road in Island


Drainage Maintenance Falls and Crystal. Beginning at the junction of
Crystal, Island
2022 Belvedere Road Route 159 in Crystal and extending east 2.32
Falls $46,000
miles to the junction of Route 2 in Island
HCP 4 Falls.

WR 42857
Drainage Maintenance Replacing culvert (#47787) on Route 2 in
2022 Dyer Brook Route 2 Dyer Brook. Located 930 feet north of the $15,000
Pond Road.
HCP 4

Highway Safety and Spot


024267.00 Improvements
Large culvert (#941218) located 0.11 of a
2022 Eagle Lake Rural Highways Route 11
mile south of Makayla Drive. $45,000
HCP 2 Large Culvert Improvements -
PE Only
Highway Safety and Spot
024269.00 Improvements
Large culvert (#180935) located 5.07 miles
2022 Eagle Lake Rural Highways Sly Brook Road $45,000
north of the Strip Road.
HCP 4 Large Culvert Improvements -
PE Only

024977.00
Highway Paving
Eagle Lake, Beginning at Quimby Road and extending
2022 Route 11
Winterville Plt north 3.62 miles.
Light Capital Paving
HCP 2

024979.00
Highway Paving
Beginning 0.03 of a mile west of Station
2022 Easton Conant Road
Road and extending east 1.78 miles.
Light Capital Paving
HCP 3

17
ID/Year Municipality Scope Name Description Total Project Cost

024979.00
Highway Paving
Richardson Road/Station Beginning at Center Road and extending
2022 Easton
Road north 3.38 miles to Conant Road.
Light Capital Paving
HCP 4

025885.00
Highway Paving
Easton, Presque Beginning at Centerline Road and extending
2023 Conant Road
Isle east 3.67 miles to Route Station Road
Light Capital Paving
HCP 3

025883.00 Forkstown Twp, Highway Paving Beginning 0.56 of a mile south of the
Glenwood Plt,
2023 Route 2A Glenwood Plt. town line and extending north
Haynesville,
Light Capital Paving 12.82 miles.
HCP 4 Reed Plt

025453.00
Puddle Dock Bridge (#2691) over Pattie
Highway-Bridges
2023/24 Fort Fairfield Route 161 Brook. Located 0.02 of a mile north of $2,920,000
Bridge Replacement Dorsey Road.
HCP 2

026065.00 Highway Paving


Beginning at Route 1A and extending
2023/24 Fort Fairfield Rural Highways Route 161 southeast 1.20 miles. Includes ramps to
Route 1A.
HCP 2 Mill And Fill

026067.00 Highway Paving


Beginning 0.05 of a mile north of McShea
2023/24 Fort Fairfield Rural Highways Route 1A Siding Road and extending northeast 1.04
miles.
HCP 2 Mill And Fill

026430.00 Highway Paving Beginning at Route 1A and extending


northwest 1.50 miles. Continuing 0.11 of a
2023/24 Fort Fairfield Rural Highways Route 161
mile southeast of Green Ridge Road and
HCP 2 1 1/4" Overlay extending northwest 2.34 miles.

WR 35640
Drainage Maintenance Cleaning under guardrail in Fort Fairfield.
2022 Fort Fairfield North Caribou Road Beginning 1.04 miles north of Route 1A in $21,000
and extending north 0.45 of a mile.
HCP 4

Highway Safety and Spot


022861.00 Improvements
Located at the intersection of Route 1 and
2023/24 Fort Kent Rural Highways Route 1
Route 11. $730,000
HCP 2 Install Or Replace Traffic
Signals
Highway Safety and Spot
022863.00 Improvements
Located at the intersection of Route 1 and
2023/24 Fort Kent Rural Highways Route 1
Route 161. $463,000
HCP 2 Install Or Replace Traffic
Signals

18
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026025.00 Improvements
Beginning 0.20 of a mile northwest of the
2022 Fort Kent Rural Highways Route 161 New Canada town line and extending $205,000
northwest 4.00 miles.
HCP 2 Highway Improvement - PE
Only
Highway Safety and Spot
026386.00 Improvements
Located 0.24 of a mile north of N. Perley
2022 Fort Kent Rural Highways Route 161 Brook Road and extending north 0.03 of a $250,000
mile.
HCP 2 Slope Stabilization/Protection -
PE Only

Highway Beginning 0.40 of a mile west of Church


022656.00 Avenue in Frenchville and extending
Construction/Rehabilitation
Fort Kent, northwest 4.66 miles. This project is only
2023/24 Route 1
Frenchville Rural Highways partially funded for construction and is $5,750,000
HCP 2 contingent upon a successful future
Reconstruction competitive grant application.

025881.00
Highway Paving
Fort Kent, Beginning 0.41 of a mile west of Church
2023 Route 1
Frenchville Avenue and extending west 4.66 miles.
Light Capital Paving
HCP 2

025135.00 Highway Paving Beginning 0.36 of a mile south of Tower


Fort Kent, Road and extending north 1.08 miles. Then,
2022 Rural Highways Route 11
Wallagrass beginning at Sutton Siding Road and
HCP 2 1 1/4" Overlay extending north 4.22 miles.

Aviation
018692.05 Safety and infrastructure improvements that
Northern Aroostook
Frenchville Runway/Taxiway may include crack sealing and pavement
2023/24 Regional Airport $103,000
markings.
Crack Sealing

Aviation
018692.06
Northern Aroostook Safety and infrastructure improvements that
Frenchville Airport Buildings $155,000
2023/24 Regional Airport may include hangar door replacement.
Multimodal Improvements

Airport
018692.08 Safety and infrastructure improvements
Northern Aroostook
Frenchville Airport - General including acquisition of snow removal $195,000
2022 Regional Airport
equipment.
Capital Equipment Purchase

Highway Beginning at the Madawaska town line and


022657.00 extending north 5.74 miles to 0.15 of a mile
Construction/Rehabilitation
east of St. Agatha Avenue. This project is
2023/24 Frenchville Route 1
Rural Highways only partially funded for construction and is $7,000,000
HCP 2 contingent upon a successful future
Reconstruction competitive grant application.

Highway Safety and Spot


026394.00 Improvements
Beginning 0.25 of a mile south of Fort Kent
2022 Frenchville Rural Highways Route 1
town line and extending north 0.02 of a mile. $100,000
HCP 2 Slope Stabilization/Protection -
PE Only

19
ID/Year Municipality Scope Name Description Total Project Cost

WR 42821
Drainage Maintenance Replacing culvert (#137554) on Cleveland
2022 Frenchville Cleveland Avenue Avenue. Located 0.18 of a mile north of the $20,000
Airport Avenue intersection.
HCP 4

WR 43372 Ditching on Airport Avenue in Frenchville.


Drainage Maintenance Beginning at the intersection of Cleveland
2022 Frenchville Airport Avenue
Avenue and Airport Avenue and extending $30,000
HCP 4 south 2.08 miles.

025881.00
Highway Paving Beginning 0.06 of a mile east of the
Frenchville,
2023 Route 1 Frenchville town line and extending
Madawaska
Light Capital Paving southwest 5.85 miles.
HCP 2

Highway Safety and Spot


024245.00
Improvements
Large culvert (#47248) located 1.25 miles
2023/24 Grand Isle Route 1
Rural Highways north of Cyr Road. $280,000
HCP 1
Large Culvert Improvements

024977.00
Highway Paving
Beginning at Cyr Road and extending north
2022 Grand Isle Route 1
2.86 miles.
Light Capital Paving
HCP 1

Highway Safety and Spot


026424.00 Improvements
Large culvert (#135119) located 0.05 of a
2022 Hamlin Rural Highways Route 1A
mile north of Mauril Road. $55,000
HCP 4 Large Culvert Replacement -
PE Only

Highway Safety and Spot


018823.00
Improvements
Large culvert (#46921) located 1.33 miles
2023/24 Haynesville Route 2A $564,000
Rural Highways north of Glenwood Plt. town line.
HCP 4
Large Culvert Improvements

024143.00 Highway Paving


Hersey, Moro
Beginning at Route 159 and extending north
2022 Plt, Mount Rural Highways Route 11
15.84 miles to T7 R5 WELS town line.
Chase, Patten
HCP 2 1 1/4" Overlay

Communication and Outreach


025097.00 Old Hamilton Bridge (#0149) over South
Hodgdon Planning McIntyre Road Branch Meduxnekeag River. Located 1.23
2022 $25,000
miles south of the Houlton town line.
Municipal/Public Outreach

025883.00 Hodgdon, Highway Paving


Houlton, Beginning 1.52 miles south of the Linneus
2023 Route 2A
Linneus, TA R2 town line and extending north 11.82 miles.
WELS Light Capital Paving
HCP 4

20
ID/Year Municipality Scope Name Description Total Project Cost

WR 43195 Ditching on Route 2A at various locations.


Hodgdon, Drainage Maintenance Beginning at Linneus-TA R2 WELS town line
2022 Route 2A
Houlton, Linneus and extending north 10.30 miles to the town $134,000
HCP 4 of Houlton compact line.

WR 43194 Ditching on Hodgdon Mills Road in various


Hodgdon, Drainage Maintenance locations. Beginning at Route 1 in Hodgdon
2022 Hodgdon Mills Road
Linneus and extending northeast 5.76 miles to Route $31,000
HCP 4 2A in Linneus.

Airport
018695.06 Safety and infrastructure improvements that
Houlton International
Houlton Airport - General may include acquisition of snow removal
2023/24 Airport $618,000
equipment.
Capital Equipment Purchase

022216.00 Bicycle/Pedestrian
Sidewalks on Market Square, Water Street,
2023/24 Houlton On-Road Sidewalk/Trail Market Square Broadway, and Main Street for a total length $1,080,000
of 0.36 of a mile.
HCP 4 Reconstruction

022240.00
Cooks Brook Bridge (#3401) over Cooks
Highway-Minor Spans
2023/24 Houlton Foxcroft Road Brook. Located 1.08 miles north of Pleasant $1,760,000
Bridge Replacement Street.
HCP 4

Highway Safety and Spot


022885.00 Improvements
Located at the intersection of Smyrna Road
2023/24 Houlton Urban Highways Route 1
and North Street. $497,000
HCP 2 Install Or Replace Traffic
Signals

025157.00
Houlton, I-95 SB / US Route 1 Bridge
Highway-Bridges
2023/24 Houlton Interstate 95 Southbound (#6098) over Route 1. Located 0.30 of a mile $350,000
Bridge Painting south of Exit 302.
HCP 1

025159.00
Houlton, I-95 NB / US Route 1 Bridge
Highway-Bridges
2023/24 Houlton Interstate 95 Northbound (#1382) over Route 1. Located 0.28 of a mile $350,000
Bridge Painting north of Exit 302.
HCP 1

026079.00
I-95 SB / Meduxnekeag River Bridge (#6099)
Highway-Bridges
2023/24 Houlton Interstate 95 Southbound over Meduxnekeag River. Located 0.50 of a $800,000
Bridge Painting mile north of Foxcroft Road.
HCP 1

Highway Safety and Spot


026388.00 Improvements
Located 0.09 of a mile northeast of McIntyre
2022 Houlton Rural Highways Route 2A
Road and extending northeast 0.22 of a mile. $250,000
HCP 4 Slope Stabilization/Protection -
PE Only

21
ID/Year Municipality Scope Name Description Total Project Cost

Highway
026590.00
Construction/Rehabilitation Beginning at Route 2 and extending north
2023/24 Houlton Foxcroft Road 4.47 miles to the Littleton town line. RAISE
Rural Highways $16,300,000
Grant recipient
HCP 4
Reconstruction

WR 43183 Sealing wear surface on bridges. B Stream


Bridge and Structural
Maintenance Ludlow Road, Front Bridge (#0151) located 280 feet east of
2022 Houlton
Ridge Road McSheffery Road. Niles Bridge (#3681) $36,000
HCP 4 located 170 feet north of B Road.

WR 43244
Bridge and Structural Painting beam ends and bearings on
2022 Houlton Maintenance Highland Avenue Highland Ave Bridge (#3874). Located 200 $20,000
feet north of River Street in Houlton.
HCP 1

026077.00 Houlton, Island


Highway-Bridges
Falls, Ludlow, Interstate 95 Southbound Interstate 95 Southbound and Northbound
2023/24 Oakfield, Bridge Beam Ends & Bearing and Northbound Region 5 Bridges. $1,650,000
Smyrna Painting

Highway Paving
025525.00 Houlton, Ludlow,
New Limerick, Interstate Beginning at Route 2 and extending south
2023/24 Interstate 95 Southbound
Oakfield, 19.27 miles.
Smyrna Ultra-Thin Bonded Wearing
HCP 1
Course

025155.00 Houlton, Various bridge joint improvements on


Highway-Bridges
Oakfield, Interstate 95 Southbound Interstate 95 southbound in Oakfield, $2,000,000
2022
Smyrna Bridge Joint Replacement Smyrna, and Houlton.

025147.00
Route 159/ I-95 Bridge (#6175) over
Highway-Bridges
2023/24 Island Falls Route 159 Interstate 95. Located 0.64 of a mile east of $700,000
Bridge Painting Old Patten Road.
HCP 1

025149.00
Belvedere Road/ I-95 Bridge (#6174) over
Highway-Bridges
2023/24 Island Falls Belvedere Road Interstate 95. Located 0.63 of a mile $750,000
Bridge Painting northwest of Sherman Street.
HCP 1

025153.00
Highway-Bridges Various bridge joint improvements on bridges
Island Falls Interstate 95 Southbound
2022 (#6176, #6177, #6178). $2,000,000
Bridge Joint Replacement

026081.00 I-95 SB/B&ARR and Patten Road Bridge


Highway-Bridges
Island Falls Interstate 95 Southbound (#6176) over Patten Road. Located 0.49 of a
2023/24 $600,000
Bridge Painting mile north of Crystal Road.

22
ID/Year Municipality Scope Name Description Total Project Cost

WR 43361
Drainage Maintenance Repairing catch basins (#906435, #906449,
Island Falls,
2022 Route 2 #892111) on Route 2 in Island Falls and
Smyrna $26,000
Smyrna.
HCP 4

Beginning on Route 1A at School Avenue


023813.00 Bicycle/Pedestrian and extending west on FFA Avenue for 0.10
Route 1A/FFA
of a mile, then continuing on High Street for
2023/24 Limestone On-Road Sidewalk/Trail Avenue/High
0.43 of a mile to Route 89. Also includes $1,040,000
Street/Huggard Avenue
HCP 4, 5 New Construction Huggard Avenue from High St. 0.10 of a mile
east, across Route 1A to Cyr Drive.

022250.00
Kingman Road Bridge (#5021) over
Highway-Bridges
2023/24 Macwahoc Plt Kingman Road Macwahoc Stream. Located 0.38 of a mile $2,420,000
Bridge Improvements southeast of Route 2.
HCP 4

024981.00
Macwahoc Plt, Highway Paving Beginning at the Mattawamkeag town line
2022 Mattawamkeag, Route 2 and extending north 4.58 miles to Silver
Molunkus Twp Light Capital Paving Ridge Road.
HCP 4

WR 42824 Ditching and cleaning guardrails in various


Drainage Maintenance locations. Beginning at the junction of Route
Macwahoc Plt,
2022 Route 2A 2 and Route 2A in Macwahoc and extending
Reed Plt $96,000
north 11.96 miles on Route 2A to the
HCP 4 Glenwood and Reed town line.

022218.00 Bicycle/Pedestrian
Beginning at Fourteenth Avenue and
2023/24 Madawaska On-Road Sidewalk/Trail Route 1 extending west 0.16 of a mile to Sixteenth $678,000
Avenue.
HCP 2 New Construction

Railroad
024899.00
Northern Railway Rail capital improvements for Maine Northern
Madawaska Railroad - General $1,000,000
2022 Company Railway Company.
Capital-Eligible Maintenance

Inventory and Performance


025083.00 Measurement
Madawaska Branch Rail Various bridges along the Madawaska
Madawaska
2023 Rail Bridge Line Branch Rail Line. $150,000

Bridge Inspections

025371.00 Maintenance
Beginning 0.02 of a mile north of Route 1 and
2023 Madawaska Urban Highways Mill Street
extending northeast 0.15 of a mile. $150,000
HCP 2 Maintenance - Drainage

Highway Safety and Spot


025411.00 Improvements
Cross culvert (#227865) located 1.14 miles
2022 Mapleton Rural Highways Hughes Road
south of Route 227. $75,000
HCP 4 Large Culvert Replacement -
PE Only

23
ID/Year Municipality Scope Name Description Total Project Cost

Highway Paving
025755.00 Beginning 0.29 of a mile east of Castle Hill
Mapleton, Rural Highways town line and extending east 7.35 miles and
2022 Route 163/163W
Presque Isle beginning at Route 163 and extending east
Ultra-Thin Bonded Wearing 0.03 of a mile to Dyer Street.
HCP 2
Course

WR 42040 Placing riprap along wingwalls on Squa Pan


Bridge and Structural
Maintenance Bridge (#5025) in Marsardis which carries
2022 Masardis Route 11
Route 11 over Squa Pan Stream. Located $55,000
HCP 2 160 feet south of the Ashland town line.

WR 43450
Bridge and Structural Sealing deck on Aroostook River Bridge
2022 Masardis Maintenance Garfield Road (#3407) in Masardis. Located 0.67 of a mile $86,000
west of the intersection of Route 11.
HCP 4

WR 41515 Ditching on Route 11 in Masardis and Twp. 9


Drainage Maintenance R5 WELS. Beginning at the Ashland-
Masardis, T9 R5
2022 Route 11 Masardis town line and extending 13.90
WELS $23,000
miles south to T9 R5 WELS-T8 R5 WELS
HCP 2 town line.

022252.00
East Hastings Bridge (#3150) over East
Highway-Minor Spans
2022 Merrill Route 212 Hastings Brook. Located 0.96 of a mile east $1,600,000
Bridge Replacement of the Moro Plt. town line.
HCP 3

025537.00
Meduxnekeag Bridge (#2542) over North
Highway-Bridges
2023/24 Monticello Route 1 Branch Meduxnekeag River. Located 0.22 of $800,000
Bridge Painting a mile north of School Street.
HCP 1

Highway
022932.00
Construction/Rehabilitation Beginning 0.63 of a mile north of the Tucker
2022 Moro Plt Route 11 Bridge (#5027) and extending north 0.20 of a $150,000
Rural Highways
mile.
HCP 2
Highway Rehabilitation

Highway
025375.00
Construction/Rehabilitation
Beginning 2.00 miles north of the Ashland
2022 Nashville Plt Route 11 $186,000
Rural Highways town line and extending north 1.35 miles.
HCP 2
Highway Rehabilitation

WR 36921
Drainage Maintenance Repairing culvert (#110842) located 0.81 of a
2022 Nashville Plt Route 11 mile north of the Ashland-Nashville Plt. town $36,000
line.
HCP 2

Highway Safety and Spot


025145.00
Improvements
Beginning 0.05 of a mile west of Martin Road
2023/24 New Canada Route 161
Rural Highways and extending west 0.57 of a mile. $250,000
HCP 2
Slope Stabilization/Protection

24
ID/Year Municipality Scope Name Description Total Project Cost

Highway
026584.00
Construction/Rehabilitation Beginning 0.25 of a mile south of the New
New Canada,
2023/24 Sly Brook Road Canada town line and extending north 0.28 of
Wallagrass Rural Highways $250,000
a mile.
HCP 4
Highway Rehabilitation

Highway Safety and Spot


018843.00
Improvements
Large culvert (#135122) located 0.02 of a
2022 New Sweden Route 161
Rural Highways mile north of Stockholm Road. $378,000
HCP 2
Large Culvert Improvements

Highway Safety and Spot


021803.00
Improvements
Large culvert (#137321) located 0.96 of a
2022 New Sweden Route 161
Rural Highways mile north of Jepson Road. $390,000
HCP 2
Large Culvert Improvements

024977.00
Highway Paving
New Sweden, Beginning at Blackstone Road and extending
2022 Westmanland Road
Westmanland east 3.93 miles.
Light Capital Paving
HCP 4

Highway Safety and Spot


023697.00
Improvements Cross culvert (#942363) located 0.20 of a
2023/24 Oakfield Ridge Road mile east of Crandall Lane and extending $645,000
Urban Highways
north 0.02 of a mile.
HCP 4
Large Culvert Replacement

025177.00
Rail Bridge Thomas Brook Rail Bridge (#7825) located
Oakfield Rail Bridge $5,250,000
2023/24 0.73 of a mile north of Ridge Road.
Bridge Replacement

WR 42873 Ditching on Oakfield Smyrna Road in


Drainage Maintenance Oakfield and Smyrna. Beginning at the
2022 Oakfield, Smyrna Oakfield Smyrna Road northbound on-ramp of Interstate 95 in $16,000
Smyrna and extending north 1.42 miles to the
HCP 3 junction of Route 2 in Oakfield.

024981.00
Highway Paving
Beginning at School House Road and
2022 Orient Boundary Road
extending east 3.04 miles.
Light Capital Paving
HCP 4

024981.00
Highway Paving Beginning at the south intersection of Route
2022 Orient School House Road 1 and extending north 0.94 of a mile to the
Light Capital Paving north intersection of Route 1.
HCP 4

023128.00
Salmon Stream Bridge (#2739) over Salmon
Highway-Minor Spans
2022 Perham Route 228 Stream. Located 0.16 of a mile north of $2,420,000
Bridge Replacement Mouse Island Road.
HCP 4

25
ID/Year Municipality Scope Name Description Total Project Cost

024977.00
Highway Paving
Perham, Beginning at Route 228 and extending east
2022 Carson Road
Woodland 6.11 miles to Route 164.
Light Capital Paving
HCP 4

WR 42413
Drainage Maintenance Replacing culvert (#110778) on Route 11 in
2022 Portage Lake Route 11 Portage. Located 0.18 of a mile south of the $23,000
intersection of the West Road.
HCP 2

024977.00
Highway Paving
Portage Lake, Beginning 0.82 of a mile north of West Street
2022 Route 11
T14 R6 WELS and extending north 8.79 miles.
Light Capital Paving
HCP 2

Highway Safety and Spot


006462.92 Improvements
Beginning at Route 1 and extending north
2022 Presque Isle Rural Highways Presque Isle Bypass
5.83 miles to the Conant Road. $2,570,000
HCP 5 Highway Improvement - PE
Only

Aviation Safety and infrastructure improvements that


018712.09
Presque Isle include hangar taxilane paving, perimeter
Presque Isle Runway/Taxiway $671,000
2022 International Airport fencing, and acquisition of ARFF Equipment
Resurfacing (Foam testing).

Aviation
018712.11 Safety and infrastructure improvements that
Presque Isle
Presque Isle Runway/Taxiway may include crack sealing and pavement
2022 International Airport $299,000
markings.
Crack Sealing

Aviation
018712.14 Safety and infrastructure improvements that
Presque Isle
Presque Isle Runway/Taxiway may include crack sealing and pavement
2023/24 International Airport $299,000
markings.
Crack Sealing

Policy, Planning and Research


018712.18 Safety and infrastructure improvements that
Airport - General Presque Isle include an environmental assessment study
Presque Isle $309,000
2023 International Airport for terminal development and land
Field Investigations, Studies, acquisition.
And Research

Aviation
018712.19 Safety and infrastructure improvements that
Airport - General Presque Isle
Presque Isle include land acquisition and obstruction
2023/24 International Airport $412,000
Sale Or Purchase Of Lot Or removal.
Building

Aviation
018712.20 Safety and infrastructure improvements that
Presque Isle
Presque Isle Airport Buildings include design and permitting for terminal
2023/24 International Airport $618,000
building.
New Construction

26
ID/Year Municipality Scope Name Description Total Project Cost

023204.00
Clark Bridge (#2155) over Clark Brook.
Highway-Minor Spans
2023/24 Presque Isle Route 1 Located 0.27 of a mile north of the Westfield $1,170,000
Bridge Culvert Rehabilitation town line.
HCP 1

System Operations by Others Transit Administrative and Operating


024651.01 Assistance for Federal Transit Administration
Presque Isle Transit - General Rural Transit Operations §5311 for statewide non-urbanized transit.
2022 $979,000
Aroostook Regional Transportation System
Operating Assistance ME-2020-027.

024979.00
Highway Paving Beginning 0.45 of a mile northeast of
2022 Presque Isle State Street Fleetwood Street and extending northeast
Light Capital Paving 1.37 miles to Route 167.
HCP 4

025133.00 Highway Paving Beginning 0.14 of a mile east of North Street


and extending east 0.45 of a mile. Continuing
2022 Presque Isle Rural Highways Route 167
0.24 of a mile east and extending east 1.95
HCP 2 1 1/4" Overlay miles.

System Operations by Others Transit Administrative and Operating


025247.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Presque Isle Transit - General $1,060,000
2023 Operations §5311 for non-urbanized transit. Aroostook
Operating Assistance Regional Transportation System (ARTS).

Transit Service Area


025363.00 FTA Section 5310 Capital Assistance.
Presque Isle Transit - General Rural Transit Capital Mobility For All Discretionary Grant. D2020-
2022 $235,000
MFAP-008
Capital Equipment Purchase

Highway
025369.00
Construction/Rehabilitation
Beginning 0.85 of a mile north of Route 163
2022 Presque Isle Parsons Road $100,000
Rural Highways and extending north 0.10 of a mile.
HCP 4
Highway Rehabilitation

Policy, Planning and Research Beginning 0.02 of a mile north of University


025753.00 Street and extending north 2.33 miles.
Presque Isle Planning Route 1 Project funding is contingent on $1,500,000
2024
Congressionally Designated Spending
Enhanced Project Scoping approval.

Highway Safety and Spot


026418.00 Improvements
Large culvert (#47019) located 0.60 of a mile
2022 Presque Isle Rural Highways Route 163 $15,000
west of Elizabeth Street.
HCP 2 Large Culvert Improvements -
PE Only

026434.00 Phair Crossing Bridge (#3259) over B&A


Highway-Bridges
Presque Isle Route 10 Railroad. Located 0.68 of a mile east of
2023/24 $4,000,000
Bridge Replacement Egypt Road.

27
ID/Year Municipality Scope Name Description Total Project Cost

WR 37260 Ditching on State Street extension in Presque


Drainage Maintenance Isle. Beginning at the intersection of Route
2022 Presque Isle State Street Extension
167 in Presque Isle and extending west for $70,000
HCP 4 1.36 miles.

025109.00 Highway Paving


Presque Isle, Beginning 0.04 of a mile north of Miller Road
2022 Rural Highways Route 1
Westfield and extending north 5.17 miles.
HCP 1 Mill And Fill

024981.00
Highway Paving
Beginning at Drew Plt. town line and
2022 Reed Plt Route 171
extending north 7.21 miles to Route 2A.
Light Capital Paving
HCP 4

WR 39979
Drainage Maintenance Replacing culvert (#182429) on Cleveland
2022 Saint Agatha Cleveland Road
Road in Saint Agatha. $18,000
HCP 4

WR 41681
Drainage Maintenance Replacing culvert (#909482) on Flat
2022 Saint Agatha Flat Mountain Road Mountain Road. Located 1.25 miles west $16,000
from the intersection of Route 162.
HCP 4

WR 42820
Drainage Maintenance Replacing culvert (#182493) on Cleveland
2022 Saint Agatha Cleveland Road Road. Located 0.33 of a mile east of Brise $20,000
Culotte Road in Saint Agatha.
HCP 4

Highway Safety and Spot


022970.00
Improvements Located 2.06 miles north of the Deboullie
2022 Saint Francis Route 161 Mountain Road and extending north 0.06 of a $153,000
Rural Highways
mile.
HCP 3
Slope Stabilization/Protection

WR 32370
Drainage Maintenance Repairing culvert (#179521) on Route 161.
2022 Saint Francis Route 161
Located 20 feet south of Gendreau Lane. $100,000
HCP 3

WR 34069
Drainage Maintenance Replacing culvert (#179530) on Route 161.
2022 Saint Francis Route 161 Located 550 feet south of the Rocky Road in $27,000
Saint Francis.
HCP 3

Highway Safety and Spot


022972.00 Improvements

2022 Saint John Plt Rural Highways Route 161 Located 0.57 of a mile east of Mill Road. $75,000
HCP 3 Slope Stabilization/Protection -
PE Only

28
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025409.00
Improvements
Large culvert (#770402) located 0.84 of a
2022 Saint John Plt Route 161
Rural Highways mile east of Jalbert Road. $350,000
HCP 3
Large Culvert Improvements

Highway
025419.00
Construction/Rehabilitation Beginning 1.20 miles southwest of the Fort
2023/24 Saint John Plt Route 161 Kent town line and extending southwest 3.36
Rural Highways $1,010,000
miles.
HCP 3
PMRAP DOT Pugmill

WR 43616
Drainage Maintenance Replacing culvert (#177424) on Route 161 in
2022 Saint John Plt Route 161 Saint John Plt. Located 0.56 of a mile north $24,000
of the Jalbert Road.
HCP 3

025451.00
I-95 NB /Route 158 Bridge (#6168) over
Highway-Bridges
2023/24 Sherman Interstate 95 Northbound Route 158. Located 0.47 of a mile north of $200,000
Bridge Painting the Benedicta Road.
HCP 1

025539.00
I-95 NB / Benedicta Road Bridge (#6167)
Highway-Bridges
2023/24 Sherman Interstate 95 Northbound over Benedicta Road. Located 0.02 of a mile $400,000
Bridge Painting south of Exit 264.
HCP 1

025545.00 I-95 SB / Benedicta Road Bridge (#1407)


Highway-Bridges over Benedicta Road. Located 0.26 of a mile
2023/24 Sherman Interstate 95 Southbound $400,000
south of Interstate 95 southbound Exit 264
Bridge Painting on-ramp.
HCP 1

025547.00
I-95 SB / Route 158 Bridge (#1406) over
Highway-Bridges
2023/24 Sherman Interstate 95 Southbound Route 158. Located at the Interstate 95 $200,000
Bridge Painting southbound Exit 264.
HCP 1

Highway Safety and Spot


023781.00 Improvements
Cross culvert (#181630) located 1.46 miles
2022 Sinclair Twp Rural Highways Route 162
northeast of Shore Road. $70,000
HCP 4 Large Culvert Replacement -
PE Only

Highway Safety and Spot


023755.00
Improvements
Large culvert (#47102) located 0.39 of a mile
2023/24 Smyrna Route 2 $616,000
Rural Highways southwest of Timoney Lake Road.
HCP 4
Large Culvert Replacement

Highway
020421.00
Construction/Rehabilitation
Beginning 0.02 of a mile south of Monroe
2023/24 Van Buren Route 1
Rural Highways Street and extending north 2.74 miles. $3,080,000
HCP 1
Reconstruction

29
ID/Year Municipality Scope Name Description Total Project Cost

Highway
022658.00
Construction/Rehabilitation Beginning 0.18 of a mile north of Parent
2023/24 Van Buren Route 1 Road in Van Buren and extending north 1.91
Rural Highways $1,800,000
miles.
HCP 1
Reconstruction

024977.00
Highway Paving
Castonguay / Champlain Beginning at Route 1 and extending north
2022 Van Buren
Road 3.04 miles to Route 1.
Light Capital Paving
HCP 4

Rail
025909.00
Rail/Highway Crossings Railroad crossing (#051147P) located 2.32
Van Buren Route 1
2022 miles north of Parent Road. $296,000
Signal Improvements
(Rail/Highway Xing)

026083.00
St. Mary's Bridge (#5309) over Violette
Highway-Bridges
2023/24 Van Buren Castonguay Road Brook. Located 0.03 of a mile north of St. $1,200,000
Bridge Replacement Mary's Brook Road.
HCP 4

026492.00 Highway Paving


Beginning 2.55 miles north of Old Mill Street
2023/24 Van Buren Rural Highways Route 1
and extending north 1.18 miles.
HCP 1 1 1/4" Overlay

026494.00 Highway Paving


Beginning 0.04 of a mile north of Fulton
2023/24 Van Buren Rural Highways Route 1
Street and extending north 1.26 miles.
HCP 1 Mill And Fill

WR 37268 Bridge and Structural Installing curtains and seals, cleaning and
Maintenance coating beams and bearings. International
Van Buren Bridge Street $21,000
2022 Bridge (#2400). Located 0.29 of a mile north
of Route 1.

Highway Safety and Spot


023785.00
Improvements
Beginning at Route 11 and extending east
2022 Wallagrass Soldier Pond Road $360,000
Rural Highways 0.72 of a mile.
HCP 4
Drainage Improvements

022022.00 Bicycle/Pedestrian
Located along Main Street, School Street,
School Street/Route
2023/24 Washburn On-Road Sidewalk/Trail and Hines Street for a total length of 0.48 of a $928,000
164/Route 228
mile.
HCP 4, 5 Multimodal Improvements

024979.00
Highway Paving
Beginning 0.22 of a mile northwest of Hale
2022 Washburn Parson Road
Road and extending northwest 2.66 miles.
Light Capital Paving
HCP 4

30
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025167.00 Beginning 0.01 of a mile north of Jardine
Improvements
Street and extending north 0.39 of a mile to
2023/24 Washburn Route 164/Route 228
Urban Highways School Street. Including 0.09 of a mile on $875,000
HCP 4 Route 228.
Drainage Improvements

025885.00
Highway Paving
Beginning at Berce Street and extending
2023 Washburn Route 164
north 7.11 miles.
Light Capital Paving
HCP 4

WR 34192
Bridge and Structural Repairing abutments. W Branch Salmon
2022 Washburn Maintenance Church Street Brook #2 Bridge (#0122). Located 560 feet $20,000
west of Route 228.
HCP 6

WR 35300
Drainage Maintenance Repairing culvert (#190158) on Route 164 in
2022 Washburn Route 164 Washburn. Located 1.00 mile south of the $45,000
Castle Hill Road.
HCP 4

WR 42136
Drainage Maintenance Repairing culvert (#190156) on Route 164 in
2022 Washburn Route 164 Washburn. Located 0.73 of a mile northwest $45,000
of North White Road.
HCP 4

WR 43589
Operational and Safety Installing new guardrail. Clayton Brook
2022 Washburn Maintenance Parsons Road Bridge (#5458). Located 0.32 of a mile north $26,000
of the intersection of the Annis Road.
HCP 4

Highway Safety and Spot Provide natural plantings to control blowing


021840.00
Improvements and drifting snow across the roadway.
2023/24 Westfield Route 1 Beginning 0.07 of a mile south of the
Rural Highways $98,000
Presque Isle town line and extending south
HCP 1 0.08 of a mile.
Shoulder Improvements

Highway Paving
025741.00
Rural Highways Beginning at the Danforth town line and
2022 Weston Route 1
extending north 3.19 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Safety and Spot


023036.00
Improvements
Large culvert (#135124) located 0.06 of a
2023/24 Woodland Route 161
Rural Highways mile northwest of the Goodwin Road. $605,000
HCP 2
Large Culvert Improvements

Highway
025373.00 Construction/Rehabilitation
Beginning 0.05 of a mile east of Davis Road
2022 Woodland Rural Highways Route 228
and extending east 0.20 of a mile. $10,000
HCP 4 Highway Rehabilitation - PE
Only

31
Cumberland

Harrison

Bridgton

Naples New
Casco Gloucester

Raymond

Sebago Pownal Brunswick


Gray
Freeport
North
Baldwin Yarmouth

Yarmouth
Windham Cumberland
Standish

Falmouth

Gorham
Portland
Westbrook

Cumberland County
South
Population 293,557 Portland

Cumberland
Land Area (sq mi) 835
Scarborough
Bridges 373 Cape
Elizabeth
Highway Corridor Priority Miles
HCP 1 293
HCP 2 129
HCP 3 171
HCP 4 323

Total HCP 1-4 916


Cumberland
ID/Year Municipality Scope Name Description Total Project Cost

WR 43473 Ditching on Route 107 in Baldwin. Beginning


Drainage Maintenance at the intersection of Route 11 and extending
2022 Baldwin Route 107
north 2.85 miles to the Baldwin-Sebago town $50,000
HCP 4 line.

025853.00
Highway Paving
Baldwin, Beginning at the Hiram town line and
2023 Convene Road
Sebago extending east 3.76 miles to Route 107.
Light Capital Paving
HCP 4

Bicycle/Pedestrian
025967.00 Biddeford, Old
ADA improvements for Collector Road paving
Orchard Beach, On-Road Sidewalk/Trail Various Locations
2023/24 projects. PACTS Sponsored. $341,000
Scarborough
Rehabilitation

Bowdoin,
Bowdoinham, Highway Paving
026342.00
Brunswick,
Interstate Interstate 295 Beginning at the Brunswick town line and
2023/24 Gardiner,
Northbound extending north 21.51 miles.
Richmond, Ultra-Thin Bonded Wearing
HCP 1 Topsham, West Course
Gardiner

026236.00
Cornshop Bridge (#0318) over Stevens
Highway-Bridges
2023/24 Bridgton Depot Street Brook. Located 0.20 of a mile west of Main $1,600,000
Bridge Replacement Street.
HCP 5

WR 43578 Repairing sidewalk and wearing surface.


Bridge and Structural
Maintenance Pondicherry Bridge (#2681) over Stevens
2022 Bridgton Route 302 $40,000
Brook in Bridgton on Route 302. Located
HCP 1 0.13 of a mile north of Maple Street.

025937.00
Highway Paving
Bridgton, Beginning at West Main Street and extending
2022 Route 117
Denmark northeast 6.96 miles.
Light Capital Paving
HCP 4

WR 43347 Ditching on Route 107 in Sebago and


Drainage Maintenance Bridgton. Beginning at the intersection of
2022 Bridgton, Sebago Route 107 $90,000
Route 117 and extending to the Sebago-
HCP 4 Baldwin town line.

Airport
018714.07 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Airport - General may include acquisition of snow removal $721,000
2023/24 Airport
equipment.
Capital Equipment Purchase

Policy, Planning and Research


018714.08
Brunswick Executive Safety and infrastructure improvements that
Brunswick Airport - General $172,000
2024 Airport may include a master plan update.
Planning Studies

32
ID/Year Municipality Scope Name Description Total Project Cost

Aviation
018714.17 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Runway/Taxiway may include Taxiway "A" pavement repairs
2022 Airport $172,000
and maintenance.
Crack Sealing

Aviation
018714.19 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Runway/Taxiway may include pavement repairs and
2023/24 Airport $172,000
maintenance.
Resurfacing

Aviation
018714.20 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Airport - General may include automated weather observing
2022 Airport $464,000
system - 3 (AWOS - 3).
Multimodal Improvements

Aviation To design, permit, and construct a Customs


018714.21 and Border Protection facility enabling aircraft
Brunswick Executive
Brunswick Airport Buildings operators to land at the Brunswick airport,
2022 Airport $515,000
clear customs, and continue on to their
New Construction destination.

Aviation
018717.06
Brunswick Executive
Brunswick Airport - General Drainage repairs to Orion Street $412,000
2023/24 Airport
Drainage Improvements

Highway Safety and Spot


021910.00 Improvements
Route 1/Mill Located at the intersection of Route 1, Mill
2022 Brunswick Urban Highways
Street/Stanwood Street Street, and Stanwood Street. $368,000
HCP 1 Intersection Improvements W/
Signal - PE Only

Beginning at the Swinging Bridge and


Policy, Planning and Research extending north along US Route 1/ Mill Street
022212.00
to Bow Street and Cabot Street, and
Brunswick Bicycle/Pedestrian - General Brunswick River Walk $140,000
2022 extending 0.32 of a mile to the Frank J. Wood
Feasibility Studies Bridge (#2016). Also includes the US Route 1
South on-ramp.

Bicycle/Pedestrian
023921.01
Brunswick Multimodal Beginning at Union Street and extending
Brunswick Off-Road Trail/Path
2023/24 Center Pathway west 0.13 of a mile. $487,000
New Construction

024641.11 Highway Paving


Municipal Partnership Initiative Program.
2022 Brunswick Urban Highways Church Road Beginning at Greenwood Road and
extending northeast 0.82 of a mile.
HCP 4 Mill And Fill

024959.00
Highway Paving
Beginning 0.08 of a mile east of Brookview
2022 Brunswick Old Bath Road
Drive and extending east 0.68 of a mile.
Light Capital Paving
HCP 4

33
ID/Year Municipality Scope Name Description Total Project Cost

Highway
025035.01 Business Partnership Initiative Program.
Construction/Rehabilitation
Extension of Katahdin Drive beginning at the
2023/24 Brunswick Katahdin Drive
Rural Highways intersection with Allagash Drive and $1,550,000
HCP 5 extending north to Route 24B.
New Construction

025151.00
Highway-Bridges River Road Bridge (#6267) over Interstate
2023/24 Brunswick River Road 295. Located 0.22 of a mile northwest of Fox $450,000
Bridge Wearing Surface Run Drive.
HCP 1 Replacement

Highway System Operations Route 1: Located 1.36 miles southeast of the


025319.00
Coastal Connector Bypass. Route 1S:
Urban Highways Route 1/Route 1S/Route
2023 Brunswick Located 0.22 of a mile northeast of Route 24.
24 $235,000
Intelligent Transportation Route 24: Located 0.02 of a mile north of
HCP 1, 2 Route 24B.
Systems

025413.00 Bicycle/Pedestrian
Beginning at Fitch Avenue and extending
2022 Brunswick On-Road Sidewalk/Trail Allagash Drive
west 0.73 of a mile. $75,000
HCP 5 New Construction - PE Only

Highway Safety and Spot


025949.00 Improvements
Located at the intersection of Route 1 and
2022 Brunswick Urban Highways Route 1/River Road
River Road. $290,000
HCP 1 Intersection Improvements W/
Signal - PE Only

026011.00 Bicycle/Pedestrian Brunswick Riverwalk - Phase I. Beginning


0.01 of a mile west of Cushing Street and
Route 1/Route 1 South
2022 Brunswick On-Road Sidewalk/Trail extending east 0.11 of a mile. Continuing at
Ramp $125,000
Bow Street and extending west 0.07 of a mile
HCP 1 New Construction - PE Only to Route 1.

Highway Safety and Spot


026037.00 Improvements
Located at the intersection of Route 1 and
2022 Brunswick Urban Highways Route 1/Church Road
Church Road. $215,000
HCP 1 Intersection Improvements W/
Signal - PE Only

026134.00 Highway System Operations


Traffic signal modifications on Maine Street
2024 Brunswick Highways - General Various Locations
and Pleasant Street. $975,000
HCP 1, 4 System Operations

Ports-Harbors
026232.00
Brunswick Boat Ramps Simpsons Point Road Located 0.45 of a mile south of Pennell Way.
2023/24 $175,000
New Construction

026326.00 Bicycle/Pedestrian
Pedestrian safety improvements at the
Mason Street/Federal
2022 Brunswick On-Road Sidewalk/Trail intersections of Mason street, Federal Street,
Street/Water Street $100,000
and Water Street.
HCP 2, 4, 5 Safety Improvements

34
ID/Year Municipality Scope Name Description Total Project Cost

026328.00 Bicycle/Pedestrian
Pedestrian safety improvements at the
Jordan Avenue/Route
2022 Brunswick On-Road Sidewalk/Trail intersection of Jordan Avenue and Bath
24B $50,000
Road.
HCP 2, 5 Safety Improvements - PE Only

WR 41344
Drainage Maintenance Replacing culvert (#47072) on Route 1 in
2022 Brunswick Route 1 Brunswick. Located 1.01 miles east of the $250,000
Freeport town line.
HCP 4

WR 43352 Repairing wearing surface and header. Route


Bridge and Structural
Maintenance 196 RAMP B Over US1 Bridge (#6372) over
2022 Brunswick Route 196
Route 1 in Brunswick. Located 0.42 of a mile $100,000
HCP 1 east of Mason Street.

WR 43353 Repairing wearing surface and joint headers


Bridge and Structural
Maintenance on Route 196 Ramp C Over US 1 Bridge
2022 Brunswick Route 196
(#6373) in Brunswick which carries Route $100,000
HCP 1 196 over Route 1.

Brunswick,
Cumberland, Highway Safety and Spot Service that aids stranded motorists, clears
025228.24 Falmouth, Improvements debris and other hazards from the roadway,
Freeport, Interstate 295 and provides temporary traffic control at
2023/24 Interstate $500,000
Portland, minor accident scenes to help keep
Scarborough, Safety Improvements customers safe and traffic flowing smoothly.
South Portland
Brunswick,
Cumberland, Highway Paving
026338.00
Falmouth,
Interstate Interstate 295 Beginning at the Topsham town line and
2023/24 Freeport,
Southbound extending south 21.63 miles.
Portland, Ultra-Thin Bonded Wearing
HCP 1 Topsham, Course
Yarmouth

Brunswick, Highway Paving


026344.00
Cumberland,
Interstate Interstate 295 Beginning at the Portland town line and
2023/24 Falmouth,
Northbound extending north 21.45 miles.
Freeport, Ultra-Thin Bonded Wearing
HCP 1 Yarmouth Course

Highway Paving
025709.00
Brunswick, Rural Highways Beginning at Mountain Road and extending
2022 Route 24
Harpswell north 7.94 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

022603.00
Frank J. Wood Bridge (#2016) over
Brunswick, Highway-Bridges
2022 Route 201 Androscoggin River. Located on the
Topsham $33,500,000
Bridge Replacement Brunswick-Topsham town line.
HCP 2

026264.00 Highway Paving


Beginning 0.17 of a mile northwest of Pennell
2023/24 Buxton, Gorham Rural Highways Route 202
Road and extending northeast 4.16 miles.
HCP 1 1 1/4" Overlay

35
ID/Year Municipality Scope Name Description Total Project Cost

Highway Beginning 0.13 of a mile north of Route 5


022641.00 extending north 2.16 miles. Beginning 0.16 of
Buxton, Construction/Rehabilitation
a mile north of Main Street extending north
2023/24 Gorham, Hollis, Route 202
Rural Highways 0.20 of a mile. Beginning 0.62 of a mile north $8,780,000
Lyman
HCP 1 of Osborne Road extending north 0.56 of a
Reconstruction mile.

Highway Paving
025711.00
Buxton,
Rural Highways Beginning at South Street and extending
2022 Gorham, Route 22
southwest 4.79 miles to Route 4.
Scarborough Highway Cyclical Pavement
HCP 3
Resurfacing

024963.00
Highway Paving
Buxton, Hollis, Beginning at Route 4 and extending north
2022 Route 35
Standish 11.34 miles.
Light Capital Paving
HCP 3, 4

Highway
022837.00
Construction/Rehabilitation
Buxton, Located at the intersection of Broadturn Road
2023/24 Route 22
Scarborough Rural Highways and Route 22. $2,600,000
HCP 3
Intersection Reconstruction

Bicycle/Pedestrian
024103.00
Beginning at Shore Road and extending
On-Road Sidewalk/Trail
2022 Cape Elizabeth Ocean Road south 0.45 of a mile to Fowler Road. PACTS $100,000
Multimodal Improvements - PE Sponsored.
HCP 4
Only

Highway
025807.00
Construction/Rehabilitation Beginning at the South Portland town line
2022 Cape Elizabeth Shore Road and extending south 0.92 of a mile to Powers $180,000
Urban Highways
Road. PACTS MPI Sponsored.
HCP 4
Reconstruction - PE Only

Bicycle/Pedestrian
024333.00 Cape Elizabeth, Priority Corridor and Centers Pedestrian-
Portland, South On-Road Sidewalk/Trail Various Locations Bicyclist Safety and Access Project. PACTS
2022 $2,250,000
Portland Sponsored.
Safety Improvements

Highway Safety and Spot


024249.00 Improvements
Large culvert (#46309) located 0.10 of a mile
2022 Casco Rural Highways Route 302
north of the Bramble Hill Road. $95,000
HCP 1 Large Culvert Improvements -
PE Only

Ferry
025029.24
Casco Bay Island Transit Casco Bay Island Transit District
Casco Ferry - General
2023/24 District improvements. $300,000
Multimodal Improvements

026228.00
Route 302/Crooked River Bridge (#2200)
Highway-Bridges
2023/24 Casco, Naples Route 35/Route 302 over Crooked River. Located 0.16 of a mile $2,000,000
Bridge Deck Replacement northwest of Hillside Avenue.
HCP 1

36
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


024307.00
Improvements
Beginning 0.02 of a mile south of Spring
2023/24 Cumberland Route 26
Rural Highways Road and extending north 0.12 of a mile. $225,000
HCP 3
Drainage Improvements

025161.00 Tuttle Road / I-295 Bridge (#5801) over


Highway-Bridges Interstate 295 and Route US 1 and MCRR.
Cumberland Tuttle Road
2023/24 Located 1.64 miles north of the Falmouth $18,300,000
Bridge Replacement town line.

025809.00 Highway Paving


Beginning at Tuttle Road and extending north
2022 Cumberland Urban Highways Route 9 1.01 miles to Greely Road. PACTS MPI
Sponsored.
HCP 4 1 1/2" Overlay

026180.00
Highway-Minor Spans Noyes Bridge (#5932) over Mill Brook.
2023/24 Cumberland Route 9
Located 0.18 of a mile north of Cross Road. $1,000,000
Bridge Replacement
HCP 4

021720.00
Bucknam Road/ I-295 Bridge (#5830) over
Highway-Bridges
2022 Falmouth Bucknam Road Interstate 295. Located 0.30 of a mile $10,600,000
Bridge Replacement northwest of Route 1.
HCP 1

021721.00
Johnson Road/ I-295 Bridge (#5792) over
Highway-Bridges
2022 Falmouth Johnson Road Interstate 295. Located 0.25 of a mile west of $8,010,000
Bridge Replacement Route 1.
HCP 1

Highway Safety and Spot


022672.00
Improvements
Installing signal with turn lanes at Interstate
2022 Falmouth Bucknam Road $1,100,000
Interstate 295 northbound off-ramp.
HCP 1
Safety Improvements

Highway Safety and Spot


022857.00
Improvements
Large culvert (#1036047) located 0.18 of a
2023/24 Falmouth Babbidge Road
Rural Highways mile southeast of the Windham town line. $400,000
HCP 4
Large Culvert Replacement

026178.00
I-295 NB/Presumpscot River Bridge (#5828)
Highway-Bridges Interstate 295
2023/24 Falmouth over Presumpscot River. Located 0.98 of a $600,000
Northbound
Bridge Painting mile north of Portland town line.
HCP 1

023134.00
Railroad Crossing Bridge (#3172) over
Highway-Bridges
2023/24 Freeport Route 1 MCRR. Located 0.05 of a mile south of $3,500,000
Bridge Improvements Summer Street.
HCP 3

37
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


024215.00
Improvements Beginning 0.41 of a mile north of the
Interstate 295
2023/24 Freeport Yarmouth town line and extending north 2.19
Interstate Northbound $495,000
miles.
HCP 1
Safety Improvements

025291.00
Highway-Bridges County Road / I-295 Bridge (#0585) over
2023/24 Freeport Old County Road Interstate 295. Located 0.56 of a mile east of $350,000
Bridge Wearing Surface Webster Road.
HCP 1 Replacement

026292.00 Bicycle/Pedestrian
Beginning at Route 1 and extending north
2022 Freeport On-Road Sidewalk/Trail Route 125
0.38 of a mile. $250,000
HCP 3 New Construction - PE Only

024961.00
Highway Paving
Freeport, Beginning at Hallowell Road and extending
2022 Pownal Road
Pownal southeast 4.06 miles.
Light Capital Paving
HCP 4

021725.00
Route 1/Cousins River Bridge (#2183) over
Freeport, Highway-Bridges
2023/24 Route 1 Cousins River. Located on the Freeport-
Yarmouth $6,100,000
Bridge Replacement Yarmouth town line.
HCP 3

026462.00
Highway-Bridges I-295 NB/Cousins River Bridge (#1137) over
Freeport, Interstate 295
2023/24 Cousins River. Located on the Freeport-
Yarmouth Northbound $450,000
Bridge Superstructure Yarmouth town line.
HCP 1 Rehabilitation

Ferry
025919.00
Frye Island Ferry Boats Frye Island Ferry Service Reconstruction of electrical systems.
2023/24 $150,000
Rehabilitation

Ferry
025921.00
Reconstruction of mainland ramp, apron
Frye Island Ferry Boats Frye Island Ferry Service
2023/24 hinge, and Island slip headwall. $175,000
Rehabilitation

Ferry
024415.23 Capital improvements to the Frye Island
Frye Island,
Ferry - General Frye Island Ferry Service Ferry Service between Raymond and Frye
2023/24 Raymond $37,000
Island.
Multimodal Improvements

Ferry
024415.24 Capital improvements to the Frye Island
Frye Island,
Ferry - General Frye Island Ferry Service Ferry Service between Raymond and Frye
2023/24 Raymond $124,000
Island.
Multimodal Improvements

38
ID/Year Municipality Scope Name Description Total Project Cost

022238.00
Mitchell Bridge (#0216) over Nonesuch River.
Highway-Bridges
2023/24 Gorham Mitchell Hill Road Located 0.04 of a mile northwest of the $1,250,000
Bridge Replacement Scarborough town line.
HCP 5

025811.00 Bicycle/Pedestrian
Route 25/Route
2022 Gorham On-Road Sidewalk/Trail 202/South Street/New Various locations. PACTS MPI Sponsored. $483,000
Portland Road
HCP 1, 2, 3 Safety Improvements

Highway System Operations


025983.00 Add traffic adaptive signal operations to the
Urban Highways
Gorham Various Locations four traffic signals on Main Street. PACTS
2024 $19,000
Intelligent Transportation Sponsored.
Systems

Policy, Planning and Research


025977.00
Gorham, Public advisory process for future use of the
Railroad - General Mountain Division Line
2022 Standish rail corridor between Standish and Gorham. $50,000
Feasibility Studies

Highway Safety and Spot


024303.00
Improvements
Beginning at Town Farm Road and extending
2022 Gray Depot Road $261,000
Rural Highways southwest 0.36 of a mile.
HCP 4
Drainage Improvements

Highway
024613.00 Construction/Rehabilitation
Beginning at Route 26 and extending north
Route 202/Main
2022 Gray Urban Highways 2.90 miles. Including segments on Route 26A
Street/Route 26A $250,000
and Main Street for 0.22 of a mile.
HCP 1, 2 Highway Rehabilitation - PE
Only

Highway Safety and Spot


025385.00
Improvements Beginning 0.23 of a mile east of Route 26A
2022 Gray Route 202 and extending north 0.26 of a mile to Brown $730,000
Rural Highways
Street.
HCP 1, 2
Drainage Improvements

Highway Safety and Spot


025457.00
Improvements
Located at the intersection of Depot Road
2023/24 Gray Depot Road
Rural Highways and Mayall Road. $100,000
HCP 4
Safety Improvements

025855.00
Highway Paving Beginning at Brown Street and extending
2023 Gray Route 4 north 2.89 miles to the New Gloucester town
Light Capital Paving line. Includes turning lanes.
HCP 2

025855.00
Highway Paving
Beginning at Mayberry Road and extending
2023 Gray North Raymond Road
north 0.57 of a mile to Egypt Road.
Light Capital Paving
HCP 4

39
ID/Year Municipality Scope Name Description Total Project Cost

WR 43380 Ditching on North Raymond Road in Gray.


Drainage Maintenance Beginning 0.10 of mile north of Mayberry
2022 Gray North Raymond Road
Road and extending 0.50 of a mile north to $15,000
HCP 4 Egypt Road.

WR 43382
Drainage Maintenance Ditching on Depot Road in Gray. Beginning
2022 Gray Depot Road at the intersection of Mayall Road and $25,000
extending north 0.75 of a mile.
HCP 4

WR 43567 Bridge and Structural Repairing wearing surface and approaches


Maintenance on Merrill Bridge (#0250) which carries Merrill
Gray Merrill Road
2022 Road over Collyer Brook in Gray. Located $45,000
0.43 of a mile north of Mayall Road.

025855.00
Highway Paving
Gray, New Beginning at Route 115 and extending north
2023 Depot Road
Gloucester 2.80 miles to Route 231.
Light Capital Paving
HCP 4

024961.00
Gray, New Highway Paving
Beginning at Gray Road and extending north
2022 Gloucester, Route 231
8.38 miles to Woodman Road.
North Yarmouth Light Capital Paving
HCP 4

Ports-Harbors
023082.00 Construction of a boat landing at Mitchell
Harpswell Piers, Floats and Fenders George J. Mitchell Field Field. Located 0.09 of a mile northeast of
2023/24 $577,000
Firehouse Road.
Rehabilitation

Ports-Harbors
023472.00
Navy pier at Mitchell Field. Located 0.09 of a
Harpswell Piers, Floats and Fenders George J. Mitchell Field $138,000
2023/24 mile northeast of Firehouse Road.
Rehabilitation

WR 43458 Ditching and replacing culvert (#175583) on


Drainage Maintenance Route 24 in Harpswell. Beginning at the
2022 Harpswell Route 24
intersection of Cundy's Harbor Road and $60,000
HCP 4 extending south 8.60 miles.

WR 43464 Ditching and replacing culvert (#175583) on


Drainage Maintenance Route 123 in Harpswell. Beginning at the
2022 Harpswell Route 123 $60,000
Harpswell-Brunswick town line and extending
HCP 4 south 9.50 miles.

023198.00
Highway-Bridges Bear River Bridge (#6121) over Bear River.
2023/24 Harrison Route 117 Located 0.03 of a mile northeast of Tolman $500,000
Bridge Wearing Surface Road.
HCP 2 Replacement

40
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026408.00 Improvements
Beginning 0.15 of a mile north of Main Street
2023/24 Harrison Rural Highways Route 117
and extending north 1.24 miles. $400,000
HCP 2 Guardrail
Installation/Replacement

025937.00
Highway Paving
Beginning at Route 11 and extending north
2022 Harrison, Naples Route 35
9.49 miles to Town Falls Road.
Light Capital Paving
HCP 4

025855.00
Highway Paving
Harrison, Beginning at Route 121 and extending north
2023 Bolster's Mills Road
Otisfield 7.81 miles to Route 117.
Light Capital Paving
HCP 4

Ports-Harbors
024621.00
Phase 2- Mariner's Wharf, wave screen.
Long Island Piers, Floats and Fenders Mariner's Landing
2023/24 Located on Wharf Street. $715,000
New Construction

026170.00
Songo Lock Draw Bridge (#2780) over Songo
Highway-Bridges
2023/24 Naples State Park Road River. Located 0.17 of a mile southwest of $1,000,000
Bridge Rehabilitation Songo School Road.
HCP 4

WR 43497 Replacing wheels and rebuilding center turn


Bridge and Structural table on Songo Lock Draw Bridge (#2780)
2022 Naples Maintenance State Park Road which carries State Park Road over Songo $25,000
River in Naples. Located 0.17 of a mile
HCP 4 southwest of Songo School Road.

Repairing wearing surface, curb, and


WR 43583 Bridge and Structural wingwall on Edes Falls Bridge (#3347) over
Naples Maintenance Edes Falls Road the Crooked River in Naples. Located 160
2022 $45,000
feet northeast of River Road on Edes Falls
Road.

026192.00
Royal River Bridge (#2729) over Royal River.
Highway-Minor Spans
2023/24 New Gloucester Route 202/100/4 Located 0.04 of a mile south of the Auburn $3,500,000
Bridge Replacement town line.
HCP 2

WR 43385
Drainage Maintenance Ditching on Route 231 in New Gloucester.
2022 New Gloucester Route 231 Beginning 0.30 of a mile south of Valley Farm $50,000
Road and extending north 3.00 miles.
HCP 4

025855.00
Highway Paving
New Gloucester, Beginning at Route 231 and extending east
2023 Allen Road
Pownal 1.83 miles.
Light Capital Paving
HCP 4, 5

41
ID/Year Municipality Scope Name Description Total Project Cost

022338.00
Highway-Bridges
Walnut Hill Bridge (#0188) over MCRR.
2023/24 North Yarmouth Route 9
Located 0.14 of a mile north of Hazel Lane. $540,000
Bridge Substructure
HCP 4 Rehabilitation

Highway Safety and Spot


023693.00
Improvements
Large culvert (#911957) located 0.05 of a
2023/24 North Yarmouth Route 115
Rural Highways mile south of Mill Road. $651,000
HCP 4
Large Culvert Replacement

Cumberland Road: Beginning at the


025813.00 Bicycle/Pedestrian Cumberland town line and extending north
1.09 miles to Walnut Hill Road Walnut Hill
2022 North Yarmouth On-Road Sidewalk/Trail Route 9/115
Road: Beginning at Cumberland Road and $650,000
HCP 4 Safety Improvements extending south 0.09 of a mile. PACTS MPI
Sponsored.

WR 43386 Ditching on Route 231 in North Yarmouth.


Drainage Maintenance Beginning at the intersection of Lufkin Road
2022 North Yarmouth Route 231
and extending north 2.22 miles to the $17,000
HCP 4 intersection of North Road.

Portland Area Comprehensive Transportation


Policy, Planning and Research System (PACTS) Unified Planning Work
002142.22
Program: Federally mandated program
Portland Planning PACTS Planning $2,080,000
2022 associated with Maine's U.S. Census-defined
MPO Program Management metropolitan planning area in the Greater
Portland region. Years 2022-2023.

Portland Area Comprehensive Transportation


Policy, Planning and Research System (PACTS) Unified Planning Work
002142.24
Program: Federally mandated program
Portland Planning PACTS Planning $2,080,000
2024 associated with Maine's U.S. Census-defined
MPO Program Management metropolitan planning area in the Greater
Portland region. Years 2024-2025.

Policy, Planning and Research


014846.22 Greater Portland Council Of Governments
Planning
Portland GPCOG RPO Support (GPCOG) Regional Planning Organization $12,500
2022
Statewide Program support.
Development

Policy, Planning and Research


014846.23 Greater Portland Council Of Governments
Planning
Portland GPCOG RPO Support (GPCOG) Regional Planning Organization $12,500
2023
Statewide Program support.
Development

Policy, Planning and Research


014846.24 Greater Portland Council Of Governments
Planning
Portland GPCOG RPO Support (GPCOG) Regional Planning Organization $12,500
2024
Statewide Program support.
Development

018419.00 Danforth Street Crossing Bridge (#3525) over


Highway-Bridges
Portland Cassidy Point Drive PTRR. Located 0.02 of a mile south of Route
2022 $195,000
Bridge Removal - PE Only 1A.

42
ID/Year Municipality Scope Name Description Total Project Cost

018469.00 Bicycle/Pedestrian
Multiuse trail along the abandoned Union
2023/24 Portland On-Road Sidewalk/Trail Union Branch Trail Branch railway extending from Park Avenue $3,070,000
to Forest Avenue.
HCP 5 New Construction

018469.10 Bicycle/Pedestrian Multiuse trail along the abandoned Union


Union Branch Trail Branch railway extending from Park Avenue
2022 Portland On-Road Sidewalk/Trail
Connector to Fore River Parkway, ending at the $41,000
HCP 1, 5 New Construction - PE Only Portland Transportation Center.

Bicycle/Pedestrian
018865.00
Beginning at Beach Street and extending
Portland Off-Road Trail/Path Route 1A
2022 west 0.57 of a mile. $588,000
New Construction

System Operations by Others


018869.22
Urban Transit ADA FTA Section 5307 for ADA Operating -
Portland Transit - General
2022 Operations Portland Transit Agencies. $612,000
Operating Assistance

System Operations by Others Transit Planning Assistance for Portland Area


018870.22
Transit Agencies, Federal Transit
Portland Transit - General Urban Transit Planning $142,000
2022 Administration §5307 for urbanized area
Administrative Assistance transit.

Transit Service Area


020625.22 FTA Section 5337 for Capital Assistance -
Portland Transit - General Urban Transit Capital Portland UZA Fixed Guideway for Casco Bay
2022 $1,500,000
Lines.
Capital Equipment Purchase

Transit Service Area


020634.01 FTA Section 5339 Capital Assistance
Portland Transit - General Urban Transit Capital Portland UZA. Carryover balance from
2022 $99,000
FFY2021
Capital Equipment Purchase

System Operations by Others Transit Capital Assistance for Portland-Area


020646.22
Transit Agencies, Federal Transit
Portland Transit - General Urban Transit Capital $13,500,000
2022 Administration §5307 for urbanized area
Administrative Assistance transit.

021932.04 Highway Paving


Municipal Partnership Initiative Program.
2022 Portland Urban Highways Stevens Avenue Beginning at Clinton Street and extending
north 0.88 of a mile.
HCP 2 Mill And Fill

Highway Beginning at Congress Street and extending


022134.00 north 0.06 of a mile to Cumberland Avenue.
Construction/Rehabilitation
Washington Continuing on Route 26, beginning at
2022 Portland $1,570,000
Urban Highways Avenue/Route 26 Cumberland Avenue and extending north
HCP 2 0.10 of a mile to E Oxford Street. PACTS
Highway Rehabilitation Sponsored.

43
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


022394.00
Improvements Beginning 0.16 of a mile south of Washington
2022 Portland Interstate 295 Avenue northbound and extending north 1.25
Urban Highways $4,500,000
miles.
HCP 1
Safety Improvements

Ferry
022705.22
Casco Bay Island Transit Passenger Ferry Program. Allocation for
Portland Ferry - General
2022 District capital improvements. $452,000
Multimodal Improvements

Ferry
022705.23
Casco Bay Island Transit Passenger Ferry Program. Allocation for
Portland Ferry - General
2023/24 District capital improvements. $452,000
Multimodal Improvements

Ferry
022705.24
Casco Bay Island Transit Passenger Ferry Program. Allocation for
Portland Ferry - General
2023/24 District capital improvements. $452,000
Multimodal Improvements

System Operations by Others


022762.22
FTA Section 5307 for Operating Assistance -
Portland Transit - General Urban Transit Operations $9,740,000
2022 Portland Transit Agencies.
Operating Assistance

Freight State contribution to Cold Storage Building


022809.34 being developed by the MePA to leverage
West Commercial Street
Portland Intermodal Freight Facility private investment and long-term
2022 Intermodal Facility $8,000,000
commitments (equity and/or port/cold storage
New Construction usage.)

Freight
022809.50 Heavy haul road and track improvements to
West Commercial Street
Portland Intermodal Freight Facility support the International Marine Terminal
2022 Intermodal Facility $2,130,000
(IMT) operations.
Rehabilitation

System Operations by Others Portland Area Comprehensive Transportation


023344.22
System (PACTS), Federal Transit
Portland Transit - General Urban Transit Planning $338,000
2022 Administration § 5303 for metropolitan
Administrative Assistance planning Fiscal Year 2022.

Ferry
023468.00 Construction of new ferry for Casco Bay
Casco Bay Island Transit
Portland Ferry Boats Island Transit District (CBITD) to serve the
2022 District $12,000,000
Peaks Island Ferry Route.
New Construction

Highway Safety and Spot


023715.00 Improvements
Beginning at Dartmouth Street and extending
2022 Portland Urban Highways Route 25 northwest 1.85 miles to Rowe Avenue. $195,000
PACTS Sponsored.
HCP 1 Intersection Improvements W/
Signal - PE Only

44
ID/Year Municipality Scope Name Description Total Project Cost

Highway
023717.00
Construction/Rehabilitation
Route 302 (Forest Beginning at Morrill's Corner and extending
2022 Portland
Urban Highways Avenue) north 0.08 of mile. $210,000
HCP 1
Reconstruction - PE Only

Bicycle/Pedestrian Beginning at State Street and extending


024105.00
north 0.16 of a mile to High Street. Beginning
On-Road Sidewalk/Trail
2022 Portland York Street/High Street at Commercial Street and extending
$100,000
Multimodal Improvements - PE northwest 0.05 of a mile to York Street.
HCP 2, 3 PACTS Sponsored.
Only

024641.10 Highway Paving


Municipal Partnership Initiative Program.
2022 Portland Urban Highways Route 77 Beginning at Congress Street and extending
southeast 0.44 of a mile.
HCP 2 Mill And Fill

Ports-Harbors Portland wharf dredging. Located off


024645.00 Commercial Street. This project is only
Portland Channels, Pier Berths Portland Pier partially funded for construction and is
2022 $3,000,000
contingent upon a successful future
Dredging competitive grant application.

System Operations by Others Transit Administrative and Operating


024651.04 Assistance for Federal Transit Administration
Rural Transit Admin/
Portland Transit - General §5311 for statewide non-urbanized transit.
2022 Operations $548,000
Casco Bay Island Transit District ME-2020-
Operating Assistance 027.

System Operations by Others Transit Administrative and Operating


024651.09 Assistance for Federal Transit Administration
Rural Transit Admin/
Portland Transit - General §5311 for statewide non-urbanized transit.
2022 Operations $1,140,000
Regional Transportation Program ME-2020-
Operating Assistance 027.

Ferry
024685.00
Casco Bay Island Transit Casco Bay Ferry Service improvements to
Portland Piers, Floats and Fenders $100,000
2022 District state owned assets serving the ferry.
Rehabilitation - PE Only

Ferry
024685.01
Casco Bay Island Transit Casco Bay Ferry Service improvements to
Portland Piers, Floats and Fenders $3,000,000
2023/24 District state owned assets serving the ferry.
Rehabilitation

Policy, Planning and Research Portland Area Comprehensive Transportation


024691.00 System (PACTS), Federal Transit
Portland Transit - General Urban Transit Planning Administration §5303 for metropolitan
2023 $340,000
planning, Fiscal Year 2023. Funds are
Planning Studies transferred to FHWA.

Transit Service Area


024735.00
FTA Section 5339 Capital Assistance -
Portland Transit - General Urban Transit Capital
2023/24 Portland UZA projects. $353,000
Capital Equipment Purchase

45
ID/Year Municipality Scope Name Description Total Project Cost

Transit Service Area


024747.00 FTA Section 5337 for Capital Assistance -
Portland Transit - General Urban Transit Capital Portland UZA Fixed Guideway for Casco Bay
2023/24 $900,000
Lines- will apply to FTA directly.
Capital-Eligible Maintenance

Transit Service Area Transit Capital Assistance from Federal


024843.13 Transit Administration § 5310 - Enhanced
Portland Transit - General Urban Transit Capital Mobility of Seniors and Individuals with
2022 $36,000
Disabilities. CRRSAA – Portland UZA
Capital Equipment Purchase apportionment.

System Operations by Others Transit Capital and Operating Assistance


024843.14
from Federal Transit Administration § 5307 -
Portland Transit - General Urban Transit Operations
2022 Urban Program. American Rescue Plan – $8,140,000
System Operations Portland UZA apportionment.

System Operations by Others Transit Operating Assistance from Federal


024843.18 Transit Administration § 5310 - Enhanced
Portland Transit - General Urban Transit Operating Mobility of Seniors and Individuals with
2022 $36,000
Disabilities. ARP – Portland UZA
System Operations apportionment.

024997.00 Highway Paving


Beginning at Congress Street and extending
2022 Portland Urban Highways Forest Avenue north 0.28 of a mile to Park Avenue. PACTS
Sponsored.
HCP 4 Mill And Fill

Ferry
025029.22
Casco Bay Island Transit Casco Bay Island Transit District
Portland Ferry - General $300,000
2022 District improvements.
Multimodal Improvements

Ferry
025029.23
Casco Bay Island Transit Casco Bay Island Transit District
Portland Ferry - General $300,000
2023/24 District improvements.
Multimodal Improvements

Highway Safety and Spot


025057.00 Improvements
Located at the intersection of Skyway Drive,
2022 Portland Urban Highways Route 22
Route 22, and Hutchins Drive. $280,000
HCP 2 Highway Improvement - PE
Only
Highway
025065.00 Construction/Rehabilitation
Beginning at Marginal Way and extending
2022 Portland Urban Highways Forest Avenue southeast 0.20 of a mile to Park Avenue. $200,000
PACTS Sponsored.
HCP 2, 4 Intersection Reconstruction -
PE Only
Highway Safety and Spot
025089.00 Improvements
Franklin Street/Marginal Located at the intersection of Franklin Street
2023/24 Portland Urban Highways
Way and Marginal Way. $360,000
HCP 1 Intersection Improvements W/
Signal

46
ID/Year Municipality Scope Name Description Total Project Cost

Multimodal System Operations


025185.00
International Marine Disassemble, transport, and reassemble
Portland Ports and Harbors - General
2022 Terminal LHM 320 Crane. $500,000
Facilities Management

Ports-Harbors
025217.00
Portland Piers, Floats and Fenders Fore Street Marina Located at the end of Fore Street.
2022 $292,000
Rehabilitation

Highway
025253.00
Construction/Rehabilitation PACTS 2023 Allocation for future design and
2023/24 Portland Brighton Avenue construction of Brighton Avenue. PACTS
Urban Highways $2,010,000
Sponsored.
HCP 1
Highway Rehabilitation

Highway Paving
025257.00
Municipal Partnership Initiative Program.
Portland Urban Highways Various Locations
2023/24 PACTS Sponsored.
Mill And Fill

Transit Service Area Transit Capital Assistance for Portland-Area


025341.00
Transit Agencies, Federal Transit
Portland Transit - General Urban Transit Capital $6,760,000
2023/24 Administration §5307 for urbanized area
Capital Equipment Purchase transit.

System Operations by Others Transit Planning Assistance for Portland-


025343.00
Area Transit Agencies, Federal Transit
Portland Transit - General Urban Transit Planning $236,000
2023 Administration §5307 for urbanized area
Administrative Assistance transit.

System Operations by Others Transit Operating Assistance for Portland-


025345.00
Area Transit Agencies, Federal Transit
Portland Transit - General Urban Transit Operations $9,940,000
2023 Administration §5307 for urbanized area
Operating Assistance transit.

System Operations by Others Transit ADA Operating Assistance for


025347.00
Portland-Area Transit Agencies, Federal
Portland Transit - General Urban Transit Operations $624,000
2023 Transit Administration §5307 for urbanized
Operating Assistance area transit.

Highway Safety and Spot


025415.00 Improvements
Large culvert (#46958) located 0.10 of a mile
Interstate 295
2022 Portland Interstate north of the Interstate 295 Exit 7 southbound $60,000
Southbound
off-ramp.
HCP 1 Large Culvert Rehabilitation -
PE Only

Transit Service Area


025421.00
FTA Section 5339 Capital Assistance -
Portland Transit - General Urban Transit Capital
2022 Portland UZA projects. $341,000
Capital Equipment Purchase

47
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


Improvements
025441.00
Portland Urban Highways Various Locations Pilot project for traffic signal operations.
2023/24 $94,000
Install Or Replace Traffic
Signals
Highway Safety and Spot
025511.00 Improvements
Large culvert (#019009) located 0.24 of a
2022 Portland Urban Highways Interstate 295
mile north of Route 1. $60,000
HCP 1 Large Culvert Rehabilitation -
PE Only
Highway Safety and Spot
025523.00 Improvements
Large culvert (#47337) located 0.35 of a mile
2022 Portland Interstate Interstate 295
north of Route 1. $288,000
HCP 1 Large Culvert Rehabilitation -
PE Only

Transit Service Area


025549.00
FTA Section 5339 Capital Assistance -
Portland Transit - General Urban Transit Capital
2023/24 Portland UZA projects $353,000
Capital Equipment Purchase

Transit Service Area


025555.00 FTA Section 5337 for Capital Assistance -
Portland Transit - General Urban Transit Capital Portland UZA Fixed Guideway for Casco Bay
2023/24 $796,000
Lines.
Capital Equipment Purchase

Transit Service Area


025579.00
FTA Section 5307 for capital projects -
Portland Transit - General Urban Transit Capital $7,250,000
2023/24 Portland Transit Agencies.
Capital-Eligible Maintenance

System Operations by Others Transit Planning Assistance for Portland Area


025581.00
Transit Agencies, Federal Transit
Portland Transit - General Urban Transit Planning $141,000
2024 Administration §5307 for urbanized area
Administrative Assistance transit.

System Operations by Others


025585.00
Urban Transit ADA FTA Section 5307 for ADA Operating -
Portland Transit - General
2024 Operations Portland Transit Agencies. $637,000
Operating Assistance

Policy, Planning and Research Portland Area Comprehensive Transportation


025605.00 System (PACTS), Federal Transit
Portland Transit - General Urban Transit Planning Administration §5303 for metropolitan $340,000
2024
planning Fiscal Year 2024. Funds are
Planning Studies transferred to FHWA.

025815.00 Highway Paving


Beginning at Smith Street and extending
2022 Portland Urban Highways Cumberland Avenue northeast 0.11 of a mile to Washington
Avenue. PACTS MPI Sponsored.
HCP 3 Mill And Fill

48
ID/Year Municipality Scope Name Description Total Project Cost

Ports-Harbors
025953.00
International Marine
Portland Marine Buildings/Facilities Located off Commercial Street.
2023/24 Terminal $5,700,000
Multimodal Improvements

Highway System Operations


025971.00
Urban Highways Upgrade the server and switch the software
Portland Software Upgrade
2022 to an NCTIP system for PACTS RTMS. $190,000
Intelligent Transportation
Systems

Highway
026005.00 Construction/Rehabilitation
Collector Road Paving for the PACTS area.
Portland Various Locations
2023/24 Urban Highways PACTS Sponsored. $2,200,000

Highway Rehabilitation

Highway
026007.00 Construction/Rehabilitation
Municipal Partnership Initiative Program.
Portland Various Locations
2023/24 Urban Highways PACTS Sponsored. $3,280,000

Highway Rehabilitation

Highway Safety and Spot


026009.00 Improvements Portland Area Comprehensive Transportation
System (PACTS) Capital Improvement
Portland PACTS Allocation $473,000
2023/24 Urban Highways funding remaining allocation. Calendar Year
2024.
Highway Improvement

Policy, Planning and Research


026055.00
Park Avenue/Congress Located on Congress Street and Park
Portland Planning $260,000
2022 Street Avenue, including ramps. PACTS Sponsored
Enhanced Project Scoping

Highway System Operations


026148.00
Portland Highways - General Various Locations Pilot project for Traffic Signal Operations.
2024 $188,000
System Operations

026176.00 Tukey Bridge (#3088) over Back Bay.


Highway-Bridges
Portland I-295/Route 1A Located 0.49 of a mile north of Mountfort $4,200,000
2023/24
Bridge Painting Street.

Ports-Harbors Located off Commercial Street. This project


026194.00
International Marine is only partially funded for construction and is
Portland Piers, Floats and Fenders $900,000
2023/24 Terminal contingent upon a successful future
Multimodal Improvements competitive grant application.

Ports-Harbors Located at Commercial Street. This project


026196.00
International Marine is only partially funded for construction and is
Portland Piers, Floats and Fenders
2023/24 Terminal contingent upon a successful future $1,180,000
Multimodal Improvements competitive grant application.

49
ID/Year Municipality Scope Name Description Total Project Cost

Ports-Harbors Located off Commercial Street. This project


026198.00
International Marine is only partially funded for construction and is
Portland Marine Buildings/Facilities
2023/24 Terminal contingent upon a successful future $120,000
Demolition/Removal competitive grant application.

Ports-Harbors
026200.00
Portland Marine Buildings/Facilities Merrill's Marine Terminal Located off Commercial Street.
2023/24 $3,000,000
Multimodal Improvements

Freight
026202.00
International Marine
Portland Intermodal Freight Facility Located off Commercial Street.
2023/24 Terminal $850,000
Demolition/Removal

Freight
026206.00
International Marine
Portland Intermodal Freight Facility Located off Commercial Street.
2022 Terminal $100,000
New Construction - PE Only

Freight
026212.00
International Marine
Portland Intermodal Freight Facility Located off Commercial Street. $300,000
2023/24 Terminal
Rehabilitation

Ports-Harbors
026214.00
Portland Marine Buildings/Facilities Fore Points Marina Tier 2 Located off Thames Street.
2023/24 $4,100,000
New Construction

Ports-Harbors
026216.00
Portland Marine Buildings/Facilities Fore Points Marina Tier 1 Located off Thames Street.
2023/24 $221,000
New Construction

Ports-Harbors
026222.00
Located off Thames Street adjacent to Ocean
Portland Piers, Floats and Fenders Eastern Waterfront
2023/24 Gateway. $360,000
New Construction

026262.00 Highway Paving


Beginning at Woodfords Street and extending
2023/24 Portland Rural Highways Stevens Avenue
north 0.36 of a mile.
HCP 2 Mill And Fill

026278.00 Highway Paving Beginning at Interstate 295 Exit 5B


southbound off-ramp and extending west
Route 22/Fore River
2023/24 Portland Urban Highways 0.51 of a mile on Route 22. Beginning at
Parkway
Route 22 and extending south 0.21 of a mile
HCP 1 Mill And Fill on Fore River Parkway.

50
ID/Year Municipality Scope Name Description Total Project Cost

Bus
026308.00
Greater Portland Transit District, Facility
Portland Intermodal Passenger Facility Urban Transit Capital
2022 Construction. $701,000
New Construction

Policy, Planning and Research


026362.00
FTA Section 5307 for Planning Assistance -
Portland Transit - General Urban Transit Planning
2022 Casco Bay Lines - will apply to FTA directly. $103,000
Planning Studies

Transit Service Area


026364.00
FTA Section 5307 for Capital Assistance -
Portland Transit - General Urban Transit Capital
2022 Casco Bay Lines - will apply to FTA directly. $2,000,000
Capital Equipment Purchase

Highway Safety and Spot


026374.00
Improvements
Beginning at Veranda Street and extending
2023/24 Portland Route 26S
Urban Highways south 0.04 of a mile. $300,000
HCP 1
Slope Stabilization/Protection

026446.00
I-295 SB/Franklin Street Bridge (#6541) over
Highway-Bridges Interstate 295
2023/24 Portland Franklin Street. Located 0.25 of a mile south
Southbound $450,000
Bridge Painting of Route 1A exit.
HCP 1

026448.00
Franklin Street Bridge (#6300) over Franklin
Highway-Bridges Interstate 295
2023/24 Portland Street. Located 0.34 of a mile north of Preble
Northbound $600,000
Bridge Painting Street Extension.
HCP 1

026450.00
St. John Street Bridge (#6297) over St. John
Highway-Bridges Interstate 295
2023/24 Portland Street. Located 0.12of a mile north of Park
Northbound $400,000
Bridge Painting Avenue.
HCP 1

026452.00 I-295 Over Fore River Parkway Bridge


Highway-Bridges Interstate 295 (#6292) over Fore River Parkway. Located
Portland
2023/24 Northbound 0.24 of a mile north of Route 1A including two $900,000
Bridge Painting ramps.

WR 43704 Bridge and Structural Upgrades and railing improvements on Cliff


Portland Maintenance Wharf Road Island Pier in Portland. Located on Cliff
2022 $50,000
Island in Portland.

Beginning at the Scarborough town line and


Highway Paving extending north 7.56 miles to the Falmouth
022420.01
Portland, South Interstate 295 town line. Beginning at Garsoe Drive and
Interstate
2022 Portland Northbound / Route 26 extending north 0.08 of a mile. Route 26
Mill And Fill South: Beginning at Anderson Street and
extending south 0.10 of a mile.

51
ID/Year Municipality Scope Name Description Total Project Cost

Policy, Planning and Research Analysis to identify a package of


023002.01 transportation improvement actions to
Portland, South Interstate 295 Planning
Planning accommodate future traffic demands into and
2022 Portland Study $174,000
out of Portland along the Interstate 295
Planning Studies corridor.

026280.00 Highway Paving Beginning at Broadway and extending north


1.28 miles. Broadway: Beginning at Route
Portland, South
2023/24 Urban Highways Route 77 77 and extending east 0.06 of a mile. Work
Portland
to include ramps and Casco Bay Bridge
HCP 2 Mill And Fill (#5900).

024641.03 Highway Paving Municipal Partnership Initiative Program.


Portland, Beginning at Turnpike Overpass Bridge
2022 Urban Highways Route 22
Westbrook (#0343) and extending west 0.68 of a mile to
HCP 2 Mill And Fill Thomas Drive.

Highway Safety and Spot


026242.00
Portland, Improvements
Install Backplates with Yellow Reflective
2023/24 Westbrook, Route 302
Rural Highways Strips and Supplemental Signal Heads. $395,000
Windham
HCP 1
Safety Improvements

024961.00
Highway Paving
Beginning 0.03 of a mile south of Lawrence
2022 Pownal Elmwood Road
Road and extending south 1.27 miles.
Light Capital Paving
HCP 4

024961.00
Highway Paving
Beginning at Allen Road and extending
2022 Pownal Elmwood Road
southeast 1.23 miles.
Light Capital Paving
HCP 4

WR 43381
Drainage Maintenance Ditching on Allen Road in Pownal. Beginning
2022 Pownal Allen Road at the New Gloucester-Pownal town line and $15,000
extending east 0.60 of a mile.
HCP 4

WR 43471 Ditching and replacing culvert (#99424) on


Drainage Maintenance Elmwood Road in Pownal. Beginning at the
2022 Pownal Elmwood Road $75,000
intersection of Route 9 and extending south
HCP 4 2.25 miles to the Pownal-Freeport town line.

Highway
021932.27 Municipal Partnership Initiative Program.
Construction/Rehabilitation
Beginning at Route 35 and extending north
2022 Raymond Main Street
Rural Highways 0.45 of a mile to Route 121. Including $850,000
HCP 4 sidewalk improvements.
Highway Rehabilitation

024963.00
Highway Paving
Beginning 0.28 of a mile north of Holmes
2022 Scarborough Beech Ridge Road
Road and extending north 1.19 miles.
Light Capital Paving
HCP 4

52
ID/Year Municipality Scope Name Description Total Project Cost

024963.00
Highway Paving
Beginning at Payne Road and extending
2022 Scarborough Beech Ridge Road
north 1.87 miles.
Light Capital Paving
HCP 4

024963.00
Highway Paving
Beginning 0.06 of a mile south of Acorn Lane
2022 Scarborough Route 77
and extending south 1.12 miles.
Light Capital Paving
HCP 4

024991.00 Highway Paving


Beginning at Black Point Road and extending
2022 Scarborough Urban Highways Highland Avenue east 0.96 of a mile to Chamberland Road.
PACTS Sponsored.
HCP 4 1 1/4" Overlay

024993.00 Highway Paving


Beginning at Roundabout Lane and
2022 Scarborough Urban Highways Route 207 extending south 1.01 miles. PACTS
Sponsored.
HCP 4 1 1/4" Overlay

Highway Safety and Spot


025657.00 Improvements
Beginning 0.39 of a mile northeast of Harlow
2022 Scarborough Rural Highways Route 1 Street and extending northeast 1.20 miles. $255,000
Including bridges (#3573, #2240).
HCP 2 Highway Improvement - PE
Only
Highway Safety and Spot
025659.00 Improvements
Beginning at Primrose Lane and extending
2022 Scarborough Rural Highways Route 9 northwest 0.73 of a mile. Including bridge $205,000
(#3712).
HCP 3 Highway Improvement - PE
Only

Highway Paving
025797.00
Beginning 0.32 of a mile southeast of Joss
Rural Highways
2022 Scarborough Broadturn Road Hill Road and extending southeast 1.56
Highway Cyclical Pavement miles.
HCP 3
Resurfacing

Highway
025819.00
Construction/Rehabilitation Beginning at Maple Avenue and extending
2022 Scarborough Gorham Road north 0.48 of a mile to Ridgeway Road.
Rural Highways $2,300,000
PACTS MPI Sponsored.
HCP 2
Reconstruction

Rail
025895.00
Rail/Highway Crossings Railroad Crossing (#053207D) located 0.20
Scarborough Winnocks Neck Road
2022 of a mile southeast of Orchard Hill Road. $353,000
Signal Improvements
(Rail/Highway Xing)

025969.00 Highway Paving


Beginning at Pine Point Road and extending
2023/24 Scarborough Urban Highways Route 9 east 0.61 of a mile to Old Orchard Beach
town line. PACTS Sponsored.
HCP 3 Mill And Fill

53
ID/Year Municipality Scope Name Description Total Project Cost

019426.00 Bicycle/Pedestrian Beginning at Wainright Field in South


Scarborough, Portland and extending south 0.80 of a mile
2022 On-Road Sidewalk/Trail Eastern Trail
South Portland to Pleasant Hill Road in Scarborough. $1,520,000
HCP 5 New Construction PACTS Sponsored.

Bicycle/Pedestrian Eastern Trail bicycle and pedestrian


019426.10
Scarborough, connection. Beginning at Nonesuch River
Off-Road Trail/Path Eastern Trail
2022 South Portland and extending 0.60 of a mile to Pleasant Hill $4,520,000
New Construction Road.

Highway
012800.30
Construction/Rehabilitation
Interstate 295 New access on Interstate 295 at Exit 4.
2023/24 South Portland
Rural Highways Southbound Project is a partnership with South Portland. $2,390,000
HCP 1
Reconstruction

Highway Beginning at Greenbelt Pathway near Evans


018638.00 Street and extending west 0.17 of a mile to
Construction/Rehabilitation
Lincoln Street and extending west on Lincoln
2023/24 South Portland Lincoln Street
Urban Highways Street 0.55 of a mile to Billy Vachon Drive $2,130,000
HCP 1, 2, 3 and extending west 0.24 of a mile. PACTS
Highway Rehabilitation Sponsored.

Aviation
018711.15 Safety and infrastructure improvements that
Portland International
South Portland Airport - General may include airport security fence and gate
2023/24 Jetport $371,000
upgrades in northeast area.
Multimodal Improvements

Aviation
018711.18
Portland International Safety and infrastructure improvements that
South Portland Runway/Taxiway $13,200,000
2022 Jetport may include rehabilitation of Runway 11-29.
Rehabilitation

Aviation
018711.19 Safety and infrastructure improvements that
Portland International
South Portland Runway/Taxiway includes reconstruction of Taxiways A, D, E,
2023/24 Jetport $9,310,000
and F.
Reconstruction

Aviation
018711.21 Safety and infrastructure improvements that
Portland International
South Portland Apron includes terminal apron rehabilitation - phase $1,550,000
2023/24 Jetport
1.
Rehabilitation

020535.00 Restore Aquatic Organism passage in Red


Brook at I-295 Ramp 5/Red Brook Bridge
Highway-Minor Spans
2023/24 South Portland Interstate 295 (#6284) located on the Maine Turnpike $511,000
Bridge Culvert Rehabilitation Approach off-ramp, and at Long Creek # 2
HCP 1 Bridge (#6219) located on Route 1.

022258.00 Ramp SP4 Bridge (#1376) over northbound


Highway-Bridges
South Portland Route 1 Southbound ramp of Interstate 295 to Route 1. Located off $5,020,000
2023/24
Bridge Deck Replacement Exit 4 on Interstate 295 southbound.

54
ID/Year Municipality Scope Name Description Total Project Cost

023601.00
I-295 NB/ Red Brook Bridge (#6285) over
Highway-Minor Spans
2023/24 South Portland Interstate 295 Red Brook. Located 0.93 of a mile north of $523,000
Bridge Culvert Rehabilitation the Portland town line.
HCP 1

Bicycle/Pedestrian
024101.00
Beginning at Angell Avenue and extending
On-Road Sidewalk/Trail
2022 South Portland Cottage Road west 0.33 of a mile to Sawyer Street. PACTS $250,000
Multimodal Improvements - PE Sponsored.
HCP 4
Only

Highway Safety and Spot


024363.00
Improvements
2023/24 South Portland Interstate 295 Located at Interstate 295 Exit 4.
Urban Highways $851,000
HCP 1
Lighting

024585.00 Highway Paving


Beginning at the Cape Elizabeth town line
2022 South Portland Urban Highways Cottage Road and extending west 0.98 of a mile to
Highland Avenue. PACTS Sponsored.
HCP 4 Mill And Fill

024641.02 Highway Paving Municipal Partnership Initiative Program.


Beginning at Elm Street and extending east
2022 South Portland Urban Highways Broadway
0.46 of a mile to Anthony Creek Bridge
HCP 2 Mill And Fill (#2020).

Highway Safety and Spot


025383.00
Improvements Beginning at Route 703 WB ramps and
2023/24 South Portland Broadway extending east 0.37 of a mile to Route 701 $685,000
Rural Highways
off-ramp.
HCP 2
Drainage Improvements

Highway Safety and Spot


025817.00 Improvements
Located at the intersection of Broadway and
2022 South Portland Urban Highways Broadway
Westbrook Street. $361,000
HCP 2 Intersection Improvements W/
Signal

026272.00 Highway Paving


Beginning at Maine Mall Road and extending
2023/24 South Portland Urban Highways Running Hill Road
west 0.83 of a mile to Cummings Road.
HCP 2 Mill And Fill

Highway Paving
025833.00
South Portland, Rural Highways Spring Street/Cummings Beginning at Main Street and extending
2023/24
Westbrook Road south 3.12 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

025117.00 Highway Paving Beginning 0.12 of a mile west of Route 113


and extending west 1.86 miles. Continuing
2023/24 Standish Rural Highways Route 25
0.09 of a mile west of Saco Road and
HCP 2 Mill And Fill extending west 1.00 mile.

55
ID/Year Municipality Scope Name Description Total Project Cost

Highway Paving
025715.00
Rural Highways Beginning at the Gorham town line and
2022 Standish Route 114
extending northwest 1.68 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

WR 43474
Drainage Maintenance Removing overburden behind guardrail on
2022 Standish Route 114
Route 114 in Standish. $30,000
HCP 4

Service Patrol - a MaineDOT sponsored


Highway System Operations service that aids stranded motorists, clears
025228.22
debris and other hazards from the roadway,
Various Towns Highways - General Interstate 295
2022 and provides temporary traffic control at $250,000
Emergency Response minor accident scenes to help keep
customers safe and traffic flowing smoothly.

Service Patrol - a MaineDOT sponsored


Highway System Operations service that aids stranded motorists, clears
025228.23
debris and other hazards from the roadway,
Various Towns Highways - General Interstate 295
2023 and provides temporary traffic control at $250,000
Emergency Response minor accident scenes to help keep
customers safe and traffic flowing smoothly.

Highway Business Partnership Initiative Program.


021938.03 Includes intersection and road improvements
Construction/Rehabilitation
at Eisenhower Drive and Saco Street, Spring
2022 Westbrook IDEXX $2,000,000
Urban Highways and County, Spring and Eisenhower, (all
HCP 4 Westbrook) and Congress and Skyline Drive
Highway Rehabilitation in Portland

Highway Safety and Spot


024275.00 Improvements
Large culvert (#114090) located 0.08 of a
2022 Westbrook Urban Highways Route 302
mile south of Royal Grant Way. $60,000
HCP 1 Large Culvert Replacement -
PE Only

024641.07 Highway Paving


Municipal Partnership Initiative Program.
2022 Westbrook Urban Highways Route 25B
Located at the Cumberland Mills Triangle.
HCP 2, 3 Mill And Fill

024995.00 Highway Paving


Beginning at Virginia Street and extending
2022 Westbrook Urban Highways Brook Street north 0.56 of a mile to the Falmouth town
line. PACTS Sponsored.
HCP 4 Mill And Fill

025491.00 Highway Paving


Beginning at Larrabee Road and extending
2023/24 Westbrook Urban Highways Route 25 northwest 1.09 miles. Including all ramps and
approaches.
HCP 1 Mill And Fill

026266.00 Highway Paving


Beginning at Larrabee Road and extending
2023/24 Westbrook Urban Highways Route 25B
west 0.56 of a mile.
HCP 2 Mill And Fill

56
ID/Year Municipality Scope Name Description Total Project Cost

Bicycle/Pedestrian
026576.00
Westbrook, Beginning at Bridge Street in Westbrook to
Off-Road Trail/Path Mountain Division Line
2022 Windham the Route 202 crossing in Windham. $450,000
New Construction - PE Only

Highway Safety and Spot


024317.16 Improvements Municipal Partnership Initiative Program.
Installation of adaptive traffic signaling
2022 Windham Urban Highways Route 302 systems at various intersections. Beginning
$1,450,000
at Route 115 and extending northwest 1.14
HCP 1, 5 Intersection Improvements W/ miles to Trails End Road.
Signal

Highway
024341.00 Beginning 0.45 of a mile west of Outpost
Construction/Rehabilitation
Drive and extending west 0.14 of a mile,
2023/24 Windham Route 302
Urban Highways including the roundabout intersection with $585,000
HCP 1 Route 202.
Intersection Reconstruction

Highway Safety and Spot


025265.00
Improvements
Located at the intersection of Route 302 and
2023/24 Windham Route 302
Rural Highways Albion Road. $156,000
HCP 1
Safety Improvements

025821.00 Bicycle/Pedestrian
Beginning at Depot Street and extending
2022 Windham On-Road Sidewalk/Trail Route 202 north 0.23 of a mile to the Mountain Division $525,000
Trail crossing. PACTS MPI Sponsored.
HCP 2 Safety Improvements

025997.00 Highway Paving


Beginning at Route 202 and extending north
2023/24 Windham Rural Highways Route 302
2.85 miles.
HCP 1 Mill And Fill

026003.00 Bicycle/Pedestrian Construction of new sidewalk on west side of


Route 302. Beginning at Shaws Access
2023/24 Windham On-Road Sidewalk/Trail Route 302 $3,100,000
Drive and extending north 0.48 of a mile to
HCP 1 New Construction Amato Drive. PACTS Sponsored

026126.00 Highway System Operations

2024 Windham Highways - General Route 302 Traffic signal modifications on Route 302. $855,000
HCP 1 System Operations

026190.00
Highway-Bridges Loveitt Bridge (#3018) over Pleasant River.
2023/24 Windham River Road
Located 0.13 of a mile north of Laskey Road. $1,000,000
Bridge Deck Replacement
HCP 3

026240.00
Highway-Bridges Varney's Bridge (#0257) over Pleasant River.
2023/24 Windham Williams Knight Road
Located 0.43 of a mile from Route 4. $1,500,000
Bridge Replacement
HCP 5

57
ID/Year Municipality Scope Name Description Total Project Cost

022382.00
Route 1/ I-295 Bridge (#5804) over Interstate
Highway-Bridges
2023/24 Yarmouth Interstate 295 295. Located 0.04 of a mile north of Interstate $12,000,000
Bridge Replacement 295 northbound Exit 15.
HCP 1

024999.00 Highway Paving


Beginning at Princes Point Road and
2022 Yarmouth Urban Highways Route 88 extending 0.79 of a mile north to Falls Bridge
over the Royal River. PACTS Sponsored.
HCP 4 Mill And Fill

Highway Safety and Spot


Improvements
025197.00
Visitor Information Roof repair at the Yarmouth visitor
Yarmouth Rural Highways
2022 Center information center. $10,000
Rest Area
Construction/Improvements

025855.00
Highway Paving
Beginning at the Cumberland town line and
2023 Yarmouth Route 88
extending north 0.81 of a mile.
Light Capital Paving
HCP 4

025981.00 Bicycle/Pedestrian
Reconstruction of sidewalk. Beginning at
2022 Yarmouth On-Road Sidewalk/Trail Route 115 Center Street and extending east 0.12 of a $78,000
mile to Railroad Square. PACTS Sponsored.
HCP 3 Reconstruction - PE Only

Bicycle/Pedestrian
025985.00 Beginning at I-295 Exit 17 and extending
Beth Condon Trail
Yarmouth Off-Road Trail/Path 0.57 of a mile to the Cousins River Bridge.
2022 Shared Use Path $69,000
PACTS Sponsored.
New Construction - PE Only

026472.00
Highway-Bridges Cotton Mill Bridge (#3983) over Royal River.
2023/24 Yarmouth Bridge Street $300,000
Located 0.16 of a mile north of Main Street.
Bridge Painting
HCP 5

WR 43552 Ditching and replacing culvert (#973943),


Drainage Maintenance repairing catch basin (#786300) on Route 88
2022 Yarmouth Route 88 in Yarmouth. Beginning at the Cumberland- $50,000
Yarmouth town line and extending northeast
HCP 4 to Princes Point Road.

58
Franklin
Gorham
Gore

Lowelltown
Twp
Beattie
Twp

Franklin County
Merrill
Strip Twp
Skinner
Population 28,897
Twp
Land Area (sq mi) 1,697
Coburn Bridges 196
Gore
Highway Corridor Priority Miles
HCP 1
Kibby
Twp 37
Chain of
Ponds Twp
HCP 2 88
HCP 3 50

Alder
Jim Pond HCP 4 217
Twp
Seven Stream
Ponds Twp

Total HCP 1-4


Twp
392

Tim Eustis
Pond
Stetsontown Twp
Twp
Wyman
Twp
Coplin
Plt
Lang Twp
Davis Carrabassett
Twp Valley

Redington
Dallas Twp
Rangeley Plt Mount
Abram Kingfield
Twp

Sandy Madrid
Twp Salem
Rangeley River Twp
Plt Plt Freeman
Twp

Phillips
Township E

Strong
Township D New
Township
6 North Vineyard
Avon
of Weld
Industry

Weld
Temple
Farmington

New
Sharon
Carthage
Wilton
Franklin

Chesterville

Jay
Franklin
ID/Year Municipality Scope Name Description Total Project Cost

025931.00
Highway Paving
Anson, New Beginning at Route 27 and extending east
2022 Route 234
Vineyard 11.16 miles to Route 8.
Light Capital Paving
HCP 4

023098.00
Highway-Minor Spans Cushman Bridge (#6588). Located 0.12 of a
2023/24 Avon Route 4
mile south of Airport Road. $2,520,000
Bridge Replacement
HCP 2

WR 41713
Drainage Maintenance Replacing culvert (#1047470) on Route 149
2022 Avon Route 149 in Avon. Located 0.24 of a mile south of the $55,000
Phillips-Avon town line.
HCP 4

024973.00
Highway Paving
Beginning at Route 4 and extending north
2022 Avon, Phillips Pleasant Street
0.51 of a mile to Route 142.
Light Capital Paving
HCP 4

025931.00
Highway Paving
Avon, Phillips, Beginning at Farmington Road and extending
2022 Route 149
Strong west 7.65 miles to Park Street.
Light Capital Paving
HCP 4

Highway
024167.00
Construction/Rehabilitation Beginning 0.13 of a mile north of Byron
Byron, Township
2022 Route 17 Village Road and extending north 10.89
D, Township E Rural Highways $1,520,000
miles.
HCP 4
PMRAP DOT Pugmill

Highway
024167.10
Construction/Rehabilitation Beginning 0.13 of a mile north of Byron
Byron, Township
2022 Route 17 Village Road and extending north 10.89
D, Township E Rural Highways $2,940,000
miles.
HCP 4
PMRAP Laydown/Surface HMA

024969.00
Highway Paving
Beginning 0.18 of a mile north of Davenport
2022 Canton, Jay Route 140
Hill Road and extending south 4.01 miles.
Light Capital Paving
HCP 4

Aviation
018689.05 Safety and infrastructure improvements that
Carrabassett Sugarloaf Regional
Runway/Taxiway may include crack sealing and pavement $155,000
2023/24 Valley Airport
markings.
Crack Sealing

Aviation
018689.07
Carrabassett Sugarloaf Regional Safety and infrastructure improvements that
Runway/Taxiway
2023/24 Valley Airport includes rehabilitation of runway $2,580,000
Rehabilitation

59
ID/Year Municipality Scope Name Description Total Project Cost

025869.00 Carrabassett
Valley, Highland Highway Paving
Beginning at Route 16 and extending north
2023 Plt, Lexington Long Falls Dam Road
17.55 miles to the Dead River Twp. town line.
Twp, New Light Capital Paving
HCP 4 Portland

026436.00
Dead River Bridge (#3135) over North
Chain Of Ponds Highway-Bridges
2023/24 Route 27 Branch Dead River. Located 0.02 of a mile
Twp $200,000
Bridge Painting north of Alder Stream Twp. town line.
HCP 3

026124.00
Williams #2 Bridge (#3181) over Wilson
Chesterville, Highway-Bridges
2022 Route 156 Stream. Located 0.47 of a mile southwest of
Farmington $300,000
Bridge Improvements - PE Only Route 41.
HCP 3

Highway Safety and Spot


023263.00
Improvements Cross culverts (#921882 and #921883)
2022 Coplin Plt Route 16 located 0.14 of a mile south of the Eustis $39,000
Rural Highways
town line.
HCP 4
Large Culvert - PE Only

Highway Paving
025745.00 Coplin Plt,
Beginning 0.21 of a mile north of
Eustis, Jim Pond Rural Highways
2022 Route 27 Carrabassett Valley town line and extending
Twp, Wyman
Highway Cyclical Pavement north 12.17 miles.
HCP 2, 3 Twp
Resurfacing

WR 41399
Department Building and Lot Constructing new crew quarters building in
2022 Dallas Plt Maintenance Route 16 Dallas Plt. on Route 16. Located 106 feet $150,000
east of Morgan Lane.
HCP 4

Highway
025259.00
Construction/Rehabilitation
Dallas Plt, Saddleback Mountain Beginning at the Dallas Hill Road and
2022 $3,000,000
Sandy River Plt Rural Highways Road extending south 4.66 miles.
HCP 5
Reconstruction

WR 43187 Repairing wingwall on South Branch Bridge


Bridge and Structural
Maintenance (#3263) in Eustis which carries Route 27 over
2022 Eustis Route 27 $75,000
Flagstaff Lake. Located 0.13 of a mile north
HCP 3 of Vaughn Road.

024903.00 Russell Mills Bridge (#0067) over Temple


Highway-Bridges
Farmington Russell Mills Road Stream. Located 0.21 of a mile north of
2023/24 $400,000
Bridge Removal Route 43.

Highway Safety and Spot


025427.00
Improvements
Large culvert (#962067) located 0.14 of a
2023/24 Farmington Route 2
Rural Highways mile north of Route 41. $591,000
HCP 1
Large Culvert Replacement

60
ID/Year Municipality Scope Name Description Total Project Cost

026071.00 Farmington, Highway Paving


Kingfield, New Beginning at Route 4 and extending
2023/24 Rural Highways Route 27
Portland, New northeast 19.30 miles.
HCP 2 Vineyard 1 1/4" Overlay

025931.00
Highway Paving
Farmington, Beginning at Fairbanks Road and extending
2022 Route 149
Strong north 8.25 miles to Farmington Road.
Light Capital Paving
HCP 4

Highway Paving
025769.00
Farmington, Rural Highways Beginning 0.08 of a mile north of Route 156
2022 Route 2
Wilton and extending north 6.69 miles to Route 43.
Ultra-Thin Bonded Wearing
HCP 1
Course

024973.00 Freeman Twp, Highway Paving


Kingfield, Beginning at Route 149 and extending
2022 Route 142
Phillips, Salem northeast 15.41 miles to Route 16.
Twp Light Capital Paving
HCP 4

025931.00
Highway Paving
Freeman Twp, Beginning at Phillips Road and extending
2022 Route 145
Strong north 10.03 miles to Salem Road.
Light Capital Paving
HCP 4

WR 41418 Replacing culvert (#164927) on Route 43 in


Drainage Maintenance Industry. Located 0.38 of a mile east of the
2022 Industry Route 43 $20,000
intersection of Shaw Hill Road and Industry
HCP 4 Road.

Ditching and replacing culverts on Route 17


WR 42628 in Jay. Beginning at the Keep Road
Drainage Maintenance intersection and extending south 5.63 miles.
2022 Jay Route 17 $177,000
Also, ditching Route 140 in Jay. Beginning
HCP 4 105 feet south of Maude Lane and extending
north 1.00 mile.

026120.00
Reed Brook Bridge (#5351) over Reed
Highway-Minor Spans
2023/24 Kingfield Route 16 Brook. Located 1.48 miles south of $1,500,000
Bridge Replacement Carrabassett Valley town line.
HCP 2

024973.00 Madrid Twp,


Rangeley, Highway Paving
Beginning 0.05 of a mile south of Township E
2022 Rangeley Plt, Route 4
town line and extending north 18.92 miles.
Sandy River Plt, Light Capital Paving
HCP 2 Township E

Highway Safety and Spot


022934.00
Improvements
Large culvert (#47113) located 0.55 of a mile
2023/24 New Sharon Route 27
Rural Highways northwest of the York Hill Road. $1,590,000
HCP 2
Large Culvert Rehabilitation

61
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025407.00
Improvements
Large culvert (#1042541) located 0.18 of a
2023/24 New Sharon Route 134
Rural Highways mile northeast of Sandy River Road. $750,000
HCP 4
Large Culvert Replacement

025931.00
Highway Paving Beginning 0.37 of a mile south of York Hill
2022 New Sharon Route 27 Road and extending north 2.66 miles to
Light Capital Paving Route 2.
HCP 1, 2

026438.00
Fillibrown Bridge (#3842) over Fillibrown
Highway-Bridges
2023/24 New Sharon Route 2 Brook. Located 0.42 of a mile southwest of $200,000
Bridge Painting Taylor Road.
HCP 1

WR 43173 Attaching approach rail on Hale Bridge


Operational and Safety
Maintenance (#2345) which carries Route 134 over Hale
2022 New Sharon Route 134
Stream in New Sharon. Located 2.50 miles $24,000
HCP 4 south of the New Sharon-Starks town line.

025931.00
Highway Paving
New Vineyard, Beginning at S Strong Road and extending
2022 Route 234
Strong east 5.31 miles to Route 27.
Light Capital Paving
HCP 4

023623.00
Lower Village Bridge (#5063) over Sandy
Highway-Bridges
2022 Phillips Route 149 River. Located 0.02 of a mile south of Amble $250,000
Bridge Improvements - PE Only Street.
HCP 4

023641.00
Highway-Bridges Ross Bridge (#5064) over Sandy River.
2022 Phillips Route 142 $250,000
Located 0.21 of a mile south of Bridge Street.
Bridge Improvements - PE Only
HCP 4

024973.00
Highway Paving
Beginning at Route 156 and extending north
2022 Phillips, Weld Route 142
12.12 miles to Route 4.
Light Capital Paving
HCP 4

Aviation
018705.02
Stephen A. Bean Safety and infrastructure improvements that
Rangeley Runway/Taxiway
2023/24 Municipal Airport may include pavement maintenance. $103,000
Crack Sealing

Policy, Planning and Research


018705.06
Stephen A. Bean Safety and infrastructure improvements that
Rangeley Airport - General
2022 Municipal Airport may include a master plan update. $155,000
Planning Studies

62
ID/Year Municipality Scope Name Description Total Project Cost

WR 39167
Drainage Maintenance Ditching on Route 4 In Sandy River Plt.
2022 Sandy River Plt Route 4 Beginning 420 feet north of Greenvale Cove $117,000
and extending north 2.46 miles.
HCP 2

WR 39789 Replacing culverts on Route 149 in Strong.


Drainage Maintenance Beginning at the junction of Route 234 and
2022 Strong Route 149
extending south 2.70 miles to the Knowlton $24,000
HCP 4 Road.

WR 43175 Replacing joint and seal on Sandy River


Bridge and Structural
Maintenance Bridge (#5161) which carries Route 145 over
2022 Strong Route 145
the Sandy River in Strong. Located 100 feet $100,000
HCP 4 north of the intersection of Route 4 in Strong.

025105.00
Bridges Bridge (#2102) over Wilson Stream.
Highway-Bridges
2023/24 Wilton Pond Road Located 0.03 of a mile southeast of the Weld $1,700,000
Bridge Replacement Road.
HCP 5

026474.00
Stoney Brook Bridge (#5342) over Stoney
Highway-Bridges
2023/24 Wyman Twp Route 27 Brook. Located 0.21 of a mile south of Camp $4,300,000
Bridge Replacement Road.
HCP 2

63
Hancock

Hancock
Hancock County Oqiton
Twp
Population 54,811 T3 ND

Land Area (sq mi) 1,587


Bridges 123
Highway Corridor Priority Miles T41 MD
HCP 1 T40 MD
69
T39 MD
HCP 2 59
HCP 3 85
T35 MD
HCP 4 319 T34 MD
Great
Pond
T32 MD
Total HCP 1-4 532

T28 MD
Aurora
Amherst

T22 MD
Osborn
Mariaville

Otis T16 MD
Dedham Eastbrook
Waltham

Bucksport T10 SD
T9
Fletchers Franklin
Landing Twp SD
Ellsworth
Orland
Hancock
T7 SD

Ver ona Sullivan


Island

Surry Hancock

Lamoine
Penobscot
Trenton
Blue Hill Gouldsboro

Castine Winter
Harbor
Bar
Harbor
Brook sv ille
Blue
Sedgwick Hill
Mount
Southw est Desert
Harbor
De e r Brooklin Tremont
Is le

Stoningto n
Swans
Islan d
Hancock
ID/Year Municipality Scope Name Description Total Project Cost

024129.00 Highway Paving


Beginning 0.68 of a mile northeast of Peaked
2022 Amherst Rural Highways Route 9 Mountain Drive and extending east 4.45
miles.
HCP 1 Mill And Fill

Aurora,
024975.00 Ellsworth,
Fletchers Highway Paving
Beginning 0.61 of a mile north of Route 1A
2022 Landing Twp, Route 179
and extending north 21.62 miles to Route 9.
Mariaville, Light Capital Paving
HCP 4 Osborn,
Waltham

Highway Safety and Spot


018776.00
Improvements
Beginning at Eden Street and extending east
2023/24 Bar Harbor Route 3
Urban Highways 0.48 of a mile. $579,000
HCP 2, 3
Drainage Improvements

Highway Safety and Spot


022652.00
Improvements
Beginning 0.02 of a mile north of First South
2023/24 Bar Harbor Route 3 $541,000
Urban Highways Street and extending north 0.19 of a mile.
HCP 3
Drainage Improvements

Highway Safety and Spot


025071.00 Improvements
Large culvert (#46319) located 0.05 of a mile
2022 Bar Harbor Rural Highways Route 102 $60,000
north of Pine Heath Road.
HCP 3 Large Culvert Replacement -
PE Only

025879.00
Highway Paving
Beginning at Norway Drive and extending
2023 Bar Harbor Route 233
east 3.95 miles to Route 3.
Light Capital Paving
HCP 3

026574.00
Cromwell Brook #3 Bridge (#0452) over
Highway-Bridges
2023/24 Bar Harbor Ledgelawn Avenue Cromwell Brook. Located 0.03 of a mile $1,500,000
Bridge Improvements north of White Spruce Road.
HCP 5

025143.00 Highway Paving


Bar Harbor, Beginning 0.20 of a mile east of Oak Point
2023/24 Rural Highways Route 3
Trenton Road and extending southeast 3.37 miles.
HCP 2 1 1/4" Overlay

Highway
025995.00
Beddington, Construction/Rehabilitation Beginning 2.76 miles north of the Cherryfield
2023/24 Deblois, T22 MD Route 193 town line and extending northwest 9.54 miles
Rural Highways $3,820,000
BPP to Route 9.
HCP 3
PMRAP DOT Pugmill

018728.00
Highway-Minor Spans Village Bridge (#2893) over Mill Stream.
2023/24 Blue Hill Route 15 Located 0.04 of a mile northeast of Water $1,100,000
Bridge Superstructure Street.
HCP 3 Replacement

64
ID/Year Municipality Scope Name Description Total Project Cost

Highway
018777.00
Construction/Rehabilitation
Beginning at the Sedgwick town line and
2023/24 Blue Hill Route 15
Rural Highways extending north 2.09 miles. $1,820,000
HCP 3
Highway Rehabilitation

Highway Safety and Spot


021845.01
Improvements
Beginning 0.37 of a mile north of Route 172
2023/24 Blue Hill Route 15
Rural Highways and extending north 0.15 of a mile. $125,000
HCP 3
Drainage Improvements

024315.00 Bicycle/Pedestrian
Beginning 0.04 of a mile south of Bay School
2022 Blue Hill On-Road Sidewalk/Trail Route 172
Drive and extending north 0.36 of a mile. $705,000
HCP 4 Multimodal Improvements

Highway Safety and Spot


025655.00 Improvements
Beginning 0.22 of a mile southeast of Parker
2022 Blue Hill Rural Highways Route 175 Point Road and extending southeast 0.08 of $105,000
a mile.
HCP 4 Highway Improvement - PE
Only

025947.00
Highway Paving
Beginning at Pleasant Street and extending
2022 Blue Hill Route 172
north 2.09 miles.
Light Capital Paving
HCP 3

025947.00
Blue Hill, Highway Paving Beginning at the north intersection of Route
2022 Brooklin, Route 175 172 and extending south 17.92 miles to
Sedgwick Light Capital Paving Route 15.
HCP 4

Highway Safety and Spot


023531.00
Improvements
Large culvert (#46688) located 0.05 of a mile
2023/24 Brooklin Route 175 $678,000
Rural Highways south of Flye Point Road.
HCP 4
Large Culvert Replacement

Ports-Harbors
024443.00
Bucks Harbor Marina Expansion. Located at
Brooksville Piers, Floats and Fenders Bucks Harbor Marina
2023/24 684 Coastal Road. $176,000
New Construction

025947.00
Highway Paving
Beginning at the north intersection of Route
2022 Brooksville Route 176
175 and extending south 10.02 miles.
Light Capital Paving
HCP 4

Highway Safety and Spot


018809.00
Brooksville, Improvements Ledge removal at various locations.
2023/24 Penobscot, Route 176 Beginning at Mines Road in Sedgwick and $67,000
Rural Highways
Sedgwick extending north 3.51 miles.
HCP 4
Roadside Improvements

65
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026426.00 Improvements
Located at the intersection of Route 1 and
2023/24 Bucksport Rural Highways Route 1
Route 15. $480,000
HCP 1 Install Or Replace Traffic
Signals

024975.00 Cherryfield,
Franklin, Highway Paving Beginning at the south intersection with
2022 Hancock, T10 Route 182 Route 1 and extending north 23.33 miles to
SD BPP, T9 SD Light Capital Paving the north intersection of Route 1.
HCP 4 BPP

System Operations by Others Transit Operating Assistance for Federal


024651.15
Transit Administration §5311 for statewide
Cranberry Isles Transit - General Rural Transit Operations
2022 non-urbanized transit. Cranberry Isles ME- $50,000
Operating Assistance 2020-027.

System Operations by Others Transit Administrative and Operating


025219.00
Assistance for Federal Transit Administration
Cranberry Isles Transit - General Rural Transit Operations
2023 §5311 for non-urbanized transit. Cranberry $50,000
Operating Assistance Isles Ferry.

Highway Safety and Spot


025661.00 Improvements
Beginning 0.15 of a mile northwest of Hardy's
2022 Deer Isle Rural Highways Route 15 Hill Road and extending northwest 0.62 of a $205,000
mile.
HCP 3 Highway Improvement - PE
Only

WR 42469 Ditching on Route 15 in Deer Isle. Beginning


Drainage Maintenance at the Reach Road intersection in North Deer
2022 Deer Isle Route 15 $42,000
Isle and extending north 1.00 mile to the
HCP 3 Deer Isle causeway.

022356.01
Mill Hill Bridge (#3063) over Mill Pond Outlet.
Deer Isle, Highway-Bridges
2022 Route 15 Located on the Stonington- Deer Isle town
Stonington $2,800,000
Bridge Replacement line. FHWA BUILD Grant recipient.
HCP 3

025947.00
Highway Paving
Deer Isle, Beginning at School Street and extending
2022 Route 15
Stonington north 11.38 miles.
Light Capital Paving
HCP 3

025947.00
Highway Paving Beginning at the south intersection of Route
Deer Isle,
2022 Sunset Avenue 15 and extending north 6.97 miles to the
Stonington
Light Capital Paving north intersection of Route 15.
HCP 4

Ditching on Sunset Road and Route 15 in


WR 42456 Deer Isle and Stonington. Beginning in
Deer Isle, Drainage Maintenance Stonington Village extending north 11.18
2022 Sunset Road, Route 15
Stonington miles and beginning in Stonington Village $122,000
HCP 3, 4 and extending north 6.97 miles on Sunset
Road.

66
ID/Year Municipality Scope Name Description Total Project Cost

024975.00
Eastbrook, Highway Paving
Beginning at Route 182 and extending north
2022 Franklin, Route 200
11.06 miles to Route 179.
Waltham Light Capital Paving
HCP 4

System Operations by Others Transit Administrative and Operating


024651.05 Assistance for Federal Transit Administration
Rural Transit Admin/
Ellsworth Transit - General §5311 for statewide non-urbanized transit.
2022 Operations $75,000
Downeast Community Partners ME-2020-
Operating Assistance 027.

System Operations by Others Transit Administrative and Operating


025239.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Ellsworth Transit - General
2023 Operations §5311 for non-urbanized transit. Downeast $180,000
Operating Assistance Community Partners (DCP).

Highway Safety and Spot


025271.00
Improvements
Located at the intersection of Route 1 and
2023/24 Ellsworth Route 1
Rural Highways Route 172. $380,000
HCP 1
Safety Improvements

Highway Safety and Spot


025461.00
Improvements
Located at the intersection of Route 1A and
2023/24 Ellsworth Route 1A $275,000
Rural Highways Winkumpaugh Road.
HCP 1
Safety Improvements

Beginning at Route 1 (Main Street) and


026073.00 Highway Paving extending south 2.01 miles on Route 3.
Beginning 0.17 of a mile south of Forrest
2023/24 Ellsworth Rural Highways Route 3/Route 1A Avenue and extending south 0.20 of a mile
on Route 1A. Continuing on Route 1A at
HCP 1 Mill And Fill Church Street and extending south 0.09 of a
mile.

Bicycle/Pedestrian
026296.00
Ellsworth Multiuse
Ellsworth Off-Road Trail/Path Connection of the Ellsworth Multiuse Trail. $370,000
2022 Pathway
New Construction - PE Only

Highway Safety and Spot


026412.00 Improvements
Beginning 0.04 of a mile north of State Street
2022 Ellsworth Urban Highways Route 1A
and extending south 0.62 of a mile. $255,000
HCP 1 Highway Improvement - PE
Only

025947.00
Highway Paving
Beginning at Route 172 and extending north
2022 Ellsworth, Surry North Bend Road
3.87 miles to Route 1.
Light Capital Paving
HCP 4

WR 42445 Ditching and replacing culverts in various


Drainage Maintenance locations on Route 184. Beginning at the
Ellsworth,
2022 Route 184 intersection of Route 1 in Ellsworth and
Lamoine $94,000
extending southeast 8.54 miles to Lamoine
HCP 4 Beach in Lamoine.

67
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


021785.00
Improvements
Cross culvert (#110136) located 0.19 of a
2023/24 Franklin Route 182
Rural Highways mile north of Alder Brook Hill Road. $355,000
HCP 4
Large Culvert Improvements

Ports-Harbors
022202.00
Frenchboro Piers, Floats and Fenders Lunt Harbor Construction of new Frenchboro dolphin.
2022 $2,890,000
Reconstruction

WR 42555 Ditching and replacing culverts in various


Drainage Maintenance locations on Route 204. Beginning at the
Lamoine,
2022 Route 204 intersection of Route 3 in Trenton and
Trenton $91,000
extending southeast 6.47 miles to the
HCP 3, 4 intersection of Seal Point Road in Lamoine.

026107.00
Tannery Bridge (#3511) over Tannery Brook.
Highway-Bridges
2023/24 Mariaville Route 181 Located 0.16 of a mile north of Olive Carr $1,500,000
Bridge Replacement Road.
HCP 4

Highway Safety and Spot


018359.00 Improvements
Beginning 0.01 of a mile east of Upper
2022 Mount Desert Rural Highways Route 3 Dunbar Road and extending south 0.66 of a $252,000
mile.
HCP 3 Highway Improvement - PE
Only

023515.00
Babsons Bridge (#5244) over Meadow
Highway-Minor Spans
2023/24 Mount Desert Route 3 Brook. Located 0.09 of a mile east of Route $2,770,000
Bridge Replacement 102.
HCP 3

025879.00
Highway Paving Beginning at Upper Dunbar Road and
2023 Mount Desert Route 3 extending southwest 3.55 miles to Route
Light Capital Paving 198.
HCP 3

025879.00
Highway Paving
Beginning at Peabody Drive and extending
2023 Mount Desert Route 198
south 0.83 of a mile.
Light Capital Paving
HCP 4

025947.00
Highway Paving
Mount Desert, Beginning at Route 102A and extending
2022 Pretty Marsh Road
Tremont north 12.41 miles to Route 102.
Light Capital Paving
HCP 4

Highway Safety and Spot


024273.00
Improvements
Large culvert (#988887) located 0.16 of a
2022 Penobscot Route 166
Rural Highways mile south of Route 175. $599,000
HCP 4
Large Culvert Replacement

68
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026400.00
Improvements
Large culvert (#165998) located 0.09 of a
2023/24 Penobscot Route 199
Rural Highways mile southwest of New Road. $545,000
HCP 4
Large Culvert Replacement

018523.22 Highway System Operations


Operating costs at the Penobscot Narrows
Prospect, Penobscot Narrows
2022 Highways - General Observatory. Located on Route 1 at the
Verona Island Observatory $150,000
Prospect- Verona Island town line.
HCP 1 Facilities Management

018523.23 Highway System Operations


Operating costs at the Penobscot Narrows
Prospect, Penobscot Narrows
2023 Highways - General Observatory. Located on Route 1 at the
Verona Island Observatory $150,000
Prospect- Verona Island town line.
HCP 1 Facilities Management

018523.24 Highway System Operations


Operating costs at the Penobscot Narrows
Prospect, Penobscot Narrows
2024 Highways - General Observatory. Located on Route 1 at the
Verona Island Observatory $150,000
Prospect- Verona Island town line.
HCP 1 Facilities Management

Department Building and Lot


Maintenance
021814.00 Repairs at the Penobscot Narrows
Prospect, Penobscot Narrows
Department Buildings and Lots Observatory. Located on Route 1 at the
2024 Verona Island Observatory $64,000
Prospect- Verona Island town line.
Repairing Damage To State
Property

024595.00
Penobscot Narrows Bridge and Observatory
Prospect, Highway-Bridges
2023/24 Route 1 (#6241) over Penobscot River. Located on
Verona Island $1,500,000
Lighting the Prospect- Verona Island town line.
HCP 1

Highway Safety and Spot


021825.00 Improvements
Large culvert (#47198) located 0.33 of a mile
2022 Sedgwick Rural Highways Route 172
south of Hales Hill Road. $60,000
HCP 4 Large Culvert Improvements -
PE Only

Highway Safety and Spot


023753.00
Improvements
Large culvert (#986663) located 0.01 of a
2023/24 Sedgwick Route 176
Rural Highways mile southeast of Rocks Lane. $525,000
HCP 4
Large Culvert Improvements

Highway Safety and Spot


026392.00 Improvements
Large culvert (#169683) located 0.14 of a
2022 Sedgwick Rural Highways Route 15 $95,000
mile southwest of Herrick Road.
HCP 3 Large Culvert Replacement -
PE Only

022204.00 Bicycle/Pedestrian
Located on the west side of Main Street.
Southwest
2022 On-Road Sidewalk/Trail Main Street Beginning at Apple Lane and extending south
Harbor $1,110,000
0.20 of a mile.
HCP 3 New Construction

69
ID/Year Municipality Scope Name Description Total Project Cost

Highway
022516.16
Construction/Rehabilitation Municipal Partnership Initiative Program.
Southwest
2022 Route 102 Beginning 0.07 of a mile north of Apple Lane
Harbor Rural Highways $419,000
and extending south 0.27 of a mile.
HCP 3
Reconstruction

022630.00
Oceanville Bridge (#3696) over Oceanville
Highway-Bridges
2023/24 Stonington Oceanville Road Thoroughfare. Located 0.38 of a mile west of $3,670,000
Bridge Replacement Hatchs Cove Road.
HCP 5

Highway Safety and Spot


026390.00 Improvements
Large culvert (#170575) located 0.85 of a
2022 Surry Rural Highways Route 172
mile north of the Blue Hill town line. $95,000
HCP 3 Large Culvert Replacement -
PE Only

Department Building and Lot


023478.00 Maintenance
Swans Island Crew Quarters, 1-2 bedroom
Swans Island Crew Quarters
2024 Department Buildings and Lots expansion. $331,000

Addition To Existing Building

Highway Safety and Spot


023020.00 Beginning 0.16 of a mile north of Earls Way
Improvements
and extending north 0.04 of a mile and
2023/24 Tremont Shore Road $745,000
Rural Highways continuing north on Route 102A for 0.06 of a
HCP 3 mile.
Slope Stabilization/Protection

Bus FTA Section 20/5320 Transit in Parks


017163.02
Program – Discretionary Grant Award
Trenton Intermodal Passenger Facility Acadia Gateway Center
2022 recipient. Design and construction of the $3,800,000
New Construction intermodal facility and welcome center.

Bus FTA Section 5339 Capital Assistance


017163.03
Statewide - FFY2020 Discretionary Grant
Trenton Intermodal Passenger Facility Acadia Gateway Center $26,200,000
2022 Award recipient. Construction of the
New Construction intermodal facility and welcome center.

Policy, Planning and Research


018710.05 Safety and infrastructure improvements that
Airport - General Hancock County - Bar
Trenton may include easement/land acquisition for $567,000
2023 Harbor Airport
Field Investigations, Studies, Runways 4 and 22 - phase 2.
And Research

Aviation
018710.09 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Navigation Aids/Lights may include obstruction removal on Runway $510,000
2023/24 Harbor Airport
4 and Runway 22 ends.
Removal Of Obstructions

Aviation
018710.11 Safety and infrastructure improvements that
Airport Buildings Hancock County - Bar
Trenton may include easement/land acquisition for
2023/24 Harbor Airport $62,000
Sale Or Purchase Of Lot Or Runways 4 and 22 - phase 1.
Building

70
ID/Year Municipality Scope Name Description Total Project Cost

Aviation Safety and infrastructure improvements that


018710.13
Hancock County - Bar may include investigation and repair as
Trenton Airport - General
2022 Harbor Airport needed airfield stormwater drainage $500,000
Drainage Improvements infrastructure.

Airport
018710.15 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Airport - General may include acquisition of snow removal
2022 Harbor Airport $1,030,000
equipment.
Capital Equipment Purchase

Airport Safety and infrastructure improvements that


018710.18
Hancock County - Bar may include no foam fire fighting system and
Trenton Airport - General
2023/24 Harbor Airport snow removal equipment attachment $62,000
Capital Equipment Purchase (bucket).

Aviation
018710.20
Hancock County - Bar Safety and infrastructure improvements that
Trenton Runway/Taxiway
2023/24 Harbor Airport may include airfield pavement markings. $258,000
Crack Sealing

Aviation
018710.21 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Navigation Aids/Lights may include obstruction removal - design and
2023/24 Harbor Airport $155,000
permitting to include eagle monitoring.
Removal Of Obstructions

Aviation
018710.22
Hancock County-Bar
Trenton Runway/Taxiway Replace/slip line culvert under Runway 4-22. $310,000
2022 Harbor Airport
Drainage Improvements

Airport
018710.23
Hancock County-Bar Safety and infrastructure improvements that
Trenton Airport - General $42,000
2023/24 Harbor Airport include no-foam fire fighting equipment.
Capital Equipment Purchase

Policy, Planning and Research


018710.24
Airport - General Hancock County - Bar Safety and infrastructure improvements that
Trenton
2023 Harbor Airport may include a master plan update. $294,000
Field Investigations, Studies,
And Research

Aviation
018710.25 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Airport - General include reconstructing part of Caruso Drive
2023/24 Harbor Airport $850,000
and parking lot.
Reconstruction

Highway Safety and Spot


023022.00
Improvements
Large culvert (#46200) located 0.36 of a mile
2023/24 Trenton Route 230
Rural Highways south of the Ellsworth town line. $700,000
HCP 4
Large Culvert Replacement

71
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


023024.00 Improvements
Located 0.49 of a mile north of the Bar
2022 Trenton Rural Highways Route 3
Harbor town line. $75,000
HCP 2 Slope Stabilization/Protection -
PE Only

System Operations by Others Transit Administrative and Operating


024651.06
Rural Transit Admin/ Assistance for Federal Transit Administration
Trenton Transit - General
2022 Operations §5311 for statewide non-urbanized transit. $828,000
Operating Assistance Downeast Transportation ME-2020-027.

System Operations by Others Transit Administrative and Operating


025237.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Trenton Transit - General
2023 Operations §5311 for non-urbanized transit. Downeast $988,000
Operating Assistance Transportation (DTI).

025879.00
Highway Paving
Beginning at the Ellsworth town line and
2023 Trenton Route 230
extending south 9.33 miles to Route 198.
Light Capital Paving
HCP 4

Highway Safety and Spot


025505.00 Improvements
Large culvert (#165852) located 0.24 of a
2022 Verona Island Rural Highways E Side Road
mile north of Wentworth Lane. $60,000
HCP 4 Large Culvert Replacement -
PE Only

72
Kennebec

Clinton

Unity
Twp

Benton
Rome

Kennebec
Oakland
Vienna
Waterville
Winslow
Albion
Belgrade

Mount
Vernon
Fayette
Sidney
Vassalboro

China

Readfield

Wayne

Augusta
Winthrop Manchester
Windsor
Hallowell

Farmingdale Chelsea

Monmouth
West
Randolph Kennebec County
Gardiner Population 122,083
Land Area (sq mi) 868
Gardiner Bridges
Pittston 258
Litchfield Highway Corridor Priority Miles
HCP 1 140
HCP 2 148
HCP 3 102
HCP 4 326

Total HCP 1-4 716


Kennebec
ID/Year Municipality Scope Name Description Total Project Cost

025299.00
Puddle Duck Bridge (#3107) over 15 Mile
Highway-Bridges
2023/24 Albion South Freedom Road Stream. Located 0.11 of a mile north of $2,720,000
Bridge Replacement Knights Road.
HCP 4

025943.00
Highway Paving Beginning 0.10 of a mile east of North
2022 Albion, Freedom Route 137 Palermo Road and extending west to Route
Light Capital Paving 202.
HCP 4

Aviation
020655.07
Design, permit, construct the remainder of
Augusta Apron Augusta State Airport
2022 the commercial apron. $1,340,000
Reconstruction

Aviation
020655.08
Design and permitting for General Aviation
Augusta Apron Augusta State Airport $283,000
2023/24 reconstruction and access security gates.
Reconstruction

Aviation
020655.09 Safety and infrastructure improvements that
Augusta Apron Augusta State Airport include General Aviation reconstruction and
2023/24 $4,840,000
access security gates.
Reconstruction

021672.00
Western Avenue/ I-95 Bridge (#5808) over
Highway-Bridges
2023/24 Augusta Route 202 Interstate 95. Located 0.27 of a mile south of $8,500,000
Bridge Replacement Old Winthrop Road.
HCP 1

021872.00 Rines Hill Bridge (#3528) over the Old Maine


Highway-Bridges
Augusta Water Street Central Railroad. Located 0.03 of a mile north $4,450,000
2022
Bridge Replacement of Green Street.

Administration
022717.22
Airport - General Funding for Operations at the State-owned
Augusta Augusta State Airport
2022 Augusta State Airport (AUG). $550,000
General Program
Administration

Administration
022717.23
Airport - General Funding for Operations at the State-owned
Augusta Augusta State Airport
2023 Augusta State Airport (AUG). $550,000
General Program
Administration

Administration
022717.24
Airport - General Funding for Operations at the State-owned
Augusta Augusta State Airport
2024 Augusta State Airport (AUG). $550,000
General Program
Administration

73
ID/Year Municipality Scope Name Description Total Project Cost

023126.00
Spaulding Brook Bridge (#2790) over
Highway-Minor Spans
2023/24 Augusta Route 17 Spaulding Brook. Located 0.41 of a mile $1,000,000
Bridge Replacement southeast of Cony Road.
HCP 2

Ports-Harbors Coordination and plan development between


023961.00 The Maine Department of Agriculture,
Augusta Ports and Harbors - General Agency Collaboration Conservation and Forestry (DACF) and
2022 $50,000
MaineDOT regarding submerged lands and
Multimodal Improvements shore harbor management.

Highway Safety and Spot


024205.00
Improvements
Beginning 0.75 of a mile north of West River
2022 Augusta Route 3
Urban Highways Road and extending south 0.03 of a mile. $486,000
HCP 1
Safety Improvements

Highway Safety and Spot


024207.00
Improvements
Beginning 0.13 of a mile south of Henry's
2022 Augusta Route 3
Urban Highways Way and extending south 0.03 of a mile. $484,000
HCP 2
Safety Improvements

024445.00 Augusta Memorial Bridge (#5196) over the


Highway-Bridges
Augusta Route 201 Kennebec River. Located 0.22 of a mile east $25,000
2022
Lighting - PE Only of Gage Street.

High-Visibility Pedestrian Crossing


024769.00 Bicycle/Pedestrian Demonstration project at multiple locations
High-Visibility that will include innovative treatments such
2023/24 Augusta On-Road Sidewalk/Trail $200,000
Crosswalks as Rectangular Rapid Flashing Beacons
HCP 2, 4 New Construction (RRFBs), dynamic pedestrian signage,
thermoplastic crossings, and in-road lighting.

Highway Safety and Spot


025273.00
Improvements
Located at the intersection of Route 201 and
2023/24 Augusta Route 201 $700,000
Urban Highways Gage Street.
HCP 2
Safety Improvements

025467.00
Old Belgrade Road/I-95 Bridge (#5806) over
Highway-Bridges
2022 Augusta Old Belgrade Road Interstate 95. Located 0.40 of a mile north of $250,000
Bridge Improvements - PE Only Eight Rod Road.
HCP 1

Beginning at Route 105 and extending north


Highway Safety and Spot 0.64 of a mile on Route 201. Beginning at
025751.00
Improvements Route 201 and extending east 0.08 of a mile
2023/24 Augusta Route 201/Route 202 on Route 202. Including exits on the rotary. $6,030,000
Rural Highways
Project funding is contingent on
HCP 2, 3 Congressionally Designated Spending
Safety Improvements
approval.

Highway Paving
025767.00
Rural Highways Beginning at the Chelsea town line and
2022 Augusta Route 9
extending north 0.80 of a mile.
Ultra-Thin Bonded Wearing
HCP 2
Course

74
ID/Year Municipality Scope Name Description Total Project Cost

Multimodal System Operations


026045.00 Replace Roof on the Snow Removal
Augusta Airport - General Augusta State Airport Equipment (SRE) Building.
2023 $100,000
Facilities Management

Multimodal System Operations


026047.00
Augusta Airport - General Augusta State Airport Terminal Building renovations.
2024 $150,000
Facilities Management

Multimodal System Operations


026049.00
Augusta Airport - General Augusta State Airport Oil water separator upgrade.
2022 $20,000
Facilities Management

026164.00 Superstructure improvements to Augusta


Highway-Bridges Memorial Bridge (#5196) over Kennebec
Augusta Route 201
2022 River. Located 0.22 of a mile east of Gage $350,000
Bridge Improvements - PE Only Street.

026336.00 Bicycle/Pedestrian
Route 11/Route Pedestrian safety improvements at the
2022 Augusta On-Road Sidewalk/Trail $55,000
201/Route 202 Memorial traffic circle.
HCP 2 Safety Improvements - PE Only

026444.00
Thorne Brook Bridge (#2850) over Thorne
Highway-Minor Spans
2023/24 Augusta Route 17 Brook. Located 0.28 of a mile southeast of $1,000,000
Bridge Replacement Cony Road.
HCP 2

Augusta, Highway Paving


025765.00
Chelsea,
Rural Highways Beginning at Route 32 and extending west
2022 Jefferson, Route 17
12.75 miles to Route 9.
Whitefield, Ultra-Thin Bonded Wearing
HCP 2 Windsor Course

Highway System Operations


026130.00 Augusta,
Interstate Interstate 95/Interstate
Fairfield, Streaming Cameras. $360,000
2024 295
Waterville Intelligent Transportation
Systems

Highway Safety and Spot


024365.00 Improvements Beginning at Maple Street and extending
Augusta, north 1.11 miles. Beginning 0.22 of a mile
2022 Rural Highways Route 201 $100,000
Hallowell north of Winthrop Street and extending north
HCP 2 Highway Improvement - PE 0.50 of a mile.
Only

Highway
022392.00
Construction/Rehabilitation Beginning 0.16 of a mile east of the
Augusta,
2023/24 Route 202 intersection of Granite Hill Road and $4,600,000
Manchester Rural Highways
extending east 1.67 miles.
HCP 2
Highway Rehabilitation

75
ID/Year Municipality Scope Name Description Total Project Cost

025863.00
Highway Paving Beginning 0.44 of a mile south of the Sidney
Augusta,
2023 Middle Road town line and extending north 10.19 miles to
Oakland, Sidney
Light Capital Paving Trafton Road.
HCP 4

025863.00 Augusta, Highway Paving


Somerville, Beginning at Bolton Hill Road and extending
2023 Route 105
Washington, east 18.39 miles to Waldoboro Road.
Windsor Light Capital Paving
HCP 4

WR 43591 Ditching and replacing culverts in various


Drainage Maintenance places on the Middle Road in Sidney.
2022 Augusta, Sidney Middle Road Beginning at the Augusta compact line and
$28,000
extending north 11.20 miles to the
HCP 4 intersection with Middle Road and Route 23.

025627.00 Highways - General


Belgrade Well Claim Mitigation efforts to offset impacts to wells.
2022 $2,000,000
Environmental Improvements
(Misc.)

WR 43582 Ditching and replacing culverts in various


Drainage Maintenance places on Route 11 in Belgrade and Oakland.
Belgrade,
2022 Route 11 Beginning with the intersection of Route 8
Oakland $152,000
and Route 11 and extending north 4.64 miles
HCP 3 to Summer Street.

023186.00
Interstate 95 NB/ River Road Bridge (#5993)
Highway-Bridges
2023/24 Benton Interstate 95 Northbound over River Road. Located 0.75 of a mile east $350,000
Bridge Painting of Interstate 95 northbound Exit 133.
HCP 1

023220.00
I-95 SB/ River Road Bridge (#1455) over
Highway-Bridges
2023/24 Benton Interstate 95 Southbound River Road. Located 0.53 of a mile east of $350,000
Bridge Painting the Fairfield town line.
HCP 1

023611.00
I-95 SB/ River Road Bridge (#1455) over
Highway-Bridges
2022 Benton Interstate 95 River Road. Located 0.53 of a mile east of $608,000
Bridge Strengthening the Fairfield town line.
HCP 1

Highway Paving
025717.00
Beginning 0.06 of a mile south of
Rural Highways
2022 Benton Route 139 Sebasticook Bridge Road and extending west
Highway Cyclical Pavement 1.89 miles.
HCP 3
Resurfacing

Benton,
Burnham, Highway Paving
025519.00
Clinton,
Interstate Beginning 1.47 miles north of the Sidney
2022 Fairfield, Interstate 95 Northbound
town line and extending north 18.14 miles.
Oakland, Ultra-Thin Bonded Wearing
HCP 1 Pittsfield, Course
Waterville

76
ID/Year Municipality Scope Name Description Total Project Cost

Highway Paving
026460.00
Benton,
Interstate Beginning 0.13 of a mile north of the Newport
2023/24 Burnham, Interstate 95 Southbound
town line and extending south 16.80 miles.
Clinton, Pittsfield Ultra-Thin Bonded Wearing
HCP 1
Course

025061.00 Various bridge joint improvements on


Benton, Clinton, Highway-Bridges
Interstate 95 Northbound Interstate 95 northbound in Clinton, Benton,
2022 Waterville $900,000
Bridge Joint Replacement and Waterville.

Highway
025423.00
Construction/Rehabilitation Beginning at Smiley Avenue and extending
2022 Benton, Winslow Route 100A northeast 3.45 miles. Continuing on Route
Rural Highways $425,000
100 for 0.06 of a mile.
HCP 4
PMRAP DOT Pugmill

Highway
025423.10
Construction/Rehabilitation Beginning at Smiley Avenue and extending
2022 Benton, Winslow Route 100A northeast 3.45 miles. Continuing on Route
Rural Highways $634,000
100 for 0.06 of a mile.
HCP 4
PMRAP Laydown/Surface HMA

Bowdoin, Highway Paving


026340.00 Bowdoinham,
Gardiner, Interstate Interstate 295 Beginning 1.19 miles north of the Gardiner
2023/24
Richmond, Southbound town line and extending south 21.63 miles.
Topsham, West Ultra-Thin Bonded Wearing
HCP 1
Gardiner Course

Bowdoinham, Policy, Planning and Research


024759.00
Gardiner, Lower Road Branch Public advisory process for future use of the
Railroad - General $82,000
2022 Richmond, Railroad rail corridor between Topsham and Gardiner.
Topsham Feasibility Studies

025943.00
Highway Paving
Burnham, Beginning at Baker Street and extending
2022 Route 11
Clinton north 6.48 miles to the Pittsfield town line.
Light Capital Paving
HCP 4

Highway Safety and Spot


026284.00
Improvements
Located at the intersection of Route 17 and
2023/24 Chelsea Route 17 $500,000
Rural Highways Windsor Road.
HCP 2
Safety Improvements

Highway Safety and Spot


024271.00
Improvements Large culvert (#266578) located 0.17 of a
2022 China Route 202 mile north of the south intersection of Pond
Rural Highways $620,000
Road.
HCP 2
Large Culvert Improvements

Highway
021842.00 Construction/Rehabilitation Beginning 1.39 miles north of Village Street
China, and extending north 5.65 miles. Beginning
2022 Vassalboro, Rural Highways Route 32 0.21 of a mile north of Preble Hill and $300,000
Winslow extending north 2.40 miles to Timber Oaks
HCP 4 Highway Rehabilitation - PE Drive.
Only

77
ID/Year Municipality Scope Name Description Total Project Cost

022232.00
Manley Holt Bridge (#2508) over
Highway-Bridges
2023/24 Clinton River Road Carrabassett Stream. Located 0.22 of a mile $3,140,000
Bridge Replacement north of Pishon Ferry Road.
HCP 5

Highway Paving
025721.00
Rural Highways Beginning at Route 11 and extending west
2022 Clinton Hinckley Road
1.28 miles.
Highway Cyclical Pavement
HCP 3, 4
Resurfacing

WR 38818
Drainage Maintenance Replacing culverts (#778164, #778173) on
2022 Clinton River Road
River Road in Clinton. $110,000
HCP 4

WR 43556 Painting on George W. Hinckley Bridge


Bridge and Structural
Maintenance (#3389) in Clinton which carriers Hinckley
2022 Clinton Route 23
Road over Kennebec River. Located 470 feet $70,000
HCP 3 east of Route 201.

WR 43559
Bridge and Structural Replacing bridge rail on I95 SB Bridge
2022 Clinton Maintenance Interstate 95 (#1454) in Clinton which carries Interstate 95 $80,000
over Hinckley Road.
HCP 1

026063.00 Highway Paving


Farmingdale, Beginning 0.04 of a mile south of 1st Street
2023/24 Rural Highways Route 201
Hallowell and extending north 1.07 miles.
HCP 2 Mill And Fill

Bicycle/Pedestrian
013344.10
Bicycle-pedestrian trail along the rail line from
Gardiner Off-Road Trail/Path Cobbossee Stream Trail $740,000
2023/24 Water Street to Winter Street.
New Construction

013344.20 Bicycle/Pedestrian
Bicycle-pedestrian trail along Arcade street.
2022 Gardiner On-Road Sidewalk/Trail Cobbossee Stream Trail Beginning at Bridge Street and extending $170,000
southwest 0.06 of a mile to Water Street.
HCP 5 New Construction

025333.00 Bicycle/Pedestrian
Beginning at Route 201 and extending
2022 Gardiner On-Road Sidewalk/Trail Main Street
southeast 0.15 of a mile. $75,000
HCP 4 New Construction - PE Only

026001.00 Highway Paving


Beginning at the Gardiner-Interstate 295
2023/24 Gardiner Rural Highways Route 201 southbound Route 201 Exit ramp and
extending northeast 4.77 miles.
HCP 2 Mill And Fill

78
ID/Year Municipality Scope Name Description Total Project Cost

025301.00 Highway-Bridges Pearl Harbor Remembrance Bridge (#2304)


Gardiner,
Route 9 over the Kennebec River. Located 0.11 of a
2023/24 Randolph $3,200,000
Bridge Wearing Surface mile west of Route 126.
Replacement

Highway Paving
025837.00
Gardiner, Rural Highways Beginning at Route 197 and extending
2023/24 Route 201
Richmond northeast 6.06 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

025463.00
Vaughan Memorial Bridge (#0490) over
Highway-Bridges
2023/24 Hallowell Litchfield Road Vaughan Stream. Located 0.41 of a mile $500,000
Bridge Improvements northeast of Smith Road.
HCP 4

025615.00 Bicycle/Pedestrian
Safe Routes to School (SRTS) pedestrian
2023/24 Hallowell On-Road Sidewalk/Trail Winthrop Street safety improvements. Beginning at Coos $60,000
Lane and extending south 0.03 of a mile.
HCP 4 New Construction

026324.00 Bicycle/Pedestrian
Beginning at North Street and extending
2022 Hallowell On-Road Sidewalk/Trail Second Street $100,000
north 0.29 of a mile to Augusta town line.
HCP 4 Safety Improvements - PE Only

026406.00 Bicycle/Pedestrian
Winthrop Street/Middle Located at the intersection of Winthrop Street
2022 Hallowell On-Road Sidewalk/Trail $75,000
Street and Middle Street.
HCP 4, 5 Safety Improvements - PE Only

Replace wearing surface on Wharf Bridge


WR 43547 Bridge and Structural (#3329) in Litchfield which carries Dennis Hill
Maintenance Dennis Hill Road, Bog
Litchfield Road over Cobbossee Stream. Located 0.13
2022 Hill Road $150,000
of a mile east of Stevenstown Road at the
Litchfield -West Gardiner town line.

023655.00
Thorofare Bridge (#3925) over Pleasant
Litchfield, Highway-Bridges
2022 Thorofare Road Pond. Located on the Litchfield-Richmond
Richmond $885,000
Bridge Deck Replacement town line.
HCP 4

023094.01 Babcock Bridge (#2029) over


Litchfield, West Highway-Bridges Cobbosseecontee Stream. Located on the
2022 Route 126
Gardiner Litchfield-West Gardiner town line. FHWA $3,320,000
Bridge Replacement BUILD Grant recipient.
HCP 3

Highway Safety and Spot


025359.00
Improvements Beginning 0.16 of a mile south of Welch
2023/24 Monmouth Route 132 Avenue and extending north 0.70 of a mile to
Rural Highways $250,000
Academy Road.
HCP 4
Drainage Improvements

79
ID/Year Municipality Scope Name Description Total Project Cost

026156.00
Bailey Flat Bridge (#3671) over Mud Mills
Highway-Minor Spans
2023/24 Monmouth Cobbossee Road Stream. Located 0.73 of a mile north of $1,000,000
Bridge Replacement Gilman Road.
HCP 4

026234.00
Highway-Bridges Waggon Bridge (#0487) over Wilson Street.
2023/24 Monmouth Waggon Road
Located 0.82 of a mile north of Blake Road. $1,500,000
Bridge Replacement
HCP 5

WR 43545 Bridge and Structural Repairing wingwalls on South Monmouth


Maintenance Bridge (#3226) in Monmouth which carries
Monmouth South Monmouth Road
2022 South Monmouth Road over Jock Stream. $60,000
Located 200 feet southeast of Bonin Road.

WR 43587 Ditching and replacing of culverts in various


Drainage Maintenance places on the Cobbossee Road in
2022 Monmouth Cobbossee Road Monmouth. Beginning at the Gray Mill Road $119,000
and extending southeast 4.60 miles to the
HCP 4 Monmouth-Litchfield town line.

WR 43574 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 9 in Wales and Monmouth.
Monmouth,
2022 Route 9 Beginning at the Sabattus-Wales town line
Wales $182,000
and extending north 7.10 miles to the
HCP 3 Monmouth-Litchfield town line.

Communication and Outreach


025079.00 Hopkins Bridge (#2380) over Hopkins
Mount Vernon Planning Blake Hill Road Stream. Located 0.20 of a mile east of Pond
2022 $25,000
Road.
Municipal/Public Outreach

WR 43548 Repairing wingwalls on Walton Mill Bridge


Bridge and Structural
Maintenance (#2987) in Mount Vernon which carries Pond
2022 Mount Vernon Route 41 $120,000
Road over Walton Stream. Located 0.69 of a
HCP 4 mile north of Sandy River Road.

WR 43588 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 41 in Mount Vernon.
2022 Mount Vernon Route 41 Beginning with the intersection of Sandy $36,000
River Road and Route 41 and extending 3.63
HCP 4 miles to the Seavey Corner Road.

025107.00
Narrows West Bridge (#5912) over Long
Mount Vernon, Highway-Bridges
2023/24 Castle Island Road Pond. Located 0.01 of a mile west of the
Rome $2,000,000
Bridge Replacement Belgrade town line.
HCP 4

WR 43579 Ditching and replacing culverts in various


Drainage Maintenance places on Route 137 in Oakland. Beginning
2022 Oakland Route 137
at Powell Avenue and extending northwest $22,000
HCP 3 1.52 miles to the Town Farm Road.

80
ID/Year Municipality Scope Name Description Total Project Cost

025863.00
Highway Paving
Oakland, Beginning at Snow Pond Road and extending
2023 Webb Road
Waterville east 2.08 miles to Mitchell Road.
Light Capital Paving
HCP 4

026162.00
Nehumkeag Bridge (#5283) over Nehumkeag
Highway-Minor Spans
2023/24 Pittston Route 27 Brook. Located 0.10 of a mile north of Forest $1,200,000
Bridge Replacement Lane.
HCP 2

Highway
025269.00
Construction/Rehabilitation
Located at the intersection of Route 27 and
2023/24 Randolph Route 27
Urban Highways Route 226. $550,000
HCP 2, 3
Intersection Reconstruction

Bicycle/Pedestrian
025113.00
Beginning at Main Street and extending north
On-Road Sidewalk/Trail
2022 Readfield Church Road 0.33 of a mile to connect to the town's $85,000
Multimodal Improvements - PE recreational complex.
HCP 5
Only

025465.00 Lyons Road/1-95 SB Bridge (#1463) over I-


95 Southbound, located 0.35 of a mile west
Highway-Bridges
2022 Sidney Lyons Road of Perry Drive. Lyons Road/I-95 NB Bridge $250,000
Bridge Improvements - PE Only (#5783), located 0.30 of a mile west of Perry
HCP 1 Drive.

025469.00
Drummond Road/I-95 Bridge (#5784) over
Highway-Bridges
2022 Sidney Drummond Road Interstate 95. Located 0.87 of a mile west of $250,000
Bridge Improvements - PE Only Route 104.
HCP 1

025473.00
Dinsmore Road/I-95 Bridge (#5782) over
Highway-Bridges
2022 Sidney Dinsmore Road Interstate 95. Located 1.12 miles east of $250,000
Bridge Improvements - PE Only Route 104.
HCP 1

WR 43236
Drainage Maintenance Replacing culverts (#50556, #50569, #50573,
2022 Sidney Middle Road
#50577, #133633) on Middle Road in Sidney. $240,000
HCP 4

WR 43544 Repairing concrete and wingwalls on Town


Bridge and Structural Farm Brook Bridge (#5073) in Sidney which
2022 Sidney Maintenance Route 104 carries West River Road over Town Farm $160,000
Brook. Located 300 feet south of Town Farm
HCP 4 Road.

Highway
018803.00 Beginning 1.14 miles north of Gray Road and
Construction/Rehabilitation
extending north 0.73 of a mile. Project
2023/24 Vassalboro Route 32
Rural Highways funding is contingent on Congressionally $1,390,000
HCP 4 Designated Spending approval.
Highway Rehabilitation

81
ID/Year Municipality Scope Name Description Total Project Cost

026442.00
Meadow Brook Bridge (#5856) over Meadow
Highway-Minor Spans
2023/24 Vassalboro Bog Road Brook. Located 0.46 of a mile west of $1,500,000
Bridge Replacement Bradley Lane.
HCP 4

025121.00 Highway Paving


Vassalboro, Beginning 0.02 of a mile north of Old Quarry
2023/24 Rural Highways Route 201
Winslow Road and extending north 4.42 miles.
HCP 2 1 1/4" Overlay

Policy, Planning and Research


018707.02 Safety and infrastructure improvements that
Waterville, Robert
Waterville Airport - General may include a vegetation management plan
2022 LaFleur Airport $344,000
and master plan update.
Planning Studies

Aviation
018707.07 Safety and infrastructure improvements that
Waterville, Robert
Waterville Runway/Taxiway include crack seal, crack repair, and
2023/24 LaFleur Airport $172,000
pavement marking.
Crack Sealing

021894.01 I-95 SB/ Webb Road Bridge (#1461) over


Highway-Bridges Webb Road. Located 1.41 miles north of the
2022 Waterville Interstate 95 Southbound $5,320,000
Sidney town line. FHWA INFRA Grant
Bridge Replacement recipient.
HCP 1

021900.01 I-95 NB/ Webb Road Bridge (#5813) over


Highway-Bridges Webb Road. Located 1.41 miles north of the
2022 Waterville Interstate 95 Northbound $5,320,000
Sidney town line. FHWA INFRA Grant
Bridge Replacement recipient.
HCP 1

023138.00
Ticonic Bridge (#2854) over Kennebec River.
Highway-Bridges
2022 Waterville Route 201 Located on the Waterville-Winslow town line. $46,700,000
Bridge Replacement FHWA BUILD Grant recipient.
HCP 2

023178.00 I-95 NB/County Road Bridge (#5816) over


Highway-Bridges
Waterville Interstate 95 Northbound County Road. Located 0.51 of a mile west of
2022 $500,000
Bridge Painting Interstate 95 northbound Exit 130.

023182.00 I-95 NB/Messalonskee Stream Bridge


Highway-Bridges (#5817) over Messalonskee Stream. Located
2022 Waterville Interstate 95 Northbound $1,800,000
0.36 of a mile south of Interstate 95
Bridge Painting northbound Exit 130.
HCP 1

023184.00 Specialist Wade A Slack Memorial Bridge


Highway-Bridges (#5818) over Route 104. Located 0.25 of a
2022 Waterville Interstate 95 Northbound
mile east of Interstate 95 northbound Exit $300,000
Bridge Painting 130.
HCP 1

82
ID/Year Municipality Scope Name Description Total Project Cost

023206.00 I-95 SB/County Road Bridge (#1459) over


Highway-Bridges
Waterville Interstate 95 Southbound County Road. Located 1.69 miles south of
2022 $500,000
Bridge Painting the Fairfield town line.

023208.00
I-95 SB/Messalonskee Bridge (#1458) over
Highway-Bridges
2022 Waterville Interstate 95 Southbound Messalonskee Stream. Located 1.54 miles $1,800,000
Bridge Painting southwest of the Fairfield town line.
HCP 1

023210.00
Specialist Wade A Slack Memorial Bridge
Highway-Bridges
2022 Waterville Interstate 95 Southbound (#1457) over Route 104. Located 0.92 of a $300,000
Bridge Painting mile southwest of the Fairfield town line.
HCP 1

023505.00
Armstrong Road/ I-95 Bridge (#5815) over
Highway-Bridges
2022 Waterville Armstrong Road Interstate 95. Located 0.05 of a mile east of $10,100,000
Bridge Replacement Marston Road.
HCP 1

System Operations by Others Transit Administrative and Operating


024651.07 Assistance for Federal Transit Administration
Rural Transit Admin/
Waterville Transit - General §5311 for non-urbanized transit. Kennebec
2022 Operations $628,000
Valley Community Action Program (KVCAP)
Operating Assistance ME-2020-027.

System Operations by Others Transit Administrative and Operating


025235.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Waterville Transit - General $628,000
2023 Operations §5311 for non-urbanized transit. Kennebec
Operating Assistance Valley Community Action Program (KVCAP).

Highway Paving
025723.00
Rural Highways Beginning 0.02 of a mile north of Webb Road
2022 Waterville Route 104
and extending north 1.68 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

025943.00
Highway Paving
Beginning at Kennedy Memorial Drive and
2022 Waterville Route 11
extending east 1.32 miles to Route 201.
Light Capital Paving
HCP 2

025943.00
Highway Paving
Beginning at Spring Street and extending
2022 Waterville Route 137B
west 0.28 of a mile to Route 104.
Light Capital Paving
HCP 2

Rail
026017.00 Consolidated Rail Infrastructure and Safety
Waterville Line/Track Pan Am Rail Improvements (CRISI) on Pan Am Railways
2022 $42,000,000
Pine Tree Corridor.
Rehabilitation

83
ID/Year Municipality Scope Name Description Total Project Cost

026152.00
Trafton Road/ I-95 Bridge (#5812) over
Highway-Bridges
2022 Waterville Trafton Road Interstate I-95. Located 0.17 of a mile west of $200,000
Bridge Improvements - PE Only Eight Rod Road.
HCP 1

WR 43546 Repairing wingwalls on Cold Stream Bridge


Bridge and Structural
Maintenance (#2165) in West Gardiner which carries
2022 West Gardiner Route 126
Lewiston Road over Cold Stream. Located $65,000
HCP 3 0.24 of a mile east of Indiana Road.

Highway Safety and Spot


021841.00 Improvements
Located at the intersection of Route 17 and
2022 Windsor Rural Highways Route 17
Route 32. $180,000
HCP 2 Highway Improvement - PE
Only

022268.00
Fish Bridge (#0509) over Winslow Stream.
Highway-Bridges
2023/24 Winslow Garland Road Located 0.10 of a mile southwest of the $1,960,000
Bridge Replacement Benton town line.
HCP 4

Highway Safety and Spot


023803.00
Improvements
Large culvert (#93710) located 0.55 of a mile
2023/24 Winslow Route 100A $256,000
Rural Highways south of Heywood Road.
HCP 4
Large Culvert Improvements

WR 43610 Producing, hauling, and providing additional


PMRAP support activities for the placement of plant
2022 Winslow Route 100A mix recycled asphalt pavement (PMRAP). $300,000
Beginning at intersection of Smiley Avenue
HCP 4 and extending northeast 3.40 miles.

84
Knox

Knox County
Population 39,771
Land Area (sq mi) 365
Bridges 91
Highway Corridor Priority Miles
HCP 1 24
HCP 2 36
Appleton
HCP 3 13
Washington HCP 4 153
Hope

Camden
Total HCP 1-4 226
Union

Rockport

Warren North Haven

Knox
Rockland

Thomaston

Owls Head Vinalhaven


Isle
South Thomaston au
Haut
Cushing
Friendship

Saint Muscle Ridge Twp


George

Knox County Island

Matinicus Isle Plt

Criehaven Twp
Knox
ID/Year Municipality Scope Name Description Total Project Cost

025939.00 Appleton, Highway Paving


Belmont, Beginning at Route 17 and extending north
2022 Route 131
Searsmont, 15.44 mile to Route 3.
Union Light Capital Paving
HCP 2, 4

025939.00
Highway Paving
Appleton, Beginning at Route 131 and extending
2022 Route 105
Camden, Hope southeast 11.30 miles to Route 1.
Light Capital Paving
HCP 4

WR 40031 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 105 in Appleton, Hope and
Appleton,
2022 Route 105 Camden. Beginning with the intersection of
Camden, Hope $222,000
Route 131 and Route 105 and extending
HCP 4 southeast 11.28 miles to Route 1.

024967.00 Belfast, Highway Paving Beginning 0.68 of a mile south of the


Camden,
2022 Route 52 Lincolnville town line and extending north
Lincolnville,
Light Capital Paving 14.00 miles.
HCP 3, 4 Northport

Highway Beginning 0.56 of a mile north of Sagamore


018283.00
Construction/Rehabilitation Farm Road and extending north 1.54 miles.
2022 Camden Route 1 Project funding is contingent on
Rural Highways $8,650,000
Congressionally Designated Spending
HCP 1 approval.
Reconstruction

022608.00 Spring Brook Bridge (#2794) over Spring


Brook. Located 0.94 of a mile southwest of
Highway-Minor Spans
2022 Camden Route 1 the Lincolnville town line. Project funding is $3,760,000
Bridge Replacement contingent on Congressionally Designated
HCP 1 Spending approval.

022610.00 Great Brook Bridge (#2326) over Great


Brook. Located 0.05 of a mile south of Dyer
Highway-Minor Spans
2022 Camden Route 1 Drive. Project funding is contingent on $1,200,000
Bridge Replacement Congressionally Designated Spending
HCP 1 approval.

Highway Safety and Spot


022839.00
Improvements
Located 0.03 of a mile northeast of Harden
2022 Camden Route 1 $1,100,000
Rural Highways Avenue.
HCP 1
Slope Stabilization/Protection

023142.00
Main Street Bridge (#2497) over Megunticook
Highway-Bridges
2023/24 Camden Route 1 River. Located 0.03 of a mile south of Alantic $2,630,000
Bridge Improvements Avenue.
HCP 1

Ports-Harbors
024439.00
Marina Expansion Project. Located at 59 Sea
Camden Piers, Floats and Fenders Sea Street $3,500,000
2023/24 Street.
New Construction

85
ID/Year Municipality Scope Name Description Total Project Cost

025095.00
Rawson Avenue Bridge (#3173) over
Highway-Bridges
2022 Camden Rawson Avenue Megunticook River. Located 0.05 of a mile $500,000
Bridge Removal southwest of Washington Street.
HCP 5

025095.01 Rawson Avenue Pedestrian Bridge over


Bicycle/Pedestrian Bridge
Camden Rawson Avenue Megunticook River. Located 0.05 of a mile
2022 $250,000
New Construction southwest of Washington Street.

025613.00 Bicycle/Pedestrian
Improvements to multiple pedestrian
2023/24 Camden On-Road Sidewalk/Trail Route 1 crossings on Route 1. Beginning at Free $275,000
Street and extending south.
HCP 1, 4 Safety Improvements

024967.00
Highway Paving
Beginning at Hatchet Mountain Road and
2022 Camden, Hope Barnes Town Road
extending southeast 7.02 miles to Route 1.
Light Capital Paving
HCP 4

024967.00
Highway Paving
Camden, Beginning at Route 1 and extending north
2022 Pascal Avenue
Rockport 2.21 miles to Route 1.
Light Capital Paving
HCP 4

WR 38821
Drainage Maintenance Replacing culverts (#95702, #95706),
2022 Cushing River Road $175,000
#95714) on River Road in Cushing.
HCP 4

System Operations by Others Transit Operating Assistance for Federal


024651.14
Transit Administration §5311 for statewide
Isle au Haut Transit - General Rural Transit Operations $120,000
2022 non-urbanized transit. Isle au Haut ME-2020-
Operating Assistance 027.

System Operations by Others


025221.00 Transit Operating Assistance for Federal
Isle au Haut Transit - General Rural Transit Operations Transit Administration §5311 for non- $120,000
2023
urbanized transit. Isle au Haut Ferry.
Operating Assistance

026572.00
Transfer Bridges North Haven Ferry North Haven Ferry Transfer Bridge (#6344)
North Haven
2023/24 Facility located 0.06 of a mile south of Main Street. $300,000
Bridge Improvements

Aviation
018713.02
Knox County Regional Safety and infrastructure improvements that
Owls Head Runway/Taxiway
2022 Airport may include hangar taxiway - Phase 2. $1,850,000
Rehabilitation

86
ID/Year Municipality Scope Name Description Total Project Cost

Aviation
018713.06
Knox County Regional Safety and infrastructure improvements that
Owls Head Runway/Taxiway
2023/24 Airport may include hangar taxiway. $1,140,000
Reconstruction

Aviation
018713.08 Safety and infrastructure improvements that
Knox County Regional
Owls Head Runway/Taxiway may include miscellaneous pavement
2023/24 Airport $1,140,000
projects.
Resurfacing

Airport
018713.11 Safety and infrastructure improvements that
Knox County Regional
Owls Head Airport - General may include acquisition of snow removal
2022 Airport $927,000
equipment.
Capital Equipment Purchase

024967.00
Highway Paving
Beginning at Dublin Road and extending
2022 Owls Head Ash Point Drive
north 1.67 miles to North Shore Drive.
Light Capital Paving
HCP 4

024967.00
Highway Paving
Beginning at Ash Point Drive and extending
2022 Owls Head North Shore Road
west 0.18 of a mile to Route 73.
Light Capital Paving
HCP 4

024967.00
Highway Paving
North and South Shore Beginning at Ash Point Drive and extending
2022 Owls Head
Road northeast 4.91 miles.
Light Capital Paving
HCP 4

024967.00
Owls Head, Highway Paving
Beginning at Route 73 and extending east
2022 South Dublin Road
2.15 miles to Ash Point Drive.
Thomaston Light Capital Paving
HCP 4

018793.00 Highway Paving


Beginning at Route 1 in Rockland and
2023/24 Rockland Urban Highways Route 73
extending south 0.90 of a mile.
HCP 3 Mill And Fill

022458.00 Highway Paving


Beginning at the Thomaston town line and
2023/24 Rockland Rural Highways Route 1
extending northeast 1.32 miles.
HCP 1 1 1/4" Overlay

Ports-Harbors
023000.00
Located at the intersection of Weeks Street
Rockland Piers, Floats and Fenders Fish Pier
2022 and Commercial Street. $500,000
New Construction

87
ID/Year Municipality Scope Name Description Total Project Cost

Ports-Harbors
023282.00
Yachting Solutions Boat Facility upgrades. Located at Yachting
Rockland Piers, Floats and Fenders
2022 Basin Solutions Boat Basin. $1,780,000
New Construction

026312.00 Bicycle/Pedestrian Installation of multiple rectangular rapid


flashing beacons. Located on Park Street,
2023/24 Rockland On-Road Sidewalk/Trail Various Locations
Maverick Street, Rankin Street, and Main $200,000
HCP 1, 2 Safety Improvements Street.

026314.00 Bicycle/Pedestrian
Pedestrian safety improvements at the
Maverick Street/Route
2022 Rockland On-Road Sidewalk/Trail intersections of Route 1, Route 1A, and
1/Route 1A $90,000
Maverick Street.
HCP 1, 2, 5 Safety Improvements - PE Only

Multimodal System Operations


026570.00
Rockland Ferry - General Port Terminal Road Located 0.03 of a mile east of Main Street.
2022 $150,000
Facilities Management

018794.00 Highway Paving


Rockland, Beginning 0.03 of a mile north of Route 1A
2023/24 Urban Highways Route 1
Rockport and extending north 0.89 of a mile.
HCP 1 Mill And Fill

024153.00 Highway Paving Beginning 0.20 of a mile north of Mountain


Rockland,
Road and extending north 7.19 miles.
2022 Rockport, Rural Highways Route 90
Includes 0.03 of a mile on Route 90
Warren
HCP 2 1 1/4" Overlay westbound.

025447.00
Highway-Bridges Rockport Bridge (#2724) over Goose River.
2022 Rockport Pascal Avenue $300,000
Located 0.03 of a mile north of High Street.
Bridge Improvements - PE Only
HCP 4

Highway Safety and Spot


025955.03 Improvements
Located at the intersection of Route 17 and
2023/24 Rockport Rural Highways Route 17
Route 90. $13,000
HCP 2 Intersection Improvements W/
Signal

024967.00
Highway Paving
Beginning 0.03 of a mile south of Factory
2022 Saint George Route 131
Road and extending north 4.28 miles.
Light Capital Paving
HCP 4

Highway Safety and Spot


025515.00
Improvements
Large culvert (#46906) located 0.87 of a mile
2023/24 Saint George Route 73
Rural Highways northwest of Dennison Road. $660,000
HCP 4
Large Culvert Replacement

88
ID/Year Municipality Scope Name Description Total Project Cost

Highway
023759.00
Saint George, Construction/Rehabilitation
Beginning 0.03 of a mile south of Island Road
2023/24 South Route 73
Rural Highways and extending west 3.43 miles. $1,330,000
Thomaston
HCP 4
PMRAP DOT Pugmill

Bicycle/Pedestrian
026290.00 Multiuse pathway across Mill River to
Mill River Multiuse
Thomaston On-Road Sidewalk/Trail connect existing walking and biking trails to
2022 Pathway $90,000
the east-bank residential district.
New Construction - PE Only

023619.00
Highway-Bridges James Andrew Griffith Bridge (#2786) over
Thomaston,
2022 Route 1 St. George River. Located on the Warren -
Warren $300,000
Bridge Substructure Thomaston town line.
HCP 1 Rehabilitation

Highway Safety and Spot


024237.00
Improvements
Large culvert (#46462) located 0.06 of a mile
2022 Union Route 17
Rural Highways east of Town House Road. $725,000
HCP 2
Large Culvert Rehabilitation

WR 43573 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 235 in Union. Beginning at
2022 Union Route 235 $50,000
the Warren-Union town line and extending
HCP 4 north 2.92 miles to Route 17.

025861.00
Union, Highway Paving
Beginning at Route 1 and extending north
2023 Waldoboro, Route 235
9.38 miles to Route 17.
Warren Light Capital Paving
HCP 4

Department Building and Lot


023821.00 Maintenance
Vinalhaven Crew Quarters Vinalhaven crew quarters expansion. $275,000
2022 Department Buildings and Lots

Construction Of New Building

WR 43621 Bridge and Structural Repairing piers on Lanes Island Bridge


Maintenance (#5270) in Vinalhaven which carries Lanes
Vinalhaven Lane Island Road
2022 Island Road over Tidal Flow. Located 315 $45,000
feet south of the Round The Mountain Road.

Highway Safety and Spot


021835.00
Improvements
Large culvert (#46645) located 0.06 of a mile
2023/24 Warren Route 235
Urban Highways north of the Waldoboro town line. $880,000
HCP 4
Large Culvert Replacement

023230.00
Fuller Bridge (#3784) over Fuller Brook.
Highway-Bridges
2023/24 Warren Western Road Located 0.25 of a mile north of the North $2,000,000
Bridge Replacement Pond Road.
HCP 5

89
ID/Year Municipality Scope Name Description Total Project Cost

023649.00
Highway-Bridges St. George River Bridge (#5654) over St.
2022 Warren Route 90 George River. Located 0.04 of a mile $391,000
Bridge Substructure southwest of Company Lane.
HCP 2 Rehabilitation

Highway Safety and Spot


025471.00
Improvements
Beginning 0.09 of a mile east of Western
2023/24 Warren Main Street
Rural Highways Road and extending east 0.25 of a mile. $350,000
HCP 4
Drainage Improvements

026154.00
St. George River Bridge (#5654) over St.
Highway-Bridges
2023/24 Warren Route 90 George River. Located 0.32 of a mile $3,300,000
Bridge Deck Replacement southwest of Route 131.
HCP 2

Highway Safety and Spot


026396.00
Improvements
Large culvert (#46641) located 1.19 miles
2023/24 Warren Route 90
Rural Highways north of Billings Road. $910,000
HCP 2
Large Culvert Replacement

026168.00
Highway-Bridges Farrar Bridge (#3929) over Jackson Stream.
2023/24 Washington Route 105 $1,000,000
Located 0.51 of a mile west of Vanner Road.
Bridge Replacement
HCP 4

90
Lincoln
Lincoln County
Population 34,342
Land Area (sq mi) 456 Somerville
Bridges 105
Highway Corridor Priority Miles
HCP 1 27
HCP 2 34
HCP 3 26
HCP 4 240
Whitefield

Jefferson
Total HCP 1-4 327

Waldoboro

Nobleboro
Dresden
Alna

Newcastle

Damariscotta
Wiscasset

Bremen

Edgecomb

Lincoln
South
Bristol Bristol

Westport Boothbay
Island

Boothbay
Harbor

Southport
Lincoln
ID/Year Municipality Scope Name Description Total Project Cost

025861.00
Highway Paving
Beginning at Route 27 and extending
2023 Alna, Newcastle Sheepscot Road
northwest 4.04 miles to Route 218.
Light Capital Paving
HCP 4

WR 43585 Ditching on Route 218 in Wiscasset and


Drainage Maintenance Alna. Beginning at the Wiscasset-Alna town
2022 Alna, Wiscasset Route 218
line and extending north 6.52 miles to the $118,000
HCP 4 Alna-Whitefield town line.

024965.00
Highway Paving
Barters Island Beginning at Kimbleton Town Road and
2022 Boothbay
Road/Corey Lane extending east 2.61 miles to Route 27.
Light Capital Paving
HCP 4

024965.00
Highway Paving
Beginning at the Boothbay Harbor town line
2022 Boothbay Route 96
and extending south 4.40 miles.
Light Capital Paving
HCP 4

WR 38817
Drainage Maintenance Replacing culverts (#123931, #123930) on
2022 Boothbay River Road $300,000
River Road in Boothbay.
HCP 4

Ports-Harbors
023807.00
The Footbridge and Located at the intersection of Boothbay
Boothbay Harbor Piers, Floats and Fenders $563,000
2023/24 Town Landing House Hill and Commercial Street.
Rehabilitation

Ports-Harbors
024619.00
Station improvements. Located off Atlantic
Boothbay Harbor Piers, Floats and Fenders Fishermen's Co-op $521,000
2023/24 Avenue.
Rehabilitation

024965.00
Highway Paving Beginning at the north intersection of Route
2022 Boothbay Harbor Route 27S 27 and extending south 0.44 of a mile to the
Light Capital Paving south intersection of Route 27.
HCP 2

025861.00
Highway Paving
Beginning at Sunset Road and extending
2023 Boothbay Harbor Atlantic Avenue
north 1.10 miles to Oak Street.
Light Capital Paving
HCP 4

021751.01
Boothbay Southport Bridge (#2789) over Townsend
Highway-Bridges
2022 Harbor, Route 27 Gut. Located at Boothbay Harbor - Southport $13,000,000
Southport Bridge Rehabilitation town line. FHWA BUILD Grant recipient.
HCP 4

91
ID/Year Municipality Scope Name Description Total Project Cost

024965.00
Boothbay Highway Paving
Beginning at Town Landing Road and
2022 Harbor, Route 27
extending north 7.62 miles to Route 96.
Southport Light Capital Paving
HCP 2, 4

024965.00
Highway Paving Beginning 0.04 of a mile east of Rock Road
Boothbay, Lake Side/Mckown Point
2022 and extending west 3.19 miles to Barters
Boothbay Harbor Road
Light Capital Paving Island Road.
HCP 4

Beginning 0.05 of a mile south of Route 96


025749.00 Boothbay, Highway Paving and extending north 1.09 miles. Beginning
Boothbay 0.49 of a mile north of Route 96 and
2023/24 Rural Highways Route 27/Cross Road
Harbor, extending north 9.16 miles. Project funding is
HCP 2 Edgecomb Cold-In-Place Recycle contingent on Congressionally Designated
Spending approval.

024965.00
Boothbay, Highway Paving
Beginning at Route 27 and extending north
2022 Edgecomb, River Road
9.39 miles.
Newcastle Light Capital Paving
HCP 4

Highway Safety and Spot


024283.00
Improvements
Large culvert (#900617) located 0.44 of a
2022 Bremen Route 32 $638,000
Rural Highways mile north of Biscay Road.
HCP 4
Large Culvert Replacement

024965.00
Highway Paving
Beginning at Biscay Road and extending east
2022 Bremen Turner Road
3.03 miles to Route 32.
Light Capital Paving
HCP 4

024965.00
Highway Paving
Bremen, Beginning at Route 32 and extending
2022 Biscay Road
Damariscotta northwest 5.10 miles to Route 1B.
Light Capital Paving
HCP 4

024965.00
Highway Paving
Beginning at Route 129 and extending north
2022 Damariscotta School Street
0.86 of a mile to Route 1B.
Light Capital Paving
HCP 4

025337.00 Bicycle/Pedestrian
Beginning 0.01 of a mile south of Church
2022 Damariscotta On-Road Sidewalk/Trail Main Street
Street and extending north 0.36 of a mile. $60,000
HCP 2 New Construction - PE Only

Highway Safety and Spot


026019.00
Improvements
Located at the intersection of Route 1 and
2023/24 Damariscotta Route 1
Rural Highways Belvedere Road. $3,100,000
HCP 1
Safety Improvements

92
ID/Year Municipality Scope Name Description Total Project Cost

025289.00
Damariscotta, Highway-Bridges Various bridge joint improvements on bridges
2022 Route 1
Newcastle (#5887, #5888, #5889, and #5890). $700,000
Bridge Joint Replacement
HCP 1

025445.00 Highway Paving


Damariscotta,
Beginning 0.05 of a mile north of Lynch Road
2022 Newcastle, Rural Highways Route 1
and extending north 9.36 miles.
Nobleboro
HCP 1, 2 Mill And Fill

023132.00
Highway-Bridges Middle Bridge (#3341) over Eastern River.
2023/24 Dresden Route 197
Located 0.28 of a mile west of Route 127. $6,070,000
Bridge Replacement
HCP 4

024965.00
Highway Paving
Beginning at Route 27 and extending north
2022 Edgecomb Eddy Road
1.55 miles to Route 1.
Light Capital Paving
HCP 4

024965.00
Highway Paving
Beginning at Route 27 and extending east
2022 Edgecomb McKay Road
1.66 miles to River Road.
Light Capital Paving
HCP 4

Highway Safety and Spot


026799.00
Improvements
Large culvert (#123913) located 0.94 of a
2023/24 Edgecomb River Road $725,000
Urban Highways mile north of McKay Road.
HCP 4
Large Culvert Replacement

WR 40871
Drainage Maintenance Replacing culvert (#123913) on River Road.
2022 Edgecomb River Road Located 220 feet south of the Khole Road in $52,000
Edgecomb.
HCP 4

WR 43550 Bridge and Structural Replace wearing surface on West Cove


Maintenance Bridge (#0613) in Edgecomb which carries
Edgecomb Mill Road
2022 Mill Road over Back River. Located 0.47 of a $80,000
mile southwest of Nichols Road.

Beginning 0.01 of a mile southwest of Lee


025283.00 Highway Paving Street and extending northeast 0.43 of a
Edgecomb, mile. Continuing at Railroad Avenue and
2022 Rural Highways Route 1
Wiscasset extending east 1.28 miles. Including Donald
HCP 1 Mill And Fill E. Davey Bridge (#2262) and Cod Cove
Bridge (#2160).

023092.00
Highway-Minor Spans Davis No.1 Bridge (#2218) over Brann Brook.
2022 Jefferson Route 17
Located 0.51 of a mile east of Route 32. $1,770,000
Bridge Replacement
HCP 2

93
ID/Year Municipality Scope Name Description Total Project Cost

Highway
024197.00
Construction/Rehabilitation
Beginning at Gardiner Road and extending
2023/24 Jefferson Route 126
Rural Highways northeast 0.45 of a mile. $164,000
HCP 4
PMRAP DOT Pugmill

024965.00
Highway Paving
Jefferson, Beginning at Jones Woods Road and
2022 Route 213
Newcastle extending north 9.26 miles.
Light Capital Paving
HCP 4

025861.00
Jefferson, Highway Paving
Beginning at Route 1B and extending north
2023 Newcastle, Route 215
17.23 miles to Route 32.
Nobleboro Light Capital Paving
HCP 2, 4

Highway Safety and Spot


024355.00 Beginning at Pump Street and extending
Improvements
northwest 0.09 of a mile, including the Route
2023/24 Newcastle Route 1B/Route 215
Urban Highways 1B ramp and 0.07 of a mile on Route 215 $955,000
HCP 2 beginning at Route 1B.
Drainage Improvements

025449.00
Meadow Brook Bridge (#2535) over Deer
Highway-Minor Spans
2023/24 Newcastle Route 215 Meadow Brook. Located 4.09 miles west of $1,500,000
Bridge Replacement Bunker Hill Road.
HCP 4

025861.00
Highway Paving Beginning at the north intersection of Route
2023 Newcastle Route 215S 215 and extending south 0.27 of a mile to the
Light Capital Paving south intersection of Route 215.
HCP 4

WR 43581 Replacing culverts in various places on


Drainage Maintenance Route 215 in Newcastle and Nobleboro.
Newcastle,
2022 Route 215 Beginning with the intersection of Route 1
Nobleboro $24,000
and Route 215 and extending north 3.79
HCP 4 miles to the Bunker Hill Road.

Highway
025361.00
Construction/Rehabilitation
Beginning 0.43 of a mile south of S Shore
2023/24 Nobleboro East Pond Road
Minor Collectors Road and extending south 0.16 of a mile. $635,000
HCP 4
Highway Rehabilitation

024161.10 Highway Paving


Nobleboro, Beginning 0.07 of a mile east of East Pond
2022 Rural Highways Route 1
Waldoboro Road and extending east 3.31 miles.
HCP 1 1 1/4" Overlay

Ditching and replacing of culverts in various


WR 43575 places on Route 105 in Somerville and
Somerville, Drainage Maintenance Washington. Beginning at the Windsor-
2022 Route 105
Washington Somerville town line and extending east 9.10 $205,000
HCP 4 miles to the intersection of Route 105 and
Route 220.

94
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


024253.00
Improvements
Large culvert (#890444) located 0.19 of a
2023/24 South Bristol Route 129
Rural Highways mile south of Clarks Cove Road. $560,000
HCP 4
Large Culvert Replacement

024965.00
Highway Paving
Beginning at Route 27 and extending south
2022 Southport Route 238
3.73 miles to Town Landing Road.
Light Capital Paving
HCP 4

Highway Safety and Spot


024243.00
Improvements
Large culvert (#124776) located 0.51 of a
2023/24 Waldoboro Route 220
Rural Highways mile northwest of Mayo Road. $753,000
HCP 4
Large Culvert Replacement

Highway Safety and Spot


024251.00
Improvements Large culvert (#46646) located on the
2023/24 Waldoboro Finntown Road Waldoboro-Friendship town line and
Rural Highways $745,000
extending into Friendship.
HCP 4
Large Culvert Replacement

WR 35028
Drainage Maintenance Replacing culvert (#92889) on Route 32.
2022 Waldoboro Route 32, Bremen Road Located 370 feet southwest of Noahs Way in $75,000
Waldoboro.
HCP 4

WR 43517 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 235 in Waldoboro and
Waldoboro,
2022 Route 235 Warren. Beginning at Route 1 and extending
Warren $76,000
northeast 6.36 miles to the Warren-Union
HCP 4 town line.

025861.00
Highway Paving
Westport Island, Beginning at Route 27 and extending south
2023 Route 144
Wiscasset 8.32 miles to West Shore Road.
Light Capital Paving
HCP 4

WR 43580 Replacing culverts in various places on


Drainage Maintenance Route 144 in Wiscasset and Westport Island.
Westport Island,
2022 Route 144 Beginning with the intersection of Birch Point
Wiscasset $28,000
Road and Route 144 and extending
HCP 4 southeast 4.10 miles to Fowles Cove Road.

Highway Safety and Spot


025513.00
Improvements
Large culvert (#894509) located 0.38 of a
2023/24 Whitefield Route 194
Rural Highways mile northwest of Radden Lane. $619,000
HCP 4
Large Culvert Replacement

026158.00
Jewett Bridge (#5460) over Albee Stream.
Highway-Minor Spans
2023/24 Whitefield Route 194 Located 0.24 of a mile west of Townhouse $1,000,000
Bridge Replacement Road.
HCP 4

95
ID/Year Municipality Scope Name Description Total Project Cost

WR 42226 Ditching and replacing culverts in various


Drainage Maintenance places on Route 218 in Whitefield. Beginning
2022 Whitefield Route 218 with the intersection of Route 126 and Route
$47,000
218 and extending northeast 3.10 miles to
HCP 4 Route 17.

025861.00
Highway Paving
Beginning at Westport Bridge Road and
2023 Wiscasset Birchpoint Road
extending north 1.90 miles to Bath Road.
Light Capital Paving
HCP 4

025305.00
Highway-Bridges New Bridge (#0627) over Monstweag Brook.
Wiscasset,
2023/24 Old Stage Road Located on the Wiscasset-Woolwich town
Woolwich $500,000
Bridge Superstructure line.
HCP 5 Replacement

96
Oxford
Bo wma ntow n
Tw p

Par m ache ne e Oxb ow


Tw p Tw p

Upp er
Lyn ch to wn Cup suptic
Tw p Tw p

Low er
Pa rkerto wn Cup suptic
Oxford County
Tw p Tw p Population 57,618
Land Area (sq mi) 2,077
Adam stown
Lincoln
Plt
Tw p Bridges 375
Highway Corridor Priority Miles
HCP 1 93
R ichar dson to w n
Tw p HCP 2 35
Maga llow ay
Plt HCP 3 47
To wn sh ip C HCP 4 371

Upto n C Byro n
Surplus An dov er Total HCP 1-4 546
Nor th S ur plus

Roxb ury
An do ve r W est
An do ve r
Gra fton
Su rp lu s Twp

Tw p
Mexico

New ry Rum fo rd Dixfie ld

Riley Hanover
Tw p Pe ru Can ton
M ilton
Tw p
Be th el
Gilea d
Woo dsto ck
Batchelders Su mne r Hartfo rd
Grant Twp

M ason Tw p West
Alb an y G re e n wo o d
Pa ris
Tw p
Ston eh am Bu ckfield

Norw ay Pa ris

Lovell Waterfo rd Heb ro n


Stow

Oxfo rd
Sw ed en

Otisfield
Fryebu rg

Den mark

Brow nfield
Oxford

Hira m
Po rter
Oxford
ID/Year Municipality Scope Name Description Total Project Cost

026122.00
Crooked River Bridge (#5079) over Crooked
Highway-Bridges
2023/24 Albany Twp Route 5 River. Located 0.08 of a mile northwest of $600,000
Bridge Deck Replacement Route 35.
HCP 4

WR 42978 Ditching and replacing drainage structures on


Albany Twp, Drainage Maintenance Route 5 in Bethel and Albany Twp. Beginning
2022 Route 5
Bethel at the intersection of Route 2 in Bethel and $139,000
HCP 4 extending south 4.69 miles.

018724.00
Evans Brook Bridge (#5506) over Evans
Batchelders Highway-Bridges
2022 Route 113 Brook. Located 1.44 miles south of the
Grant Twp $1,200,000
Bridge Deck Replacement Gilead town line.
HCP 4

Highway Safety and Spot


008869.20 Improvements
Batchelders
Beginning 3.32 miles north of the Stow town
2022 Grant Twp, Rural Highways Route 113 $80,000
line and extending north 6.46 miles.
Gilead
HCP 4 Highway Improvement - PE
Only

Aviation
018686.02 Safety and infrastructure improvements that
Bethel Navigation Aids/Lights Bethel Regional Airport may include design and construction for
2022 $258,000
obstruction removal and fence relocation.
Removal Of Obstructions

Policy, Planning and Research


018686.05 Safety and infrastructure improvements that
Bethel Airport - General Bethel Regional Airport may include a Wildlife Site Visit and siting
2022 $82,000
work for AWOS III equipment.
Planning Studies

Aviation Safety improvements to include design and


018686.07 construction of AWOS III system: Automatic
Bethel Navigation Aids/Lights Bethel Regional Airport weather reporting to meet FAA and national
2023/24 $567,000
weather service accuracy and reliability
New Construction standards.

Aviation
018686.08
Airport - General
Bethel Bethel Regional Airport Acquire easement for drainage purposes.
2023/24 $77,000
Sale Or Purchase Of Lot Or
Building

021667.00 Bicycle/Pedestrian
Beginning at existing sidewalk and extending
2022 Bethel On-Road Sidewalk/Trail Route 26
south 0.09 of a mile to Railroad Street. $565,000
HCP 1 New Construction

Rail
021667.10 Pedestrian at-grade crossing protection,
Bethel Rail/Highway Crossings Route 26 located at the intersection of Route 26 (Main
2022 $285,000
Street) and Railroad Street.
Rail Crossing Improvements

97
ID/Year Municipality Scope Name Description Total Project Cost

Bicycle/Pedestrian
024367.00
On-Road Sidewalk/Trail Beginning at Route 2 overpass and
2022 Bethel Route 2
extending north 0.30 of a mile. $70,000
Multimodal Improvements - PE
HCP 1
Only

Highway Safety and Spot


Improvements
025179.00
Visitor Information Climate control at the Bethel visitor
Bethel Rural Highways
2023/24 Center information center. $10,000
Rest Area
Construction/Improvements

Highway Paving
025845.00
Rural Highways Beginning at Route 2 and extending east
2023/24 Bethel Parkway
0.43 of a mile to Route 26.
Highway Cyclical Pavement
HCP 3
Resurfacing

025915.00 Highway Paving


Beginning 0.03 of a mile south of Taylor
2022 Bethel Rural Highways Route 26
Smith Road and extending west 2.73 miles.
HCP 1 3/4" Overlay

WR 43172 Replacing joint seal on C.N. RR Crossing


Bridge and Structural
Maintenance Bridge (#3791) in Bethel which carries Route
2022 Bethel Route 2 $85,000
2 over C.N. RR and Route 26. Located 50
HCP 1 feet north of C.N. RR and Railroad Street.

024969.00
Highway Paving
Bethel, Hanover, Beginning at Route 35 and extending north
2022 Route 2
Newry 6.79 miles.
Light Capital Paving
HCP 1

025477.00
Charles E Hill Bridge (#3417) over the Saco
Highway-Bridges
2022 Brownfield Route 160 River. Located 0.08 of a mile north of $500,000
Bridge Improvements - PE Only Woodland Acres Drive.
HCP 4

025853.00
Highway Paving
Beginning at the New Hampshire state line
2023 Brownfield Center Conway Road
and extending east 5.04 miles to Route 160.
Light Capital Paving
HCP 4

025853.00
Highway Paving
Beginning at Route 160 and extending east
2023 Brownfield Pig Street
0.88 of a mile to Route 5.
Light Capital Paving
HCP 4

025853.00
Highway Paving
Brownfield, Beginning at Route 5 and extending east
2023 Route 160
Denmark 5.32 miles to Route 117.
Light Capital Paving
HCP 4

98
ID/Year Municipality Scope Name Description Total Project Cost

Highway Paving
025831.00
Brownfield, Rural Highways Beginning at Bullring Road and extending
2023/24 Route 5
Fryeburg, Hiram north 13.56 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

023533.00
Highway-Bridges River Bridge (#5450) over West Branch
2022 Buckfield Paris Hill Road Nezinscot River. Located 0.10 of a mile $374,000
Bridge Substructure southwest of North Buckfield Road.
HCP 5 Rehabilitation

Highway
023537.00
Construction/Rehabilitation Beginning 0.04 of a mile north of Byron
2022 Byron Route 17 Village Road and extending west 0.12 of a
Rural Highways $193,000
mile.
HCP 4
Reconstruction

026414.00
New Coos Bridge (#5847) over the Swift
Highway-Bridges
2023/24 Byron Route 17 River. Located 0.11 of a mile north of Byron $300,000
Bridge Painting Village Road.
HCP 4

Producing, hauling, and providing additional


WR 43277 support activities for the placement of plant
PMRAP mix recycled asphalt pavement (PMRAP).
2022 Byron Route 17 $500,000
Beginning 0.13 of a mile north of Byron
HCP 4 Village Road and extending north 10.89
miles.

024969.00
Highway Paving Beginning 0.13 of a mile north of Canton
2022 Canton Route 140 Point Road and extending south 0.76 of a
Light Capital Paving mile.
HCP 4

023166.00
Highway-Bridges Hiram Bridge (#5087) over Ossipee River.
2022 Cornish, Hiram Bridge Street $582,000
Located 0.16 of a mile north of Route 25.
Bridge Rehabilitation
HCP 5

Highway Safety and Spot


024305.00
Improvements
Beginning at Denmark Road and extending
2023/24 Denmark Route 160 $267,000
Rural Highways southeast 0.24 of a mile.
HCP 4
Drainage Improvements

Highway Safety and Spot


025393.00
Improvements
Large culvert (#46559) located 0.02 of a mile
2023/24 Denmark Route 117
Rural Highways south of Moose Pond Road. $630,000
HCP 4
Large Culvert Replacement

025853.00
Highway Paving
Beginning at Route 5 and extending north
2023 Denmark, Hiram Route 117
7.19 miles to Route 160.
Light Capital Paving
HCP 4

99
ID/Year Municipality Scope Name Description Total Project Cost

WR 43636 Ditching on Route 117 in Hiram and


Drainage Maintenance Denmark. Beginning 0.10 of a mile south of
2022 Denmark, Hiram Route 117
the Hiram-Denmark town line in Hiram and $20,000
HCP 4 extending north 2.34 miles.

Highway Safety and Spot


025403.00
Improvements
Beginning 0.04 of a mile north of Route 2 and
2023/24 Dixfield Route 142
Rural Highways extending north 1.13 miles. $1,400,000
HCP 4
Drainage Improvements

Highway Safety and Spot


026372.00
Improvements
Large culvert (#47306) located 0.06 of a mile
2023/24 Dixfield Route 142
Rural Highways north of Holt Hill Road. $720,000
HCP 4
Large Culvert Improvements

WR 41281 Department Building and Lot Constructing a new salt shed at the Dixfield
Maintenance maintenance lot. Located on Route 2 in
Dixfield Route 2
2022 Dixfield 0.83 of a mile east of Whittemore $300,000
Drive.

Aviation Safety and infrastructure improvements that


018693.01
Eastern Slope Regional may include design and reconstruct in place
Fryeburg Runway/Taxiway $2,830,000
2023/24 Airport Parallel Taxiway "A", stub Taxiway "B" and C
Reconstruction and crack repair and mark Runway 14-32.

Aviation
018693.03 Safety and infrastructure improvements that
Eastern Slope Regional
Fryeburg Runway/Taxiway may include crack seal and crack repair to
2022 Airport $155,000
include wildlife hazard site visit.
Crack Sealing

Aviation Extend the runway in accordance with the


018693.04
Eastern Slope Regional FAA-approved Master Plan to permit aircraft
Fryeburg Runway/Taxiway $3,610,000
2022 Airport to operate under wet or contaminated
New Construction conditions.

Highway
018820.00
Construction/Rehabilitation
Beginning 0.15 of a mile north of Melanie
2023/24 Fryeburg Route 5 $247,000
Rural Highways Lane and extending north 2.14 miles.
HCP 4
PMRAP DOT Pugmill

Highway
018820.10
Construction/Rehabilitation
Beginning 0.15 of a mile north of Melanie
2023/24 Fryeburg Route 5
Rural Highways Lane and extending north 2.14 miles. $609,000
HCP 4
PMRAP Laydown/Surface HMA

Replace wearing surface and approach rail


WR 43699 Bridge and Structural on Hemlock Bridge (#1004) in Fryeburg
Fryeburg Maintenance Hemlock Bridge Road which carries Hemlock Bridge Road over the
2022 $45,000
Old Course Saco River. Located 2.37 miles
north of Sanborn Road.

100
ID/Year Municipality Scope Name Description Total Project Cost

026416.00
Androscoggin River Bridge (#5084) over the
Highway-Bridges
2023/24 Gilead Bridge Street Androscoggin River. Located 0.32 of a mile $600,000
Bridge Painting north of Route 2.
HCP 5

WR 42802 Cleaning under guardrail on Route 2 in


Drainage Maintenance Gilead. Beginning at the New Hampshire
2022 Gilead Route 2
state line and extending east 12.93 miles into $72,000
HCP 1 Bethel.

WR 41639 Installing approach rail on Morgan Brook #2


Operational and Safety Bridge (#3381) which carries Route 219 over
2022 Greenwood Maintenance Route 219 Twitchell (Morgan) Brook in Greenwood.
$22,000
Located 0.42 of a mile southwest of Kangas
HCP 4 Road.

025129.00 Highway Paving


Greenwood, Beginning 0.75 of a mile north of Mills Road
2022 Rural Highways Route 26
Woodstock and extending north 1.64 miles.
HCP 1 1 1/4" Overlay

WR 41704
Drainage Maintenance Replacing culvert (#162098) on Route 140 in
2022 Hartford Route 140 Hartford. Located 360 feet north of Currier $140,000
Drive.
HCP 4

WR 43131 Operational and Safety Installing approach rail on Bicknell Bridge


Maintenance (#3574) which carries Station Road over
Hebron Station Road $28,000
2022 Bicknell Brook in Hebron. Located 260 feet
east of the junction of Route 124.

025853.00
Highway Paving
Beginning at Route 117 and extending east
2023 Hiram Sebago Road
2.23 miles to the Baldwin town line.
Light Capital Paving
HCP 4

025853.00
Highway Paving
Beginning at Route 160 and extending east
2023 Hiram South Hiram Road
2.71 miles to the Cornish town line.
Light Capital Paving
HCP 4

WR 43637 Ditching on South Hiram Road in Hiram.


Drainage Maintenance Beginning at the Cornish-Hiram town line and
2022 Hiram South Hiram Road $50,000
extending west 2.70 miles to the intersection
HCP 4 of Route 160.

WR 42636 Cleaning under guardrails on Route 140.


Drainage Maintenance Beginning in Jay at the intersection of Bridge
2022 Jay Route 140
Street and extending north 2.91 miles to the $45,000
HCP 4 Jay-Canton town line.

101
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025509.00
Improvements
Large culvert (#1032130) located 0.83 of a
2023/24 Lincoln Plt Route 16
Rural Highways mile north of Littlehale Road. $600,000
HCP 4
Large Culvert Replacement

WR 43185
Drainage Maintenance Ditching on Route 16 in Lincoln Plt.
2022 Lincoln Plt Route 16 Beginning at the junction of Cameron Road $16,000
and extending north 2.10 miles.
HCP 4

Highway
021798.00
Construction/Rehabilitation Beginning 0.38 of a mile north of Shave Hill
2023/24 Lovell Route 5 Road and extending north 1.23 miles to
Rural Highways $142,000
Perkins Road.
HCP 4
PMRAP DOT Pugmill

Highway
021798.10
Construction/Rehabilitation Beginning 0.38 of a mile north of Shave Hill
2023/24 Lovell Route 5 Road and extending north 1.23 miles to
Rural Highways $350,000
Perkins Road.
HCP 4
PMRAP Laydown/Surface HMA

Highway
021797.00
Construction/Rehabilitation Beginning at West Stoneham Road and
Lovell,
2023/24 Route 5 extending north 4.41 miles to the Albany
Stoneham Rural Highways $509,000
Twp. town line.
HCP 4
PMRAP DOT Pugmill

Highway
021797.10
Construction/Rehabilitation Beginning at West Stoneham Road and
Lovell,
2023/24 Route 5 extending north 4.41 miles to the Albany
Stoneham Rural Highways $1,250,000
Twp. town line.
HCP 4
PMRAP Laydown/Surface HMA

Highway Safety and Spot


025381.00
Improvements Beginning at West Stoneham Road and
Lovell,
2023/24 Route 5 extending east 4.42 miles to the Waterford
Stoneham Rural Highways $205,000
town line.
HCP 4
Safety Improvements

WR 43184 Repairing bridge curb on Cold Brook Bridge


Bridge and Structural (#3541) in Lower Cupsuptic Twp. which
Lower Cupsuptic Maintenance
2022 Route 16 carries Route 16 over Cold Brook. Located $55,000
Twp
2.00 miles west of the Lower Cupsuptic Twp.-
HCP 4 Adamstown Twp. town line.

WR 42926 Ditching on Route 16 in Rangeley. Beginning


Drainage Maintenance at the junction of Route 4 and extending
Lower Cupsuptic
2022 Route 16 north 2.33 miles in Lower Cupsuptic Twp. $143,000
Twp, Rangeley
and beginning 0.24 of a mile east of Morton
HCP 4 Cutoff Road and extending east 100 feet.

Highway Safety and Spot


024347.00
Improvements
Beginning at Route 2 and extending north
2022 Mexico Route 17
Rural Highways 0.41 of a mile to Porter Bridge Road. $202,000
HCP 4
Drainage Improvements

102
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025429.00 Improvements
Located at the intersections of Route 2 and
2023/24 Mexico Rural Highways Route 2
Walmart and Route 2 and Route 17. $830,000
HCP 1 Install Or Replace Traffic
Signals

WR 42552 Cleaning under guardrail on Route 2.


Drainage Maintenance Beginning at the Mexico-Rumford town line
2022 Mexico Route 2
and extending southeast 5.06 miles to the $45,000
HCP 1 Dixfield-Mexico town line.

WR 43171 Installing joint curtains on Veterans Memorial


Bridge and Structural
Maintenance Bridge (#3327) which carries Veterans Street
2022 Mexico Veterans Street
over the Androscoggin River in Rumford. $100,000
HCP 2 Located 50 feet south of Route 2.

021700.01
Red Bridge (#2707) over Swift River. Located
Mexico, Highway-Bridges
2023/24 Route 2 at the Rumford-Mexico town line. FHWA
Rumford $8,850,000
Bridge Replacement INFRA Grant recipient.
HCP 1

Ditching and replacing culverts on Route 17


WR 42598 in Mexico. Beginning at the Recreational
Drainage Maintenance Route 17, Greenwoods Park and extending north 1.13 miles. Also,
2022 Mexico, Sumner $278,000
Road ditching on Greenwoods Road. Beginning in
HCP 4 Sumner at the junction of Route 219 and
extending north 9.77 miles.

Highway Safety and Spot


022936.00
Improvements
Large culvert (#900175) located 0.57 of a
2023/24 Newry Route 26 $600,000
Rural Highways mile south of Branch Road.
HCP 4
Large Culvert Replacement

WR 41235
Drainage Maintenance Ditching on Route 26 in Newry. Beginning at
2022 Newry Route 26 the junction of Route 2 and extending north $116,000
17.65 miles.
HCP 4

023116.00
Tannery Brook Bridge (#3610) over Tannery
Highway-Minor Spans
2023/24 Norway Route 117 Brook. Located 0.14 of a mile northwest of $2,400,000
Bridge Replacement Paris Street.
HCP 2

025287.00 Highway Paving


Beginning 0.02 of a mile north of Skeetfield
2023/24 Norway, Oxford Rural Highways Route 26 Road and extending northwest 3.49 miles to
0.02 of a mile south of Fair Street.
HCP 1 Mill And Fill

025991.00
Highway-Minor Spans College Swamp Bridge (#3475) located on
2023/24 Otisfield Bolsters Mills Road
Bolsters Mills Road over College Swamp. $1,500,000
Bridge Replacement
HCP 4

103
ID/Year Municipality Scope Name Description Total Project Cost

WR 43633 Ditching on Bolsters Mill Road in Otisfield.


Drainage Maintenance Beginning at the intersection of Route 121
2022 Otisfield Bolsters Mills Road
and extending north 4.25 miles to the $25,000
HCP 4 intersection of Jesse Mill Road.

Aviation
018702.02 Safety and infrastructure improvements that
Oxford County Regional
Oxford Apron may include the design and reconstruction of
2023/24 Airport $1,200,000
the terminal apron.
Reconstruction

Aviation
018702.03
Oxford County Regional Safety and infrastructure improvements that
Oxford Airport Buildings
2023/24 Airport include taxiway hangar - Phase 1 $172,000
New Construction

Highway Safety and Spot


022952.00 Improvements
Located at the intersection of Route 26 and
2022 Oxford Rural Highways Route 26
Skeetfield Road. $985,000
HCP 1 Intersection Improvements W/
Signal

025855.00
Highway Paving
Beginning at the Otisfield town line and
2023 Oxford Route 121
extending north 3.58 miles to Route 26.
Light Capital Paving
HCP 1, 4

025855.00
Highway Paving
Beginning at Route 121 and extending north
2023 Oxford Roller Rink Road
0.50 of a mile to Route 26.
Light Capital Paving
HCP 4

Ditching and replacing culverts (#1070355,


WR 43668 #1070358) on Route 121 Oxford. Beginning
Drainage Maintenance
Oxford Route 121 at the Otisfield-Oxford town line and
2022 $115,000
extending 6.50 miles east to the Oxford-
Mechanic Falls town line.

025443.00 Highway Paving


Beginning 0.04 of a mile west of River Road
2022 Peru Rural Highways Route 108
and extending northwest 5.54 miles.
HCP 2 1 1/4" Overlay

Highway Safety and Spot


026378.00 Large culvert (#46052) located 0.37 of a mile
Improvements
west of Colcord Pond Road. Large culvert
2023/24 Porter Route 25 $300,000
Rural Highways (#46053) located 0.08 of a mile east of New
HCP 2 Hampshire state line.
Large Culvert Rehabilitation

Highway Safety and Spot Beginning 0.29 of a mile south of Main Street
023745.00 and extending south 0.49 of a mile.
Improvements
Continuing 0.43 of a mile south of Mine
2022 Roxbury Route 120 $119,000
Rural Highways Notch Road and extending south 0.54 of a
HCP 4 mile. Continuing at Horseshoe Valley Road
Shoulder Improvements and extending east 1.80 miles.

104
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025405.00
Improvements
Large culvert (#202711) located 0.92 of a
2023/24 Roxbury Route 120
Rural Highways mile northeast of Horseshoe Valley Road. $710,000
HCP 4
Large Culvert Replacement

022621.00
Highway-Bridges High Bridge (#5188) over Androscoggin
2023/24 Rumford South Rumford Road
River. Located 0.11 of a mile east of Route 2. $6,820,000
Bridge Replacement
HCP 4

023196.00
Chisholm Park Bridge (#2990) over
Highway-Bridges
2023/24 Rumford Portland Street Androscoggin River West Chanel. Located $2,500,000
Bridge Rehabilitation 0.04 of a mile east of River Road.
HCP 4

024775.00
Martins Bridge (#2514) over Ellis River.
Highway-Bridges
2023/24 Rumford Route 2 Located 0.05 of a mile north of Ellis River $5,500,000
Bridge Replacement Road.
HCP 1

025293.00
Highway-Bridges
Morse Bridge (#2585) over the Androscoggin
2023/24 Rumford Route 108 $350,000
Bridge Wearing Surface River. Located 0.04 of a mile east of Route 2.
HCP 2 Replacement

Highway Safety and Spot


025431.00 Improvements
Located at the intersections of Route 2 and
2023/24 Rumford Rural Highways Route 2 Route 120, Portland and River Streets, and $1,240,000
Congress and Bridge Streets.
HCP 1, 2, 4 Install Or Replace Traffic
Signals

026118.00 MCRR Overpass Bridge (#5754) over


Highway-Bridges
Rumford Railroad Street RMCRR Siding. Located 0.05 of a mile $2,400,000
2023/24
Bridge Deck Replacement northeast of Route 108.

WR 42956 Ditching on Route 113 in Stow. Beginning at


Drainage Maintenance the Maine-New Hampshire state line and
2022 Stow Route 113
extending north 4.50 miles to Batchelders $95,000
HCP 4 Grant.

WR 43496 Repairing wingwalls, fascia, curb, and bridge


Bridge and Structural rail. Little Cold River Bridge (#3581) which
2022 Stow Maintenance Route 113 carries Route 113 over Little Cold River in $80,000
Stow. Located 480 feet north of Nutmeg
HCP 4 Avenue.

022360.00
Highway-Bridges West Sumner Meadow Bridge (#5843) over
2022 Sumner Main Street the West Branch Nezinscot River. Located $361,000
Bridge Substructure 0.25 of a mile northeast of Front Street.
HCP 3 Rehabilitation

105
ID/Year Municipality Scope Name Description Total Project Cost

WR 43493 Repairing wearing surface treatment. Duck


Bridge and Structural Pond Brook Bridge (#6104) in Sweden which
2022 Sweden Maintenance Waterford Road carries Waterford Road over Duck Pond
$30,000
Brook. Located 0.20 of a mile south of
HCP 4 Hapgood Road.

WR 43494 Repairing wearing surface and replacing


Bridge and Structural guardrail on Black Pond Brook Bridge
2022 Sweden Maintenance Waterford Road (#6105) in Sweden which carries Waterford
$35,000
Road over Black Pond Brook. Located 0.31
HCP 4 of a mile south of Hapgood Road.

WR 43857
Drainage Maintenance Replacing cross culvert instream work
2022 Sweden Knights Hill Road requiring permits on Knights Hill Road in $200,000
Sweden.
HCP 4

Highway Safety and Spot


024617.00
Improvements
Large culvert (#46194) located 1.21 miles
2023/24 Waterford Route 118
Rural Highways west of Hersey Road. $815,000
HCP 4
Large Culvert Replacement

026188.00
Highway-Bridges Knightly Bridge (#3797) over Cooked River.
2023/24 Waterford Route 118 $1,200,000
Located 0.79 of a mile east of Route 37.
Bridge Deck Replacement
HCP 4

WR 43413 Ditching, cleaning culverts, replacing


Drainage Maintenance entrance culverts on Valley Road in
2022 Waterford Route 35 Waterford. Beginning north of MacDonald $112,000
Road and extending north to the intersection
HCP 4 of Route 35 and Route 118.

025131.00 Highway Paving


Beginning at the West Paris town line and
2022 Woodstock Rural Highways Route 26
extending northwest 4.56 miles.
HCP 1 1 1/4" Overlay

WR 43129 Operational and Safety Installing approach rail. Andrews #2 Bridge


Maintenance (#1516) which carries Andrews Road over
Woodstock Andrews Road
2022 Andrews Brook in Norway. Located 160 feet $28,000
east of the junction of Route 26.

106
T8 R8
WELS
T8 R7 T8 R6
Penobscot
WELS WELS

T7 R8 T7 R7 T7 R6

Penobscot
WELS WELS WELS

T6 R8 T6 R7 T6 R6
WELS WELS WELS

Penobscot County T5 R7
T5 R8 Mount
Population 151,096 WELS WELS Chase

Land Area (sq mi) 3,397


T4 R8 T4 R7
Bridges 437 WELS
Patten
WELS
Highway Corridor Priority Miles
HCP 1 297 T3 R7
Stacyville
T3 R8 WELS
HCP 2 123 WELS
HCP 3 201 Soldiertown Herseytow n
T2 R8
HCP 4 Twp T2 Twp
549 WELS
R7 WELS

T1 R8
Total HCP 1-4 1,170 WELS
Grindstone T1 R6
Twp WELS

T3 Indian Millinocket
T4 Indian Purchase
Twp
Purchase Medway
Twp TA R7
Hopkins Academy
WELS Drew Plt
Grant Twp Kin gman
Long A Matta wamke ag
Twp
Twp
T2 R9 Woodville Prentiss
T3 R9 NW P Twp T7
Webster R3 NBPP
NW P
Plt
Winn
Chester Carroll
T2 R8
NW P Springfield Plt
Seboeis
Plt Lee
Lincoln
Mattam iscontis
Twp
Maxfield
Lakeville
T3 R1 Pu ka kon

Enfield
Twp
NBPP

Howland
Lowell Burlington
Edinburg
Lagrange Grand
Summit Falls
Twp Twp
Argyle
Bradford Twp
Garland Charleston Greenbush
Alton Greenfield
Dexter
Twp
Hudson
Corinth Milford
Corinna Exeter
Old Town
Kenduskeag

Glenburn
Orono Bradley
Stetson Levant
Newport
Bangor Eddington
Hermon Clifton
Carmel
Bre wer
Etna
Plymouth Holden
Ham pden
Newburgh
Dixmont Orrington
Penobscot
ID/Year Municipality Scope Name Description Total Project Cost

024123.00 Highway Paving


Beginning 0.37 of a mile south of Hatch Road
2022 Alton Rural Highways Route 16
and extending south 1.78 miles.
HCP 2 1 1/4" Overlay

021687.00
Hemlock Stream Bridge (#3735) over
Highway-Bridges
2023/24 Argyle Twp Route 116 Hemlock Stream. Located 2.22 miles north of $2,970,000
Bridge Replacement Argyle Road.
HCP 4

Bangor Area Comprehensive Transportation


Policy, Planning and Research System (BACTS) Unified Planning Work
002163.22
Program: Federally mandated program
Bangor Planning BACTS Planning
2022 associated with Maine's U.S. Census-defined $780,000
MPO Program Management metropolitan planning area in the Greater
Bangor region.Years 2022-2023.

Bangor Area Comprehensive Transportation


Policy, Planning and Research System (BACTS) Unified Planning Work
002163.24
Program: Federally mandated program
Bangor Planning BACTS Planning $780,000
2024 associated with Maine's U.S. Census-defined
MPO Program Management metropolitan planning area in the Greater
Bangor region. Years 2024-2025.

Policy, Planning and Research


014853.22
Planning Penobscot/Piscataquis Regional Planning
Bangor Planning Support $10,000
2022 Organization support.
Statewide Program
Development

Policy, Planning and Research


014853.23
Planning Penobscot/Piscataquis Regional Planning
Bangor Planning Support $10,000
2023 Organization support.
Statewide Program
Development

Policy, Planning and Research


014853.24
Planning Penobscot/Piscataquis Regional Planning
Bangor Planning Support $10,000
2024 Organization support.
Statewide Program
Development

Highway Safety and Spot


018595.10 Improvements Diverging diamond interchange on Hogan
Road/ Interstate 95 Exit 187 and Hogan
2022 Bangor Urban Highways Hogan Road Road/ I-95 Bridge (#5823) over Interstate 95. $2,100,000
Located 0.26 of a mile north of Haskell Road.
HCP 1, 2 Intersection Improvements W/ FHWA AID Demo Grant recipient.
Signal - PE Only
Highway Safety and Spot Construction of diverging diamond
018595.11 Improvements interchange on Hogan Road/ Interstate 95
Exit 187 and Hogan Road/ I-95 Bridge
2023/24 Bangor Urban Highways Hogan Road (#5823). This project is only partially funded $7,850,000
for construction and is contingent upon a
HCP 1, 2 Intersection Improvements W/ successful future competitive grant
Signal application.

Aviation
018709.03 Safety and infrastructure improvements that
Bangor International
Bangor Runway/Taxiway may include rehabilitation of Runway 15-33 -
2023/24 Airport $10,300,000
Phase 1.
Reconstruction

107
ID/Year Municipality Scope Name Description Total Project Cost

Aviation
018709.10 Safety and infrastructure improvements that
Bangor International
Bangor Runway/Taxiway may include rehabilitation of Runway 15-33 -
2023/24 Airport $18,600,000
Phase 2.
Rehabilitation

Aviation
018709.11 Safety and infrastructure improvements that
Bangor International
Bangor Runway/Taxiway may include design and permitting for the
2022 Airport $515,000
rehabilitation of Runway 15-33.
Rehabilitation

System Operations by Others Transit American with Disabilities Act (ADA)


020270.22
Operating Assistance for Bangor, Community
Bangor Transit - General Urban Transit Operations
2022 Connector, Federal Transit Administration $213,000
Operating Assistance §5307 for urbanized area transit.

System Operations by Others Transit American with Disabilities Act (ADA)


020720.21
Operating Assistance for Bangor, Community
Bangor Transit - General Urban Transit Operations
2022 Connector, Federal Transit Administration $213,000
Operating Assistance §5307 for urbanized area transit.

Highway Safety and Spot Beginning at Center Street and extending


021663.00
Improvements north 0.14 of a mile to Alden Street. Includes
2023/24 Bangor Broadway intersection improvements at northbound and
Urban Highways $2,460,000
southbound Interstate 95 ramps. FHWA
HCP 1, 2, 4 RAISE Grant Recipient.
Safety Improvements

022276.01 I-95/ Broadway Bridge (#5789) over Route


Highway-Bridges 15. Located 0.06 of a mile west of Interstate
2023/24 Bangor Interstate 95 $19,900,000
95 northbound Exit 187. FHWA INFRA Grant
Bridge Replacement recipient.
HCP 1

Transit Service Area Transit Capital Assistance for Bangor,


022757.22
Community Connector, Federal Transit
Bangor Transit - General Urban Transit Capital $647,000
2022 Administration §5307 for urbanized area
Capital-Eligible Maintenance transit.

System Operations by Others


022761.22
FTA Section 5307 for Operating Assistance -
Bangor Transit - General Urban Transit Operations
2022 Community Connector. $1,610,000
Operating Assistance

Transit Service Area Transit Capital Assistance for the Bangor


022769.19
area Small Urban Transit Agencies, Federal
Bangor Transit - General Urban Transit Capital $146,000
2022 Transit Administration §5339 for urbanized
Capital Equipment Purchase area transit.

Transit Service Area Transit Capital Assistance for the Bangor


022769.20
area Small Urban Transit Agencies, Federal
Bangor Transit - General Urban Transit Capital
2022 Transit Administration §5339 for urbanized $152,000
Capital Equipment Purchase area transit.

108
ID/Year Municipality Scope Name Description Total Project Cost

Transit Service Area Transit Capital Assistance for the Bangor


022769.21
area Small Urban Transit Agencies, Federal
Bangor Transit - General Urban Transit Capital
2022 Transit Administration §5339 for urbanized $146,000
Capital Equipment Purchase area transit.

Transit Service Area Transit Capital Assistance for the Bangor


022769.22
area Small Urban Transit Agencies, Federal
Bangor Transit - General Urban Transit Capital
2022 Transit Administration §5339 for urbanized $159,000
Capital Equipment Purchase area transit, Fiscal Year 2022.

Highway Safety and Spot Located at the intersection of Broadway and


023114.00 Improvements State Street; Hancock Street and Oak Street;
Washington Street, Oak Street and
2022 Bangor Urban Highways Route 2
Penobscot Bridge; Washington Street, $753,000
HCP 1, 2 Intersection Improvements W/ Exchange Street and Penobscot Plaza.
Signal BACTS Sponsored.

System Operations by Others Bangor Area Comprehensive Transportation


023342.22
System (BACTS), Federal Transit
Bangor Transit - General Urban Transit Planning
2022 Administration §5303 for metropolitan $101,000
Administrative Assistance planning, Fiscal Year 2022.

023521.00 Highway Paving


Beginning at Hancock Street and extending
2022 Bangor Urban Highways State Street
northeast 0.96 of a mile. BACTS Sponsored.
HCP 2 Mill And Fill

Highway Safety and Spot


023573.00 Improvements
Located at the intersection of State Street
2023/24 Bangor Urban Highways State Street
and Forest Avenue. BACTS Sponsored. $310,000
HCP 2 Intersection Improvements W/
Signal

024131.00 Highway Paving


Beginning at Route 2 and extending north
2022 Bangor Urban Highways Route 2/Hogan Road 0.44 of a mile. Includes Hogan Road/Route
2 intersection.
HCP 2, 3 1 1/4" Overlay

024641.12 Highway Paving


Municipal Partnership Initiative Program.
2022 Bangor Urban Highways Hancock Street Beginning at Route 2 and extending
southwest 0.81 of a mile to Oak Street.
HCP 2 Mill And Fill

System Operations by Others Transit Administrative and Operating


024651.08
Rural Transit Admin and Assistance for Federal Transit Administration
Bangor Transit - General
2022 Operations Assistance §5311 for statewide non-urbanized transit. $899,000
Operating Assistance Penquis ME-2020-027.

Policy, Planning and Research Bangor Area Comprehensive Transportation


024695.00 System (BACTS), Federal Transit
Bangor Transit - General Urban Transit Planning Administration §5303 for metropolitan $103,000
2023
planning, Fiscal Year 2023. Funds are
Planning Studies transferred to FHWA.

109
ID/Year Municipality Scope Name Description Total Project Cost

System Operations by Others Transit Capital Assistance (preventive


024697.00
maintenance) for Bangor, Community
Bangor Transit - General Urban Transit Operations
2023 Connector, Federal Transit Administration $213,000
Operating Assistance §5307 for urbanized area transit.

Transit Service Area Transit Capital Assistance (preventive


024717.00
maintenance) for Bangor, Community
Bangor Transit - General Urban Transit Capital
2023/24 Connector, Federal Transit Administration $687,000
Capital-Eligible Maintenance §5307 for urbanized area transit.

System Operations by Others Transit Operating Assistance for Bangor,


024719.00
Community Connector, Federal Transit
Bangor Transit - General Urban Transit Operations
2023 Administration §5307 for urbanized area $1,620,000
Operating Assistance transit.

Transit Service Area


024739.00 FTA Section 5339 for Capital Assistance -
Bangor Transit - General Urban Transit Capital Bangor, Community Connector bus service -
2023/24 $159,000
will apply to FTA directly.
Capital Equipment Purchase

Bicycle/Pedestrian
024771.00 Enhancements to the Bangor Riverfront trail
Bangor Off-Road Trail/Path Riverfront Trail system to include lighting, restroom, and a
2023/24 $465,000
new trail spur.
New Construction

025063.00
I-395 / Main Street Bridge (#5799) over Main
Highway-Bridges
2023/24 Bangor Interstate 395 Street. Located 0.23 of a mile west of the $400,000
Bridge Joint Replacement Brewer town line.
HCP 1

025141.00 Highway Paving


Beginning 0.36 of a mile west of Pushaw
2022 Bangor Rural Highways Route 15
Road and extending northwest 0.83 of a mile.
HCP 2 Mill And Fill

System Operations by Others Transit Administrative and Operating


025233.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Bangor Transit - General $959,000
2023 Operations §5311 for non-urbanized transit. Penquis,
Operating Assistance The Lynx.

Transit Capital Assistance for Federal Transit


Transit Service Area Administration §5339 Bus and Bus Facilities,
025351.00
FTA Discretionary Grant Award. The
Bangor Transit - General Urban Transit Capital $496,000
2022 Community Connector Public Transit System
Capital Equipment Purchase in Bangor received $396,800 to implement
fixed route bus stops, build bus shelters.

025379.00 Highway Paving


Beginning at Washington Street and
2023/24 Bangor Urban Highways Oak Street extending north 0.24 of a mile to State Street.
BACTS Sponsored.
HCP 1 Mill And Fill

110
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


Improvements
025437.00
Bangor Urban Highways Various Locations Pilot project for traffic signal operations.
2023/24 $53,000
Install Or Replace Traffic
Signals

Transit Service Area


025553.00 FTA Section 5339 for Capital Assistance -
Bangor Transit - General Urban Transit Capital Bangor, Community Connector bus service -
2023/24 $150,000
will apply to FTA directly.
Capital Equipment Purchase

Transit Service Area Transit Capital Assistance for Bangor,


025589.00
Community Connector, Federal Transit
Bangor Transit - General Urban Transit Capital
2023/24 Administration §5307 for urbanized area $687,000
Capital-Eligible Maintenance transit.

System Operations by Others Transit American with Disabilities Act (ADA)


025593.00
Operating Assistance for Bangor, Community
Bangor Transit - General Urban Transit Operating
2024 Connector, Federal Transit Administration $213,000
Operating Assistance §5307 for urbanized area transit.

Policy, Planning and Research Bangor Area Comprehensive Transportation


025607.00 System (BACTS), Federal Transit
Bangor Transit - General Urban Transit Planning Administration §5303 for metropolitan
2024 $103,000
planning Fiscal Year 2024. Funds are
Planning Studies transferred to FHWA.

025617.00 Bicycle/Pedestrian Sidewalk improvements and signal


modifications. Beginning at Husson Avenue
2023/24 Bangor On-Road Sidewalk/Trail Broadway $155,000
and extending north 0.15 of a mile to
HCP 2 New Construction Grandview Avenue.

Highway Paving
025775.00
Urban Highways Beginning 0.07 of a mile north of Husson
2022 Bangor Route 15
Avenue and extending north 2.72 miles.
Ultra-Thin Bonded Wearing
HCP 2
Course

026095.00
Highway-Bridges Kenduskeag Avenue/I-95 Bridge (#5798)
2023/24 Bangor Kenduskeag Avenue over Interstate 95 . Located 0.19 of a mile $400,000
Bridge Substructure north of Linden Street.
HCP 1 Rehabilitation

026103.00 Highway Paving


Beginning at the Washington Street Bridge
2023/24 Bangor Urban Highways Washington Street and extending east 0.37 of a mile. Includes
an additional 0.22 of a divided highway.
HCP 1, 2 Mill And Fill

Highway System Operations


026128.00
Interstate
Bangor Interstate 395 Over Height Detection.
2024 $300,000
Intelligent Transportation
Systems

111
ID/Year Municipality Scope Name Description Total Project Cost

Highway System Operations


026144.00
Bangor Highways - General Various Locations Pilot project for Traffic Signal Operations.
2024 $105,000
System Operations

Highway Safety and Spot


026346.00 Improvements Bangor Area Comprehensive Transportation
System (BACTS) Capital Improvement
Bangor BACTS Allocation
2023/24 Urban Highways funding remaining allocation. Calendar Year $158,000
2024.
Highway Improvement

Highway Safety and Spot


026354.00 Improvements
Located at the intersection of Kenduskeag
Kenduskeag
2023/24 Bangor Urban Highways Avenue and Griffin Road. BACTS
Avenue/Griffin Road $266,000
Sponsored.
HCP 3 Intersection Improvements W/
Signal

021713.00
Highway-Bridges
Bangor, Brewer Interstate 395 Interstate 395 Bridges Study.
2022 $250,000
Bridge Improvements - PE Only

022278.00 Veterans Remembrance Bridge (#1558) over


Highway-Bridges
Bangor, Brewer Interstate 395 the Penobscot River. Located at the Bangor- $3,240,000
2022
Bridge Rehabilitation Brewer town line.

025311.00 Highway-Bridges Penobscot Bridge (#2038) over Penobscot


Bangor, Brewer Route 1C River. Located on the Brewer-Bangor town
2023/24 $1,000,000
Bridge Substructure line.
Rehabilitation

025313.00 Joshua Chamberlain Bridge (#5312) over


Highway-Bridges Penobscot River and Railroad Yard. Located
Bangor, Brewer Route 1A $1,500,000
2023/24 0.06 of a mile northwest of the Brewer town
Bridge Rehabilitation line.

Highway Paving
025481.00
Interstate Interstate 395 Beginning at Route 1A and extending west
2023/24 Bangor, Brewer
Westbound 4.93 miles.
Ultra-Thin Bonded Wearing
HCP 1
Course

Highway Paving
025483.00
Interstate Beginning at Odlin Road and extending east
2023/24 Bangor, Brewer Interstate 395 Eastbound
4.76 miles.
Ultra-Thin Bonded Wearing
HCP 1, 2
Course

025139.00 Highway Paving


Bangor,
Beginning 0.10 of a mile north of Route 221
2022 Glenburn, Urban Highways Route 15
and extending north 4.38 miles.
Kenduskeag
HCP 2 1 1/4" Overlay

112
ID/Year Municipality Scope Name Description Total Project Cost

026464.00 Bicycle/Pedestrian
Beginning 0.10 of a mile south of Boynton
2022 Bradley On-Road Sidewalk/Trail Route 178
Street and extending north 0.57 of a mile. $93,000
HCP 4 Rehabilitation - PE Only

WR 42168 Ditching on Route 178 in Milford, Bradley and


Bradley, Drainage Maintenance Eddington. Beginning at the intersection of
2022 Eddington, Route 178 Route 9 in Eddington and extending north
$240,000
Milford 9.21 miles to the intersection of Route 2 in
HCP 4 Milford.

Highway Safety and Spot


022833.00 Improvements

2022 Brewer Rural Highways Route 15 Located 0.13 of a mile north of Abbott Street. $75,000
HCP 1 Slope Stabilization/Protection -
PE Only
Highway Safety and Spot
023112.00 Improvements Located at the intersection of State Street,
Penobscot Street and Penobscot Bridge; and
2022 Brewer Urban Highways Route 9
State Street and North Main Street. BACTS $189,000
HCP 1 Intersection Improvements W/ Sponsored.
Signal

Bicycle/Pedestrian Design and construction of Phase 3 of the


024773.00
Brewer Riverwalk. Beginning at Hardy Street
Brewer Off-Road Trail/Path Brewer Riverwalk $625,000
2022 and extending south 900 feet along the east
New Construction side of the Penobscot River.

Highway Safety and Spot


025103.00
Improvements
2022 Brewer Interstate 395 Eastbound Located at Exit 5. $1,290,000
Rural Highways
HCP 1
Lighting

025377.00 Highway Paving


Beginning at Abbott Street and extending
2023/24 Brewer Urban Highways South Main Street 0.95 of a mile to Wilson Street. BACTS
Sponsored.
HCP 1, 2 Mill And Fill

026330.00 Bicycle/Pedestrian
Beginning 0.16 of a mile east of Liberty Drive
2023/24 Brewer On-Road Sidewalk/Trail Parkway South
and extending east 0.41 of a mile. $125,000
HCP 3 Safety Improvements

026332.00 Bicycle/Pedestrian
Beginning 0.02 of a mile south of Burr Street
2023/24 Brewer On-Road Sidewalk/Trail Route 15B
and extending north 0.09 of a mile. $145,000
HCP 1 Safety Improvements

026350.00 Highway Paving


Beginning at Eastern Avenue and extending
2023/24 Brewer Urban Highways State Street northwest 0.70 of a mile to the Penobscot
Bridge. BACTS Sponsored.
HCP 1 Mill And Fill

113
ID/Year Municipality Scope Name Description Total Project Cost

026352.00 Highway Paving


Beginning at Wilson Street and extending
2023/24 Brewer Urban Highways Parkway South south 0.47 of a mile to the I-395 bridge joint.
BACTS Sponsored.
HCP 3 Mill And Fill

Highway Safety and Spot


026356.00 Improvements
Located at the intersection of Parkway South
2023/24 Brewer Urban Highways Parkway South/Route1A
and Wilson Street. BACTS Sponsored. $74,000
HCP 1 Intersection Improvements W/
Signal

Replacing bridge joints, repairing sidewalk,


WR 42633 Bridge and Structural and painting beam ends on Parkway South-
Brewer Maintenance Parkway South I395 Bridge (#1562) in Brewer which carries
2022 $40,000
Parkway South over Interstate 395. Located
0.10 of a mile east of Liberty Drive.

Highway Safety and Spot Beginning 0.47 of a mile west of the


018915.90 intersection of Interstate 395 and Route 1A
Brewer, Improvements
Interstate 395/Route 9 and extending north 6.05 miles to the
2023/24 Eddington,
Rural Highways Connector Brewer-Holden town line and to Route 9 $1,600,000
Holden
HCP 1, 5 approximately 0.90 of a mile west of Chemo
Signing Pond Road.

Highway Paving
025823.00 Carmel, Etna,
Hermon, Rural Highways Beginning at the Palmyra town line and
2023/24 Route 2
Newport, extending east 22.58 miles.
Plymouth Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Paving
025829.00
Beginning 0.93 of a mile west of the
Carroll Plt, Rural Highways
2023/24 Route 6 Springfield-Carroll Plt. town line and
Springfield
Highway Cyclical Pavement extending east 7.57 miles.
HCP 3
Resurfacing

024981.00
Highway Paving
Beginning at Route 116 and extending east
2022 Chester, Lincoln Chester/Bridge Road
1.00 mile to Route 2.
Light Capital Paving
HCP 4

024981.00
Highway Paving
Chester, Beginning 0.75 of a mile north of Chester
2022 Route 116
Woodville Road and extending north 5.06 miles.
Light Capital Paving
HCP 4

026476.00
Mulligan Stream Bridge (#6160) over
Highway-Minor Spans
2023/24 Corinna Nokomis Road Mulligan Stream. Located 0.66 of a mile $1,500,000
Bridge Replacement northeast of Williams Drive.
HCP 4

025945.00
Highway Paving
Corinna, Beginning at Route 7 and extending
2022 Route 11
Corinth, Exeter northeast 15.75 miles to Route 15.
Light Capital Paving
HCP 4

114
ID/Year Municipality Scope Name Description Total Project Cost

025455.00
Robyville Bridge (#1003) over Kenduskeag
Highway-Bridges
2023/24 Corinth Covered Bridge Road Stream. Located 0.28 of a mile north of the $150,000
Bridge Painting Kenduskeag town line.
HCP 5

WR 42119 Ditching and replacing culverts on Route 43.


Drainage Maintenance Beginning at the intersection of Route 15 in
2022 Corinth, Hudson Route 43
Corinth and extending 12.00 miles to the $102,000
HCP 4 Hudson-Alton town line.

Aviation
018690.05 Safety and infrastructure improvements that
Dexter Runway/Taxiway Dexter Regional Airport may include crack sealing and pavement
2022 $103,000
markings.
Crack Sealing

Aviation
018690.17 Safety and infrastructure improvements that
Dexter Airport Buildings Dexter Regional Airport may include construction of an arrivals
2023/24 $438,000
building.
New Construction

025945.00
Highway Paving
Beginning at Ripley town line and extending
2022 Dexter Cambridge Road
east 1.71 miles to Route 23.
Light Capital Paving
HCP 4

Highway Safety and Spot


025163.00 Improvements
Large culvert (#188325) located 0.19 of a
2022 Dixmont Rural Highways Simpson Corner Road
mile north of Kenniston Road. $60,000
HCP 4 Large Culvert Replacement -
PE Only

026097.00
Crocker Brook Bridge (#5424) over Crocker
Highway-Minor Spans
2023/24 Dixmont Route 202 Brook. Located 0.40 of a mile east of Troy $1,000,000
Bridge Replacement town line.
HCP 3

Highway Safety and Spot


026358.00 Improvements
Large culvert (#18837) located 0.41 of a mile
2022 Dixmont Rural Highways Route 202
west of Route 143. $60,000
HCP 3 Large Culvert Rehabilitation -
PE Only

025875.00
Highway Paving
Beginning at Route 9 and extending east
2023 Dixmont, Etna Route 143
9.53 miles to Route 2.
Light Capital Paving
HCP 4

WR 42350 Ditching and replacing culverts on Kennebec


Dixmont, Drainage Maintenance Road. Beginning at the intersection of Route
2022 Kennebec Road
Newburgh 9 in Dixmont and extending east 4.00 miles $137,000
HCP 4 to the town of Newburg.

115
ID/Year Municipality Scope Name Description Total Project Cost

022304.00
Mattawamkeag River Bridge (#5105) over
Highway-Bridges
2022 Drew Plt Route 171 Mattawamkeag River. Located 0.14 of a mile $215,000
Bridge Improvements - PE Only north of Eight Road.
HCP 4

Highway Safety and Spot


025521.00 Improvements
Cross culvert (#137691) located 0.67 of a
2022 Drew Plt Rural Highways Route 171
mile south of Reed Plt. $60,000
HCP 4 Large Culvert Improvements -
PE Only

Highway Safety and Spot


021782.00
Improvements
Large culvert (#46776) located 0.22 of a mile
2023/24 Eddington Route 46
Rural Highways north of Hatcase Pond Road. $875,000
HCP 2
Large Culvert Replacement

026294.00 Bicycle/Pedestrian
Route 6/Old County Beginning at Route 155 and extending north
2022 Enfield On-Road Sidewalk/Trail
Road 0.50 of a mile. $120,000
HCP 3, 5 New Construction - PE Only

WR 39040 Ditching on Route 155 in Enfield. Beginning


Drainage Maintenance 0.15 of a mile south of the Enfield-Lincoln
2022 Enfield Route 155 $51,000
town line and extending south 0.56 of a mile
HCP 4 to Millett Mallett Road in Lincoln.

Highway Paving
025731.00
Beginning 0.10 of a mile south of Mohawk
Rural Highways
2022 Enfield, Lincoln Route 2 Road and extending north 6.21 miles to River
Highway Cyclical Pavement Road.
HCP 3
Resurfacing

Highway Safety and Spot


024279.00
Improvements
Large culvert (#47394) located 0.73 of a mile
2023/24 Etna Route 2 $670,000
Rural Highways east of West Etna Road.
HCP 3
Large Culvert Improvements

021727.01
Boom Bridge (#3587) over Beach Bridge
Highway-Bridges
2022 Greenbush Route 2 Brook. Located 2.43 miles north of Milford $5,150,000
Bridge Replacement town line. FHWA BUILD Grant recipient.
HCP 3

025877.00
Greenbush, Highway Paving
Beginning at Route 2 and extending east
2023 Greenfield Twp, Greenfield Road
8.74 miles to Crocker Turn Road.
Milford Light Capital Paving
HCP 4

Rail
024797.00
Railroad crossing (#051288Y) located 0.17 of
Hampden Rail/Highway Crossings Route 9 $375,000
2022 a mile north of the Winterport town line.
Rail Crossing Improvements

116
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


Improvements
025181.00
Visitor Information New roof at the Hampden southbound visitor
Hampden Rural Highways
2023/24 Center information center. $50,000
Rest Area
Construction/Improvements
Highway Safety and Spot
Improvements
025187.00
Visitor Information Paving at the Hampden northbound and
Hampden Rural Highways
2022 Center southbound visitor information centers. $600,000
Rest Area
Construction/Improvements
Highway Safety and Spot
Improvements
025193.00
Visitor Information New roof at the Hampden northbound visitor
Hampden Rural Highways
2022 Center information center. $44,000
Rest Area
Construction/Improvements
Highway Safety and Spot
Improvements
025195.00
Visitor Information Gazebo roof at the Hampden northbound
Hampden Rural Highways
2022 Center visitor information center. $10,000
Rest Area
Construction/Improvements

Highway Safety and Spot


025281.00
Improvements
Beginning 0.39 of a mile north of Route 9 and
2023/24 Hampden Route 202 $430,000
Rural Highways extending north 0.15 of a mile.
HCP 1
Slope Stabilization/Protection

026101.00 Highway Paving


Beginning 0.25 of a mile northeast of
2023/24 Hampden Rural Highways Route 1A Wheelden Heights and extending northeast
1.13 miles.
HCP 2 1 1/4" Overlay

026482.00 Highway Paving


Beginning at the Winterport town line and
2023/24 Hampden Urban Highways Route 1A
extending north 3.17 miles.
HCP 1, 2 1 1/4" Overlay

WR 41382 Ditching and replacing culverts on the


Drainage Maintenance Kennebec Road. Beginning at the
2022 Hampden Kennebec Road intersection of Route 69 and extending east $96,000
5.79 miles to the intersection of Route 1A in
HCP 4 Hampden.

WR 42535 Replacing curb and wearing surface. Sucker


Bridge and Structural
Maintenance Brook Bridge (#0157) on Route 1A in
2022 Hampden Route 1A
Hampden. Located 0.12 of a mile northeast $80,000
HCP 2 of Schoolhouse Lane.

Highway Paving
024171.00
Hampden, Interstate Interstate 95 Northbound Beginning at Exit 180 and extending south
2022
Hermon and Southbound 3.75 miles.
Ultra-Thin Bonded Wearing
HCP 1
Course

117
ID/Year Municipality Scope Name Description Total Project Cost

Highway
022581.10
Construction/Rehabilitation
Hampden, Beginning at Route 202 and extending south
2022 Route 69
Newburgh Rural Highways 3.87 miles. $1,510,000
HCP 4
PMRAP Laydown/Surface HMA

026059.00 Highway Paving


Hampden, Beginning 0.01 of a mile south of Memorial
2023/24 Rural Highways Route 1A
Winterport Drive and extending north 3.75 miles.
HCP 1 Mill And Fill

Producing, hauling, and providing additional


WR 37102 support activities for the placement of plant
Hampden, PMRAP mix recycled asphalt pavement (PMRAP).
2022 Route 69
Newburgh Beginning at Route 202 in Newburgh and $1,220,000
HCP 4 extending south 3.87 miles to the Hampden-
Winterport town line.

Bicycle/Pedestrian
026302.00 Pedestrian safety improvements including a
Hermon Off-Road Trail/Path Billing Road sidewalk on the west side of the road
2022 $85,000
extending to Schoolhouse Lane.
New Construction - PE Only

WR 41503 Ditching on Route 11 in Stacyville and


Herseytown Twp, Drainage Maintenance Herseytown. Beginning 1.95 miles south of
2022 Route 11 $42,000
Stacyville the Siberia Road in Stacyville and extending
HCP 4 5.29 miles in Herseyville.

Highway Safety and Spot


018827.00
Improvements
Large culvert (#46277) located 5.73 miles
2023/24 Howland Seboeis Road $607,000
Rural Highways north of North Howland Road.
HCP 4
Large Culvert Rehabilitation

025087.00
I-95 SB/Piscataquis River Bridge (#6069)
Highway-Bridges
2022 Howland Interstate 95 Southbound over the Piscataquis River. Located 1.81 $1,200,000
Bridge Painting miles north of the Exit 217 off-ramp.
HCP 1

025535.00
Route 155/ I-95 Bridge (#6068) over
Highway-Bridges
2022 Howland Route 6 Interstate 95. Located 0.27 of a mile east of $700,000
Bridge Painting Maxfield Road.
HCP 1

025543.00
I-95 NB/ Piscataquis River Bridge (#1419)
Highway-Bridges
2022 Howland Interstate 95 Northbound over Piscataquis River. Located 0.48 of a $1,200,000
Bridge Painting mile north of River Road.
HCP 1

026087.00
Highway-Bridges I-95 SB Over Seboeis Road Bridge (#6070)
2023/24 Howland Interstate 95 Southbound over Seboeis Road. Located 19.69 miles $4,500,000
Bridge Superstructure north of Lagrange Road.
HCP 1 Replacement

118
ID/Year Municipality Scope Name Description Total Project Cost

025877.00 Howland, Highway Paving


Mattamiscontis North Howland Beginning at Route 6 and extending north
2023
Twp, Maxfield, Road/Seboeis Road 9.31 miles.
Seboeis Plt Light Capital Paving
HCP 4

025877.00
Howland, Highway Paving
Beginning at Route 6 and extending east
2023 Maxfield, Joe Raymond Road
15.67 miles to Route 155.
Medford, Milo Light Capital Paving
HCP 4

Highway Paving
024915.00
Beginning 0.84 of a mile north of the
Rural Highways
2022 Kenduskeag Route 15 Kenduskeag Stream Bridge and extending
Ultra-Thin Bonded Wearing northwest 2.30 miles to Southard Avenue.
HCP 2
Course

Highway Safety and Spot


026384.00 Improvements
Large culvert (#111470) located 0.10 of a
2022 Kingman Twp Rural Highways Route 170
mile west of Park Street. $60,000
HCP 4 Large Culvert Replacement -
PE Only

Highway
018786.00
Construction/Rehabilitation
Beginning 0.11 of a mile west of Medford
2023/24 Lagrange Route 6 $2,150,000
Rural Highways Road and extending south 0.93 of a mile.
HCP 2
Highway Rehabilitation

025877.00
Highway Paving
Lagrange, Milo, Beginning at Paddy Hill Road and extending
2023 Route 6
Orneville Twp southeast 5.96 miles to the Medford Road.
Light Capital Paving
HCP 2

025887.00
Highway Paving
Lakeville, Beginning at Route 6 and extending south
2023 Bottle Lake Road
Springfield 6.09 miles.
Light Capital Paving
HCP 4

Highway Paving
025827.00
Rural Highways Beginning at Lincoln town line and extending
2023/24 Lee Route 6
east 3.71 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

WR 43342
Drainage Maintenance Ditching on Route 168 at various locations.
2022 Lee Route 168 Beginning 200 feet east of the Hook Road $120,000
and extending east 9.00 miles.
HCP 4

Highway Safety and Spot


021847.00
Improvements
Beginning at Goding Avenue and extending
2022 Lincoln Route 2
Rural Highways north 0.80 of a mile to Lee Road. $323,000
HCP 3
Drainage Improvements

119
ID/Year Municipality Scope Name Description Total Project Cost

Beginning 0.06 of a mile south of the


022018.00 Bicycle/Pedestrian intersection of Route 2 on Route 155 and
Route 2/Route 6/Route continuing north 0.24 of a mile on Route 2,
2023/24 Lincoln On-Road Sidewalk/Trail
155 and 0.03 of a mile on Route 6. Includes $862,000
HCP 3, 4 Multimodal Improvements sidewalks on both sides of the roads, for a
total project length of 3,100 feet.

Highway Safety and Spot


022653.00
Improvements
Beginning at Hale Street and extending south
2023/24 Lincoln Route 155
Urban Highways 0.57 of a mile to Transalpine Road. $60,000
HCP 4
Drainage Improvements

Highway Paving
025733.00
Rural Highways Beginning 0.29 of a mile northeast of Kelley
2022 Lincoln Route 2
Avenue and extending east 0.68 of a mile.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Paving
025735.00
Rural Highways Beginning at Lee Road and extending north
2022 Lincoln Route 2
6.21 miles to the Winn town line.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Paving
025737.00
Rural Highways Beginning at Main Street and extending east
2022 Lincoln Route 6
7.95 miles to the Lee town line.
Highway Cyclical Pavement
HCP 3
Resurfacing

Ditching on North Howland Road and


WR 41735 Seboeis Road in Howland, Mattamiscontis
Mattamiscontis Drainage Maintenance North Howland Road, Twp., Maxfield, and Seboeis Plt. Beginning at
2022 Twp, Maxfield, $141,000
Seboeis Road the intersection of Route 6 in Howland and
Seboeis Plt
HCP 4 extending north 11.64 miles to the Mountain
Road in Seboeis Plt.

Highway Safety and Spot


022922.00
Improvements
Large culvert (#46619) located 0.37 of a mile
2023/24 Mattawamkeag Route 157 $433,000
Rural Highways north of Jordan Mills Road.
HCP 3
Large Culvert Improvements

Highway Safety and Spot


025425.00 Improvements
Cross culvert (#184299) located 0.38 of a
2022 Mattawamkeag Rural Highways Route 2 $179,000
mile northeast of the Winn town line.
HCP 3 Large Culvert Replacement -
PE Only
Highway Safety and Spot
Improvements
025183.00
Visitor Information Shingle staining at the Medway northbound
Medway Rural Highways $15,000
2023/24 Center and southbound visitor information centers.
Rest Area
Construction/Improvements

Bus
025331.00
Medway Parking Lots Park and Ride Lot Located 0.36 of a mile south of Village Lane.
2022 $60,000
Reconstruction

120
ID/Year Municipality Scope Name Description Total Project Cost

WR 42775
Drainage Maintenance Replacing culvert (#107754) located 0.53 of a
2022 Medway Route 116 mile east of the Turnpike Road on Route 116 $18,000
in Medway.
HCP 4

Aviation Safety and infrastructure improvements that


018699.05
Millinocket Municipal may include an FAA reimbursable agreement
Millinocket Navigation Aids/Lights
2023/24 Airport for the construction work associated with the $464,000
Lighting reconstruction of Runway 11-29.

Aviation
018699.06 Safety and infrastructure improvements that
Millinocket Municipal
Millinocket Runway/Taxiway may include the reconstruction of Runway
2023/24 Airport $6,180,000
11-29 and partial parallel Taxiway "D".
Reconstruction

Policy, Planning and Research Planning Partnership Initiative Program.


025647.00 Feasibility study regarding bicycle and
Central Street/Penobscot
Millinocket Planning pedestrian safety within the busiest
2022 Avenue $75,000
downtown corridors on Central Street and
Feasibility Studies Penobscot Avenue.

026298.00 Bicycle/Pedestrian
Beginning at Congress Street and extending
2022 Millinocket On-Road Sidewalk/Trail Route 11 $75,000
east 0.20 of a mile to Ash Street.
HCP 2 New Construction - PE Only

WR 41546 Repairing wearing surface on Granite Street


Bridge and Structural
Maintenance Bridge (#0902) in Millinocket which carries
2022 Millinocket Granite Street $182,000
Granite Street over Millinocket Stream.
HCP 4 Located 100 feet south of York Street.

024981.00 Millinocket, T3 Highway Paving


Indian Purchase Beginning at the T4 Indian Purchase Twp.
2022 Route 11
Twp, T4 Indian town line and extending northeast 4.81 miles.
Purchase Twp Light Capital Paving
HCP 4

WR 42895 Ditching on Route 159 at various locations.


Drainage Maintenance Beginning at Owlsboro Road and extending
2022 Mount Chase Route 159
west 3.07 miles to the Shin Pond Bridge $85,000
HCP 4 (#2760).

Bus
026304.00
Located at Carmel Road North and North
Newburgh Parking Lots Park and Ride Lot
2023/24 County Road. $400,000
New Construction

Highway Safety and Spot


023689.00 Beginning at the Palmyra town line and
Improvements
Newport, extending east 0.22 of a mile. Project
2023/24 Route 2 $4,820,000
Palmyra Rural Highways funding is contingent on Congressionally
HCP 1 Designated Spending approval.
Safety Improvements

121
ID/Year Municipality Scope Name Description Total Project Cost

024133.00 Highway Paving


Newport, Beginning 0.03 of a mile northeast of Pooler
2022 Palmyra, Rural Highways Route 2 Road and extending east 9.00 miles.
Pittsfield Including 0.32 of a mile on Route 2W.
HCP 1 1 1/4" Overlay

Highway Paving
025825.00
Newport, Rural Highways Beginning at the Interstate 95 Exit #161 off-
2023/24 Route 7
Plymouth ramp and extending north 1.12 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

Aviation
018701.04 Safety and infrastructure improvements that
Dewitt Field, Old Town
Old Town Runway/Taxiway may include design, permitting and
2022 Municipal Airport $1,340,000
construction of Taxiway "B".
Reconstruction

022445.00 Highway Paving


Beginning at Abbot Street and extending
2022 Old Town Urban Highways Route 2A northeast 0.34 of a mile to Jefferson Street.
BACTS Sponsored.
HCP 2 Mill And Fill

Highway Safety and Spot


023971.00 Improvements
Located at the intersection of Route 2A and
2022 Old Town Urban Highways Center Street
Main Street and Route 2A and Water Street. $805,000
HCP 3 Intersection Improvements W/
Signal

025101.00
I-95 Interchange 53 Bridge (#6062) over
Highway-Bridges
2022 Old Town Route 16 Interstate 95. Located 0.33 of a mile north of $850,000
Bridge Painting Old Bennoch Road.
HCP 1

025531.00
I-95 NB/ Kirkland Road Bridge (#6059) over
Highway-Bridges
2022 Old Town Interstate 95 Northbound Kirkland Road. Located 0.79 of a mile north $400,000
Bridge Painting of the Orono town line.
HCP 1

025533.00
Route 43/ I-95 Bridge (#6061) over Interstate
Highway-Bridges
2022 Old Town Route 43 95. Located 0.63 of a mile north of Bennoch $750,000
Bridge Painting Road.
HCP 1

Highway Safety and Spot


025611.00
Improvements
Large culvert (#46853) located 0.40 of a mile
2023/24 Old Town Route 43 $900,000
Rural Highways east of the intersection of Kirkland Road.
HCP 4
Large Culvert Replacement

Highway Paving
025777.00
Rural Highways Beginning 0.11 of a mile north of College
2022 Old Town Route 2A
Avenue and extending north 0.94 of a mile.
Ultra-Thin Bonded Wearing
HCP 2
Course

122
ID/Year Municipality Scope Name Description Total Project Cost

025945.00
Highway Paving Beginning 0.34 of a mile northeast of
2022 Old Town Route 2A Pembroke Drive and extending northeast
Light Capital Paving 1.34 miles to Route 2.
HCP 2

Highway Safety and Spot Begining 0.05 of a mile south of Interstate 95


025999.00
Improvements Exit 193 northbound and extending north
Old Town,
2023/24 Interstate 95 0.60 of a mile. Continuing 0.08 of a mile north
Orono Rural Highways $1,080,000
of Interstate 95 Exit 193 southbound and
HCP 1 extending south 0.50 of a mile.
Lighting

Highway
024601.00 Construction/Rehabilitation
Old Town,
Various Locations State Police Weigh Station improvements.
2022 Pittsfield Interstate $1,010,000

Highway Rehabilitation

025619.00 Bicycle/Pedestrian New pedestrian crossings and sidewalk


repairs on Main Street between Westwood
2022 Orono On-Road Sidewalk/Trail Route 2/Pine Street Drive and Forest Avenue for 0.29 of a mile. $100,000
Improved pedestrian access on Pine Street
HCP 2, 3, 5 New Construction - PE Only for 0.06 of a mile.

026316.00 Bicycle/Pedestrian
Pedestrian crossing improvements on
Godfrey Drive/Stillwater
2022 Orono On-Road Sidewalk/Trail Godfrey Drive. Install sidewalk on the east
Avenue $100,000
side of Stillwater Avenue for 0.18 of a mile.
HCP 2, 5 Safety Improvements - PE Only

026348.00 Highway Paving


Beginning at the north intersection of Boulder
2023/24 Orono Urban Highways Route 2 Drive and extending north 0.76 of a mile to
the Old Town town line. BACTS Sponsored.
HCP 3 Mill And Fill

Highway Safety and Spot


022960.00
Improvements
Beginning 0.06 of a mile south of the Patten
2022 Patten Route 11 $117,000
Rural Highways town line and extending north 0.06 of a mile.
HCP 2
Drainage Improvements

Highway Safety and Spot


024241.00 Improvements
Large culvert (#46557) located 0.51 of a mile
2022 Patten Rural Highways Route 11
north of the Shin Pond Road. $100,000
HCP 2 Large Culvert Improvements -
PE Only

025887.00
Prentiss Twp T7 Highway Paving Beginning at Route 6 and extending
2023 R3 NBPP, Route 169 northeast 11.97 miles to the T8 R3 NBPP
Springfield Light Capital Paving town line.
HCP 4

Highway Safety and Spot


025111.00
Improvements Beginning 0.47 of a mile north of the Hersey
2023/24 Stacyville Route 11 Town Twp. town line and extending northeast $15,000
Rural Highways
0.15 of a mile.
HCP 4
Shoulder Improvements

123
ID/Year Municipality Scope Name Description Total Project Cost

025875.00
Highway Paving
Beginning at Route 143 and extending east
2023 Stetson Route 222
2.78 miles.
Light Capital Paving
HCP 4

Highway Safety and Spot


024263.00 Improvements
Large culvert (#995797) located 0.70 of a
2022 T6 R8 WELS Rural Highways Grand Lake Road
mile east of the T5 R8 WELS town line. $45,000
HCP 4 Large Culvert Improvements -
PE Only
Highway Safety and Spot
024247.00 Improvements
Large culvert (#46554) located 0.43 of a mile
2022 T6 R8 Wels Rural Highways Grand Lake Road
east of T5 R8 WELS town line. $60,000
HCP 4 Large Culvert Improvements -
PE Only
Highway Safety and Spot
023028.00 Improvements

2022 Veazie Rural Highways Route 2 Located 0.07 of a mile north of Main Street. $75,000
HCP 3 Slope Stabilization/Protection -
PE Only

022266.00
Mattagodus Bridge (#5116) over Mattagodus
Highway-Bridges
2023/24 Webster Plt Route 170 Stream. Located 0.43 of a mile southeast of $3,050,000
Bridge Replacement the Kingman Twp. town line.
HCP 4

124
Piscataquis
T10 R15 T10 R14 T10 R13 T10 R12 T10 R11 T10 R10 T10 R9
WELS WELS WELS WELS WELS WELS WELS

T9 R15 T9 R14 T9 R13 T9 R12 T9 R11 T9 R10 T9 R9


WELS WELS WELS WELS WELS WELS WELS

Soper
T8 R15 T8 R14 Eagle T8 R11 T8 R10 T8 R9
Mountain
WELS WELS Lake Twp WELS WELS WELS
Twp

T7 R15 T7 R14 T7 R13 T7 R12 T7 R11 T7 R10 T7 R9


WELS WELS WELS WELS WELS WELS WELS

Trout

Piscataquis
T6 R15 T6 R14 T6 R13 T6 R12 T6 R11 T6 R10
Brook
WELS WELS WELS WELS WELS WELS
Twp

T5 R15 T5 R14 Chesuncook T5 R12 T5 R11 Nesourdnahunk T5 R9


WELS WELS Twp WELS WELS Twp WELS

T4 R15
WELS T4 R14 T4 R13 T4 R12 T4 R11 T4 R10 T4 R9
WELS WELS WELS WELS WELS WELS

Northeast Mount
T3 R13 T3 R12 T3 R11 T3 R10 Katahdin
Carry Lobster WELS WELS
Twp WELS WELS Twp
Twp

T2 R12
TX R14
WELS
T2 R13 Rainbow T2 R10
Eas t M iddlesex WELS WELS Twp T2 R9 Piscataquis County
WELS
Canal WELS
Days Grant Tw p Population 16,800
Land Area (sq mi) 3,961
Academy
Grant Twp Spencer T1 R13 T1 R12 T1 R11 T1 R10 T1 R9
Bay Twp WELS WELS WELS WELS WELS
Bridges 127
Lily Highway Corridor Priority Miles
Bay Twp Frenchtown Shawtown TA R11 TA R10
Twp Twp WELS WELS HCP 2 70
HCP 3 28
Beaver Cove
Big
TB R11 TB R10 HCP 4 174
Bow doin WELS WELS
Moose Bowdoin College Grant
Twp College Grant Eas t Twp
West Twp
Ebeemee
T4 R9 Total HCP 1-4 272
Greenville NWP
Moosehead Katahdin Twp
Junction T7 R9 Iron Works
Twp Elliottsville NWP Twp
Twp Lake
Williamsburg
Brownville View
Shirley Plt
Tw p

Bowerbank
Willimantic Barnard
Twp
Monson
Medford
Milo
Blanchard Sebec
Twp
Guilford
Abbot Dover-Foxcroft Orneville
Kingsbury Atkinson Twp
Sangerville
Parkman

Wellington
Piscataquis
ID/Year Municipality Scope Name Description Total Project Cost

024971.00
Highway Paving
Beginning 0.98 of a mile southeast of Gales
2022 Abbot Route 6
Road and extending east 0.56 of a mile.
Light Capital Paving
HCP 2

024971.00
Abbot, Highway Paving
Beginning at Lily Bay Road and extending
2022 Greenville, Route 6
south 21.45 miles.
Monson, Shirley Light Capital Paving
HCP 2

Highway
025707.00 Construction/Rehabilitation Beginning at Lily Bay Road and extending
Abbot,
south 21.45 miles, then beginning 0.98 of a
2022 Greenville, Rural Highways Route 6
mile south of Gales Road and extending $100,000
Monson, Shirley
HCP 2 Full Depth Reclaim W/Emulsion south 0.56 of a mile.
- PE Only

Highway Paving
025763.00
Rural Highways Beginning 0.03 of a mile west of the Guilford
2022 Abbot, Guilford Route 6
town line and extending east 0.92 of a mile.
Ultra-Thin Bonded Wearing
HCP 2
Course

025941.00
Barnard Twp, Highway Paving
Beginning at Clark Cove Road and extending
2022 Bowerbank, Bowerbank Road
east 5.06 miles to Barnard Road.
Sebec Light Capital Paving
HCP 4

025941.00 Barnard Twp,


Brownville, Highway Paving
Sebec Village Beginning at Route 6 and extending north
2022 Sebec,
Road/Barnard Road 10.56 miles to Route 11.
Williamsburg Light Capital Paving
HCP 4 Twp

Ditching on the Sebec Village Road in Sebec,


WR 42646 Barnard Twp, Barnard Road in Barnard Twp. and
Drainage Maintenance Sebec Village Road,
Sebec, Williamsburg Twp., and Williamsburg Road in
2022 Barnard Road,
Williamsburg Brownville. Beginning at the intersection of $146,000
Williamsburg Road
HCP 4 Twp Route 6 in Sebec and extending 10.63 miles
to the intersection of Route 11.

024971.00 Beaver Cove, Highway Paving


Frenchtown Twp, Beginning at Pritham Avenue and extending
2022 Lily Bay Road
Greenville, Lily north 18.86 miles.
Bay Twp Light Capital Paving
HCP 4

WR 43476 Replacing culverts on Lily Bay Road In


Drainage Maintenance Greenville. Beginning 320 feet south of
Beaver Cove,
2022 Lily Bay Road Shoals Road and extending north 14.79
Greenville $24,000
miles to the Lily Bay Twp.-Frenchtown Twp.
HCP 4 town line.

025867.00
Brighton Plt, Highway Paving
Beginning at Route 151 and extending
2023 Harmony, Route 154
southeast 10.59 miles to Route 150.
Wellington Light Capital Paving
HCP 4

125
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


018810.00
Improvements
Located at the intersection of Church Street
2023/24 Brownville Church Street
Rural Highways and Stickney Hill Road. $300,000
HCP 4
Drainage Improvements

Highway Safety and Spot


020415.00
Improvements
2023/24 Brownville Route 11 Located 0.75 of a mile south of Airport Road.
Rural Highways $672,000
HCP 4
Slope Stabilization/Protection

025877.00
Highway Paving
Beginning at Route 11 and extending north
2023 Brownville Church Street
3.86 miles.
Light Capital Paving
HCP 4

025877.00
Highway Paving
Beginning at Church Street and extending
2023 Brownville Schoodic Lake Road
east 4.39 miles to Lake Avenue.
Light Capital Paving
HCP 4

025941.00
Brownville, Highway Paving Beginning 0.18 of a mile north of Church
2022 Ebeemee Twp, Route 11 Street and extending north 14.75 miles to
T4 R9 NWP Light Capital Paving Long A Twp. town line.
HCP 4

025877.00
Highway Paving
Beginning at Park Street and extending north
2023 Brownville, Milo Pleasant Street
6.99 miles to Church Street.
Light Capital Paving
HCP 4

WR 41356 Ditching on Route 15 in Charleston and


Drainage Maintenance Dover-Foxcroft. Beginning 0.28 of a mile
Charleston,
2022 Route 15 north of Old State Road in Charleston and
Dover-Foxcroft $98,000
extending to the intersection of Bear Hill
HCP 2 Road in Dover-Foxcroft.

023120.00
Highway-Bridges Dover Bridge (#5118) over Piscataquis River.
2023/24 Dover-Foxcroft Essex Street
Located 0.04 of a mile east of River Street. $8,880,000
Bridge Replacement
HCP 4

023555.00 Highway Paving


Beginning at Lincoln Street and extending
2022 Dover-Foxcroft Rural Highways Route 6
northeast 0.96 of a mile.
HCP 2 Mill And Fill

Highway Safety and Spot


025329.00
Improvements
Located at the intersection of Route 7 and
2023/24 Dover-Foxcroft Route 15
Rural Highways Route 15. $605,000
HCP 3
Safety Improvements

126
ID/Year Municipality Scope Name Description Total Project Cost

Highway Paving
025773.00
Rural Highways Beginning 0.19 of a mile south of Dyer Road
2022 Dover-Foxcroft Route 15
and extending north 4.79 miles.
Ultra-Thin Bonded Wearing
HCP 2
Course

026075.00 Highway Paving


Beginning 0.15 of a mile southeast of Bear
2023/24 Dover-Foxcroft Rural Highways Route 15 Hill Road and extending northwest 0.95 of a
mile.
HCP 2 Mill And Fill

WR 41086 Painting beam ends under Cass Notch


Bridge and Structural
Maintenance Crossing Bridge (#5287) on Pine Street in
2022 Dover-Foxcroft Pine Street
Dover-Foxcroft. Located 370 feet east of $65,000
HCP 4 Sangerville town line.

026480.00 Highway Paving


Dover-Foxcroft, Beginning 0.02 of a mile east of Sebec Shore
2023/24 Rural Highways Route 6
Guilford Road and extending east 2.25 miles.
HCP 2 1 1/4" Overlay

Aviation
018694.02
Greenville Municipal Safety and infrastructure improvements that
Greenville Runway/Taxiway $155,000
2023/24 Airport includes design and permitting Taxiway "C."
Reconstruction

Policy, Planning and Research


018694.03 Safety and infrastructure improvements that
Greenville Municipal
Greenville Airport - General may include an environmental assessment
2022 Airport $155,000
for the taxiway and apron.
Planning Studies

Aviation
018694.06 Safety and infrastructure improvements
Greenville Municipal
Greenville Navigation Aids/Lights including the design, permitting, and
2023/24 Airport $567,000
construction of AWOS III
New Construction

Highway Safety and Spot


024217.00
Improvements
Located at the intersection of Route 6/15 and
2023/24 Greenville Route 6/15
Rural Highways Lily Bay Road. $161,000
HCP 2
Flashing Beacon

WR 43045
Drainage Maintenance Ditching on Lily Bay Road. Beginning 0.24 of
2022 Greenville Route 6 a mile north of the junction of Cemetery Road $138,000
and extending south 13.89 miles.
HCP 4

WR 43199 Repairing wingwall on West Cove Bridge


Bridge and Structural (#3752) in Greenville which carries Routes 6
2022 Greenville Maintenance Route 6 over Wiggin Stream. Located 53 feet east of $78,000
Greenville-Moosehead Junction Twp. town
HCP 3 line.

127
ID/Year Municipality Scope Name Description Total Project Cost

025303.00
Guilford Memorial Bridge (#2337) over the
Highway-Bridges
2023/24 Guilford Route 6 Piscataquis River. Located 0.06 of a mile $300,000
Bridge Painting north of Elm Street.
HCP 2

025875.00
Highway Paving
Guilford, Beginning at Route 6 and extending east
2023 Hudson/Pleasant Avenue
Sangerville 1.45 miles to Main Street.
Light Capital Paving
HCP 4

Highway Safety and Spot


021794.00
Improvements
Large culvert (#46502) located 0.22 of a mile
2023/24 Kingsbury Plt Route 16
Rural Highways east of the Mayfield Twp. town line. $908,000
HCP 4
Large Culvert Replacement

Replace wearing surface on Kingsbury


WR 42025 Bridge and Structural Bridge (#3290) in Kingsbury Plt. which
Kingsbury Plt Maintenance Hotel Drive carries Hotel Drive over Kingsbury Stream.
2022 $83,000
Located 210 feet north of Wellington Road in
Kingsbury Plt.

020502.01
Old Toll Bridge (#2867) over Piscataquis
Highway-Bridges
2022 Milo Route 6 River. Located 0.35 of a mile northwest of $10,800,000
Bridge Replacement Route 11. FHWA BUILD Grant recipient.
HCP 2

025209.00 Canal Bridge (#2124), Second West Opening


Bridge (#2931), Milo West Opening Bridge
Highway-Bridges
2022 Milo Route 6 (#2573), East Opening Bridge (#2572) over $300,000
Bridge Improvements - PE Only the Sebec River. Various locations on Route
HCP 2 6.

Rail
025911.00
Rail/Highway Crossings Railroad crossing (#051206P) located 0.20 of
Milo First Street $375,000
2022 a mile east of Ferry Road.
Signal Improvements
(Rail/Highway Xing)

WR 43110
Drainage Maintenance Replacing culverts (#111032), (#116605),
2022 Monson, Shirley Route 6 (#116599), (#110988) on Route 6 in Shirley $17,000
and Monson.
HCP 2

Highway Safety and Spot


022958.00
Improvements
Large culvert (#46300) located 0.26 of a mile
2023/24 Parkman Route 150 $1,210,000
Rural Highways north of Wellington Road.
HCP 3
Large Culvert Improvements

Highway Safety and Spot


Improvements
026578.00
Site improvements that will serve the general
T1 R9 WELS Rural Highways Scenic Byway Gateway
2023/24 public. $300,000
Rest Area
Construction/Improvements

128
Sagadahoc

Richmond

Bowdoin

Bowdoinham

Woolwich
Topsham

Sagadahoc
Bath

Sagadahoc County West Bath


Arrowsic
Population 35,634
Land Area (sq mi) 254
Bridges 99
Highway Corridor Priority Miles
HCP 1 64
HCP 2 3
HCP 3 36
HCP 4 117

Phippsburg
Total HCP 1-4 220 Georgetown
Sagadahoc
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025663.00 Improvements Beginning 0.08 of a mile south of Vale Road
and extending south 0.39 of a mile. Including
2022 Arrowsic Rural Highways Route 127 large culvert (#46976). Continuing 2.95 miles
$105,000
south and extending south 0.25 of a mile.
HCP 4 Highway Improvement - PE Including large culvert (#270179).
Only

WR 43619 Replacing beam supports on Max L. Wilder


Bridge and Structural Memorial Bridge (#2026) in Arrowsic which
2022 Arrowsic Maintenance Route 127 carries Arrowsic Road over Sasonoa River.
$300,000
Located 280 feet southeast of Bailey Bluff
HCP 4 Drive.

Highway
021664.00 Beginning 0.08 of a mile southeast of
Construction/Rehabilitation
Richardson Street and extending northwest
2023/24 Bath State Road
Rural Highways 0.15 of a mile, including 0.02 of a mile on $1,550,000
HCP 1, 3, 4 Richardson Street.
Intersection Reconstruction

System Operations by Others Transit Administrative and Operating


024651.02
Rural Transit Admin/ Assistance for Federal Transit Administration
Bath Transit - General $143,000
2022 Operations §5311 for statewide non-urbanized transit.
Operating Assistance West's Transportation ME-2020-027.

024959.00
Highway Paving Beginning 0.28 of a mile north of New
2022 Bath Old Brunswick Road Meadows Road and extending south 1.55
Light Capital Paving miles.
HCP 4

System Operations by Others


025245.00 Transit Administrative and Operating
Rural Transit Admin/
Bath Transit - General Assistance for Federal Transit Administration $143,000
2023 Operations
§5311 for non-urbanized transit. City of Bath.
Operating Assistance

025487.00 Bicycle/Pedestrian New sidewalks along the north and


southbound sections of Leeman Highway to
2022 Bath On-Road Sidewalk/Trail Leeman Highway
close gaps in the city's existing sidewalk $180,000
HCP 1 New Construction - PE Only network.

026334.00 Bicycle/Pedestrian
Sidewalks on Washington Street, Union
Washington Street/Union
2022 Bath On-Road Sidewalk/Trail Street, and Castine Avenue. Including $100,000
Street/Castine Avenue
pedestrian crossing improvements.
HCP 4, 5 Safety Improvements - PE Only

024959.00
Highway Paving
Bath, Beginning 0.08 of a mile south of High Street
2022 Route 209
Phippsburg and extending south 2.58 miles.
Light Capital Paving
HCP 3

026160.00
Lewis Bridge (#5396) over West Cathance
Highway-Minor Spans
2023/24 Bowdoin Route 125 Stream. Located 0.41 of a mile west of Deer $1,500,000
Bridge Replacement Run Road.
HCP 4

129
ID/Year Municipality Scope Name Description Total Project Cost

025099.00
Abagadasset Bridge (#5493) over the
Highway-Bridges
2022 Bowdoinham Route 24 Abagadasset River. Located 0.15 of a mile $150,000
Bridge Improvements - PE Only east of Carding Machine Road.
HCP 4

Ports-Harbors
025203.00
Located on Railroad Avenue off of River
Bowdoinham Piers, Floats and Fenders Railroad Avenue
2022 Road. $240,000
New Construction

WR 43959 Tree and Brush removal on Route 24 in


Custodial Maintenance Bowdoinham. Beginning at the Topsham-
2022 Bowdoinham Route 25 Bowdoinham town line extending west 10.42
$125,000
miles to the Bowdoinham-Richmond town
HCP 4 line.

025863.00
Highway Paving
Bowdoinham, Beginning at the Topsham town line and
2023 Route 24
Richmond extending north 10.43 miles.
Light Capital Paving
HCP 4

024959.00
Highway Paving
Bowdoinham, Beginning 0.01 of a mile north of Loop Road
2022 Route 24
Topsham and extending north 3.08 miles.
Light Capital Paving
HCP 4

WR 42014 Ditching on Route 24 in Bowdoinham,


Bowdoinham, Drainage Maintenance Richmond and Gardiner. Beginning at the
2022 Gardiner, Route 24 $75,000
Bowdoinham-Topsham town line and
Richmond
HCP 4 extending north 18.00 miles.

Ports-Harbors
026218.00
Perkins Twp
Piers, Floats and Fenders Swan Island Pier Located on Swans Island.
2023/24 Swan Island $400,000
Rehabilitation

Ports-Harbors
020848.00
Pier rehabilitation, located on Fort Popham
Phippsburg Piers, Floats and Fenders Popham Road Pier
2023/24 Pier. $240,000
Rehabilitation

024959.00
Highway Paving
Beginning 0.40 of a mile north of Sam Day
2022 Phippsburg Route 209
Hill Road and extending south 7.32 miles.
Light Capital Paving
HCP 3, 4

024959.00
Highway Paving
Beginning at Popham Road and extending
2022 Phippsburg Route 216
south 2.28 miles.
Light Capital Paving
HCP 4

130
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot Beginning 0.71 of a mile east of Route 216
025665.00 Improvements extending east 0.16 of a mile including large
culvert (#1017939); Beginning 1.01 miles
2022 Phippsburg Rural Highways Route 209
east of Parker Head Road extending east $105,000
HCP 4 Highway Improvement - PE 0.73 of a mile; Beginning at Fort Baldwin
Only Road extending east 0.11 of a mile.

Highway Safety and Spot


024309.00
Improvements
Remove railroad abutments. Located 0.04 of
2022 Richmond Route 24
Rural Highways a mile north of Route 197. $102,000
HCP 4
Safety Improvements

025069.00
Stewart Bridge (#6186) over Abagadassett
Highway-Bridges
2023/24 Richmond Alexander Reed Road River. Located 0.52 of a mile southeast of $1,200,000
Bridge Replacement Brown Road.
HCP 4

Highway Safety and Spot


023783.00 Improvements
Located at the intersection of Route 201 and
2022 Topsham Urban Highways Route 201
Route 24. $421,000
HCP 2 Intersection Improvements W/
Signal

024641.01 Highway Paving Municipal Partnership Initiative Program.


Beginning 0.58 of a mile north of Route 24B
2022 Topsham Urban Highways Route 201
and extending north 1.00 mile to 295
HCP 2, 3 1 1/4" Overlay Overpass Bridge (#6308).

Highway Safety and Spot


025395.00
Improvements
Interstate 295 Large culvert (#927086) located 1.26 miles
2023/24 Topsham $400,000
Rural Highways Northbound north of Interstate 295 Exit 31 on-ramp.
HCP 1
Large Culvert Rehabilitation

Highway Paving
025719.00
Beginning 0.02 of a mile north of Old Augusta
Rural Highways
2022 Topsham Route 201 Road and extending north 3.67 miles to the
Highway Cyclical Pavement Bowdoin town line.
HCP 3
Resurfacing

026138.00 Highway System Operations


Route 196/Topsham Fair Traffic Signal modifications on Route 196 and
2024 Topsham Highways - General
Mall Road Topsham Fair Mall Road. $1,210,000
HCP 1, 2, 5 System Operations

026268.00 Highway Paving


Beginning at Smith Road and extending
2023/24 Topsham Rural Highways Route 196
southeast 0.99 of a mile.
HCP 1 Mill And Fill

Repairing wearing surface. Muddy River


WR 43350 Bridge and Structural Bridge (#3825) in Topsham which carries
Topsham Maintenance Foreside Road Foreside Road over the Muddy River in
2022 $45,000
Topsham. Located 0.24 of a mile north of
Philippon Drive.

131
ID/Year Municipality Scope Name Description Total Project Cost

024959.00
Highway Paving
Beginning at Meadow Brook Road and
2022 West Bath Berry's Mill Road
extending north 4.51 miles to State Road.
Light Capital Paving
HCP 4

024959.00
Highway Paving Beginning at Brighams Cove Road and
2022 West Bath Campbell Pond Road extending north 0.26 of a mile to Birch Point
Light Capital Paving Road.
HCP 4

024959.00
Highway Paving
Beginning at Old Brunswick Road and
2022 West Bath New Meadows Road
extending south 0.76 of a mile.
Light Capital Paving
HCP 4

Highway
025267.00
Construction/Rehabilitation
Located at the intersection of Route 1 and
2023/24 Woolwich Route 1
Rural Highways Nequasset Road. $900,000
HCP 1
Intersection Reconstruction

132
Big Te n
Tw p
T10 R 16
W E LS
Somerset
T9 R1 7 T9 R1 6
T9 R 18
W E LS W E LS
WE LS

T8 R1 8 T8 R1 7 T8 R1 6
T8 R1 9 W E LS W E LS W E LS
W EL S

T7 R1 9 T7 R1 8 T7 R1 7 T7 R1 6
W E LS W E LS W E LS W E LS

Sa int
Big S ix T6 R1 8 T6 R1 7
Jo hn
Tw p W E LS W E LS
Tw p
Rus s ell
T 5 R 19 T5 R1 8 T5 R1 7
Po nd
T5 R 20
WELS W E LS W E LS
WE LS Tw p
Elm
Dole C o m s to ck T4 R1 7 Stream
T4 R 5
Broo k W E LS Tw p
NB KP
Tw p
Tw p
Se b oo m oo k
Pittston Plymouth Tw p
H am m on d
Ac ad em y Twp
Tw p
Gra nt
P ren tis s
Twp T 4
R4 N B K P Bi g W
Ald er So ldie rto wn Wes t
Mid dles ex Tw p
B ald Broo k Tw p T2
Sa nd y M o u n ta in Ca nal Gran t
Tw p
Ba y Tw p T4 R 3 R3 N B K P
Tom h egan
Somerset County
Tw p
M oos e Th o rn d ik e Bras s ua
Tw p
Population 50,592
Riv er Tw p Tw p
D e nn isto w n Land Area (sq mi) 3 ,9 2 4
Fors y th Pl t
Tw p Lon g Ta u nto n &
S andw ic h Ra y nh a m A ca d e my Bridges 278
Po nd A ca dem y Gra n t
Attea n Jackman Tw p
Highway Corridor Priority Miles
Gr ant T wp

Hole b Tw p Sapling
Tw p Parlin M ise ry Twp HCP 1 181
B r a d s tre e t Pond Twp Tw p
T5 R 7
Appleton BK P W K R Tw p
Johnson Chase In dia n HCP 2 39
Twp Stream St re a m
U p p e r Mountain Tw p
Tw p
HCP 3 91
T5 R6 H ob bs tow n E n c h a n te d Twp
BK P Tw p Tw p Sq ua re to w n HCP 4 296
WKR W es t M o xie
Tw p
Lower Fork s P lt
T3 R5 Enchanted Go r e
Kin g & BK P Ea st
Ba rtlett
Twp
The M ox ie Total HCP 1-4 607
WKR Bow to wn
Tw p Pie rc e Tw p Fork s Tw p
T3 R4 Po nd Plt
Flagstaff BK P Tw p B ald
Twp WKR M o u n ta in
Ca rryin g Caratun k

Somerset
Dea d Tw p T2 R 3
Bige low Pla ce
Tw p Riv er To w n Tw p
Tw p P lea s ant M ay fie ld
Tw p
Ridge
P lt M os co w
High lan d
Plt
Bin gh a m Brigh to n
Plt Cambridge
Lexington Con c ord
Twp Tw p Riple y
Harm on y
Athe ns Sa int
So lon
New Em b de n Alb an s
Po rtlan d
Hartland
Cornv ille
Pa lm yra
An so n M adis on
De tro it
Skowheg an Pittsfield
Stark s C anaan
N o rri dg e w o ck

Me rce r
Smithfield Fairfield
Somerset
ID/Year Municipality Scope Name Description Total Project Cost

023200.00
Highway-Bridges Robert Garland Bridge (#2615) over
2023/24 Anson Route 201A Carrabassett River. Located 0.12 of a mile $1,060,000
Bridge Wearing Surface north of Route 234.
HCP 2 Replacement

025931.00
Highway Paving
Beginning at Embden Pond Road and
2022 Anson Route 16
extending east 0.43 of a mile to Route 8.
Light Capital Paving
HCP 3

026069.00 Highway Paving


Beginning at Main Street and extending north
2023/24 Anson Rural Highways Route 201A
4.60 miles.
HCP 2 1 1/4" Overlay

026113.00
Highway-Bridges Bicentennial Memorial Bridge (#2491) over
2023/24 Anson, Madison Route 8/43/148/201A Kennebec River. Located on the Madison- $1,000,000
Bridge Wearing Surface Anson town line.
HCP 2 Replacement

WR 43252
Drainage Maintenance Ditching on Route 43 in Athens. Beginning at
2022 Athens Route 43 the junction of Route 150 and extending $60,000
southeast 11.25 miles.
HCP 4

025867.00
Athens, Brighton Highway Paving
Beginning at Route 150 and extending north
2023 Plt, Mayfield Route 151
12.90 miles to Route 16.
Twp Light Capital Paving
HCP 3, 4

Highway Paving
025839.00
Athens, Rural Highways Beginning 0.72 of a mile south of James
2023/24 Route 150
Cornville Road and extending north 4.00 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

025867.00
Athens, Highway Paving
Beginning at Route 150 and extending east
2023 Cornville, Route 43
11.95 miles to Route 152.
Hartland Light Capital Paving
HCP 4

Highway Paving
025841.00
Athens, Rural Highways Beginning 0.04 of a mile north of Academy
2023/24 Route 150
Harmony Street and extending east 8.91 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Paving Beginning at the Austin Stream Bridge


024905.00
Bingham, (#2027) and extending north 4.39 miles.
Rural Highways
2022 Caratunk, Route 201 Continuing 0.60 of a mile south of Spruce
Moscow Ultra-Thin Bonded Wearing Grove Road and extending north 3.76 miles
HCP 1 to The Forks Plt. town line.
Course

133
ID/Year Municipality Scope Name Description Total Project Cost

WR 42699 Repairing catch basins on Route 201 in


Bingham, Drainage Maintenance Bingham. Beginning 50 feet south of Bates
2022 Route 201
Moscow Street and extending north 1.00 mile into $20,000
HCP 1 Moscow.

Highway Safety and Spot


022835.00
Improvements
Large culvert (#46672) located 0.67 of a mile
2023/24 Brighton Plt Route 154
Rural Highways west of the Wellington town line. $725,000
HCP 4
Large Culvert Replacement

025987.00
Parkman Road Bridge (#2276) over
Highway-Bridges
2023/24 Cambridge Route 150 Ferguson Stream. Located 0.12 of a mile $1,500,000
Bridge Improvements north of Route 152.
HCP 3

026478.00
Hilton Bridge (#1069) over Jimmy Brook.
Highway-Minor Spans
2023/24 Cambridge Chandler Hill Road Located 0.52 of a mile southwest of Goose $1,500,000
Bridge Replacement Flat Road.
HCP 4

WR 42951 Ditching and replacing culverts on Route 150


Drainage Maintenance in Cambridge. Beginning 320 feet south of
2022 Cambridge Route 150 $31,000
North Road and extending south 0.70 of a
HCP 3 mile.

025945.00
Highway Paving
Cambridge, Dexter Road/Chandler Beginning at Ripley Road and extending
2022
Ripley Hill Road northeast 7.06 miles to the Dexter town line.
Light Capital Paving
HCP 4

025867.00
Highway Paving
Canaan, Beginning at Route 2 and extending north
2023 Route 23
Hartland 10.42 miles to Route 43.
Light Capital Paving
HCP 4

WR 42698
Drainage Maintenance Cleaning under guardrail on Route 16.
2022 Concord Twp Route 16 Beginning at the Concord-Embden town line $21,000
and extending north 4.30 miles to Cool Road.
HCP 4

Highway Paving
025729.00
Cornville, Rural Highways Beginning 0.03 of a mile north of Libby Lane
2022 Route 150
Skowhegan and extending north 5.72 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

025871.00
Highway Paving
Cornville, Beginning 1.17 miles north of Route 2 and
2023 West Ridge Road
Skowhegan extending north 8.61 miles to Route 150.
Light Capital Paving
HCP 4

134
ID/Year Municipality Scope Name Description Total Project Cost

023659.00
Village Bridge (#3309) over East Branch
Highway-Bridges
2023/24 Detroit Route 69 Sebasticook River. Located 0.26 of a mile $1,620,000
Bridge Improvements northwest of Troy Road.
HCP 4

025869.00
Highway Paving Beginning at the New Portland town line and
2023 Embden Katie Crotch Road extending southeast 0.54 of a mile to Route
Light Capital Paving 16.
HCP 4

Highway Safety and Spot


026370.00
Improvements
Large culvert (#46730) located 0.36 of a mile
2023/24 Embden Crosstown Road
Rural Highways east of Dunbar Hill Road. $610,000
HCP 4
Large Culvert Replacement

WR 42781 Repairing abutment on Boyington Bridge


Bridge and Structural
Maintenance (#2090) in Embden which carries Route 16
2022 Embden Route 16
over Martin Stream. Located 260 feet north of $23,000
HCP 4 the junction of 201A.

023192.00 I-95/ MCRR Bridge (#5999) over Lower


Highway-Bridges
Fairfield Interstate 95 Northbound Kennebec River. Located 0.10 of a mile east $600,000
2023/24
Bridge Painting of Interstate 95 northbound Exit 133.

025123.00 Highway Paving


Beginning at Route 201 and extending north
2023/24 Fairfield Urban Highways Route 139 3.06 miles. Continuing at Middle Road and
extending north 2.04 miles.
HCP 2 Mill And Fill

026432.00 Highway Paving


Beginning 0.01 of a mile north of the
2023/24 Fairfield Rural Highways Route 201/201S Waterville town line and extending north 2.77
miles.
HCP 1, 2 Mill And Fill

WR 43543 Repairing and painting on Black Mills Bridge


Bridge and Structural
Maintenance (#3968) in Fairfield which carries Middle
2022 Fairfield Route 104
Road over Martin Stream. Located 315 feet $75,000
HCP 4 north of Breton Hill Road.

WR 42786 Ditching and replacing culverts. Beginning at


Farmington, Drainage Maintenance the Farmington urban compact line on Route
2022 Route 43
Industry, Starks 43 and extending northeast 8.88 miles to the $328,000
HCP 4 Anson-Starks town line.

Communication and Outreach


025081.00 Water Street Bridge (#1097) over Overflow
Hartland Planning Water Street BR Sebasticook. Located 0.05 of a mile west $25,000
2022
of Commercial Street.
Municipal/Public Outreach

135
ID/Year Municipality Scope Name Description Total Project Cost

WR 40957 Cleaning under guardrails and grading


Drainage Maintenance shoulders on Route 152 in Hartland.
2022 Hartland Route 152
Beginning at the intersection of Route 43 and $21,000
HCP 4 extending south 1.48 miles.

Highway
025115.00
Construction/Rehabilitation
Hartland, Beginning 0.22 of a mile north of Ford Hill
2023/24 Route 152
Palmyra Rural Highways Road and extending north 1.44 miles. $455,000
HCP 4
PMRAP DOT Pugmill

WR 43193 Ditching and replacing culverts on Long Falls


Drainage Maintenance Dam Road. Beginning at the Highland Plt.-
2022 Highland Plt Long Falls Dam Road Lexington Twp. town line and extending
$177,000
south 6.17 miles to the Carrabassett Valley-
HCP 4 Highland Plt. town line.

Replacing culvert (#165012) in Industry on


WR 40891 Route 43. Located at the intersection of
Drainage Maintenance Church Street and Industry Road. Replacing
2022 Industry, Starks Route 43
culvert (#1039414) on Route 43 in Starks. $16,000
HCP 4 Located 0.44 of a mile northeast of Branns
Mill Road.

Airport
018696.04 Safety and infrastructure improvements that
Jackman Airport - General Newton Field Airport may include acquisition of snow removal
2022 $155,000
equipment.
Capital Equipment Purchase

Aviation
018696.09 Safety and infrastructure improvements that
Jackman Runway/Taxiway Newton Field Airport include design, construct, and overlay of
2023/24 $412,000
terminal apron. (phase 2).
Rehabilitation

Aviation
018696.17 Safety and infrastructure improvements that
Jackman Runway/Taxiway Newton Field Airport include design, construct, and overlay of
2022 $587,000
terminal apron and taxiway.
Reconstruction

026150.00
A.J. Albee Bridge (#3042) over Michael
Highway-Bridges
2023/24 Lexington Twp Long Falls Dam Road Brook. Located 0.03 of a mile north of Old $2,100,000
Bridge Replacement County Road.
HCP 4

Highway Safety and Spot


026368.00
Improvements
Large culvert (#46348) located 0.34 of a mile
2023/24 Lexington Twp Long Falls Dam Road
Rural Highways north of Back Road. $136,000
HCP 4
Large Culvert Replacement

023637.00 Parlin Stream No. 2 Bridge (#6025) over


Highway-Bridges
Parlin Pond Stream. Located 3.14 miles west
2022 Long Pond Twp Route 6
of the Sandwich Academy Grant Twp. town $423,000
Bridge Substructure
HCP 3 Rehabilitation line.

136
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


025399.00 Improvements
Beginning at the intersection of Routes
2022 Madison Rural Highways Route 43 8/148/201A and extending east 0.68 of a $60,000
mile.
HCP 4 Drainage Improvements - PE
Only
Highway Safety and Spot
025401.00 Improvements
Beginning 0.12 of a mile north of Father
2022 Madison Rural Highways Route 201A Rasle Road and extending north 0.93 of a $120,000
mile.
HCP 2 Drainage Improvements - PE
Only

WR 42944 Ditching and installing underdrain on East


Drainage Maintenance Madison Road. Beginning 0.60 of a mile
2022 Madison East Madison Road
north of Bagley Road and extending north $18,000
HCP 4 0.50 of a mile.

WR 43119
Drainage Maintenance Ditching and replacing culverts on Route 148
2022 Madison Route 148 in Madison. Beginning at the intersection of $55,000
Route 201 and extending west 4.61 miles.
HCP 3

026496.00 Highway Paving


Madison, Beginning 0.09 of a mile north of Sophie May
2023/24 Rural Highways Route 201A
Norridgewock Lane and extending north 6.32 miles.
HCP 2 1 1/4" Overlay

025871.00
Highway Paving
Madison, Beginning at Route 201 and extending north
2023 East Madison Road
Skowhegan 7.97 miles to Route 43.
Light Capital Paving
HCP 4

022254.00
Carrabassett Bridge (#5131) over the
Highway-Bridges
2023/24 New Portland Route 146 Carrabassett River. Located 0.02 of a mile $1,250,000
Bridge Rehabilitation north of New Portland Road.
HCP 4

025869.00
Highway Paving
Beginning at the Embden town line and
2023 New Portland Katie Crotch Road
extending northwest 1.46 miles to Route 146.
Light Capital Paving
HCP 4

025869.00
Highway Paving
Beginning at Bog Road and extending
2023 New Portland Route 146
southwest 6.27 miles to Route 27.
Light Capital Paving
HCP 4

Aviation
018700.04 Safety and infrastructure improvements that
Central Maine Regional
Norridgewock Runway/Taxiway may include taxilane reconstruction - phase
2023/24 Airport $343,000
1.
Reconstruction

137
ID/Year Municipality Scope Name Description Total Project Cost

Aviation
018700.07
Central Maine Regional Airfield crack sealing and pavement
Norridgewock Runway/Taxiway
2022 Airport markings. $130,000
Crack Sealing

026300.00 Bicycle/Pedestrian
Beginning at Perkins Street and extending
2022 Norridgewock On-Road Sidewalk/Trail Route 2
east 0.53 of a mile. $135,000
HCP 1 Rehabilitation - PE Only

Highway Safety and Spot


026366.00
Improvements
Beginning 0.03 of a mile west of Mechanic
2023/24 Norridgewock Route 2
Rural Highways Street and extending east 0.02 of a mile. $395,000
HCP 1
Large Culvert Rehabilitation

Beginning at Upper Main Street and


026500.00 Highway Paving extending northeast 0.64 of a mile on Route
2. Beginning at Route 2 and extending north
2023/24 Norridgewock Rural Highways Route 2/Route 201A
0.19 of a mile on Route 201A. Beginning 0.01
HCP 1, 2 Mill And Fill of a mile south of River Road and extending
north 0.10 of a mile on Route 201A.

022256.00
Hanson Bridge (#1035) over Smith Brook.
Highway-Minor Spans
2023/24 Palmyra Palmyra Road Located 0.34 of a mile south of Spring Hill $1,700,000
Bridge Replacement Road.
HCP 4

Highway Safety and Spot


024209.00
Improvements
Located at the intersection of Route 2 and
2022 Palmyra Route 2 $744,000
Rural Highways Route 152.
HCP 1
Safety Improvements

025315.00
Route 100 / I-95 Bridge (#5957) over
Highway-Bridges
2023/24 Palmyra Route 100 Interstate 95. Located 0.86 of a mile north of $6,520,000
Bridge Replacement Karen Street.
HCP 1

026468.00 Highway Paving


Palmyra, Beginning 0.14 of a mile west of Route 11
2023/24 Interstate Interstate 95 Southbound
Pittsfield and extending south 7.15 miles.
HCP 1 1 1/2" Overlay

Aviation
018703.01 Safety and infrastructure improvements that
Pittsfield Municipal
Pittsfield Runway/Taxiway may include crack seal and pavement
2023/24 Airport $361,000
markings.
Crack Sealing

Highway Beginning 0.02 of a mile south of Nichols


021812.00
Construction/Rehabilitation Street and extending north 1.85 miles.
2022 Pittsfield Route 11 Project funding is contingent on $4,420,000
Rural Highways
Congressionally Designated Spending
HCP 4 approval.
Highway Rehabilitation

138
ID/Year Municipality Scope Name Description Total Project Cost

023603.00 I-95 SB/ Route 152 and MCRR Bridge


Highway-Bridges
Pittsfield Interstate 95 Southbound (#5986) over Route 152. Located 1.24 miles
2022 $3,710,000
Bridge Deck Replacement west of the Palmyra town line.

023607.00
I-95 NB/ North Main Street Bridge (#5989)
Highway-Bridges
2022 Pittsfield Interstate 95 Northbound over Madawaska Avenue. Located 0.38 of a $2,310,000
Bridge Deck Replacement mile west of the Palmyra town line.
HCP 1

023609.00
I-95 SB/ North Main Street Bridge (#1445)
Highway-Bridges
2022 Pittsfield Interstate 95 Southbound over Madawaska Avenue. Located 0.36 of a $2,600,000
Bridge Rehabilitation mile west of the Palmyra town line.
HCP 1

023613.00
I-95 SB/ Sebasticook River Bridge (#1446)
Highway-Bridges
2022 Pittsfield Interstate 95 Southbound over Interstate 95 southbound. Located 1.06 $4,380,000
Bridge Rehabilitation miles south of the Palmyra town line.
HCP 1

026109.00
Farnham Bridge (#2274) over Farnham
Highway-Minor Spans
2023/24 Pittsfield Route 11/100 Brook. Located 0.12 of a mile north of Webb $1,500,000
Bridge Replacement Road.
HCP 4

026111.00
Osborne Bridge (#2634) over Farnham
Highway-Minor Spans
2023/24 Pittsfield Route 11/100 Brook. Located 0.18 of a mile north of Webb $1,500,000
Bridge Replacement Road.
HCP 4

WR 43821 Replacing curb, repairing rail, and piers on


Bridge and Structural
Maintenance Hunnewell Bridge (#5778) in Pittsfield which
2022 Pittsfield Route 69 $56,000
carries Route 69 over West Branch
HCP 4 Sebasticook River.

Communication and Outreach


025067.00
Fish Bridge (#1034) over Indian Stream.
Saint Albans Planning Webb Ridge Road
2022 Located 0.32 of a mile east of Route 23. $25,000
Municipal/Public Outreach

026586.00
St. Albans Fish Bridge (#1034) over Indian
Highway-Bridges
2022 Saint Albans Webb Ridge Road Stream. Located 0.35 of a mile northeast of $130,000
Bridge Improvements - PE Only Route 152.
HCP 5

WR 43227 Replacing culverts on Route 43 in Saint


Drainage Maintenance Albans. Beginning 0.34 of a mile east of
2022 Saint Albans Route 43
Hartland Road and extending east 4.45 $34,000
HCP 4 miles.

139
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


022978.00 Improvements
Large culvert (#47168) located 0.09 of a mile
2022 Skowhegan Rural Highways Route 104
north of Heritage Drive. $95,000
HCP 4 Large Culvert Improvements -
PE Only
Highway Safety and Spot
024339.00 Improvements
Located at the intersection of Madison
2023/24 Skowhegan Urban Highways Route 2W
Avenue and Commercial Street. $902,000
HCP 1 Intersection Improvements W/
Signal

Bicycle/Pedestrian Beginning 0.38 of a mile northeast of Mary


025277.00
Street and extending northeast 0.29 of a mile
On-Road Sidewalk/Trail Norridgewock
2022 Skowhegan on Norridgewock Avenue, and 0.09 of a mile
Avenue/Pleasant Street $164,000
Multimodal Improvements - PE on Pleasant Street and extending to Coburn
HCP 4, 5 Avenue.
Only

026115.00
Smith Pond Bridge (#6152) over West
Highway-Bridges
2023/24 Skowhegan Route 150 Branch Wesserunsett Stream. Located 0.36 $1,400,000
Bridge Deck Replacement of a mile north of Molunkus Road.
HCP 3

WR 42652 Ditching and grading shoulders on Malbons


Drainage Maintenance Mills Road in Skowhegan. Beginning at the
2022 Skowhegan Malbons Mills Road $44,000
Skowhegan-Cornville town line and
HCP 4 extending south 2.08 miles.

022260.01
Main Street Bridge (#2504) over Fall Brook.
Highway-Bridges
2022 Solon Route 201 Located 0.01 of a mile west of Brook Street. $4,730,000
Bridge Replacement FHWA INFRA Grant recipient.
HCP 1

WR 42807 Ditching and replacing culverts on Route 148


Drainage Maintenance in Starks. Beginning in Industry near the
2022 Starks Route 148 $69,000
Industry-Starks town line and extending north
HCP 4 0.65 of a mile.

Rail
025907.00 Taunton &
Rail/Highway Crossings Railroad crossing (#847792N) located 2.53
Raynham Route 6 $375,000
2022 miles northeast of Adams Dam Road.
Academy Grant Signal Improvements
(Rail/Highway Xing)

022362.00
The Forks Bridge (#2841) over the Upper
The Forks Plt, Highway-Bridges
2023/24 Route 201 Kennebec River. Located 0.03 of a mile north
West Forks Plt $790,000
Bridge Rehabilitation of Lake Moxie Road.
HCP 1

Highway Paving
025771.00
Rural Highways Beginning 0.06 of a mile north of The Forks
2022 West Forks Plt Route 201
Plt. town line and extending north 7.41 miles.
Ultra-Thin Bonded Wearing
HCP 1
Course

140
Waldo

Burnham
Troy
Winterport

Jackson
Monroe
Frankfort
Unity Thorndike

Prospect

Brooks
Knox Swanville
Stockton
Springs
Freedom

Searsport
Waldo

Montville
Morrill

Palermo Belfast

Belmont
Liberty
Searsmont
Northport

Lincolnville

Waldo County
Population 39,694
Land Area (sq mi) 730 Islesboro

Bridges 173
Highway Corridor Priority Miles
HCP 1 80
HCP 2 1
Waldo

HCP 3 25
HCP 4 265

Total HCP 1-4 371


Waldo
ID/Year Municipality Scope Name Description Total Project Cost

Aviation
018685.05
Safety and infrastructure improvements that
Belfast Runway/Taxiway Belfast Municipal Airport
2023/24 include crack seal work. $47,000
Crack Sealing

System Operations by Others Transit Administrative and Operating


024651.10 Assistance for Federal Transit Administration
Rural Transit Admin/
Belfast Transit - General §5311 for statewide non-urbanized transit.
2022 Operations $707,000
Waldo Community Action Partners dba Mid-
Operating Assistance Coast Public Transportation ME-2020-027.

System Operations by Others Transit Administrative and Operating


025229.00 Assistance for Federal Transit Administration
Rural Transit Admin/
Belfast Transit - General §5311 for non-urbanized transit. Waldo
2023 Operations $707,000
Community Action Partners dba Mid-Coast
Operating Assistance Public Transportation.

025295.00 Highway-Bridges Veterans Memorial Bridge (#5750) over the


Belfast Route 1 Passagassawaukeag River. Located 0.27 of
2023/24 $250,000
Bridge Superstructure a mile east of High Street.
Rehabilitation

025865.00
Highway Paving
Belfast, Morrill, Beginning at Route 131 and extending east
2023 Poors Mill Road
Waldo 5.87 miles.
Light Capital Paving
HCP 4

Highway Safety and Spot


026454.00
Improvements
Beginning 0.12 of a mile west of Lincolnville
2023/24 Belmont Route 3 $100,000
Rural Highways Road and extending east 0.17 of a mile.
HCP 1
Drainage Improvements

025865.00
Belmont, Morrill, Highway Paving
Beginning at Route 3 and extending
2023 Swanville, Route 131
northeast 15.56 miles to Route 141.
Waldo Light Capital Paving
HCP 4

025939.00
Highway Paving
Belmont, Beginning at Route 173 and extending
2022 Linconville Road
Searsmont northeast 2.69 miles to Augusta Road.
Light Capital Paving
HCP 4

WR 43222 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 131 in Belmont, Morrill and
Belmont, Morrill,
2022 Route 131 Waldo. Beginning with Route 3 and
Waldo $156,000
extending north 6.21 miles to Route 137 in
HCP 4 Waldo.

WR 38825 Replacing culverts (#132466, #132444) on


Drainage Maintenance Lincolnville Road,
Belmont, Howard Road and Lincolnville Road in
2022 Howard Road,
Searsmont Belmont. Also replacing culvert (#214744) on $125,000
Lincolnville Road
HCP 4 Route 173 in Searsmont.

141
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026398.00
Improvements
Large culvert (#51171) located 1.09 miles
2023/24 Brooks Route 7
Rural Highways north of Morgan Pitch Road. $580,000
HCP 4
Large Culvert Replacement

Highway Safety and Spot


026502.00
Improvements
Beginning 0.08 of a mile north of Hamlin
2023/24 Brooks Route 7
Rural Highways Drive and extending north 0.18 of a mile. $210,000
HCP 4
Drainage Improvements

025859.00
Highway Paving
Brooks, Knox, Beginning 0.24 of a mile west of Veterans
2023 Route 139
Thorndike Highway and extending west 9.08 miles.
Light Capital Paving
HCP 4

025859.00
Highway Paving
Brooks, Knox, Beginning at Route 131 and extending
2023 Route 137
Waldo northwest 1.58 miles.
Light Capital Paving
HCP 4

025859.00
Highway Paving Beginning 3.73 miles southwest of Route 69
Brooks, Monroe,
2023 Route 139 and extending southwest 11.58 miles to
Winterport
Light Capital Paving Veterans Highway.
HCP 4

WR 43577 Ditching and replacing of culverts in various


Drainage Maintenance places on the Troy Road in Burnham.
2022 Burnham Troy Road Beginning with the intersection with Route $166,000
100 and Troy Road and extending east 6.10
HCP 4 miles to the Burnham-Troy town line.

Highway Safety and Spot


022865.00
Improvements
Large culverts (#46840 and #46841) located
2023/24 Frankfort Loggin Road $1,270,000
Rural Highways 0.14 of a mile west of Old Stage Road.
HCP 4
Large Culvert Replacement

Highway Safety and Spot


025667.00 Improvements
Beginning 0.01 of a mile south of Mount
2022 Frankfort Rural Highways Route 1A Waldo Road and extending north 0.42 of a $155,000
mile. Including large culvert (#94455).
HCP 1 Highway Improvement - PE
Only

WR 43551 Replacing joints in Frankfort on Upper Bridge


Bridge and Structural
Maintenance (#2883) which carries 1A over North Branch
2022 Frankfort Route 1A
Marsh River. Located 50 feet west of Mill $80,000
HCP 1 Lane.

026057.00 Highway Paving


Frankfort,
Beginning at the Route 1-Route 1A
2023/24 Prospect, Rural Highways Route 1A
interchange and extending north 5.95 miles.
Stockton Springs
HCP 1 1 1/4" Overlay

142
ID/Year Municipality Scope Name Description Total Project Cost

025865.00
Highway Paving
Frankfort, Beginning at Black Hill Road and extending
2023 North Searsport Road
Searsport north 4.59 miles to Loggin Road.
Light Capital Paving
HCP 4

WR 40024 Ditching on the Mount Ephraim Road and


Frankfort, Drainage Maintenance North Searsport Road, North Searsport Road in Searsport and
2022 $83,000
Searsport Mount Ephraim Road Frankfort. Beginning at Route 1 and
HCP 4 extending north 11.46 miles to Loggin Road.

026220.00
Lower Village Bridge (#2485) over Sandy
Highway-Minor Spans
2023/24 Freedom Route 137 Stream. Located 0.18 of a mile east of $1,500,000
Bridge Replacement Pleasant Street.
HCP 4

WR 35439 Replacing culvert (#153908) on Webb Road


Drainage Maintenance in Knox. Located 50 feet east of the Old
2022 Knox Webb Road County Road. Replacing culvert (#131798) $300,000
on Webb Road. Located 0.37 of a mile east
HCP 4 of Route 137.

025943.00
Highway Paving
Knox, Liberty, Beginning at Route 105 and extending north
2022 Route 220
Montville 18.18 miles to Route 137.
Light Capital Paving
HCP 4

WR 40030 Ditching and replacing culverts in various


Knox, Thorndike, Drainage Maintenance places on Route 220. Beginning at the
2022 Route 220 $124,000
Troy, Unity Montville-Knox town line and extending north
HCP 4 16.43 miles to the Troy-Detroit town line.

025865.00
Liberty, Highway Paving
Beginning at Route 131 and extending
2023 Montville, Route 173
northwest 7.15 miles to Pinnacle Road.
Searsmont Light Capital Paving
HCP 4

025859.00
Highway Paving
Beginning at Route 1 and extending west
2023 Lincolnville Route 173
5.28 miles to Route 52.
Light Capital Paving
HCP 4

Policy, Planning and Research


026568.00
Parking alternatives will be explored.
Lincolnville Ferry - General Lincolnville Ferry Service
2022 Located 0.07 of a mile east of Route 1. $150,000
Feasibility Studies

WR 43530 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 173 in Lincolnville.
2022 Lincolnville Route 173 Beginning at the intersection of Route 1 and $126,000
Route 173 and extending northwest 8.10
HCP 4 miles to the Lincolnville-Searsmont town line.

143
ID/Year Municipality Scope Name Description Total Project Cost

025939.00
Highway Paving
Lincolnville, Beginning at Route 52 and extending north
2022 Route 173
Searsmont 6.84 miles to Route 131.
Light Capital Paving
HCP 4

WR 43223 Replacing culverts in various places on the


Drainage Maintenance Poors Mill Road in Morrill and Waldo.
2022 Morrill, Waldo Poors Mill Road Beginning at Route 131 and extending
$28,000
southeast 1.90 miles to the Waldo-Belfast
HCP 4 town line.

024159.00 Highway Paving


Beginning 0.23 of a mile north of Pound Hill
2022 Northport Rural Highways Route 1
Road and extending north 2.70 miles.
HCP 1 Mill And Fill

Highway Safety and Spot


022966.00
Improvements
Located 0.20 of a mile north of Switzer
2023/24 Prospect Route 1
Rural Highways Spring Road. $1,260,000
HCP 1
Slope Stabilization/Protection

025541.00
Colson Bridge (#2168) over Colson Stream.
Highway-Bridges
2023/24 Prospect Route 1A Located 0.38 of a mile north of Hawes Bridge $2,900,000
Bridge Improvements Road.
HCP 1

026440.00
Highway-Bridges Marsh Bridge (#2510) over Carley Brook.
2023/24 Prospect Route 174 $800,000
Located 0.40 of a mile east of Route 1A.
Bridge Deck Replacement
HCP 4

WR 42980 Ditching on Route 173 from Searsmont to


Drainage Maintenance Liberty. Beginning at the intersection with
2022 Searsmont Route 173 Route 131 and Route 173 and extending $45,000
northwest 6.35 miles to Main Street in
HCP 4 Liberty.

Highway
017281.00
Construction/Rehabilitation
Beginning at Savage Road and extending
2022 Searsport Route 1 $11,900,000
Rural Highways northeast 1.94 miles.
HCP 1
Reconstruction

Ports-Harbors
020805.00
The commercial channel of Searsport, which
Searsport Channels, Pier Berths Searsport Channel
2022 serves Mack Point. $5,500,000
Dredging

Funding for further study, scoping, planning


Policy, Planning and Research and design of port improvements in
025645.00
Port upgrades for Searsport to support offshore wind
Searsport Ports and Harbors - General $2,000,000
2022 Offshore Wind development through public/private
Feasibility Studies partnerships to facilitate sustainable
renewable energy and jobs for Maine.

144
ID/Year Municipality Scope Name Description Total Project Cost

025865.00
Highway Paving
Beginning at East Main Street and extending
2023 Searsport Mount Ephraim Road
north 7.00 miles to North Searsport Road.
Light Capital Paving
HCP 4

Ports-Harbors
026204.00
Ports and Harbors - General
Searsport Mack Point Located off Trundy Road.
2022 $125,000
Multimodal Improvements - PE
Only

025865.00
Highway Paving
Searsport, Beginning at Route 141 and extending
2023 North Searsport Road
Swanville northeast 3.23 miles to Black Hill Road.
Light Capital Paving
HCP 4

Highway Safety and Spot


023779.00
Improvements
Large culvert (#46702) located 0.03 of a mile
2022 Stockton Springs Route 1
Rural Highways north of the Searsport town line. $1,250,000
HCP 1
Large Culvert Replacement

Rail
025897.00
Rail/Highway Crossings Railroad crossing (#051225U) located 0.07 of
Stockton Springs Route 174 $375,000
2023/24 a mile northeast of Route 1A.
Signal Improvements
(Rail/Highway Xing)

Rail
025899.00
Rail/Highway Crossings Railroad crossing (#051216V) located 0.13 of
Stockton Springs Steamboat Wharf Road $375,000
2023/24 a mile east of Route 1.
Signal Improvements
(Rail/Highway Xing)

Highway Safety and Spot


023012.00 Improvements
Located 1.10 miles north of Town House
2022 Swanville Rural Highways Route 141
Road. $75,000
HCP 4 Slope Stabilization/Protection -
PE Only

WR 40022 Ditching on Route 131 in Waldo and


Drainage Maintenance Swanville. Beginning at Evans Corner and
2022 Swanville, Waldo Route 131
extending northeast 4.73 miles then $50,000
HCP 4 southeast 2.37 miles to Swan Lake Avenue.

WR 43359 Ditching on Route 139 in Thorndike and


Drainage Maintenance Unity. Beginning at the intersection of East
2022 Thorndike, Unity Route 139 Thorndike Road and Route 139 in Thorndike $59,000
and extending northwest 5.15 miles to Depot
HCP 4 Street in Unity.

WR 43221 Ditching and replacing of culverts in various


Drainage Maintenance places on Route 202 in Troy. Beginning at
2022 Troy Route 202
the South Mitchell Road and extending east $44,000
HCP 3 1.25 miles to the Rogers Road.

145
ID/Year Municipality Scope Name Description Total Project Cost

Highway Paving
025835.00
Rural Highways Beginning at Marina Road and extending
2023/24 Troy, Unity Route 9
northeast 8.59 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

025859.00
Highway Paving
Beginning at Route 220 and extending west
2023 Unity Route 139
0.69 of a mile to Route 202.
Light Capital Paving
HCP 3, 4

026061.00 Highway Paving


Beginning at Mountain View Drive and
2023/24 Winterport Rural Highways Route 1A
extending northeast 1.18 miles.
HCP 1 Mill And Fill

Ditching and replacing culverts in various


WR 37345 places on the Cove Road and Back
Drainage Maintenance Back Winterport Road, Winterport Road in Winterport. Beginning
2022 Winterport
Cove Road with the Hampden-Winterport town line and $30,000
HCP 4 extending south 1.10 miles then east 1.29
miles to Route 1A.

146
Washington

Washington
Fores t
City Twp

T8 R4 Danforth
NBPP
T11 R3 Washington County
Forest NBPP Vanceboro
Twp Population 31,490
Brookton
T8 R3 Twp Lambert Land Area (sq mi) 2,563
NBPP Lake Twp
Bridges 175
Codyville Highway Corridor Priority Miles
Topsfield Plt HCP 1 83
Kossuth
Twp Dyer Twp HCP 2 73
HCP 3 95
Waite
HCP 4 299
Talmadge Fowler
T6 R1
Twp
NBPP
Total HCP 1-4 550
Indian
Twp Res
T6 ND Grand Lake
BPP Stream Plt
Sakom
Twp
Princeton

Big
Greenlaw Lake Calais
T43 MD Baileyville
Chopping Twp
T42 MD BPP Baring
Twp
BPP Alexander Plt
Robbinston
Meddybem ps
T37 MD Crawford
T26 ED
T36 MD BPP BPP Charlotte
BPP Cooper Perry
Pembroke
T19 ED
Day Block BPP
Twp Cathance Dennysville

T30 MD Wesley Twp


Devereaux BPP Eastport
Twp
Berry
Edmunds
T25 MD Twp
Twp
BPP Marion
T24 MD Northfield Twp
Beddington BPP Lubec
East Trescott
T19 MD Machias Twp
BPP Whiting
T18 MD Centerville
BPP Twp
Marshfield
Deblois
C olum bia M ac hias Cutler
Falls
Columbia Jonesboro
Cherryfield Ro q ue
Blu ffs

Ha rring to n Jonesport

Milbridge Addison

Steuben
Washington
ID/Year Municipality Scope Name Description Total Project Cost

016849.00
Dike Bridge (#3718) over West Branch
Highway-Bridges
2022 Addison Ridge Road Pleasant River. Located 0.06 of a mile $415,000
Bridge Improvements - PE Only southwest of Water Street.
HCP 5

WR 42398 Ditching and replacing culverts on Basin


Drainage Maintenance Road, East Side Road, Wescogus Road in
Basin Road, East Side
2022 Addison Addison. Beginning at the intersection of
Road, Wescogus Road $333,000
Route 187 and extending 13.11 miles to the
HCP 4 intersection of Route 187.

Highway Safety and Spot


024277.00
Improvements
Large culvert (#46925) located 0.39 of a mile
2023/24 Baileyville Route 9
Rural Highways west of Route 1. $713,000
HCP 1
Large Culvert Replacement

Baring Plt, Berry


025873.00 Twp, Cathance Highway Paving
Twp, Cooper, Beginning at Route 1A and extending north
2023 Route 191
East Machias, 34.11 miles to Route 1.
Marion Twp, Light Capital Paving
HCP 4
Meddybemps

WR 42472 Ditching and replacing culverts on Route 191.


Berry Twp,
Drainage Maintenance Beginning at the intersection of Route 1 in
Cathance Twp,
2022 Route 191 East Machias and extending 22.59 miles to
Cooper, East $292,000
0.37 of a mile north of North Union Road in
HCP 4 Machias
Cooper.

Highway Paving
025739.00
Brookton Twp, Rural Highways Beginning 2.02 miles north of Forest City
2022 Route 1
Danforth Road and extending north 9.33 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Safety and Spot


021846.00
Improvements
Beginning at Main Street and extending
2023/24 Calais Route 1 $244,000
Rural Highways south 0.41 of a mile.
HCP 1
Drainage Improvements

Highway Safety and Spot


022649.00
Improvements Beginning 0.07 of a mile east of Washington
2023/24 Calais South Street Street and extending northeast 0.01 of a $121,000
Urban Highways
mile.
HCP 4
Drainage Improvements

Highway Safety and Spot


025503.00
Improvements
2023/24 Calais Route 1 Located 0.04 of a mile north of Scholl Lane. $150,000
Urban Highways
HCP 1
Drainage Improvements

026085.00
Ferry Point Bridge (#2279) over St. Croix
Highway-Bridges
2022 Calais Main Street River. Located 0.22 of a mile west of Route $500,000
Bridge Improvements - PE Only 1.
HCP 2

147
ID/Year Municipality Scope Name Description Total Project Cost

Policy, Planning and Research


025975.00 Public advisory process for future use of the
Calais, Charlotte Railroad - General Calais Branch rail corridor from Calais to Ayers Junction in
2022 $50,000
Charlotte.
Feasibility Studies

021686.10
Moosehorn Bridge (#3332) over Cranberry
Highway-Bridges
2023/24 Charlotte Station Road Creek. Located 0.17 of a mile west of $1,500,000
Bridge Replacement Goodell Road.
HCP 5

Highway Safety and Spot


025507.00
Improvements
Large culvert (#88727) located 0.41 of a mile
2023/24 Charlotte Route 214
Rural Highways north of Charlotte Road. $480,000
HCP 4
Large Culvert Replacement

026105.00
Round Pond Bridge (#3787) over Round
Highway-Bridges
2023/24 Charlotte Charlotte Road Pond Outlet. Located 1.10 miles northeast of $1,600,000
Bridge Replacement Ayers Junction Road.
HCP 4

Highway Safety and Spot


020405.00 Improvements
Beginning 0.07 of a mile north of Spruce
Cherryfield,
2022 Rural Highways Route 1 Street in Milbridge and extending north 4.81
Milbridge $1,200,000
miles.
HCP 3 Highway Improvement - PE
Only

025387.00
Little Tomah Bridge (#2472) over Little
Highway-Bridges
2023/24 Codyville Twp Route 6 Tomah Stream. Located 1.80 miles $2,700,000
Bridge Replacement southwest of Todd Farm Road.
HCP 4

025887.00 Codyville Twp, Highway Paving


Lambert Lake Beginning at Route 1 and extending
2023 Route 6
Twp, Topsfield, northeast 21.28 miles.
Vanceboro Light Capital Paving
HCP 3, 4

Highway Safety and Spot


025165.00 Improvements
Large culvert (#923533) located 0.21 of a
2022 Columbia Rural Highways Addison Road
mile northwest of the Addison town line. $60,000
HCP 4 Large Culvert Replacement -
PE Only

026486.00 Highway Paving


Columbia,
Beginning 0.11 of a mile from Addison Road
2023/24 Columbia Falls, Rural Highways Route 1
and extending east 9.84 miles.
Jonesboro
HCP 2 1 1/4" Overlay

024981.00
Highway Paving
Beginning at the Weston town line and
2022 Danforth Bancroft Road
extending south 0.80 of a mile to Route 169.
Light Capital Paving
HCP 4

148
ID/Year Municipality Scope Name Description Total Project Cost

Rail
025913.00
Rail/Highway Crossings Railroad crossing (#863160W) located 0.29
Danforth Route 169
2022 of a mile north of Horseback Road. $246,000
Signal Improvements
(Rail/Highway Xing)

WR 33256
Drainage Maintenance Replacing culvert (#969004) in Danforth.
2022 Danforth Route 1 Located 1.80 miles south of the intersection $18,000
of Route 1 and Route 169.
HCP 3

025297.00
Deblois Bridge (#3152) over Narraguagus
Highway-Bridges
2023/24 Deblois Route 193 River. Located 0.14 of a mile east of Lane $1,200,000
Bridge Deck Replacement Road.
HCP 3

025529.00
Chase Mills Bridge (#5465) over Gardiner
Highway-Bridges
2023/24 East Machias Chase Mills Road Lake Outlet. Located 0.03 of a mile north of $2,000,000
Bridge Replacement Lakeside Road.
HCP 5

WR 35154 Repairing piers and sealing Rim Memorial


Bridge and Structural
Maintenance Bridge (#2253) over the Machias River.
2022 East Machias Rim Road $60,000
Located on the East Machias-Machiasport
HCP 4 town line.

Highway
025137.00
Construction/Rehabilitation Beginning 0.03 of a mile east of the
East Machias,
2023/24 Route 1 Whitneyville town line and extending north
Machias Rural Highways $6,890,000
6.59 miles.
HCP 2
Full Depth Reclaim W/Cement

024975.00
Highway Paving Beginning 0.37 of a mile southeast of Chases
East Machias,
2022 Route 1 Mill Road and extending southeast 1.60
Whiting
Light Capital Paving miles.
HCP 2

Aviation
018691.02 Safety and infrastructure improvements that
Eastport Municipal
Eastport Navigation Aids/Lights may include a precision approach path $180,000
2022 Airport
indicator and a segmented circle.
Lighting

Aviation
018691.03
Eastport Municipal Pavement maintenance and pavement
Eastport Apron
2022 Airport marking for the apron. $220,000
Rehabilitation

Highway Safety and Spot


023038.00
Improvements
Beginning at Deep Cove Road and extending
2023/24 Eastport Route 190
Rural Highways east 0.62 of a mile to Water Street. $446,000
HCP 1
Drainage Improvements

149
ID/Year Municipality Scope Name Description Total Project Cost

024357.00 Bicycle/Pedestrian
Beginning at Battery Street and extending
2022 Eastport On-Road Sidewalk/Trail High Street
north 0.27 of a mile. $585,000
HCP 5 Multimodal Improvements

Ports-Harbors
025201.00
Eastport Marine Buildings/Facilities Eastport Fish Pier Located 0.02 of a mile north of Water Street.
2022 $66,000
Rehabilitation

Ports-Harbors Located off Sea Street. This project is only


026208.00
partially funded for construction and is
Eastport Breakwaters Breakwater Pier
2023/24 contingent upon a successful future $800,000
Reconstruction competitive grant application.

Freight Facility Located 0.35 of a mile south of Newport


026210.00 Road at Estes Head. This project is only
Eastport Freight Facilities - General Barron Road partially funded for construction and is
2023/24 $150,000
contingent upon a successful future
Capital Equipment Purchase competitive grant application.

025873.00
Highway Paving
Beginning at Route 1 and extending east
2023 Edmunds Twp South Edmunds Road
0.46 of a mile to Park Road.
Light Capital Paving
HCP 4

WR 42346 Ditching and replacing culverts on Dorman


Drainage Maintenance Road. Beginning at the intersection of Route
2022 Harrington Dorman Road $138,000
1A and extending 1.77 miles to the
HCP 4 intersection of Route 1 in Harrington.

Highway Safety and Spot


022651.00 Improvements Beginning at Route 1 in Milbridge and
Harrington, extending north 0.16 of a mile. Beginning
2022 Rural Highways Route 1A $415,000
Milbridge 0.25 of a mile north of Cross Road in
HCP 2 Highway Improvement - PE Milbridge and extending north 3.39 miles.
Only

WR 43487 Replace wearing surface on Chandler River


Bridge and Structural
Maintenance Bridge (#2149) in Jonesboro which carries
2022 Jonesboro Route 1
over Chandler River on Route 1. Located 370 $100,000
HCP 2 feet north of Looks Point Road.

025989.00
Cross Cove Bridge (# 2207) over Cross
Highway-Bridges
2023/24 Jonesport Route 187 Cove. Located 0.01 of a mile northeast of $2,500,000
Bridge Replacement Island Street.
HCP 4

025993.00
Cummings Bridge (#2211) over Donovan
Highway-Minor Spans
2023/24 Jonesport Route 187 Creek. Located 0.09 of a mile east of Indian $1,500,000
Bridge Replacement River Road.
HCP 4

150
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026402.00 Improvements
Lambert Lake Large culvert (#894499) located 2.83 miles
2022 Rural Highways Route 6
Twp northeast of Vanceboro town line. $45,000
HCP 4 Large Culvert Replacement -
PE Only

020497.00
FDR Memorial Bridge (#5978) over Lubec
Highway-Bridges
2022 Lubec Route 189 Narrows. Located 0.11 of a mile northeast of $450,000
Bridge Improvements - PE Only Water Street.
HCP 4

Highway Safety and Spot


025365.00
Improvements Beginning 0.47 of a mile west of Quoddy
2023/24 Lubec South Lubec Road Farm Road and extending southwest 0.08 of
Minor Collectors $370,000
a mile.
HCP 4
Slope Stabilization/Protection

Highway Safety and Spot


025367.00
Improvements
Beginning 0.31 of a mile north of Bridges
2023/24 Lubec South Lubec Road
Minor Collectors Lane and extending north 0.04 of a mile. $350,000
HCP 4
Slope Stabilization/Protection

025873.00
Highway Paving
Beginning 0.69 of a mile east of Spark Plug
2023 Lubec South Lubec Road
Lane and extending northwest 4.60 miles.
Light Capital Paving
HCP 4

025873.00
Highway Paving
Lubec, Trescott Beginning at Route 1 and extending
2023 Route 189
Twp, Whiting northeast 11.12 miles the Canadian Border.
Light Capital Paving
HCP 4

Policy, Planning and Research


016714.00
Dike Bridge (#2246) over Middle River.
Machias Planning Route 1 $1,140,000
2024 Located 0.17 of a mile north of Route 1A.
Enhanced Project Scoping

Dike Bridge (#2246) over Middle River.


016714.01 Located 0.17 of a mile north of Route 1A.
Highway-Bridges This project is only partially funded for
2023/24 Machias Route 1
construction and is contingent upon a $2,500,000
Bridge Improvements successful future competitive grant
HCP 2
application.

Aviation
018698.05 Safety and infrastructure improvements that
Machias Valley Regional
Machias Runway/Taxiway may include design and permitting for taxi
2023/24 Airport $464,000
lane construction.
New Construction

Policy, Planning and Research


018698.06
Airport - General Machias Valley Regional Taxilane study - Environmental Assessment
Machias
2022 Airport and NEPA review. $93,000
Field Investigations, Studies,
And Research

151
ID/Year Municipality Scope Name Description Total Project Cost

Aviation
018698.07 To acquire land for a longer runway, which
Airport - General Machias Valley Regional would facilitate LifeFlight, the lifesaving
Machias
2022 Airport medical/emergency air transport for the $1,290,000
Sale Or Purchase Of Lot Or region.
Building

Highway Safety and Spot


022655.00
Improvements Beginning 0.08 of a mile north of Center
2023/24 Machias Route 1A Street and extending north 0.29 of a mile to
Urban Highways $602,000
Route 1.
HCP 4
Drainage Improvements

Highway Safety and Spot


023673.00
Improvements
Beginning 0.28 of a mile north of Court Street
2022 Machias Route 1
Rural Highways and extending north 0.38 of a mile. $60,000
HCP 2
Safety Improvements - PE Only

025211.00
Clifford Bridge (#5223) over Clifford Stream.
Highway-Minor Spans
2023/24 Marion Twp Route 86 Located 1.56 miles southwest of Marion $1,500,000
Bridge Replacement Station Road.
HCP 4

System Operations by Others Transit Administrative and Operating


024651.13
Rural Transit Admin/ Assistance for Federal Transit Administration
Milbridge Transit - General $85,000
2022 Operations §5311 for statewide non-urbanized transit.
Operating Assistance West's Transportation ME-2020-027.

Aviation
018704.03 Safety and infrastructure improvements that
Princeton Municipal
Princeton Navigation Aids/Lights may include design and permitting of
2023/24 Airport $361,000
taxilanes for hangar development.
New Construction

Aviation Safety and infrastructure improvements that


018704.05
Princeton Municipal may include a pavement maintenance project
Princeton Runway/Taxiway $206,000
2022 Airport (apron and runway) to include pavement
Crack Sealing markings.

026093.00
Mill Cove New Bridge (#6205) over Mill
Highway-Minor Spans
2023/24 Robbinston Route 1 Cove. Located 0.08 of a mile north of Ridge $1,800,000
Bridge Replacement Road.
HCP 1

System Operations by Others Transit Administrative and Operating


025223.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Steuben Transit - General
2023 Operations §5311 for non-urbanized transit. West's $96,000
Operating Assistance Transportation.

WR 41576 Ditching on Route 6 in Topsfield and


Topsfield, Drainage Maintenance Vanceboro. Beginning at the intersection of
2022 Route 6
Vanceboro Route 1 in Topsfield and extending east to $69,000
HCP 4 the Canadian border.

152
ID/Year Municipality Scope Name Description Total Project Cost

026089.00
Rice Bridge (#2714) over Rice Stream.
Highway-Minor Spans
2023/24 Trescott Twp Route 191 Located 0.21 of a mile north of Moose River $1,500,000
Bridge Replacement Road.
HCP 4

026224.00
Highway-Bridges International Bridge (#2401) over Saint Croix
2023/24 Vanceboro Route 6 River. Located 0.04 of a mile east of Water $500,000
Bridge Substructure Street.
HCP 4 Rehabilitation

026091.00
B16 New Stream Bridge (#6289) over E.
Highway-Minor Spans
2023/24 Wesley Route 9 Branch B16 New Steam. Located 0.67 of a $1,000,000
Bridge Replacement mile west of Junior Williams Road.
HCP 1

026230.00
Beaver Dam Bridge (#2061) over Beaver
Highway-Minor Spans
2023/24 Wesley Route 9 Dam Brook. Located 3.00 miles north of $1,200,000
Bridge Replacement Junior Williams Road.
HCP 1

024975.00
Highway Paving Beginning 0.12 of a mile northeast of Bean
2022 Whiting Route 1 Heath Road and extending northeast 2.98
Light Capital Paving miles.
HCP 2

153
York

Cornish
Limington

Parsonsfield

Limerick

Newfield Buxton
Hollis

Waterboro

York
Shapleigh

Dayton Saco Old


Orchard
Beach
Acton Lyman
Alfred

Biddeford
Sanford
Arundel

Kennebunkport
Lebanon
Kennebunk

North
Berwick
Wells

Berwick York County


Population 206,229

Ogunquit
Land Area (sq mi) 991
South Bridges 323
Berwick
Highway Corridor Priority Miles
HCP 1 167
York
HCP 2 135
HCP 3 99
Eliot HCP 4 307

Kittery Total HCP 1-4 708


York
ID/Year Municipality Scope Name Description Total Project Cost

Highway
020267.00 Construction/Rehabilitation
Beginning 0.60 of a mile south of Garvin
2022 Acton Rural Highways Route 109
Road and extending north 2.21 miles. $750,000
HCP 2 Highway Rehabilitation - PE
Only

Highway Paving
025757.00
Acton, Rural Highways Beginning at Shapleigh Corner Road and
2022 Route 109
Shapleigh extending north 3.84 miles.
Ultra-Thin Bonded Wearing
HCP 2
Course

Highway Safety and Spot


025459.00
Improvements
Beginning 0.56 of a mile north of the Sanford
2023/24 Alfred Route 4
Rural Highways town line and extending north 0.26 of a mile. $1,140,000
HCP 2
Safety Improvements

Highway Safety and Spot


026376.00
Improvements
Large culvert (#46513) located 0.05 of a mile
2023/24 Alfred Route 202 $500,000
Rural Highways south of Brock Road.
HCP 1
Large Culvert Replacement

Highway Safety and Spot


022821.00 Improvements
Beginning 0.08 of a mile east of Graves Road
2022 Alfred, Lyman Rural Highways Route 111 $210,000
and extending west 0.96 of a mile.
HCP 1 Highway Improvement - PE
Only

024349.00 Maintenance
Beginning at Walker Road and extending
2022 Alfred, Lyman Rural Highways Route 111 $41,000
west 0.96 of a mile to Blueberry Hill Road.
HCP 1 Maintenance - Vegetation

Highway Safety and Spot


022823.00 Improvements
Located at the intersection of Route 1 and
2023/24 Arundel Rural Highways Route 1 $435,000
Log Cabin Road.
HCP 2 Install Or Replace Traffic
Signals
Highway Safety and Spot
023509.00 Improvements
Beginning at River Road and extending north
2023/24 Arundel Rural Highways Route 1 $415,000
0.03 of a mile to Limerick Road.
HCP 2 Install Or Replace Traffic
Signals

Highway Safety and Spot


025397.00
Improvements
Large culvert (#46490) located 0.04 of a mile
2023/24 Arundel Log Cabin Road $480,000
Rural Highways south of Old Post Road.
HCP 4
Large Culvert Replacement

026226.00
Days Mill Bridge (#2221) over Kennebunk
Arundel, Highway-Bridges
2023/24 Route 35 River. Located 0.02 of a mile north of Days
Kennebunk $1,500,000
Bridge Replacement Mills Road.
HCP 4

154
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


020249.00 Improvements
Beginning at Route 35 and extending east
2022 Arundel, Lyman Rural Highways Route 111
1.00 mile to Thompson Road. $450,000
HCP 1 Highway Improvement - PE
Only

022284.00
New Dam Bridge (#6053) over Salmon Falls
Highway-Bridges
2023/24 Berwick New Dam Road River. Located on the Berwick, Maine- $412,000
Bridge Rehabilitation Somersworth, New Hampshire state line.
HCP 5

022606.00
Eddy Bridge (#6048) over Salmon Falls
Highway-Bridges
2023/24 Berwick Rochester Street River. Located on the Berwick, Maine - $645,000
Bridge Rehabilitation Somersworth, New Hampshire state line.
HCP 4

Highway Safety and Spot


023529.00
Improvements
Large culvert (#189339) located 0.02 of a
2022 Berwick Route 9
Rural Highways mile west of Old Sanford Road. $800,000
HCP 2
Large Culvert Replacement

Highway Safety and Spot


024647.00 Improvements
Located at the intersection of Saw Mill Hill
2023/24 Berwick Urban Highways Route 9 Road and Route 9/School Street. KACTS $890,000
Sponsored.
HCP 2, 4 Intersection Improvements W/O
Signal
Highway Safety and Spot
026466.00 Improvements
Beginning 0.14 of a mile north of Logan
2022 Berwick Urban Highways Route 9
Street and extending north 4.09 miles. $250,000
HCP 2 Highway Improvement - PE
Only

WR 43472
Drainage Maintenance Ditching Route 236 Berwick. Beginning at the
2022 Berwick Route 236 South Berwick town line and extending north $50,000
to Powerhouse Road.
HCP 2

Aviation
018687.06 Safety and infrastructure improvements that
Biddeford Municipal
Biddeford Apron may include General Aviation apron design $810,000
2023/24 Airport
and reconstruction.
Reconstruction

Airport
018687.07
Biddeford Municipal Safety and infrastructure improvements that
Biddeford Airport - General
2022 Airport include snow removal equipment. $206,000
Capital Equipment Purchase

Highway Safety and Spot


024641.04 Improvements
Municipal Partnership Initiative Program.
2022 Biddeford Urban Highways Route 1 Located at the intersection of Route 1, Pearl $2,500,000
Street and Spruce Street.
HCP 2 Intersection Improvements W/
Signal

155
ID/Year Municipality Scope Name Description Total Project Cost

System Operations by Others Transit Operating Assistance for Federal


024651.03
Rural Transit Operations Transit Administration §5311 for statewide
Biddeford Transit - General
2022 and PM non-urbanized transit. Biddeford-Saco-Old $274,000
Operating Assistance Orchard Beach Transit ME-2020-027.

025017.00 Highway Paving


Beginning at Main Street and extending west
2022 Biddeford Urban Highways South Street 0.34 of a mile to 0.12 of a mile west of
Cathedral Oaks Drive. PACTS Sponsored.
HCP 4 Mill And Fill

Study to evaluate transportation alternatives


Policy, Planning and Research to improve connectivity between I-95 via Exit
025043.00
32 South Street and downtown Biddeford in
Biddeford Planning South Street
2022 order to relieve congestion along Route 111 $141,000
Planning Studies and to support economic development.

System Operations by Others


025051.00
Biddeford Transit - General Urban Transit Operations Biddeford Downtown Circulator Project.
2022 $359,000
Operating Assistance

System Operations by Others


025053.00
Biddeford Transit - General Urban Transit Operations Biddeford Downtown Circulator Project.
2023 $359,000
Operating Assistance

System Operations by Others Transit Operating Assistance for Federal


025243.00
Rural Transit Operations/ Transit Administration §5311 for non-
Biddeford Transit - General $313,000
2023 Preventive Maintenance urbanized transit. Biddeford, Saco, Old
Operating Assistance Orchard Beach (BSOOB) Transit.

Highway
025653.00 Construction/Rehabilitation
Beginning at St. Mary Street and extending
2022 Biddeford Urban Highways Elm Street northeast 0.12 of a mile to Lincoln Street. $200,000
PACTS Sponsored
HCP 2 Intersection Reconstruction -
PE Only

025805.00 Highway Paving


Beginning at Jefferson Street and extending
2022 Biddeford Urban Highways South Street west 0.22 of a mile to Elm Street. PACTS
MPI Sponsored.
HCP 4 Mill And Fill

025959.00 Highway Paving Beginning at West Street and extending


south 0.25 of a mile on Hill Street. Beginning
2023/24 Biddeford Urban Highways Hill Street/Landry Street
at Precourt Street and extending east 0.17 of
HCP 4 Mill And Fill a mile to Hill Street. PACTS Sponsored.

025963.00 Highway Paving Beginning at Pool Street and extending west


0.20 of a mile to Birch Street. Beginning at
2023/24 Biddeford Urban Highways Route 111
Graham Street and extending west 0.22 of a
HCP 2 Mill And Fill mile to Route 1. PACTS Sponsored.

156
ID/Year Municipality Scope Name Description Total Project Cost

WR 43914 Repairing wearing surface and approaches to


Bridge and Structural
Maintenance South Street Crossing West Bridge (#6194)
2022 Biddeford South Street
in Biddeford which carries South Street over $40,000
HCP 4 B&M Railroad Spur.

Policy, Planning and Research Planning Partnership Initiative Program.


024983.00 Evaluation of a new section of the Eastern
Biddeford, Saco Planning Eastern Trail Trail, including a safe way for bicyclists and
2022 $86,000
pedestrians to cross the Saco River between
Planning Studies Biddeford and Saco.

Highway Paving
025713.00
Rural Highways Beginning at Route 202 and extending east
2022 Buxton Portland Road
2.37 miles to Route 22.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Paving
025795.00
Rural Highways Beginning at Route 112 and extending east
2022 Buxton Route 4A
0.75 of a mile to Route 4.
Highway Cyclical Pavement
HCP 3
Resurfacing

Highway Safety and Spot


026380.00
Improvements
Large culvert (#1063182) located 0.38 of a
2023/24 Buxton Route 22 $180,000
Rural Highways mile northwest of Dunnell Road.
HCP 3
Large Culvert Replacement

Highway Safety and Spot


026382.00
Improvements
Large culvert (#1063141) located 0.01 of a
2023/24 Buxton Route 22 $800,000
Rural Highways mile southeast of Rankin Road.
HCP 3
Large Culvert Replacement

WR 43389
Drainage Maintenance Ditching Route 22 in Buxton. Beginning at
2022 Buxton Route 22 Broadturn Road and extending northwest to $100,000
Route 202.
HCP 3

023643.00
Salmon Falls Bridge (#3708) over Saco
Highway-Bridges
2022 Buxton, Hollis Route 202 River. Located on the Hollis- Buxton town $3,000,000
Bridge Deck Replacement line.
HCP 1

025479.00
West Buxton Bridge (#3340) over the Saco
Highway-Bridges
2022 Buxton, Hollis West Buxton Road River. Located 0.07 of a mile west of Route $500,000
Bridge Improvements - PE Only 112.
HCP 4

Highway Safety and Spot


022847.00
Improvements Little River Bridge (#2465) over Little River.
2022 Cornish Route 25 Beginning 0.01 of a mile east of Thompson
Highway-Minor Spans $150,000
Street and extending west 0.02 of a mile.
HCP 2
Slope Stabilization/Protection

157
ID/Year Municipality Scope Name Description Total Project Cost

024963.00
Highway Paving
Beginning at the Hiram town line and
2022 Cornish South Hiram Road
extending east 0.62 of a mile to Route 25.
Light Capital Paving
HCP 4

WR 43913 Mill and fill wearing surface and approaches


Bridge and Structural
Maintenance and replace joint headers to Depot Bridge
2022 Cornish Depot Road
(#3025) in Cornish which carries Route 5 $170,000
HCP 3 over Saco River.

Highway Safety and Spot


023551.00
Improvements
Large culvert (#46526) located at the
2023/24 Dayton Route 5
Rural Highways intersection of Route 5 and River Road. $805,000
HCP 3
Large Culvert Rehabilitation

Highway Safety and Spot


019429.00 Improvements
Located at the intersection of Route 236 and
2022 Eliot Urban Highways Route 236
Depot Road. $235,000
HCP 2 Intersection Improvements W/
Signal - PE Only

System Operations by Others FTA Section 5307 for Operating Assistance -


025587.00
Kittery Area Comprehensive Transportation
Eliot Transit - General Urban Transit Operating $252,000
2024 System (KACTS) urban area (Dover-
Operating Assistance Rochester).

025857.00
Highway Paving
Beginning at the Kittery town line and
2023 Eliot State Road
extending north 1.37 miles to Route 103.
Light Capital Paving
HCP 3, 4

025857.00
Highway Paving
Beginning at State Road and extending north
2023 Eliot Beech Road
2.54 miles to Route 236.
Light Capital Paving
HCP 4

025857.00
Highway Paving
Beginning at Route 236 and extending south
2023 Eliot Route 103
3.66 miles to Old Road.
Light Capital Paving
HCP 4

WR 43463 Ditching on Beech Ridge Road in Eliot.


Drainage Maintenance Beginning at the intersection of Route 236
2022 Eliot Beech Ridge Road
and extending south west 0.97 of a mile to $21,000
HCP 4 the intersection of State Road.

WR 43477 Ditching on Route 101 in Eliot. Beginning at


Drainage Maintenance the Kittery-Eliot town line and extending north
2022 Eliot Route 101
6.18 miles to the Maine-New Hampshire $16,000
HCP 4 border.

158
ID/Year Municipality Scope Name Description Total Project Cost

025857.00
Highway Paving
Beginning at State Road and extending south
2023 Eliot, Kittery Route 103
2.54 miles to Kittery town line.
Light Capital Paving
HCP 4

024121.00 Highway Paving


Beginning at the I-95 overpass and extending
Eliot, Kittery,
2022 Urban Highways Route 236 north 10.43 miles to Route 4. Includes 0.63
South Berwick
of a mile on Route 236S.
HCP 1, 2 Hot-In-Place Recycle

025857.00
Highway Paving Beginning at Kittery town line and extending
Eliot, Kittery,
2023 Route 101 west 6.19 miles to the New Hampshire state
South Berwick
Light Capital Paving line.
HCP 4

Highway Safety and Spot


022500.00 Improvements
Eliot, South Beginning at Scotland Bridge Road in York
2022 Rural Highways Route 91
Berwick, York and extending northwest 3.75 miles. $290,000
HCP 4 Highway Improvement - PE
Only

025857.00
Highway Paving
Eliot, South Beginning at Scotland Bridge Road and
2023 Route 91
Berwick, York extending north 5.62 miles to Route 236.
Light Capital Paving
HCP 4

025857.00
Highway Paving
Beginning at Route 101 and extending north
2023 Eliot, York Beech Ridge Road
1.63 miles to McIntire Lane.
Light Capital Paving
HCP 4

WR 43475
Drainage Maintenance Ditching Beech Ridge Road between York
2022 Eliot, York Beech Ridge Road and Eliot. Beginning at the urban compact $20,000
line and extending to Route 101.
HCP 4

Highway Safety and Spot


026021.00
Improvements
Located at the intersection of Route 35 and
2023/24 Hollis Route 202
Rural Highways Route 202. $275,000
HCP 1
Safety Improvements

024963.00
Highway Paving
Hollis, Beginning at Route 5 and extending
2022 Plains Road
Waterboro northeast 5.20 miles to Route 117.
Light Capital Paving
HCP 4

023629.00
Nash Mill Bridge (#5756) over Mousam
Highway-Bridges
2023/24 Kennebunk Mill Street River. Located 0.14 of a mile north of $1,230,000
Bridge Rehabilitation Hammond Road.
HCP 4

159
ID/Year Municipality Scope Name Description Total Project Cost

Highway Safety and Spot


026360.00
Improvements
Beginning 0.05 of a mile south of Walker
2023/24 Kennebunk Route 35
Rural Highways Road and extending north 0.13 of a mile. $100,000
HCP 4
Roadside Improvements

Policy, Planning and Research Planning Partnership Initiative Program.


024985.00 Kennebunk, Evaluation of two new sections of the Eastern
North Berwick, Planning Eastern Trail Trail; 1) between Route 9 in North Berwick to
2022 $58,000
Wells Perry Oliver Road in Wells, and 2) from
Planning Studies Alfred Road to Route 35 in Kennebunk.

023188.00
Highway-Minor Spans Branch Brook Bridge (#3091) over Branch
Kennebunk,
2023/24 Route 9A Brook. Located on the Wells-Kennebunk
Wells $436,000
Bridge Substructure town line.
HCP 4 Rehabilitation

025857.00
Highway Paving Beginning 0.75 of a mile north of Route 109
Kennebunk,
2023 Route 9A and extending north 3.88 miles. Includes
Wells
Light Capital Paving paved shoulders.
HCP 4

Ports-Harbors
025205.00
Cape Porpoise Pier - Bait shed demolition and reconstruction
Kennebunkport Marine Buildings/Facilities $500,000
2023/24 Phase 3 located at the end of Pier Road.
Reconstruction

Ports-Harbors
025207.00
Cape Porpoise Pier - Wharf improvements located at the end of
Kennebunkport Piers, Floats and Fenders $500,000
2022 Phase 2 Pier Road.
Rehabilitation

Kittery Area Comprehensive Transportation


Policy, Planning and Research System (KACTS) Unified Planning Work
002173.22
Program: Federally mandated program
Kittery Planning KACTS Planning $338,000
2022 associated with Maine's U.S. Census-defined
MPO Program Management metropolitan planning area in the Greater
Kittery region. Years 2022-2023.

Kittery Area Comprehensive Transportation


Policy, Planning and Research System (KACTS) Unified Planning Work
002173.24
Program: Federally mandated program
Kittery Planning KACTS Planning $338,000
2024 associated with Maine's U.S. Census-defined
MPO Program Management metropolitan planning area in the Greater
Kittery region. Years 2024-2025.

Policy, Planning and Research


014854.22 Southern Maine Planning and Development
Planning
Kittery SMPDC RPO Support Commission (SMPDC) Regional Planning
2022 $12,500
Statewide Program Organization support.
Development

Policy, Planning and Research


014854.23 Southern Maine Planning and Development
Planning
Kittery SMPDC RPO Support Commission (SMPDC) Regional Planning $12,500
2023
Statewide Program Organization support.
Development

160
ID/Year Municipality Scope Name Description Total Project Cost

Policy, Planning and Research


014854.24 Southern Maine Planning and Development
Planning
Kittery SMPDC RPO Support Commission (SMPDC) Regional Planning
2024 $12,500
Statewide Program Organization support.
Development

Highway Safety and Spot


016710.01 Improvements
Located at the intersection of Route 1 and
2022 Kittery Urban Highways Route 1A
Bridge Street. $25,000
HCP 1 Intersection Improvements W/O
Signal

Highway Safety and Spot Beginning 0.09 of a mile northwest of Main


018653.00 Street and extending east 0.31 of a mile;
Improvements
Wentworth Street extending north 0.19 of a
2023/24 Kittery Route 103
Urban Highways mile to Whipple Road. Includes signal at $1,810,000
HCP 1 Walker and Wentworth Streets. KACTS
Safety Improvements Sponsored.

System Operations by Others


020644.22 FTA Section 5307 for Operating Assistance -
Kittery Transit - General Urban Transit Operations Kittery Area Comprehensive Transportation
2022 $372,000
System (KACTS) urban area (Portsmouth).
Operating Assistance

System Operations by Others FTA Section 5307 for Operating Assistance -


022709.22
Kittery Area Comprehensive Transportation
Kittery Transit - General Urban Transit Operations $252,000
2022 System (KACTS) urban area (Dover-
Operating Assistance Rochester).

023150.00
Badger Island Bridge (#2031) over
Highway-Bridges
2023/24 Kittery Route 1 Piscataqua River. Located 0.07 of a mile $815,000
Bridge Improvements south of Water Street.
HCP 2

System Operations by Others Kittery Area Comprehensive Transportation


023348.22
System (KACTS), Federal Transit
Kittery Transit - General Urban Transit Planning $40,000
2022 Administration §5303 for metropolitan
Administrative Assistance planning Fiscal Year 2022.

Beginning 0.19 of a mile north of Bridge


024151.00 Highway Paving Street and extending north 1.08 miles.
Beginning 0.05 of a mile north of Rogers
Route 1/Route 1A/Route
2022 Kittery Rural Highways Road and extending north 2.07 miles to
236
Lewis Road. Including 1AS and Route 1S.
HCP 1, 2 Mill And Fill Includes 0.20 of a mile on Routes 236 &
236S,

Policy, Planning and Research Kittery Area Comprehensive Transportation


024689.00 System (KACTS), Federal Transit
Kittery Transit - General Urban Transit Planning Administration §5303 for metropolitan
2023 $41,000
planning, Fiscal Year 2023. Funds are
Planning Studies transferred to FHWA.

System Operations by Others


024713.00 Transit Operating Assistance KACTS-MPO
Kittery Transit - General Urban Transit Operations Region, Federal Transit Administration §5307 $380,000
2023
for urbanized area transit.
Operating Assistance

161
ID/Year Municipality Scope Name Description Total Project Cost

System Operations by Others


024715.00 Transit Operating Assistance KACTS-MPO
Kittery Transit - General Urban Transit Operations Region, Federal Transit Administration §5307
2023 $252,000
for urbanized area transit.
Operating Assistance

Highway Safety and Spot


Improvements
025189.00
Visitor Information Garage roof replacement at the Kittery visitor
Kittery Rural Highways
2022 Center information center. $20,000
Rest Area
Construction/Improvements

System Operations by Others


025249.00 Transit Operating Assistance for Cooperative
Kittery Transit - General Urban Transit Operations Alliance for Seacoast Transportation
2022 $33,000
(COAST).
Operating Assistance

Highway Safety and Spot


025433.00 Improvements
Located at the Intersection or Route 1
2023/24 Kittery Rural Highways Route 1 Bypass
Bypass and Gorges Road. $470,000
HCP 1 Install Or Replace Traffic
Signals
Highway Safety and Spot
025435.00 Improvements Located at the intersections of Routes 1 and
101 and Route 1 and Haley Drive, as well as
2023/24 Kittery Rural Highways Route 1
the entrances to the Kittery Outlet Centers $1,310,000
HCP 2 Install Or Replace Traffic both north and south of Dexter Lane.
Signals

System Operations by Others


025577.00 FTA Section 5307 for Operating Assistance -
Kittery Transit - General Urban Transit Operating Kittery Area Comprehensive Transportation
2024 $380,000
System (KACTS) urban area (Portsmouth).
Operating Assistance

System Operations by Others Kittery Area Comprehensive Transportation


025649.00
System (KACTS), Federal Transit
Kittery Transit - General Urban Transit Planning $41,000
2024 Administration §5303 for metropolitan
Administrative Assistance planning Fiscal Year 2024.

Highway System Operations


025917.00 A study to identify traffic patterns and
Interstate available detours between Kittery and
2022 Kittery Various Locations
Portsmouth NH, for extended closure due to $100,000
Intelligent Transportation bridge improvements.
HCP 1
Systems

026172.00
Highway-Bridges Sarah Mildred Long Bridge (#3641) over
2023/24 Kittery Route 1 Bypass Piscataqua River and Roads. Located on the $1,000,000
Bridge Superstructure Kittery and New Hampshire State line.
HCP 1 Rehabilitation

Highway Paving
026043.00
Interstate 95 Northbound Weigh Stations on Interstate 95 northbound
Kittery, York Interstate
2022 and Southbound and southbound.
3/4" Overlay

162
ID/Year Municipality Scope Name Description Total Project Cost

022244.00
Highway-Bridges New Bridge (#3717) over Salmons Falls.
Lebanon New Bridge Road
2023/24 Located 0.08 of a mile north of Hillside Drive. $1,520,000
Bridge Replacement

Highway Safety and Spot


025955.04 Improvements
Located at the intersection of Route 202 and
2023/24 Lebanon Rural Highways Route 202
Depot Road. $24,000
HCP 1 Intersection Improvements W/
Signal

Highway Safety and Spot


026288.00
Improvements
Located at the intersection of Route 202,
2023/24 Lebanon Route 202
Rural Highways Center Street and Long Swamp Road. $2,500,000
HCP 1
Safety Improvements

Replacing wearing surface, repairing center


WR 43430 Bridge and Structural pier, abutments, and pave approaches.
Lebanon Maintenance Little River Road Gristmill Bridge (#5258) which carries Little
2022 $60,000
River Road over Little River in Lebanon.
Located 0.32 of a mile north of Chick Road.

WR 43470 Ditching on Route 25 in Limington. Beginning


Drainage Maintenance at the intersection of Route 11 and extending
2022 Limington Route 25 $50,000
north 4.60 miles north to the intersection of
HCP 2 Cape Road.

Highway Safety and Spot


020248.00 Improvements
Beginning at Route 35 and extending west
2022 Lyman Rural Highways Route 111
0.86 of a mile. $210,000
HCP 1 Highway Improvement - PE
Only

Highway Safety and Spot


022895.00
Improvements
Located at the intersection of Route 35 and
2023/24 Lyman Route 35 $185,000
Rural Highways South Street.
HCP 4
Flashing Beacon

025857.00
Highway Paving
Beginning at Route 111 and extending north
2023 Lyman Kennebunk Pond Road
2.11 miles to the South Waterboro Road.
Light Capital Paving
HCP 4

Highway Safety and Spot


026282.00
Improvements
Located at the intersection of Route 111 and
2023/24 Lyman Route 111
Rural Highways Day Road. $1,100,000
HCP 1
Safety Improvements

WR 43366
Drainage Maintenance Ditching on Kennebunk Pond Road.
2022 Lyman Kennebunk Pond Road Beginning at Route 111 and extending north $55,000
2.11 miles to South Waterboro.
HCP 4

163
ID/Year Municipality Scope Name Description Total Project Cost

024963.00
Highway Paving
Lyman, Beginning at May Street and extending
2022 South Waterboro Road
Waterboro southeast 7.67 miles.
Light Capital Paving
HCP 4

Highway Safety and Spot


023687.00 Improvements
Beginning at Bridge Street and extending
2022 Newfield Rural Highways Route 11
east 0.14 of a mile. $80,000
HCP 4 Highway Improvement - PE
Only

024963.00
Highway Paving
Beginning at the New Hampshire state line
2022 Newfield Route 110
and extending east 3.57 miles to Route 11.
Light Capital Paving
HCP 4

WR 43367
Drainage Maintenance Ditching on Route 11 in Newfield. Beginning
2022 Newfield Route 11 at the intersection of Route 110 extending $21,000
3.95 miles to the Newfield-Limerick town line.
HCP 4

WR 43571
Drainage Maintenance Ditching on Route 110 in Newfield. Beginning
2022 Newfield Route 110 at the New Hampshire-Maine State border $30,000
and extending west 3.60 miles to Route 11.
HCP 4

024963.00
Highway Paving
Newfield, Beginning at Route 11 and extending south
2022 Newfield Road
Shapleigh 5.25 miles to West Road.
Light Capital Paving
HCP 4

Rail
025901.00
Railroad crossing (#053153A) located at the
North Berwick Rail/Highway Crossings Route 4 $180,000
2022 intersection of Route 4 and Buffum Road.
Rail Crossing Improvements

025119.00 Highway Paving


North Berwick, Beginning 0.12 of a mile north of Lebanon
2022 Rural Highways Route 4
Sanford Road and extending north 7.02 miles.
HCP 2 Hot-In-Place Recycle

Ports-Harbors
023084.00 Replacement of the Pedestrian Draw Bridge
Ogunquit Piers, Floats and Fenders Pedestrian Draw Bridge at Perkins Cove. Located 0.14 of a mile south
2023/24 $1,000,000
of the Whistling Oyster Lane.
Rehabilitation

025857.00
Highway Paving
Beginning at the York town line and
2023 Ogunquit Shore Road
extending north 1.36 miles to Route 1.
Light Capital Paving
HCP 4

164
ID/Year Municipality Scope Name Description Total Project Cost

Rail
025903.00
Old Orchard Rail/Highway Crossings Railroad crossing (#053204H) located 0.03 of
Walnut Street
2022 Beach a mile north of Route 9. $352,000
Signal Improvements
(Rail/Highway Xing)

025961.00 Highway Paving


Beginning at Saco Avenue and extending
Old Orchard
2023/24 Urban Highways Union Avenue east 0.60 of a mile to West Grand Avenue.
Beach
PACTS Sponsored.
HCP 4 Mill And Fill

025965.00 Highway Paving


Beginning at Washington Avenue and
Old Orchard
2023/24 Urban Highways Route 5 extending east 0.30 of a mile to Old Orchard
Beach
Street. PACTS Sponsored.
HCP 2 Mill And Fill

025853.00
Highway Paving
Beginning at South Road and extending
2023 Parsonsfield Merrill Hill Road
north 5.07 miles to Route 160.
Light Capital Paving
HCP 4

Highway Safety and Spot


021938.04 Improvements
Business Partnership Initiative Program.
2022 Saco Urban Highways Route 1 Located at the intersection of Route 1 and $480,000
Flag Pond Road.
HCP 2 Intersection Improvements W/
Signal

Bus
023274.00
Saco Parking Lots Park and Ride Lot Located 0.60 of a mile north of North Street.
2023/24 $430,000
Rehabilitation

024163.00 Highway Paving


Beginning 0.02 of a mile south of Cascade
2023/24 Saco Urban Highways Route 1
Road and extending north 1.06 miles.
HCP 2 Mill And Fill

025857.00
Highway Paving
Beginning at Route 5 and extending north
2023 Saco Louden Road
0.57 of a mile.
Light Capital Paving
HCP 4

Policy, Planning and Research


018706.02 Safety and infrastructure improvements that
Sanford Seacoast
Sanford Airport - General may include a Master Plan Update at the $172,000
2022 Regional Airport
Sanford Seacoast Regional Airport (SFM).
Planning Studies

Aviation
018706.05 Safety and infrastructure improvements that
Sanford Seacoast
Sanford Apron may include design, permitting and
2023/24 Regional Airport $2,290,000
construction of the apron.
Reconstruction

165
ID/Year Municipality Scope Name Description Total Project Cost

Policy, Planning and Research


018706.06
Airport - General Sanford Seacoast
Sanford Targeted Master Plan Update.
2022 Regional Airport $172,000
Field Investigations, Studies,
And Research

Highway Safety and Spot


019001.00 Improvements
Located at the intersection of Route 4 and
2023/24 Sanford Rural Highways Route 4
School Street. $1,840,000
HCP 2 Intersection Improvements W/
Signal

Highway
022642.00
Construction/Rehabilitation
Beginning at River Street and extending
2023/24 Sanford Route 202
Rural Highways north 0.72 of a mile. $6,200,000
HCP 1
Reconstruction

Highway Safety and Spot Intersections of Route 109/ Emery Street,


022678.00 Improvements Washington Street, Lebanon/Winter Street,
Route 11A /224, Route 4 and Cottage Street,
2022 Sanford Urban Highways Various Locations
Route 109 at Walmart, Jagger Mill at Shaw's, $180,000
HCP 1, 3 Intersection Improvements W/ Westview at Mardens, Route 4A and Route
Signal - PE Only 224, Route 224 and River Street.

Highway Safety and Spot


023747.00
Improvements
Large culvert (#46484) located 0.19 of a mile
2023/24 Sanford Route 202 $180,000
Rural Highways northeast of Jellerson Road.
HCP 1
Large Culvert Rehabilitation

Highway Safety and Spot


024395.01 Main Street beginning at Emery Street
Improvements
extending north 0.53 of a mile. School Street
2022 Main Street/School
Sanford Urban Highways beginning at Elm Street extending north 0.21
Street/Washington Street $400,000
HCP 1, 2, 4, of a mile. Washington Street beginning at
Highway Improvement - PE Main Street extending north 0.21 of a mile.
5
Only

Highway
024641.06
Construction/Rehabilitation Municipal Partnership Initiative Program.
2022 Sanford River Street Beginning at High Street and extending north $1,660,000
Urban Highways
0.80 of a mile to Votech Drive.
HCP 4
Highway Rehabilitation

System Operations by Others Transit Administrative and Operating


024651.12 Assistance for Federal Transit Administration
Rural Transit Admin/
Sanford Transit - General §5311 for statewide non-urbanized transit. $1,650,000
2022 Operations
York County Community Action Corporation
Operating Assistance ME-2020-027.

System Operations by Others Transit Administrative and Operating


025225.00
Rural Transit Admin/ Assistance for Federal Transit Administration
Sanford Transit - General
2023 Operations §5311 for non-urbanized transit. York County $1,880,000
Operating Assistance Community Action Corporation (YCCAC).

025317.00
Powers Bridge (#3827) over Mousam River.
Highway-Bridges
2023/24 Sanford Route 4 Located 0.12 of a mile southwest of Gavel $3,620,000
Bridge Replacement Road.
HCP 2

166
ID/Year Municipality Scope Name Description Total Project Cost

025335.00 Bicycle/Pedestrian Beginning at Washington Street and


Riverside Avenue/
extending northwest 0.89 of a mile. Including
2023/24 Sanford On-Road Sidewalk/Trail William Oscar Emery
the intersection of William Oscar Emery Drive $1,170,000
Drive
HCP 4, 5 New Construction and River Street.

Bus
026306.00
Sanford Parking Lots Park and Ride Lot Located on Emerson Street.
2023/24 $210,000
New Construction

Bicycle/Pedestrian
026310.00 Purchase and installation of new and
Sanford On-Road Sidewalk/Trail Various locations replacement regulatory and warning signage
2022 $75,000
at various locations.
Safety Improvements

WR 43819
Bridge and Structural Replacing bearing plates on Powers Bridge
2022 Sanford Maintenance Route 4 (#3827) located in Sanford which carries $30,000
Route 4 over the Mousam River.
HCP 2

024963.00
Highway Paving
Beginning 0.05 of a mile north of the Sanford
2022 Shapleigh Route 109
town line and extending north 1.90 miles.
Light Capital Paving
HCP 2

Highway Safety and Spot


021829.00 Improvements
Located at the intersection of Routes 236 and
2022 South Berwick Urban Highways Route 91
91. $2,750,000
HCP 2 Intersection Improvements W/
Signal

023136.00
Toll Bridge (#3017) over Salmon Falls River.
Highway-Bridges
2022 South Berwick Route 101 Located 0.27 of a mile northwest of $100,000
Bridge Improvements - PE Only Waterside Lane.
HCP 4

023645.00 Salmon Falls Bridge (#5700) over Salmon


Highway-Bridges Falls River. Located on the South Berwick,
2022 South Berwick Main Street $200,000
Maine- Rollinsford, New Hampshire state
Bridge Improvements - PE Only line.
HCP 4

Highway Safety and Spot


024281.00
Improvements
Large culvert (#46515) located 0.17 of a mile
2022 Waterboro Route 202
Rural Highways west of Old Alfred Road. $560,000
HCP 1
Large Culvert Improvements

024963.00
Highway Paving Beginning 0.06 of a mile northeast of the
2022 Waterboro West Road Shapleigh town line and extending south 6.31
Light Capital Paving miles.
HCP 4

167
ID/Year Municipality Scope Name Description Total Project Cost

023535.00
Buffam Bridge (#2107) over Webhannet
Highway-Minor Spans
2023/24 Wells Post Road River. Located 0.02 of a mile south of Falls $1,770,000
Bridge Replacement Park.
HCP 2

Highway Safety and Spot


023791.00
Improvements
Located at the intersection of Route 109 and
2022 Wells Route 109
Rural Highways Garden Street. $110,000
HCP 1
Safety Improvements - PE Only

Highway Safety and Spot


023913.10
Improvements Improvements to Furbish Road within the
Rachel Carson
2023/24 Wells Rachel Carson National Wildlife Refuge.
Rural Highways Sanctuary $64,000
Federal Lands Access Program.
HCP 5
Drainage Improvements

Rail Expanded platform project at the site of the


024321.00
Wells Siding and existing Wells Amtrak stop, and construct a
Wells Sidings
2022 Platform second, parallel track continuing south for $3,900,000
New Construction approximately 6.00 miles.

025857.00
Highway Paving
Beginning at Route 9 and extending north
2023 Wells Route 9A
0.88 of a mile to Route 109.
Light Capital Paving
HCP 4

Rail
025905.00
Rail/Highway Crossings Railroad crossing (#053168P) located 0.36 of
Wells Burnt Mill Road $348,000
2022 a mile northwest of Route 9.
Signal Improvements
(Rail/Highway Xing)

Beginning 0.04 of a mile south of Lindsay


Highway Road extending north 0.15 of a mile then
021651.00
Construction/Rehabilitation northeast 0.17 of a mile on Long Sands
Route 1A/Long Sands
2023/24 York Road. Also includes 0.29 of a mile of Route
Urban Highways Road $3,240,000
1A from intersection to Moulton Lane;
HCP 3, 4 construction in WIN 21651.01. KACTS
Intersection Reconstruction
Sponsored.

Highway
021651.01
Construction/Rehabilitation Beginning at Hospital Drive and extending
2023/24 York Route 1A south 0.29 of a mile to Moulton Lane. $795,000
Urban Highways
KACTS Sponsored.
HCP 3
Highway Rehabilitation

Highway Safety and Spot


021904.00 Improvements
Located at the intersection of Route 1A and
2022 York Rural Highways Route 1A
Long Sands Road. $38,000
HCP 3 Intersection Improvements W/
Signal - PE Only

System Operations by Others Transit Capital and Operating Assistance


024843.15 from Federal Transit Administration §5307 -
York Transit - General Urban Transit Operations Urban Program. American Rescue Plan –
2022 $377,000
Dover/Rochester and Portsmouth
System Operations apportionment.

168
ID/Year Municipality Scope Name Description Total Project Cost

025857.00
Highway Paving Beginning at the Kittery town line and
2023 York Route 103 extending north 2.01 miles to Harris Island
Light Capital Paving Road.
HCP 4

169
Statewide Capital
Projects
Ë
Statewide Capital
ID/Year Municipality Scope Name Description Total Project Cost

018896.16
1 - Southern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $6,190,000

018896.17
1 - Southern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $7,300,000

018995.15
1 - Southern Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $100,000

018995.16
1 - Southern Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000

018995.17
1 - Southern Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000

022196.16
1 - Southern Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $4,330,000

024813.00 Highway Safety and Spot


1 - Southern Improvements ADA Improvements for LCP and CPR in
Various Locations $415,000
2022 Region Region 1.

025527.00
Highway Safety and Spot
1 - Southern Improvements
2022 Various Locations Truck Weigh Areas.
Region $100,000
HCP 2

026592.00 Highway Safety and Spot


1 - Southern Improvements ADA Improvements for LCP and CPR in
Various Locations
2023 Region Region 1. $10,000

024097.00 Rail Upgrades to the Pan Am Mainline from


1 - Southern
Yarmouth to Waterville. This project is only
Region, 2 - Mid- Pan Am Rail
2022 Line/Track partially funded for construction. CRISI Grant $35,500,000
Coast Region
recipient.

170
ID/Year Municipality Scope Name Description Total Project Cost

1 - Southern
025321.00 Region, 2 - Mid-
Maine Advanced Signal Control and
Coast Region, 3 Highway Safety and Spot Connected Vehicle System for safe, efficient,
2023 - Western Improvements Various Locations and equitable rural transportation (MAST)
Region, 4 - $6,970,000
HCP 1, 2, 3, Project. This project is a successful ATCMTD
Eastern Region,
4 grant recipient.
5 - Northern
Region

024261.00 1 - Southern
Region, 3 - Highway Safety and Spot
2022 Western Region, Improvements Procurement of sign equipment and
Various Locations
4 - Eastern accessories. $112,000
HCP 1, 2, 3, Region, 5 -
4 Northern Region

018896.26
2 - Mid-Coast Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $4,570,000

018896.27
2 - Mid-Coast Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $4,710,000

018995.25
2 - Mid-Coast Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $123,000

018995.26
2 - Mid-Coast Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000

018995.27
2 - Mid-Coast Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000

022196.26
2 - Mid-Coast Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $2,830,000

023727.00 Highway Safety and Spot


2 - Mid-Coast Improvements Various Locations Replace guardrail.
2022 Region $165,000

023729.00 Highway Safety and Spot


2 - Mid-Coast Improvements Various Locations Guardrail upgrades.
2022 Region $117,000

171
ID/Year Municipality Scope Name Description Total Project Cost

024809.00 Highway Safety and Spot


2 - Mid-Coast Improvements ADA Improvements for CPR and LCP in
Various Locations
2022 Region Region 3. $56,000

024811.00 Highway Safety and Spot


2 - Mid-Coast Improvements ADA Improvements for CPR and LCP in
Various Locations
2022 Region Region 2. $716,000

026594.00 Highway Safety and Spot


2 - Mid-Coast Improvements ADA Improvements for CPR and LCP in
Various Locations
2023 Region Region 2. $115,000

026456.00
2 - Mid-Coast Highway Preservation Paving
2023 Region, 4 - Various Locations Statewide interstate ramp paving. $2,000,000
Eastern Region
HCP 1

018896.36
3 - Western Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $3,310,000

018896.37
3 - Western Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $5,010,000

018995.35
3 - Western Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $100,000

018995.36
3 - Western Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000

018995.37
3 - Western Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000

022196.36
3 - Western Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $3,120,000

172
ID/Year Municipality Scope Name Description Total Project Cost

026596.00 Highway Safety and Spot


3 - Western Improvements ADA Improvements for CPR and LCP in
Various Locations
2023 Region Region 3. $10,000

018896.46
4 - Eastern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $5,580,000

018896.47
4 - Eastern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $6,000,000

018995.45
4 - Eastern Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $100,000

018995.46
4 - Eastern Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000

018995.47
4 - Eastern Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000

022196.46
4 - Eastern Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $4,210,000

024807.00 Highway Safety and Spot


4 - Eastern Improvements Various Locations ADA Improvements for LCP in Region 4
2022 Region $606,000

026598.00 Highway Safety and Spot


4 - Eastern Improvements Various Locations ADA Improvements for LCP in Region 4
2023 Region $35,000

025631.00 4 - Eastern Interstate, NHS, and Freight Network bridge


Bridge Construction
Region, 5 - Various Locations deck replacements. FHWA INFRA Grant
2024 $80,800,000
Northern Region recipient.

173
ID/Year Municipality Scope Name Description Total Project Cost

018896.56
5 - Northern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $4,280,000

018896.57
5 - Northern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $3,780,000

018995.55
5 - Northern Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $96,000

018995.56
5 - Northern Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000

018995.57
5 - Northern Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000

022196.56
5 - Northern Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $2,700,000

016336.22 Highway Safety and Spot Enhance the MLRC Road System
Statewide Improvements RSMS Sign Software Management Software to include technical
2022 $25,000
assistance and software adjustments.

016336.23 Highway Safety and Spot Enhance the MLRC Road System
Statewide Improvements RSMS Sign Software Management Software to include technical
2023 $25,000
assistance and software adjustments.

016336.24 Highway Safety and Spot Enhance the MLRC Road System
Statewide Improvements RSMS Sign Software Management Software to include technical
2024 $25,000
assistance and software adjustments.

018516.22 Bicycle/Pedestrian Management fee to Maine Department of


Statewide Down East Sunrise Trail Agriculture, Conservation, and Forestry for
2022 Off-Road Trail/Path $50,000
oversight of the Down East Sunrise Trail.

174
ID/Year Municipality Scope Name Description Total Project Cost

018516.23 Bicycle/Pedestrian Management fee to Maine Department of


Statewide Down East Sunrise Trail Agriculture, Conservation, and Forestry for
2023 Off-Road Trail/Path $50,000
oversight of the Down East Sunrise Trail.

018516.24 Bicycle/Pedestrian Management fee to Maine Department of


Statewide Down East Sunrise Trail Agriculture, Conservation, and Forestry for
2024 Off-Road Trail/Path $50,000
oversight of the Down East Sunrise Trail.

018517.22 Bus
Statewide Various Locations Capital improvements to Park and Ride Lots.
2022 Parking Lots $100,000

018517.23 Bus
Statewide Various Locations Capital improvements to Park and Ride Lots.
2023 Parking Lots $100,000

018517.24 Bus
Statewide Various Locations Capital improvements to Park and Ride Lots. $100,000
2024 Parking Lots

018521.22 Rail A MaineDOT public/private matching


Industrial Rail Access program to support economic opportunity by
Statewide $2,500,000
2022 Line/Track Program improving freight rail-related infrastructure for
Maine businesses and shippers.

018521.23 Rail A MaineDOT public/private matching


Industrial Rail Access program to support economic opportunity by
Statewide $4,000,000
2023 Line/Track Program improving freight rail-related infrastructure for
Maine businesses and shippers.

018521.24 Rail A MaineDOT public/private matching


Industrial Rail Access program to support economic opportunity by
Statewide $4,000,000
2024 Line/Track Program improving freight rail-related infrastructure for
Maine businesses and shippers.

A Federal Highway Administration funding


018524.22 Bicycle/Pedestrian set-aside that MaineDOT transfers to the
Recreational Trails
Statewide Maine Department of Agriculture, $1,400,000
2022 Off-Road Trail/Path Program
Conservation and Forestry for improvements
to multi-use trails.

A Federal Highway Administration funding


018524.23 Bicycle/Pedestrian set-aside that MaineDOT transfers to the
Recreational Trails
Statewide Maine Department of Agriculture,
2023 Off-Road Trail/Path Program $1,400,000
Conservation and Forestry for improvements
to multi-use trails.

175
ID/Year Municipality Scope Name Description Total Project Cost

A Federal Highway Administration funding


018524.24 Bicycle/Pedestrian set-aside that MaineDOT transfers to the
Recreational Trails
Statewide Maine Department of Agriculture,
2024 Off-Road Trail/Path Program $1,400,000
Conservation and Forestry for improvements
to multi-use trails.

018599.22 Rail
Operational improvements to state-owned rail
Statewide State-Owned Rail Lines
2022 Line/Track lines. $1,410,000

018599.23 Rail
Operational improvements to state-owned rail
Statewide State-Owned Rail Lines
2023 Line/Track lines. $1,410,000

018599.24 Rail
Operational improvements to state-owned rail
Statewide State-Owned Rail Lines
2024 Line/Track lines. $1,410,000

018717.05 Aviation Safety and infrastructure improvements that


Statewide Various Locations may include statewide crack sealing at $618,000
2023 Runway/Taxiway
multiple Airports across the State.

018717.07 Aviation Safety and infrastructure improvements that


Statewide Various Locations include siting and design for AWOS III at $691,000
2022 Navigation Aids/Lights
various airports.

018717.08 Aviation Safety and infrastructure improvements to


Statewide Various Locations include installation of AWOS III at various $1,000,000
2023 Navigation Aids/Lights
airports.

018898.00 Highway Safety and Spot Provide reflectorized delineators to mitigate


Improvements Selected Moose
Statewide moose crashes and install in-pavement solar $30,000
2022 Corridors
lights at selected locations.

019518.22 Bus
Statewide maintenance of Park and Ride
Statewide Various Locations
2022 Parking Lots lots. $70,000

019518.23 Bus
Statewide maintenance of Park and Ride
Statewide Various Locations
2023 Parking Lots lots. $70,000

176
ID/Year Municipality Scope Name Description Total Project Cost

019518.24 Bus
Statewide maintenance of Park and Ride
Statewide Various Locations
2024 Parking Lots lots. $70,000

020222.22 This program disburses a portion of the State


Non-Project Capital Local Roads Assistance Highway Fund directly to municipalities
Statewide
2022 Program primarily for capital improvement of local $21,600,000
roads.

020222.23 This program disburses a portion of the State


Non-Project Capital Local Roads Assistance Highway Fund directly to municipalities
Statewide
2023 Program primarily for capital improvement of local $21,300,000
roads.

020222.24 This program disburses a portion of the State


Non-Project Capital Local Roads Assistance Highway Fund directly to municipalities
Statewide
2024 Program primarily for capital improvement of local $21,900,000
roads.

020237.23 Highway Safety and Spot


Improvements Improvements at MaineDOT Visitor
Statewide Various Locations $215,000
2023 Information Centers.

020237.24 Highway Safety and Spot


Improvements Improvements at MaineDOT Visitor
Statewide Various Locations $225,000
2024 Information Centers.

020773.22
Non-Project Capital FTA Section 5311 for Capital Assistance -
Statewide Rural Transit Capital $100,000
2024 transit agencies statewide RURAL.

020777.22 FTA Section 5310 for Operating / Capital


Non-Project Capital
Statewide Rural Transit Capital Assistance - transit agencies statewide $938,000
2022
RURAL.

020791.22
Non-Project Capital FTA Section 5310 for Operating / Capital
Statewide Urban Transit Capital
2022 Assistance - transit agencies URBAN. $750,000

020809.22 Capital equipment acquisition for the Maine


Non-Project Capital
Statewide Public Safety Equipment State Police Commercial Vehicle
2022 $250,000
Enforcement unit.

177
ID/Year Municipality Scope Name Description Total Project Cost

020809.23 Capital equipment acquisition for the Maine


Non-Project Capital
Statewide Public Safety Equipment State Police Commercial Vehicle
2023 $250,000
Enforcement unit.

020809.24 Capital equipment acquisition for the Maine


Non-Project Capital
Statewide Public Safety Equipment State Police Commercial Vehicle
2024 $250,000
Enforcement unit.

020821.22 Highway Safety and Spot


Improvements Landscaping support associated with high-
Statewide Landscaping
2022 profile projects. $50,000

020821.23 Highway Safety and Spot


Improvements Landscaping support associated with high-
Statewide Landscaping
2023 profile projects. $50,000

020821.24 Highway Safety and Spot


Improvements Landscaping support associated with high-
Statewide Landscaping $50,000
2024 profile projects.

020826.22 Freight Annual cost-share for Innovative Technology


Statewide Data Management Design (ITD) hosting and system $135,000
2022 Freight Monitoring Facility
maintenance.

020826.23 Freight Annual cost-share for Innovative Technology


Statewide Data Management Design (ITD) hosting and system $140,000
2023 Freight Monitoring Facility
maintenance.

020826.24 Freight Annual cost-share for Innovative Technology


Statewide Data Management Design (ITD) hosting and system
2024 Freight Monitoring Facility $140,000
maintenance.

020828.22 Rail
Statewide Various Locations Rail Line Improvements.
2022 Line/Track $1,500,000

020828.23 Rail
Statewide Various Locations Rail Line Improvements.
2023 Line/Track $1,500,000

178
ID/Year Municipality Scope Name Description Total Project Cost

020828.24 Rail
Statewide Various Locations Rail Line Improvements.
2024 Line/Track $1,500,000

021844.00
Non-Project Capital Work Zone Sign
Statewide Work Zone sign packages for Local Roads.
2022 Packages $120,000

022048.00 Highway Safety and Spot Pedestrian Safety efforts: Projects such as
Statewide Improvements Various Locations overhead lighting, signage, signals, crossing
2022 $50,000
improvements, etc.

022777.22
Ferry Maine State Ferry Maine State Ferry Service infrastructure
Statewide
2022 Service improvements. $630,000

022777.23
Ferry Maine State Ferry Maine State Ferry Service infrastructure
Statewide $630,000
2023 Service improvements.

022777.24
Ferry Maine State Ferry Maine State Ferry Service infrastructure
Statewide $630,000
2024 Service improvements.

022779.21
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital $3,830,000
2022 Statewide - Statewide National Distribution.

022779.22
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital
2022 Statewide - Statewide National Distribution. $4,380,000

022783.22
Non-Project Capital State bond funds to match FTA funding for
Statewide Transit
2022 Transit Buses - capital projects only. $850,000

Rail/Highway Crossing Improvement


022814.23 Rail Program (23 USC 130). These funds provide
Statewide Rail/Highway Crossing for the elimination of hazards and the
2023 Rail/Highway Crossings $294,000
installation of protective devices at public
rail/highway crossings.

179
ID/Year Municipality Scope Name Description Total Project Cost

Rail/Highway Crossing Improvement


022814.24 Rail Program (23 USC 130). These funds provide
Statewide Rail/Highway Crossing for the elimination of hazards and the
2024 Rail/Highway Crossings $1,200,000
installation of protective devices at public
rail/highway crossings.

022988.00 Highway Safety and Spot


Statewide Improvements Curve Warning Signs Upgrade curve warning signs.
2022 $1,000,000

023771.00 Highway Safety and Spot Went-off-road safety mitigation on 5-8


Statewide Improvements Off-Road Mitigations selected high-risk curves on HCP 1 or 2
2022 $200,000
roads.

023773.00 Highway Safety and Spot Address pedestrian safety infrastructure


Improvements Pedestrian Safety needs within some of the focus communities
Statewide
2022 Improvements that were identified through Pedestrian $165,000
Safety Forums/Site Safety Reviews.

023777.00 Highway Safety and Spot


Improvements Wrong Way remediation for Interstate on-
Statewide Various Interstate Ramps $150,000
2023 ramps and off-ramps.

024181.00 Highway Safety and Spot


Statewide Improvements Various Locations Small message boards.
2022 $25,000

024183.00 Highway Safety and Spot


Improvements Procurement of Dynamic Speed feedback
Statewide Various Locations $200,000
2022 signs.

024225.00 Highway Safety and Spot In conjunction with Public Safety, the location
Statewide Improvements Various Locations identification and implementation of Wrong
2023 $250,000
Way mitigation strategies.

024229.00 Highway Safety and Spot


Statewide Improvements Various Locations Procurement of School Zone signage.
2022 $500,000

024231.00 Highway Safety and Spot


Improvements Procurement of Rectangular Rapid Flashing
Statewide Various Locations
2022 Beacons (RRFB). $250,000

180
ID/Year Municipality Scope Name Description Total Project Cost

024547.00 Highway Safety and Spot


Statewide Improvements Various Locations New and replacement rumble strip program.
2022 $1,240,000

024549.00 Highway Safety and Spot


Improvements Statewide cable guardrail
Statewide Various Locations
2022 installation/replacement. $1,200,000

024553.00 Highway Safety and Spot


Statewide Improvements Various Locations Installation of flashing LED stop signs.
2022 $69,000

024555.00 Highway Safety and Spot


Improvements Systemic 3-Leg Rural Stop Control Sign
Statewide Various Locations
2022 Upgrades. $240,000

024605.00
Ferry Maine State Ferry Design for a new ferry that services the
Statewide $500,000
2022 Service Maine State Ferry Service.

A MaineDOT partnership program for


024641.00 municipalities that supports economic
Highway Preservation Paving
Statewide MPI Program opportunity through improvements to the
2022 $2,290,000
state highway system.

024709.00
Non-Project Capital FTA Section 5310 Statewide Capital
Statewide Rural Transit Capital $882,000
2023 Projects.

024731.00
Non-Project Capital FTA Section 5310 Statewide-Urban Capital
Statewide Urban Transit Capital
2023 Projects. $706,000

024733.00
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital
2023 Statewide - Statewide National Distribution. $4,120,000

024791.00 Replace existing E. Frank Thompson engines


Ferry Maine State Ferry with new, cleaner and reduced emission
Statewide
2022 Service engines. Funding provided by Maine's $250,000
Volkswagen settlement allocation.

181
ID/Year Municipality Scope Name Description Total Project Cost

Transit Capital Assistance from Federal


024843.11 Transit Administration § 5310 - Enhanced
Non-Project Capital
Statewide Rural Transit Capital Mobility of Seniors and Individuals with
2022 $122,000
Disabilities. CRRSAA – Rural
apportionment.

Transit Capital Assistance from Federal


024843.12 Transit Administration § 5310 - Enhanced
Non-Project Capital
Statewide Urban Transit Capital Mobility of Seniors and Individuals with
2022 $52,000
Disabilities. CRRSAA – Small Urban
apportionment - locations TBD.

024897.00
Ferry Maine State Ferry Design for a new ferry that services the
Statewide
2022 Service Maine State Ferry Service. $380,000

024897.10
Ferry Maine State Ferry New ferry that services the Maine State Ferry
Statewide
2022 Service Service. $10,000,000

024987.00 Highway Safety and Spot


Statewide Improvements Various Locations New and replacement rumble strip program.
2023 $745,000

A MaineDOT partnership program for


025033.00 municipalities that supports economic
Highway Preservation Paving
Statewide MPI Program opportunity through improvements to the
2023 $16,000,000
state highway system.

A public-private matching program that


025037.00 Highway Safety and Spot supports economic opportunity by sharing the
Statewide Improvements BPI Program cost of improvements to the state highway
2022 $6,000,000
system that arise from businesses and/or
municipalities.

A public-private matching program that


025039.00 Highway Safety and Spot supports economic opportunity by sharing the
Statewide Improvements BPI Program cost of improvements to the state highway
2023 $6,000,000
system that arise from businesses and/or
municipalities.

025041.00 Remaining allocation for projects to be


Highway Light Capital Paving
Statewide Light Capital Paving selected based on pavement conditions in
2023 $9,130,000
order to keep roads serviceable.

025091.00 Highway Safety and Spot


Statewide Improvements Various Locations Vertical Speed Treatments.
2023 $50,000

182
ID/Year Municipality Scope Name Description Total Project Cost

025169.00 Highway Safety and Spot


Improvements Statewide cable guardrail
Statewide Various Locations
2023 installation/replacement. $800,000

025171.00 Highway Safety and Spot Hardware procurement contract to buy


Improvements equipment meant to enhance the safety in
Statewide Safety Vertical Elements
2022 areas identified during road safety $88,000
assessments and audits.

025261.00 Highway Safety and Spot


Improvements Purchase of LED Signs for Safety
Statewide Various Locations
2023 Improvements. $100,000

025263.00 Highway Safety and Spot


Improvements Install Backplates with Yellow Reflective
Statewide Various Locations
2023 Strips and Supplemental Signal Heads. $100,000

025485.00
Highway Preservation Paving
Statewide Various Locations Interstate crack sealing.
2023 $600,000

025493.00 Highway Safety and Spot


Statewide Improvements Various Locations Wrong-way driving mitigation.
2024 $250,000

025495.00 Highway Safety and Spot


Statewide Improvements Various Locations In-street pedestrian crossing signs.
2023 $51,000

025497.00 Highway Safety and Spot


Statewide Improvements Various Locations Install School Zone signage.
2023 $251,000

025499.00 Highway Safety and Spot


Statewide Improvements Various Locations Dynamic Speed signs.
2023 $251,000

025501.00 Highway Safety and Spot


Improvements Install Rectangular Rapid Flashing Beacons
Statewide Various Locations
2023 at select locations. $251,000

183
ID/Year Municipality Scope Name Description Total Project Cost

025571.00 FTA Section 5310 for Operating / Capital


Non-Project Capital
Statewide Urban Transit Capital Assistance - transit agencies statewide
2024 $706,000
Urban.

025573.00
Non-Project Capital FTA Section 5310 for Operating / Capital
Statewide Rural Transit Capital
2024 Assistance - transit agencies statewide Rural. $882,000

025651.00
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital
2024 Statewide - Statewide National Distribution. $4,120,000

Scoping, design, and construction of a state-


025923.00 Highway Safety and Spot municipal partnerships to improve the
Improvements Village Partnership economic vitality and livability of village
Statewide
2022 Initiative (VPI) areas. Projects may compete for $10,000,000
discretionary grants (est. $32M) associated
with the Bipartisan Infrastructure Law (IIJA).

Scoping, design, and construction of a state-


025925.00 Highway Safety and Spot municipal partnerships to improve the
Improvements Village Partnership economic vitality and livability of village
Statewide $10,000,000
2023 Initiative (VPI) areas. Projects may compete for
discretionary grants (est. $32M) associated
with the Bipartisan Infrastructure Law (IIJA).

Scoping, design, and construction of a state-


025927.00 Highway Safety and Spot municipal partnerships to improve the
Improvements Village Partnership economic vitality and livability of village
Statewide $10,000,000
2024 Initiative (VPI) areas. Projects may compete for
discretionary grants (est. $32M) associated
with the Bipartisan Infrastructure Law (IIJA).

025929.22 Highway Safety and Spot


Improvements Maintaining weigh stations in support of
Statewide Weigh Stations $250,000
2022 Maine State Police.

025929.23 Highway Safety and Spot


Improvements Maintaining weigh stations in support of
Statewide Weigh Stations
2023 Maine State Police. $250,000

025929.24 Highway Safety and Spot


Improvements Maintaining weigh stations in support of
Statewide Weigh Stations
2024 Maine State Police. $250,000

025951.00 Highway Safety and Spot Implementation of Safety Improvements


Statewide Improvements Various Locations identified throughout the year through safety
2022 $1,410,000
audits and consultations with municipalities.

184
ID/Year Municipality Scope Name Description Total Project Cost

026013.00 Highway Safety and Spot


Statewide Improvements Various Locations Truck Weight Areas
2024 $220,000

026023.00 Highway Safety and Spot


Statewide Improvements Various Locations Obsolete Cable Guardrail Replacement.
2024 $493,000

026033.00 Projects to be selected annually based on


Highway Light Capital Paving
Statewide Light Capital Paving pavement conditions in order to keep roads
2024 $37,000,000
serviceable.

026039.00
Ferry Maine State Ferry Improve cold weather resilience of the E.
Statewide
2022 Service Frank Thompson Ferry. $50,000

A public-private matching program that


026051.00 Highway Safety and Spot supports economic opportunity by sharing the
Statewide Improvements BPI Program cost of improvements to the state highway
2024 $6,000,000
system that arise from businesses and/or
municipalities.

A MaineDOT partnership program for


026053.00 municipalities that supports economic
Highway Preservation Paving
Statewide MPI Program opportunity through improvements to the
2024 $16,000,000
state highway system.

026246.00 Highway Safety and Spot


Improvements Install large animal high impact area signage
Statewide Various Locations $75,000
2024 on select corridors.

026248.00 Highway Safety and Spot


Improvements Purchase of LED Signs for Safety
Statewide Various Locations
2024 Improvements. $100,000

026250.00 Highway Safety and Spot


Improvements Local Road Sign Retro-
Statewide Local Road Sign Retro-Reflectivity Upgrades.
2024 Reflectivity Upgrades $50,000

026252.00 Highway Safety and Spot Purchase equipment meant to enhance the
Statewide Improvements Various Locations safety in areas identified during road safety
2024 $76,000
assessments and audits.

185
ID/Year Municipality Scope Name Description Total Project Cost

026254.00 Highway Safety and Spot


Statewide Improvements Various Locations Purchase School Zone signage.
2024 $251,000

026256.00 Highway Safety and Spot


Statewide Improvements Various Locations Dynamic Speed signs.
2024 $251,000

026258.00 Highway Safety and Spot


Improvements Purchase Rectangular Rapid Flashing
Statewide Various Locations
2024 Beacons at select locations. $251,000

026260.00 Highway Safety and Spot


Statewide Improvements Various Locations New and replacement rumble strip program.
2024 $745,000

026410.00 Highway Safety and Spot


Improvements Warning, Regulatory
Statewide Warning, regulatory sign upgrades. $50,000
2023 Sign Upgrades

026458.00
Highway Preservation Paving
Statewide Various Locations Interstate crack sealing.
2024 $625,000

026580.00 Ports-Harbors
Electronic upgrades to Ferry Service
Statewide MSFS Facilities $100,000
2022 Marine Buildings/Facilities Facilities.

186
Statewide Operations
Ë
Statewide Operations
ID/Year Municipality Scope Name Description Total Project Cost

BR 23027
System Operations 24-Hour Transportation Management Center
Statewide Various Locations
2022 (TMC). $900,000

BR 23099
System Operations 24-Hour Transportation Management Center
Statewide Various Locations
2023 (TMC). $950,000

BR 23153
System Operations 24-Hour Transportation Management Center
Statewide Various Locations
2024 (TMC). $1,000,000

BR 23062
Crew Operations
Statewide Dept. Operations Augusta Sign Shop operations.
2022 $875,000

BR 23134
Crew Operations
Statewide Dept. Operations Augusta Sign Shop operations.
2023 $900,000

BR 23188
Crew Operations
Statewide Dept. Operations Augusta Sign Shop operations.
2024 $925,000

Inventory and Performance


018549.22
Measurement Inspection of mast arms, sign trusses,
Statewide Ancillary Structures $500,000
2022 signals, and highway lighting.
Maintenance and Operations

Inventory and Performance


018549.23
Measurement Inspection of mast arms, sign trusses,
Statewide Ancillary Structures
2023 signals, and highway lighting. $500,000
Maintenance and Operations

Inventory and Performance


018549.24
Measurement Inspection of mast arms, sign trusses,
Statewide Ancillary Structures
2024 signals, and highway lighting. $500,000
Maintenance and Operations

Inventory and Performance


019928.22 Bridge Inspection and bridge load rating on
Measurement
Statewide Rail Bridges all MaineDOT-owned rail bridges on active
2022 $650,000
Maintenance and Operations rail lines.

187
ID/Year Municipality Scope Name Description Total Project Cost

Inventory and Performance


019928.23 Bridge Inspection and bridge load rating on
Measurement
Statewide Rail Bridges all MaineDOT-owned rail bridges on active
2023 $450,000
Maintenance and Operations rail lines.

Inventory and Performance


019928.24 Bridge Inspection and bridge load rating on
Measurement
Statewide Rail Bridges all MaineDOT-owned rail bridges on active
2024 $650,000
Maintenance and Operations rail lines.

Inventory and Performance


022035.22
Measurement Bridge inspections statewide to include scour
Statewide Bridge Inspections
2022 and testing of bridges. $4,500,000
Maintenance and Operations

Inventory and Performance


022035.23
Measurement Bridge inspections statewide to include scour
Statewide Bridge Inspections
2023 and testing of bridges. $4,500,000
Maintenance and Operations

Inventory and Performance


022035.24
Measurement Bridge inspections statewide to include scour
Statewide Bridge Inspections $4,500,000
2024 and testing of bridges.
Maintenance and Operations

022009.22 Administration
Design and Construction Bridge design and construction program
Statewide $1,230,000
2022 Capital Project Support Support management and project support.

022009.23 Administration
Design and Construction Bridge design and construction program
Statewide $1,280,000
2023 Capital Project Support Support management and project support.

022009.24 Administration
Design and Construction Bridge design and construction program
Statewide
2024 Capital Project Support Support management and project support. $1,280,000

022038.22 Work Program Management Responsible for general civil rights issues
Statewide Civil Rights and specific legal requirements related to civil
2022 Compliance Activities $315,000
rights under state and federal law.

022038.23 Work Program Management Responsible for general civil rights issues
Statewide Civil Rights and specific legal requirements related to civil
2023 Compliance Activities $315,000
rights under state and federal law.

188
ID/Year Municipality Scope Name Description Total Project Cost

022038.24 Work Program Management Responsible for general civil rights issues
Statewide Civil Rights and specific legal requirements related to civil
2024 Compliance Activities $315,000
rights under state and federal law.

022039.22 Administration Combination of federal grant and formula


funds for the Disadvantaged Business
Statewide DBE Support Services
2022 Compliance Activities Enterprise Program for federally funded $120,000
highway projects and contracts.

022039.23 Administration Combination of federal grant and formula


funds for the Disadvantaged Business
Statewide DBE Support Services
2023 Compliance Activities Enterprise Program for federally funded $120,000
highway projects and contracts.

022039.24 Administration Combination of federal grant and formula


funds for the Disadvantaged Business
Statewide DBE Support Services
2024 Compliance Activities Enterprise Program for federally funded $120,000
highway projects and contracts.

Combination of federal grant and federal


022040.22 Administration funds for Services to promote and increase
Statewide OJT Support diversity in employment in highway
2022 Compliance Activities $35,000
construction trades and on federally funded
projects.

Combination of federal grant and federal


022040.23 Administration funds for Services to promote and increase
Statewide OJT Support diversity in employment in highway
2023 Compliance Activities $35,000
construction trades and on federally funded
projects.

Combination of federal grant and federal


022040.24 Administration funds for Services to promote and increase
Statewide OJT Support diversity in employment in highway
2024 Compliance Activities $35,000
construction trades and on federally funded
projects.

Employee Education and


022042.22 Funding to promote education and
Training
Statewide Diversity Education employment in the trades to support
2022 $50,000
Compliance Activities economic opportunity.

Employee Education and


022042.23 Funding to promote education and
Training
Statewide Diversity Education employment in the trades to support
2023 $50,000
Compliance Activities economic opportunity.

Employee Education and


022042.24 Funding to promote education and
Training
Statewide Diversity Education employment in the trades to support
2024 $50,000
Compliance Activities economic opportunity.

189
ID/Year Municipality Scope Name Description Total Project Cost

022043.22 Communication and Outreach Annual FHWA National Summer


Transportation Institute (NSTI) grant funding
Statewide NSTI
2022 Compliance Activities to support youth education in transportation $35,000
related professions.

022043.23 Communication and Outreach Annual FHWA National Summer


Transportation Institute (NSTI) grant funding
Statewide NSTI
2023 Compliance Activities to support youth education in transportation $35,000
related professions.

022043.24 Communication and Outreach Annual FHWA National Summer


Transportation Institute (NSTI) grant funding
Statewide NSTI
2024 Compliance Activities to support youth education in transportation $35,000
related professions.

BR 23032
Contract Administration Contract Administration - Bureau of
Statewide Dept. Operations
2022 Maintenance and Operations. $1,400,000

BR 23104
Contract Administration Contract Administration - Bureau of
Statewide Dept. Operations $1,500,000
2023 Maintenance and Operations.

BR 23158
Contract Administration Contract Administration - Bureau of
Statewide Dept. Operations $1,600,000
2024 Maintenance and Operations.

022002.22 Administration
Construction contracts development,
Statewide Construction Contracts $525,000
2022 Capital Project Support procurement, and payment.

022002.23 Administration
Construction contracts development,
Statewide Construction Contracts
2023 Capital Project Support procurement, and payment. $530,000

022002.24 Administration
Construction contracts development,
Statewide Construction Contracts
2024 Capital Project Support procurement, and payment. $530,000

022017.22 Administration Direct labor and operating costs for


administration, user support, and
Statewide Engineering Software
2022 Capital Project Support development of the department's CADD $485,000
system.

190
ID/Year Municipality Scope Name Description Total Project Cost

022017.23 Administration Direct labor and operating costs for


administration, user support, and
Statewide Engineering Software
2023 Capital Project Support development of the department's CADD $605,000
system.

022017.24 Administration Direct labor and operating costs for


administration, user support, and
Statewide Engineering Software
2024 Capital Project Support development of the department's CADD $605,000
system.

BR 23036 Employee Education and


Training Employee Education and Training - Bureau
Statewide Dept. Operations
2022 of Maintenance and Operations. $7,100,000

BR 23108 Employee Education and


Training Employee Education and Training - Bureau
Statewide Dept. Operations
2023 of Maintenance and Operations. $7,200,000

BR 23162 Employee Education and


Training Employee Education and Training - Bureau
Statewide Dept. Operations $7,350,000
2024 of Maintenance and Operations.

BR 23049 Engineering and Professional


Services Engineering and Professional Services -
Statewide Various Locations $800,000
2022 Bureau of Maintenance and Operations.

BR 23121 Engineering and Professional


Services Engineering and Professional Services -
Statewide Various Locations $870,000
2023 Bureau of Maintenance and Operations.

BR 23175 Engineering and Professional


Services Engineering and Professional Services -
Statewide Various Locations
2024 Bureau of Maintenance and Operations. $950,000

012818.22 Work Program Management Funding for USFWS liaison to review projects
subject to the federal Clean Water Act and
Statewide USFWS Reviews $260,000
2022 Compliance Activities Endangered Species Act to ensure on time
and in compliance project delivery.

012818.23 Work Program Management Funding for USFWS liaison to review projects
subject to the federal Clean Water Act and
Statewide USFWS Reviews
2023 Compliance Activities Endangered Species Act to ensure on time $260,000
and in compliance project delivery.

191
ID/Year Municipality Scope Name Description Total Project Cost

012818.24 Work Program Management Funding for USFWS liaison to review projects
subject to the federal Clean Water Act and
Statewide USFWS Reviews
2024 Compliance Activities Endangered Species Act to ensure on time $260,000
and in compliance project delivery.

Implement requirements of the Clean Water


017266.22 Work Program Management Act. Including retrofits of drainage systems
MEPDES General
Statewide on MaineDOT assets within Urban Impaired
2022 Compliance Activities Permits $350,000
Stream watersheds. Maine Pollutant
Discharge Elimination System (MEPDES).

Implement requirements of the Clean Water


017266.23 Work Program Management Act. Including retrofits of drainage systems
MEPDES General
Statewide on MaineDOT assets within Urban Impaired
2023 Compliance Activities Permits $350,000
Stream watersheds. Maine Pollutant
Discharge Elimination System (MEPDES).

Implement requirements of the Clean Water


017266.24 Work Program Management Act. Including retrofits of drainage systems
MEPDES General
Statewide on MaineDOT assets within Urban Impaired
2024 Compliance Activities Permits $350,000
Stream watersheds. Maine Pollutant
Discharge Elimination System (MEPDES).

017275.22 Work Program Management Ensure efficient delivery of work subject to


Historic Resource
Statewide federal historic resource review under
2022 Compliance Activities Reviews $85,000
Section 106.

017275.23 Work Program Management Ensure efficient delivery of work subject to


Historic Resource
Statewide federal historic resource review under
2023 Compliance Activities Reviews $85,000
Section 106.

017275.24 Work Program Management Ensure efficient delivery of work subject to


Historic Resource
Statewide federal historic resource review under
2024 Compliance Activities Reviews $85,000
Section 106.

018520.22 Work Program Management Increase traveler safety, decrease wildlife


Statewide Animal Crash Reduction mortality, and comply with relevant
2022 Compliance Activities $15,000
regulations by reducing incidents.

018520.23 Work Program Management Increase traveler safety, decrease wildlife


Statewide Animal Crash Reduction mortality, and comply with relevant
2023 Compliance Activities $15,000
regulations by reducing incidents.

018520.24 Work Program Management Increase traveler safety, decrease wildlife


Statewide Animal Crash Reduction mortality, and comply with relevant
2024 Compliance Activities $15,000
regulations by reducing incidents.

192
ID/Year Municipality Scope Name Description Total Project Cost

019357.22 Work Program Management Long Creek Watershed Management District


1 - Southern assessment; to monitor storm water quantity
Long Creek Watershed
2022 Region Compliance Activities and quality from MaineDOT porous $186,000
pavement project(s).

019357.23 Work Program Management Long Creek Watershed Management District


1 - Southern assessment; to monitor stormwater quantity
Long Creek Watershed
2023 Region Compliance Activities and quality from MaineDOT porous $186,000
pavement project(s).

019357.24 Work Program Management Long Creek Watershed Management District


1 - Southern assessment; to monitor stormwater quantity
Long Creek Watershed
2024 Region Compliance Activities and quality from MaineDOT porous $186,000
pavement project(s).

019364.22 Work Program Management


Data collection and project screening to
Statewide Natural Areas Program
2022 Compliance Activities ensure regulatory compliance. $15,000

019364.23 Work Program Management


Data collection and project screening to
Statewide Natural Areas Program $15,000
2023 Compliance Activities ensure regulatory compliance.

019364.24 Work Program Management


Data collection and project screening to
Statewide Natural Areas Program $15,000
2024 Compliance Activities ensure regulatory compliance.

Operation of 10 gauges in USGS-managed


019369.22 Work Program Management statewide stream gauge network. Data is
critical for maintaining up-to-date hydrologic
Statewide Streamflow Gauging $95,000
2022 Compliance Activities design methods as well as tracking climate
change impacts on river flows. Matched with
USGS funding.

Operation of 10 gauges in USGS-managed


019369.23 Work Program Management statewide stream gauge network. Data is
critical for maintaining up-to-date hydrologic
Statewide Streamflow Gauging
2023 Compliance Activities design methods as well as tracking climate $95,000
change impacts on river flows. Matched with
USGS funding.

Operation of 10 gauges in USGS-managed


019369.24 Work Program Management statewide stream gauge network. Data is
critical for maintaining up-to-date hydrologic
Statewide Streamflow Gauging
2024 Compliance Activities design methods as well as tracking climate $95,000
change impacts on river flows. Matched with
USGS funding.

Ecological data collection, screening,


019371.22 Work Program Management assessment, and monitoring to ensure
Environmental Reviews/
Statewide efficient compliance with design, $100,000
2022 Compliance Activities Measures
construction, conservation measures, asset
performance, and mitigation.

193
ID/Year Municipality Scope Name Description Total Project Cost

Ecological data collection, screening,


019371.23 Work Program Management assessment, and monitoring to ensure
Environmental Reviews/
Statewide efficient compliance with design,
2023 Compliance Activities Measures $100,000
construction, conservation measures, asset
performance. and mitigation.

Ecological data collection, screening,


019371.24 Work Program Management assessment, and monitoring to ensure
Environmental Reviews/
Statewide efficient compliance with design,
2024 Compliance Activities Measures $100,000
construction, conservation measures, asset
performance, and mitigation.

020580.22 Highway System Operations


Statewide River Gauges River Gauge operation fees.
2022 Highways $95,000

020580.23 Highway System Operations


Statewide River Gauges River Gauge operation fees.
2023 Highways $95,000

020580.24 Highway System Operations


Statewide River Gauges River Gauge operation fees. $95,000
2024 Highways

022020.22 Work Program Management


Environmental Environmental coordination (inter- and intra-
Statewide $1,100,000
2022 Compliance Activities Coordination agency).

022020.23 Work Program Management


Environmental Environmental coordination (inter- and intra-
Statewide $1,100,000
2023 Compliance Activities Coordination agency).

022020.24 Work Program Management


Environmental Environmental coordination (inter- and intra-
Statewide
2024 Compliance Activities Coordination agency). $1,100,000

STIC Grant to fund a field tour of and


024793.00 Policy, Planning and Research discussions with The Ray. This opportunity to
experience these innovative transportation
Statewide STIC Grant $7,000
2022 Compliance Activities facilities will allow MaineDOT to begin to plan
and incorporate greenhouse gas reduction
technologies into our infrastructure.

025671.00 Policy, Planning and Research Energy management services to reduce


Energy Management
Statewide energy costs and invest in renewable energy
2022 Compliance Activities Services $20,000
sources.

194
ID/Year Municipality Scope Name Description Total Project Cost

025671.22 Policy, Planning and Research Energy management services to reduce


Energy Management
Statewide energy costs and invest in renewable energy
2022 Compliance Activities Services $400,000
sources.

025671.23 Policy, Planning and Research Energy management services to reduce


Energy Management
Statewide energy costs and invest in renewable energy
2023 Compliance Activities Services $400,000
sources.

025671.24 Policy, Planning and Research Energy management services to reduce


Energy Management
Statewide energy costs and invest in renewable energy
2024 Compliance Activities Services $400,000
sources.

Funding for US Army Corps of Engineers


025801.22 Administration (USACE) liaison position to review projects
US Army Corps of
Statewide subject to USACE review and approval and
2022 Compliance Activities Engineers $150,000
to ensure on time and in compliance project
delivery.

Funding for US Army Corps of Engineers


025801.23 Administration (USACE) liaison position to review projects
US Army Corps of
Statewide subject to USACE review and approval and
2023 Compliance Activities Engineers $150,000
to ensure on time and in compliance project
delivery.

Funding for US Army Corps of Engineers


025801.24 Administration (USACE) liaison position to review projects
US Army Corps of
Statewide subject to USACE review and approval and
2024 Compliance Activities Engineers $150,000
to ensure on time and in compliance project
delivery.

025803.22 Administration
National Environmental National Environmental Policy Act (NEPA)
Statewide $50,000
2022 Compliance Activities Policy Act Assignment ( 23 USC 327) Management.

025803.23 Administration
National Environmental National Environmental Policy Act (NEPA)
Statewide
2023 Compliance Activities Policy Act Assignment ( 23 USC 327) Management. $50,000

025803.24 Administration
National Environmental National Environmental Policy Act (NEPA)
Statewide
2024 Compliance Activities Policy Act Assignment ( 23 USC 327) Management. $50,000

To develop a coastwide model of sea-level


026035.00 Policy, Planning and Research rise and storm surge, and conducting a
Maine Coastal Modeling vulnerability assessment of the state's built
Statewide $1,000,000
2022 Compliance Activities Vulnerability Assessment infrastructure, and develop climate-ready
design guidance for improvement projects.
EDA Grant recipient.

195
ID/Year Municipality Scope Name Description Total Project Cost

BR 23037
Environmental Stewardship Environmental Stewardship - Bureau of
Statewide Various Locations
2022 Maintenance and Operations. $885,000

BR 23109
Environmental Stewardship Environmental Stewardship - Bureau of
Statewide Various Locations
2023 Maintenance and Operations. $900,000

BR 23163
Environmental Stewardship Environmental Stewardship - Bureau of
Statewide Various Locations
2024 Maintenance and Operations. $950,000

018526.22 Administration
Funding to support the operations of the
Statewide Executive Office
2022 General Administration Executive Office. $1,500,000

018526.23 Administration
Funding to support the operations of the
Statewide Executive Office $1,500,000
2023 General Administration Executive Office.

018526.24 Administration
Funding to support the operations of the
Statewide Executive Office $1,500,000
2024 General Administration Executive Office.

To support Maine Suicide Prevention


018586.22 Communication and Outreach Program's research, media education, and
training efforts, especially those involving
Statewide NAMI $15,000
2022 General Administration transportation infrastructure. This funding
provided to the National Alliance on Mental
Illness - Maine Affiliate.

To support Maine Suicide Prevention


018586.23 Communication and Outreach Program's research, media education, and
training efforts, especially those involving
Statewide NAMI
2023 General Administration transportation infrastructure. This funding $15,000
provided to the National Alliance on Mental
Illness - Maine Affiliate.

To support Maine Suicide Prevention


018586.24 Communication and Outreach Program's research, media education, and
training efforts, especially those involving
Statewide NAMI
2024 General Administration transportation infrastructure. This funding $15,000
provided to the National Alliance on Mental
Illness - Maine Affiliate.

020221.22 Administration Work includes equipment, training and


management to realize efficiencies and
Statewide Creative Services
2022 General Administration enhance communication with MaineDOT's $780,000
customers.

196
ID/Year Municipality Scope Name Description Total Project Cost

020221.23 Administration Work includes equipment, training and


management to realize efficiencies and
Statewide Creative Services
2023 General Administration enhance communication with MaineDOT's $780,000
customers.

020221.24 Administration Work includes equipment, training and


management to realize efficiencies and
Statewide Creative Services
2024 General Administration enhance communication with MaineDOT's $780,000
customers.

National Cooperative Highway Research


020223.22 Administration Program (NCHRP), Transportation Research
Board (TRB), New England Consortium,
Statewide Pooled Fund Projects
2022 General Administration Clean Roads Initiative and American $521,000
Association of State Highway Transportation
Officials (AASHTO).

National Cooperative Highway Research


020223.23 Administration Program (NCHRP), Transportation Research
Board (TRB), New England Consortium,
Statewide Pooled Fund Projects
2023 General Administration Clean Roads Initiative and American $521,000
Association of State Highway Transportation
Officials (AASHTO).

National Cooperative Highway Research


020223.24 Administration Program (NCHRP), Transportation Research
Board (TRB), New England Consortium,
Statewide Pooled Fund Projects $521,000
2024 General Administration Clean Roads Initiative and American
Association of State Highway Transportation
Officials (AASHTO).

022015.22 Administration Engineering oversight, evaluation and


Statewide Engineering Oversight enhancements to Maine's transportation $100,000
2022 General Administration
system.

022015.23 Administration Engineering oversight, evaluation and


Statewide Engineering Oversight enhancements to Maine's transportation $100,000
2023 General Administration
system.

022015.24 Administration Engineering oversight, evaluation and


Statewide Engineering Oversight enhancements to Maine's transportation
2024 General Administration $100,000
system.

Partnership between the MaineDOT and the


025673.00 Policy, Planning and Research Governor's Office of Policy Innovation and
Clean Transportation the Future (GOPIF) on policies, programs,
Statewide
2022 General Administration Roadmap and regulatory changes needed to meet the $25,000
state's electric vehicle (EV) and
transportation emission reduction goals.

025933.22 Policy, Planning and Research Acquisition and installation of publicly


accessible charging stations for Electric
Statewide Electric Vehicles
2022 General Administration Vehicles (EVs) along highway corridors to $4,820,000
expand use of EVs in Maine.

197
ID/Year Municipality Scope Name Description Total Project Cost

025933.23 Policy, Planning and Research Acquisition and installation of publicly


accessible charging stations for Electric
Statewide Electric Vehicles
2023 General Administration Vehicles (EVs) along highway corridors to $4,820,000
expand use of EVs in Maine.

025933.24 Policy, Planning and Research Acquisition and installation of publicly


accessible charging stations for Electric
Statewide Electric Vehicles
2024 General Administration Vehicles (EVs) along highway corridors to $4,820,000
expand use of EVs in Maine.

018452.22 Multimodal System Operations


Maine State Ferry
Statewide Maine State Ferry Service operations.
2022 Ferry Route Service $12,300,000

018452.23 Multimodal System Operations


Maine State Ferry
Statewide Maine State Ferry Service operations.
2023 Ferry Route Service $12,400,000

018452.24 Multimodal System Operations


Maine State Ferry
Statewide Maine State Ferry Service operations. $12,800,000
2024 Ferry Route Service

Assists employees with printing large print


018533.22 Administration jobs and supply needs. Prepares bid
Statewide Support Services documents and publications for sale to the
2022 Financial Administration $1,100,000
public. Organizes all incoming and outgoing
mail/packages.

Assists employees with printing large print


018533.23 Administration jobs and supply needs. Prepares bid
Statewide Support Services documents and publications for sale to the
2023 Financial Administration $1,100,000
public. Organizes all incoming and outgoing
mail/packages.

Assists employees with printing large print


018533.24 Administration jobs and supply needs. Prepares bid
Statewide Support Services documents and publications for sale to the $1,100,000
2024 Financial Administration
public. Organizes all incoming and outgoing
mail/packages.

020524.22 Administration Support to enhance the accuracy of financial


Finance and forecasting and promoting integrity in the
Statewide $4,500,000
2022 Financial Administration Administration administration of transportation programs and
funds.

020524.23 Administration Support to enhance the accuracy of financial


Finance and forecasting and promoting integrity in the
Statewide
2023 Financial Administration Administration administration of transportation programs and $4,500,000
funds.

198
ID/Year Municipality Scope Name Description Total Project Cost

020524.24 Administration Support to enhance the accuracy of financial


Finance and forecasting and promoting integrity in the
Statewide
2024 Financial Administration Administration administration of transportation programs and $4,500,000
funds.

020823.00 Administration
The repayment of GARVEE bonds for
Statewide Bond Principal/Interest
2022 Financial Administration Calendar Years 2022, 2023, and 2024. $81,700,000

State Cost Allocation Plan (STACAP)


022031.22 Administration enables Maine's Controller's Office and
central government to recover the cost of
Statewide STACAP
2022 Financial Administration providing un-billed central services to state $750,000
programs that operate with federal and/or
special revenue funds.

State Cost Allocation Plan (STACAP)


022031.23 Administration enables Maine's Controller's Office and
central government to recover the cost of
Statewide STACAP
2023 Financial Administration providing un-billed central services to state $750,000
programs that operate with federal and/or
special revenue funds.

State Cost Allocation Plan (STACAP)


022031.24 Administration enables Maine's Controller's Office and
central government to recover the cost of
Statewide STACAP $750,000
2024 Financial Administration providing un-billed central services to state
programs that operate with federal and/or
special revenue funds.

025847.00 Policy, Planning and Research


Effort to enhance compliance with and
Statewide Multi-State Partnership $90,000
2022 Financial Administration collection of highway use taxes.

1 - Southern
018769.22 Region, 2 - Mid- Highway System Operations
Coast Region, 4
Interstate Striping Polyurea striping for the interstate.
2022 - Eastern Highways $1,500,000
Region, 5 -
Northern Region

018769.23 Highway System Operations


Statewide Interstate Striping Polyurea striping for the interstate.
2023 Highways $1,500,000

018769.24 Highway System Operations


Statewide Interstate Striping Polyurea striping for the interstate.
2024 Highways $1,500,000

020820.22 Administration
Perform geotechnical field work for slope
Statewide Geotechnical Field Work
2022 Capital Project Support monitoring and miscellaneous develpoment. $25,000

199
ID/Year Municipality Scope Name Description Total Project Cost

020820.23 Administration
Perform geotechnical fieldwork for slope
Statewide Geotechnical Field Work
2023 Capital Project Support monitoring and miscellaneous development. $25,000

020820.24 Administration
Perform geotechnical fieldwork for slope
Statewide Geotechnical Field Work
2024 Capital Project Support monitoring and miscellaneous development. $25,000

022010.22 Administration
Design and Construction Highway program management and project
Statewide
2022 Capital Project Support Support support. $2,780,000

022010.23 Administration
Design and Construction Highway program management and project
Statewide
2023 Capital Project Support Support support. $2,900,000

022010.24 Administration
Design and Construction Highway program management and project
Statewide $2,900,000
2024 Capital Project Support Support support.

024175.00 Highway System Operations


Statewide Interstate 95/295 Interstate 95 and 295 Ramp Metering. $200,000
2023 Highways

Employee Education and


018507.22 Occupational safety training, education and
Training
Statewide Training wellness programs to reduce costs and
2022 $64,000
General Administration increase staff productivity.

Employee Education and


018507.23 Occupational safety training, education and
Training
Statewide Training wellness programs to reduce costs and
2023 $64,000
General Administration increase staff productivity.

Employee Education and


018507.24 Occupational safety training, education and
Training
Statewide Training wellness programs to reduce costs and
2024 $64,000
General Administration increase staff productivity.

Work includes labor relations, workers


018528.22 Administration compensation administration, recruitment
and retention as well as supporting managers
Statewide Human Resources
2022 General Administration in policy compliance, state and federal $2,140,000
regulations, and collective bargaining
administration.

200
ID/Year Municipality Scope Name Description Total Project Cost

Work includes labor relations, workers


018528.23 Administration compensation administration, recruitment
and retention as well as supporting managers
Statewide Human Resources
2023 General Administration in policy compliance, state and federal $2,140,000
regulations, and collective bargaining
administration.

Work includes labor relations, workers


018528.24 Administration compensation administration, recruitment
and retention as well as supporting managers
Statewide Human Resources
2024 General Administration in policy compliance, state and federal $2,140,000
regulations, and collective bargaining
administration.

Employee Education and


019786.22
2 - Mid-Coast Training Funding for the operation and maintenance
Fairfield Training Center
2022 Region of the MaineDOT Fairfield Training Center. $90,000
General Administration

Employee Education and


019786.23
2 - Mid-Coast Training Funding for the operation and maintenance
Fairfield Training Center
2023 Region of the MaineDOT Fairfield Training Center. $90,000
General Administration

Employee Education and


019786.24
Training Funding for the operation and maintenance
Statewide Fairfield Training Center $90,000
2024 of the MaineDOT Fairfield Training Center.
General Administration

022154.22 Work Program Management


Statewide Health-Wellness Efforts Healthy Workforce Initiative. $400,000
2022 General Administration

022154.23 Work Program Management


Statewide Health-Wellness Efforts Healthy Workforce Initiative. $400,000
2023 General Administration

022154.24 Work Program Management


Statewide Health-Wellness Efforts Healthy Workforce Initiative.
2024 General Administration $400,000

Provides legal advice and representation,


020523.22 Administration contracts for specialized legal consultants,
Statewide Legal Services prepares title abstracts and provides other $1,210,000
2022 Compliance Activities
real estate support to MaineDOT and other
state agencies.

Provides legal advice and representation,


020523.23 Administration contracts for specialized legal consultants,
Statewide Legal Services prepares title abstracts and provides other
2023 Compliance Activities $1,210,000
real estate support to MaineDOT and other
state agencies.

201
ID/Year Municipality Scope Name Description Total Project Cost

Provides legal advice and representation,


020523.24 Administration contracts for specialized legal consultants,
Statewide Legal Services prepares title abstracts and provides other
2024 Compliance Activities $1,210,000
real estate support to MaineDOT and other
state agencies.

Inventory and Performance


002102.22
Measurement
Statewide Highway Classification State transportation network.
2022 $150,000
Maintenance and Operations

Inventory and Performance


002102.23
Measurement
Statewide Highway Classification State transportation network.
2023 $150,000
Maintenance and Operations

Inventory and Performance


002102.24
Measurement
Statewide Highway Classification State transportation network.
2024 $150,000
Maintenance and Operations

005412.22 Administration
Statewide Management Local Road Assistance Program (LRAP). $40,000
2022 Maintenance and Operations

005412.23 Administration
Statewide Management Local Road Assistance Program (LRAP). $40,000
2023 Maintenance and Operations

005412.24 Administration
Statewide Management Local Road Assistance Program (LRAP). $40,000
2024 Maintenance and Operations

Operation of the Maine Local Roads Center,


009676.22 Communication and Outreach the Local Road Assistance Program (LRAP),
Community Services
Statewide highway classifications, Urban Compact $57,000
2022 Maintenance and Operations Division
boundaries, State/US Route Numbering, and
the Adopt-A-Highway.

Operation of the Maine Local Roads Center,


009676.23 Communication and Outreach the Local Road Assistance Program (LRAP),
Community Services
Statewide highway classifications, Urban Compact
2023 Maintenance and Operations Division $57,000
boundaries, State/US Route Numbering, and
the Adopt-A-Highway.

Operation of the Maine Local Roads Center,


009676.24 Communication and Outreach the Local Road Assistance Program (LRAP),
Community Services
Statewide highway classifications, Urban Compact
2024 Maintenance and Operations Division $57,000
boundaries, State/US Route Numbering, and
the Adopt-A-Highway.

202
ID/Year Municipality Scope Name Description Total Project Cost

018501.22 Maintenance
Statewide Vegetation Management Roadside vegetation management.
2022 Highways $100,000

018501.23 Maintenance
Statewide Vegetation Management Roadside vegetation management.
2023 Highways $100,000

018501.24 Maintenance
Statewide Vegetation Management Roadside vegetation management.
2024 Highways $100,000

018837.00 Communication and Outreach


Defensive driving training for municipal and
Statewide Defensive Driving
2022 Maintenance and Operations public works employees. $15,000

The Maine Local Roads Center provides


020224.22 Communication and Outreach training and assistance to local road/bridge
Local Technical
Statewide managers in 502 municipalities. The Center
2022 Maintenance and Operations Assistance Program $350,000
is one of 50+ Local Technical Assistance
Programs (LTAP) established by the FHWA.

The Maine Local Roads Center provides


020224.23 Communication and Outreach training and assistance to local road/bridge
Local Technical
Statewide managers in 502 municipalities. The Center
2023 Maintenance and Operations Assistance Program $350,000
is one of 50+ Local Technical Assistance
Programs (LTAP) established by the FHWA.

The Maine Local Roads Center provides


020224.24 Communication and Outreach training and assistance to local road/bridge
Local Technical
Statewide managers in 502 municipalities. The Center
2024 Maintenance and Operations Assistance Program $350,000
is one of 50+ Local Technical Assistance
Programs (LTAP) established by the FHWA.

020581.22 Highway System Operations


Statewide striping to increase safety on
Statewide Various Locations
2022 Highways Maine roads. $6,400,000

020581.23 Highway System Operations


Statewide striping to increase safety on
Statewide Various Locations
2023 Highways Maine roads. $7,000,000

020581.24 Highway System Operations


Statewide striping to increase safety on
Statewide Various Locations
2024 Highways Maine roads. $7,000,000

203
ID/Year Municipality Scope Name Description Total Project Cost

020830.22 Administration
Municipal Coordination to find and promote
Statewide Municipal Coordination
2022 Maintenance and Operations efficiencies in transportation services. $50,000

020830.23 Administration
Municipal Coordination to find and promote
Statewide Municipal Coordination
2023 Maintenance and Operations efficiencies in transportation services. $50,000

020830.24 Administration
Municipal Coordination to find and promote
Statewide Municipal Coordination
2024 Maintenance and Operations efficiencies in transportation services. $50,000

Department Building and Lot


021490.22
2 - Mid-Coast Maintenance Funding for the operation and maintenance
Industrial Drive Facility
2022 Region of the MaineDOT Industrial Drive Facility. $500,000
Maintenance and Operations

Department Building and Lot


021490.23
2 - Mid-Coast Maintenance Funding for the operation and maintenance
Industrial Drive Facility $500,000
2023 Region of the MaineDOT Industrial Drive Facility.
Maintenance and Operations

Department Building and Lot


021490.24
Maintenance Funding for the operation and maintenance
Statewide Industrial Drive Facility $500,000
2024 of the MaineDOT Industrial Drive Facility.
Maintenance and Operations

Inventory and Performance


021912.22
Measurement
Statewide Weigh in Motion (WIM) Weigh in Motion (WIM) data processing.
2022 $25,000
Maintenance and Operations

Inventory and Performance


021912.23
Measurement
Statewide Weigh in Motion (WIM) Weigh in Motion (WIM) data processing.
2023 $25,000
Maintenance and Operations

Inventory and Performance


021912.24
Measurement
Statewide Weigh in Motion (WIM) Weigh in Motion (WIM) data processing.
2024 $25,000
Maintenance and Operations

022523.00 Communication and Outreach


Regulatory and warning sign replacement
Statewide Sign Package / Training
2022 Maintenance and Operations and training program. $120,000

204
ID/Year Municipality Scope Name Description Total Project Cost

022525.00 Communication and Outreach


Municipal Safety Training including
Statewide Safety Training
2022 Maintenance and Operations Commercial Vehicle Driver Training. $38,000

023072.22 Communication and Outreach On-site technical assistance on all subjects of


Statewide Road Ranger road maintenance, construction, and
2022 Maintenance and Operations $50,000
management of local roads.

023072.23 Communication and Outreach On-site technical assistance on all subjects of


Statewide Road Ranger road maintenance, construction, and
2023 Maintenance and Operations $50,000
management of local roads.

023072.24 Communication and Outreach On-site technical assistance on all subjects of


Statewide Road Ranger road maintenance, construction, and
2024 Maintenance and Operations $50,000
management of local roads.

023074.22 Communication and Outreach


On-site technical assistance on bridge minor
Statewide Bridge Ranger $50,000
2022 Maintenance and Operations spans and small structures.

023074.23 Communication and Outreach


On-site technical assistance on bridge minor
Statewide Bridge Ranger $50,000
2023 Maintenance and Operations spans and small structures.

023074.24 Communication and Outreach


On-site technical assistance on bridge minor
Statewide Bridge Ranger $50,000
2024 Maintenance and Operations spans and small structures.

023076.22 Communication and Outreach Technical assistance to towns on all subjects


of traffic, signing, striping, ADA compliance,
Statewide Traffic Ranger
2022 Maintenance and Operations traffic signals, school zones, speed limits, $50,000
etc.

023076.23 Communication and Outreach Technical assistance to towns on all subjects


of traffic, signing, striping, ADA compliance,
Statewide Traffic Ranger
2023 Maintenance and Operations traffic signals, school zones, speed limits, $50,000
etc.

023076.24 Communication and Outreach Technical assistance to towns on all subjects


of traffic, signing, striping, ADA compliance,
Statewide Traffic Ranger
2024 Maintenance and Operations traffic signals, school zones, speed limits, $50,000
etc.

205
ID/Year Municipality Scope Name Description Total Project Cost

023434.22 Maintenance
1 - Southern Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000

023434.23 Maintenance
1 - Southern Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000

023434.24 Maintenance
1 - Southern Leasing excavators to maintain and upgrade
Excavator Leasing
2024 Region Highways the drainage systems prior to paving. $100,000

023436.22 Maintenance
2 - Mid-Coast Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000

023436.23 Maintenance
2 - Mid-Coast Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2023 Region Highways the drainage systems prior to paving.

023436.24 Maintenance
2 - Mid-Coast Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2024 Region Highways the drainage systems prior to paving.

023438.22 Maintenance
3 - Western Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2022 Region Highways the drainage systems prior to paving.

023438.23 Maintenance
3 - Western Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000

023438.24 Maintenance
3 - Western Leasing excavators to maintain and upgrade
Excavator Leasing
2024 Region Highways the drainage systems prior to paving. $100,000

023440.22 Maintenance
4 - Eastern Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000

206
ID/Year Municipality Scope Name Description Total Project Cost

023440.23 Maintenance
4 - Eastern Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000

023440.24 Maintenance
4 - Eastern Leasing excavators to maintain and upgrade
Excavator Leasing
2024 Region Highways the drainage systems prior to paving. $100,000

023442.22 Maintenance
5 - Northern Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000

023442.23 Maintenance
5 - Northern Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000

023442.24 Maintenance
5 - Northern Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2024 Region Highways the drainage systems prior to paving.

BR 23056 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations $2,850,000
2022 Administration, Headquarters.

BR 23128 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations $2,900,000
2023 Administration, Headquarters.

BR 23182 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2024 Administration, Headquarters. $2,950,000

BR 23051 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2022 Administration, Region 1. $1,530,000

BR 23123 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2023 Administration, Region 1. $1,550,000

207
ID/Year Municipality Scope Name Description Total Project Cost

BR 23177 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2024 Administration, Region 1. $1,580,000

BR 23052 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2022 Administration, Region 2. $2,000,000

BR 23124 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2023 Administration, Region 2. $2,050,000

BR 23178 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2024 Administration, Region 2. $2,080,000

BR 23053 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations $1,330,000
2022 Administration, Region 3.

BR 23125 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations $1,350,000
2023 Administration, Region 3.

BR 23179 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations $1,380,000
2024 Administration, Region 3.

BR 23054 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2022 Administration, Region 4. $1,550,000

BR 23126 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2023 Administration, Region 4. $1,580,000

BR 23180 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2024 Administration, Region 4. $1,600,000

208
ID/Year Municipality Scope Name Description Total Project Cost

BR 23055 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2022 Administration, Region 5. $1,280,000

BR 23127 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2023 Administration, Region 5. $1,300,000

BR 23181 Department, Bureau and Office


Administration Bureau of Maintenance and Operations
Statewide Dept. Operations
2024 Administration, Region 5. $1,330,000

020831.22 Administration
Operating costs for the department's Data
Statewide Data Collection Vehicle
2022 Capital Project Support Collection Vehicle (ARAN). $300,000

020831.23 Administration
Operating costs for the department's Data
Statewide Data Collection Vehicle $320,000
2023 Capital Project Support Collection Vehicle (ARAN).

020831.24 Administration
Operating costs for the department's Data
Statewide Data Collection Vehicle $320,000
2024 Capital Project Support Collection Vehicle (ARAN).

022011.22 Work Program Management


Materials exploration and testing services
Statewide Materials Testing $650,000
2022 Capital Project Support and equipment.

022011.23 Work Program Management


Materials exploration and testing services
Statewide Materials Testing
2023 Capital Project Support and equipment. $675,000

022011.24 Work Program Management


Materials exploration and testing services
Statewide Materials Testing
2024 Capital Project Support and equipment. $675,000

Inventory and Performance


022012.22
Measurement Materials Quality Assurance Program and
Statewide Quality Assurance
2022 project support. $1,800,000
Capital Project Support

209
ID/Year Municipality Scope Name Description Total Project Cost

Inventory and Performance


022012.23
Measurement Materials Quality Assurance Program and
Statewide Quality Assurance
2023 project support. $1,900,000
Capital Project Support

Inventory and Performance


022012.24
Measurement Materials Quality Assurance Program and
Statewide Quality Assurance
2024 project support. $1,900,000
Capital Project Support

025025.22 Maintenance
Improvements at MaineDOT Visitor
Statewide Various Locations
2022 Highways Information Centers. $700,000

025025.23 Maintenance
Improvements at MaineDOT Visitor
Statewide Various Locations
2023 Highways Information Centers. $700,000

025025.24 Maintenance
Improvements at MaineDOT Visitor
Statewide Various Locations $700,000
2024 Highways Information Centers.

026582.00 Policy, Planning and Research


Ferry service operational review, including
Statewide MSFS Facilities/Boats $150,000
2022 Maintenance and Operations electric/hybrid propulsion opportunities.

022007.22 Administration
Multimodal project engineering and
Statewide Multimodal Engineering $425,000
2022 Capital Project Support development.

022007.23 Administration
Multimodal project engineering and
Statewide Multimodal Engineering
2023 Capital Project Support development. $425,000

022007.24 Administration
Multimodal project engineering and
Statewide Multimodal Engineering
2024 Capital Project Support development. $450,000

022008.22 Administration
Multimodal design and construction program
Statewide Multimodal Production
2022 Capital Project Support management and support. $800,000

210
ID/Year Municipality Scope Name Description Total Project Cost

022008.23 Administration
Multimodal design and construction program
Statewide Multimodal Production
2023 Capital Project Support management and support. $835,000

022008.24 Administration
Multimodal design and construction program
Statewide Multimodal Production
2024 Capital Project Support management and support. $835,000

Dedicated Short-Range Communications


024185.00 Highway System Operations (DSRC), Road Weather Information System
Statewide Various Locations (RWIS), On-Board Units (OBUs), Automatic
2023 Highways $575,000
Vehicle Location (AVL) and meteorological
support for plow truck connections.

024211.00 Highway System Operations


New Road Weather Information System
Statewide Various Locations
2022 Highways (RWIS) locations in all Interstate camps. $960,000

Installation of three large permanent


024239.00 1 - Southern Highway System Operations Changeable Message Signs (CMS) on
Region, 2 - Mid-
Various Locations Interstate 295 and Interstate 95 with
2022 Coast Region, 4 Highways $1,060,000
Dedicated Short-Range Communications
- Eastern Region
(DSRC), radar, and cameras.

Highway System Operations Permanent portable Changeable Message


024763.00
Signs (CMS) on key corridors: Route 201
Statewide Production Support and Various Locations $250,000
2023 Jackman-Bingham, Route 9 Calais-Brewer,
Administration
and Route 1A Ellsworth-Brewer.

025325.00 Highway System Operations


Interstate 95, Interstate Camera Coverage in Bangor on Interstate 95
Statewide $325,000
2023 Highways 295 and Falmouth to Freeport on Interstate 295.

Develops long-range planning documents,


002116.22 Policy, Planning and Research administers planning and scoping studies,
Transportation System
Statewide assigns cost shares through project
2022 Planning and Research Planning $600,000
agreements, and assists with state and
federal policy work.

Develops long-range planning documents,


002116.23 Policy, Planning and Research administers planning and scoping studies,
Transportation System
Statewide assigns cost shares through project $625,000
2023 Planning and Research Planning
agreements, and assists with state and
federal policy work.

Develops long-range planning documents,


002116.24 Policy, Planning and Research administers planning and scoping studies,
Transportation System
Statewide assigns cost shares through project
2024 Planning and Research Planning $650,000
agreements, and assists with state and
federal policy work.

211
ID/Year Municipality Scope Name Description Total Project Cost

005692.22 Communication and Outreach Work includes Federally mandated statewide


Statewide Planning and planning and customer outreach. Work also
Statewide
2022 Planning and Research Outreach includes active transportation planning and $725,000
RPO planning coordination.

005692.23 Communication and Outreach Work includes Federally mandated statewide


Statewide Planning and planning and customer outreach. Work also
Statewide
2023 Planning and Research Outreach includes active transportation planning and $750,000
RPO planning coordination.

005692.24 Communication and Outreach Work includes Federally mandated statewide


Statewide Planning and planning and customer outreach. Work also
Statewide
2024 Planning and Research Outreach includes active transportation planning and $775,000
RPO planning coordination.

Bureau of Planning management and


support, including the development of
009730.22 Administration required federal documents, the direction of
Statewide Planning Administration planning activities statewide, support in the
2022 Planning and Research $490,000
development of the Work Plan, and
management and performance measurement
of bureau staff.
Bureau of Planning management and
support, including the development of
009730.23 Administration required federal documents, the direction of
Statewide Planning Administration planning activities statewide, support in the
2023 Planning and Research $510,000
development of the Work Plan, and
management and performance measurement
of bureau staff.
Bureau of Planning management and
support, including the development of
009730.24 Administration required federal documents, the direction of
Statewide Planning Administration planning activities statewide, support in the
2024 Planning and Research $530,000
development of the Work Plan, and
management and performance measurement
of bureau staff.

009860.22 Work Program Management Interagency transfer of funds to the Maine


DEP's Air Bureau for federally required
Statewide Mobile Source Impact $500,000
2022 Planning and Research conformity and related analysis and
reporting.

009860.23 Work Program Management Interagency transfer of funds to the Maine


DEP's Air Bureau for federally required
Statewide Mobile Source Impact
2023 Planning and Research conformity and related analysis and $500,000
reporting.

009860.24 Work Program Management Interagency transfer of funds to the Maine


DEP's Air Bureau for federally required
Statewide Mobile Source Impact
2024 Planning and Research conformity and related analysis and $500,000
reporting.

014847.22 Policy, Planning and Research Hancock County Planning Commission


4 - Eastern
HCPC RPO Support (HCPC) Regional Planning Organization
2022 Region Planning and Research $10,000
support.

212
ID/Year Municipality Scope Name Description Total Project Cost

014847.23 Policy, Planning and Research Hancock County Planning Commission


4 - Eastern
HCPC RPO Support (HCPC) Regional Planning Organization
2023 Region Planning and Research $10,000
support.

014847.24 Policy, Planning and Research Hancock County Planning Commission


4 - Eastern
HCPC RPO Support (HCPC) Regional Planning Organization
2024 Region Planning and Research $10,000
support.

014848.22 Policy, Planning and Research Kennebec Valley Council of Governments


2 - Mid-Coast
KVCOG RPO Support (KVCOG) Regional Planning Organization
2022 Region Planning and Research $12,500
support.

014848.23 Policy, Planning and Research Kennebec Valley Council of Governments


2 - Mid-Coast
KVCOG RPO Support (KVCOG) Regional Planning Organization
2023 Region Planning and Research $12,500
support.

014848.24 Policy, Planning and Research Kennebec Valley Council of Governments


2 - Mid-Coast
KVCOG RPO Support (KVCOG) Regional Planning Organization
2024 Region Planning and Research $12,500
support.

014849.22 Policy, Planning and Research Lincoln County Regional Planning


2 - Mid-Coast
LCPC RPO Support Commission (LCRPC) Regional Planning
2022 Region Planning and Research $7,500
Organization support.

014849.23 Policy, Planning and Research Lincoln County Regional Planning


2 - Mid-Coast
LCPC RPO Support Commission (LCRPC) Regional Planning
2023 Region Planning and Research $7,500
Organization support.

014849.24 Policy, Planning and Research Lincoln County Regional Planning


2 - Mid-Coast
LCPC RPO Support Commission (LCRPC) Regional Planning $7,500
2024 Region Planning and Research
Organization support.

014852.22 Policy, Planning and Research Northern Maine Development Commission


5 - Northern
NMDC RPO Support (NMDC) Regional Planning Organization
2022 Region Planning and Research $10,000
support.

014852.23 Policy, Planning and Research Northern Maine Development Commission


5 - Northern
NMDC RPO Support (NMDC) Regional Planning Organization
2023 Region Planning and Research $10,000
support.

213
ID/Year Municipality Scope Name Description Total Project Cost

014852.24 Policy, Planning and Research Northern Maine Development Commission


Statewide NMDC RPO Support (NMDC) Regional Planning Organization
2024 Planning and Research $10,000
support.

014855.22 Policy, Planning and Research Washington County Council of Governments


4 - Eastern
WCCOG RPO Support (WCCOG) Regional Planning Organization
2022 Region Planning and Research $7,500
support.

014855.23 Policy, Planning and Research Washington County Council of Governments


4 - Eastern
WCCOG RPO Support (WCCOG) Regional Planning Organization
2023 Region Planning and Research $7,500
support.

014855.24 Policy, Planning and Research Washington County Council of Governments


Statewide WCCOG RPO Support (WCCOG) Regional Planning Organization
2024 Planning and Research $7,500
support.

014856.22 Administration Regional multimodal transportation planning


services consistent with current state and
Statewide Regional Planning $338,000
2022 Planning and Research federal transportation laws with emphasis on
municipal outreach.

014856.23 Administration Regional multimodal transportation planning


services consistent with current state and
Statewide Regional Planning $338,000
2023 Planning and Research federal transportation laws with emphasis on
municipal outreach.

014856.24 Administration Regional multimodal transportation planning


services consistent with current state and
Statewide Regional Planning $338,000
2024 Planning and Research federal transportation laws with emphasis on
municipal outreach.

Funding for the continued analysis of


017582.22 Policy, Planning and Research potential transportation solutions that
Statewide Planning Studies promote economic development, leverage
2022 Planning and Research $200,000
additional investment, and improve safety
and mobility.

Funding for the continued analysis of


017582.23 Policy, Planning and Research potential transportation solutions that
Statewide Planning Studies promote economic development, leverage $200,000
2023 Planning and Research
additional investment, and improve safety
and mobility.

Funding for the continued analysis of


017582.24 Policy, Planning and Research potential transportation solutions that
Statewide Planning Studies promote economic development, leverage
2024 Planning and Research $200,000
additional investment, and improve safety
and mobility.

214
ID/Year Municipality Scope Name Description Total Project Cost

018505.22 Policy, Planning and Research Planning Partnership Initiative (PPI): This
Planning Partnership competitive program supports regional
Statewide
2022 Planning and Research Initiative planning efforts through grants awarded on a $400,000
best-value basis.

018505.23 Policy, Planning and Research Planning Partnership Initiative (PPI): This
Planning Partnership competitive program supports regional
Statewide
2023 Planning and Research Initiative planning efforts through grants awarded on a $400,000
best-value basis.

018505.24 Policy, Planning and Research Planning Partnership Initiative (PPI): This
Planning Partnership competitive program supports regional
Statewide
2024 Planning and Research Initiative planning efforts through grants awarded on a $400,000
best-value basis.

Bicycle and Pedestrian Safety Education


018522.22 Communication and Outreach Program in schools and communities
Statewide Bike/Ped Safety Program statewide, focuses on safety presentations
2022 Planning and Research $156,000
and activities to improve safety behaviors to
reduce injuries and crashes.

Bicycle and Pedestrian Safety Education


018522.23 Communication and Outreach Program in schools and communities
Statewide Bike/Ped Safety Program statewide, focuses on safety presentations
2023 Planning and Research $156,000
and activities to improve safety behaviors to
reduce injuries and crashes.

Bicycle and Pedestrian Safety Education


018522.24 Communication and Outreach Program in schools and communities
Statewide Bike/Ped Safety Program statewide, focuses on safety presentations
2024 Planning and Research $156,000
and activities to improve safety behaviors to
reduce injuries and crashes.

Project management, resource allocation and


018535.22 Policy, Planning and Research development of the department's Aviation
Work Plan using asset management systems
Statewide Aviation Program $211,000
2022 Planning and Research and principles, production of the federally
required Airport Capital Improvement Plan
(ACIP) and other submittals.

Project management, resource allocation and


018535.23 Policy, Planning and Research development of the department's Aviation
Work Plan using asset management systems
Statewide Aviation Program
2023 Planning and Research and principles, production of the federally $211,000
required Airport Capital Improvement Plan
(ACIP) and other submittals.

Project management, resource allocation and


018535.24 Policy, Planning and Research development of the department's Aviation
Work Plan using asset management systems
Statewide Aviation Program
2024 Planning and Research and principles, production of the federally $211,000
required Airport Capital Improvement Plan
(ACIP) and other submittals.

018717.03 Policy, Planning and Research Update to the Statewide Aviation System
Plan that may result in safety and
Statewide Aviation System Plan
2022 Planning and Research infrastructure improvements. AIP 3-23-0003- $797,000
012-2021

215
ID/Year Municipality Scope Name Description Total Project Cost

018717.04 Policy, Planning and Research Update to the Statewide Pavement Condition
Statewide Aviation
Statewide Index Plan that may result in safety and
2023 Planning and Research System Plan $412,000
infrastructure improvements.

018905.22 Administration State share of reimbursement of railroad rail


Statewide Freight Rail crossing maintenance costs under 23 MRSA
2022 Planning and Research $604,000
617§7231.

018905.23 Administration State share of reimbursement of railroad rail


Statewide Freight Rail crossing maintenance costs under 23 MRSA
2023 Planning and Research $604,000
617§7231.

018905.24 Administration State share of reimbursement of railroad rail


Statewide Freight Rail crossing maintenance costs under 23 MRSA
2024 Planning and Research $604,000
617§7231.

020767.20 System Operations by Others FTA Section 5311 - Intercity Capital /


Statewide Rural Transit Intercity Operating - statewide transit agencies $2,450,000
2022 Transit Service Area
RURAL.

020767.21 System Operations by Others FTA Section 5311 - Intercity Capital /


Statewide Rural Transit Intercity Operating - statewide transit agencies $2,450,000
2022 Transit Service Area
RURAL.

020767.22 System Operations by Others FTA Section 5311 - Intercity Capital /


Statewide Rural Transit Intercity Operating - statewide transit agencies $2,450,000
2024 Transit Service Area
RURAL.

020793.22 System Operations by Others GO Maine Activities. A partnership with the


Statewide GO Maine Maine Turnpike Authority to provide
2022 Transit Service Area $500,000
statewide commuting options.

020793.23 System Operations by Others GO Maine Activities. A partnership with the


Statewide GO Maine Maine Turnpike Authority to provide
2023 Transit Service Area $500,000
statewide commuting options.

020793.24 System Operations by Others GO Maine Activities. A partnership with the


Statewide GO Maine Maine Turnpike Authority to provide
2024 Transit Service Area $500,000
statewide commuting options.

216
ID/Year Municipality Scope Name Description Total Project Cost

020829.22 Administration The Mobility Engineering and Analysis


Mobility Engineering and Section provides transportation travel
Statewide
2022 Planning and Research Analysis Section information, analysis, and recommendations $800,000
at different study levels.

020829.23 Administration The Mobility Engineering and Analysis


Mobility Engineering and Section provides transportation travel
Statewide $800,000
2023 Planning and Research Analysis Section information, analysis, and recommendations
at different study levels.

020829.24 Administration The Mobility Engineering and Analysis


Mobility Engineering and Section provides transportation travel
Statewide
2024 Planning and Research Analysis Section information, analysis, and recommendations $800,000
at different study levels.

The Office of Freight and Passenger


022026.22 Administration Services (OFPS) forms policy, programs, and
Office of Freight and
Statewide projects that improve Maine's freight
2022 Planning and Research Passenger Services $814,000
transportation network as a cohesive system
to provide more choices to shippers.

The Office of Freight and Passenger


022026.23 Administration Services (OFPS) forms policy, programs, and
Office of Freight and
Statewide projects that improve Maine's freight
2023 Planning and Research Passenger Services $814,000
transportation network as a cohesive system
to provide more choices to shippers.

The Office of Freight and Passenger


022026.24 Administration Services (OFPS) forms policy, programs, and
Office of Freight and
Statewide projects that improve Maine's freight
2024 Planning and Research Passenger Services $814,000
transportation network as a cohesive system
to provide more choices to shippers.

022046.22 System Operations by Others Northern New England Passenger Rail


Statewide NNEPRA Operations Authority operating assistance, SGR/CMAQ- $13,000,000
2022 Transit Service Area
FTA Transfer.

022046.23 System Operations by Others Northern New England Passenger Rail


Statewide NNEPRA Operations Authority operating assistance, SGR/CMAQ-
2023 Transit Service Area $13,000,000
FTA Transfer.

022046.24 System Operations by Others Northern New England Passenger Rail


Statewide NNEPRA Operating Authority operating assistance, SGR/CMAQ-
2024 Transit Service Area $13,000,000
FTA Transfer.

022200.22 Communication and Outreach


Pedestrian safety outreach to targeted
Statewide Various Locations
2022 Planning and Research populations. $25,000

217
ID/Year Municipality Scope Name Description Total Project Cost

022200.23 Communication and Outreach


Pedestrian safety outreach to targeted
Statewide Various Locations
2023 Planning and Research populations. $25,000

022200.24 Communication and Outreach


Pedestrian safety outreach to targeted
Statewide Various Locations
2024 Planning and Research populations. $25,000

022780.20 System Operations by Others FTA Section 5311 for Rural Transit
Statewide Rural Transit RTAP Assistance Program (RTAP) - statewide
2022 Transit Service Area $162,000
transit agencies RURAL.

022780.21 System Operations by Others FTA Section 5311 for Rural Transit
Statewide Rural Transit RTAP Assistance Program (RTAP) - statewide
2022 Transit Service Area $162,000
transit agencies RURAL.

022780.22 System Operations by Others FTA Section 5311 for Rural Transit
Statewide Rural Transit RTAP Assistance Program (RTAP) - statewide $160,000
2024 Transit Service Area
transit agencies RURAL.

023382.21 System Operations by Others Transit JARC Operating Assistance for


Statewide Rural Transit Operations Federal Transit Administration §5311 for $283,000
2022 Transit Service Area
statewide non-urbanized transit.

023382.22 System Operations by Others Transit JARC Operating Assistance for


Federal Transit Administration §5311 for
Statewide Rural Transit Operations $283,000
2024 Transit Service Area statewide non-urbanized transit, Fiscal Year
2022 (50/50).

023452.22 Policy, Planning and Research


Insurance for Augusta State Airport and
Statewide Aviation Program
2022 Planning and Research Deblois Airstrip. $4,000

023452.23 Policy, Planning and Research


Insurance for Augusta State Airport and
Statewide Aviation Program
2023 Planning and Research Deblois Airstrip. $4,000

023452.24 Policy, Planning and Research


Insurance for Augusta State Airport and
Statewide Aviation Program
2024 Planning and Research Deblois Airstrip. $4,000

218
ID/Year Municipality Scope Name Description Total Project Cost

023869.00 Policy, Planning and Research Coordination and development of


Statewide Long-Range Plan MaineDOT's Long-Range Transportation
2022 Planning and Research $344,000
Plan (LRTP).

024291.00 Work Program Management


Resources to leverage investment and
Statewide Multimodal Investment
2022 Planning and Research facilitate an opportune multimodal project. $1,300,000

024643.00 Policy, Planning and Research Planning activities and pilot deployments for
I-95 Corridor Coalition
Statewide a mileage-based user fee system with the I-
2022 Planning and Research Pilot $320,000
95 States.

024651.00 System Operations by Others Transit Operating Assistance for Federal


Transit Administration § 5311 for statewide
Statewide Rural Transit Operations
2022 Transit Service Area non-urbanized transit. Monhegan Boat $40,000
Lines, Grant ME-2020-027

024671.00 System Operations by Others


Rural Transit
Statewide FTA Section 5311 Statewide Administration. $450,000
2022 Transit Service Area Administration

024673.00 System Operations by Others Transit Operating Assistance for Federal


Statewide Rural Transit Operations Transit Administration §5311 for statewide $8,260,000
2024 Transit Service Area
non-urbanized transit.

024677.00 System Operations by Others Transit Administrative Assistance for Federal


Rural Transit
Statewide Transit Administration §5311 for statewide
2024 Transit Service Area Administration $2,840,000
non-urbanized transit.

024679.00 System Operations by Others


Rural Transit
Statewide FTA Section 5311 Statewide Administration.
2024 Transit Service Area Administration $500,000

024681.00 System Operations by Others


Statewide Transit
Statewide FTA Section 5310 Statewide Administration.
2022 Transit Service Area Administration $75,000

024683.00 System Operations by Others Federal Transit Administration §5304 for


Statewide Urban Transit Planning statewide urban transit planning, Fiscal Year $156,000
2023 Transit Service Area
2022 (80/20).

219
ID/Year Municipality Scope Name Description Total Project Cost

024705.00 System Operations by Others


Federal Transit Administration § 5304 for
Statewide Urban Transit Planning
2024 Transit Service Area statewide urban transit planning, (80/20). $163,000

024711.00 System Operations by Others


Rural Transit
Statewide FTA Section 5310 Statewide Administration.
2023 Transit Service Area Administration $76,000

024749.00 System Operations by Others Federal Transit Administration §5304 for


Statewide Urban Transit Planning statewide urban transit planning, Fiscal Year
2022 Transit Service Area $164,000
2021 (80/20).

024843.08 System Operations by Others Transit Operating Assistance for Federal


Statewide Rural Transit Operations Transit Administration § 5311 Rural Program,
2022 Transit Service Area $7,590,000
FTA American Rescue Plan funds.

024843.09 System Operations by Others Transit RTAP Assistance for Federal Transit
Statewide Rural Transit RTAP Administration § 5311 Rural Program, FTA $98,000
2022 Transit Service Area
American Rescue Plan funds.

024843.10 System Operations by Others Transit Intercity Operating Assistance for


Rural Transit Intercity
Statewide Federal Transit Administration § 5311 Rural
2022 Transit Service Area Operations $1,140,000
Program, FTA American Rescue Plan funds.

024843.16 System Operations by Others Transit Operating Assistance from Federal


Transit Administration § 5310 - Enhanced
Statewide Rural Transit Operations Mobility of Seniors and Individuals with $122,000
2022 Transit Service Area
Disabilities. ARP – Rural apportionment.

Transit Operating Assistance from Federal


024843.17 System Operations by Others Transit Administration § 5310 - Enhanced
Statewide Urban Transit Operating Mobility of Seniors and Individuals with
2022 Transit Service Area $52,000
Disabilities. ARP – Small urban
apportionment.

Information Technology
024859.22
Support
Statewide Data Subscription Streetlight data subscription.
2022 $251,000
Planning and Research

Information Technology
024859.23
Support
Statewide Data Subscription Streetlight data subscription.
2023 $251,000
Planning and Research

220
ID/Year Municipality Scope Name Description Total Project Cost

Information Technology
024859.24
Support
Statewide Data Subscription Streetlight data subscription.
2024 $251,000
Planning and Research

025231.00 System Operations by Others Transit Administrative and Operating


Rural Transit Admin/ Assistance for Federal Transit Administration
Statewide
2023 Transit Service Area Operations §5311 for non-urbanized transit. Regional $1,170,000
Transportation Program (RTP).

025241.00 System Operations by Others Transit Administrative and Operating


Rural Transit Admin/ Assistance for Federal Transit Administration
Statewide
2023 Transit Service Area Operations §5311 for non-urbanized transit. Casco Bay $548,000
Island Transit District (CBITD).

025575.00 System Operations by Others


Statewide Transit
Statewide FTA Section 5310 Statewide Administration.
2024 Transit Service Area Administration $77,000

025583.00 System Operations by Others


1 - Southern FTA Section 5307 for Operating Assistance -
Urban Transit Operating $10,100,000
2024 Region Transit Service Area Portland Transit Agencies.

025591.00 System Operations by Others


4 - Eastern FTA Section 5307 for Operating Assistance -
Urban Transit Operating $1,620,000
2024 Region Transit Service Area Community Connector.

Androscoggin Transportation Resource


025609.00 Policy, Planning and Research Center (ATRC), Federal Transit
1 - Southern
Urban Transit Planning Administration § 5303 for metropolitan
2024 Region Planning and Research $100,000
planning Fiscal Year 2024. Funds are
transferred to FHWA.

025701.00 Policy, Planning and Research


Highway-Rail Grade State Highway-Rail Grade Crossing Action
Statewide
2022 Planning and Research Crossing Action Plan Plan. $130,000

025703.00 Policy, Planning and Research


Statewide Strategic Update to the Statewide Strategic Transit
Statewide
2022 Planning and Research Transit Plan Plan. $200,000

025789.00 Policy, Planning and Research


Statewide Active Development of a Statewide Active
Statewide
2022 Planning and Research Transportation Plan Transportation Plan. $245,000

221
ID/Year Municipality Scope Name Description Total Project Cost

An effort to evaluate public transportation


025793.00 Work Program Management facilities to determine the upgrades needed
Public Transportation
to support electric vehicles. Evaluations will
Statewide Emission Reduction
2022 Planning and Research include a cost benefit analysis to aid future $502,000
Strategy
decisions to modernize and to accommodate
electric vehicles.

025957.00 Policy, Planning and Research Economic Evaluation Study for commuter
Economic Evaluation
Statewide and passenger train between Portland and
2022 Planning and Research Study $200,000
Lewiston/Auburn.

026015.00 Policy, Planning and Research Transit Propensity Study for communities
between Portland and Bangor to assess
Statewide Transit Propensity Study
2022 Planning and Research demand and viability for new or enhanced $200,000
transit service including passenger.

026041.00 Policy, Planning and Research


Discretionary funding to address planning
Statewide Future Planning Needs
2024 Planning and Research needs in urbanized areas. $2,300,000

022001.22 Administration
Statewide Project Development Capital project development and production. $535,000
2022 Capital Project Support

022001.23 Administration
Statewide Project Development Capital project development and production. $550,000
2023 Capital Project Support

022001.24 Administration
Statewide Project Development Capital project development and production. $550,000
2024 Capital Project Support

Inventory and Performance


018099.22
Measurement Existing condition data collection and
Statewide Data Collection $100,000
2022 processing.
Capital Project Support

Inventory and Performance


018099.23
Measurement Existing condition data collection and
Statewide Data Collection
2023 processing. $100,000
Capital Project Support

Inventory and Performance


018099.24
Measurement Existing condition data collection and
Statewide Data Collection
2024 processing. $100,000
Capital Project Support

222
ID/Year Municipality Scope Name Description Total Project Cost

022005.22 Administration
Statewide Property Acquisition Property management and acquisition.
2022 Capital Project Support $950,000

022005.23 Administration
Statewide Property Acquisition Property management and acquisition.
2023 Capital Project Support $985,000

022005.24 Administration
Statewide Property Acquisition Property management and acquisition.
2024 Capital Project Support $985,000

022006.22 Work Program Management


Statewide Survey Survey project support and equipment.
2022 Capital Project Support $1,730,000

022006.23 Work Program Management


Statewide Survey Survey project support and equipment. $1,800,000
2023 Capital Project Support

022006.24 Work Program Management


Statewide Survey Survey project support and equipment. $1,800,000
2024 Capital Project Support

022198.22 Work Program Management


Software upgrades and purchase of survey
Statewide Survey Equipment $300,000
2022 Capital Project Support equipment.

022198.23 Work Program Management


Software upgrades and purchase of survey
Statewide Survey Equipment
2023 Capital Project Support equipment. $300,000

022198.24 Work Program Management


Software upgrades and purchase of survey
Statewide Survey Equipment
2024 Capital Project Support equipment. $300,000

Management of MaineDOT Highway Asset


002118.22 Administration Management System, including inventory,
highway data collection, asset priorities,
Statewide Highway Management
2022 Info. Systems Management customer service levels, performance $590,000
reporting, and prioritization/ scoping of
pavement preservation candidates.

223
ID/Year Municipality Scope Name Description Total Project Cost

Management of MaineDOT Highway Asset


002118.23 Administration Management System, including inventory,
highway data collection, asset priorities,
Statewide Highway Management
2023 Info. Systems Management customer service levels, performance $590,000
reporting, and prioritization/ scoping of
pavement preservation candidates.

Management of MaineDOT Highway Asset


002118.24 Administration Management System, including inventory,
highway data collection, asset priorities,
Statewide Highway Management
2024 Info. Systems Management customer service levels, performance $590,000
reporting, and prioritization/ scoping of
pavement preservation candidates.

Work includes resource allocation and


004777.22 Policy, Planning and Research development of the department's Work Plan
Program Development
Statewide using asset management systems and
2022 Info. Systems Management Division $718,000
principles, production of the federally
required STIP and other submittals.

Work includes resource allocation and


004777.23 Policy, Planning and Research development of the department's Work Plan
Program Development
Statewide using asset management systems and
2023 Info. Systems Management Division $745,000
principles, production of the federally
required STIP and other submittals.

Work includes resource allocation and


004777.24 Policy, Planning and Research development of the department's Work Plan
Program Development
Statewide using asset management systems and
2024 Info. Systems Management Division $775,000
principles, production of the federally
required STIP and other submittals.

006309.22 Administration Application development and user support of


Statewide GIS Management the department's Geographical Information $983,000
2022 Info. Systems Management
Systems.

006309.23 Administration Application development and user support of


Statewide GIS Management the department's Geographical Information $1,010,000
2023 Info. Systems Management
Systems.

006309.24 Administration Application development and user support of


Statewide GIS Management the department's Geographical Information
2024 Info. Systems Management $1,030,000
Systems.

022032.22 Administration Office of Information Technology charges


Information Technology incurred in the support, development and
Statewide
2022 Info. Systems Management Expenditures maintenance of MaineDOT's information $13,300,000
technology systems.

022032.23 Administration Office of Information Technology charges


Information Technology incurred in the support, development and
Statewide
2023 Info. Systems Management Expenditures maintenance of MaineDOT's information $13,500,000
technology systems.

224
ID/Year Municipality Scope Name Description Total Project Cost

022032.24 Administration Office of Information Technology charges


Information Technology incurred in the support, development and
Statewide
2024 Info. Systems Management Expenditures maintenance of MaineDOT's information $13,500,000
technology systems.

Inventory and Performance To provide ongoing process review and


022033.22
Measurement appropriate management tools to increase
Statewide Information Development
2022 department efficiency, effectiveness and $880,000
Info. Systems Management
transparency to the public.

Inventory and Performance To provide ongoing process review and


022033.23
Measurement appropriate management tools to increase
Statewide Information Development
2023 department efficiency, effectiveness and $880,000
Info. Systems Management
transparency to the public.

Inventory and Performance To provide ongoing process review and


022033.24
Measurement appropriate management tools to increase
Statewide Information Development
2024 department efficiency, effectiveness and $880,000
Info. Systems Management
transparency to the public.

To provide funding for the acquisition and


022160.22 Work Program Management management of remotely-sensed geospatial
data. This data is for Departmental mapping
Statewide Mapping Data $125,000
2022 Info. Systems Management services, to update/enhance inventory data
and ultimately support Departmental planning
and decision-making.

To provide funding for the acquisition and


022160.23 Work Program Management management of remotely-sensed geospatial
data. This data is for Departmental mapping
Statewide Mapping Data $125,000
2023 Info. Systems Management services, to update/enhance inventory data
and ultimately support Departmental planning
and decision-making.

To provide funding for the acquisition and


022160.24 Work Program Management management of remotely-sensed geospatial
data. This data is for Departmental mapping
Statewide Mapping Data $125,000
2024 Info. Systems Management services, to update/enhance inventory data
and ultimately support Departmental planning
and decision-making.

Management of MaineDOT Bridge Asset


024000.22 Work Program Management Management System, including inventory,
Statewide Bridge Management bridge data collection, asset priorities,
2022 Info. Systems Management $480,000
customer service levels, performance
reporting, and prioritization / scoping.

Management of MaineDOT Bridge Asset


024000.23 Work Program Management Management System, including inventory,
Statewide Bridge Management bridge data collection, asset priorities,
2023 Info. Systems Management $500,000
customer service levels, performance
reporting, and prioritization / scoping.

Management of MaineDOT Bridge Asset


024000.24 Work Program Management Management System, including inventory,
Statewide Bridge Management bridge data collection, asset priorities, $500,000
2024 Info. Systems Management
customer service levels, performance
reporting, and prioritization / scoping.

225
ID/Year Municipality Scope Name Description Total Project Cost

Inventory and Performance


025085.00
Measurement Rockland Branch Rail Various rail bridges along the Rockland
Statewide
2022 Line Branch Rail Line. $150,000
Info. Systems Management

026588.00 Work Program Management Identify and address gaps in the information
Straight-Line Diagram currently available to DOT personnel involved
Statewide
2022 Info. Systems Management Tool with scoping preservation projects by further $125,000
developing the straight-line diagram tool.

009001.22 Inventory and Performance


Measurement Collecting and categorizing crash records for
Statewide Crash Records
2022 analysis in targeting safety improvements. $414,000

009001.23 Inventory and Performance


Measurement Collecting and categorizing crash records for
Statewide Crash Records
2023 analysis in targeting safety improvements. $414,000

009001.24 Inventory and Performance


Measurement Collecting and categorizing crash records for
Statewide Crash Records $414,000
2024 analysis in targeting safety improvements.

021800.00
Communication and Outreach Defensive Driving
Statewide Municipal defensive driving training. $15,000
2022 Training

022025.22 Oversight, evaluation and enhancement of


Administration
Statewide Safety Office transportation safety operations and
2022 $645,000
improvements statewide.

022025.23 Oversight, evaluation and enhancement of


Administration
Statewide Safety Office transportation safety operations and
2023 $645,000
improvements statewide.

022025.24 Oversight, evaluation and enhancement of


Administration
Statewide Safety Office transportation safety operations and
2024 $645,000
improvements statewide.

022152.22
Work Program Management Funding to upgrade critical ADA deficiencies
Statewide ADA Improvements
2022 in priority areas. $500,000

226
ID/Year Municipality Scope Name Description Total Project Cost

022152.23
Work Program Management Funding to upgrade critical ADA deficiencies
Statewide ADA Improvements
2023 in priority areas. $500,000

022152.24
Work Program Management Funding to upgrade critical ADA deficiencies
Statewide ADA Improvements
2024 in priority areas. $500,000

022994.00
Communication and Outreach Transportation Safety
Statewide Maine Transportation Safety Coalition.
2022 Coalition $4,000

BR 23067
Custodial Maintenance
Statewide Various Locations Statewide Integrated Vegetation Control.
2022 $5,110,000

BR 23139
Custodial Maintenance
Statewide Various Locations Statewide Integrated Vegetation Control.
2023 $5,220,000

BR 23193
Custodial Maintenance
Statewide Various Locations Statewide Integrated Vegetation Control.
2024 $5,320,000

BR 23040
System Operations Statewide Intelligent Transportation System
Statewide Various Locations $475,000
2022 (ITS) Device Maintenance.

BR 23112
System Operations Statewide Intelligent Transportation System
Statewide Various Locations
2023 (ITS) Device Maintenance. $500,000

BR 23166
System Operations Statewide Intelligent Transportation System
Statewide Various Locations
2024 (ITS) Device Maintenance. $525,000

BR 23028
Custodial Maintenance Statewide bridge cleaning, washing and
Statewide Various Locations
2022 sealing. $2,130,000

227
ID/Year Municipality Scope Name Description Total Project Cost

BR 23100
Custodial Maintenance Statewide bridge cleaning, washing and
Statewide Various Locations
2023 sealing. $2,170,000

BR 23154
Custodial Maintenance Statewide bridge cleaning, washing and
Statewide Various Locations
2024 sealing. $2,250,000

BR 23029 Bridge and Structural


Statewide Maintenance Various Locations Statewide bridge work and improvements.
2022 $3,900,000

BR 23101 Bridge and Structural


Statewide Maintenance Various Locations Statewide bridge work and improvements.
2023 $10,700,000

BR 23155 Bridge and Structural


Statewide Maintenance Various Locations Statewide bridge work and improvements.
2024 $10,900,000

BR 23030 Department Building and Lot


Statewide Maintenance Dept. Operations Statewide building and lot maintenance.
2022 $9,900,000

BR 23102 Department Building and Lot


Statewide Maintenance Dept. Operations Statewide building and lot maintenance.
2023 $10,200,000

BR 23156 Department Building and Lot


Statewide Maintenance Dept. Operations Statewide building and lot maintenance.
2024 $10,600,000

BR 23031
Drainage Maintenance
Statewide Various Locations Statewide catch basin and culvert cleaning.
2022 $1,420,000

BR 23103
Drainage Maintenance
Statewide Various Locations Statewide catch basin and culvert cleaning.
2023 $1,450,000

228
ID/Year Municipality Scope Name Description Total Project Cost

BR 23157
Drainage Maintenance
Statewide Various Locations Statewide catch basin and culvert cleaning.
2024 $1,480,000

BR 23033
Crew Operations Statewide crew supervision and
Statewide Dept. Operations
2022 management. $7,100,000

BR 23105
Crew Operations Statewide crew supervision and
Statewide Dept. Operations
2023 management. $7,250,000

BR 23159
Crew Operations Statewide crew supervision and
Statewide Dept. Operations
2024 management. $7,400,000

BR 23035
Drainage Maintenance Statewide drainage maintenance and
Statewide Various Locations $8,500,000
2022 improvements.

BR 23107
Drainage Maintenance Statewide drainage maintenance and
Statewide Various Locations $20,900,000
2023 improvements.

BR 23161
Drainage Maintenance Statewide drainage maintenance and
Statewide Various Locations $21,500,000
2024 improvements.

BR 23038
Crew Operations Statewide equipment service, repair and
Statewide Dept. Operations
2022 associated fleet costs. $10,600,000

BR 23110
Crew Operations Statewide equipment service, repair and
Statewide Dept. Operations
2023 associated fleet costs. $10,700,000

BR 23164
Crew Operations Statewide equipment service, repair and
Statewide Dept. Operations
2024 associated fleet costs. $10,800,000

229
ID/Year Municipality Scope Name Description Total Project Cost

BR 23039 Operational and Safety


Maintenance Statewide guardrail installation and
Statewide Various Locations
2022 maintenance. $2,600,000

BR 23111 Operational and Safety


Maintenance Statewide guardrail installation and
Statewide Various Locations
2023 maintenance. $2,650,000

BR 23165 Operational and Safety


Maintenance Statewide guardrail installation and
Statewide Various Locations
2024 maintenance. $2,700,000

BR 23046
Custodial Maintenance
Statewide Various Locations Statewide highway patrolling and inspecting.
2022 $2,800,000

BR 23118
Custodial Maintenance
Statewide Various Locations Statewide highway patrolling and inspecting.
2023 $2,900,000

BR 23172
Custodial Maintenance
Statewide Various Locations Statewide highway patrolling and inspecting.
2024 $3,000,000

BR 23041 Infrastructure Inspection and


Inventory Statewide infrastructure inspections and
Statewide Dept. Operations $1,500,000
2022 inventory.

BR 23113 Infrastructure Inspection and


Inventory Statewide infrastructure inspections and
Statewide Dept. Operations
2023 inventory. $1,700,000

BR 23167 Infrastructure Inspection and


Inventory Statewide infrastructure inspections and
Statewide Dept. Operations
2024 inventory. $1,950,000

BR 23042
Custodial Maintenance
Statewide Various Locations Statewide litter and debris removal.
2022 $600,000

230
ID/Year Municipality Scope Name Description Total Project Cost

BR 23114
Custodial Maintenance
Statewide Various Locations Statewide litter and debris removal.
2023 $625,000

BR 23168
Custodial Maintenance
Statewide Various Locations Statewide litter and debris removal.
2024 $650,000

BR 23043
Crew Operations
Statewide Dept. Operations Statewide material processing and transport.
2022 $1,450,000

BR 23115
Crew Operations
Statewide Dept. Operations Statewide material processing and transport.
2023 $1,500,000

BR 23169
Crew Operations
Statewide Dept. Operations Statewide material processing and transport.
2024 $1,550,000

BR 23044
System Operations
Statewide Various Locations Statewide movable bridge operations.
2022 $1,680,000

BR 23116
System Operations
Statewide Various Locations Statewide movable bridge operations.
2023 $1,700,000

BR 23170
System Operations
Statewide Various Locations Statewide movable bridge operations.
2024 $1,730,000

BR 23045
Custodial Maintenance
Statewide Various Locations Statewide mowing.
2022 $1,350,000

BR 23117
Custodial Maintenance
Statewide Various Locations Statewide mowing.
2023 $1,400,000

231
ID/Year Municipality Scope Name Description Total Project Cost

BR 23171
Custodial Maintenance
Statewide Various Locations Statewide mowing.
2024 $1,450,000

BR 23047
Surface and Base Maintenance
Statewide Various Locations Statewide pavement maintenance and repair.
2022 $7,100,000

BR 23119
Surface and Base Maintenance
Statewide Various Locations Statewide pavement maintenance and repair.
2023 $7,250,000

BR 23173
Surface and Base Maintenance
Statewide Various Locations Statewide pavement maintenance and repair.
2024 $7,400,000

BR 23048
System Operations
Statewide Various Locations Statewide permitting.
2022 $1,000,000

BR 23120
System Operations
Statewide Various Locations Statewide permitting.
2023 $1,050,000

BR 23174
System Operations
Statewide Various Locations Statewide permitting.
2024 $1,100,000

BR 23050
Custodial Maintenance
Statewide Various Locations Statewide railroad maintenance.
2022 $425,000

BR 23122
Custodial Maintenance
Statewide Various Locations Statewide railroad maintenance.
2023 $450,000

BR 23176
Custodial Maintenance
Statewide Various Locations Statewide railroad maintenance.
2024 $475,000

232
ID/Year Municipality Scope Name Description Total Project Cost

BR 23058
Custodial Maintenance
Statewide Various Locations Statewide rest area maintenance.
2022 $650,000

BR 23130
Custodial Maintenance
Statewide Various Locations Statewide rest area maintenance.
2023 $700,000

BR 23184
Custodial Maintenance
Statewide Various Locations Statewide rest area maintenance.
2024 $750,000

BR 23060
Surface and Base Maintenance Statewide roadway shoulder and base
Statewide Various Locations
2022 maintenance. $1,880,000

BR 23132
Surface and Base Maintenance Statewide roadway shoulder and base
Statewide Various Locations $1,900,000
2023 maintenance.

BR 23186
Surface and Base Maintenance Statewide roadway shoulder and base
Statewide Various Locations $1,930,000
2024 maintenance.

BR 23059
Surface and Base Maintenance
Statewide Various Locations Statewide shoulder grading.
2022 $665,000

BR 23131
Surface and Base Maintenance
Statewide Various Locations Statewide shoulder grading.
2023 $700,000

BR 23185
Surface and Base Maintenance
Statewide Various Locations Statewide shoulder grading.
2024 $725,000

BR 23061 Operational and Safety


Statewide Maintenance Various Locations Statewide sign maintenance.
2022 $2,250,000

233
ID/Year Municipality Scope Name Description Total Project Cost

BR 23133 Operational and Safety


Statewide Maintenance Various Locations Statewide sign maintenance.
2023 $2,300,000

BR 23187 Operational and Safety


Statewide Maintenance Various Locations Statewide sign maintenance.
2024 $2,350,000

BR 23063
Winter Maintenance
Statewide Various Locations Statewide snow and ice control.
2022 $46,000,000

BR 23135
Winter Maintenance
Statewide Various Locations Statewide snow and ice control.
2023 $46,300,000

BR 23189
Winter Maintenance
Statewide Various Locations Statewide snow and ice control.
2024 $46,900,000

BR 23064
Custodial Maintenance
Statewide Various Locations Statewide sweeping.
2022 $1,910,000

BR 23136
Custodial Maintenance
Statewide Various Locations Statewide sweeping.
2023 $1,950,000

BR 23190
Custodial Maintenance
Statewide Various Locations Statewide sweeping.
2024 $1,990,000

BR 23065
System Operations
Statewide Various Locations Statewide traffic engineering and support.
2022 $1,650,000

BR 23137
System Operations
Statewide Various Locations Statewide traffic engineering and support.
2023 $1,680,000

234
ID/Year Municipality Scope Name Description Total Project Cost

BR 23191
System Operations
Statewide Various Locations Statewide traffic engineering and support.
2024 $1,720,000

BR 23066 Operational and Safety


Maintenance Statewide traffic signal and highway lighting
Statewide Various Locations
2022 maintenance. $1,500,000

BR 23138 Operational and Safety


Maintenance Statewide traffic signal and highway lighting
Statewide Various Locations
2023 maintenance. $1,580,000

BR 23192 Operational and Safety


Maintenance Statewide traffic signal and highway lighting
Statewide Various Locations
2024 maintenance. $1,650,000

BR 23057
System Operations Statewide transportation system emergency
Statewide Various Locations $950,000
2022 response.

BR 23129
System Operations Statewide transportation system emergency
Statewide Various Locations $975,000
2023 response.

BR 23183
System Operations Statewide transportation system emergency
Statewide Various Locations $1,000,000
2024 response.

Inventory and Performance Statewide traffic volume counts for


008993.22 monitoring traffic growth, meeting FHWA
Measurement
Statewide Traffic Volume Counts reporting requirements, and providing $1,150,000
2022
Maintenance and Operations detailed information for Legislative and
Department analysis.

Inventory and Performance Statewide traffic volume counts for


008993.23 monitoring traffic growth, meeting FHWA
Measurement
Statewide Traffic Volume Counts reporting requirements, and providing
2023 $970,000
Maintenance and Operations detailed information for Legislative and
Department analysis.

Inventory and Performance Statewide traffic volume counts for


008993.24 monitoring traffic growth, meeting FHWA
Measurement
Statewide Traffic Volume Counts reporting requirements, and providing
2024 $970,000
Maintenance and Operations detailed information for Legislative and
Department analysis.

235
ID/Year Municipality Scope Name Description Total Project Cost

Inventory and Performance


008995.22 Manual collection of vehicle size and weight
Measurement
Statewide Vehicle Classification classification data for highway and bridge
2022 $125,000
Maintenance and Operations design.

Inventory and Performance


008995.23 Manual collection of vehicle size and weight
Measurement
Statewide Vehicle Classification classification data for highway and bridge
2023 $130,000
Maintenance and Operations design.

Inventory and Performance


008995.24 Manual collection of vehicle size and weight
Measurement
Statewide Vehicle Classification classification data for highway and bridge
2024 $130,000
Maintenance and Operations design.

Inventory and Performance


008998.22 Operation and analysis of vehicle weigh-in-
Measurement Vehicle Size and Weight
Statewide motion devices used in highway and bridge
2022 Characteristics $175,000
Maintenance and Operations design.

Inventory and Performance


008998.23 Operation and analysis of vehicle weigh-in-
Measurement Vehicle Size and Weight
Statewide motion devices used in highway and bridge
2023 Characteristics $175,000
Maintenance and Operations design.

Inventory and Performance


008998.24 Operation and analysis of vehicle weigh in
Measurement Vehicle Size and Weight
Statewide motion devices used in highway and bridge
2024 Characteristics $175,000
Maintenance and Operations design.

Inventory and Performance


008999.22 Collection of data from origin and destination,
Measurement
Statewide Traffic Studies and other traffic studies for use in improving
2022 $100,000
Maintenance and Operations highway system efficiency.

Inventory and Performance


008999.23 Collection of data from origin and destination,
Measurement
Statewide Traffic Studies and other traffic studies for use in improving
2023 $100,000
Maintenance and Operations highway system efficiency.

Inventory and Performance


008999.24 Collection of data from origin and destination,
Measurement
Statewide Traffic Studies and other traffic studies for use in improving
2024 $100,000
Maintenance and Operations highway system efficiency.

022034.22 Highway System Operations Operation of Intelligent Transportation


Systems (ITS) field devices. These systems
Statewide ITS Field Devices
2022 Highways will help drivers avoid hazards and manage $950,000
congestion.

236
ID/Year Municipality Scope Name Description Total Project Cost

022034.23 Highway System Operations Operation of Intelligent Transportation


Systems (ITS) field devices. These systems
Statewide ITS Field Devices
2023 Highways will help drivers avoid hazards and manage $1,000,000
congestion.

022034.24 Highway System Operations Operation of Intelligent Transportation


Systems (ITS) field devices. These systems
Statewide ITS Field Devices
2024 Highways will help drivers avoid hazards and manage $1,000,000
congestion.

022037.22 Administration Operations for Advanced Traffic


Statewide ATMS/TIS Operations Management System (ATMS) and Traveler
2022 Maintenance and Operations $650,000
Information System (TIS).

022037.23 Administration Operations for Advanced Traffic


Statewide ATMS/TIS Operations Management System (ATMS) and Traveler
2023 Maintenance and Operations $650,000
Information System (TIS).

022037.24 Administration Operations for Advanced Traffic


Statewide ATMS/TIS Operations Management System (ATMS) and Traveler $700,000
2024 Maintenance and Operations
Information System (TIS).

023332.00 Highway System Operations STIC funding for Strategic Highway Research
Strategic Highway
Statewide Program (SHRP2) Traffic Incident
2022 Highways Research Program $21,000
Management (TIM) Training.

023767.02 Highway System Operations


Statewide Variable Speed Signs Variable speed limit signs. $119,000
2022 Highways

Feasibility/scoping study on the use of


024185.01 Policy, Planning and Research Dedicated Short-Range Communications
(DSRC), Road Weather Information System
Statewide Various Locations
2022 Maintenance and Operations (RWIS), On-Board Units (OBUs), Automatic $100,000
Vehicle Location (AVL) and meteorological
support for plow truck connections.

024187.00 Highway System Operations


Intelligent Transportation System (ITS)
Statewide Interstate 295
2022 Highways fiber/cameras/queue detection. $2,500,000

STIC Grant to fund one year of intelligent


024545.00 Highway System Operations traffic signal split monitoring post-processing
in the municipalities of South Portland,
Statewide STIC Grant
2022 Highways Ellsworth, Kennebunk and Wells, to aid in the $25,000
development of split monitoring performance
measures and guidelines.

237
ID/Year Municipality Scope Name Description Total Project Cost

024761.00 Highway System Operations Automated Traffic Signal Performance


Automated Traffic Signal
Statewide Measures (ATSPM) and the connection of
2022 Highways Performance Measures $100,000
existing signal locations.

Highway System Operations


024765.00 Network-wide customizable road-network
ITS Studies/Data
Statewide Production Support and performance visualization tool for multiple
2022 Analysis $350,000
Administration MaineDOT user groups.

025279.00 Highway System Operations


Statewide Data Analysis Purchase of Probe data for MaineDOT.
2022 Highways $350,000

AID Demo Grant State Match - ATMS ESRI


025323.00 Highway System Operations Integration/Crowdsource. This project is only
Statewide Grant Match partially funded for construction and is
2022 Highways $200,000
contingent upon a successful competitive
grant application.

025327.00 Highway System Operations


Statewide Interstate 95 Replacement of Changeable Message Sign. $300,000
2022 Highways

025891.24 Highway System Operations


Statewide Various Locations Traffic Incident Management Operations. $400,000
2024 Highways

025893.24 Highway System Operations


Automated Traffic Signal Performance
Statewide Various Locations $250,000
2024 Highways Measures.

026029.00 Highway System Operations


Small Portable CMS Procurement for TIM"S
Statewide Small Portable CMS
2024 Highways Deployment. $130,000

026031.00 Highway System Operations


Statewide Drone Procurement Drone Procurement for Sheriff Departments.
2024 Highways $180,000

026132.00 Highway System Operations


Dynamic Over Height detection for low
Statewide Various Locations
2024 Highways bridges. $120,000

238
ID/Year Municipality Scope Name Description Total Project Cost

026136.00 Highway System Operations


Permanent Changeable Message Sign
Statewide Various Locations
2024 Highways (CMS) off interstate. $1,000,000

026140.00 Highway System Operations


Statewide Various Locations Road Weather Information System (RWIS).
2024 Highways $1,200,000

026142.00 Highway System Operations


Probe data for Intelligent Transportation
Statewide Various Locations
2024 Highways System (ITS) devices. $350,000

002134.22
Policy, Planning and Research Administration and management of the
Statewide Research Administration
2022 federally mandated research program. $175,000

002134.23
Policy, Planning and Research Administration and management of the
Statewide Research Administration $175,000
2023 federally mandated research program.

002134.24
Policy, Planning and Research Administration and management of the
Statewide Research Administration $175,000
2024 federally mandated research program.

007115.22 Highway System Operations Work includes evaluation of projects to


Post - Construction
Statewide identify efficiencies and increase the cost
2022 Highways Evaluation $65,000
effectiveness of future projects.

007115.23 Highway System Operations Work includes evaluation of projects to


Post - Construction
Statewide identify efficiencies and increase the cost
2023 Highways Evaluation $65,000
effectiveness of future projects.

007115.24 Highway System Operations Work includes evaluation of projects to


Post - Construction
Statewide identify efficiencies and increase the cost
2024 Highways Evaluation $65,000
effectiveness of future projects.

007519.22
Policy, Planning and Research Evaluate new products to identify efficiencies
Statewide New Product Evaluation
2022 and increase cost effectiveness. $120,000

239
ID/Year Municipality Scope Name Description Total Project Cost

007519.23
Policy, Planning and Research Evaluate new products to identify efficiencies
Statewide New Product Evaluation
2023 and increase cost effectiveness. $120,000

007519.24
Policy, Planning and Research Evaluate new products to identify efficiencies
Statewide New Product Evaluation
2024 and increase cost effectiveness. $120,000

Projects established to address research


008958.22 needs, such as: conducting synthesis of the
Policy, Planning and Research
Statewide Problem Solving state of the practice, collecting and analyzing
2022 $65,000
field data and longer-term performance
evaluation.

Projects established to address research


008958.23 needs, such as: conducting synthesis of the
Policy, Planning and Research
Statewide Problem Solving state of the practice, collecting and analyzing
2023 $65,000
field data and longer-term performance
evaluation.

Projects established to address research


008958.24 needs, such as: conducting synthesis of the
Policy, Planning and Research
Statewide Problem Solving state of the practice, collecting and analyzing
2024 $65,000
field data and longer-term performance
evaluation.

Annual contributions to the AASHTO


Technical Services Program for initiatives
020822.22 such as pavement and bridge preservation
Administration AASHTO Technical
Statewide technical transfer, new product evaluation, $131,000
2022 Services
material standards development and
sustainable transportation technical
assistance.
Annual contributions to the AASHTO
Technical Services Program for initiatives
020822.23 such as pavement and bridge preservation
Administration AASHTO Technical
Statewide technical transfer, new product evaluation,
2023 Services $131,000
material standards development and
sustainable transportation technical
assistance.
Annual contributions to the AASHTO
Technical Services Program for initiatives
020822.24 such as pavement and bridge preservation
Administration AASHTO Technical
Statewide technical transfer, new product evaluation,
2024 Services $131,000
material standards development and
sustainable transportation technical
assistance.

022028.22 Surface Transportation Research:


Policy, Planning and Research
Statewide Research Initiative Anticipated funding for future federally
2022 $175,000
mandated research initiatives.

022028.23 Surface Transportation Research:


Policy, Planning and Research
Statewide Research Initiative Anticipated funding for future federally
2023 $175,000
mandated research initiatives.

240
ID/Year Municipality Scope Name Description Total Project Cost

022028.24 Surface Transportation Research:


Policy, Planning and Research
Statewide Research Initiative Anticipated funding for future federally
2024 $175,000
mandated research initiatives.

024815.00
Policy, Planning and Research Identification of aquatic species of interest
Statewide DNA Testing Protocol
2022 and development of a DNA testing protocol. $50,000

025851.22
Policy, Planning and Research Research and Pilot
Statewide Innovation Program management
2022 Projects $150,000

025851.23
Policy, Planning and Research Research and Pilot
Statewide Innovation Program management.
2023 Projects $150,000

025851.24
Policy, Planning and Research Research and Pilot
Statewide Innovation Program management. $150,000
2024 Projects

241
Municipal Index
Ë
Municipal Index

Municipality County Tab Municipality County Tab


Abbot Piscataquis Beals Washington
Acton York Beaver Cove Piscataquis
Adamstown Twp Oxford Beddington Washington
Addison Washington Belfast Waldo
Albany Twp Oxford Belgrade Kennebec
Albion Kennebec Belmont Waldo
Alder Stream Twp Franklin Benedicta Twp Aroostook
Alexander Washington Benton Kennebec
Alfred York Berry Twp Washington
Allagash Aroostook Berwick York
Alna Lincoln Bethel Oxford
Alton Penobscot Biddeford York
Amherst Hancock Big Lake Twp Washington
Amity Aroostook Big Moose Twp Piscataquis
Andover Oxford Bingham Somerset
Andover North Surplus Oxford Blaine Aroostook
Andover West Surplus Twp Oxford Blanchard Twp Piscataquis
Anson Somerset Blue Hill Hancock
Appleton Knox Boothbay Lincoln
Argyle Twp Penobscot Boothbay Harbor Lincoln
Arrowsic Sagadahoc Bowdoin Sagadahoc
Arundel York Bowdoinham Sagadahoc
Ashland Aroostook Bowerbank Piscataquis
Athens Somerset Bradford Penobscot
Atkinson Piscataquis Bradley Penobscot
Auburn Androscoggin Bremen Lincoln
Augusta Kennebec Brewer Penobscot
Aurora Hancock Bridgewater Aroostook
Avon Franklin Bridgton Cumberland
Baileyville Washington Brighton Plt Somerset
Baldwin Cumberland Bristol Lincoln
Bancroft Aroostook Brooklin Hancock
Bangor Penobscot Brooks Waldo
Bar Harbor Hancock Brooksville Hancock
Baring Plt Washington Brookton Twp Washington
Barnard Twp Piscataquis Brownfield Oxford
Batchelders Grant Twp Oxford Brownville Piscataquis
Bath Sagadahoc Brunswick Cumberland

242
Municipality County Tab Municipality County Tab
Buckfield Oxford Coburn Gore Franklin
Bucksport Hancock Codyville Plt Washington
Burlington Penobscot Columbia Washington
Burnham Waldo Columbia Falls Washington
Buxton York Concord Twp Somerset
Byron Oxford Connor Twp Aroostook
C Surplus Oxford Cooper Washington
Calais Washington Coplin Plt Franklin
Cambridge Somerset Corinna Penobscot
Camden Knox Corinth Penobscot
Canaan Somerset Cornish York
Canton Oxford Cornville Somerset
Cape Elizabeth Cumberland Cove Point Twp Piscataquis
Caratunk Somerset Cranberry Isles Hancock
Caribou Aroostook Crawford Washington
Carmel Penobscot Cross Lake Twp Aroostook
Carrabassett Valley Franklin Crystal Aroostook
Carroll Plt Penobscot Cumberland Cumberland
Carrying Place Town Twp Somerset Cushing Knox
Carrying Place Twp Somerset Cutler Washington
Carthage Franklin Cyr Plt Aroostook
Cary Plt Aroostook Dallas Plt Franklin
Casco Cumberland Damariscotta Lincoln
Castine Hancock Danforth Washington
Castle Hill Aroostook Day Block Twp Washington
Caswell Aroostook Dayton York
Cathance Twp Washington Dead River Twp Somerset
Centerville Twp Washington Deblois Washington
Chain of Ponds Twp Franklin Dedham Hancock
Chapman Aroostook Deer Isle Hancock
Charleston Penobscot Denmark Oxford
Charlotte Washington Dennistown Plt Somerset
Chebeague Island Cumberland Dennysville Washington
Chelsea Kennebec Detroit Somerset
Cherryfield Washington Devereaux Twp Washington
Chester Penobscot Dexter Penobscot
Chesterville Franklin Dixfield Oxford
Chesuncook Twp Piscataquis Dixmont Penobscot
China Kennebec Dover-Foxcroft Piscataquis
Clifton Penobscot Dresden Lincoln
Clinton Kennebec Drew Plt Penobscot

243
Municipality County Tab Municipality County Tab
East Millinocket Penobscot Frenchville Aroostook
East Moxie Twp Somerset Friendship Knox
Eastbrook Hancock Frye Island Cumberland
Easton Aroostook Fryeburg Oxford
Eastport Washington Gardiner Kennebec
Durham Androscoggin Garfield Plt Aroostook
Dyer Brook Aroostook Garland Penobscot
E Twp Aroostook Georgetown Sagadahoc
Eagle Lake Aroostook Gilead Oxford
East Machias Washington Glenburn Penobscot
Ebeemee Twp Piscataquis Glenwood Plt Aroostook
Eddington Penobscot Gorham Cumberland
Edgecomb Lincoln Gouldsboro Hancock
Edinburg Penobscot Grafton Twp Oxford
Edmunds Twp Washington Grand Falls Twp Penobscot
Eliot York Grand Isle Aroostook
Elliottsville Twp Piscataquis Grand Lake Stream Plt Washington
Ellsworth Hancock Gray Cumberland
Embden Somerset Great Pond Hancock
Enfield Penobscot Greenbush Penobscot
Etna Penobscot Greene Androscoggin
Eustis Franklin Greenfield Twp Penobscot
Exeter Penobscot Greenlaw Chopping Twp Washington
Fairfield Somerset Greenville Piscataquis
Falmouth Cumberland Greenwood Oxford
Farmingdale Kennebec Grindstone Twp Penobscot
Farmington Franklin Guilford Piscataquis
Fayette Kennebec Hallowell Kennebec
Fletchers Landing Twp Hancock Hamlin Aroostook
Forest City Twp Washington Hammond Aroostook
Forest Twp Washington Hampden Penobscot
Forkstown Twp Aroostook Hancock Hancock
Fort Fairfield Aroostook Hanover Oxford
Fort Kent Aroostook Harfords Point Twp Piscataquis
Frankfort Waldo Harmony Somerset
Franklin Hancock Harpswell Cumberland
Freedom Waldo Harrington Washington
Freeman Twp Franklin Harrison Cumberland
Freeport Cumberland Hartford Oxford
Frenchboro Hancock Hartland Somerset
Frenchtown Twp Piscataquis Haynesville Aroostook

244
Municipality County Tab Municipality County Tab
Hebron Oxford Lakeville Penobscot
Hermon Penobscot Lambert Lake Twp Washington
Hersey Aroostook Lamoine Hancock
Herseytown Twp Penobscot Lang Twp Franklin
Hibberts Gore Lincoln Lebanon York
Highland Plt Somerset Lee Penobscot
Hiram Oxford Leeds Androscoggin
Hodgdon Aroostook Levant Penobscot
Holden Penobscot Lewiston Androscoggin
Hollis York Lexington Twp Somerset
Hope Knox Liberty Waldo
Houlton Aroostook Lily Bay Twp Piscataquis
Howland Penobscot Limerick York
Hudson Penobscot Limestone Aroostook
Indian Island Penobscot Limington York
Indian Twp Res Washington Lincoln Penobscot
Industry Franklin Lincoln Plt Oxford
Island Falls Aroostook Lincolnville Waldo
Isle au Haut Knox Linneus Aroostook
Islesboro Waldo Lisbon Androscoggin
Jackman Somerset Litchfield Kennebec
Jackson Waldo Littleton Aroostook
Jay Franklin Livermore Androscoggin
Jefferson Lincoln Livermore Falls Androscoggin
Jim Pond Twp Franklin Long A Twp Penobscot
Johnson Mountain Twp Somerset Long Island Cumberland
Jonesboro Washington Long Pond Twp Somerset
Jonesport Washington Lovell Oxford
Katahdin Iron Works Twp Piscataquis Lowell Penobscot
Kenduskeag Penobscot Lower Cupsuptic Twp Oxford
Kennebunk York Lubec Washington
Kennebunkport York Ludlow Aroostook
Kingfield Franklin Lyman York
Kingman Twp Penobscot Machias Washington
Kingsbury Plt Piscataquis Machiasport Washington
Kittery York Macwahoc Plt Aroostook
Knox Waldo Madawaska Aroostook
Kossuth Twp Washington Madawaska Lake Twp Aroostook
Lagrange Penobscot Madison Somerset
Lake View Plt Piscataquis Madrid Twp Franklin

245
Municipality County Tab Municipality County Tab
Magalloway Plt Oxford Mount Desert Hancock
Manchester Kennebec Mount Katahdin Twp Piscataquis
Mapleton Aroostook Mount Vernon Kennebec
Mariaville Hancock Moxie Gore Somerset
Marion Twp Washington Naples Cumberland
Mars Hill Aroostook Nashville Plt Aroostook
Marshfield Washington Nesourdnahunk Twp Piscataquis
Masardis Aroostook New Canada Aroostook
Mason Twp Oxford New Gloucester Cumberland
Matinicus Isle Plt Knox New Limerick Aroostook
Mattamiscontis Twp Penobscot New Portland Somerset
Mattawamkeag Penobscot New Sharon Franklin
Maxfield Penobscot New Sweden Aroostook
Mayfield Twp Somerset New Vineyard Franklin
Mechanic Falls Androscoggin Newburgh Penobscot
Meddybemps Washington Newcastle Lincoln
Medford Piscataquis Newfield York
Medway Penobscot Newport Penobscot
Mercer Somerset Newry Oxford
Merrill Aroostook Nobleboro Lincoln
Mexico Oxford Norridgewock Somerset
Milbridge Washington North Berwick York
Milford Penobscot North Haven Knox
Millinocket Penobscot North Yarmouth Cumberland
Milo Piscataquis N. Yarmouth Academy Grant Twp Aroostook
Milton Twp Oxford Northfield Washington
Minot Androscoggin Northport Waldo
Misery Gore Twp Somerset Norway Oxford
Molunkus Twp Aroostook Oakfield Aroostook
Monhegan Island Plt Lincoln Oakland Kennebec
Monmouth Kennebec Ogunquit York
Monroe Waldo Old Orchard Beach York
Monson Piscataquis Old Town Penobscot
Monticello Aroostook Orient Aroostook
Montville Waldo Orland Hancock
Moose River Somerset Orneville Twp Piscataquis
Moosehead Junction Twp Piscataquis Orono Penobscot
Moro Plt Aroostook Orrington Penobscot
Morrill Waldo Osborn Hancock
Moscow Somerset Otis Hancock
Mount Chase Penobscot Otisfield Oxford

246
Municipality County Tab Municipality County Tab
Owls Head Knox Ripley Somerset
Oxbow Plt Aroostook Robbinston Washington
Oxford Oxford Rockland Knox
Palermo Waldo Rockport Knox
Palmyra Somerset Rockwood Strip T1 R1 NBKP Somerset
Paris Oxford Rome Kennebec
Parkman Piscataquis Roque Bluffs Washington
Parlin Pond Twp Somerset Roxbury Oxford
Parsonsfield York Rumford Oxford
Passadumkeag Penobscot Sabattus Androscoggin
Patten Penobscot Saco York
Pembroke Washington Sagadahoc County Island Sagadahoc
Penobscot Hancock Saint Agatha Aroostook
Perham Aroostook Saint Albans Somerset
Perkins Twp Franklin Saint Francis Aroostook
Perry Washington Saint George Knox
Peru Oxford Saint John Plt Aroostook
Phillips Franklin Salem Twp Franklin
Phippsburg Sagadahoc Sandwich Academy Grant Twp Somerset
Pittsfield Somerset Sandy Bay Twp Somerset
Pittston Kennebec Sandy River Plt Franklin
Pleasant Point Washington Sanford York
Pleasant Ridge Plt Somerset Sangerville Piscataquis
Plymouth Penobscot Sapling Twp Somerset
Poland Androscoggin Scarborough Cumberland
Portage Lake Aroostook Searsmont Waldo
Porter Oxford Searsport Waldo
Portland Cumberland Sebago Cumberland
Pownal Cumberland Sebec Piscataquis
Prentiss Twp T7 R3 NBPP Penobscot Seboeis Plt Penobscot
Presque Isle Aroostook Sedgwick Hancock
Princeton Washington Shapleigh York
Prospect Waldo Sherman Aroostook
Randolph Kennebec Shirley Piscataquis
Rangeley Franklin Sidney Kennebec
Rangeley Plt Franklin Silver Ridge Twp Aroostook
Raymond Cumberland Skowhegan Somerset
Readfield Kennebec Smithfield Somerset
Reed Plt Aroostook Smyrna Aroostook
Richmond Sagadahoc Soldiertown Twp T2 R7 WELS Penobscot
Riley Twp Oxford Solon Somerset

247
Municipality County Tab Municipality County Tab
Somerville Lincoln T2 R8 NWP Penobscot
Sorrento Hancock T2 R9 NWP Penobscot
South Berwick York T2 R9 WELS Piscataquis
South Bristol Lincoln T22 MD Hancock
South Portland Cumberland T24 MD BPP Washington
South Thomaston Knox T26 ED BPP Washington
Southport Lincoln T28 MD Hancock
Southwest Harbor Hancock T3 Indian Purchase Twp Penobscot
Springfield Penobscot T3 ND Hancock
Stacyville Penobscot T3 R10 WELS Piscataquis
Standish Cumberland T3 R4 BKP WKR Somerset
Starks Somerset T30 MD BPP Washington
Stetson Penobscot T32 MD Hancock
Steuben Washington T4 Indian Purchase Twp Penobscot
Stockholm Aroostook T4 R10 WELS Piscataquis
Stockton Springs Waldo T4 R11 WELS Piscataquis
Stoneham Oxford T4 R13 WELS Piscataquis
Stonington Hancock T4 R9 NWP Piscataquis
Stow Oxford T5 R11 WELS Piscataquis
Strong Franklin T5 R7 WELS Penobscot
Sullivan Hancock T5 R8 WELS Penobscot
Summit Twp Penobscot T5 R9 WELS Piscataquis
Sumner Oxford T6 R6 WELS Penobscot
Surry Hancock T6 R7 WELS Penobscot
Swans Island Hancock T6 R8 WELS Penobscot
Swanville Waldo T7 R5 WELS Aroostook
Sweden Oxford T7 SD Hancock
T1 R13 WELS Piscataquis T8 R3 NBPP Washington
T1 R5 WELS Aroostook T8 R4 NBPP Washington
T1 R6 WELS Penobscot T8 R5 WELS Aroostook
T1 R8 WELS Penobscot T9 R5 WELS Aroostook
T1 R9 WELS Piscataquis T9 SD Hancock
T10 SD Hancock TA R2 WELS Aroostook
T11 R4 WELS Aroostook TA R7 WELS Penobscot
T14 R6 WELS Aroostook Talmadge Washington
Taunton & Raynham Academy
T15 R6 WELS Aroostook Grant Somerset
T17 R3 WELS Aroostook TD R2 WELS Aroostook
T17 R4 WELS Aroostook Temple Franklin
T18 MD BPP Washington The Forks Plt Somerset
T2 R10 WELS Piscataquis Thomaston Knox

248
Municipality County Tab Municipality County Tab
Thorndike Waldo Weld Franklin
Tomhegan Twp Somerset Wellington Piscataquis
Topsfield Washington Wells York
Topsham Sagadahoc Wesley Washington
Township 6 North of Weld Franklin West Bath Sagadahoc
Township C Oxford West Forks Plt Somerset
Township D Franklin West Gardiner Kennebec
Township E Franklin West Paris Oxford
Tremont Hancock Westbrook Cumberland
Trenton Hancock Westfield Aroostook
Trescott Twp Washington Westmanland Aroostook
Trout Brook Twp Piscataquis Weston Aroostook
Troy Waldo Westport Island Lincoln
Turner Androscoggin Whitefield Lincoln
Union Knox Whiting Washington
Unity Waldo Whitneyville Washington
Unity Twp Kennebec Williamsburg Twp Piscataquis
Upper Molunkus Twp Aroostook Willimantic Piscataquis
Upton Oxford Wilton Franklin
Van Buren Aroostook Windham Cumberland
Vanceboro Washington Windsor Kennebec
Vassalboro Kennebec Winn Penobscot
Veazie Penobscot Winslow Kennebec
Verona Island Hancock Winter Harbor Hancock
Vienna Kennebec Winterport Waldo
Vinalhaven Knox Winterville Plt Aroostook
Wade Aroostook Winthrop Kennebec
Waite Washington Wiscasset Lincoln
Waldo Waldo Woodland Aroostook
Waldoboro Lincoln Woodstock Oxford
Wales Androscoggin Woodville Penobscot
Wallagrass Aroostook Woolwich Sagadahoc
Waltham Hancock Wyman Twp Franklin
Warren Knox Yarmouth Cumberland
Washburn Aroostook York York
Washington Knox
Washington Twp Franklin
Waterboro York
Waterford Oxford
Waterville Kennebec
Wayne Kennebec
Webster Plt Penobscot

249
Work Plan
Terms & Definitions
Ë
WORK PLAN TERMS AND DEFINITIONS

ACIP: Airport Capital Improvement Plan.

ADA or Americans with Disabilities Act: The Americans with Disabilities Act prohibits
discrimination and ensures equal opportunity for persons with disabilities in employment,
government services, public accommodations, commercial facilities and transportation.

Administration: The ongoing functions that support MaineDOT programs and projects,
including department-wide financial and administrative services, financial administration for
federal programs, human resources, legal services, operation of the Executive Office, geographic
information systems, performance measurement and accountability, the Freight and Business
Services Office, the Business and Community Relations Office and engineering oversight .

AID Demo or Accelerated Innovation Deployment Demonstration: The AID Demonstration


program provides funding as an incentive to accelerate the use of innovation in highway
transportation projects.

Airport Master Plan: An Airport Master Plan is a comprehensive study of an airport that
describes short-, medium- and long- term development plans to meet future aviation demand.

American Rescue Plan Act (ARPA) Statewide Planning, Research, and Networks grant:
Economic adjustment assistance grants provided by the Economic Development
Administration (EDA).

Apron: The area of an airport intended to accommodate the loading and unloading of passengers
and cargo, and the refueling, servicing and parking of aircraft.

Asset Location Management: Managing transportation asset data, coordinating data between
systems, analyzing data and work-reporting, and producing reports, maps and data files.

Asset Name: Names the publicly owned or publicly used facility or program on which work is to
occur.

Aviation: Includes crack-sealing to preserve airport runway pavement.

Avigation Easement: Avigation easement is an easement or right in the airspace above or in the
vicinity of a particular property. It includes the right to create such noise or other effects as may
result from the lawful operation of aircraft in such airspace and the right to remove any

Items in Italics indicate Statewide Operations or Statewide Capital Programs

250
obstructions to such overflight. This in effect prevents the landowners near airports from
building above a set height or requires the trimming of trees.

AVL or Automatic Vehicle Location: Automatic Vehicle Location is a means of determining


the location of a vehicle and transmitting that information to a receiver, allowing transit agencies
to determine location of buses, wait times and other information.

ATCMTD or Advanced Transportation and Congestion Management Technologies


Deployment Grant: The FAST Act established the Advanced Transportation and Congestion
Management Technologies Deployment Program to make competitive grants for the
development of model deployment sites for large scale installation and operation of advanced
transportation technologies to improve safety, efficiency, system performance, and infrastructure
return on investment.

ATSPM or Automated Traffic Signal Performance Measures: Automated Traffic Signal


Performance Measures (ATSPMs), included in the Every Day Counts 4 technology initiative, is
defined as a suite of performance measures, data collection and data analysis tools to support
objectives and performance based approaches to traffic signal operations, maintenance,
management and design to improve the safety, mobility and efficiency of signalized intersections
for all users.

Bicycle- Pedestrian: Improve transportation and safety, encourage healthful activities, and
promote economic development, while improving the livability and vitality of local
communities.

BIG or Boating Infrastructure Grants: Boating Infrastructure Grants is a program of the U.S.
Fish and Wildlife Service to support boating infrastructure.

BPI or Business Partnership Initiative: Provides state funding to match private and municipal
investment in highway improvements performed to facilitate economic development.

BR: Bureau Request for Maintenance and Operations.

Bridge: A span length of at least 20 feet, in accordance with federal law.

Bridge and Structural Maintenance: Investments to prevent or repair routine problems, and to
extend the useful life of bridges until capital funding becomes available.

Bridge Deck: The portion of the bridge that provides direct support for vehicular and pedestrian
traffic.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

251
Bridge Preservation: Bridge-strengthening and other bridge improvements on state-owned
bridges.

Bridge Scour Countermeasures: Techniques employed to mitigate the effects of sediment


scour and other hydraulic stress on bridge structures.

Bridge Substructure: The parts of a bridge that are below the bottom of the girders. Pilings,
shafts, spread footings and columns may be part of the substructure.

Bridge Superstructure: The parts of a bridge that are above the bottom of the girders. Girders,
bridge deck and bridge railing are parts of the superstructure.

BUILD: Better Utilizing Investments to Leverage Development. FHWA Discretionary Grant


program providing funding for investments in surface transportation infrastructure with a
significant impact in their local or regional communities.

Building and Lot Maintenance: Supports maintenance of over 600 buildings and more than 100
building lots, as well as maintenance of ancillary lot structures.

CADD: Computer Aided Design and Drafting.

Catch Basin: A reservoir for collecting surface drainage or runoff.

CBITD: Casco Bay Island Transit District. The ferry system that serves Portland and nearby
islands in Casco Bay.

CE or Construction Engineering: The supervision and inspection of construction activities.

CHBP: Competitive Highway Bridge Program. FHWA Discretionary Grant program providing
funding for highway bridge replacement or rehabilitation projects on public roads that
demonstrate cost savings by bundling at least two highway bridge projects into a single contract.

Chip Sealing: Consists of a layer of asphalt binder that is overlaid by a layer of embedded
aggregate that furnishes, among other things, protection to the asphalt layer from tire damage and
macrotexture that creates a skid-resistant surface.

CIPR or Cold in Place Recycling: The process of removing a portion of the pavement surface,
processing it to a uniform particle size, and mixing with emulsion and Portland cement in a
continuous portable operation to create a recycled pavement layer.

CMAQ or Congestion Mitigation for Air Quality: A source of Federal-aid funding for
transportation improvements designed to improve air quality and mitigate congestion.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

252
CMQ, CMQR: Central Maine and Quebec Railway.

CMS: Changeable Message Signs.

Cold Storage Building: A building facility used to store salt and sand materials for use in
maintaining a roadway facility in winter.

Communications and Outreach: This program includes the Local Transportation Assistance
Program, work zone-safety and bicycle-pedestrian safety education, and audio-visual and other
creative services.

CON: Construction phase of project work.

Contract Administration: Costs related to developing and administering contracts.

CPR or Cyclical Pavement Resurfacing: The application of a 3/4” overlay used to preserve
lower priority roads that are considered “built”.

Crack Sealing: Roadway or runway surface crack sealing treatments, to prevent surface damage
from freeze thaw cycles.

Crew Operations: Crew management and planning, and overall work preparation activities.
Equipment transport and certain repairs also fall into this category.

CRISI: Consolidated Rail Infrastructure and Safety Improvements. FRA Discretionary Grant
program providing funding for a wide range of projects that improve the safety, efficiency and
reliability of intercity passenger and freight rail systems.

CSL or Customer Service Level: A measure of how a road compares to other roads of the same
priority across the state, based on safety, condition and service.

Culvert: Any pipe or other structure under a roadway that has a diameter of less than 5 feet, or
multiple pipes or other structures with a combined opening of less than 20 square feet in area.

Custodial Maintenance: Activities aimed at keeping the assets clean and functioning, such as
patrolling and inspecting highways, sweeping, cleaning bridges, and vegetation management.

Debt Service: Debt service is the cash required over a given time period for the repayment of
interest and principal on a debt instrument.

Description: Provides a detailed description as to the specific location of where work is to occur
and/or details the type of work that is to occur over a specific area.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

253
Dolphin: Man-made marine structure that extends above the water level and is not connected to
shore.

Drainage Maintenance: Removing water from the highway structure, which increases roadway
longevity—ditching, catch basin and culvert cleaning, and installation/replacement of drainage
structure.

DSRC or Dedicated Short-Range Communications: One-way or two-way short-range to


medium-range wireless communication channels specifically designed for automotive use and a
corresponding set of protocols and standards.

DSRX: Downeast Scenic Railroad.

Easement: A certain right to use the real property of another without possessing it.

EMAS or Engineered Materials Arresting System: EMAS uses crushable material at the end
of a runway to stop an aircraft that overruns the runway.

Employee Education and Training: All costs associated with creating, presenting and attending
various trainings, as well as costs associated with attending meetings and conferences.

EMR: Eastern Maine Railway.

Engineering and Professional Services: Legal work, right-of-way, design, geotechnical


engineering, surveying, civil rights, planning, project management and utility coordination.

Enhanced Project Scoping: A planning process intended to manage future risk by detailing the
basic need, possible impacts, roadway design matters, potential cost and stakeholder issues of
proposed projects.

Environmental Stewardship: The collection, documenting, permitting and administration of


environmental issues associated with maintenance activities or projects.

ESRI: Environmental Systems Research Institute) is an international supplier of geographic


information system (GIS) software, web GIS and geodatabase management applications.

FAA or Federal Aviation Administration: The national aviation authority of the United States
with powers to regulate all aspects of civil aviation, including inspecting and rating civilian
aircraft and pilots, enforcing the rules of air safety, and installing and maintaining air-navigation
and traffic control facilities.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

254
FASTLANE: Fostering Advancements in Shipping and Transportation for the Long-Term
Achievement of National Efficiencies. USDOT Discretionary Grant program providing funding
for nationally and regionally significant freight and highway projects.

Feasibility Study: An analysis and evaluation of a proposed action which is based on extensive
investigation and research to determine order-of-magnitude costs and benefits for the proposed
action.

Federal Functional Classification: The process by which both rural and urban streets and
highways are grouped into classes.

Federal Fund: A fund in which all resources are provided by the Federal Government.

FFY or Federal Fiscal Year: Federal Fiscal Year, which begins October 1st.

FHWA or Federal Highway Administration: The Federal Highway Administration (FHWA)


is a division of the United States Department of Transportation that specializes in highway
transportation.

Finger Floats: Floating parallel docks for use as a boat slip.

Fog Seal: A method of adding asphalt to an existing pavement surface to improve sealing or
waterproofing, prevent further stone loss by holding aggregate in place, or simply improve the
surface appearance.

Freight: The movement of goods or cargo by ship, train or truck.

FTA or Federal Transit Administration: The FTA provides financial and technical assistance
to local public transit systems, including buses, subways, light rail, commuter rail, trolleys and
ferries. FTA also oversees safety measures and helps develop next-generation technology
research.

FTA 5303: Funding provided by FTA for Metropolitan Transportation Planning.

FTA 5304: Funding provided by FTA for Statewide and Non-metropolitan Transportation
Planning.

FTA 5307: Funding provided by FTA for transit investments, operating assistance and
transportation planning in urbanized areas.

FTA 5310: Funding provided by FTA to improve transportation for seniors and individuals with
disabilities.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

255
FTA 5311: Funding provided by FTA to support public transportation in rural areas.

FTA 5337: Funding provided by FTA to finance capital projects to maintain public
transportation systems in a state of good repair.

FTA 5339: Funding provided by FTA to replace, rehabilitate and purchase buses and related
equipment and to construct bus-related facilities.

Full Depth Reclamation with Foamed Asphalt: The foamed asphalt stabilization process
involves full depth reclamation of all the existing hot mix asphalt and some of the underlying
sub-base gravel, shaping this material to the desired grade and cross-slope and compacting the
material to specifications.

Funding: Comprises the total funding being applied to a project, specific to the scope.

GARVEE: A Grant Anticipation Revenue Vehicle (GARVEE) is any bond or other form of debt
repayable, either exclusively or primarily, with future Federal-aid highway funds under
Section 122 of Title 23 of the United States Code.

General Fund: A fund used to account for all transactions of a governmental unit that are not
accounted for in another fund.

General Obligation Bonds: General obligation (G.O.) bonds are debt instruments issued to raise
funds for public works. G.O. bonds are backed by the full faith and credit of the issuing entity.

Grader Work: Reshaping the shoulder of the highway to facilitate runoff to ditches.

Guardrail: Railing designed to keep vehicles from straying into dangerous or off-limits areas.

Guardrail Crash Cushion: Energy-absorbing cushioning device that offers protection from
collisions with fixed guardrail installations.

Hangar: A large building for storing and maintaining aircraft.

HCD or Habitat Connectivity Design: Design incorporating key strategies to protect


biodiversity, maintain viable ecosystems and wildlife populations and facilitate the movement
and adaptation of wildlife populations.

HCP or Highway Corridor Priority: A classification system based on common-sense factors


including the economic importance of the road. HCP model classifies all 23,500 miles of public
highways as one of five levels:
• HCP l: 1,760 miles - 8% of statewide mileage; 42% of Maine vehicle-miles traveled
(VMT); the Maine Turnpike, all Interstate miles, and key principal arterials.
Items in Italics indicate Statewide Operations or Statewide Capital Programs

256
• HCP 2: 1,355 miles - 6% of statewide mileage; 17% of VMT; non-Interstate and high-
value arterials.
• HCP 3: 2,211 miles - 9% of statewide mileage; 16% of VMT; the remaining arterials
and the most significant major-collectors.
• HCP 4: 3,731 miles - 16% of statewide mileage; 12% of VMT; the remaining major-
and urban-collector highways, as well as minor-collector highways and state-aid roads.
• HCP 6: 14,362 miles - 61% of statewide mileage; 13% of VMT; local roads and streets
that are the year-round responsibility of municipalities.
Heavy Pavement Treatment: Applied to roadways in fair to good condition that have
deteriorated too far for light treatments to be effective, but are still able to be preserved with a
more substantial treatment.

Highway and Bridge Capital: Capital investments for highway and bridge improvements.

Highway and Bridge Maintenance: Maintenance investments for the highway and bridge
program.

Highway Fund: The State Highway Fund is an account that receives its resources mainly
through fuel taxes and is used to fund projects that are related to the State's highway system.

Highway Light Capital Paving: (LCP) Program performs light paving treatments to improve
safety and drivability, and to extend the life of lower-priority roadways.

Highway Preservation Paving: Preserves the investments in existing highways with treatments
such as repaving, crack sealing, drainage repair, etc., in each region and the Interstate.

Highway Preservation Paving 1 1/4" overlay: Projects scoped for this treatment will receive a
1 ¼ inch HMA surface covering the travel way and any adjacent paved shoulders.

Highway Preservation Paving 3/4" overlay: Projects scoped for this treatment will receive a
travel way leveling course followed by a ¾ inch HMA surface course covering mainline travel
way and shoulders.

Highway Reconstruction: The rebuilding of an existing highway to modern design standards to


ensure adequate levels of service for travelers.

Highway Rehabilitation: Structural enhancements that extend the service life of an existing
pavement and/or improve its load-carrying capacity.

Highway Safety and Spot Improvements: An activity grouping that includes striping, guardrail,
rumble strips, crack-sealing, signage, measures to reduce vehicle/large animal collisions,
improvements to visitor information centers, and installation of pedestrian crossing-signals.
Items in Italics indicate Statewide Operations or Statewide Capital Programs

257
Highway System Operations: Project-level expenses across multiple types of projects, and
various operational activities including: fees for river gauges, landscaping, operating costs for
the ARAN data collection vehicle, operation of intelligent transportation system field devices
and advanced transportation management system operations.

HMA or Hot Mix Asphalt: Hot mix asphalt is a combination of approximately 95% stone, sand
or gravel bound together by asphalt cement-a product of crude oil. Asphalt cement is heated
aggregate, combined, and mixed with the aggregate at an HMA facility.

HTF or Highway Trust Fund: An account established by law to hold federal highway user
taxes that are dedicated for highway and transit-related purposes. The HTF has two accounts:
the Highway Account and the Mass Transit Account.

ID or Identification Number: The primary means of identifying and tracking projects within
programs and information systems.

IMT: The International Marine Terminal, located on the Portland waterfront.

Information Technology Support: Funds development, operation and maintenance of the


department’s technology systems through the state Office of Information Technology.

INFRA: Infrastructure for Rebuilding America. USDOT Discretionary Grant program


providing funding for projects that address critical issues facing our nation’s highways and
bridges by creating opportunities for all levels of government and the private sector to fund
infrastructure, using innovative approaches to improve the processes for building significant
projects, and increasing accountability for the projects that are built.

Infrastructure Inspection and Inventory: Collection, monitoring and review of the department’s
assets, which include highways, rail, ferry, structures and appurtenances.

Intermodal Facility: A transportation facility designed to facilitate the change in mode for
passenger or freight movement.

Interpretive Signs: Signs used to inform and make visitors aware of notable features of an area.

Inventory and Performance Management: A grouping of work that includes vehicle


size/weight classification, traffic counts, highway classification, traffic studies, bridge
inspections, the Safety Office, and operation of the Results and Information Office (RIO).

ITS or Intelligent Transportation System: Electronics, communications, or information


processing used singly or in combination to improve the efficiency or safety of a surface
transportation system.
Items in Italics indicate Statewide Operations or Statewide Capital Programs

258
Large Culvert: (Formerly referred to as a “strut”.) A large culvert is a pipe or other structure
that has a clear span between 5 and 10 feet, or multiple pipes or structures with a combined
opening between 19 and 80 square feet in area.

LCP or Light Capital Pavement: Light Capital Pavement is typically the application of a 5/8”
nominal overlay, used as a holding action on unbuilt roads, to improve safety and durability and
to extend the life of lower-priority roadways.

LED or Light-Emitting Diode: Semiconductor light sources that are highly efficient, used in
highway lighting and signage installation.

Light Pavement Treatment: Intended to provide a new wearing surface for traffic and to
protect the underlying pavement on the roadway.

Local Road Assistance or LRAP: The program working with municipal and tribal jurisdictions
to provide training, technical assistance and information regarding the construction, maintenance
and managing of local roads and bridges in Maine.

LRFD or Load and Resistance Factor Design: LRFD incorporates state-of-the-art analysis and
design methodologies with load and resistance factors based on the known variability of applied
loads and material properties. These load and resistance factors are calibrated from actual bridge
statistics to ensure a uniform level of safety.

Marine: Programs include the Boating Infrastructure Grant program funded by the U.S. Fish and
Wildlife Service, funding for infrastructure improvements for the Maine State Ferry Service, and
marine port improvements, statewide.

MCRR: Maine Central Railroad.

MePA or Maine Port Authority: The Maine Port Authority plans, develops, maintains and
promotes port and intermodal facilities across the State to stimulate commerce and enhance the
global competitiveness for the future wealth and prosperity of Maine.

Microsurfacing: A mixture of asphalt emulsion, graded aggregates (1/4” to 3/8”), mineral filler,
water and other additives. The mixture is made and placed on a continuous basis using a travel
paver (Slurry Surfacing Machine).

Mill and Fill: A pavement management treatment that extends the life of existing roadways by
removing a portion of the roadway surface then replacing it with a suitable depth of new hot mix
asphalt.

Mitigation: Actions that avoid, minimize, or compensate for potential adverse impacts.
Items in Italics indicate Statewide Operations or Statewide Capital Programs

259
MNR: Maine Northern Railway.

MPA or Metropolitan Planning Area: The boundaries of a metropolitan planning area (MPA)
shall be determined by agreement between the MPO and the Governor. At a minimum, the MPA
boundaries shall encompass the entire existing urbanized area (as defined by the Bureau of the
Census) plus the contiguous area expected to become urbanized within a 20-year forecast period
for the metropolitan transportation plan. The MPA boundaries may be further expanded to
encompass the entire metropolitan statistical area or combined statistical area, as defined by the
Office of Management and Budget.

The cities and towns included in the MPA for each MPO are listed below:

ATRC includes Auburn, Lewiston, Lisbon and Sabattus

BACTS includes Bangor, Bradley, Brewer, Eddington, Hampden, Hermon, Indian


Island, Milford, Old Town, Orono, Orrington and Veazie

KACTS includes Berwick, Eliot, Kittery, Lebanon, South Berwick and York

PACTS includes Arundel, Biddeford, Cape Elizabeth, Cumberland, Falmouth, Freeport,


Gorham, North Yarmouth, Old Orchard Beach, Portland, Raymond, Saco, Scarborough,
South Portland, Westbrook, Windham, Yarmouth

MPI or Municipal Partnership Initiative: A method to develop, fund and build projects of
municipal interest on the state infrastructure system with MaineDOT as a partner.

MPO or Metropolitan Planning Organization: A federally chartered planning entity


responsible for transportation planning and approval of federal transportation funding in
federally defined metropolitan areas. Maine has four: Androscoggin Transportation Resource
Center (ATRC), Bangor Area Comprehensive Transportation System (BACTS), Kittery Area
Comprehensive Transportation System (KACTS) and the Portland Area Comprehensive
Transportation System (PACTS).

MTA or Maine Turnpike Authority: The Maine Turnpike Authority is a public entity that was
established for the purpose of constructing, maintaining, reconstructing and operating a toll
highway from Kittery to Augusta.

Multimodal: A term that describes the transportation of goods or passengers performed by


multiple modes of transport. This can include rail, bus, ferry, bicycling, walking and aviation.

Multimodal Capital: Capital outlays for non-highway transportation investments.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

260
Multimodal Operations: Operating outlays for non-highway transportation investments.

Multimodal System Operations: An activity grouping that includes operating support for
aviation facilities, bicycle/pedestrian facilities, Visitor Information Centers, transit, and operation
of the Maine State Ferry Service.

Multi-use Path: A path or sidewalk designed for use by cyclists and pedestrians, and sometimes
motorized vehicles.

NHPP or National Highway Performance Program: A federal program that funds


construction and maintenance projects located on the National Highway System.

NHS or National Highway System: A highway system, consisting primarily of existing


Interstate routes and a portion of the federally designated principal arterial highways.

NPDES II MS4: As authorized by the Clean Water Act, the National Pollutant Discharge
Elimination System (NPDES) permit program controls water pollution by regulating point
sources that discharge pollutants into waters of the United States.

OBU or On-board Unit: A vehicle mounted device used to transmit and receive a variety of
message traffic to and from other connected devices (other OBUs and RSUs). Among the
message types and applications supported by this device are vehicle safety messages, a primary
subject of this standard, used to exchange information on each vehicle’s dynamic movements for
coordination and safety.

Operational and Safety Maintenance: A work grouping that includes traffic control and
roadway delineation and protection, including signage, traffic signal maintenance, lighting,
striping, and guardrail installation and maintenance.

PACTS Municipal Partnership Initiative: A program that funds state/ local financial
partnerships with municipalities to make highway improvements of local interest in the Portland
metropolitan area.

Park and Ride Lots: Designated parking areas for drivers who ride in another vehicle for a
portion of their trip.

PE or Preliminary Engineering: Engineering work done prior to advertising a project.

Pedestrian Refuge: A small section of pavement or sidewalk completely surrounded by asphalt


or other road materials, where pedestrians can stop before finishing crossing the road.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

261
Pilings: Linear members usually hexagon, square, round or "H" shaped constructed of timber,
steel, concrete or a composite of these materials, driven into the earth to carry structural load.

PMRAP or Plant Mix Recycled Asphalt Pavement: A cold pavement mix consisting of
reclaimed asphalt materials used as a base to add structure and correct deficient cross-slopes.

Policy, Planning and Research: An activity group that includes management of MaineDOT
planning activities and studies, public outreach; project scoping and analysis; Work Plan
development; Metropolitan and non-metropolitan planning; and research programs and projects.

Polyurea Reflective Striping: Highly reflective road paint for road lines and asphalt striping.

PPI or Planning Partnership Initiative: This competitive program supports regional planning
efforts through grants awarded on a best-value basis.

PPP or Public-Private Partnership: A Public-Private Partnership is a mutually beneficial


collaboration between a public agency and a private-sector entity.

Precision Approach Path Indicator: A visual aid consisting of lights in a single row of either
two or four light units set perpendicular to the airport runway centerline. The row of light units
is normally installed on the left side of the runway.

Preservation Paving: Paving done to a highway facility that facilitates the preservation of the
investment.

Public Transportation Capital: Capital funding for buses and bus facilities under Federal Transit
Administration (FTA) intercity, urban, small urban, and rural programs that serve the general
public, and elderly and disabled persons. Some FTA funding may be used for either capital or
operating expense. This category also includes improvements to park and ride lots.

Public Transportation Operations: Supports statewide operations, planning and administration


for buses and passenger rail, including operating support and administration of federal programs,
state-funded transit assistance, and operating support for the Downeaster passenger rail service.

Rail: Operational improvements to state-owned rail lines, rail-crossing improvements and the
Industrial Rail Access Program (IRAP), which partners with private-sector entities to fund rail
improvements that support economic development.

RAISE: Rebuilding American Infrastructure with Sustainability and Equity (RAISE)


discretionary grants program to support roads, bridges, transit, rail, ports or intermodal
transportation.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

262
Recreational Trails Program: A Federal Highway Administration funding set-aside that
MaineDOT transfers to the Maine Department of Agriculture, Conservation and Forestry for
improvements to multi-use trails.

Region: A MaineDOT maintenance region. MaineDOT's field operations and facilities are
grouped into five large geographic areas of the state (Northern, Southern, Eastern, Western and
Mid-Coast).

Roof Condensing Unit: Air conditioning condensing unit placed on a roof.

Roundabout: A type of circular intersection or junction in which road traffic is slowed and
flows almost continuously in one direction around a central island to several exits onto the
various intersecting roads.

Route: Established path along the public road network. A route's length is typically measured in
miles. Locations along the route are typically referenced by their mile point.

ROW, RW or Right of Way: A right of way is a type of ownership or easement granted over
the land for transportation purposes. This can be for a highway, public footpath, rail transport,
canal, etc. Also, the property acquisition phase of a project.

RRFB or Rectangular Rapid Flashing Beacon: RRFBs are pedestrian-actuated conspicuity


enhancements used in combination with a pedestrian, school, or trail crossing warning sign to
improve safety at uncontrolled, marked crosswalks. The device includes two rectangular-shaped
yellow indications, each with an LED-array-based light source, that flash with high frequency
when activated.

RTAP or Rural Transit Assistance Program: A Federal Transit Administration program that
provides a source of funding to assist in the design and implementation of training and technical
assistance projects and other support services tailored to meet the needs of transit operators in
non-urbanized areas.

RWIS or Road Weather Information System: RWIS is comprised of Environmental Sensor


Stations (ESS) in the field, a communication system for data transfer, and central systems to
collect field data from numerous ESS. These stations measure atmospheric, pavement and/or
water level conditions.

Safety and Spot Improvements: Roadway treatments that address single issues or a series of
issues along a roadway.

Scope: The type and extent of the planned treatment, activity, or operation that will take place.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

263
SHIP or Small Harbors Improvement Program: A state program that promotes economic
development, public access and improved commercial fishing opportunities, and works to
preserve and create infrastructure at facilities in tidewater and coastal municipalities.

SLA, SLR: Saint Lawrence and Atlantic Railroad.

SRTS or Safe Routes to School: An approach that promotes walking and bicycling
to school through infrastructure improvements, enforcement, tools, safety education, and
incentives to encourage walking and bicycling to school.

STP or Surface Transportation Program: A Federal-aid Highway program that provides


flexible funding that may be used by states and localities for projects on any Federal-aid highway
including the National Highway System, bridge projects on any public road

Surface and Base Maintenance: Localized pavement repairs, shimming, and paving of certain
corridors. This activity also includes the preparation of base gravels or shoulder work.

Taxiway: A defined path established for the taxiing of aircraft from one part of an airport to
another.

TIGER: Transportation Investment Generating Economic Recovery. FHWA Discretionary


Grant program providing funding for road, rail, transit and port projects that promise to achieve
critical national objectives.

Traffic Calming: Changes in street alignment, installation of barriers and other physical
measures to reduce traffic speed and/or cut-through volumes, in the interest of street safety,
livability and other public purpose.

Transfer Bridge: A structure that facilitates car movement from a dock to a ferry.

UA or Urbanized Area: A continuous urban area as designated by the U.S. Bureau of the
Census having a population of 50,000 or more.

Ultra-Thin Bonded Wearing Course: The placement of a thin (3/4”) HMA surface course over
a polymer modified tack coat membrane placed by a spray paver.

Vessel Electronic Devices: Electronic devices classed for use in the marine environment,
designed for navigation and other marine functions.

VPI or Village Partnership Initiative: Funding for planning, scoping and design for a new
state-municipal partnership initiative to improve the economic vitality of village and downtown
areas across Maine. Cost shares to be based upon scope, nature of project, and
other factors.
Items in Italics indicate Statewide Operations or Statewide Capital Programs

264
W-beam: The wide flange I beam (W shape) is a structural steel shape with I (or H) form. Top
and bottom plates of a I beam are named as flanges and the vertical plate which connects the
flanges is named as web. In wide flange I beams, flanges are nearly parallel to each other.

Wearing Surface: The surface portion of a roadway or bridge deck which is in the direct contact
with the vehicles.

Wetland Mitigation: Actions that avoid, minimize, or compensate for potential adverse impacts
to wetlands.

Wingwalls: The retaining wall extension of an abutment extended to the side-slope material of
an approach, causeway or embankment.

Winter Maintenance: Activities associated with snow and ice control, and monitoring the
highways for hazardous winter conditions.

Work Program Management: A grouping of work activities that support the development of
projects, including overall project management, software, property acquisition and compliance
oversight.

WR or Work Request: A Work Request for the Bureau of Maintenance and Operations.

Items in Italics indicate Statewide Operations or Statewide Capital Programs

265

You might also like