Three-Year
Work Plan
2022 Edition
January 2022
January 18th, 2022
As we look ahead, there is reason for cautious optimism. At least three developments indicate
that we soon may be able to transition from “MacGyver” mode – which is MaineDOT’s general
approach, born of fiscal necessity, of doing the best we can with what we have – toward a more
proactive approach.
First, in November 2021, the federal Bipartisan Infrastructure Law (BIL) became law. The
national discussion surrounding this bill has dramatically affected perception and expectations to
the point that the most common question MaineDOT is asked now is “What are you going to do
with all that money?” In short, once funding from the BIL begins to flow, it will be good for
transportation in Maine and could be very good depending upon the rules and policies related to
competitive discretionary grants, but it is not a panacea.
The BIL provides two main types of federal transportation funding: (1) formula funding that
MaineDOT can rely upon to build the basic elements of its Work Plan and (2) competitive
funding from discretionary grant programs, which is less reliable but represents a great
opportunity. The increase in formula funding – although significant (28%) – will be largely
offset by construction cost inflation fueled by tight labor and material markets. The dramatic
increase in competitive discretionary grant programs looks very promising but depends upon
eligibility and related policies being developed by federal agencies, a process that will take many
months or more. MaineDOT is cautiously optimistic that with the continued help of our federal
delegation, grant funding can allow us to make meaningful investments in our iconic New
England villages, connecting corridors, modal options that support the people who need them,
active transportation, and initiatives that support jobs and the environment including port
investments to support a clean energy future.
Second, Maine policymakers and voters continue to demonstrate that they understand the
tangible, foundational value that transportation has to the safety, economic opportunity, and
quality of life of all Maine people. In 2021, in Governor Mills proposed, and the Legislature
approved, two General Fund initiatives that provided nearly $106 million to MaineDOT. This
unprecedented level of General Fund support saved MaineDOT’s capital transportation program
by offsetting a state Highway Fund revenue hole caused by the reductions in fuel tax revenue
from the pandemic and high construction cost inflation. In addition, this past November, more
than 70% of voters approved a $100-million transportation bond, providing much-needed state
match for federal and other funds to support MaineDOT’s capital programs.
Third, our outreach and partnership efforts continue to grow. MaineDOT is leading a
comprehensive look at transportation system and customer needs through several interactive,
planning initiatives that will result in an update of the state’s long-term transportation goals.
These efforts include the Long-Range Transportation Plan 2050, which will synthesize the other
modally specific plans; our Statewide Strategic Transit Plan; the Maine State Rail Plan; and the
first-ever Statewide Active Transportation Plan. Further, this year we are adding a Village
Partnership Initiative to our suite of community-based partnership programs. The Village
Partnership will focus on lower-speed areas where people meet, walk, shop, and do business.
The projects can vary from small, spot improvements to larger, once-in-a-lifetime, placemaking
investments if we successfully partner to access federal discretionary funds.
All these developments point to the promise of a more optimistic, proactive future for
transportation in Maine. With that said, such a future is dependent upon further clarification
regarding goals, costs, and funding – all of which are in a state of flux right now. MaineDOT
intends to use 2022 to evaluate these and other factors, conduct a reset, and emerge from this
period of uncertainty with an updated and proactive plan for transportation in 2023.
Until then, the team at MaineDOT will continue to do what it always does – deliver for the
people of Maine.
Respectfully,
Counties
• Androscoggin ………………………………………………………………...……………………… 3
• Aroostook …………………………………………………………………......................................... 13
• Cumberland ………………………………………………………………......................................... 32
• Franklin …………………………………………………………………............................................ 59
• Hancock ……………………………………………………………………..……………………….. 64
• Kennebec …………………………………………………………………………………………….. 73
• Knox …………………………………………………………………………………………………. 85
• Lincoln ……………………………………………………………………………………………….. 91
• Oxford ………………………………………………………………………………………............... 97
• Penobscot …………………………………………………………………………………………….. 107
• Piscataquis …………………………………………………………………........................................ 125
• Sagadahoc ……………………………………………………………………………………………. 129
• Somerset ……………………………………………………………………………………………… 133
• Waldo ………………………………………………………………………………………………… 141
• Washington …………………………………………………………………………………............... 147
• York …………………………………………………………………………………………………... 154
Introduction
This Work Plan describes all work planned by the Maine Department of Transportation
(MaineDOT) and its transportation partners for calendar years 2022, 2023, and 2024. Published
early each calendar year, all MaineDOT work plans since 2013 have included all capital projects
and programs, maintenance and operations activities, planning initiatives, and administrative
functions for three calendar years. 1 This Work Plan contains 2,316 work items with a total value
of $3.17 billion, consisting primarily of work delivered or coordinated through MaineDOT. It also
includes funds to be expended by transportation partners that receive federal funds directly,
including airports and transit agencies.
As 2022 begins, we need to acknowledge that the COVID-19 pandemic has affected us in
permanent ways and continues to impact everything we do. To date, MaineDOT has lost four
teammates to COVID, and we miss them. Scores of infections, quarantines, close contacts,
isolations, work restrictions, and worker shortages make MaineDOT’s already tough job even
tougher. Extended snow or ice storms this season will tax our ability to maintain usual levels of
service.
Despite these ongoing challenges, the team at MaineDOT continues to fulfill our mission of
supporting economic opportunity and quality of life by responsibly providing our customers the
safest and most reliable transportation system possible, given available resources. It is a critical
mission that affects all Maine people every day.
As was starkly demonstrated during this pandemic, life doesn’t move forward much if people and
the goods they need can’t move too. At the start of the pandemic, in the spring of 2020, vehicle-
miles traveled (VMT) in Maine and across the country plummeted by almost half, as depicted in
the red line on the graph below. Despite the ongoing pandemic, overall statewide traffic volumes
in 2021 (the black line on the graph below) have largely returned to the pre-pandemic levels of
2019 (the blue line on the graph below). Most recently, for the last ten weeks of 2021, highway
travel has been within 1% of what it was for the same ten weeks two years ago, which was then at
an all-time high.
1
MaineDOT’s Work Plan is different from its Construction Advertisement Schedule, published early each January.
The Construction Advertisement Schedule is a subset of the Work Plan; it contains only capital projects that are
advertised for construction bids from private contractors for one calendar year. The Work Plan includes all work
activities over three calendar years.
i
Although overall highway travel is back, the location and mix of travel appear to be slightly
different. Differences include increased truck traffic likely due in significant part due to home
improvement and online shopping, increased recreational travel, and decreased commuting to
offices in some urban areas. Travel by air and ferry have largely returned to normal or increased
from 2019 levels, whereas train travel is down about 25%, and intercity bus travel remains down
about 50%. How these trends play out in the long term is speculative, but MaineDOT’s job of
keeping Maine moving remains as critical as ever. Doing that job is dependent upon available
resources.
A. Sources of Funds
Any work plan requires that funding levels be estimated using reasonable assumptions.
MaineDOT makes these assumptions with humility and respect. We know that decisions regarding
funding are made by policymakers, not by us. However, the reality is that to achieve the
predictability that the public, policymakers, government officials at all levels, contractors, and
consultants want and need, we need to assemble and publish a longer-term plan, looking ahead, in
this case, three years. To prepare such a plan requires that we predict the future, including levels
of available funding. Although doing so is necessary, it can be uncomfortable, because we do not
want to look overly confident, unappreciative, or unaware of the many competing needs. We are
very aware of our situation and know that we may need to adjust this plan to meet whatever policy
decisions are made.
ii
With that understanding, the major sources of estimated funding that support this three-year Work
Plan are shown in Figure 1 and described below. 2
Figure 1
2
This Work Plan Sources of Funds chart cannot align precisely with the sources charts provided with state Highway
Fund budgets for three major reasons. The first is timing. MaineDOT work plans cover three calendar years, which
is most helpful for construction season planning, while the Maine state budget covers two state fiscal years (July 1st
to June 30th). Federal fiscal years (October 1st through September 30th) include variable schedules for budgeting and
continuing resolutions. Second, the Work Plan funding includes sources that are not part of the state budget,
principally federal FTA and FAA funds received directly by agencies other than MaineDOT and capital funds carried
forward from previous years. Third, the Work Plan includes the total value of projects and activities, even if some
amounts have already been expended (e.g. design and permitting costs).
iii
1. State Highway Fund Revenues
State Highway Fund (HF) revenue sources, shown as the two green wedges in Figure 1, are derived
largely from state per-gallon fuel fees and motor vehicle fees. Those total an estimated $882
million and represent about 28% of the total value of Work Plan items. This revenue includes
budgeted HF allocations (the dark green wedge) and funds passing through the TransCap Trust
Fund at the Maine Municipal Bond Bank after debt service reserve requirements are met (the light
green wedge), which is used for Light Capital Paving.
Highway Fund revenues are a primary, foundational funding source of MaineDOT work plans.
Article IX, Section 19 of the Maine Constitution requires that Highway Fund revenues be used for
specified highway- and bridge-related activities. Even so, these revenues provide some of
MaineDOT’s most flexible funding, allowing us to fund almost all our maintenance and operations
activities and other work without federal or bond-related restrictions. HF revenues allow us to
maintain and operate the system we have, including conducting critical operations like
snowfighting.
2. Federal Funds
This year, before we provide the usual summary of various sources of federal funds – which is
done in subsections (a) through (f) below – we must first outline the potential impacts of the biggest
thing to happen to federal transportation funding in a generation: the recently-enacted Bipartisan
Infrastructure Law.
Maine Transportation Impacts of the Bipartisan Infrastructure Law
Federal funding of infrastructure – including transportation – has been an almost constant topic of
discussion – and thankfully now action – over the last year. In November 2021, Congress passed,
and President Biden signed, the Infrastructure Investment and Jobs Act (IIJA), which has since
become known as the Bipartisan Infrastructure Law (BIL).
At the outset, MaineDOT wants to express its sincere gratitude to the President and Congress –
and especially our Maine Congressional delegation – for coming together to address infrastructure
funding nationally. It has been discussed for many years, and they got it done, thus demonstrating
the wide bipartisan support for the work that we do. This action is very much appreciated, and we
at MaineDOT vow to use this funding prudently to help as many Maine people as we can.
This national discussion has dramatically affected perception and expectations. The most common
question MaineDOT is asked now is, “What are you going to do with all that money?” The high-
level simple answer is that the BIL is good for transportation in Maine and could be very good
depending upon the rules and policies that are being developed related to competitive discretionary
grants, but the BIL is not a panacea for transportation needs in Maine.
A more complete answer requires a look beyond the headlines and to the two types of federal
transportation funding provided by the BIL: (1) formula funding that MaineDOT can rely on to
build the basic elements of its Work Plan and (2) the hugely upsized discretionary grant programs
for which we apply and compete periodically – funding that is less reliable but that provides the
opportunity for us to invest in our transportation system in new and meaningful ways. The first
iv
type of funding – formula funding – is analogous to a pay raise in a home budget. The second
type – discretionary grant programs – is more akin to a competitive bonus program that you are
confident you should be able to win occasionally, but there are no guarantees.
Formula Fund Changes in the BIL. Regarding reliable transportation formula funding, the BIL
calls for MaineDOT to eventually receive about $1.3 billion in core federal highway and bridge
program funding and an additional $225 million in dedicated bridge funding over the five-year life
of the bill. Annually, this translates into an estimated $66 million more in reliable formula funding
on average over the five-year life of the bill, representing about a 28% increase over existing levels.
That will be a welcome and healthy increase, and it could not come at a better time.
By way of context, this increase in reliable formula funds should be evaluated after making at least
three significant observations.
First, although we are confident these authorized formula fund increases will happen, and we have
built this Work Plan accordingly, they have not yet begun to flow. That will happen when an
appropriations bill passes – the second critical step needed to turn authorized funding into
spendable funding. Today, federal funding is governed by a Continuing Resolution that sets
funding levels at historical levels. This means that MaineDOT is currently receiving about 2%
less federal funding than we did last year. When an appropriations bill will pass is unclear. The
current Continuing Resolution is set to expire on February 18th, 2022. An appropriations bill could
happen any time before or after that date. This being a federal election year, history indicates that
the closer the election gets, the tougher it is to pass significant legislation.
Second, as Figure 1 above shows, this Work Plan calls for investing an average of $1 billion per
year in transportation from all sources. In this context, although this $66-million-per-year increase
in reliable formula funding is a welcome part of the largest and most reliable keystones of the
fiscal foundation of our plan, it is not a transformational increase.
Third, construction costs – fueled by tight labor and material markets – are up 30% to 40% or more
in Maine over three years and appear to be still rising. That makes this increase especially well-
timed; it is a lifeline for MaineDOT and transportation in Maine. It is much like a critically needed
cost-of-living increase in your paycheck after you have been experiencing substantially higher
costs. It is a big help in assuring that MaineDOT can perform its core function of providing for
the safe and reliable movement of people and goods over our existing system.
Regarding other modes of transportation, transit formula funding for operations received a healthy
33% increase, and airports may receive increases estimated from 30% to 100%, depending on the
size of airport, use, landings, etc. The bulk of multimodal capital funding will come from
discretionary grant programs.
Discretionary Grant Changes in the BIL. This is the potential game-changer. The BIL provides
an exciting new opportunity for transformational change in Maine through dramatic increases to
existing programs and the creation of many additional competitive discretionary grant programs.
v
Existing grant programs that MaineDOT has come to rely upon – like RAISE and INFRA on the
highway side and CRISI on the rail side – have been dramatically increased, often doubled from
previous levels. This means more opportunity to compete for these grants.
Further, the BIL created at least nine new competitive grant programs, creating more opportunities
to explore. These programs, with the five-year amounts provided nationally, are set forth below.
How these upsized and new competitive grant programs will impact Maine is not yet clear. Once
the federal agencies define eligibility and award criteria and related policies – a process that will
take many months or more – the potential will become clearer.
With that qualifier, MaineDOT has worked hard to seek federal dollars in the past, and we will do
so again in the future. With the continued help of our delegation, we expect grant funding could
allow us to reimagine aspects of our infrastructure without taking away from our core mobility
function. This could allow meaningful investments in the things that make Maine special: our
iconic villages and downtowns, our connecting corridors, modal options that support the people
who need them, active transportation, and investment targeted to move our economy including
port investment to support the jobs that come with a cleaner energy future. By way of example,
see the discussion on a new Village Partnership Initiative in Section B(1)(c) below.
Federal funding of all types, shown in various shades of blue in Figure 1 above, are estimated to
be $1,404 million, which represents about 44% of the total value of Work Plan items. This includes
$1,274 million to be received by MaineDOT and $130 million to be received directly by other
transportation partners, including airports and transit agencies.
Federal funds consist of several types, including core formula programs from the Federal Highway
Administration (the largest segment), federal multimodal funds received by MaineDOT, federal
multimodal funds received by other transportation partners (including airports and transit
agencies), federal competitive grant funding, and assumed federal coronavirus relief funding.
Each of these federal funding types generally includes extensive rules, restrictions, and guidance
that designate and limit how the funding can be used. See Section B(1)(b) regarding Resource
Allocation below. Each type of federal funds is described below.
vi
a. Federal Highway Formula Funds. As noted above, funding for core federal highway programs
from the Federal Highway Administration (FHWA) in this Work Plan, sometimes known as
“formula funds,” is estimated at $1,009 million. It is shown as the solid darker blue wedge in
Figure 1 and represents about 32% of the value of Work Plan items delivered or coordinated by
MaineDOT. These funding sources typically require a state or local match of at least 20% of the
total cost of projects (sometimes significantly more).
d. Federal Competitive Grants. Competitive USDOT discretionary grant programs have become
a critical component of the fiscal foundation that supports basic transportation needs in Maine.
These programs include BUILD, INFRA, TIGER, FASTLANE, CRISI, AID Demonstration, and
FTA grants. This Work Plan is built upon $190 million of awarded grants, shown as the blue
polka-dotted wedge in Figure 1 and representing about 6% of the total value of Work Plan items.
The awarded grants and future successful applications are an assumed portion of the funding of
many other projects in this plan.
Due to well-prepared applications and the outstanding work of our Congressional delegation,
Maine has been very fortunate to receive a very high percentage of grant funding for which
MaineDOT has applied or endorsed. Over the years, grant projects have shifted from extraordinary
one-time projects like the Madawaska International Bridge replacement project to basic system
needs like bundles of traffic signals and smaller bridges.
Awarded grants that support the work in this Work Plan are as follows:
• $38.1-million INFRA grant to fund the Freight Reliability Actions for Maine (FRAME)
bridge replacement and intersection improvement bundle, which includes eight bridges and
one intersection on critical freight corridors around the state.
• $12.8-million FTA Section 5339 Bus and Bus Facilities grant for construction of the
Acadia Gateway Center intermodal facility and welcome center in Trenton.
• $25-million BUILD grant for the replacement of the Ticonic Bridge connecting Waterville
and Winslow.
vii
• $20-million BUILD grant to fund the Bridging the Economy of Rural Maine six-bridge
replacement/rehabilitation bundle.
• $17.5-million CRISI grant to fund upgrades to the PanAm Railways mainline from
Waterville to Royal Junction.
• $600,000 AID Demonstration grant for innovative designs in construction of the proposed
diverging diamond interchange between I-95 and Hogan Road in Bangor.
• $3.47-million ATCMTD grant Maine Advanced Signal Control and Connected Vehicle
System for Safe, Efficient and Equitable Rural Transportation (MAST) Project to fund the
installation of Advanced Traffic Controllers, remotely viewable and programmable
detectors, and Dedicated Short Range Communications (DSRC) at traffic signals around
the state.
• $45.2-million INFRA grant to fund interstate, NHS, and Freight Network bridge deck and
substructure replacements around the state.
• $16.9-million CRISI grant to fund upgrades to the mainline railway from Waterville to
Mattawmamkeag.
• $1.65-million RAISE grant to improve intersection and interstate ramps over I-95.
• $1-million EDA grant for Sea Level Rise and Vulnerability Assessment.
On April 26th, 2021, the chair of the Senate Committee on Appropriations announced an intention
to “restore” the use of Congressionally Directed Spending items in appropriations bills for the
upcoming fiscal year (FFY2022). As noted by the Committee, such Congressionally Directed
Spending items will be subject to the Senate rules and restrictions governing earmarks. Similarly,
on February 26th, 2021, the chair of the House Committee on Appropriations announced that the
committee will accept member requests for Community Project Funding in appropriations bills for
the upcoming fiscal year (FFY2022).
Accordingly, MaineDOT has included member requests made for Congressionally Directed
Spending projects in this Work Plan. These requests total $47.4 million for highway and bridge
viii
projects and $13 million in rail improvement projects. This funding is shown in the associated
federal programs from which they were requested and are treated as added funding. These requests
are currently on hold requiring a FFY2022 appropriations bill to authorize the funding for
approved requests. As with all funding sources, if these funds do not materialize, we will need to
adjust this plan.
When it comes to support from the General Fund, there was good news in 2021. Governor Mills
proposed, and the Legislature approved, two General Fund initiatives – a one-time transfer and
cascade language – that provided nearly $106 million to MaineDOT. MaineDOT thanks Governor
Mills, the Appropriations Committee, and all policymakers who made that happen. This
unprecedented action saved the state’s transportation capital program by filling a Highway Fund
revenue hole caused by pandemic-induce reductions in fuel tax revenue and by paying for
extraordinary construction cost inflation that was exacerbated by the pandemic.
In addition, this past November, more than 70% of voters approved an annual $100-million
transportation bond, which will be used to match federal and other funds and support the capital
programs of the first year (2022) of this plan.
Looking beyond this year, this plan is again built upon an ongoing General Fund support to match
various types of federal funds to support our capital programs. Shown as the yellow in Figure 1,
General Fund support totaling $403 million is assumed over the three-year Work Plan period,
representing about 13% of the total value of Work Plan items. The nature and extent of General
Fund support is subject to policy review and could include a mix of General Fund transfers to
MaineDOT, amounts available through the cascade, wholesale liquor revenue, and/or general
obligation bonding.
4. Other Bonding
a. GARVEE Bonds. This Work Plan also assumes the availability of about $75 million in bond
funds in Grant Anticipation Revenue (GARVEE) bonding allowed by the Federal Highway
Administration. GARVEEs are revenue bonds repaid with future FHWA formula funds. Shown
in orange in Figure 1, the $75 million in proposed new GARVEE bond issuances represents about
2% of the total value of Work Plan items. Authorization for GARVEE bond issuances are typically
included in biennial Highway Fund budgets. In accordance with the transportation debt policy set
forth in 23 MRSA §1604, this level of GARVEE use assures that no more than 15% of such future
federal funds are used for debt service, and at least $25 million in GARVEE capacity is reserved
for emergency needs.
c. TransCap Revenue Bonds. At this time, this Work Plan does not rely upon any new TransCap
revenue bonds issued by the Maine Municipal Bond Bank pursuant to 30-A MRS §6006-G. Since
2008, as revenue streams have been dedicated to support bonding, there have been four TransCap
Trust Fund revenue bond issuances with a face value of $240 million and one refinancing. The
current outstanding principal balance of all TransCap bonds is $87 million.
ix
5. State Multimodal Funding
Non-highway projects are funded through the Multimodal accounts in MaineDOT’s Highway
Fund budget. These accounts rely on funding from a variety of sources, including revenues from
car rental taxes, aviation fuel taxes, island ferry service subsidies, rail taxes, rail leases, and
Penobscot Narrows Observatory fees. This state multimodal funding is shown as the purple wedge
in Figure 1. It totals about $52 million over the three-year period of this plan and represents about
2% of the total value of the Work Plan items.
This Work Plan is also based upon the anticipated receipt of about $139 million from
municipalities. Shown as the red wedge in Figure 1, this represents about 4% of the total value of
Work Plan items. This funding is largely derived through agreements with municipalities,
reflecting the local benefit of projects and activities in the Work Plan. This includes local funding
for transit operations, local bicycle and pedestrian project funding, airports, and MaineDOT’s
popular Municipal Partnership Initiative (MPI). The MPI program is a voluntary, low-process
program in which municipalities take the lead on projects. MaineDOT acts more like a funder and
partner, providing high-level engineering guidance.
This category captures less common, but important, funding from various sources, including from
governmental agencies other than municipalities. This category includes funding from private
shares including such significant projects as the Waterville to Yarmouth rail upgrades, Acadia
Gateway Center, and the Saddleback Mountain Road. This category totals $66 million over the
three-year period of this plan and is shown as the maroon wedge in Figure 1. It represents about
2% of the total value of Work Plan items.
This also includes funding from private sources pledged pursuant to MaineDOT’s Business
Partnership Initiative (BPI). In a typical BPI project, the state contribution is capped at $1 million,
with the state share being one third of the total project cost. The remaining two thirds is typically
split between a private business entity and a municipality.
These funds represent amounts carried forward that were previously programmed, which is typical
in a long-term capital program. Shown as the white hatched area in Figure 1, this represents 5%
of the total value of Work Plan items. These amounts support projects and activities in multiple
areas listed in the plan and include federal transit and aviation funding, state multimodal funding
and bonding, and capital highway and bridge funding.
x
7. Adapting to Funding Uncertainty
As noted above, each of the sources of funds described requires assumptions and comes with risk
from macroeconomic forces, pandemic realities, competing priorities, and non-appropriation.
Even when funding seems certain, there are many factors that affect MaineDOT’s ability to access
that funding. As an example, as of the date of publication of this Work Plan, the federal BIL
recently passed calls for significant increases to federal funding, but absent an appropriations bill,
that funding is not yet flowing.
As this Work Plan is delivered, MaineDOT is ready to adapt to such changes. If construction bid
prices come in lower than anticipated or new funding becomes available, we will have projects
ready to go to supplement the plan as we did in 2020. Alternatively, if state or federal funding
does not materialize as expected or prices are higher than anticipated, we will defer projects as we
did in the spring of 2019.
In the end, MaineDOT will remain nimble so that we can put available funding to work as soon as
prudently possible.
B. Uses of Funds
Uses of funds are determined by several factors including data-driven technical asset management
principles, resource allocation principles arising from funding eligibility and system priorities,
goals arising from long-term planning and asset management studies, community outreach and
partnership initiatives, and project selection the input from experts on various MaineDOT
committees. Each of these factors is described below.
a. Asset Management: Rational, Data-Driven, and Customer-Focused. MaineDOT has long used
data-driven asset management strategies to allocate resources and prioritize projects. These
strategies are set forth in MaineDOT’s Transportation Asset Management Plan (TAMP) as well as
in asset-specific MaineDOT documents including its Roads Report, Keeping Our Bridges Safe
Report, Integrated Freight Strategy, Transit Asset Management Plan, Traffic and Mobility Plan,
and Interstate Operating Plan. Federal performance targets and measurements also strengthen
MaineDOT’s existing performance-driven processes. Using objective data, funding requirements,
and the committee process outlined in subsection c. below, MaineDOT allocates resources and
selects projects to maximize customer value from each available dollar. Asset management at
MaineDOT is a continuous loop of planning, delivery, and measurement, as illustrated in Figure 2
below.
xi
Figure 2
b. Resource Allocation Principles: Funding Eligibility and System Priorities. Restrictions on the
use of federal and state eligibilities largely determine the funding available for each expenditure
category in the Work Plan. For example, a specific amount is allocated by FHWA for the National
Highway Performance Program and another amount for the Congestion Mitigation and Air Quality
Program. Aviation funding provided by the FAA must be used for aviation. Funding provided by
the FTA must be used for transit. There is limited flexibility in the use of different funding sources
across programs. This largely determines how much funding there is for certain modes and for
certain uses within modes.
Within these limitations, resources are first allocated to “must-do” uses such as debt service,
federal compliance, winter plowing, and critical safety needs.
Bridges are always a high priority, due to safety concerns and the fact that the loss of a single
bridge can shut down an entire corridor.
Light Capital Paving (LCP), a low-cost-per-mile program that keeps more than half of the 8,800
miles of roads under MaineDOT jurisdiction in serviceable condition, is also always a high
priority. Funding for the LCP program is complicated by the fact that it relies on funding passing
through the TransCap Trust Fund at the Maine Municipal Bond Bank and that use of bond funds
for LCP is imprudent due to its short useful life (seven years).
Further, given the funding challenges at MaineDOT, using all federal funding by providing
required state match must also be a high priority. Failure to deliver a project funded by a past
competitive grant award jeopardizes the success of future awards.
xii
• Long-Range Transportation Plan 2050 – This plan will convey MaineDOT’s vision for an
integrated view of all modes of a statewide transportation system toward the goal of not
only providing for safe and efficient travel throughout the state, but also enhancing
economic opportunity and quality of life. This will serve as a synthesizing document that
ties together the modally-specific plans to develop a unified vision for the state’s
transportation system.
• Roads Report 2022 – This technical asset management analysis will assess the impact of
recently established capital goals for highways for which MaineDOT is responsible; review
conditions; set service levels; standardize cross section and treatment strategies consistent
with the priority of the road; and determine resulting paving, rehabilitation and
reconstruction funding needs.
• Keeping Our Bridges Safe 2022 – This will be the third edition of a technical asset
management report aimed at assessing the condition of our bridge inventory,
recommending cost-effective management strategies, and determining bridge funding
needs.
• Statewide Strategic Transit Plan – This effort will update the Maine Strategic Transit Plan
2025 considering new developments and funding opportunities. In addition to the needs
in more urban areas, MaineDOT is particularly interested in exploring new models and
approaches for providing public transportation more efficiently and effectively in Maine’s
rural areas.
• Maine State Rail Plan – This is a multi-year guide for focusing federal, state, and local
investments on a rail system that supports the vision, goals, and objectives of this plan.
New planning efforts will also include an analysis of the rail-to-trail or rail-with-trail
conversions for certain state-owned rail assets that are currently dormant.
• Specific Regional Transit Studies – Advocates for increased regional fixed-route intercity
transit, especially in the form of passenger rail, have been pushing for service extensions.
In response to this interest, MaineDOT is conducting two specific regional transit studies
to better gauge demand, costs, and benefits.
xiii
including passenger rail, between the communities of Portland and Bangor. The
study will include a review of relevant traffic counts, recent data from the United
States Census Bureau, population figures, employment data, and all reasonably
feasible corridors of service and primary trip generators that could significantly
affect demand. The study report will include estimates of the propensity of transit
service demand, an estimated range of the incremental growth in transit service
demand, an estimated range of incremental growth in transit service, and cost
estimates of capital required for operating new or enhanced transit services.
• Statewide Active Transportation Plan – This first-ever plan will lay out a statewide vision
and goals for active transportation (a.k.a. bicycle and pedestrian travel), assess current
programs and practices, and identify implementable strategies. Additionally, this active
transportation plan will review key corridors for potential trail-until-rail options and assess
lower-priority highway corridors for potential shoulder enhancements.
• Statewide Aviation System Plan (Phase II) – Phase I was completed earlier in 2021. Areas
of focus for Phase II include maximizing investments to meet system needs, a method of
prioritization for identified needs, development of meaningful and practical metrics to track
condition and performance of the airport system, and recommendations for strategies to
best leverage public investments to generate private investments and public policies that
support a safe and efficient airport system.
d. Community Outreach and Partnership Initiatives. MaineDOT works closely with other state
agencies, counties, municipalities, regional and metropolitan planning organizations, tribal
governments, and stakeholder groups in a collaborative and coordinated manner to address the
transportation needs in communities across Maine. Sometimes these needs fall outside the scope
of MaineDOT’s essential asset management programs, which are properly focused on the need to
support our economic competitiveness by maintaining the safe and reliable regional, statewide,
and interstate movement of people and goods on our existing transportation system.
The more locally focused transportation needs can vary. They can be as basic as resurfacing a
road or as transformative as revitalizing a village, reconstructing a highway to enhance economic
vitality, building new bicycle and pedestrian facilities, or expanding or adjusting transit options.
As these needs are identified by partner groups, MaineDOT looks to partner with affected
communities to find solutions.
To make solutions more likely, MaineDOT has established a suite of partnership initiatives to help
communities meet their needs. These include our Planning Partnership Initiative, Municipal
Partnership Initiative, and Business Partnership Initiative.
This year, we are standing up a fourth partnership initiative to add to our suite of community-based
programs: a Village Partnership Initiative. As noted above, MaineDOT has traditionally focused
on rural highway mobility, mostly in areas with speed limits of at least 45 mph, thus making sure
“you can get there from here.” The Village Partnership Initiative will move beyond this traditional
xiv
and necessary function and focus on projects in lower-speed areas where people meet, walk, shop,
and do business on a human scale. Our iconic New England villages are part of who we are, part
of our brand, and a key part of our economy and quality of life. Simply put, the goal of the Village
Partnership Initiative is to make sure that once you get there, the there is a place you want to be.
In this way, these projects can be bigger than transportation; they can become placemaking.
Building on past successes in places like Naples, Bridgton, Hallowell, and Belgrade, this new
community-based initiative will allow municipalities to make their village areas more walkable,
bicycle-friendly, and business-friendly.
Subject to funding, the Village Partnership Initiative is designed to be available to all willing
communities that have or can agree upon a local vision. Village projects can vary from small, spot
improvements to large, once-in-a-lifetime investments if we can successfully partner to access
federal discretionary funds. Working with other agencies, these communities should have access
to broadband, as good internet connections are as important as physical connections are today.
We have adjusted all four of MaineDOT’s community-based initiatives to provide our municipal
partners with a seamless suite of programs to address concerns, build on a shared vision, and
reimagine our communities.
e. Project Selection Process. For assets MaineDOT controls, like the state highway and bridge
system, prioritization and selection of projects for the Work Plan is driven by MaineDOT staff
committees: the Highway Committee, the Bridge Committee, the Multimodal Committee, the
Safety and Mobility Committee, and the Management Team of the Bureau of Maintenance and
Operations (M&O). These committees are comprised of staff from relevant disciplines and
specializations. They include engineers and technicians with hundreds of years of cumulative
experience.
The committees work throughout the year in conjunction with the Bureau of Planning to identify
project candidates and prioritize them for potential inclusion in the Work Plan. Selection
methodologies for these committees vary according to asset type and transportation mode, but the
underlying asset management principles – managing the overall transportation system; using
current, reliable data and rational scoring systems; and building in flexibility for unanticipated
needs and developments – are common across all areas. In the fall of each calendar year, the
committees review the last two years of the current Work Plan and make any needed adjustments
in cost, schedule, and project scope. Once those adjustments are made, new projects are typically
added for the third year of the Work Plan.
MaineDOT’s Results and Information Office (RIO) coordinates the work of the individual
program committees, the Bureau of Planning’s public outreach efforts, and the MaineDOT
Executive Team to assemble the work activities through the Program Development Division to
produce a final Work Plan.
xv
2. Breakdown of Uses of Funds
The strategies and processes described above result in the listing and description of individual
projects and work activities in the Work Plan. Individual projects can be best found online by
searching by municipality or by work type. As shown in Figure 3 and described below, activities
in this Work Plan can be broken down into four high-level categories 3: (a) capital work including
highway and bridge capital projects and multimodal capital work, (b) operational activities
including highway and bridge maintenance and operations and multimodal operations, (c) system
management work, and (d) administration.
Figure 3
a. Capital Work
This Work Plan includes more than $2.2 billion in capital work. This represents about 70% of all
MaineDOT activities. This focus on capital production distinguishes MaineDOT from most
governmental agencies. This capital work consists of more than $1.8 billion in highway and bridge
projects and nearly $424 million in multimodal capital projects. Capital projects are major
improvement projects with defined beginning and ending dates. This work includes bridge
3
The categories of Uses of Funds for this Work Plan are based upon asset- and activity-based use categories in
MaineDOT management systems and include all funding sources for three years. They are different from the Use of
Funds pie chart categories provided with MaineDOT budget information, which include only amounts affected by the
state budget system over two state fiscal years. Major differences between the two include FTA and FAA funds
expended directly by agencies other than MaineDOT, amounts expended by municipalities, and capital funds carried
forward from previous years.
xvi
replacements, highway construction and paving, acquisition of buses and ferries, sidewalk
construction, and major improvements to airports. Most capital projects in this Work Plan have
undergone or are currently undergoing engineering and will be constructed by private contractors
selected through a competitive bidding process.
As noted above, MaineDOT manages more than half of the 8,800 miles of highway under its
jurisdiction with the Light Capital Paving (LCP) program. It is our most visible and lowest-cost-
per-mile program. As part of the ongoing quest to squeeze the most value from each exiting dollar,
MaineDOT also reviewed the state’s highway corridor priorities. This review and other policy
changes have resulted in the need to do more than 700 miles per year for 2022 and 2023 and then
hopefully settling in at 700 miles per year in the long term dependent on conditions, funding,
winter severity, etc. Funding for LCP traditionally comes from cash resources, principally funds
passing through the TransCap Trust Fund at the Maine Municipal Bond Bank after debt service
reserve requirements are met. Bonding for LCP is generally considered imprudent due to its short
useful life (seven years). This remains an ongoing challenge to meet the shortfall in cash resources
to meet the LCP need every year.
The bar charts that follow show the total cost of most highway and bridge capital projects in the
Work Plan that are funded for construction, including the costs of construction, engineering, and
right of way (property acquisition).
xvii
xviii
ii. Multimodal Capital Work
Multimodal capital work includes all other non-highway capital work. MaineDOT will invest
$424 million in multimodal capital projects in this Work Plan, including investments in the specific
modes below.
Aviation. This Work Plan provides $107 million for aviation capital needs statewide. Projects
include runway and taxiway reconstruction, safety improvements and devices, and other
enhancements to improve airport access and support economic development.
Transit. This Work Plan funds $81 million in transit capital needs. These funds provide support
to Maine’s 22 regional and local transit providers, which own and operate more than 400 transit
vehicles. MaineDOT oversees procurement and management of the state transit fleet and ensures
compliance with federal requirements and continued eligibility for federal funding.
Passenger Rail. This Work Plan includes $3.9 million of state match for the Wells Siding Project
being developed by the Northern New England Passenger Rail Authority (NNEPRA) as well as
funding for feasibility and design of the Portland Transportation Center.
Ferries. This Work Plan provides about $30.9 million for the Maine State Ferry Service (MSFS)
and Casco Bay Island Transit District (CBITD) capital projects, including funding for ferry
rehabilitation and infrastructure improvements at various locations.
xix
Ports and Other Marine Investments. This Work Plan includes $51.4 million in funding for marine
freight investments and other improvements to public marine facilities. Of this total, $16.5 million
for the Boating Infrastructure Grant (BIG) and Small Harbor Improvement Program (SHIP) is
planned for projects to make waterfront improvements in coastal communities, leveraging local
and private funds.
Freight Rail. This Work Plan provides $114 million in freight rail capital funding. The
investments will include operational improvements on state-owned rail lines, improvements at
railroad crossings, and improvements to critical rail bridges and other rail line capital projects.
Included in that total is $10.5 million for the Industrial Rail Access Program (IRAP), which
leverages private funding.
Active Transportation Capital Projects. This Work Plan includes $38.5 million in funding for
active transportation projects over a three-year period. Projects and initiatives include sidewalk
construction, active transportation shared facilities, crossing improvements, and active
transportation safety improvements.
b. Operations Work
Operational activities at MaineDOT, including administration, can be broken down into highway
and bridge maintenance and operations, multimodal maintenance and operations, and department
operations.
Maintenance and operation of Maine’s extensive highway and bridge system – a subset of the
Statewide Operations listings – accounts for a large portion of MaineDOT’s overall work
activities. This work is essential to the movement of people and goods and to the health of the
Maine economy. It is also an essential and cost-effective means of protecting the state highway
and bridge system. From year to year, and within CY2022, actual expenditures for this work will
depend on the constantly changing condition of the transportation system and, importantly, on
weather. For those reasons, overall expenditures for routine maintenance and operation of the
highway and bridge system are shown in the Work Plan as approximate, annual budget figures.
Highway and bridge maintenance and operations work accounts for $535 million in this Work
Plan, while three-year annual averages for major maintenance and operations work include:
• $10.3 million in bridge and structural maintenance.
• $5.2 million in bridge and other infrastructure inspections and inventory.
• $15.5 million in custodial maintenance.
• $22.4 million in drainage maintenance.
• $6.6 million in operational and safety maintenance.
• $9.9 million in surface and base maintenance.
• $46.4 million in winter maintenance.
xx
ii. Multimodal Operations
Transit Operations. Maine’s 22 transit providers provide coordinated service to users within and
between communities around the state. Transit operations work items include transit planning,
administration, and operating support for these services. This Work Plan provides $133 million
for transit operations.
Passenger Rail Operations. The Northern New England Passenger Rail Authority (NNEPRA)
manages the Downeaster passenger rail service, which runs five trains per day from Brunswick to
Boston. This Work Plan provides $13 million annually for these passenger rail operations, which
help provide greater connectivity between Mid-Coast Maine and the Greater Boston area.
Ferry Service Operations. The Maine State Ferry Service (MSFS) connects Islesboro, North
Haven, Swan’s Island, Vinalhaven, Frenchboro, and Matinicus with the mainland. This Work
Plan provides $37.5 million for MSFS operations.
Aviation Operations. This Work Plan provides $5.6 million for statewide aviation operations,
including $1.92 million for operations at one of the two state-owned airports: the Augusta State
Airport.
System management is necessary to achieve the mission of the department for the entire
multimodal transportation system. These activities include continuously monitoring the
performance and condition of transportation assets, making sure the projects and scopes selected
are the right ones. System management also involves ensuring that we are meeting customer
expectations and system needs while meeting compliance requirements and doing so within
available resources. This work includes asset management, planning, environmental work,
compliance, and safety efforts. The value of such work in this Work Plan totals $100 million, or
3% of the total value of Work Plan items.
d. Administration
Administration includes executive functions, finance and administration, human resources, most
non-crew training, legal, information technology, federal compliance activities, and other
traditional administrative activities needed to support any large and complex organization. The
value of such work in this Work Plan totals $95 million – less than 3% of the total value of Work
Plan items.
Annually recurring work items for various MaineDOT work units that perform system
management and administration work appear as three annual listings. These and other activities
are provided in the Statewide Operations tab.
xxi
C. Unmet Need: A Time to Reassess
Providing safe and reliable transportation in Maine will always be a big challenge for several
reasons: Maine’s large land area, its relatively low and widely dispersed population, its geology
and weather that – while beautiful – result in an expansive multimodal transportation system that
is a challenge to manage. All this means that transportation needs will always exceed available
funding.
That being so, a seemingly simple question is “How much is the unmet funding need for
transportation in Maine?” As explained below, the answer to that question is not simple,
especially this year.
The last time the question of unmet need was seriously analyzed was in March of 2020, just before
the pandemic impacts struck the nation. At that time, which seems much longer than 22 months
ago, the bipartisan Blue Ribbon Commission to Study and Recommend Funding Solutions for the
State’s Transportation Systems (BRC) found that Maine’s unmet capital transportation need was
about $232 million per year. That figure was calculated using estimated 2019 construction costs
and after assuming ongoing General Fund support of $100 million per year would continue –
usually in the form of general obligation bonding. If that support did not exist, the unmet need as
found by the BRC would be about $330 million per year (https://legislature.maine.gov/doc/4091).
To update an unmet funding need in any policy area, one needs to be able to responsibly estimate
at least three basic variables: goals, costs, and available funding. Simply put, one needs to know
what one is trying to achieve, what achieving those goals costs, and what funding is available. A
review of each of these three variables regarding transportation shows that they are all very much
in flux right now, making this an especially difficult time to speak with specificity.
Goals from Long-term Planning. First, transportation goals in Maine are appropriately under
review. On the federal level, policy changes and funding for new programs mean we need to adjust
to make sure Maine is securing its fair share of available federal funding. Federal and state laws
and other policy factors require that we undertake a long-term review of our transportation system
and customer needs to establish long-term goals. As summarized in section B(1)(c) above,
MaineDOT is currently leading numerous high-level, long-term planning and asset management
studies that will guide an update of long-term transportation goals. These assessments are slated
to be complete by the end of this year.
A myriad of transportation goals that affect funding will result from these planning and asset
management efforts. By way of example only, goals could arise regarding the rate of Priority 3
highway rehabilitation, the number of village projects to undertake each year, and the rate of EV
charging station installation.
In addition, other non-transportation policy goals can have a dramatic impact on unmet need. For
example, as noted above, if policymakers wanted to rely less on bonding to support MaineDOT
xxii
capital programs, the unmet need could increase by up to $100 million per year. Policy goals are
bounded only by a policymaker’s imagination. The point is that all of this is necessary to determine
the goals that define the need.
Costs. After determining goals, the next step in determining an unmet funding need is to estimate
the cost of meeting them. Unfortunately, that is another moving target. As noted above, Maine
and the nation have been experiencing a superheated construction bidding environment in recent
years. The cost of materials has skyrocketed, and Maine contractors – like contractors across the
country – continue to struggle to attract construction workers. In Maine, over three years, major
paving treatments have increased by more than 40% and bridge costs have increased by 33%. Just
applying a 20% adjustment from the 2019 estimate of the BRC referenced above would yield an
additional unmet need amount of at least $130 million.
Whether this steep climb in construction prices will continue to moderate is unknown. Most
economists think things will settle out eventually, possibly before the end of this year. Therefore,
that would be a better time to try to estimate what it will cost to meet our goals.
Available Resources. Once we estimate an overall funding need for transportation, we then must
subtract the estimated amount of funding that we reasonably expect to receive. Again, this is a
tough time to make that calculation.
On the federal front, as noted in section A(2) above, we can estimate the increase in the amount of
reliable formula funds per year ($66 million), but that won’t be enough to make up for the loss of
buying power. More importantly, the expanded and new discretionary grant programs may
provide significant influx of transportation funding – perhaps more than $100 million every year.
However, as noted above, we cannot reasonably estimate that right now, as eligibility and award
criteria and related policy surrounding these grant programs are still being defined, a process that
will take months or longer.
Moreover, we need to remember that more federal funding does not mean less need for state
funding in most cases. In fact, because federal funding almost always requires a state match, the
need for state funding will likely increase. Although that may seem counterintuitive, recall that
each additional state dollar may bring in four federal dollars, which make it a very sound
transportation investment. Again, it looks like we will know much more by the end of 2022.
So, what is the answer to the question posed earlier: How much is the unmet funding need for
transportation in Maine? The reasoned answer is that because the variables of goals, costs, and
available funding are all in flux, the question cannot be answered with a precise dollar amount
right now. However, we do know that the new federal BIL, although potentially very helpful,
certainly will not eliminate the need for ongoing state support for transportation; in fact, it could
increase that need. We also know that every dollar we spend on transportation in Maine affects
the safety, economic opportunity, and quality of life of Maine people in very tangible ways.
Infrastructure funding ensures that people can reliably get to and from work and that children can
get safely to and from school. The package on your doorstep at the end of the day was on several
xxiii
trucks, likely a ship, and perhaps a plane. Transportation connects all of us and everything we do,
and the money invested in transportation provides benefits that are tangible and immediate.
By next year, the fog currently surrounding these variables should clear, and we expect to be able
to provide a better estimate of unmet need. In the meantime, the 1,700 dedicated teammates at
MaineDOT will continue to fulfill our mission of supporting economic opportunity and quality of
life by responsibly providing our customers the safest and most reliable transportation system
possible, given available resources.
xxiv
Reading the Work Plan
Reading the Work Plan
The Work Plan describes all projects and activities of the department. Listings in the Work Plan
include projects and activities planned for Calendar Years (CYs) 2022, 2023 and 2024. CY 2022
projects that are not listed as PE-only will proceed as indicated in 2022, unless something unforeseen
occurs. The timing of CY 2023 and 2024 projects are flexible to changing needs, and schedules may
change in next year’s Work Plan. *CY 2023 and 2024 capital projects (represented as 2023/24) are
typically in some stage of pre-construction development and projected to begin sometime in 2023 or
2024, so long as the funding assumptions in the Work Plan unfold as anticipated.
1
Tips on Using This Work Plan
This Work Plan is published on the MaineDOT website in printable and searchable formats. Visit
http://maine.gov/mdot/workplan/search/ for more information. In addition to work scheduled for the
next three years, the Work Plan web page also provides municipality-specific reports including a
summary of the highway maintenance work completed in the preceding year, current Local Road
Assistance Program (LRAP) payments, and recently completed capital projects. There is also a link
to MaineDOT’s interactive MapViewer which includes Highway Corridor Priority (HCP)
designations and other features on Maine’s transportation system.
2
Androscoggin
Androscoggin
HCP 3 66
HCP 4 158
Turner
Greene
Minot
Wales
Lewiston
Mechanic
Falls
Sabattus
Poland
Auburn
Lisbon
Durham
Androscoggin
ID/Year Municipality Scope Name Description Total Project Cost
Highway
018651.00 Beginning 0.01 of a mile north of Mill Street
Construction/Rehabilitation
and extending southeast 0.13 of a mile to
2022 Auburn Route 136/Broad Street
Urban Highways Broad Street, and continuing on Broad Street $2,440,000
HCP 1 for 0.06 of a mile. ATRC Sponsored.
Intersection Reconstruction
3
ID/Year Municipality Scope Name Description Total Project Cost
Highway
022384.00
Construction/Rehabilitation Beginning at East Hardscrabble Road and
2022 Auburn Hotel Road extending north 0.50 of a mile to Lewiston
Urban Highways $2,290,000
Junction Road. ATRC Sponsored.
HCP 3
Intersection Reconstruction
4
ID/Year Municipality Scope Name Description Total Project Cost
024961.00
Highway Paving
Beginning at Lewiston Junction Road and
2022 Auburn Kittyhawk Avenue
extending southeast 1.91 miles to Route 202.
Light Capital Paving
HCP 1
024961.00
Highway Paving
Beginning 0.06 of a mile north of Plummer
2022 Auburn Turner Street
Street and extending south 0.13 of a mile.
Light Capital Paving
HCP 2
024961.00
Highway Paving
Beginning at Route 4 and extending north
2022 Auburn Turner Street
1.19 miles.
Light Capital Paving
HCP 2
024961.00
Highway Paving Beginning 0.33 of a mile south of Youngs
2022 Auburn Hotel Road Corner Road and extending north 0.93 of a
Light Capital Paving mile to Whitman Spring Road.
HCP 3, 4
024961.00
Highway Paving Beginning 0.14 of a mile east of North
2022 Auburn Lake Shore Drive Auburn Road and extending east 2.56 miles
Light Capital Paving to Route 4.
HCP 4
024961.00
Highway Paving Beginning 0.34 of a mile northwest of
2022 Auburn Lake Street Colonial Way and extending northwest 0.63
Light Capital Paving of a mile to Hotel Road.
HCP 4
024961.00
Highway Paving
Beginning at Aviation Avenue and extending
2022 Auburn Lewiston Junction Road
northeast 1.02 miles to Hotel Road.
Light Capital Paving
HCP 4
5
ID/Year Municipality Scope Name Description Total Project Cost
6
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025761.00 Beginning at Turner Street and extending
Auburn, Urban Highways southeast 2.63 miles, including bridges
Russell Street/VMB
2022 Lewiston (#6260, #6331, #6383, #6384, #6385, #1370)
Ultra-Thin Bonded Wearing and various ramps.
Course
023657.00
Tracy Brook Bridge (#2852) over Meadow
Highway-Bridges
2022 Durham Route 125 Brook. Located 0.17 of a mile east of $3,440,000
Bridge Replacement Brickyard Hill Road.
HCP 4
7
ID/Year Municipality Scope Name Description Total Project Cost
024969.00
Highway Paving Beginning 0.15 of a mile south of Baldwin Hill
Fayette,
2022 Route 17 Road and extending west 6.33 miles to Route
Livermore Falls
Light Capital Paving 133.
HCP 4
026166.00
Highway-Bridges Stinchfield Bridge (#5002) over Dead River.
2022 Leeds Route 106 $300,000
Located 0.72 of a mile north of Ridge Road.
Bridge Improvements - PE Only
HCP 4
Highway Paving
025727.00
Rural Highways Beginning 0.11 of a mile east of North Road
2022 Leeds, Wayne Route 219
and extending east 3.83 miles to Route 133.
Highway Cyclical Pavement
HCP 3
Resurfacing
8
ID/Year Municipality Scope Name Description Total Project Cost
9
ID/Year Municipality Scope Name Description Total Project Cost
026320.00 Bicycle/Pedestrian
Installation of stamped concrete crosswalks,
2023/24 Lewiston On-Road Sidewalk/Trail Route 196 ADA upgrades, high visibility markings and $250,000
signage.
HCP 1 Safety Improvements
026322.00 Bicycle/Pedestrian
Webster Street/Central Located at the intersection of Sabattus
2023/24 Lewiston On-Road Sidewalk/Trail Avenue/Ash Street/Route Street, Webster Street, Central Avenue, and
$100,000
126 Ash Street.
HCP 1, 3, 4 Safety Improvements
Highway Paving
025725.00
Litchfield,
Rural Highways Beginning at the Sabattus town line and
2022 Monmouth, Route 9
extending north 7.54 miles.
Wales Highway Cyclical Pavement
HCP 3
Resurfacing
025937.00
Highway Paving
Mechanic Falls, Beginning 0.73 of a mile east of North Main
2022 Route 121
Minot, Poland Street and extending southeast 2.85 miles.
Light Capital Paving
HCP 2
10
ID/Year Municipality Scope Name Description Total Project Cost
024959.00
Highway Paving
Beginning at Route 126 and extending north
2022 Sabattus Main Street
0.56 of a mile to High Street.
Light Capital Paving
HCP 4
026184.00
Sabattus River Bridge (#5393) over Sabattus
Highway-Bridges
2023/24 Sabattus Route 126 River. Located 0.14 of a mile northeast of $3,000,000
Bridge Improvements Main Street.
HCP 1
Highway
024199.00
Construction/Rehabilitation
Located at the intersection of Route 4 and
2023/24 Turner Route 4 $1,400,000
Rural Highways Route 117.
HCP 1, 3
Intersection Reconstruction
11
ID/Year Municipality Scope Name Description Total Project Cost
025309.00
Turner Center Bridge (#3886) over the
Highway-Bridges
2023/24 Turner Route 117 Nezinscot River. Located 0.07 of a mile west $1,800,000
Bridge Deck Replacement of Lower Street.
HCP 3
Highway
025417.00
Construction/Rehabilitation
Beginning 0.10 of a mile south of Route 4
2023/24 Turner Route 219
Rural Highways and extending east 2.03 miles. $606,000
HCP 3
PMRAP DOT Pugmill
12
Big
Twenty
Aroostook
Twp
WELS WELS WELS WELS WELS Lake WELS WELS Lake Twp
Connor Caswell
T15
Twp
R15 T15 R14 T15 R13 T15 R12 T15 R11 T15 R10 T15 R9 T15 R8 Winterville T15 R6 T15 R5 Westmanland New
WELS WELS WELS WELS WELS WELS WELS WELS Plt WELS WELS Sweden
Limestone
T14 T14 R15 T14 R14 T14 R13 T14 R12 T14 R11 T14 R10 T14 R9 T14 R8
T14 R6 T14 R5 Perham Woodland
R16 WELS WELS WELS WELS WELS WELS WELS WELS T14 R7 Caribou
WELS WELS
WELS WELS
T13 R16 T13 R15 T13 R14 T13 R13 T13 R12 T13 R11 T13 R10 T13 R9 T13 R8
T13 R7 Portage T13 R5 Wade Wash burn Fort
WELS WELS WELS WELS WELS WELS WELS WELS WELS WELS
WELS Lake Fairfield
T12 R16 T12 R15 T12 R14 T12 R13 T12 R12 T12 R11 T12 R10 T12 R9 T12 R8 T12 R7 Castle Mapleton
T12 R17 WELS Nashville Presque
WELS WELS WELS WELS WELS WELS WELS WELS WELS Hill
WELS Plt Isle
Ashland Easton
T11 R17 T11 R16 T11 R15 T11 R14 T11 R13 T11 R12 T11 R11 T11 R10 T11 R9 T11 R8 T11 R4
WELS T11 R7 Garfield Chapman
WELS WELS WELS WELS WELS WELS WELS WELS WELS WELS
WELS Plt
Mars
Westfield Hill
T10 R8 T10 R3
T10 R7 T10 R6 Masardis Scopan
WELS Twp WELS
WELS WELS Blaine
E Twp
T9 R8 Oxbow T9 R5 T9 R4
Aroostook
T9 R7 T9 R3 TD R2 Bridgewater
WELS Plt WELS WELS
WELS WELS WELS
Saint
T8 R5 T8 R3
Croix TC R2
WELS WELS Monticello
Twp WELS
T7 R5 Webbertown Dudley
WELS Twp Twp Ham mond Littleton
HCP 2 217
Silver Glenwood Orient
T2 R4
HCP 3 123 Ridge
Twp WELS
Plt Haynes ville
Highway Paving
025743.00
Rural Highways Beginning 0.80 of a mile north of Tracy Road
2022 Amity, Cary Twp Route 1
and extending north 4.24 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
WR 42412
Drainage Maintenance Replacing culvert (#110387) on Route 227 in
2022 Ashland Route 227 Ashland. Located 2.34 miles east of the $23,000
intersection of Route 11 and Route 227.
HCP 4
024977.00
Highway Paving
Ashland, Beginning at Lagoon Road and extending
2022 Route 11
Nashville Plt north 8.60 miles.
Light Capital Paving
HCP 2
13
ID/Year Municipality Scope Name Description Total Project Cost
WR 42822
Drainage Maintenance Ditching on Bancroft Road in Bancroft.
2022 Bancroft Twp Bancroft Road Beginning at the intersection of Hinch Road $26,000
and extending south 2.00 miles.
HCP 4
024981.00
Highway Paving
Bancroft Twp, Beginning at Ferry Road and extending east
2022 Selden/Number 9 Road
Orient, Weston 5.10 miles to Route 1.
Light Capital Paving
HCP 4
024981.00
Highway Paving
Bancroft Twp, Beginning 0.28 of a mile north of the Weston
2022 Bancroft Road
Weston town line and extending south 2.50 miles.
Light Capital Paving
HCP 4
025307.00
Casey Road/I-95 Bridge (#6165) over
Highway-Bridges
2023/24 Benedicta Twp Casey Road Interstate 95. Located 0.76 of a mile west of $650,000
Bridge Painting Aroostook Road.
HCP 1
026238.00
Casey Road/I-95 Bridge (#6165) over
Highway-Bridges
2023/24 Benedicta Twp Casey Road Interstate 95. Located 0.76 of a mile west of $4,500,000
Bridge Deck Replacement Aroostook Road.
HCP 1
024979.00
Highway Paving
Beginning at Route 1 and extending east
2022 Bridgewater Corner Road
2.99 miles to Boundary Line Road.
Light Capital Paving
HCP 4
024979.00
Highway Paving
Beginning at Route 1 and extending
2022 Bridgewater Boundary Line Road
northeast 3.87 miles.
Light Capital Paving
HCP 4, 5
14
ID/Year Municipality Scope Name Description Total Project Cost
Aviation
018688.04 Safety and infrastructure improvements that
Caribou Apron Caribou Municipal Airport may include design and reconstruction of the
2023/24 $642,000
apron.
Reconstruction
018984.00
Highway-Bridges Caribou Stream Bridge (#0181) over Caribou
2023/24 Caribou Bridge Street Stream. Located 0.02 of a mile south of $520,000
Bridge Substructure Water Street.
HCP 5 Rehabilitation
Highway
023579.00
Construction/Rehabilitation
Located 0.03 of a mile south of Buck Road
2022 Caribou Presque Isle Road $167,000
Rural Highways and extending north 0.05 of a mile.
HCP 4
Highway Rehabilitation
15
ID/Year Municipality Scope Name Description Total Project Cost
WR 42810
Drainage Maintenance Replacing culverts (#139219, #139223)on
West Presque Isle Road,
2022 Caribou West Presque Isle Road and McBurnie Road
McBurnie Road $16,000
in Caribou.
HCP 4
WR 43438 Department Building and Lot Replacing lights and installing generator
Caribou Maintenance Route 1 transfer switch in buildings (#35723),
2022 $41,000
(#35724). Located on Route 1 in Caribou.
021696.00
Greenlaw Brook No. 2 Bridge (#5625) over
Caribou, Highway-Minor Spans
2022 West Gate Road Greenlaw Brook. Located 0.18 of a mile north
Limestone $3,410,000
Bridge Replacement of Route 89.
HCP 4
024979.00
Highway Paving
Caribou, Beginning at Route 167 and extending north
2022 Route 205
Presque Isle 10.69 miles to Route 161.
Light Capital Paving
HCP 4
024977.00
Caribou, Highway Paving Beginning 0.03 of a mile south of the
2022 Washburn, Route 164 Woodland town line and extending northeast
Woodland Light Capital Paving 2.25 miles.
HCP 4
025885.00
Castle Hill, Highway Paving Beginning 0.84 of a mile northeast of Turner
2023 Mapleton, Route 227 Road and extending northeast 10.43 miles to
Presque Isle Light Capital Paving Skyway Street.
HCP 4
024979.00
Highway Paving
Caswell, Hamlin, Beginning at Route 89 and extending north
2022 Route 1A
Limestone 17.44 miles to Route 1.
Light Capital Paving
HCP 4
024977.00
Highway Paving
Connor Twp, Beginning at New Sweden Road and
2022 Station Road
New Sweden extending east 4.86 miles to Route 1.
Light Capital Paving
HCP 4
16
ID/Year Municipality Scope Name Description Total Project Cost
024981.00
Crystal, Island Highway Paving
Beginning at T1 R5 WELS town line and
2022 Falls, Sherman, Route 2
extending north 15.00 miles.
Silver Ridge Twp Light Capital Paving
HCP 4
WR 42857
Drainage Maintenance Replacing culvert (#47787) on Route 2 in
2022 Dyer Brook Route 2 Dyer Brook. Located 930 feet north of the $15,000
Pond Road.
HCP 4
024977.00
Highway Paving
Eagle Lake, Beginning at Quimby Road and extending
2022 Route 11
Winterville Plt north 3.62 miles.
Light Capital Paving
HCP 2
024979.00
Highway Paving
Beginning 0.03 of a mile west of Station
2022 Easton Conant Road
Road and extending east 1.78 miles.
Light Capital Paving
HCP 3
17
ID/Year Municipality Scope Name Description Total Project Cost
024979.00
Highway Paving
Richardson Road/Station Beginning at Center Road and extending
2022 Easton
Road north 3.38 miles to Conant Road.
Light Capital Paving
HCP 4
025885.00
Highway Paving
Easton, Presque Beginning at Centerline Road and extending
2023 Conant Road
Isle east 3.67 miles to Route Station Road
Light Capital Paving
HCP 3
025883.00 Forkstown Twp, Highway Paving Beginning 0.56 of a mile south of the
Glenwood Plt,
2023 Route 2A Glenwood Plt. town line and extending north
Haynesville,
Light Capital Paving 12.82 miles.
HCP 4 Reed Plt
025453.00
Puddle Dock Bridge (#2691) over Pattie
Highway-Bridges
2023/24 Fort Fairfield Route 161 Brook. Located 0.02 of a mile north of $2,920,000
Bridge Replacement Dorsey Road.
HCP 2
WR 35640
Drainage Maintenance Cleaning under guardrail in Fort Fairfield.
2022 Fort Fairfield North Caribou Road Beginning 1.04 miles north of Route 1A in $21,000
and extending north 0.45 of a mile.
HCP 4
18
ID/Year Municipality Scope Name Description Total Project Cost
025881.00
Highway Paving
Fort Kent, Beginning 0.41 of a mile west of Church
2023 Route 1
Frenchville Avenue and extending west 4.66 miles.
Light Capital Paving
HCP 2
Aviation
018692.05 Safety and infrastructure improvements that
Northern Aroostook
Frenchville Runway/Taxiway may include crack sealing and pavement
2023/24 Regional Airport $103,000
markings.
Crack Sealing
Aviation
018692.06
Northern Aroostook Safety and infrastructure improvements that
Frenchville Airport Buildings $155,000
2023/24 Regional Airport may include hangar door replacement.
Multimodal Improvements
Airport
018692.08 Safety and infrastructure improvements
Northern Aroostook
Frenchville Airport - General including acquisition of snow removal $195,000
2022 Regional Airport
equipment.
Capital Equipment Purchase
19
ID/Year Municipality Scope Name Description Total Project Cost
WR 42821
Drainage Maintenance Replacing culvert (#137554) on Cleveland
2022 Frenchville Cleveland Avenue Avenue. Located 0.18 of a mile north of the $20,000
Airport Avenue intersection.
HCP 4
025881.00
Highway Paving Beginning 0.06 of a mile east of the
Frenchville,
2023 Route 1 Frenchville town line and extending
Madawaska
Light Capital Paving southwest 5.85 miles.
HCP 2
024977.00
Highway Paving
Beginning at Cyr Road and extending north
2022 Grand Isle Route 1
2.86 miles.
Light Capital Paving
HCP 1
20
ID/Year Municipality Scope Name Description Total Project Cost
Airport
018695.06 Safety and infrastructure improvements that
Houlton International
Houlton Airport - General may include acquisition of snow removal
2023/24 Airport $618,000
equipment.
Capital Equipment Purchase
022216.00 Bicycle/Pedestrian
Sidewalks on Market Square, Water Street,
2023/24 Houlton On-Road Sidewalk/Trail Market Square Broadway, and Main Street for a total length $1,080,000
of 0.36 of a mile.
HCP 4 Reconstruction
022240.00
Cooks Brook Bridge (#3401) over Cooks
Highway-Minor Spans
2023/24 Houlton Foxcroft Road Brook. Located 1.08 miles north of Pleasant $1,760,000
Bridge Replacement Street.
HCP 4
025157.00
Houlton, I-95 SB / US Route 1 Bridge
Highway-Bridges
2023/24 Houlton Interstate 95 Southbound (#6098) over Route 1. Located 0.30 of a mile $350,000
Bridge Painting south of Exit 302.
HCP 1
025159.00
Houlton, I-95 NB / US Route 1 Bridge
Highway-Bridges
2023/24 Houlton Interstate 95 Northbound (#1382) over Route 1. Located 0.28 of a mile $350,000
Bridge Painting north of Exit 302.
HCP 1
026079.00
I-95 SB / Meduxnekeag River Bridge (#6099)
Highway-Bridges
2023/24 Houlton Interstate 95 Southbound over Meduxnekeag River. Located 0.50 of a $800,000
Bridge Painting mile north of Foxcroft Road.
HCP 1
21
ID/Year Municipality Scope Name Description Total Project Cost
Highway
026590.00
Construction/Rehabilitation Beginning at Route 2 and extending north
2023/24 Houlton Foxcroft Road 4.47 miles to the Littleton town line. RAISE
Rural Highways $16,300,000
Grant recipient
HCP 4
Reconstruction
WR 43244
Bridge and Structural Painting beam ends and bearings on
2022 Houlton Maintenance Highland Avenue Highland Ave Bridge (#3874). Located 200 $20,000
feet north of River Street in Houlton.
HCP 1
Highway Paving
025525.00 Houlton, Ludlow,
New Limerick, Interstate Beginning at Route 2 and extending south
2023/24 Interstate 95 Southbound
Oakfield, 19.27 miles.
Smyrna Ultra-Thin Bonded Wearing
HCP 1
Course
025147.00
Route 159/ I-95 Bridge (#6175) over
Highway-Bridges
2023/24 Island Falls Route 159 Interstate 95. Located 0.64 of a mile east of $700,000
Bridge Painting Old Patten Road.
HCP 1
025149.00
Belvedere Road/ I-95 Bridge (#6174) over
Highway-Bridges
2023/24 Island Falls Belvedere Road Interstate 95. Located 0.63 of a mile $750,000
Bridge Painting northwest of Sherman Street.
HCP 1
025153.00
Highway-Bridges Various bridge joint improvements on bridges
Island Falls Interstate 95 Southbound
2022 (#6176, #6177, #6178). $2,000,000
Bridge Joint Replacement
22
ID/Year Municipality Scope Name Description Total Project Cost
WR 43361
Drainage Maintenance Repairing catch basins (#906435, #906449,
Island Falls,
2022 Route 2 #892111) on Route 2 in Island Falls and
Smyrna $26,000
Smyrna.
HCP 4
022250.00
Kingman Road Bridge (#5021) over
Highway-Bridges
2023/24 Macwahoc Plt Kingman Road Macwahoc Stream. Located 0.38 of a mile $2,420,000
Bridge Improvements southeast of Route 2.
HCP 4
024981.00
Macwahoc Plt, Highway Paving Beginning at the Mattawamkeag town line
2022 Mattawamkeag, Route 2 and extending north 4.58 miles to Silver
Molunkus Twp Light Capital Paving Ridge Road.
HCP 4
022218.00 Bicycle/Pedestrian
Beginning at Fourteenth Avenue and
2023/24 Madawaska On-Road Sidewalk/Trail Route 1 extending west 0.16 of a mile to Sixteenth $678,000
Avenue.
HCP 2 New Construction
Railroad
024899.00
Northern Railway Rail capital improvements for Maine Northern
Madawaska Railroad - General $1,000,000
2022 Company Railway Company.
Capital-Eligible Maintenance
Bridge Inspections
025371.00 Maintenance
Beginning 0.02 of a mile north of Route 1 and
2023 Madawaska Urban Highways Mill Street
extending northeast 0.15 of a mile. $150,000
HCP 2 Maintenance - Drainage
23
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025755.00 Beginning 0.29 of a mile east of Castle Hill
Mapleton, Rural Highways town line and extending east 7.35 miles and
2022 Route 163/163W
Presque Isle beginning at Route 163 and extending east
Ultra-Thin Bonded Wearing 0.03 of a mile to Dyer Street.
HCP 2
Course
WR 43450
Bridge and Structural Sealing deck on Aroostook River Bridge
2022 Masardis Maintenance Garfield Road (#3407) in Masardis. Located 0.67 of a mile $86,000
west of the intersection of Route 11.
HCP 4
022252.00
East Hastings Bridge (#3150) over East
Highway-Minor Spans
2022 Merrill Route 212 Hastings Brook. Located 0.96 of a mile east $1,600,000
Bridge Replacement of the Moro Plt. town line.
HCP 3
025537.00
Meduxnekeag Bridge (#2542) over North
Highway-Bridges
2023/24 Monticello Route 1 Branch Meduxnekeag River. Located 0.22 of $800,000
Bridge Painting a mile north of School Street.
HCP 1
Highway
022932.00
Construction/Rehabilitation Beginning 0.63 of a mile north of the Tucker
2022 Moro Plt Route 11 Bridge (#5027) and extending north 0.20 of a $150,000
Rural Highways
mile.
HCP 2
Highway Rehabilitation
Highway
025375.00
Construction/Rehabilitation
Beginning 2.00 miles north of the Ashland
2022 Nashville Plt Route 11 $186,000
Rural Highways town line and extending north 1.35 miles.
HCP 2
Highway Rehabilitation
WR 36921
Drainage Maintenance Repairing culvert (#110842) located 0.81 of a
2022 Nashville Plt Route 11 mile north of the Ashland-Nashville Plt. town $36,000
line.
HCP 2
24
ID/Year Municipality Scope Name Description Total Project Cost
Highway
026584.00
Construction/Rehabilitation Beginning 0.25 of a mile south of the New
New Canada,
2023/24 Sly Brook Road Canada town line and extending north 0.28 of
Wallagrass Rural Highways $250,000
a mile.
HCP 4
Highway Rehabilitation
024977.00
Highway Paving
New Sweden, Beginning at Blackstone Road and extending
2022 Westmanland Road
Westmanland east 3.93 miles.
Light Capital Paving
HCP 4
025177.00
Rail Bridge Thomas Brook Rail Bridge (#7825) located
Oakfield Rail Bridge $5,250,000
2023/24 0.73 of a mile north of Ridge Road.
Bridge Replacement
024981.00
Highway Paving
Beginning at School House Road and
2022 Orient Boundary Road
extending east 3.04 miles.
Light Capital Paving
HCP 4
024981.00
Highway Paving Beginning at the south intersection of Route
2022 Orient School House Road 1 and extending north 0.94 of a mile to the
Light Capital Paving north intersection of Route 1.
HCP 4
023128.00
Salmon Stream Bridge (#2739) over Salmon
Highway-Minor Spans
2022 Perham Route 228 Stream. Located 0.16 of a mile north of $2,420,000
Bridge Replacement Mouse Island Road.
HCP 4
25
ID/Year Municipality Scope Name Description Total Project Cost
024977.00
Highway Paving
Perham, Beginning at Route 228 and extending east
2022 Carson Road
Woodland 6.11 miles to Route 164.
Light Capital Paving
HCP 4
WR 42413
Drainage Maintenance Replacing culvert (#110778) on Route 11 in
2022 Portage Lake Route 11 Portage. Located 0.18 of a mile south of the $23,000
intersection of the West Road.
HCP 2
024977.00
Highway Paving
Portage Lake, Beginning 0.82 of a mile north of West Street
2022 Route 11
T14 R6 WELS and extending north 8.79 miles.
Light Capital Paving
HCP 2
Aviation
018712.11 Safety and infrastructure improvements that
Presque Isle
Presque Isle Runway/Taxiway may include crack sealing and pavement
2022 International Airport $299,000
markings.
Crack Sealing
Aviation
018712.14 Safety and infrastructure improvements that
Presque Isle
Presque Isle Runway/Taxiway may include crack sealing and pavement
2023/24 International Airport $299,000
markings.
Crack Sealing
Aviation
018712.19 Safety and infrastructure improvements that
Airport - General Presque Isle
Presque Isle include land acquisition and obstruction
2023/24 International Airport $412,000
Sale Or Purchase Of Lot Or removal.
Building
Aviation
018712.20 Safety and infrastructure improvements that
Presque Isle
Presque Isle Airport Buildings include design and permitting for terminal
2023/24 International Airport $618,000
building.
New Construction
26
ID/Year Municipality Scope Name Description Total Project Cost
023204.00
Clark Bridge (#2155) over Clark Brook.
Highway-Minor Spans
2023/24 Presque Isle Route 1 Located 0.27 of a mile north of the Westfield $1,170,000
Bridge Culvert Rehabilitation town line.
HCP 1
024979.00
Highway Paving Beginning 0.45 of a mile northeast of
2022 Presque Isle State Street Fleetwood Street and extending northeast
Light Capital Paving 1.37 miles to Route 167.
HCP 4
Highway
025369.00
Construction/Rehabilitation
Beginning 0.85 of a mile north of Route 163
2022 Presque Isle Parsons Road $100,000
Rural Highways and extending north 0.10 of a mile.
HCP 4
Highway Rehabilitation
27
ID/Year Municipality Scope Name Description Total Project Cost
024981.00
Highway Paving
Beginning at Drew Plt. town line and
2022 Reed Plt Route 171
extending north 7.21 miles to Route 2A.
Light Capital Paving
HCP 4
WR 39979
Drainage Maintenance Replacing culvert (#182429) on Cleveland
2022 Saint Agatha Cleveland Road
Road in Saint Agatha. $18,000
HCP 4
WR 41681
Drainage Maintenance Replacing culvert (#909482) on Flat
2022 Saint Agatha Flat Mountain Road Mountain Road. Located 1.25 miles west $16,000
from the intersection of Route 162.
HCP 4
WR 42820
Drainage Maintenance Replacing culvert (#182493) on Cleveland
2022 Saint Agatha Cleveland Road Road. Located 0.33 of a mile east of Brise $20,000
Culotte Road in Saint Agatha.
HCP 4
WR 32370
Drainage Maintenance Repairing culvert (#179521) on Route 161.
2022 Saint Francis Route 161
Located 20 feet south of Gendreau Lane. $100,000
HCP 3
WR 34069
Drainage Maintenance Replacing culvert (#179530) on Route 161.
2022 Saint Francis Route 161 Located 550 feet south of the Rocky Road in $27,000
Saint Francis.
HCP 3
2022 Saint John Plt Rural Highways Route 161 Located 0.57 of a mile east of Mill Road. $75,000
HCP 3 Slope Stabilization/Protection -
PE Only
28
ID/Year Municipality Scope Name Description Total Project Cost
Highway
025419.00
Construction/Rehabilitation Beginning 1.20 miles southwest of the Fort
2023/24 Saint John Plt Route 161 Kent town line and extending southwest 3.36
Rural Highways $1,010,000
miles.
HCP 3
PMRAP DOT Pugmill
WR 43616
Drainage Maintenance Replacing culvert (#177424) on Route 161 in
2022 Saint John Plt Route 161 Saint John Plt. Located 0.56 of a mile north $24,000
of the Jalbert Road.
HCP 3
025451.00
I-95 NB /Route 158 Bridge (#6168) over
Highway-Bridges
2023/24 Sherman Interstate 95 Northbound Route 158. Located 0.47 of a mile north of $200,000
Bridge Painting the Benedicta Road.
HCP 1
025539.00
I-95 NB / Benedicta Road Bridge (#6167)
Highway-Bridges
2023/24 Sherman Interstate 95 Northbound over Benedicta Road. Located 0.02 of a mile $400,000
Bridge Painting south of Exit 264.
HCP 1
025547.00
I-95 SB / Route 158 Bridge (#1406) over
Highway-Bridges
2023/24 Sherman Interstate 95 Southbound Route 158. Located at the Interstate 95 $200,000
Bridge Painting southbound Exit 264.
HCP 1
Highway
020421.00
Construction/Rehabilitation
Beginning 0.02 of a mile south of Monroe
2023/24 Van Buren Route 1
Rural Highways Street and extending north 2.74 miles. $3,080,000
HCP 1
Reconstruction
29
ID/Year Municipality Scope Name Description Total Project Cost
Highway
022658.00
Construction/Rehabilitation Beginning 0.18 of a mile north of Parent
2023/24 Van Buren Route 1 Road in Van Buren and extending north 1.91
Rural Highways $1,800,000
miles.
HCP 1
Reconstruction
024977.00
Highway Paving
Castonguay / Champlain Beginning at Route 1 and extending north
2022 Van Buren
Road 3.04 miles to Route 1.
Light Capital Paving
HCP 4
Rail
025909.00
Rail/Highway Crossings Railroad crossing (#051147P) located 2.32
Van Buren Route 1
2022 miles north of Parent Road. $296,000
Signal Improvements
(Rail/Highway Xing)
026083.00
St. Mary's Bridge (#5309) over Violette
Highway-Bridges
2023/24 Van Buren Castonguay Road Brook. Located 0.03 of a mile north of St. $1,200,000
Bridge Replacement Mary's Brook Road.
HCP 4
WR 37268 Bridge and Structural Installing curtains and seals, cleaning and
Maintenance coating beams and bearings. International
Van Buren Bridge Street $21,000
2022 Bridge (#2400). Located 0.29 of a mile north
of Route 1.
022022.00 Bicycle/Pedestrian
Located along Main Street, School Street,
School Street/Route
2023/24 Washburn On-Road Sidewalk/Trail and Hines Street for a total length of 0.48 of a $928,000
164/Route 228
mile.
HCP 4, 5 Multimodal Improvements
024979.00
Highway Paving
Beginning 0.22 of a mile northwest of Hale
2022 Washburn Parson Road
Road and extending northwest 2.66 miles.
Light Capital Paving
HCP 4
30
ID/Year Municipality Scope Name Description Total Project Cost
025885.00
Highway Paving
Beginning at Berce Street and extending
2023 Washburn Route 164
north 7.11 miles.
Light Capital Paving
HCP 4
WR 34192
Bridge and Structural Repairing abutments. W Branch Salmon
2022 Washburn Maintenance Church Street Brook #2 Bridge (#0122). Located 560 feet $20,000
west of Route 228.
HCP 6
WR 35300
Drainage Maintenance Repairing culvert (#190158) on Route 164 in
2022 Washburn Route 164 Washburn. Located 1.00 mile south of the $45,000
Castle Hill Road.
HCP 4
WR 42136
Drainage Maintenance Repairing culvert (#190156) on Route 164 in
2022 Washburn Route 164 Washburn. Located 0.73 of a mile northwest $45,000
of North White Road.
HCP 4
WR 43589
Operational and Safety Installing new guardrail. Clayton Brook
2022 Washburn Maintenance Parsons Road Bridge (#5458). Located 0.32 of a mile north $26,000
of the intersection of the Annis Road.
HCP 4
Highway Paving
025741.00
Rural Highways Beginning at the Danforth town line and
2022 Weston Route 1
extending north 3.19 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
Highway
025373.00 Construction/Rehabilitation
Beginning 0.05 of a mile east of Davis Road
2022 Woodland Rural Highways Route 228
and extending east 0.20 of a mile. $10,000
HCP 4 Highway Rehabilitation - PE
Only
31
Cumberland
Harrison
Bridgton
Naples New
Casco Gloucester
Raymond
Yarmouth
Windham Cumberland
Standish
Falmouth
Gorham
Portland
Westbrook
Cumberland County
South
Population 293,557 Portland
Cumberland
Land Area (sq mi) 835
Scarborough
Bridges 373 Cape
Elizabeth
Highway Corridor Priority Miles
HCP 1 293
HCP 2 129
HCP 3 171
HCP 4 323
025853.00
Highway Paving
Baldwin, Beginning at the Hiram town line and
2023 Convene Road
Sebago extending east 3.76 miles to Route 107.
Light Capital Paving
HCP 4
Bicycle/Pedestrian
025967.00 Biddeford, Old
ADA improvements for Collector Road paving
Orchard Beach, On-Road Sidewalk/Trail Various Locations
2023/24 projects. PACTS Sponsored. $341,000
Scarborough
Rehabilitation
Bowdoin,
Bowdoinham, Highway Paving
026342.00
Brunswick,
Interstate Interstate 295 Beginning at the Brunswick town line and
2023/24 Gardiner,
Northbound extending north 21.51 miles.
Richmond, Ultra-Thin Bonded Wearing
HCP 1 Topsham, West Course
Gardiner
026236.00
Cornshop Bridge (#0318) over Stevens
Highway-Bridges
2023/24 Bridgton Depot Street Brook. Located 0.20 of a mile west of Main $1,600,000
Bridge Replacement Street.
HCP 5
025937.00
Highway Paving
Bridgton, Beginning at West Main Street and extending
2022 Route 117
Denmark northeast 6.96 miles.
Light Capital Paving
HCP 4
Airport
018714.07 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Airport - General may include acquisition of snow removal $721,000
2023/24 Airport
equipment.
Capital Equipment Purchase
32
ID/Year Municipality Scope Name Description Total Project Cost
Aviation
018714.17 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Runway/Taxiway may include Taxiway "A" pavement repairs
2022 Airport $172,000
and maintenance.
Crack Sealing
Aviation
018714.19 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Runway/Taxiway may include pavement repairs and
2023/24 Airport $172,000
maintenance.
Resurfacing
Aviation
018714.20 Safety and infrastructure improvements that
Brunswick Executive
Brunswick Airport - General may include automated weather observing
2022 Airport $464,000
system - 3 (AWOS - 3).
Multimodal Improvements
Aviation
018717.06
Brunswick Executive
Brunswick Airport - General Drainage repairs to Orion Street $412,000
2023/24 Airport
Drainage Improvements
Bicycle/Pedestrian
023921.01
Brunswick Multimodal Beginning at Union Street and extending
Brunswick Off-Road Trail/Path
2023/24 Center Pathway west 0.13 of a mile. $487,000
New Construction
024959.00
Highway Paving
Beginning 0.08 of a mile east of Brookview
2022 Brunswick Old Bath Road
Drive and extending east 0.68 of a mile.
Light Capital Paving
HCP 4
33
ID/Year Municipality Scope Name Description Total Project Cost
Highway
025035.01 Business Partnership Initiative Program.
Construction/Rehabilitation
Extension of Katahdin Drive beginning at the
2023/24 Brunswick Katahdin Drive
Rural Highways intersection with Allagash Drive and $1,550,000
HCP 5 extending north to Route 24B.
New Construction
025151.00
Highway-Bridges River Road Bridge (#6267) over Interstate
2023/24 Brunswick River Road 295. Located 0.22 of a mile northwest of Fox $450,000
Bridge Wearing Surface Run Drive.
HCP 1 Replacement
025413.00 Bicycle/Pedestrian
Beginning at Fitch Avenue and extending
2022 Brunswick On-Road Sidewalk/Trail Allagash Drive
west 0.73 of a mile. $75,000
HCP 5 New Construction - PE Only
Ports-Harbors
026232.00
Brunswick Boat Ramps Simpsons Point Road Located 0.45 of a mile south of Pennell Way.
2023/24 $175,000
New Construction
026326.00 Bicycle/Pedestrian
Pedestrian safety improvements at the
Mason Street/Federal
2022 Brunswick On-Road Sidewalk/Trail intersections of Mason street, Federal Street,
Street/Water Street $100,000
and Water Street.
HCP 2, 4, 5 Safety Improvements
34
ID/Year Municipality Scope Name Description Total Project Cost
026328.00 Bicycle/Pedestrian
Pedestrian safety improvements at the
Jordan Avenue/Route
2022 Brunswick On-Road Sidewalk/Trail intersection of Jordan Avenue and Bath
24B $50,000
Road.
HCP 2, 5 Safety Improvements - PE Only
WR 41344
Drainage Maintenance Replacing culvert (#47072) on Route 1 in
2022 Brunswick Route 1 Brunswick. Located 1.01 miles east of the $250,000
Freeport town line.
HCP 4
Brunswick,
Cumberland, Highway Safety and Spot Service that aids stranded motorists, clears
025228.24 Falmouth, Improvements debris and other hazards from the roadway,
Freeport, Interstate 295 and provides temporary traffic control at
2023/24 Interstate $500,000
Portland, minor accident scenes to help keep
Scarborough, Safety Improvements customers safe and traffic flowing smoothly.
South Portland
Brunswick,
Cumberland, Highway Paving
026338.00
Falmouth,
Interstate Interstate 295 Beginning at the Topsham town line and
2023/24 Freeport,
Southbound extending south 21.63 miles.
Portland, Ultra-Thin Bonded Wearing
HCP 1 Topsham, Course
Yarmouth
Highway Paving
025709.00
Brunswick, Rural Highways Beginning at Mountain Road and extending
2022 Route 24
Harpswell north 7.94 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
022603.00
Frank J. Wood Bridge (#2016) over
Brunswick, Highway-Bridges
2022 Route 201 Androscoggin River. Located on the
Topsham $33,500,000
Bridge Replacement Brunswick-Topsham town line.
HCP 2
35
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025711.00
Buxton,
Rural Highways Beginning at South Street and extending
2022 Gorham, Route 22
southwest 4.79 miles to Route 4.
Scarborough Highway Cyclical Pavement
HCP 3
Resurfacing
024963.00
Highway Paving
Buxton, Hollis, Beginning at Route 4 and extending north
2022 Route 35
Standish 11.34 miles.
Light Capital Paving
HCP 3, 4
Highway
022837.00
Construction/Rehabilitation
Buxton, Located at the intersection of Broadturn Road
2023/24 Route 22
Scarborough Rural Highways and Route 22. $2,600,000
HCP 3
Intersection Reconstruction
Bicycle/Pedestrian
024103.00
Beginning at Shore Road and extending
On-Road Sidewalk/Trail
2022 Cape Elizabeth Ocean Road south 0.45 of a mile to Fowler Road. PACTS $100,000
Multimodal Improvements - PE Sponsored.
HCP 4
Only
Highway
025807.00
Construction/Rehabilitation Beginning at the South Portland town line
2022 Cape Elizabeth Shore Road and extending south 0.92 of a mile to Powers $180,000
Urban Highways
Road. PACTS MPI Sponsored.
HCP 4
Reconstruction - PE Only
Bicycle/Pedestrian
024333.00 Cape Elizabeth, Priority Corridor and Centers Pedestrian-
Portland, South On-Road Sidewalk/Trail Various Locations Bicyclist Safety and Access Project. PACTS
2022 $2,250,000
Portland Sponsored.
Safety Improvements
Ferry
025029.24
Casco Bay Island Transit Casco Bay Island Transit District
Casco Ferry - General
2023/24 District improvements. $300,000
Multimodal Improvements
026228.00
Route 302/Crooked River Bridge (#2200)
Highway-Bridges
2023/24 Casco, Naples Route 35/Route 302 over Crooked River. Located 0.16 of a mile $2,000,000
Bridge Deck Replacement northwest of Hillside Avenue.
HCP 1
36
ID/Year Municipality Scope Name Description Total Project Cost
026180.00
Highway-Minor Spans Noyes Bridge (#5932) over Mill Brook.
2023/24 Cumberland Route 9
Located 0.18 of a mile north of Cross Road. $1,000,000
Bridge Replacement
HCP 4
021720.00
Bucknam Road/ I-295 Bridge (#5830) over
Highway-Bridges
2022 Falmouth Bucknam Road Interstate 295. Located 0.30 of a mile $10,600,000
Bridge Replacement northwest of Route 1.
HCP 1
021721.00
Johnson Road/ I-295 Bridge (#5792) over
Highway-Bridges
2022 Falmouth Johnson Road Interstate 295. Located 0.25 of a mile west of $8,010,000
Bridge Replacement Route 1.
HCP 1
026178.00
I-295 NB/Presumpscot River Bridge (#5828)
Highway-Bridges Interstate 295
2023/24 Falmouth over Presumpscot River. Located 0.98 of a $600,000
Northbound
Bridge Painting mile north of Portland town line.
HCP 1
023134.00
Railroad Crossing Bridge (#3172) over
Highway-Bridges
2023/24 Freeport Route 1 MCRR. Located 0.05 of a mile south of $3,500,000
Bridge Improvements Summer Street.
HCP 3
37
ID/Year Municipality Scope Name Description Total Project Cost
025291.00
Highway-Bridges County Road / I-295 Bridge (#0585) over
2023/24 Freeport Old County Road Interstate 295. Located 0.56 of a mile east of $350,000
Bridge Wearing Surface Webster Road.
HCP 1 Replacement
026292.00 Bicycle/Pedestrian
Beginning at Route 1 and extending north
2022 Freeport On-Road Sidewalk/Trail Route 125
0.38 of a mile. $250,000
HCP 3 New Construction - PE Only
024961.00
Highway Paving
Freeport, Beginning at Hallowell Road and extending
2022 Pownal Road
Pownal southeast 4.06 miles.
Light Capital Paving
HCP 4
021725.00
Route 1/Cousins River Bridge (#2183) over
Freeport, Highway-Bridges
2023/24 Route 1 Cousins River. Located on the Freeport-
Yarmouth $6,100,000
Bridge Replacement Yarmouth town line.
HCP 3
026462.00
Highway-Bridges I-295 NB/Cousins River Bridge (#1137) over
Freeport, Interstate 295
2023/24 Cousins River. Located on the Freeport-
Yarmouth Northbound $450,000
Bridge Superstructure Yarmouth town line.
HCP 1 Rehabilitation
Ferry
025919.00
Frye Island Ferry Boats Frye Island Ferry Service Reconstruction of electrical systems.
2023/24 $150,000
Rehabilitation
Ferry
025921.00
Reconstruction of mainland ramp, apron
Frye Island Ferry Boats Frye Island Ferry Service
2023/24 hinge, and Island slip headwall. $175,000
Rehabilitation
Ferry
024415.23 Capital improvements to the Frye Island
Frye Island,
Ferry - General Frye Island Ferry Service Ferry Service between Raymond and Frye
2023/24 Raymond $37,000
Island.
Multimodal Improvements
Ferry
024415.24 Capital improvements to the Frye Island
Frye Island,
Ferry - General Frye Island Ferry Service Ferry Service between Raymond and Frye
2023/24 Raymond $124,000
Island.
Multimodal Improvements
38
ID/Year Municipality Scope Name Description Total Project Cost
022238.00
Mitchell Bridge (#0216) over Nonesuch River.
Highway-Bridges
2023/24 Gorham Mitchell Hill Road Located 0.04 of a mile northwest of the $1,250,000
Bridge Replacement Scarborough town line.
HCP 5
025811.00 Bicycle/Pedestrian
Route 25/Route
2022 Gorham On-Road Sidewalk/Trail 202/South Street/New Various locations. PACTS MPI Sponsored. $483,000
Portland Road
HCP 1, 2, 3 Safety Improvements
Highway
024613.00 Construction/Rehabilitation
Beginning at Route 26 and extending north
Route 202/Main
2022 Gray Urban Highways 2.90 miles. Including segments on Route 26A
Street/Route 26A $250,000
and Main Street for 0.22 of a mile.
HCP 1, 2 Highway Rehabilitation - PE
Only
025855.00
Highway Paving Beginning at Brown Street and extending
2023 Gray Route 4 north 2.89 miles to the New Gloucester town
Light Capital Paving line. Includes turning lanes.
HCP 2
025855.00
Highway Paving
Beginning at Mayberry Road and extending
2023 Gray North Raymond Road
north 0.57 of a mile to Egypt Road.
Light Capital Paving
HCP 4
39
ID/Year Municipality Scope Name Description Total Project Cost
WR 43382
Drainage Maintenance Ditching on Depot Road in Gray. Beginning
2022 Gray Depot Road at the intersection of Mayall Road and $25,000
extending north 0.75 of a mile.
HCP 4
025855.00
Highway Paving
Gray, New Beginning at Route 115 and extending north
2023 Depot Road
Gloucester 2.80 miles to Route 231.
Light Capital Paving
HCP 4
024961.00
Gray, New Highway Paving
Beginning at Gray Road and extending north
2022 Gloucester, Route 231
8.38 miles to Woodman Road.
North Yarmouth Light Capital Paving
HCP 4
Ports-Harbors
023082.00 Construction of a boat landing at Mitchell
Harpswell Piers, Floats and Fenders George J. Mitchell Field Field. Located 0.09 of a mile northeast of
2023/24 $577,000
Firehouse Road.
Rehabilitation
Ports-Harbors
023472.00
Navy pier at Mitchell Field. Located 0.09 of a
Harpswell Piers, Floats and Fenders George J. Mitchell Field $138,000
2023/24 mile northeast of Firehouse Road.
Rehabilitation
023198.00
Highway-Bridges Bear River Bridge (#6121) over Bear River.
2023/24 Harrison Route 117 Located 0.03 of a mile northeast of Tolman $500,000
Bridge Wearing Surface Road.
HCP 2 Replacement
40
ID/Year Municipality Scope Name Description Total Project Cost
025937.00
Highway Paving
Beginning at Route 11 and extending north
2022 Harrison, Naples Route 35
9.49 miles to Town Falls Road.
Light Capital Paving
HCP 4
025855.00
Highway Paving
Harrison, Beginning at Route 121 and extending north
2023 Bolster's Mills Road
Otisfield 7.81 miles to Route 117.
Light Capital Paving
HCP 4
Ports-Harbors
024621.00
Phase 2- Mariner's Wharf, wave screen.
Long Island Piers, Floats and Fenders Mariner's Landing
2023/24 Located on Wharf Street. $715,000
New Construction
026170.00
Songo Lock Draw Bridge (#2780) over Songo
Highway-Bridges
2023/24 Naples State Park Road River. Located 0.17 of a mile southwest of $1,000,000
Bridge Rehabilitation Songo School Road.
HCP 4
026192.00
Royal River Bridge (#2729) over Royal River.
Highway-Minor Spans
2023/24 New Gloucester Route 202/100/4 Located 0.04 of a mile south of the Auburn $3,500,000
Bridge Replacement town line.
HCP 2
WR 43385
Drainage Maintenance Ditching on Route 231 in New Gloucester.
2022 New Gloucester Route 231 Beginning 0.30 of a mile south of Valley Farm $50,000
Road and extending north 3.00 miles.
HCP 4
025855.00
Highway Paving
New Gloucester, Beginning at Route 231 and extending east
2023 Allen Road
Pownal 1.83 miles.
Light Capital Paving
HCP 4, 5
41
ID/Year Municipality Scope Name Description Total Project Cost
022338.00
Highway-Bridges
Walnut Hill Bridge (#0188) over MCRR.
2023/24 North Yarmouth Route 9
Located 0.14 of a mile north of Hazel Lane. $540,000
Bridge Substructure
HCP 4 Rehabilitation
42
ID/Year Municipality Scope Name Description Total Project Cost
018469.00 Bicycle/Pedestrian
Multiuse trail along the abandoned Union
2023/24 Portland On-Road Sidewalk/Trail Union Branch Trail Branch railway extending from Park Avenue $3,070,000
to Forest Avenue.
HCP 5 New Construction
Bicycle/Pedestrian
018865.00
Beginning at Beach Street and extending
Portland Off-Road Trail/Path Route 1A
2022 west 0.57 of a mile. $588,000
New Construction
43
ID/Year Municipality Scope Name Description Total Project Cost
Ferry
022705.22
Casco Bay Island Transit Passenger Ferry Program. Allocation for
Portland Ferry - General
2022 District capital improvements. $452,000
Multimodal Improvements
Ferry
022705.23
Casco Bay Island Transit Passenger Ferry Program. Allocation for
Portland Ferry - General
2023/24 District capital improvements. $452,000
Multimodal Improvements
Ferry
022705.24
Casco Bay Island Transit Passenger Ferry Program. Allocation for
Portland Ferry - General
2023/24 District capital improvements. $452,000
Multimodal Improvements
Freight
022809.50 Heavy haul road and track improvements to
West Commercial Street
Portland Intermodal Freight Facility support the International Marine Terminal
2022 Intermodal Facility $2,130,000
(IMT) operations.
Rehabilitation
Ferry
023468.00 Construction of new ferry for Casco Bay
Casco Bay Island Transit
Portland Ferry Boats Island Transit District (CBITD) to serve the
2022 District $12,000,000
Peaks Island Ferry Route.
New Construction
44
ID/Year Municipality Scope Name Description Total Project Cost
Highway
023717.00
Construction/Rehabilitation
Route 302 (Forest Beginning at Morrill's Corner and extending
2022 Portland
Urban Highways Avenue) north 0.08 of mile. $210,000
HCP 1
Reconstruction - PE Only
Ferry
024685.00
Casco Bay Island Transit Casco Bay Ferry Service improvements to
Portland Piers, Floats and Fenders $100,000
2022 District state owned assets serving the ferry.
Rehabilitation - PE Only
Ferry
024685.01
Casco Bay Island Transit Casco Bay Ferry Service improvements to
Portland Piers, Floats and Fenders $3,000,000
2023/24 District state owned assets serving the ferry.
Rehabilitation
45
ID/Year Municipality Scope Name Description Total Project Cost
Ferry
025029.22
Casco Bay Island Transit Casco Bay Island Transit District
Portland Ferry - General $300,000
2022 District improvements.
Multimodal Improvements
Ferry
025029.23
Casco Bay Island Transit Casco Bay Island Transit District
Portland Ferry - General $300,000
2023/24 District improvements.
Multimodal Improvements
46
ID/Year Municipality Scope Name Description Total Project Cost
Ports-Harbors
025217.00
Portland Piers, Floats and Fenders Fore Street Marina Located at the end of Fore Street.
2022 $292,000
Rehabilitation
Highway
025253.00
Construction/Rehabilitation PACTS 2023 Allocation for future design and
2023/24 Portland Brighton Avenue construction of Brighton Avenue. PACTS
Urban Highways $2,010,000
Sponsored.
HCP 1
Highway Rehabilitation
Highway Paving
025257.00
Municipal Partnership Initiative Program.
Portland Urban Highways Various Locations
2023/24 PACTS Sponsored.
Mill And Fill
47
ID/Year Municipality Scope Name Description Total Project Cost
48
ID/Year Municipality Scope Name Description Total Project Cost
Ports-Harbors
025953.00
International Marine
Portland Marine Buildings/Facilities Located off Commercial Street.
2023/24 Terminal $5,700,000
Multimodal Improvements
Highway
026005.00 Construction/Rehabilitation
Collector Road Paving for the PACTS area.
Portland Various Locations
2023/24 Urban Highways PACTS Sponsored. $2,200,000
Highway Rehabilitation
Highway
026007.00 Construction/Rehabilitation
Municipal Partnership Initiative Program.
Portland Various Locations
2023/24 Urban Highways PACTS Sponsored. $3,280,000
Highway Rehabilitation
49
ID/Year Municipality Scope Name Description Total Project Cost
Ports-Harbors
026200.00
Portland Marine Buildings/Facilities Merrill's Marine Terminal Located off Commercial Street.
2023/24 $3,000,000
Multimodal Improvements
Freight
026202.00
International Marine
Portland Intermodal Freight Facility Located off Commercial Street.
2023/24 Terminal $850,000
Demolition/Removal
Freight
026206.00
International Marine
Portland Intermodal Freight Facility Located off Commercial Street.
2022 Terminal $100,000
New Construction - PE Only
Freight
026212.00
International Marine
Portland Intermodal Freight Facility Located off Commercial Street. $300,000
2023/24 Terminal
Rehabilitation
Ports-Harbors
026214.00
Portland Marine Buildings/Facilities Fore Points Marina Tier 2 Located off Thames Street.
2023/24 $4,100,000
New Construction
Ports-Harbors
026216.00
Portland Marine Buildings/Facilities Fore Points Marina Tier 1 Located off Thames Street.
2023/24 $221,000
New Construction
Ports-Harbors
026222.00
Located off Thames Street adjacent to Ocean
Portland Piers, Floats and Fenders Eastern Waterfront
2023/24 Gateway. $360,000
New Construction
50
ID/Year Municipality Scope Name Description Total Project Cost
Bus
026308.00
Greater Portland Transit District, Facility
Portland Intermodal Passenger Facility Urban Transit Capital
2022 Construction. $701,000
New Construction
026446.00
I-295 SB/Franklin Street Bridge (#6541) over
Highway-Bridges Interstate 295
2023/24 Portland Franklin Street. Located 0.25 of a mile south
Southbound $450,000
Bridge Painting of Route 1A exit.
HCP 1
026448.00
Franklin Street Bridge (#6300) over Franklin
Highway-Bridges Interstate 295
2023/24 Portland Street. Located 0.34 of a mile north of Preble
Northbound $600,000
Bridge Painting Street Extension.
HCP 1
026450.00
St. John Street Bridge (#6297) over St. John
Highway-Bridges Interstate 295
2023/24 Portland Street. Located 0.12of a mile north of Park
Northbound $400,000
Bridge Painting Avenue.
HCP 1
51
ID/Year Municipality Scope Name Description Total Project Cost
024961.00
Highway Paving
Beginning 0.03 of a mile south of Lawrence
2022 Pownal Elmwood Road
Road and extending south 1.27 miles.
Light Capital Paving
HCP 4
024961.00
Highway Paving
Beginning at Allen Road and extending
2022 Pownal Elmwood Road
southeast 1.23 miles.
Light Capital Paving
HCP 4
WR 43381
Drainage Maintenance Ditching on Allen Road in Pownal. Beginning
2022 Pownal Allen Road at the New Gloucester-Pownal town line and $15,000
extending east 0.60 of a mile.
HCP 4
Highway
021932.27 Municipal Partnership Initiative Program.
Construction/Rehabilitation
Beginning at Route 35 and extending north
2022 Raymond Main Street
Rural Highways 0.45 of a mile to Route 121. Including $850,000
HCP 4 sidewalk improvements.
Highway Rehabilitation
024963.00
Highway Paving
Beginning 0.28 of a mile north of Holmes
2022 Scarborough Beech Ridge Road
Road and extending north 1.19 miles.
Light Capital Paving
HCP 4
52
ID/Year Municipality Scope Name Description Total Project Cost
024963.00
Highway Paving
Beginning at Payne Road and extending
2022 Scarborough Beech Ridge Road
north 1.87 miles.
Light Capital Paving
HCP 4
024963.00
Highway Paving
Beginning 0.06 of a mile south of Acorn Lane
2022 Scarborough Route 77
and extending south 1.12 miles.
Light Capital Paving
HCP 4
Highway Paving
025797.00
Beginning 0.32 of a mile southeast of Joss
Rural Highways
2022 Scarborough Broadturn Road Hill Road and extending southeast 1.56
Highway Cyclical Pavement miles.
HCP 3
Resurfacing
Highway
025819.00
Construction/Rehabilitation Beginning at Maple Avenue and extending
2022 Scarborough Gorham Road north 0.48 of a mile to Ridgeway Road.
Rural Highways $2,300,000
PACTS MPI Sponsored.
HCP 2
Reconstruction
Rail
025895.00
Rail/Highway Crossings Railroad Crossing (#053207D) located 0.20
Scarborough Winnocks Neck Road
2022 of a mile southeast of Orchard Hill Road. $353,000
Signal Improvements
(Rail/Highway Xing)
53
ID/Year Municipality Scope Name Description Total Project Cost
Highway
012800.30
Construction/Rehabilitation
Interstate 295 New access on Interstate 295 at Exit 4.
2023/24 South Portland
Rural Highways Southbound Project is a partnership with South Portland. $2,390,000
HCP 1
Reconstruction
Aviation
018711.15 Safety and infrastructure improvements that
Portland International
South Portland Airport - General may include airport security fence and gate
2023/24 Jetport $371,000
upgrades in northeast area.
Multimodal Improvements
Aviation
018711.18
Portland International Safety and infrastructure improvements that
South Portland Runway/Taxiway $13,200,000
2022 Jetport may include rehabilitation of Runway 11-29.
Rehabilitation
Aviation
018711.19 Safety and infrastructure improvements that
Portland International
South Portland Runway/Taxiway includes reconstruction of Taxiways A, D, E,
2023/24 Jetport $9,310,000
and F.
Reconstruction
Aviation
018711.21 Safety and infrastructure improvements that
Portland International
South Portland Apron includes terminal apron rehabilitation - phase $1,550,000
2023/24 Jetport
1.
Rehabilitation
54
ID/Year Municipality Scope Name Description Total Project Cost
023601.00
I-295 NB/ Red Brook Bridge (#6285) over
Highway-Minor Spans
2023/24 South Portland Interstate 295 Red Brook. Located 0.93 of a mile north of $523,000
Bridge Culvert Rehabilitation the Portland town line.
HCP 1
Bicycle/Pedestrian
024101.00
Beginning at Angell Avenue and extending
On-Road Sidewalk/Trail
2022 South Portland Cottage Road west 0.33 of a mile to Sawyer Street. PACTS $250,000
Multimodal Improvements - PE Sponsored.
HCP 4
Only
Highway Paving
025833.00
South Portland, Rural Highways Spring Street/Cummings Beginning at Main Street and extending
2023/24
Westbrook Road south 3.12 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
55
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025715.00
Rural Highways Beginning at the Gorham town line and
2022 Standish Route 114
extending northwest 1.68 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
WR 43474
Drainage Maintenance Removing overburden behind guardrail on
2022 Standish Route 114
Route 114 in Standish. $30,000
HCP 4
56
ID/Year Municipality Scope Name Description Total Project Cost
Bicycle/Pedestrian
026576.00
Westbrook, Beginning at Bridge Street in Westbrook to
Off-Road Trail/Path Mountain Division Line
2022 Windham the Route 202 crossing in Windham. $450,000
New Construction - PE Only
Highway
024341.00 Beginning 0.45 of a mile west of Outpost
Construction/Rehabilitation
Drive and extending west 0.14 of a mile,
2023/24 Windham Route 302
Urban Highways including the roundabout intersection with $585,000
HCP 1 Route 202.
Intersection Reconstruction
025821.00 Bicycle/Pedestrian
Beginning at Depot Street and extending
2022 Windham On-Road Sidewalk/Trail Route 202 north 0.23 of a mile to the Mountain Division $525,000
Trail crossing. PACTS MPI Sponsored.
HCP 2 Safety Improvements
2024 Windham Highways - General Route 302 Traffic signal modifications on Route 302. $855,000
HCP 1 System Operations
026190.00
Highway-Bridges Loveitt Bridge (#3018) over Pleasant River.
2023/24 Windham River Road
Located 0.13 of a mile north of Laskey Road. $1,000,000
Bridge Deck Replacement
HCP 3
026240.00
Highway-Bridges Varney's Bridge (#0257) over Pleasant River.
2023/24 Windham Williams Knight Road
Located 0.43 of a mile from Route 4. $1,500,000
Bridge Replacement
HCP 5
57
ID/Year Municipality Scope Name Description Total Project Cost
022382.00
Route 1/ I-295 Bridge (#5804) over Interstate
Highway-Bridges
2023/24 Yarmouth Interstate 295 295. Located 0.04 of a mile north of Interstate $12,000,000
Bridge Replacement 295 northbound Exit 15.
HCP 1
025855.00
Highway Paving
Beginning at the Cumberland town line and
2023 Yarmouth Route 88
extending north 0.81 of a mile.
Light Capital Paving
HCP 4
025981.00 Bicycle/Pedestrian
Reconstruction of sidewalk. Beginning at
2022 Yarmouth On-Road Sidewalk/Trail Route 115 Center Street and extending east 0.12 of a $78,000
mile to Railroad Square. PACTS Sponsored.
HCP 3 Reconstruction - PE Only
Bicycle/Pedestrian
025985.00 Beginning at I-295 Exit 17 and extending
Beth Condon Trail
Yarmouth Off-Road Trail/Path 0.57 of a mile to the Cousins River Bridge.
2022 Shared Use Path $69,000
PACTS Sponsored.
New Construction - PE Only
026472.00
Highway-Bridges Cotton Mill Bridge (#3983) over Royal River.
2023/24 Yarmouth Bridge Street $300,000
Located 0.16 of a mile north of Main Street.
Bridge Painting
HCP 5
58
Franklin
Gorham
Gore
Lowelltown
Twp
Beattie
Twp
Franklin County
Merrill
Strip Twp
Skinner
Population 28,897
Twp
Land Area (sq mi) 1,697
Coburn Bridges 196
Gore
Highway Corridor Priority Miles
HCP 1
Kibby
Twp 37
Chain of
Ponds Twp
HCP 2 88
HCP 3 50
Alder
Jim Pond HCP 4 217
Twp
Seven Stream
Ponds Twp
Tim Eustis
Pond
Stetsontown Twp
Twp
Wyman
Twp
Coplin
Plt
Lang Twp
Davis Carrabassett
Twp Valley
Redington
Dallas Twp
Rangeley Plt Mount
Abram Kingfield
Twp
Sandy Madrid
Twp Salem
Rangeley River Twp
Plt Plt Freeman
Twp
Phillips
Township E
Strong
Township D New
Township
6 North Vineyard
Avon
of Weld
Industry
Weld
Temple
Farmington
New
Sharon
Carthage
Wilton
Franklin
Chesterville
Jay
Franklin
ID/Year Municipality Scope Name Description Total Project Cost
025931.00
Highway Paving
Anson, New Beginning at Route 27 and extending east
2022 Route 234
Vineyard 11.16 miles to Route 8.
Light Capital Paving
HCP 4
023098.00
Highway-Minor Spans Cushman Bridge (#6588). Located 0.12 of a
2023/24 Avon Route 4
mile south of Airport Road. $2,520,000
Bridge Replacement
HCP 2
WR 41713
Drainage Maintenance Replacing culvert (#1047470) on Route 149
2022 Avon Route 149 in Avon. Located 0.24 of a mile south of the $55,000
Phillips-Avon town line.
HCP 4
024973.00
Highway Paving
Beginning at Route 4 and extending north
2022 Avon, Phillips Pleasant Street
0.51 of a mile to Route 142.
Light Capital Paving
HCP 4
025931.00
Highway Paving
Avon, Phillips, Beginning at Farmington Road and extending
2022 Route 149
Strong west 7.65 miles to Park Street.
Light Capital Paving
HCP 4
Highway
024167.00
Construction/Rehabilitation Beginning 0.13 of a mile north of Byron
Byron, Township
2022 Route 17 Village Road and extending north 10.89
D, Township E Rural Highways $1,520,000
miles.
HCP 4
PMRAP DOT Pugmill
Highway
024167.10
Construction/Rehabilitation Beginning 0.13 of a mile north of Byron
Byron, Township
2022 Route 17 Village Road and extending north 10.89
D, Township E Rural Highways $2,940,000
miles.
HCP 4
PMRAP Laydown/Surface HMA
024969.00
Highway Paving
Beginning 0.18 of a mile north of Davenport
2022 Canton, Jay Route 140
Hill Road and extending south 4.01 miles.
Light Capital Paving
HCP 4
Aviation
018689.05 Safety and infrastructure improvements that
Carrabassett Sugarloaf Regional
Runway/Taxiway may include crack sealing and pavement $155,000
2023/24 Valley Airport
markings.
Crack Sealing
Aviation
018689.07
Carrabassett Sugarloaf Regional Safety and infrastructure improvements that
Runway/Taxiway
2023/24 Valley Airport includes rehabilitation of runway $2,580,000
Rehabilitation
59
ID/Year Municipality Scope Name Description Total Project Cost
025869.00 Carrabassett
Valley, Highland Highway Paving
Beginning at Route 16 and extending north
2023 Plt, Lexington Long Falls Dam Road
17.55 miles to the Dead River Twp. town line.
Twp, New Light Capital Paving
HCP 4 Portland
026436.00
Dead River Bridge (#3135) over North
Chain Of Ponds Highway-Bridges
2023/24 Route 27 Branch Dead River. Located 0.02 of a mile
Twp $200,000
Bridge Painting north of Alder Stream Twp. town line.
HCP 3
026124.00
Williams #2 Bridge (#3181) over Wilson
Chesterville, Highway-Bridges
2022 Route 156 Stream. Located 0.47 of a mile southwest of
Farmington $300,000
Bridge Improvements - PE Only Route 41.
HCP 3
Highway Paving
025745.00 Coplin Plt,
Beginning 0.21 of a mile north of
Eustis, Jim Pond Rural Highways
2022 Route 27 Carrabassett Valley town line and extending
Twp, Wyman
Highway Cyclical Pavement north 12.17 miles.
HCP 2, 3 Twp
Resurfacing
WR 41399
Department Building and Lot Constructing new crew quarters building in
2022 Dallas Plt Maintenance Route 16 Dallas Plt. on Route 16. Located 106 feet $150,000
east of Morgan Lane.
HCP 4
Highway
025259.00
Construction/Rehabilitation
Dallas Plt, Saddleback Mountain Beginning at the Dallas Hill Road and
2022 $3,000,000
Sandy River Plt Rural Highways Road extending south 4.66 miles.
HCP 5
Reconstruction
60
ID/Year Municipality Scope Name Description Total Project Cost
025931.00
Highway Paving
Farmington, Beginning at Fairbanks Road and extending
2022 Route 149
Strong north 8.25 miles to Farmington Road.
Light Capital Paving
HCP 4
Highway Paving
025769.00
Farmington, Rural Highways Beginning 0.08 of a mile north of Route 156
2022 Route 2
Wilton and extending north 6.69 miles to Route 43.
Ultra-Thin Bonded Wearing
HCP 1
Course
025931.00
Highway Paving
Freeman Twp, Beginning at Phillips Road and extending
2022 Route 145
Strong north 10.03 miles to Salem Road.
Light Capital Paving
HCP 4
026120.00
Reed Brook Bridge (#5351) over Reed
Highway-Minor Spans
2023/24 Kingfield Route 16 Brook. Located 1.48 miles south of $1,500,000
Bridge Replacement Carrabassett Valley town line.
HCP 2
61
ID/Year Municipality Scope Name Description Total Project Cost
025931.00
Highway Paving Beginning 0.37 of a mile south of York Hill
2022 New Sharon Route 27 Road and extending north 2.66 miles to
Light Capital Paving Route 2.
HCP 1, 2
026438.00
Fillibrown Bridge (#3842) over Fillibrown
Highway-Bridges
2023/24 New Sharon Route 2 Brook. Located 0.42 of a mile southwest of $200,000
Bridge Painting Taylor Road.
HCP 1
025931.00
Highway Paving
New Vineyard, Beginning at S Strong Road and extending
2022 Route 234
Strong east 5.31 miles to Route 27.
Light Capital Paving
HCP 4
023623.00
Lower Village Bridge (#5063) over Sandy
Highway-Bridges
2022 Phillips Route 149 River. Located 0.02 of a mile south of Amble $250,000
Bridge Improvements - PE Only Street.
HCP 4
023641.00
Highway-Bridges Ross Bridge (#5064) over Sandy River.
2022 Phillips Route 142 $250,000
Located 0.21 of a mile south of Bridge Street.
Bridge Improvements - PE Only
HCP 4
024973.00
Highway Paving
Beginning at Route 156 and extending north
2022 Phillips, Weld Route 142
12.12 miles to Route 4.
Light Capital Paving
HCP 4
Aviation
018705.02
Stephen A. Bean Safety and infrastructure improvements that
Rangeley Runway/Taxiway
2023/24 Municipal Airport may include pavement maintenance. $103,000
Crack Sealing
62
ID/Year Municipality Scope Name Description Total Project Cost
WR 39167
Drainage Maintenance Ditching on Route 4 In Sandy River Plt.
2022 Sandy River Plt Route 4 Beginning 420 feet north of Greenvale Cove $117,000
and extending north 2.46 miles.
HCP 2
025105.00
Bridges Bridge (#2102) over Wilson Stream.
Highway-Bridges
2023/24 Wilton Pond Road Located 0.03 of a mile southeast of the Weld $1,700,000
Bridge Replacement Road.
HCP 5
026474.00
Stoney Brook Bridge (#5342) over Stoney
Highway-Bridges
2023/24 Wyman Twp Route 27 Brook. Located 0.21 of a mile south of Camp $4,300,000
Bridge Replacement Road.
HCP 2
63
Hancock
Hancock
Hancock County Oqiton
Twp
Population 54,811 T3 ND
T28 MD
Aurora
Amherst
T22 MD
Osborn
Mariaville
Otis T16 MD
Dedham Eastbrook
Waltham
Bucksport T10 SD
T9
Fletchers Franklin
Landing Twp SD
Ellsworth
Orland
Hancock
T7 SD
Surry Hancock
Lamoine
Penobscot
Trenton
Blue Hill Gouldsboro
Castine Winter
Harbor
Bar
Harbor
Brook sv ille
Blue
Sedgwick Hill
Mount
Southw est Desert
Harbor
De e r Brooklin Tremont
Is le
Stoningto n
Swans
Islan d
Hancock
ID/Year Municipality Scope Name Description Total Project Cost
Aurora,
024975.00 Ellsworth,
Fletchers Highway Paving
Beginning 0.61 of a mile north of Route 1A
2022 Landing Twp, Route 179
and extending north 21.62 miles to Route 9.
Mariaville, Light Capital Paving
HCP 4 Osborn,
Waltham
025879.00
Highway Paving
Beginning at Norway Drive and extending
2023 Bar Harbor Route 233
east 3.95 miles to Route 3.
Light Capital Paving
HCP 3
026574.00
Cromwell Brook #3 Bridge (#0452) over
Highway-Bridges
2023/24 Bar Harbor Ledgelawn Avenue Cromwell Brook. Located 0.03 of a mile $1,500,000
Bridge Improvements north of White Spruce Road.
HCP 5
Highway
025995.00
Beddington, Construction/Rehabilitation Beginning 2.76 miles north of the Cherryfield
2023/24 Deblois, T22 MD Route 193 town line and extending northwest 9.54 miles
Rural Highways $3,820,000
BPP to Route 9.
HCP 3
PMRAP DOT Pugmill
018728.00
Highway-Minor Spans Village Bridge (#2893) over Mill Stream.
2023/24 Blue Hill Route 15 Located 0.04 of a mile northeast of Water $1,100,000
Bridge Superstructure Street.
HCP 3 Replacement
64
ID/Year Municipality Scope Name Description Total Project Cost
Highway
018777.00
Construction/Rehabilitation
Beginning at the Sedgwick town line and
2023/24 Blue Hill Route 15
Rural Highways extending north 2.09 miles. $1,820,000
HCP 3
Highway Rehabilitation
024315.00 Bicycle/Pedestrian
Beginning 0.04 of a mile south of Bay School
2022 Blue Hill On-Road Sidewalk/Trail Route 172
Drive and extending north 0.36 of a mile. $705,000
HCP 4 Multimodal Improvements
025947.00
Highway Paving
Beginning at Pleasant Street and extending
2022 Blue Hill Route 172
north 2.09 miles.
Light Capital Paving
HCP 3
025947.00
Blue Hill, Highway Paving Beginning at the north intersection of Route
2022 Brooklin, Route 175 172 and extending south 17.92 miles to
Sedgwick Light Capital Paving Route 15.
HCP 4
Ports-Harbors
024443.00
Bucks Harbor Marina Expansion. Located at
Brooksville Piers, Floats and Fenders Bucks Harbor Marina
2023/24 684 Coastal Road. $176,000
New Construction
025947.00
Highway Paving
Beginning at the north intersection of Route
2022 Brooksville Route 176
175 and extending south 10.02 miles.
Light Capital Paving
HCP 4
65
ID/Year Municipality Scope Name Description Total Project Cost
024975.00 Cherryfield,
Franklin, Highway Paving Beginning at the south intersection with
2022 Hancock, T10 Route 182 Route 1 and extending north 23.33 miles to
SD BPP, T9 SD Light Capital Paving the north intersection of Route 1.
HCP 4 BPP
022356.01
Mill Hill Bridge (#3063) over Mill Pond Outlet.
Deer Isle, Highway-Bridges
2022 Route 15 Located on the Stonington- Deer Isle town
Stonington $2,800,000
Bridge Replacement line. FHWA BUILD Grant recipient.
HCP 3
025947.00
Highway Paving
Deer Isle, Beginning at School Street and extending
2022 Route 15
Stonington north 11.38 miles.
Light Capital Paving
HCP 3
025947.00
Highway Paving Beginning at the south intersection of Route
Deer Isle,
2022 Sunset Avenue 15 and extending north 6.97 miles to the
Stonington
Light Capital Paving north intersection of Route 15.
HCP 4
66
ID/Year Municipality Scope Name Description Total Project Cost
024975.00
Eastbrook, Highway Paving
Beginning at Route 182 and extending north
2022 Franklin, Route 200
11.06 miles to Route 179.
Waltham Light Capital Paving
HCP 4
Bicycle/Pedestrian
026296.00
Ellsworth Multiuse
Ellsworth Off-Road Trail/Path Connection of the Ellsworth Multiuse Trail. $370,000
2022 Pathway
New Construction - PE Only
025947.00
Highway Paving
Beginning at Route 172 and extending north
2022 Ellsworth, Surry North Bend Road
3.87 miles to Route 1.
Light Capital Paving
HCP 4
67
ID/Year Municipality Scope Name Description Total Project Cost
Ports-Harbors
022202.00
Frenchboro Piers, Floats and Fenders Lunt Harbor Construction of new Frenchboro dolphin.
2022 $2,890,000
Reconstruction
026107.00
Tannery Bridge (#3511) over Tannery Brook.
Highway-Bridges
2023/24 Mariaville Route 181 Located 0.16 of a mile north of Olive Carr $1,500,000
Bridge Replacement Road.
HCP 4
023515.00
Babsons Bridge (#5244) over Meadow
Highway-Minor Spans
2023/24 Mount Desert Route 3 Brook. Located 0.09 of a mile east of Route $2,770,000
Bridge Replacement 102.
HCP 3
025879.00
Highway Paving Beginning at Upper Dunbar Road and
2023 Mount Desert Route 3 extending southwest 3.55 miles to Route
Light Capital Paving 198.
HCP 3
025879.00
Highway Paving
Beginning at Peabody Drive and extending
2023 Mount Desert Route 198
south 0.83 of a mile.
Light Capital Paving
HCP 4
025947.00
Highway Paving
Mount Desert, Beginning at Route 102A and extending
2022 Pretty Marsh Road
Tremont north 12.41 miles to Route 102.
Light Capital Paving
HCP 4
68
ID/Year Municipality Scope Name Description Total Project Cost
024595.00
Penobscot Narrows Bridge and Observatory
Prospect, Highway-Bridges
2023/24 Route 1 (#6241) over Penobscot River. Located on
Verona Island $1,500,000
Lighting the Prospect- Verona Island town line.
HCP 1
022204.00 Bicycle/Pedestrian
Located on the west side of Main Street.
Southwest
2022 On-Road Sidewalk/Trail Main Street Beginning at Apple Lane and extending south
Harbor $1,110,000
0.20 of a mile.
HCP 3 New Construction
69
ID/Year Municipality Scope Name Description Total Project Cost
Highway
022516.16
Construction/Rehabilitation Municipal Partnership Initiative Program.
Southwest
2022 Route 102 Beginning 0.07 of a mile north of Apple Lane
Harbor Rural Highways $419,000
and extending south 0.27 of a mile.
HCP 3
Reconstruction
022630.00
Oceanville Bridge (#3696) over Oceanville
Highway-Bridges
2023/24 Stonington Oceanville Road Thoroughfare. Located 0.38 of a mile west of $3,670,000
Bridge Replacement Hatchs Cove Road.
HCP 5
Aviation
018710.09 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Navigation Aids/Lights may include obstruction removal on Runway $510,000
2023/24 Harbor Airport
4 and Runway 22 ends.
Removal Of Obstructions
Aviation
018710.11 Safety and infrastructure improvements that
Airport Buildings Hancock County - Bar
Trenton may include easement/land acquisition for
2023/24 Harbor Airport $62,000
Sale Or Purchase Of Lot Or Runways 4 and 22 - phase 1.
Building
70
ID/Year Municipality Scope Name Description Total Project Cost
Airport
018710.15 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Airport - General may include acquisition of snow removal
2022 Harbor Airport $1,030,000
equipment.
Capital Equipment Purchase
Aviation
018710.20
Hancock County - Bar Safety and infrastructure improvements that
Trenton Runway/Taxiway
2023/24 Harbor Airport may include airfield pavement markings. $258,000
Crack Sealing
Aviation
018710.21 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Navigation Aids/Lights may include obstruction removal - design and
2023/24 Harbor Airport $155,000
permitting to include eagle monitoring.
Removal Of Obstructions
Aviation
018710.22
Hancock County-Bar
Trenton Runway/Taxiway Replace/slip line culvert under Runway 4-22. $310,000
2022 Harbor Airport
Drainage Improvements
Airport
018710.23
Hancock County-Bar Safety and infrastructure improvements that
Trenton Airport - General $42,000
2023/24 Harbor Airport include no-foam fire fighting equipment.
Capital Equipment Purchase
Aviation
018710.25 Safety and infrastructure improvements that
Hancock County - Bar
Trenton Airport - General include reconstructing part of Caruso Drive
2023/24 Harbor Airport $850,000
and parking lot.
Reconstruction
71
ID/Year Municipality Scope Name Description Total Project Cost
025879.00
Highway Paving
Beginning at the Ellsworth town line and
2023 Trenton Route 230
extending south 9.33 miles to Route 198.
Light Capital Paving
HCP 4
72
Kennebec
Clinton
Unity
Twp
Benton
Rome
Kennebec
Oakland
Vienna
Waterville
Winslow
Albion
Belgrade
Mount
Vernon
Fayette
Sidney
Vassalboro
China
Readfield
Wayne
Augusta
Winthrop Manchester
Windsor
Hallowell
Farmingdale Chelsea
Monmouth
West
Randolph Kennebec County
Gardiner Population 122,083
Land Area (sq mi) 868
Gardiner Bridges
Pittston 258
Litchfield Highway Corridor Priority Miles
HCP 1 140
HCP 2 148
HCP 3 102
HCP 4 326
025299.00
Puddle Duck Bridge (#3107) over 15 Mile
Highway-Bridges
2023/24 Albion South Freedom Road Stream. Located 0.11 of a mile north of $2,720,000
Bridge Replacement Knights Road.
HCP 4
025943.00
Highway Paving Beginning 0.10 of a mile east of North
2022 Albion, Freedom Route 137 Palermo Road and extending west to Route
Light Capital Paving 202.
HCP 4
Aviation
020655.07
Design, permit, construct the remainder of
Augusta Apron Augusta State Airport
2022 the commercial apron. $1,340,000
Reconstruction
Aviation
020655.08
Design and permitting for General Aviation
Augusta Apron Augusta State Airport $283,000
2023/24 reconstruction and access security gates.
Reconstruction
Aviation
020655.09 Safety and infrastructure improvements that
Augusta Apron Augusta State Airport include General Aviation reconstruction and
2023/24 $4,840,000
access security gates.
Reconstruction
021672.00
Western Avenue/ I-95 Bridge (#5808) over
Highway-Bridges
2023/24 Augusta Route 202 Interstate 95. Located 0.27 of a mile south of $8,500,000
Bridge Replacement Old Winthrop Road.
HCP 1
Administration
022717.22
Airport - General Funding for Operations at the State-owned
Augusta Augusta State Airport
2022 Augusta State Airport (AUG). $550,000
General Program
Administration
Administration
022717.23
Airport - General Funding for Operations at the State-owned
Augusta Augusta State Airport
2023 Augusta State Airport (AUG). $550,000
General Program
Administration
Administration
022717.24
Airport - General Funding for Operations at the State-owned
Augusta Augusta State Airport
2024 Augusta State Airport (AUG). $550,000
General Program
Administration
73
ID/Year Municipality Scope Name Description Total Project Cost
023126.00
Spaulding Brook Bridge (#2790) over
Highway-Minor Spans
2023/24 Augusta Route 17 Spaulding Brook. Located 0.41 of a mile $1,000,000
Bridge Replacement southeast of Cony Road.
HCP 2
025467.00
Old Belgrade Road/I-95 Bridge (#5806) over
Highway-Bridges
2022 Augusta Old Belgrade Road Interstate 95. Located 0.40 of a mile north of $250,000
Bridge Improvements - PE Only Eight Rod Road.
HCP 1
Highway Paving
025767.00
Rural Highways Beginning at the Chelsea town line and
2022 Augusta Route 9
extending north 0.80 of a mile.
Ultra-Thin Bonded Wearing
HCP 2
Course
74
ID/Year Municipality Scope Name Description Total Project Cost
026336.00 Bicycle/Pedestrian
Route 11/Route Pedestrian safety improvements at the
2022 Augusta On-Road Sidewalk/Trail $55,000
201/Route 202 Memorial traffic circle.
HCP 2 Safety Improvements - PE Only
026444.00
Thorne Brook Bridge (#2850) over Thorne
Highway-Minor Spans
2023/24 Augusta Route 17 Brook. Located 0.28 of a mile southeast of $1,000,000
Bridge Replacement Cony Road.
HCP 2
Highway
022392.00
Construction/Rehabilitation Beginning 0.16 of a mile east of the
Augusta,
2023/24 Route 202 intersection of Granite Hill Road and $4,600,000
Manchester Rural Highways
extending east 1.67 miles.
HCP 2
Highway Rehabilitation
75
ID/Year Municipality Scope Name Description Total Project Cost
025863.00
Highway Paving Beginning 0.44 of a mile south of the Sidney
Augusta,
2023 Middle Road town line and extending north 10.19 miles to
Oakland, Sidney
Light Capital Paving Trafton Road.
HCP 4
023186.00
Interstate 95 NB/ River Road Bridge (#5993)
Highway-Bridges
2023/24 Benton Interstate 95 Northbound over River Road. Located 0.75 of a mile east $350,000
Bridge Painting of Interstate 95 northbound Exit 133.
HCP 1
023220.00
I-95 SB/ River Road Bridge (#1455) over
Highway-Bridges
2023/24 Benton Interstate 95 Southbound River Road. Located 0.53 of a mile east of $350,000
Bridge Painting the Fairfield town line.
HCP 1
023611.00
I-95 SB/ River Road Bridge (#1455) over
Highway-Bridges
2022 Benton Interstate 95 River Road. Located 0.53 of a mile east of $608,000
Bridge Strengthening the Fairfield town line.
HCP 1
Highway Paving
025717.00
Beginning 0.06 of a mile south of
Rural Highways
2022 Benton Route 139 Sebasticook Bridge Road and extending west
Highway Cyclical Pavement 1.89 miles.
HCP 3
Resurfacing
Benton,
Burnham, Highway Paving
025519.00
Clinton,
Interstate Beginning 1.47 miles north of the Sidney
2022 Fairfield, Interstate 95 Northbound
town line and extending north 18.14 miles.
Oakland, Ultra-Thin Bonded Wearing
HCP 1 Pittsfield, Course
Waterville
76
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
026460.00
Benton,
Interstate Beginning 0.13 of a mile north of the Newport
2023/24 Burnham, Interstate 95 Southbound
town line and extending south 16.80 miles.
Clinton, Pittsfield Ultra-Thin Bonded Wearing
HCP 1
Course
Highway
025423.00
Construction/Rehabilitation Beginning at Smiley Avenue and extending
2022 Benton, Winslow Route 100A northeast 3.45 miles. Continuing on Route
Rural Highways $425,000
100 for 0.06 of a mile.
HCP 4
PMRAP DOT Pugmill
Highway
025423.10
Construction/Rehabilitation Beginning at Smiley Avenue and extending
2022 Benton, Winslow Route 100A northeast 3.45 miles. Continuing on Route
Rural Highways $634,000
100 for 0.06 of a mile.
HCP 4
PMRAP Laydown/Surface HMA
025943.00
Highway Paving
Burnham, Beginning at Baker Street and extending
2022 Route 11
Clinton north 6.48 miles to the Pittsfield town line.
Light Capital Paving
HCP 4
Highway
021842.00 Construction/Rehabilitation Beginning 1.39 miles north of Village Street
China, and extending north 5.65 miles. Beginning
2022 Vassalboro, Rural Highways Route 32 0.21 of a mile north of Preble Hill and $300,000
Winslow extending north 2.40 miles to Timber Oaks
HCP 4 Highway Rehabilitation - PE Drive.
Only
77
ID/Year Municipality Scope Name Description Total Project Cost
022232.00
Manley Holt Bridge (#2508) over
Highway-Bridges
2023/24 Clinton River Road Carrabassett Stream. Located 0.22 of a mile $3,140,000
Bridge Replacement north of Pishon Ferry Road.
HCP 5
Highway Paving
025721.00
Rural Highways Beginning at Route 11 and extending west
2022 Clinton Hinckley Road
1.28 miles.
Highway Cyclical Pavement
HCP 3, 4
Resurfacing
WR 38818
Drainage Maintenance Replacing culverts (#778164, #778173) on
2022 Clinton River Road
River Road in Clinton. $110,000
HCP 4
WR 43559
Bridge and Structural Replacing bridge rail on I95 SB Bridge
2022 Clinton Maintenance Interstate 95 (#1454) in Clinton which carries Interstate 95 $80,000
over Hinckley Road.
HCP 1
Bicycle/Pedestrian
013344.10
Bicycle-pedestrian trail along the rail line from
Gardiner Off-Road Trail/Path Cobbossee Stream Trail $740,000
2023/24 Water Street to Winter Street.
New Construction
013344.20 Bicycle/Pedestrian
Bicycle-pedestrian trail along Arcade street.
2022 Gardiner On-Road Sidewalk/Trail Cobbossee Stream Trail Beginning at Bridge Street and extending $170,000
southwest 0.06 of a mile to Water Street.
HCP 5 New Construction
025333.00 Bicycle/Pedestrian
Beginning at Route 201 and extending
2022 Gardiner On-Road Sidewalk/Trail Main Street
southeast 0.15 of a mile. $75,000
HCP 4 New Construction - PE Only
78
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025837.00
Gardiner, Rural Highways Beginning at Route 197 and extending
2023/24 Route 201
Richmond northeast 6.06 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
025463.00
Vaughan Memorial Bridge (#0490) over
Highway-Bridges
2023/24 Hallowell Litchfield Road Vaughan Stream. Located 0.41 of a mile $500,000
Bridge Improvements northeast of Smith Road.
HCP 4
025615.00 Bicycle/Pedestrian
Safe Routes to School (SRTS) pedestrian
2023/24 Hallowell On-Road Sidewalk/Trail Winthrop Street safety improvements. Beginning at Coos $60,000
Lane and extending south 0.03 of a mile.
HCP 4 New Construction
026324.00 Bicycle/Pedestrian
Beginning at North Street and extending
2022 Hallowell On-Road Sidewalk/Trail Second Street $100,000
north 0.29 of a mile to Augusta town line.
HCP 4 Safety Improvements - PE Only
026406.00 Bicycle/Pedestrian
Winthrop Street/Middle Located at the intersection of Winthrop Street
2022 Hallowell On-Road Sidewalk/Trail $75,000
Street and Middle Street.
HCP 4, 5 Safety Improvements - PE Only
023655.00
Thorofare Bridge (#3925) over Pleasant
Litchfield, Highway-Bridges
2022 Thorofare Road Pond. Located on the Litchfield-Richmond
Richmond $885,000
Bridge Deck Replacement town line.
HCP 4
79
ID/Year Municipality Scope Name Description Total Project Cost
026156.00
Bailey Flat Bridge (#3671) over Mud Mills
Highway-Minor Spans
2023/24 Monmouth Cobbossee Road Stream. Located 0.73 of a mile north of $1,000,000
Bridge Replacement Gilman Road.
HCP 4
026234.00
Highway-Bridges Waggon Bridge (#0487) over Wilson Street.
2023/24 Monmouth Waggon Road
Located 0.82 of a mile north of Blake Road. $1,500,000
Bridge Replacement
HCP 5
025107.00
Narrows West Bridge (#5912) over Long
Mount Vernon, Highway-Bridges
2023/24 Castle Island Road Pond. Located 0.01 of a mile west of the
Rome $2,000,000
Bridge Replacement Belgrade town line.
HCP 4
80
ID/Year Municipality Scope Name Description Total Project Cost
025863.00
Highway Paving
Oakland, Beginning at Snow Pond Road and extending
2023 Webb Road
Waterville east 2.08 miles to Mitchell Road.
Light Capital Paving
HCP 4
026162.00
Nehumkeag Bridge (#5283) over Nehumkeag
Highway-Minor Spans
2023/24 Pittston Route 27 Brook. Located 0.10 of a mile north of Forest $1,200,000
Bridge Replacement Lane.
HCP 2
Highway
025269.00
Construction/Rehabilitation
Located at the intersection of Route 27 and
2023/24 Randolph Route 27
Urban Highways Route 226. $550,000
HCP 2, 3
Intersection Reconstruction
Bicycle/Pedestrian
025113.00
Beginning at Main Street and extending north
On-Road Sidewalk/Trail
2022 Readfield Church Road 0.33 of a mile to connect to the town's $85,000
Multimodal Improvements - PE recreational complex.
HCP 5
Only
025469.00
Drummond Road/I-95 Bridge (#5784) over
Highway-Bridges
2022 Sidney Drummond Road Interstate 95. Located 0.87 of a mile west of $250,000
Bridge Improvements - PE Only Route 104.
HCP 1
025473.00
Dinsmore Road/I-95 Bridge (#5782) over
Highway-Bridges
2022 Sidney Dinsmore Road Interstate 95. Located 1.12 miles east of $250,000
Bridge Improvements - PE Only Route 104.
HCP 1
WR 43236
Drainage Maintenance Replacing culverts (#50556, #50569, #50573,
2022 Sidney Middle Road
#50577, #133633) on Middle Road in Sidney. $240,000
HCP 4
Highway
018803.00 Beginning 1.14 miles north of Gray Road and
Construction/Rehabilitation
extending north 0.73 of a mile. Project
2023/24 Vassalboro Route 32
Rural Highways funding is contingent on Congressionally $1,390,000
HCP 4 Designated Spending approval.
Highway Rehabilitation
81
ID/Year Municipality Scope Name Description Total Project Cost
026442.00
Meadow Brook Bridge (#5856) over Meadow
Highway-Minor Spans
2023/24 Vassalboro Bog Road Brook. Located 0.46 of a mile west of $1,500,000
Bridge Replacement Bradley Lane.
HCP 4
Aviation
018707.07 Safety and infrastructure improvements that
Waterville, Robert
Waterville Runway/Taxiway include crack seal, crack repair, and
2023/24 LaFleur Airport $172,000
pavement marking.
Crack Sealing
023138.00
Ticonic Bridge (#2854) over Kennebec River.
Highway-Bridges
2022 Waterville Route 201 Located on the Waterville-Winslow town line. $46,700,000
Bridge Replacement FHWA BUILD Grant recipient.
HCP 2
82
ID/Year Municipality Scope Name Description Total Project Cost
023208.00
I-95 SB/Messalonskee Bridge (#1458) over
Highway-Bridges
2022 Waterville Interstate 95 Southbound Messalonskee Stream. Located 1.54 miles $1,800,000
Bridge Painting southwest of the Fairfield town line.
HCP 1
023210.00
Specialist Wade A Slack Memorial Bridge
Highway-Bridges
2022 Waterville Interstate 95 Southbound (#1457) over Route 104. Located 0.92 of a $300,000
Bridge Painting mile southwest of the Fairfield town line.
HCP 1
023505.00
Armstrong Road/ I-95 Bridge (#5815) over
Highway-Bridges
2022 Waterville Armstrong Road Interstate 95. Located 0.05 of a mile east of $10,100,000
Bridge Replacement Marston Road.
HCP 1
Highway Paving
025723.00
Rural Highways Beginning 0.02 of a mile north of Webb Road
2022 Waterville Route 104
and extending north 1.68 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
025943.00
Highway Paving
Beginning at Kennedy Memorial Drive and
2022 Waterville Route 11
extending east 1.32 miles to Route 201.
Light Capital Paving
HCP 2
025943.00
Highway Paving
Beginning at Spring Street and extending
2022 Waterville Route 137B
west 0.28 of a mile to Route 104.
Light Capital Paving
HCP 2
Rail
026017.00 Consolidated Rail Infrastructure and Safety
Waterville Line/Track Pan Am Rail Improvements (CRISI) on Pan Am Railways
2022 $42,000,000
Pine Tree Corridor.
Rehabilitation
83
ID/Year Municipality Scope Name Description Total Project Cost
026152.00
Trafton Road/ I-95 Bridge (#5812) over
Highway-Bridges
2022 Waterville Trafton Road Interstate I-95. Located 0.17 of a mile west of $200,000
Bridge Improvements - PE Only Eight Rod Road.
HCP 1
022268.00
Fish Bridge (#0509) over Winslow Stream.
Highway-Bridges
2023/24 Winslow Garland Road Located 0.10 of a mile southwest of the $1,960,000
Bridge Replacement Benton town line.
HCP 4
84
Knox
Knox County
Population 39,771
Land Area (sq mi) 365
Bridges 91
Highway Corridor Priority Miles
HCP 1 24
HCP 2 36
Appleton
HCP 3 13
Washington HCP 4 153
Hope
Camden
Total HCP 1-4 226
Union
Rockport
Knox
Rockland
Thomaston
Criehaven Twp
Knox
ID/Year Municipality Scope Name Description Total Project Cost
025939.00
Highway Paving
Appleton, Beginning at Route 131 and extending
2022 Route 105
Camden, Hope southeast 11.30 miles to Route 1.
Light Capital Paving
HCP 4
023142.00
Main Street Bridge (#2497) over Megunticook
Highway-Bridges
2023/24 Camden Route 1 River. Located 0.03 of a mile south of Alantic $2,630,000
Bridge Improvements Avenue.
HCP 1
Ports-Harbors
024439.00
Marina Expansion Project. Located at 59 Sea
Camden Piers, Floats and Fenders Sea Street $3,500,000
2023/24 Street.
New Construction
85
ID/Year Municipality Scope Name Description Total Project Cost
025095.00
Rawson Avenue Bridge (#3173) over
Highway-Bridges
2022 Camden Rawson Avenue Megunticook River. Located 0.05 of a mile $500,000
Bridge Removal southwest of Washington Street.
HCP 5
025613.00 Bicycle/Pedestrian
Improvements to multiple pedestrian
2023/24 Camden On-Road Sidewalk/Trail Route 1 crossings on Route 1. Beginning at Free $275,000
Street and extending south.
HCP 1, 4 Safety Improvements
024967.00
Highway Paving
Beginning at Hatchet Mountain Road and
2022 Camden, Hope Barnes Town Road
extending southeast 7.02 miles to Route 1.
Light Capital Paving
HCP 4
024967.00
Highway Paving
Camden, Beginning at Route 1 and extending north
2022 Pascal Avenue
Rockport 2.21 miles to Route 1.
Light Capital Paving
HCP 4
WR 38821
Drainage Maintenance Replacing culverts (#95702, #95706),
2022 Cushing River Road $175,000
#95714) on River Road in Cushing.
HCP 4
026572.00
Transfer Bridges North Haven Ferry North Haven Ferry Transfer Bridge (#6344)
North Haven
2023/24 Facility located 0.06 of a mile south of Main Street. $300,000
Bridge Improvements
Aviation
018713.02
Knox County Regional Safety and infrastructure improvements that
Owls Head Runway/Taxiway
2022 Airport may include hangar taxiway - Phase 2. $1,850,000
Rehabilitation
86
ID/Year Municipality Scope Name Description Total Project Cost
Aviation
018713.06
Knox County Regional Safety and infrastructure improvements that
Owls Head Runway/Taxiway
2023/24 Airport may include hangar taxiway. $1,140,000
Reconstruction
Aviation
018713.08 Safety and infrastructure improvements that
Knox County Regional
Owls Head Runway/Taxiway may include miscellaneous pavement
2023/24 Airport $1,140,000
projects.
Resurfacing
Airport
018713.11 Safety and infrastructure improvements that
Knox County Regional
Owls Head Airport - General may include acquisition of snow removal
2022 Airport $927,000
equipment.
Capital Equipment Purchase
024967.00
Highway Paving
Beginning at Dublin Road and extending
2022 Owls Head Ash Point Drive
north 1.67 miles to North Shore Drive.
Light Capital Paving
HCP 4
024967.00
Highway Paving
Beginning at Ash Point Drive and extending
2022 Owls Head North Shore Road
west 0.18 of a mile to Route 73.
Light Capital Paving
HCP 4
024967.00
Highway Paving
North and South Shore Beginning at Ash Point Drive and extending
2022 Owls Head
Road northeast 4.91 miles.
Light Capital Paving
HCP 4
024967.00
Owls Head, Highway Paving
Beginning at Route 73 and extending east
2022 South Dublin Road
2.15 miles to Ash Point Drive.
Thomaston Light Capital Paving
HCP 4
Ports-Harbors
023000.00
Located at the intersection of Weeks Street
Rockland Piers, Floats and Fenders Fish Pier
2022 and Commercial Street. $500,000
New Construction
87
ID/Year Municipality Scope Name Description Total Project Cost
Ports-Harbors
023282.00
Yachting Solutions Boat Facility upgrades. Located at Yachting
Rockland Piers, Floats and Fenders
2022 Basin Solutions Boat Basin. $1,780,000
New Construction
026314.00 Bicycle/Pedestrian
Pedestrian safety improvements at the
Maverick Street/Route
2022 Rockland On-Road Sidewalk/Trail intersections of Route 1, Route 1A, and
1/Route 1A $90,000
Maverick Street.
HCP 1, 2, 5 Safety Improvements - PE Only
025447.00
Highway-Bridges Rockport Bridge (#2724) over Goose River.
2022 Rockport Pascal Avenue $300,000
Located 0.03 of a mile north of High Street.
Bridge Improvements - PE Only
HCP 4
024967.00
Highway Paving
Beginning 0.03 of a mile south of Factory
2022 Saint George Route 131
Road and extending north 4.28 miles.
Light Capital Paving
HCP 4
88
ID/Year Municipality Scope Name Description Total Project Cost
Highway
023759.00
Saint George, Construction/Rehabilitation
Beginning 0.03 of a mile south of Island Road
2023/24 South Route 73
Rural Highways and extending west 3.43 miles. $1,330,000
Thomaston
HCP 4
PMRAP DOT Pugmill
Bicycle/Pedestrian
026290.00 Multiuse pathway across Mill River to
Mill River Multiuse
Thomaston On-Road Sidewalk/Trail connect existing walking and biking trails to
2022 Pathway $90,000
the east-bank residential district.
New Construction - PE Only
023619.00
Highway-Bridges James Andrew Griffith Bridge (#2786) over
Thomaston,
2022 Route 1 St. George River. Located on the Warren -
Warren $300,000
Bridge Substructure Thomaston town line.
HCP 1 Rehabilitation
025861.00
Union, Highway Paving
Beginning at Route 1 and extending north
2023 Waldoboro, Route 235
9.38 miles to Route 17.
Warren Light Capital Paving
HCP 4
023230.00
Fuller Bridge (#3784) over Fuller Brook.
Highway-Bridges
2023/24 Warren Western Road Located 0.25 of a mile north of the North $2,000,000
Bridge Replacement Pond Road.
HCP 5
89
ID/Year Municipality Scope Name Description Total Project Cost
023649.00
Highway-Bridges St. George River Bridge (#5654) over St.
2022 Warren Route 90 George River. Located 0.04 of a mile $391,000
Bridge Substructure southwest of Company Lane.
HCP 2 Rehabilitation
026154.00
St. George River Bridge (#5654) over St.
Highway-Bridges
2023/24 Warren Route 90 George River. Located 0.32 of a mile $3,300,000
Bridge Deck Replacement southwest of Route 131.
HCP 2
026168.00
Highway-Bridges Farrar Bridge (#3929) over Jackson Stream.
2023/24 Washington Route 105 $1,000,000
Located 0.51 of a mile west of Vanner Road.
Bridge Replacement
HCP 4
90
Lincoln
Lincoln County
Population 34,342
Land Area (sq mi) 456 Somerville
Bridges 105
Highway Corridor Priority Miles
HCP 1 27
HCP 2 34
HCP 3 26
HCP 4 240
Whitefield
Jefferson
Total HCP 1-4 327
Waldoboro
Nobleboro
Dresden
Alna
Newcastle
Damariscotta
Wiscasset
Bremen
Edgecomb
Lincoln
South
Bristol Bristol
Westport Boothbay
Island
Boothbay
Harbor
Southport
Lincoln
ID/Year Municipality Scope Name Description Total Project Cost
025861.00
Highway Paving
Beginning at Route 27 and extending
2023 Alna, Newcastle Sheepscot Road
northwest 4.04 miles to Route 218.
Light Capital Paving
HCP 4
024965.00
Highway Paving
Barters Island Beginning at Kimbleton Town Road and
2022 Boothbay
Road/Corey Lane extending east 2.61 miles to Route 27.
Light Capital Paving
HCP 4
024965.00
Highway Paving
Beginning at the Boothbay Harbor town line
2022 Boothbay Route 96
and extending south 4.40 miles.
Light Capital Paving
HCP 4
WR 38817
Drainage Maintenance Replacing culverts (#123931, #123930) on
2022 Boothbay River Road $300,000
River Road in Boothbay.
HCP 4
Ports-Harbors
023807.00
The Footbridge and Located at the intersection of Boothbay
Boothbay Harbor Piers, Floats and Fenders $563,000
2023/24 Town Landing House Hill and Commercial Street.
Rehabilitation
Ports-Harbors
024619.00
Station improvements. Located off Atlantic
Boothbay Harbor Piers, Floats and Fenders Fishermen's Co-op $521,000
2023/24 Avenue.
Rehabilitation
024965.00
Highway Paving Beginning at the north intersection of Route
2022 Boothbay Harbor Route 27S 27 and extending south 0.44 of a mile to the
Light Capital Paving south intersection of Route 27.
HCP 2
025861.00
Highway Paving
Beginning at Sunset Road and extending
2023 Boothbay Harbor Atlantic Avenue
north 1.10 miles to Oak Street.
Light Capital Paving
HCP 4
021751.01
Boothbay Southport Bridge (#2789) over Townsend
Highway-Bridges
2022 Harbor, Route 27 Gut. Located at Boothbay Harbor - Southport $13,000,000
Southport Bridge Rehabilitation town line. FHWA BUILD Grant recipient.
HCP 4
91
ID/Year Municipality Scope Name Description Total Project Cost
024965.00
Boothbay Highway Paving
Beginning at Town Landing Road and
2022 Harbor, Route 27
extending north 7.62 miles to Route 96.
Southport Light Capital Paving
HCP 2, 4
024965.00
Highway Paving Beginning 0.04 of a mile east of Rock Road
Boothbay, Lake Side/Mckown Point
2022 and extending west 3.19 miles to Barters
Boothbay Harbor Road
Light Capital Paving Island Road.
HCP 4
024965.00
Boothbay, Highway Paving
Beginning at Route 27 and extending north
2022 Edgecomb, River Road
9.39 miles.
Newcastle Light Capital Paving
HCP 4
024965.00
Highway Paving
Beginning at Biscay Road and extending east
2022 Bremen Turner Road
3.03 miles to Route 32.
Light Capital Paving
HCP 4
024965.00
Highway Paving
Bremen, Beginning at Route 32 and extending
2022 Biscay Road
Damariscotta northwest 5.10 miles to Route 1B.
Light Capital Paving
HCP 4
024965.00
Highway Paving
Beginning at Route 129 and extending north
2022 Damariscotta School Street
0.86 of a mile to Route 1B.
Light Capital Paving
HCP 4
025337.00 Bicycle/Pedestrian
Beginning 0.01 of a mile south of Church
2022 Damariscotta On-Road Sidewalk/Trail Main Street
Street and extending north 0.36 of a mile. $60,000
HCP 2 New Construction - PE Only
92
ID/Year Municipality Scope Name Description Total Project Cost
025289.00
Damariscotta, Highway-Bridges Various bridge joint improvements on bridges
2022 Route 1
Newcastle (#5887, #5888, #5889, and #5890). $700,000
Bridge Joint Replacement
HCP 1
023132.00
Highway-Bridges Middle Bridge (#3341) over Eastern River.
2023/24 Dresden Route 197
Located 0.28 of a mile west of Route 127. $6,070,000
Bridge Replacement
HCP 4
024965.00
Highway Paving
Beginning at Route 27 and extending north
2022 Edgecomb Eddy Road
1.55 miles to Route 1.
Light Capital Paving
HCP 4
024965.00
Highway Paving
Beginning at Route 27 and extending east
2022 Edgecomb McKay Road
1.66 miles to River Road.
Light Capital Paving
HCP 4
WR 40871
Drainage Maintenance Replacing culvert (#123913) on River Road.
2022 Edgecomb River Road Located 220 feet south of the Khole Road in $52,000
Edgecomb.
HCP 4
023092.00
Highway-Minor Spans Davis No.1 Bridge (#2218) over Brann Brook.
2022 Jefferson Route 17
Located 0.51 of a mile east of Route 32. $1,770,000
Bridge Replacement
HCP 2
93
ID/Year Municipality Scope Name Description Total Project Cost
Highway
024197.00
Construction/Rehabilitation
Beginning at Gardiner Road and extending
2023/24 Jefferson Route 126
Rural Highways northeast 0.45 of a mile. $164,000
HCP 4
PMRAP DOT Pugmill
024965.00
Highway Paving
Jefferson, Beginning at Jones Woods Road and
2022 Route 213
Newcastle extending north 9.26 miles.
Light Capital Paving
HCP 4
025861.00
Jefferson, Highway Paving
Beginning at Route 1B and extending north
2023 Newcastle, Route 215
17.23 miles to Route 32.
Nobleboro Light Capital Paving
HCP 2, 4
025449.00
Meadow Brook Bridge (#2535) over Deer
Highway-Minor Spans
2023/24 Newcastle Route 215 Meadow Brook. Located 4.09 miles west of $1,500,000
Bridge Replacement Bunker Hill Road.
HCP 4
025861.00
Highway Paving Beginning at the north intersection of Route
2023 Newcastle Route 215S 215 and extending south 0.27 of a mile to the
Light Capital Paving south intersection of Route 215.
HCP 4
Highway
025361.00
Construction/Rehabilitation
Beginning 0.43 of a mile south of S Shore
2023/24 Nobleboro East Pond Road
Minor Collectors Road and extending south 0.16 of a mile. $635,000
HCP 4
Highway Rehabilitation
94
ID/Year Municipality Scope Name Description Total Project Cost
024965.00
Highway Paving
Beginning at Route 27 and extending south
2022 Southport Route 238
3.73 miles to Town Landing Road.
Light Capital Paving
HCP 4
WR 35028
Drainage Maintenance Replacing culvert (#92889) on Route 32.
2022 Waldoboro Route 32, Bremen Road Located 370 feet southwest of Noahs Way in $75,000
Waldoboro.
HCP 4
025861.00
Highway Paving
Westport Island, Beginning at Route 27 and extending south
2023 Route 144
Wiscasset 8.32 miles to West Shore Road.
Light Capital Paving
HCP 4
026158.00
Jewett Bridge (#5460) over Albee Stream.
Highway-Minor Spans
2023/24 Whitefield Route 194 Located 0.24 of a mile west of Townhouse $1,000,000
Bridge Replacement Road.
HCP 4
95
ID/Year Municipality Scope Name Description Total Project Cost
025861.00
Highway Paving
Beginning at Westport Bridge Road and
2023 Wiscasset Birchpoint Road
extending north 1.90 miles to Bath Road.
Light Capital Paving
HCP 4
025305.00
Highway-Bridges New Bridge (#0627) over Monstweag Brook.
Wiscasset,
2023/24 Old Stage Road Located on the Wiscasset-Woolwich town
Woolwich $500,000
Bridge Superstructure line.
HCP 5 Replacement
96
Oxford
Bo wma ntow n
Tw p
Upp er
Lyn ch to wn Cup suptic
Tw p Tw p
Low er
Pa rkerto wn Cup suptic
Oxford County
Tw p Tw p Population 57,618
Land Area (sq mi) 2,077
Adam stown
Lincoln
Plt
Tw p Bridges 375
Highway Corridor Priority Miles
HCP 1 93
R ichar dson to w n
Tw p HCP 2 35
Maga llow ay
Plt HCP 3 47
To wn sh ip C HCP 4 371
Upto n C Byro n
Surplus An dov er Total HCP 1-4 546
Nor th S ur plus
Roxb ury
An do ve r W est
An do ve r
Gra fton
Su rp lu s Twp
Tw p
Mexico
Riley Hanover
Tw p Pe ru Can ton
M ilton
Tw p
Be th el
Gilea d
Woo dsto ck
Batchelders Su mne r Hartfo rd
Grant Twp
M ason Tw p West
Alb an y G re e n wo o d
Pa ris
Tw p
Ston eh am Bu ckfield
Norw ay Pa ris
Oxfo rd
Sw ed en
Otisfield
Fryebu rg
Den mark
Brow nfield
Oxford
Hira m
Po rter
Oxford
ID/Year Municipality Scope Name Description Total Project Cost
026122.00
Crooked River Bridge (#5079) over Crooked
Highway-Bridges
2023/24 Albany Twp Route 5 River. Located 0.08 of a mile northwest of $600,000
Bridge Deck Replacement Route 35.
HCP 4
018724.00
Evans Brook Bridge (#5506) over Evans
Batchelders Highway-Bridges
2022 Route 113 Brook. Located 1.44 miles south of the
Grant Twp $1,200,000
Bridge Deck Replacement Gilead town line.
HCP 4
Aviation
018686.02 Safety and infrastructure improvements that
Bethel Navigation Aids/Lights Bethel Regional Airport may include design and construction for
2022 $258,000
obstruction removal and fence relocation.
Removal Of Obstructions
Aviation
018686.08
Airport - General
Bethel Bethel Regional Airport Acquire easement for drainage purposes.
2023/24 $77,000
Sale Or Purchase Of Lot Or
Building
021667.00 Bicycle/Pedestrian
Beginning at existing sidewalk and extending
2022 Bethel On-Road Sidewalk/Trail Route 26
south 0.09 of a mile to Railroad Street. $565,000
HCP 1 New Construction
Rail
021667.10 Pedestrian at-grade crossing protection,
Bethel Rail/Highway Crossings Route 26 located at the intersection of Route 26 (Main
2022 $285,000
Street) and Railroad Street.
Rail Crossing Improvements
97
ID/Year Municipality Scope Name Description Total Project Cost
Bicycle/Pedestrian
024367.00
On-Road Sidewalk/Trail Beginning at Route 2 overpass and
2022 Bethel Route 2
extending north 0.30 of a mile. $70,000
Multimodal Improvements - PE
HCP 1
Only
Highway Paving
025845.00
Rural Highways Beginning at Route 2 and extending east
2023/24 Bethel Parkway
0.43 of a mile to Route 26.
Highway Cyclical Pavement
HCP 3
Resurfacing
024969.00
Highway Paving
Bethel, Hanover, Beginning at Route 35 and extending north
2022 Route 2
Newry 6.79 miles.
Light Capital Paving
HCP 1
025477.00
Charles E Hill Bridge (#3417) over the Saco
Highway-Bridges
2022 Brownfield Route 160 River. Located 0.08 of a mile north of $500,000
Bridge Improvements - PE Only Woodland Acres Drive.
HCP 4
025853.00
Highway Paving
Beginning at the New Hampshire state line
2023 Brownfield Center Conway Road
and extending east 5.04 miles to Route 160.
Light Capital Paving
HCP 4
025853.00
Highway Paving
Beginning at Route 160 and extending east
2023 Brownfield Pig Street
0.88 of a mile to Route 5.
Light Capital Paving
HCP 4
025853.00
Highway Paving
Brownfield, Beginning at Route 5 and extending east
2023 Route 160
Denmark 5.32 miles to Route 117.
Light Capital Paving
HCP 4
98
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025831.00
Brownfield, Rural Highways Beginning at Bullring Road and extending
2023/24 Route 5
Fryeburg, Hiram north 13.56 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
023533.00
Highway-Bridges River Bridge (#5450) over West Branch
2022 Buckfield Paris Hill Road Nezinscot River. Located 0.10 of a mile $374,000
Bridge Substructure southwest of North Buckfield Road.
HCP 5 Rehabilitation
Highway
023537.00
Construction/Rehabilitation Beginning 0.04 of a mile north of Byron
2022 Byron Route 17 Village Road and extending west 0.12 of a
Rural Highways $193,000
mile.
HCP 4
Reconstruction
026414.00
New Coos Bridge (#5847) over the Swift
Highway-Bridges
2023/24 Byron Route 17 River. Located 0.11 of a mile north of Byron $300,000
Bridge Painting Village Road.
HCP 4
024969.00
Highway Paving Beginning 0.13 of a mile north of Canton
2022 Canton Route 140 Point Road and extending south 0.76 of a
Light Capital Paving mile.
HCP 4
023166.00
Highway-Bridges Hiram Bridge (#5087) over Ossipee River.
2022 Cornish, Hiram Bridge Street $582,000
Located 0.16 of a mile north of Route 25.
Bridge Rehabilitation
HCP 5
025853.00
Highway Paving
Beginning at Route 5 and extending north
2023 Denmark, Hiram Route 117
7.19 miles to Route 160.
Light Capital Paving
HCP 4
99
ID/Year Municipality Scope Name Description Total Project Cost
WR 41281 Department Building and Lot Constructing a new salt shed at the Dixfield
Maintenance maintenance lot. Located on Route 2 in
Dixfield Route 2
2022 Dixfield 0.83 of a mile east of Whittemore $300,000
Drive.
Aviation
018693.03 Safety and infrastructure improvements that
Eastern Slope Regional
Fryeburg Runway/Taxiway may include crack seal and crack repair to
2022 Airport $155,000
include wildlife hazard site visit.
Crack Sealing
Highway
018820.00
Construction/Rehabilitation
Beginning 0.15 of a mile north of Melanie
2023/24 Fryeburg Route 5 $247,000
Rural Highways Lane and extending north 2.14 miles.
HCP 4
PMRAP DOT Pugmill
Highway
018820.10
Construction/Rehabilitation
Beginning 0.15 of a mile north of Melanie
2023/24 Fryeburg Route 5
Rural Highways Lane and extending north 2.14 miles. $609,000
HCP 4
PMRAP Laydown/Surface HMA
100
ID/Year Municipality Scope Name Description Total Project Cost
026416.00
Androscoggin River Bridge (#5084) over the
Highway-Bridges
2023/24 Gilead Bridge Street Androscoggin River. Located 0.32 of a mile $600,000
Bridge Painting north of Route 2.
HCP 5
WR 41704
Drainage Maintenance Replacing culvert (#162098) on Route 140 in
2022 Hartford Route 140 Hartford. Located 360 feet north of Currier $140,000
Drive.
HCP 4
025853.00
Highway Paving
Beginning at Route 117 and extending east
2023 Hiram Sebago Road
2.23 miles to the Baldwin town line.
Light Capital Paving
HCP 4
025853.00
Highway Paving
Beginning at Route 160 and extending east
2023 Hiram South Hiram Road
2.71 miles to the Cornish town line.
Light Capital Paving
HCP 4
101
ID/Year Municipality Scope Name Description Total Project Cost
WR 43185
Drainage Maintenance Ditching on Route 16 in Lincoln Plt.
2022 Lincoln Plt Route 16 Beginning at the junction of Cameron Road $16,000
and extending north 2.10 miles.
HCP 4
Highway
021798.00
Construction/Rehabilitation Beginning 0.38 of a mile north of Shave Hill
2023/24 Lovell Route 5 Road and extending north 1.23 miles to
Rural Highways $142,000
Perkins Road.
HCP 4
PMRAP DOT Pugmill
Highway
021798.10
Construction/Rehabilitation Beginning 0.38 of a mile north of Shave Hill
2023/24 Lovell Route 5 Road and extending north 1.23 miles to
Rural Highways $350,000
Perkins Road.
HCP 4
PMRAP Laydown/Surface HMA
Highway
021797.00
Construction/Rehabilitation Beginning at West Stoneham Road and
Lovell,
2023/24 Route 5 extending north 4.41 miles to the Albany
Stoneham Rural Highways $509,000
Twp. town line.
HCP 4
PMRAP DOT Pugmill
Highway
021797.10
Construction/Rehabilitation Beginning at West Stoneham Road and
Lovell,
2023/24 Route 5 extending north 4.41 miles to the Albany
Stoneham Rural Highways $1,250,000
Twp. town line.
HCP 4
PMRAP Laydown/Surface HMA
102
ID/Year Municipality Scope Name Description Total Project Cost
021700.01
Red Bridge (#2707) over Swift River. Located
Mexico, Highway-Bridges
2023/24 Route 2 at the Rumford-Mexico town line. FHWA
Rumford $8,850,000
Bridge Replacement INFRA Grant recipient.
HCP 1
WR 41235
Drainage Maintenance Ditching on Route 26 in Newry. Beginning at
2022 Newry Route 26 the junction of Route 2 and extending north $116,000
17.65 miles.
HCP 4
023116.00
Tannery Brook Bridge (#3610) over Tannery
Highway-Minor Spans
2023/24 Norway Route 117 Brook. Located 0.14 of a mile northwest of $2,400,000
Bridge Replacement Paris Street.
HCP 2
025991.00
Highway-Minor Spans College Swamp Bridge (#3475) located on
2023/24 Otisfield Bolsters Mills Road
Bolsters Mills Road over College Swamp. $1,500,000
Bridge Replacement
HCP 4
103
ID/Year Municipality Scope Name Description Total Project Cost
Aviation
018702.02 Safety and infrastructure improvements that
Oxford County Regional
Oxford Apron may include the design and reconstruction of
2023/24 Airport $1,200,000
the terminal apron.
Reconstruction
Aviation
018702.03
Oxford County Regional Safety and infrastructure improvements that
Oxford Airport Buildings
2023/24 Airport include taxiway hangar - Phase 1 $172,000
New Construction
025855.00
Highway Paving
Beginning at the Otisfield town line and
2023 Oxford Route 121
extending north 3.58 miles to Route 26.
Light Capital Paving
HCP 1, 4
025855.00
Highway Paving
Beginning at Route 121 and extending north
2023 Oxford Roller Rink Road
0.50 of a mile to Route 26.
Light Capital Paving
HCP 4
Highway Safety and Spot Beginning 0.29 of a mile south of Main Street
023745.00 and extending south 0.49 of a mile.
Improvements
Continuing 0.43 of a mile south of Mine
2022 Roxbury Route 120 $119,000
Rural Highways Notch Road and extending south 0.54 of a
HCP 4 mile. Continuing at Horseshoe Valley Road
Shoulder Improvements and extending east 1.80 miles.
104
ID/Year Municipality Scope Name Description Total Project Cost
022621.00
Highway-Bridges High Bridge (#5188) over Androscoggin
2023/24 Rumford South Rumford Road
River. Located 0.11 of a mile east of Route 2. $6,820,000
Bridge Replacement
HCP 4
023196.00
Chisholm Park Bridge (#2990) over
Highway-Bridges
2023/24 Rumford Portland Street Androscoggin River West Chanel. Located $2,500,000
Bridge Rehabilitation 0.04 of a mile east of River Road.
HCP 4
024775.00
Martins Bridge (#2514) over Ellis River.
Highway-Bridges
2023/24 Rumford Route 2 Located 0.05 of a mile north of Ellis River $5,500,000
Bridge Replacement Road.
HCP 1
025293.00
Highway-Bridges
Morse Bridge (#2585) over the Androscoggin
2023/24 Rumford Route 108 $350,000
Bridge Wearing Surface River. Located 0.04 of a mile east of Route 2.
HCP 2 Replacement
022360.00
Highway-Bridges West Sumner Meadow Bridge (#5843) over
2022 Sumner Main Street the West Branch Nezinscot River. Located $361,000
Bridge Substructure 0.25 of a mile northeast of Front Street.
HCP 3 Rehabilitation
105
ID/Year Municipality Scope Name Description Total Project Cost
WR 43857
Drainage Maintenance Replacing cross culvert instream work
2022 Sweden Knights Hill Road requiring permits on Knights Hill Road in $200,000
Sweden.
HCP 4
026188.00
Highway-Bridges Knightly Bridge (#3797) over Cooked River.
2023/24 Waterford Route 118 $1,200,000
Located 0.79 of a mile east of Route 37.
Bridge Deck Replacement
HCP 4
106
T8 R8
WELS
T8 R7 T8 R6
Penobscot
WELS WELS
T7 R8 T7 R7 T7 R6
Penobscot
WELS WELS WELS
T6 R8 T6 R7 T6 R6
WELS WELS WELS
Penobscot County T5 R7
T5 R8 Mount
Population 151,096 WELS WELS Chase
T1 R8
Total HCP 1-4 1,170 WELS
Grindstone T1 R6
Twp WELS
T3 Indian Millinocket
T4 Indian Purchase
Twp
Purchase Medway
Twp TA R7
Hopkins Academy
WELS Drew Plt
Grant Twp Kin gman
Long A Matta wamke ag
Twp
Twp
T2 R9 Woodville Prentiss
T3 R9 NW P Twp T7
Webster R3 NBPP
NW P
Plt
Winn
Chester Carroll
T2 R8
NW P Springfield Plt
Seboeis
Plt Lee
Lincoln
Mattam iscontis
Twp
Maxfield
Lakeville
T3 R1 Pu ka kon
Enfield
Twp
NBPP
Howland
Lowell Burlington
Edinburg
Lagrange Grand
Summit Falls
Twp Twp
Argyle
Bradford Twp
Garland Charleston Greenbush
Alton Greenfield
Dexter
Twp
Hudson
Corinth Milford
Corinna Exeter
Old Town
Kenduskeag
Glenburn
Orono Bradley
Stetson Levant
Newport
Bangor Eddington
Hermon Clifton
Carmel
Bre wer
Etna
Plymouth Holden
Ham pden
Newburgh
Dixmont Orrington
Penobscot
ID/Year Municipality Scope Name Description Total Project Cost
021687.00
Hemlock Stream Bridge (#3735) over
Highway-Bridges
2023/24 Argyle Twp Route 116 Hemlock Stream. Located 2.22 miles north of $2,970,000
Bridge Replacement Argyle Road.
HCP 4
Aviation
018709.03 Safety and infrastructure improvements that
Bangor International
Bangor Runway/Taxiway may include rehabilitation of Runway 15-33 -
2023/24 Airport $10,300,000
Phase 1.
Reconstruction
107
ID/Year Municipality Scope Name Description Total Project Cost
Aviation
018709.10 Safety and infrastructure improvements that
Bangor International
Bangor Runway/Taxiway may include rehabilitation of Runway 15-33 -
2023/24 Airport $18,600,000
Phase 2.
Rehabilitation
Aviation
018709.11 Safety and infrastructure improvements that
Bangor International
Bangor Runway/Taxiway may include design and permitting for the
2022 Airport $515,000
rehabilitation of Runway 15-33.
Rehabilitation
108
ID/Year Municipality Scope Name Description Total Project Cost
109
ID/Year Municipality Scope Name Description Total Project Cost
Bicycle/Pedestrian
024771.00 Enhancements to the Bangor Riverfront trail
Bangor Off-Road Trail/Path Riverfront Trail system to include lighting, restroom, and a
2023/24 $465,000
new trail spur.
New Construction
025063.00
I-395 / Main Street Bridge (#5799) over Main
Highway-Bridges
2023/24 Bangor Interstate 395 Street. Located 0.23 of a mile west of the $400,000
Bridge Joint Replacement Brewer town line.
HCP 1
110
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025775.00
Urban Highways Beginning 0.07 of a mile north of Husson
2022 Bangor Route 15
Avenue and extending north 2.72 miles.
Ultra-Thin Bonded Wearing
HCP 2
Course
026095.00
Highway-Bridges Kenduskeag Avenue/I-95 Bridge (#5798)
2023/24 Bangor Kenduskeag Avenue over Interstate 95 . Located 0.19 of a mile $400,000
Bridge Substructure north of Linden Street.
HCP 1 Rehabilitation
111
ID/Year Municipality Scope Name Description Total Project Cost
021713.00
Highway-Bridges
Bangor, Brewer Interstate 395 Interstate 395 Bridges Study.
2022 $250,000
Bridge Improvements - PE Only
Highway Paving
025481.00
Interstate Interstate 395 Beginning at Route 1A and extending west
2023/24 Bangor, Brewer
Westbound 4.93 miles.
Ultra-Thin Bonded Wearing
HCP 1
Course
Highway Paving
025483.00
Interstate Beginning at Odlin Road and extending east
2023/24 Bangor, Brewer Interstate 395 Eastbound
4.76 miles.
Ultra-Thin Bonded Wearing
HCP 1, 2
Course
112
ID/Year Municipality Scope Name Description Total Project Cost
026464.00 Bicycle/Pedestrian
Beginning 0.10 of a mile south of Boynton
2022 Bradley On-Road Sidewalk/Trail Route 178
Street and extending north 0.57 of a mile. $93,000
HCP 4 Rehabilitation - PE Only
2022 Brewer Rural Highways Route 15 Located 0.13 of a mile north of Abbott Street. $75,000
HCP 1 Slope Stabilization/Protection -
PE Only
Highway Safety and Spot
023112.00 Improvements Located at the intersection of State Street,
Penobscot Street and Penobscot Bridge; and
2022 Brewer Urban Highways Route 9
State Street and North Main Street. BACTS $189,000
HCP 1 Intersection Improvements W/ Sponsored.
Signal
026330.00 Bicycle/Pedestrian
Beginning 0.16 of a mile east of Liberty Drive
2023/24 Brewer On-Road Sidewalk/Trail Parkway South
and extending east 0.41 of a mile. $125,000
HCP 3 Safety Improvements
026332.00 Bicycle/Pedestrian
Beginning 0.02 of a mile south of Burr Street
2023/24 Brewer On-Road Sidewalk/Trail Route 15B
and extending north 0.09 of a mile. $145,000
HCP 1 Safety Improvements
113
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025823.00 Carmel, Etna,
Hermon, Rural Highways Beginning at the Palmyra town line and
2023/24 Route 2
Newport, extending east 22.58 miles.
Plymouth Highway Cyclical Pavement
HCP 3
Resurfacing
Highway Paving
025829.00
Beginning 0.93 of a mile west of the
Carroll Plt, Rural Highways
2023/24 Route 6 Springfield-Carroll Plt. town line and
Springfield
Highway Cyclical Pavement extending east 7.57 miles.
HCP 3
Resurfacing
024981.00
Highway Paving
Beginning at Route 116 and extending east
2022 Chester, Lincoln Chester/Bridge Road
1.00 mile to Route 2.
Light Capital Paving
HCP 4
024981.00
Highway Paving
Chester, Beginning 0.75 of a mile north of Chester
2022 Route 116
Woodville Road and extending north 5.06 miles.
Light Capital Paving
HCP 4
026476.00
Mulligan Stream Bridge (#6160) over
Highway-Minor Spans
2023/24 Corinna Nokomis Road Mulligan Stream. Located 0.66 of a mile $1,500,000
Bridge Replacement northeast of Williams Drive.
HCP 4
025945.00
Highway Paving
Corinna, Beginning at Route 7 and extending
2022 Route 11
Corinth, Exeter northeast 15.75 miles to Route 15.
Light Capital Paving
HCP 4
114
ID/Year Municipality Scope Name Description Total Project Cost
025455.00
Robyville Bridge (#1003) over Kenduskeag
Highway-Bridges
2023/24 Corinth Covered Bridge Road Stream. Located 0.28 of a mile north of the $150,000
Bridge Painting Kenduskeag town line.
HCP 5
Aviation
018690.05 Safety and infrastructure improvements that
Dexter Runway/Taxiway Dexter Regional Airport may include crack sealing and pavement
2022 $103,000
markings.
Crack Sealing
Aviation
018690.17 Safety and infrastructure improvements that
Dexter Airport Buildings Dexter Regional Airport may include construction of an arrivals
2023/24 $438,000
building.
New Construction
025945.00
Highway Paving
Beginning at Ripley town line and extending
2022 Dexter Cambridge Road
east 1.71 miles to Route 23.
Light Capital Paving
HCP 4
026097.00
Crocker Brook Bridge (#5424) over Crocker
Highway-Minor Spans
2023/24 Dixmont Route 202 Brook. Located 0.40 of a mile east of Troy $1,000,000
Bridge Replacement town line.
HCP 3
025875.00
Highway Paving
Beginning at Route 9 and extending east
2023 Dixmont, Etna Route 143
9.53 miles to Route 2.
Light Capital Paving
HCP 4
115
ID/Year Municipality Scope Name Description Total Project Cost
022304.00
Mattawamkeag River Bridge (#5105) over
Highway-Bridges
2022 Drew Plt Route 171 Mattawamkeag River. Located 0.14 of a mile $215,000
Bridge Improvements - PE Only north of Eight Road.
HCP 4
026294.00 Bicycle/Pedestrian
Route 6/Old County Beginning at Route 155 and extending north
2022 Enfield On-Road Sidewalk/Trail
Road 0.50 of a mile. $120,000
HCP 3, 5 New Construction - PE Only
Highway Paving
025731.00
Beginning 0.10 of a mile south of Mohawk
Rural Highways
2022 Enfield, Lincoln Route 2 Road and extending north 6.21 miles to River
Highway Cyclical Pavement Road.
HCP 3
Resurfacing
021727.01
Boom Bridge (#3587) over Beach Bridge
Highway-Bridges
2022 Greenbush Route 2 Brook. Located 2.43 miles north of Milford $5,150,000
Bridge Replacement town line. FHWA BUILD Grant recipient.
HCP 3
025877.00
Greenbush, Highway Paving
Beginning at Route 2 and extending east
2023 Greenfield Twp, Greenfield Road
8.74 miles to Crocker Turn Road.
Milford Light Capital Paving
HCP 4
Rail
024797.00
Railroad crossing (#051288Y) located 0.17 of
Hampden Rail/Highway Crossings Route 9 $375,000
2022 a mile north of the Winterport town line.
Rail Crossing Improvements
116
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
024171.00
Hampden, Interstate Interstate 95 Northbound Beginning at Exit 180 and extending south
2022
Hermon and Southbound 3.75 miles.
Ultra-Thin Bonded Wearing
HCP 1
Course
117
ID/Year Municipality Scope Name Description Total Project Cost
Highway
022581.10
Construction/Rehabilitation
Hampden, Beginning at Route 202 and extending south
2022 Route 69
Newburgh Rural Highways 3.87 miles. $1,510,000
HCP 4
PMRAP Laydown/Surface HMA
Bicycle/Pedestrian
026302.00 Pedestrian safety improvements including a
Hermon Off-Road Trail/Path Billing Road sidewalk on the west side of the road
2022 $85,000
extending to Schoolhouse Lane.
New Construction - PE Only
025087.00
I-95 SB/Piscataquis River Bridge (#6069)
Highway-Bridges
2022 Howland Interstate 95 Southbound over the Piscataquis River. Located 1.81 $1,200,000
Bridge Painting miles north of the Exit 217 off-ramp.
HCP 1
025535.00
Route 155/ I-95 Bridge (#6068) over
Highway-Bridges
2022 Howland Route 6 Interstate 95. Located 0.27 of a mile east of $700,000
Bridge Painting Maxfield Road.
HCP 1
025543.00
I-95 NB/ Piscataquis River Bridge (#1419)
Highway-Bridges
2022 Howland Interstate 95 Northbound over Piscataquis River. Located 0.48 of a $1,200,000
Bridge Painting mile north of River Road.
HCP 1
026087.00
Highway-Bridges I-95 SB Over Seboeis Road Bridge (#6070)
2023/24 Howland Interstate 95 Southbound over Seboeis Road. Located 19.69 miles $4,500,000
Bridge Superstructure north of Lagrange Road.
HCP 1 Replacement
118
ID/Year Municipality Scope Name Description Total Project Cost
025877.00
Howland, Highway Paving
Beginning at Route 6 and extending east
2023 Maxfield, Joe Raymond Road
15.67 miles to Route 155.
Medford, Milo Light Capital Paving
HCP 4
Highway Paving
024915.00
Beginning 0.84 of a mile north of the
Rural Highways
2022 Kenduskeag Route 15 Kenduskeag Stream Bridge and extending
Ultra-Thin Bonded Wearing northwest 2.30 miles to Southard Avenue.
HCP 2
Course
Highway
018786.00
Construction/Rehabilitation
Beginning 0.11 of a mile west of Medford
2023/24 Lagrange Route 6 $2,150,000
Rural Highways Road and extending south 0.93 of a mile.
HCP 2
Highway Rehabilitation
025877.00
Highway Paving
Lagrange, Milo, Beginning at Paddy Hill Road and extending
2023 Route 6
Orneville Twp southeast 5.96 miles to the Medford Road.
Light Capital Paving
HCP 2
025887.00
Highway Paving
Lakeville, Beginning at Route 6 and extending south
2023 Bottle Lake Road
Springfield 6.09 miles.
Light Capital Paving
HCP 4
Highway Paving
025827.00
Rural Highways Beginning at Lincoln town line and extending
2023/24 Lee Route 6
east 3.71 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
WR 43342
Drainage Maintenance Ditching on Route 168 at various locations.
2022 Lee Route 168 Beginning 200 feet east of the Hook Road $120,000
and extending east 9.00 miles.
HCP 4
119
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025733.00
Rural Highways Beginning 0.29 of a mile northeast of Kelley
2022 Lincoln Route 2
Avenue and extending east 0.68 of a mile.
Highway Cyclical Pavement
HCP 3
Resurfacing
Highway Paving
025735.00
Rural Highways Beginning at Lee Road and extending north
2022 Lincoln Route 2
6.21 miles to the Winn town line.
Highway Cyclical Pavement
HCP 3
Resurfacing
Highway Paving
025737.00
Rural Highways Beginning at Main Street and extending east
2022 Lincoln Route 6
7.95 miles to the Lee town line.
Highway Cyclical Pavement
HCP 3
Resurfacing
Bus
025331.00
Medway Parking Lots Park and Ride Lot Located 0.36 of a mile south of Village Lane.
2022 $60,000
Reconstruction
120
ID/Year Municipality Scope Name Description Total Project Cost
WR 42775
Drainage Maintenance Replacing culvert (#107754) located 0.53 of a
2022 Medway Route 116 mile east of the Turnpike Road on Route 116 $18,000
in Medway.
HCP 4
Aviation
018699.06 Safety and infrastructure improvements that
Millinocket Municipal
Millinocket Runway/Taxiway may include the reconstruction of Runway
2023/24 Airport $6,180,000
11-29 and partial parallel Taxiway "D".
Reconstruction
026298.00 Bicycle/Pedestrian
Beginning at Congress Street and extending
2022 Millinocket On-Road Sidewalk/Trail Route 11 $75,000
east 0.20 of a mile to Ash Street.
HCP 2 New Construction - PE Only
Bus
026304.00
Located at Carmel Road North and North
Newburgh Parking Lots Park and Ride Lot
2023/24 County Road. $400,000
New Construction
121
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025825.00
Newport, Rural Highways Beginning at the Interstate 95 Exit #161 off-
2023/24 Route 7
Plymouth ramp and extending north 1.12 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
Aviation
018701.04 Safety and infrastructure improvements that
Dewitt Field, Old Town
Old Town Runway/Taxiway may include design, permitting and
2022 Municipal Airport $1,340,000
construction of Taxiway "B".
Reconstruction
025101.00
I-95 Interchange 53 Bridge (#6062) over
Highway-Bridges
2022 Old Town Route 16 Interstate 95. Located 0.33 of a mile north of $850,000
Bridge Painting Old Bennoch Road.
HCP 1
025531.00
I-95 NB/ Kirkland Road Bridge (#6059) over
Highway-Bridges
2022 Old Town Interstate 95 Northbound Kirkland Road. Located 0.79 of a mile north $400,000
Bridge Painting of the Orono town line.
HCP 1
025533.00
Route 43/ I-95 Bridge (#6061) over Interstate
Highway-Bridges
2022 Old Town Route 43 95. Located 0.63 of a mile north of Bennoch $750,000
Bridge Painting Road.
HCP 1
Highway Paving
025777.00
Rural Highways Beginning 0.11 of a mile north of College
2022 Old Town Route 2A
Avenue and extending north 0.94 of a mile.
Ultra-Thin Bonded Wearing
HCP 2
Course
122
ID/Year Municipality Scope Name Description Total Project Cost
025945.00
Highway Paving Beginning 0.34 of a mile northeast of
2022 Old Town Route 2A Pembroke Drive and extending northeast
Light Capital Paving 1.34 miles to Route 2.
HCP 2
Highway
024601.00 Construction/Rehabilitation
Old Town,
Various Locations State Police Weigh Station improvements.
2022 Pittsfield Interstate $1,010,000
Highway Rehabilitation
026316.00 Bicycle/Pedestrian
Pedestrian crossing improvements on
Godfrey Drive/Stillwater
2022 Orono On-Road Sidewalk/Trail Godfrey Drive. Install sidewalk on the east
Avenue $100,000
side of Stillwater Avenue for 0.18 of a mile.
HCP 2, 5 Safety Improvements - PE Only
025887.00
Prentiss Twp T7 Highway Paving Beginning at Route 6 and extending
2023 R3 NBPP, Route 169 northeast 11.97 miles to the T8 R3 NBPP
Springfield Light Capital Paving town line.
HCP 4
123
ID/Year Municipality Scope Name Description Total Project Cost
025875.00
Highway Paving
Beginning at Route 143 and extending east
2023 Stetson Route 222
2.78 miles.
Light Capital Paving
HCP 4
2022 Veazie Rural Highways Route 2 Located 0.07 of a mile north of Main Street. $75,000
HCP 3 Slope Stabilization/Protection -
PE Only
022266.00
Mattagodus Bridge (#5116) over Mattagodus
Highway-Bridges
2023/24 Webster Plt Route 170 Stream. Located 0.43 of a mile southeast of $3,050,000
Bridge Replacement the Kingman Twp. town line.
HCP 4
124
Piscataquis
T10 R15 T10 R14 T10 R13 T10 R12 T10 R11 T10 R10 T10 R9
WELS WELS WELS WELS WELS WELS WELS
Soper
T8 R15 T8 R14 Eagle T8 R11 T8 R10 T8 R9
Mountain
WELS WELS Lake Twp WELS WELS WELS
Twp
Trout
Piscataquis
T6 R15 T6 R14 T6 R13 T6 R12 T6 R11 T6 R10
Brook
WELS WELS WELS WELS WELS WELS
Twp
T4 R15
WELS T4 R14 T4 R13 T4 R12 T4 R11 T4 R10 T4 R9
WELS WELS WELS WELS WELS WELS
Northeast Mount
T3 R13 T3 R12 T3 R11 T3 R10 Katahdin
Carry Lobster WELS WELS
Twp WELS WELS Twp
Twp
T2 R12
TX R14
WELS
T2 R13 Rainbow T2 R10
Eas t M iddlesex WELS WELS Twp T2 R9 Piscataquis County
WELS
Canal WELS
Days Grant Tw p Population 16,800
Land Area (sq mi) 3,961
Academy
Grant Twp Spencer T1 R13 T1 R12 T1 R11 T1 R10 T1 R9
Bay Twp WELS WELS WELS WELS WELS
Bridges 127
Lily Highway Corridor Priority Miles
Bay Twp Frenchtown Shawtown TA R11 TA R10
Twp Twp WELS WELS HCP 2 70
HCP 3 28
Beaver Cove
Big
TB R11 TB R10 HCP 4 174
Bow doin WELS WELS
Moose Bowdoin College Grant
Twp College Grant Eas t Twp
West Twp
Ebeemee
T4 R9 Total HCP 1-4 272
Greenville NWP
Moosehead Katahdin Twp
Junction T7 R9 Iron Works
Twp Elliottsville NWP Twp
Twp Lake
Williamsburg
Brownville View
Shirley Plt
Tw p
Bowerbank
Willimantic Barnard
Twp
Monson
Medford
Milo
Blanchard Sebec
Twp
Guilford
Abbot Dover-Foxcroft Orneville
Kingsbury Atkinson Twp
Sangerville
Parkman
Wellington
Piscataquis
ID/Year Municipality Scope Name Description Total Project Cost
024971.00
Highway Paving
Beginning 0.98 of a mile southeast of Gales
2022 Abbot Route 6
Road and extending east 0.56 of a mile.
Light Capital Paving
HCP 2
024971.00
Abbot, Highway Paving
Beginning at Lily Bay Road and extending
2022 Greenville, Route 6
south 21.45 miles.
Monson, Shirley Light Capital Paving
HCP 2
Highway
025707.00 Construction/Rehabilitation Beginning at Lily Bay Road and extending
Abbot,
south 21.45 miles, then beginning 0.98 of a
2022 Greenville, Rural Highways Route 6
mile south of Gales Road and extending $100,000
Monson, Shirley
HCP 2 Full Depth Reclaim W/Emulsion south 0.56 of a mile.
- PE Only
Highway Paving
025763.00
Rural Highways Beginning 0.03 of a mile west of the Guilford
2022 Abbot, Guilford Route 6
town line and extending east 0.92 of a mile.
Ultra-Thin Bonded Wearing
HCP 2
Course
025941.00
Barnard Twp, Highway Paving
Beginning at Clark Cove Road and extending
2022 Bowerbank, Bowerbank Road
east 5.06 miles to Barnard Road.
Sebec Light Capital Paving
HCP 4
025867.00
Brighton Plt, Highway Paving
Beginning at Route 151 and extending
2023 Harmony, Route 154
southeast 10.59 miles to Route 150.
Wellington Light Capital Paving
HCP 4
125
ID/Year Municipality Scope Name Description Total Project Cost
025877.00
Highway Paving
Beginning at Route 11 and extending north
2023 Brownville Church Street
3.86 miles.
Light Capital Paving
HCP 4
025877.00
Highway Paving
Beginning at Church Street and extending
2023 Brownville Schoodic Lake Road
east 4.39 miles to Lake Avenue.
Light Capital Paving
HCP 4
025941.00
Brownville, Highway Paving Beginning 0.18 of a mile north of Church
2022 Ebeemee Twp, Route 11 Street and extending north 14.75 miles to
T4 R9 NWP Light Capital Paving Long A Twp. town line.
HCP 4
025877.00
Highway Paving
Beginning at Park Street and extending north
2023 Brownville, Milo Pleasant Street
6.99 miles to Church Street.
Light Capital Paving
HCP 4
023120.00
Highway-Bridges Dover Bridge (#5118) over Piscataquis River.
2023/24 Dover-Foxcroft Essex Street
Located 0.04 of a mile east of River Street. $8,880,000
Bridge Replacement
HCP 4
126
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025773.00
Rural Highways Beginning 0.19 of a mile south of Dyer Road
2022 Dover-Foxcroft Route 15
and extending north 4.79 miles.
Ultra-Thin Bonded Wearing
HCP 2
Course
Aviation
018694.02
Greenville Municipal Safety and infrastructure improvements that
Greenville Runway/Taxiway $155,000
2023/24 Airport includes design and permitting Taxiway "C."
Reconstruction
Aviation
018694.06 Safety and infrastructure improvements
Greenville Municipal
Greenville Navigation Aids/Lights including the design, permitting, and
2023/24 Airport $567,000
construction of AWOS III
New Construction
WR 43045
Drainage Maintenance Ditching on Lily Bay Road. Beginning 0.24 of
2022 Greenville Route 6 a mile north of the junction of Cemetery Road $138,000
and extending south 13.89 miles.
HCP 4
127
ID/Year Municipality Scope Name Description Total Project Cost
025303.00
Guilford Memorial Bridge (#2337) over the
Highway-Bridges
2023/24 Guilford Route 6 Piscataquis River. Located 0.06 of a mile $300,000
Bridge Painting north of Elm Street.
HCP 2
025875.00
Highway Paving
Guilford, Beginning at Route 6 and extending east
2023 Hudson/Pleasant Avenue
Sangerville 1.45 miles to Main Street.
Light Capital Paving
HCP 4
020502.01
Old Toll Bridge (#2867) over Piscataquis
Highway-Bridges
2022 Milo Route 6 River. Located 0.35 of a mile northwest of $10,800,000
Bridge Replacement Route 11. FHWA BUILD Grant recipient.
HCP 2
Rail
025911.00
Rail/Highway Crossings Railroad crossing (#051206P) located 0.20 of
Milo First Street $375,000
2022 a mile east of Ferry Road.
Signal Improvements
(Rail/Highway Xing)
WR 43110
Drainage Maintenance Replacing culverts (#111032), (#116605),
2022 Monson, Shirley Route 6 (#116599), (#110988) on Route 6 in Shirley $17,000
and Monson.
HCP 2
128
Sagadahoc
Richmond
Bowdoin
Bowdoinham
Woolwich
Topsham
Sagadahoc
Bath
Phippsburg
Total HCP 1-4 220 Georgetown
Sagadahoc
ID/Year Municipality Scope Name Description Total Project Cost
Highway
021664.00 Beginning 0.08 of a mile southeast of
Construction/Rehabilitation
Richardson Street and extending northwest
2023/24 Bath State Road
Rural Highways 0.15 of a mile, including 0.02 of a mile on $1,550,000
HCP 1, 3, 4 Richardson Street.
Intersection Reconstruction
024959.00
Highway Paving Beginning 0.28 of a mile north of New
2022 Bath Old Brunswick Road Meadows Road and extending south 1.55
Light Capital Paving miles.
HCP 4
026334.00 Bicycle/Pedestrian
Sidewalks on Washington Street, Union
Washington Street/Union
2022 Bath On-Road Sidewalk/Trail Street, and Castine Avenue. Including $100,000
Street/Castine Avenue
pedestrian crossing improvements.
HCP 4, 5 Safety Improvements - PE Only
024959.00
Highway Paving
Bath, Beginning 0.08 of a mile south of High Street
2022 Route 209
Phippsburg and extending south 2.58 miles.
Light Capital Paving
HCP 3
026160.00
Lewis Bridge (#5396) over West Cathance
Highway-Minor Spans
2023/24 Bowdoin Route 125 Stream. Located 0.41 of a mile west of Deer $1,500,000
Bridge Replacement Run Road.
HCP 4
129
ID/Year Municipality Scope Name Description Total Project Cost
025099.00
Abagadasset Bridge (#5493) over the
Highway-Bridges
2022 Bowdoinham Route 24 Abagadasset River. Located 0.15 of a mile $150,000
Bridge Improvements - PE Only east of Carding Machine Road.
HCP 4
Ports-Harbors
025203.00
Located on Railroad Avenue off of River
Bowdoinham Piers, Floats and Fenders Railroad Avenue
2022 Road. $240,000
New Construction
025863.00
Highway Paving
Bowdoinham, Beginning at the Topsham town line and
2023 Route 24
Richmond extending north 10.43 miles.
Light Capital Paving
HCP 4
024959.00
Highway Paving
Bowdoinham, Beginning 0.01 of a mile north of Loop Road
2022 Route 24
Topsham and extending north 3.08 miles.
Light Capital Paving
HCP 4
Ports-Harbors
026218.00
Perkins Twp
Piers, Floats and Fenders Swan Island Pier Located on Swans Island.
2023/24 Swan Island $400,000
Rehabilitation
Ports-Harbors
020848.00
Pier rehabilitation, located on Fort Popham
Phippsburg Piers, Floats and Fenders Popham Road Pier
2023/24 Pier. $240,000
Rehabilitation
024959.00
Highway Paving
Beginning 0.40 of a mile north of Sam Day
2022 Phippsburg Route 209
Hill Road and extending south 7.32 miles.
Light Capital Paving
HCP 3, 4
024959.00
Highway Paving
Beginning at Popham Road and extending
2022 Phippsburg Route 216
south 2.28 miles.
Light Capital Paving
HCP 4
130
ID/Year Municipality Scope Name Description Total Project Cost
Highway Safety and Spot Beginning 0.71 of a mile east of Route 216
025665.00 Improvements extending east 0.16 of a mile including large
culvert (#1017939); Beginning 1.01 miles
2022 Phippsburg Rural Highways Route 209
east of Parker Head Road extending east $105,000
HCP 4 Highway Improvement - PE 0.73 of a mile; Beginning at Fort Baldwin
Only Road extending east 0.11 of a mile.
025069.00
Stewart Bridge (#6186) over Abagadassett
Highway-Bridges
2023/24 Richmond Alexander Reed Road River. Located 0.52 of a mile southeast of $1,200,000
Bridge Replacement Brown Road.
HCP 4
Highway Paving
025719.00
Beginning 0.02 of a mile north of Old Augusta
Rural Highways
2022 Topsham Route 201 Road and extending north 3.67 miles to the
Highway Cyclical Pavement Bowdoin town line.
HCP 3
Resurfacing
131
ID/Year Municipality Scope Name Description Total Project Cost
024959.00
Highway Paving
Beginning at Meadow Brook Road and
2022 West Bath Berry's Mill Road
extending north 4.51 miles to State Road.
Light Capital Paving
HCP 4
024959.00
Highway Paving Beginning at Brighams Cove Road and
2022 West Bath Campbell Pond Road extending north 0.26 of a mile to Birch Point
Light Capital Paving Road.
HCP 4
024959.00
Highway Paving
Beginning at Old Brunswick Road and
2022 West Bath New Meadows Road
extending south 0.76 of a mile.
Light Capital Paving
HCP 4
Highway
025267.00
Construction/Rehabilitation
Located at the intersection of Route 1 and
2023/24 Woolwich Route 1
Rural Highways Nequasset Road. $900,000
HCP 1
Intersection Reconstruction
132
Big Te n
Tw p
T10 R 16
W E LS
Somerset
T9 R1 7 T9 R1 6
T9 R 18
W E LS W E LS
WE LS
T8 R1 8 T8 R1 7 T8 R1 6
T8 R1 9 W E LS W E LS W E LS
W EL S
T7 R1 9 T7 R1 8 T7 R1 7 T7 R1 6
W E LS W E LS W E LS W E LS
Sa int
Big S ix T6 R1 8 T6 R1 7
Jo hn
Tw p W E LS W E LS
Tw p
Rus s ell
T 5 R 19 T5 R1 8 T5 R1 7
Po nd
T5 R 20
WELS W E LS W E LS
WE LS Tw p
Elm
Dole C o m s to ck T4 R1 7 Stream
T4 R 5
Broo k W E LS Tw p
NB KP
Tw p
Tw p
Se b oo m oo k
Pittston Plymouth Tw p
H am m on d
Ac ad em y Twp
Tw p
Gra nt
P ren tis s
Twp T 4
R4 N B K P Bi g W
Ald er So ldie rto wn Wes t
Mid dles ex Tw p
B ald Broo k Tw p T2
Sa nd y M o u n ta in Ca nal Gran t
Tw p
Ba y Tw p T4 R 3 R3 N B K P
Tom h egan
Somerset County
Tw p
M oos e Th o rn d ik e Bras s ua
Tw p
Population 50,592
Riv er Tw p Tw p
D e nn isto w n Land Area (sq mi) 3 ,9 2 4
Fors y th Pl t
Tw p Lon g Ta u nto n &
S andw ic h Ra y nh a m A ca d e my Bridges 278
Po nd A ca dem y Gra n t
Attea n Jackman Tw p
Highway Corridor Priority Miles
Gr ant T wp
Hole b Tw p Sapling
Tw p Parlin M ise ry Twp HCP 1 181
B r a d s tre e t Pond Twp Tw p
T5 R 7
Appleton BK P W K R Tw p
Johnson Chase In dia n HCP 2 39
Twp Stream St re a m
U p p e r Mountain Tw p
Tw p
HCP 3 91
T5 R6 H ob bs tow n E n c h a n te d Twp
BK P Tw p Tw p Sq ua re to w n HCP 4 296
WKR W es t M o xie
Tw p
Lower Fork s P lt
T3 R5 Enchanted Go r e
Kin g & BK P Ea st
Ba rtlett
Twp
The M ox ie Total HCP 1-4 607
WKR Bow to wn
Tw p Pie rc e Tw p Fork s Tw p
T3 R4 Po nd Plt
Flagstaff BK P Tw p B ald
Twp WKR M o u n ta in
Ca rryin g Caratun k
Somerset
Dea d Tw p T2 R 3
Bige low Pla ce
Tw p Riv er To w n Tw p
Tw p P lea s ant M ay fie ld
Tw p
Ridge
P lt M os co w
High lan d
Plt
Bin gh a m Brigh to n
Plt Cambridge
Lexington Con c ord
Twp Tw p Riple y
Harm on y
Athe ns Sa int
So lon
New Em b de n Alb an s
Po rtlan d
Hartland
Cornv ille
Pa lm yra
An so n M adis on
De tro it
Skowheg an Pittsfield
Stark s C anaan
N o rri dg e w o ck
Me rce r
Smithfield Fairfield
Somerset
ID/Year Municipality Scope Name Description Total Project Cost
023200.00
Highway-Bridges Robert Garland Bridge (#2615) over
2023/24 Anson Route 201A Carrabassett River. Located 0.12 of a mile $1,060,000
Bridge Wearing Surface north of Route 234.
HCP 2 Replacement
025931.00
Highway Paving
Beginning at Embden Pond Road and
2022 Anson Route 16
extending east 0.43 of a mile to Route 8.
Light Capital Paving
HCP 3
026113.00
Highway-Bridges Bicentennial Memorial Bridge (#2491) over
2023/24 Anson, Madison Route 8/43/148/201A Kennebec River. Located on the Madison- $1,000,000
Bridge Wearing Surface Anson town line.
HCP 2 Replacement
WR 43252
Drainage Maintenance Ditching on Route 43 in Athens. Beginning at
2022 Athens Route 43 the junction of Route 150 and extending $60,000
southeast 11.25 miles.
HCP 4
025867.00
Athens, Brighton Highway Paving
Beginning at Route 150 and extending north
2023 Plt, Mayfield Route 151
12.90 miles to Route 16.
Twp Light Capital Paving
HCP 3, 4
Highway Paving
025839.00
Athens, Rural Highways Beginning 0.72 of a mile south of James
2023/24 Route 150
Cornville Road and extending north 4.00 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
025867.00
Athens, Highway Paving
Beginning at Route 150 and extending east
2023 Cornville, Route 43
11.95 miles to Route 152.
Hartland Light Capital Paving
HCP 4
Highway Paving
025841.00
Athens, Rural Highways Beginning 0.04 of a mile north of Academy
2023/24 Route 150
Harmony Street and extending east 8.91 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
133
ID/Year Municipality Scope Name Description Total Project Cost
025987.00
Parkman Road Bridge (#2276) over
Highway-Bridges
2023/24 Cambridge Route 150 Ferguson Stream. Located 0.12 of a mile $1,500,000
Bridge Improvements north of Route 152.
HCP 3
026478.00
Hilton Bridge (#1069) over Jimmy Brook.
Highway-Minor Spans
2023/24 Cambridge Chandler Hill Road Located 0.52 of a mile southwest of Goose $1,500,000
Bridge Replacement Flat Road.
HCP 4
025945.00
Highway Paving
Cambridge, Dexter Road/Chandler Beginning at Ripley Road and extending
2022
Ripley Hill Road northeast 7.06 miles to the Dexter town line.
Light Capital Paving
HCP 4
025867.00
Highway Paving
Canaan, Beginning at Route 2 and extending north
2023 Route 23
Hartland 10.42 miles to Route 43.
Light Capital Paving
HCP 4
WR 42698
Drainage Maintenance Cleaning under guardrail on Route 16.
2022 Concord Twp Route 16 Beginning at the Concord-Embden town line $21,000
and extending north 4.30 miles to Cool Road.
HCP 4
Highway Paving
025729.00
Cornville, Rural Highways Beginning 0.03 of a mile north of Libby Lane
2022 Route 150
Skowhegan and extending north 5.72 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
025871.00
Highway Paving
Cornville, Beginning 1.17 miles north of Route 2 and
2023 West Ridge Road
Skowhegan extending north 8.61 miles to Route 150.
Light Capital Paving
HCP 4
134
ID/Year Municipality Scope Name Description Total Project Cost
023659.00
Village Bridge (#3309) over East Branch
Highway-Bridges
2023/24 Detroit Route 69 Sebasticook River. Located 0.26 of a mile $1,620,000
Bridge Improvements northwest of Troy Road.
HCP 4
025869.00
Highway Paving Beginning at the New Portland town line and
2023 Embden Katie Crotch Road extending southeast 0.54 of a mile to Route
Light Capital Paving 16.
HCP 4
135
ID/Year Municipality Scope Name Description Total Project Cost
Highway
025115.00
Construction/Rehabilitation
Hartland, Beginning 0.22 of a mile north of Ford Hill
2023/24 Route 152
Palmyra Rural Highways Road and extending north 1.44 miles. $455,000
HCP 4
PMRAP DOT Pugmill
Airport
018696.04 Safety and infrastructure improvements that
Jackman Airport - General Newton Field Airport may include acquisition of snow removal
2022 $155,000
equipment.
Capital Equipment Purchase
Aviation
018696.09 Safety and infrastructure improvements that
Jackman Runway/Taxiway Newton Field Airport include design, construct, and overlay of
2023/24 $412,000
terminal apron. (phase 2).
Rehabilitation
Aviation
018696.17 Safety and infrastructure improvements that
Jackman Runway/Taxiway Newton Field Airport include design, construct, and overlay of
2022 $587,000
terminal apron and taxiway.
Reconstruction
026150.00
A.J. Albee Bridge (#3042) over Michael
Highway-Bridges
2023/24 Lexington Twp Long Falls Dam Road Brook. Located 0.03 of a mile north of Old $2,100,000
Bridge Replacement County Road.
HCP 4
136
ID/Year Municipality Scope Name Description Total Project Cost
WR 43119
Drainage Maintenance Ditching and replacing culverts on Route 148
2022 Madison Route 148 in Madison. Beginning at the intersection of $55,000
Route 201 and extending west 4.61 miles.
HCP 3
025871.00
Highway Paving
Madison, Beginning at Route 201 and extending north
2023 East Madison Road
Skowhegan 7.97 miles to Route 43.
Light Capital Paving
HCP 4
022254.00
Carrabassett Bridge (#5131) over the
Highway-Bridges
2023/24 New Portland Route 146 Carrabassett River. Located 0.02 of a mile $1,250,000
Bridge Rehabilitation north of New Portland Road.
HCP 4
025869.00
Highway Paving
Beginning at the Embden town line and
2023 New Portland Katie Crotch Road
extending northwest 1.46 miles to Route 146.
Light Capital Paving
HCP 4
025869.00
Highway Paving
Beginning at Bog Road and extending
2023 New Portland Route 146
southwest 6.27 miles to Route 27.
Light Capital Paving
HCP 4
Aviation
018700.04 Safety and infrastructure improvements that
Central Maine Regional
Norridgewock Runway/Taxiway may include taxilane reconstruction - phase
2023/24 Airport $343,000
1.
Reconstruction
137
ID/Year Municipality Scope Name Description Total Project Cost
Aviation
018700.07
Central Maine Regional Airfield crack sealing and pavement
Norridgewock Runway/Taxiway
2022 Airport markings. $130,000
Crack Sealing
026300.00 Bicycle/Pedestrian
Beginning at Perkins Street and extending
2022 Norridgewock On-Road Sidewalk/Trail Route 2
east 0.53 of a mile. $135,000
HCP 1 Rehabilitation - PE Only
022256.00
Hanson Bridge (#1035) over Smith Brook.
Highway-Minor Spans
2023/24 Palmyra Palmyra Road Located 0.34 of a mile south of Spring Hill $1,700,000
Bridge Replacement Road.
HCP 4
025315.00
Route 100 / I-95 Bridge (#5957) over
Highway-Bridges
2023/24 Palmyra Route 100 Interstate 95. Located 0.86 of a mile north of $6,520,000
Bridge Replacement Karen Street.
HCP 1
Aviation
018703.01 Safety and infrastructure improvements that
Pittsfield Municipal
Pittsfield Runway/Taxiway may include crack seal and pavement
2023/24 Airport $361,000
markings.
Crack Sealing
138
ID/Year Municipality Scope Name Description Total Project Cost
023607.00
I-95 NB/ North Main Street Bridge (#5989)
Highway-Bridges
2022 Pittsfield Interstate 95 Northbound over Madawaska Avenue. Located 0.38 of a $2,310,000
Bridge Deck Replacement mile west of the Palmyra town line.
HCP 1
023609.00
I-95 SB/ North Main Street Bridge (#1445)
Highway-Bridges
2022 Pittsfield Interstate 95 Southbound over Madawaska Avenue. Located 0.36 of a $2,600,000
Bridge Rehabilitation mile west of the Palmyra town line.
HCP 1
023613.00
I-95 SB/ Sebasticook River Bridge (#1446)
Highway-Bridges
2022 Pittsfield Interstate 95 Southbound over Interstate 95 southbound. Located 1.06 $4,380,000
Bridge Rehabilitation miles south of the Palmyra town line.
HCP 1
026109.00
Farnham Bridge (#2274) over Farnham
Highway-Minor Spans
2023/24 Pittsfield Route 11/100 Brook. Located 0.12 of a mile north of Webb $1,500,000
Bridge Replacement Road.
HCP 4
026111.00
Osborne Bridge (#2634) over Farnham
Highway-Minor Spans
2023/24 Pittsfield Route 11/100 Brook. Located 0.18 of a mile north of Webb $1,500,000
Bridge Replacement Road.
HCP 4
026586.00
St. Albans Fish Bridge (#1034) over Indian
Highway-Bridges
2022 Saint Albans Webb Ridge Road Stream. Located 0.35 of a mile northeast of $130,000
Bridge Improvements - PE Only Route 152.
HCP 5
139
ID/Year Municipality Scope Name Description Total Project Cost
026115.00
Smith Pond Bridge (#6152) over West
Highway-Bridges
2023/24 Skowhegan Route 150 Branch Wesserunsett Stream. Located 0.36 $1,400,000
Bridge Deck Replacement of a mile north of Molunkus Road.
HCP 3
022260.01
Main Street Bridge (#2504) over Fall Brook.
Highway-Bridges
2022 Solon Route 201 Located 0.01 of a mile west of Brook Street. $4,730,000
Bridge Replacement FHWA INFRA Grant recipient.
HCP 1
Rail
025907.00 Taunton &
Rail/Highway Crossings Railroad crossing (#847792N) located 2.53
Raynham Route 6 $375,000
2022 miles northeast of Adams Dam Road.
Academy Grant Signal Improvements
(Rail/Highway Xing)
022362.00
The Forks Bridge (#2841) over the Upper
The Forks Plt, Highway-Bridges
2023/24 Route 201 Kennebec River. Located 0.03 of a mile north
West Forks Plt $790,000
Bridge Rehabilitation of Lake Moxie Road.
HCP 1
Highway Paving
025771.00
Rural Highways Beginning 0.06 of a mile north of The Forks
2022 West Forks Plt Route 201
Plt. town line and extending north 7.41 miles.
Ultra-Thin Bonded Wearing
HCP 1
Course
140
Waldo
Burnham
Troy
Winterport
Jackson
Monroe
Frankfort
Unity Thorndike
Prospect
Brooks
Knox Swanville
Stockton
Springs
Freedom
Searsport
Waldo
Montville
Morrill
Palermo Belfast
Belmont
Liberty
Searsmont
Northport
Lincolnville
Waldo County
Population 39,694
Land Area (sq mi) 730 Islesboro
Bridges 173
Highway Corridor Priority Miles
HCP 1 80
HCP 2 1
Waldo
HCP 3 25
HCP 4 265
Aviation
018685.05
Safety and infrastructure improvements that
Belfast Runway/Taxiway Belfast Municipal Airport
2023/24 include crack seal work. $47,000
Crack Sealing
025865.00
Highway Paving
Belfast, Morrill, Beginning at Route 131 and extending east
2023 Poors Mill Road
Waldo 5.87 miles.
Light Capital Paving
HCP 4
025865.00
Belmont, Morrill, Highway Paving
Beginning at Route 3 and extending
2023 Swanville, Route 131
northeast 15.56 miles to Route 141.
Waldo Light Capital Paving
HCP 4
025939.00
Highway Paving
Belmont, Beginning at Route 173 and extending
2022 Linconville Road
Searsmont northeast 2.69 miles to Augusta Road.
Light Capital Paving
HCP 4
141
ID/Year Municipality Scope Name Description Total Project Cost
025859.00
Highway Paving
Brooks, Knox, Beginning 0.24 of a mile west of Veterans
2023 Route 139
Thorndike Highway and extending west 9.08 miles.
Light Capital Paving
HCP 4
025859.00
Highway Paving
Brooks, Knox, Beginning at Route 131 and extending
2023 Route 137
Waldo northwest 1.58 miles.
Light Capital Paving
HCP 4
025859.00
Highway Paving Beginning 3.73 miles southwest of Route 69
Brooks, Monroe,
2023 Route 139 and extending southwest 11.58 miles to
Winterport
Light Capital Paving Veterans Highway.
HCP 4
142
ID/Year Municipality Scope Name Description Total Project Cost
025865.00
Highway Paving
Frankfort, Beginning at Black Hill Road and extending
2023 North Searsport Road
Searsport north 4.59 miles to Loggin Road.
Light Capital Paving
HCP 4
026220.00
Lower Village Bridge (#2485) over Sandy
Highway-Minor Spans
2023/24 Freedom Route 137 Stream. Located 0.18 of a mile east of $1,500,000
Bridge Replacement Pleasant Street.
HCP 4
025943.00
Highway Paving
Knox, Liberty, Beginning at Route 105 and extending north
2022 Route 220
Montville 18.18 miles to Route 137.
Light Capital Paving
HCP 4
025865.00
Liberty, Highway Paving
Beginning at Route 131 and extending
2023 Montville, Route 173
northwest 7.15 miles to Pinnacle Road.
Searsmont Light Capital Paving
HCP 4
025859.00
Highway Paving
Beginning at Route 1 and extending west
2023 Lincolnville Route 173
5.28 miles to Route 52.
Light Capital Paving
HCP 4
143
ID/Year Municipality Scope Name Description Total Project Cost
025939.00
Highway Paving
Lincolnville, Beginning at Route 52 and extending north
2022 Route 173
Searsmont 6.84 miles to Route 131.
Light Capital Paving
HCP 4
025541.00
Colson Bridge (#2168) over Colson Stream.
Highway-Bridges
2023/24 Prospect Route 1A Located 0.38 of a mile north of Hawes Bridge $2,900,000
Bridge Improvements Road.
HCP 1
026440.00
Highway-Bridges Marsh Bridge (#2510) over Carley Brook.
2023/24 Prospect Route 174 $800,000
Located 0.40 of a mile east of Route 1A.
Bridge Deck Replacement
HCP 4
Highway
017281.00
Construction/Rehabilitation
Beginning at Savage Road and extending
2022 Searsport Route 1 $11,900,000
Rural Highways northeast 1.94 miles.
HCP 1
Reconstruction
Ports-Harbors
020805.00
The commercial channel of Searsport, which
Searsport Channels, Pier Berths Searsport Channel
2022 serves Mack Point. $5,500,000
Dredging
144
ID/Year Municipality Scope Name Description Total Project Cost
025865.00
Highway Paving
Beginning at East Main Street and extending
2023 Searsport Mount Ephraim Road
north 7.00 miles to North Searsport Road.
Light Capital Paving
HCP 4
Ports-Harbors
026204.00
Ports and Harbors - General
Searsport Mack Point Located off Trundy Road.
2022 $125,000
Multimodal Improvements - PE
Only
025865.00
Highway Paving
Searsport, Beginning at Route 141 and extending
2023 North Searsport Road
Swanville northeast 3.23 miles to Black Hill Road.
Light Capital Paving
HCP 4
Rail
025897.00
Rail/Highway Crossings Railroad crossing (#051225U) located 0.07 of
Stockton Springs Route 174 $375,000
2023/24 a mile northeast of Route 1A.
Signal Improvements
(Rail/Highway Xing)
Rail
025899.00
Rail/Highway Crossings Railroad crossing (#051216V) located 0.13 of
Stockton Springs Steamboat Wharf Road $375,000
2023/24 a mile east of Route 1.
Signal Improvements
(Rail/Highway Xing)
145
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025835.00
Rural Highways Beginning at Marina Road and extending
2023/24 Troy, Unity Route 9
northeast 8.59 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
025859.00
Highway Paving
Beginning at Route 220 and extending west
2023 Unity Route 139
0.69 of a mile to Route 202.
Light Capital Paving
HCP 3, 4
146
Washington
Washington
Fores t
City Twp
T8 R4 Danforth
NBPP
T11 R3 Washington County
Forest NBPP Vanceboro
Twp Population 31,490
Brookton
T8 R3 Twp Lambert Land Area (sq mi) 2,563
NBPP Lake Twp
Bridges 175
Codyville Highway Corridor Priority Miles
Topsfield Plt HCP 1 83
Kossuth
Twp Dyer Twp HCP 2 73
HCP 3 95
Waite
HCP 4 299
Talmadge Fowler
T6 R1
Twp
NBPP
Total HCP 1-4 550
Indian
Twp Res
T6 ND Grand Lake
BPP Stream Plt
Sakom
Twp
Princeton
Big
Greenlaw Lake Calais
T43 MD Baileyville
Chopping Twp
T42 MD BPP Baring
Twp
BPP Alexander Plt
Robbinston
Meddybem ps
T37 MD Crawford
T26 ED
T36 MD BPP BPP Charlotte
BPP Cooper Perry
Pembroke
T19 ED
Day Block BPP
Twp Cathance Dennysville
Ha rring to n Jonesport
Milbridge Addison
Steuben
Washington
ID/Year Municipality Scope Name Description Total Project Cost
016849.00
Dike Bridge (#3718) over West Branch
Highway-Bridges
2022 Addison Ridge Road Pleasant River. Located 0.06 of a mile $415,000
Bridge Improvements - PE Only southwest of Water Street.
HCP 5
Highway Paving
025739.00
Brookton Twp, Rural Highways Beginning 2.02 miles north of Forest City
2022 Route 1
Danforth Road and extending north 9.33 miles.
Highway Cyclical Pavement
HCP 3
Resurfacing
026085.00
Ferry Point Bridge (#2279) over St. Croix
Highway-Bridges
2022 Calais Main Street River. Located 0.22 of a mile west of Route $500,000
Bridge Improvements - PE Only 1.
HCP 2
147
ID/Year Municipality Scope Name Description Total Project Cost
021686.10
Moosehorn Bridge (#3332) over Cranberry
Highway-Bridges
2023/24 Charlotte Station Road Creek. Located 0.17 of a mile west of $1,500,000
Bridge Replacement Goodell Road.
HCP 5
026105.00
Round Pond Bridge (#3787) over Round
Highway-Bridges
2023/24 Charlotte Charlotte Road Pond Outlet. Located 1.10 miles northeast of $1,600,000
Bridge Replacement Ayers Junction Road.
HCP 4
025387.00
Little Tomah Bridge (#2472) over Little
Highway-Bridges
2023/24 Codyville Twp Route 6 Tomah Stream. Located 1.80 miles $2,700,000
Bridge Replacement southwest of Todd Farm Road.
HCP 4
024981.00
Highway Paving
Beginning at the Weston town line and
2022 Danforth Bancroft Road
extending south 0.80 of a mile to Route 169.
Light Capital Paving
HCP 4
148
ID/Year Municipality Scope Name Description Total Project Cost
Rail
025913.00
Rail/Highway Crossings Railroad crossing (#863160W) located 0.29
Danforth Route 169
2022 of a mile north of Horseback Road. $246,000
Signal Improvements
(Rail/Highway Xing)
WR 33256
Drainage Maintenance Replacing culvert (#969004) in Danforth.
2022 Danforth Route 1 Located 1.80 miles south of the intersection $18,000
of Route 1 and Route 169.
HCP 3
025297.00
Deblois Bridge (#3152) over Narraguagus
Highway-Bridges
2023/24 Deblois Route 193 River. Located 0.14 of a mile east of Lane $1,200,000
Bridge Deck Replacement Road.
HCP 3
025529.00
Chase Mills Bridge (#5465) over Gardiner
Highway-Bridges
2023/24 East Machias Chase Mills Road Lake Outlet. Located 0.03 of a mile north of $2,000,000
Bridge Replacement Lakeside Road.
HCP 5
Highway
025137.00
Construction/Rehabilitation Beginning 0.03 of a mile east of the
East Machias,
2023/24 Route 1 Whitneyville town line and extending north
Machias Rural Highways $6,890,000
6.59 miles.
HCP 2
Full Depth Reclaim W/Cement
024975.00
Highway Paving Beginning 0.37 of a mile southeast of Chases
East Machias,
2022 Route 1 Mill Road and extending southeast 1.60
Whiting
Light Capital Paving miles.
HCP 2
Aviation
018691.02 Safety and infrastructure improvements that
Eastport Municipal
Eastport Navigation Aids/Lights may include a precision approach path $180,000
2022 Airport
indicator and a segmented circle.
Lighting
Aviation
018691.03
Eastport Municipal Pavement maintenance and pavement
Eastport Apron
2022 Airport marking for the apron. $220,000
Rehabilitation
149
ID/Year Municipality Scope Name Description Total Project Cost
024357.00 Bicycle/Pedestrian
Beginning at Battery Street and extending
2022 Eastport On-Road Sidewalk/Trail High Street
north 0.27 of a mile. $585,000
HCP 5 Multimodal Improvements
Ports-Harbors
025201.00
Eastport Marine Buildings/Facilities Eastport Fish Pier Located 0.02 of a mile north of Water Street.
2022 $66,000
Rehabilitation
025873.00
Highway Paving
Beginning at Route 1 and extending east
2023 Edmunds Twp South Edmunds Road
0.46 of a mile to Park Road.
Light Capital Paving
HCP 4
025989.00
Cross Cove Bridge (# 2207) over Cross
Highway-Bridges
2023/24 Jonesport Route 187 Cove. Located 0.01 of a mile northeast of $2,500,000
Bridge Replacement Island Street.
HCP 4
025993.00
Cummings Bridge (#2211) over Donovan
Highway-Minor Spans
2023/24 Jonesport Route 187 Creek. Located 0.09 of a mile east of Indian $1,500,000
Bridge Replacement River Road.
HCP 4
150
ID/Year Municipality Scope Name Description Total Project Cost
020497.00
FDR Memorial Bridge (#5978) over Lubec
Highway-Bridges
2022 Lubec Route 189 Narrows. Located 0.11 of a mile northeast of $450,000
Bridge Improvements - PE Only Water Street.
HCP 4
025873.00
Highway Paving
Beginning 0.69 of a mile east of Spark Plug
2023 Lubec South Lubec Road
Lane and extending northwest 4.60 miles.
Light Capital Paving
HCP 4
025873.00
Highway Paving
Lubec, Trescott Beginning at Route 1 and extending
2023 Route 189
Twp, Whiting northeast 11.12 miles the Canadian Border.
Light Capital Paving
HCP 4
Aviation
018698.05 Safety and infrastructure improvements that
Machias Valley Regional
Machias Runway/Taxiway may include design and permitting for taxi
2023/24 Airport $464,000
lane construction.
New Construction
151
ID/Year Municipality Scope Name Description Total Project Cost
Aviation
018698.07 To acquire land for a longer runway, which
Airport - General Machias Valley Regional would facilitate LifeFlight, the lifesaving
Machias
2022 Airport medical/emergency air transport for the $1,290,000
Sale Or Purchase Of Lot Or region.
Building
025211.00
Clifford Bridge (#5223) over Clifford Stream.
Highway-Minor Spans
2023/24 Marion Twp Route 86 Located 1.56 miles southwest of Marion $1,500,000
Bridge Replacement Station Road.
HCP 4
Aviation
018704.03 Safety and infrastructure improvements that
Princeton Municipal
Princeton Navigation Aids/Lights may include design and permitting of
2023/24 Airport $361,000
taxilanes for hangar development.
New Construction
026093.00
Mill Cove New Bridge (#6205) over Mill
Highway-Minor Spans
2023/24 Robbinston Route 1 Cove. Located 0.08 of a mile north of Ridge $1,800,000
Bridge Replacement Road.
HCP 1
152
ID/Year Municipality Scope Name Description Total Project Cost
026089.00
Rice Bridge (#2714) over Rice Stream.
Highway-Minor Spans
2023/24 Trescott Twp Route 191 Located 0.21 of a mile north of Moose River $1,500,000
Bridge Replacement Road.
HCP 4
026224.00
Highway-Bridges International Bridge (#2401) over Saint Croix
2023/24 Vanceboro Route 6 River. Located 0.04 of a mile east of Water $500,000
Bridge Substructure Street.
HCP 4 Rehabilitation
026091.00
B16 New Stream Bridge (#6289) over E.
Highway-Minor Spans
2023/24 Wesley Route 9 Branch B16 New Steam. Located 0.67 of a $1,000,000
Bridge Replacement mile west of Junior Williams Road.
HCP 1
026230.00
Beaver Dam Bridge (#2061) over Beaver
Highway-Minor Spans
2023/24 Wesley Route 9 Dam Brook. Located 3.00 miles north of $1,200,000
Bridge Replacement Junior Williams Road.
HCP 1
024975.00
Highway Paving Beginning 0.12 of a mile northeast of Bean
2022 Whiting Route 1 Heath Road and extending northeast 2.98
Light Capital Paving miles.
HCP 2
153
York
Cornish
Limington
Parsonsfield
Limerick
Newfield Buxton
Hollis
Waterboro
York
Shapleigh
Biddeford
Sanford
Arundel
Kennebunkport
Lebanon
Kennebunk
North
Berwick
Wells
Ogunquit
Land Area (sq mi) 991
South Bridges 323
Berwick
Highway Corridor Priority Miles
HCP 1 167
York
HCP 2 135
HCP 3 99
Eliot HCP 4 307
Highway
020267.00 Construction/Rehabilitation
Beginning 0.60 of a mile south of Garvin
2022 Acton Rural Highways Route 109
Road and extending north 2.21 miles. $750,000
HCP 2 Highway Rehabilitation - PE
Only
Highway Paving
025757.00
Acton, Rural Highways Beginning at Shapleigh Corner Road and
2022 Route 109
Shapleigh extending north 3.84 miles.
Ultra-Thin Bonded Wearing
HCP 2
Course
024349.00 Maintenance
Beginning at Walker Road and extending
2022 Alfred, Lyman Rural Highways Route 111 $41,000
west 0.96 of a mile to Blueberry Hill Road.
HCP 1 Maintenance - Vegetation
026226.00
Days Mill Bridge (#2221) over Kennebunk
Arundel, Highway-Bridges
2023/24 Route 35 River. Located 0.02 of a mile north of Days
Kennebunk $1,500,000
Bridge Replacement Mills Road.
HCP 4
154
ID/Year Municipality Scope Name Description Total Project Cost
022284.00
New Dam Bridge (#6053) over Salmon Falls
Highway-Bridges
2023/24 Berwick New Dam Road River. Located on the Berwick, Maine- $412,000
Bridge Rehabilitation Somersworth, New Hampshire state line.
HCP 5
022606.00
Eddy Bridge (#6048) over Salmon Falls
Highway-Bridges
2023/24 Berwick Rochester Street River. Located on the Berwick, Maine - $645,000
Bridge Rehabilitation Somersworth, New Hampshire state line.
HCP 4
WR 43472
Drainage Maintenance Ditching Route 236 Berwick. Beginning at the
2022 Berwick Route 236 South Berwick town line and extending north $50,000
to Powerhouse Road.
HCP 2
Aviation
018687.06 Safety and infrastructure improvements that
Biddeford Municipal
Biddeford Apron may include General Aviation apron design $810,000
2023/24 Airport
and reconstruction.
Reconstruction
Airport
018687.07
Biddeford Municipal Safety and infrastructure improvements that
Biddeford Airport - General
2022 Airport include snow removal equipment. $206,000
Capital Equipment Purchase
155
ID/Year Municipality Scope Name Description Total Project Cost
Highway
025653.00 Construction/Rehabilitation
Beginning at St. Mary Street and extending
2022 Biddeford Urban Highways Elm Street northeast 0.12 of a mile to Lincoln Street. $200,000
PACTS Sponsored
HCP 2 Intersection Reconstruction -
PE Only
156
ID/Year Municipality Scope Name Description Total Project Cost
Highway Paving
025713.00
Rural Highways Beginning at Route 202 and extending east
2022 Buxton Portland Road
2.37 miles to Route 22.
Highway Cyclical Pavement
HCP 3
Resurfacing
Highway Paving
025795.00
Rural Highways Beginning at Route 112 and extending east
2022 Buxton Route 4A
0.75 of a mile to Route 4.
Highway Cyclical Pavement
HCP 3
Resurfacing
WR 43389
Drainage Maintenance Ditching Route 22 in Buxton. Beginning at
2022 Buxton Route 22 Broadturn Road and extending northwest to $100,000
Route 202.
HCP 3
023643.00
Salmon Falls Bridge (#3708) over Saco
Highway-Bridges
2022 Buxton, Hollis Route 202 River. Located on the Hollis- Buxton town $3,000,000
Bridge Deck Replacement line.
HCP 1
025479.00
West Buxton Bridge (#3340) over the Saco
Highway-Bridges
2022 Buxton, Hollis West Buxton Road River. Located 0.07 of a mile west of Route $500,000
Bridge Improvements - PE Only 112.
HCP 4
157
ID/Year Municipality Scope Name Description Total Project Cost
024963.00
Highway Paving
Beginning at the Hiram town line and
2022 Cornish South Hiram Road
extending east 0.62 of a mile to Route 25.
Light Capital Paving
HCP 4
025857.00
Highway Paving
Beginning at the Kittery town line and
2023 Eliot State Road
extending north 1.37 miles to Route 103.
Light Capital Paving
HCP 3, 4
025857.00
Highway Paving
Beginning at State Road and extending north
2023 Eliot Beech Road
2.54 miles to Route 236.
Light Capital Paving
HCP 4
025857.00
Highway Paving
Beginning at Route 236 and extending south
2023 Eliot Route 103
3.66 miles to Old Road.
Light Capital Paving
HCP 4
158
ID/Year Municipality Scope Name Description Total Project Cost
025857.00
Highway Paving
Beginning at State Road and extending south
2023 Eliot, Kittery Route 103
2.54 miles to Kittery town line.
Light Capital Paving
HCP 4
025857.00
Highway Paving Beginning at Kittery town line and extending
Eliot, Kittery,
2023 Route 101 west 6.19 miles to the New Hampshire state
South Berwick
Light Capital Paving line.
HCP 4
025857.00
Highway Paving
Eliot, South Beginning at Scotland Bridge Road and
2023 Route 91
Berwick, York extending north 5.62 miles to Route 236.
Light Capital Paving
HCP 4
025857.00
Highway Paving
Beginning at Route 101 and extending north
2023 Eliot, York Beech Ridge Road
1.63 miles to McIntire Lane.
Light Capital Paving
HCP 4
WR 43475
Drainage Maintenance Ditching Beech Ridge Road between York
2022 Eliot, York Beech Ridge Road and Eliot. Beginning at the urban compact $20,000
line and extending to Route 101.
HCP 4
024963.00
Highway Paving
Hollis, Beginning at Route 5 and extending
2022 Plains Road
Waterboro northeast 5.20 miles to Route 117.
Light Capital Paving
HCP 4
023629.00
Nash Mill Bridge (#5756) over Mousam
Highway-Bridges
2023/24 Kennebunk Mill Street River. Located 0.14 of a mile north of $1,230,000
Bridge Rehabilitation Hammond Road.
HCP 4
159
ID/Year Municipality Scope Name Description Total Project Cost
023188.00
Highway-Minor Spans Branch Brook Bridge (#3091) over Branch
Kennebunk,
2023/24 Route 9A Brook. Located on the Wells-Kennebunk
Wells $436,000
Bridge Substructure town line.
HCP 4 Rehabilitation
025857.00
Highway Paving Beginning 0.75 of a mile north of Route 109
Kennebunk,
2023 Route 9A and extending north 3.88 miles. Includes
Wells
Light Capital Paving paved shoulders.
HCP 4
Ports-Harbors
025205.00
Cape Porpoise Pier - Bait shed demolition and reconstruction
Kennebunkport Marine Buildings/Facilities $500,000
2023/24 Phase 3 located at the end of Pier Road.
Reconstruction
Ports-Harbors
025207.00
Cape Porpoise Pier - Wharf improvements located at the end of
Kennebunkport Piers, Floats and Fenders $500,000
2022 Phase 2 Pier Road.
Rehabilitation
160
ID/Year Municipality Scope Name Description Total Project Cost
023150.00
Badger Island Bridge (#2031) over
Highway-Bridges
2023/24 Kittery Route 1 Piscataqua River. Located 0.07 of a mile $815,000
Bridge Improvements south of Water Street.
HCP 2
161
ID/Year Municipality Scope Name Description Total Project Cost
026172.00
Highway-Bridges Sarah Mildred Long Bridge (#3641) over
2023/24 Kittery Route 1 Bypass Piscataqua River and Roads. Located on the $1,000,000
Bridge Superstructure Kittery and New Hampshire State line.
HCP 1 Rehabilitation
Highway Paving
026043.00
Interstate 95 Northbound Weigh Stations on Interstate 95 northbound
Kittery, York Interstate
2022 and Southbound and southbound.
3/4" Overlay
162
ID/Year Municipality Scope Name Description Total Project Cost
022244.00
Highway-Bridges New Bridge (#3717) over Salmons Falls.
Lebanon New Bridge Road
2023/24 Located 0.08 of a mile north of Hillside Drive. $1,520,000
Bridge Replacement
025857.00
Highway Paving
Beginning at Route 111 and extending north
2023 Lyman Kennebunk Pond Road
2.11 miles to the South Waterboro Road.
Light Capital Paving
HCP 4
WR 43366
Drainage Maintenance Ditching on Kennebunk Pond Road.
2022 Lyman Kennebunk Pond Road Beginning at Route 111 and extending north $55,000
2.11 miles to South Waterboro.
HCP 4
163
ID/Year Municipality Scope Name Description Total Project Cost
024963.00
Highway Paving
Lyman, Beginning at May Street and extending
2022 South Waterboro Road
Waterboro southeast 7.67 miles.
Light Capital Paving
HCP 4
024963.00
Highway Paving
Beginning at the New Hampshire state line
2022 Newfield Route 110
and extending east 3.57 miles to Route 11.
Light Capital Paving
HCP 4
WR 43367
Drainage Maintenance Ditching on Route 11 in Newfield. Beginning
2022 Newfield Route 11 at the intersection of Route 110 extending $21,000
3.95 miles to the Newfield-Limerick town line.
HCP 4
WR 43571
Drainage Maintenance Ditching on Route 110 in Newfield. Beginning
2022 Newfield Route 110 at the New Hampshire-Maine State border $30,000
and extending west 3.60 miles to Route 11.
HCP 4
024963.00
Highway Paving
Newfield, Beginning at Route 11 and extending south
2022 Newfield Road
Shapleigh 5.25 miles to West Road.
Light Capital Paving
HCP 4
Rail
025901.00
Railroad crossing (#053153A) located at the
North Berwick Rail/Highway Crossings Route 4 $180,000
2022 intersection of Route 4 and Buffum Road.
Rail Crossing Improvements
Ports-Harbors
023084.00 Replacement of the Pedestrian Draw Bridge
Ogunquit Piers, Floats and Fenders Pedestrian Draw Bridge at Perkins Cove. Located 0.14 of a mile south
2023/24 $1,000,000
of the Whistling Oyster Lane.
Rehabilitation
025857.00
Highway Paving
Beginning at the York town line and
2023 Ogunquit Shore Road
extending north 1.36 miles to Route 1.
Light Capital Paving
HCP 4
164
ID/Year Municipality Scope Name Description Total Project Cost
Rail
025903.00
Old Orchard Rail/Highway Crossings Railroad crossing (#053204H) located 0.03 of
Walnut Street
2022 Beach a mile north of Route 9. $352,000
Signal Improvements
(Rail/Highway Xing)
025853.00
Highway Paving
Beginning at South Road and extending
2023 Parsonsfield Merrill Hill Road
north 5.07 miles to Route 160.
Light Capital Paving
HCP 4
Bus
023274.00
Saco Parking Lots Park and Ride Lot Located 0.60 of a mile north of North Street.
2023/24 $430,000
Rehabilitation
025857.00
Highway Paving
Beginning at Route 5 and extending north
2023 Saco Louden Road
0.57 of a mile.
Light Capital Paving
HCP 4
Aviation
018706.05 Safety and infrastructure improvements that
Sanford Seacoast
Sanford Apron may include design, permitting and
2023/24 Regional Airport $2,290,000
construction of the apron.
Reconstruction
165
ID/Year Municipality Scope Name Description Total Project Cost
Highway
022642.00
Construction/Rehabilitation
Beginning at River Street and extending
2023/24 Sanford Route 202
Rural Highways north 0.72 of a mile. $6,200,000
HCP 1
Reconstruction
Highway
024641.06
Construction/Rehabilitation Municipal Partnership Initiative Program.
2022 Sanford River Street Beginning at High Street and extending north $1,660,000
Urban Highways
0.80 of a mile to Votech Drive.
HCP 4
Highway Rehabilitation
025317.00
Powers Bridge (#3827) over Mousam River.
Highway-Bridges
2023/24 Sanford Route 4 Located 0.12 of a mile southwest of Gavel $3,620,000
Bridge Replacement Road.
HCP 2
166
ID/Year Municipality Scope Name Description Total Project Cost
Bus
026306.00
Sanford Parking Lots Park and Ride Lot Located on Emerson Street.
2023/24 $210,000
New Construction
Bicycle/Pedestrian
026310.00 Purchase and installation of new and
Sanford On-Road Sidewalk/Trail Various locations replacement regulatory and warning signage
2022 $75,000
at various locations.
Safety Improvements
WR 43819
Bridge and Structural Replacing bearing plates on Powers Bridge
2022 Sanford Maintenance Route 4 (#3827) located in Sanford which carries $30,000
Route 4 over the Mousam River.
HCP 2
024963.00
Highway Paving
Beginning 0.05 of a mile north of the Sanford
2022 Shapleigh Route 109
town line and extending north 1.90 miles.
Light Capital Paving
HCP 2
023136.00
Toll Bridge (#3017) over Salmon Falls River.
Highway-Bridges
2022 South Berwick Route 101 Located 0.27 of a mile northwest of $100,000
Bridge Improvements - PE Only Waterside Lane.
HCP 4
024963.00
Highway Paving Beginning 0.06 of a mile northeast of the
2022 Waterboro West Road Shapleigh town line and extending south 6.31
Light Capital Paving miles.
HCP 4
167
ID/Year Municipality Scope Name Description Total Project Cost
023535.00
Buffam Bridge (#2107) over Webhannet
Highway-Minor Spans
2023/24 Wells Post Road River. Located 0.02 of a mile south of Falls $1,770,000
Bridge Replacement Park.
HCP 2
025857.00
Highway Paving
Beginning at Route 9 and extending north
2023 Wells Route 9A
0.88 of a mile to Route 109.
Light Capital Paving
HCP 4
Rail
025905.00
Rail/Highway Crossings Railroad crossing (#053168P) located 0.36 of
Wells Burnt Mill Road $348,000
2022 a mile northwest of Route 9.
Signal Improvements
(Rail/Highway Xing)
Highway
021651.01
Construction/Rehabilitation Beginning at Hospital Drive and extending
2023/24 York Route 1A south 0.29 of a mile to Moulton Lane. $795,000
Urban Highways
KACTS Sponsored.
HCP 3
Highway Rehabilitation
168
ID/Year Municipality Scope Name Description Total Project Cost
025857.00
Highway Paving Beginning at the Kittery town line and
2023 York Route 103 extending north 2.01 miles to Harris Island
Light Capital Paving Road.
HCP 4
169
Statewide Capital
Projects
Ë
Statewide Capital
ID/Year Municipality Scope Name Description Total Project Cost
018896.16
1 - Southern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $6,190,000
018896.17
1 - Southern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $7,300,000
018995.15
1 - Southern Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $100,000
018995.16
1 - Southern Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000
018995.17
1 - Southern Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000
022196.16
1 - Southern Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $4,330,000
025527.00
Highway Safety and Spot
1 - Southern Improvements
2022 Various Locations Truck Weigh Areas.
Region $100,000
HCP 2
170
ID/Year Municipality Scope Name Description Total Project Cost
1 - Southern
025321.00 Region, 2 - Mid-
Maine Advanced Signal Control and
Coast Region, 3 Highway Safety and Spot Connected Vehicle System for safe, efficient,
2023 - Western Improvements Various Locations and equitable rural transportation (MAST)
Region, 4 - $6,970,000
HCP 1, 2, 3, Project. This project is a successful ATCMTD
Eastern Region,
4 grant recipient.
5 - Northern
Region
024261.00 1 - Southern
Region, 3 - Highway Safety and Spot
2022 Western Region, Improvements Procurement of sign equipment and
Various Locations
4 - Eastern accessories. $112,000
HCP 1, 2, 3, Region, 5 -
4 Northern Region
018896.26
2 - Mid-Coast Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $4,570,000
018896.27
2 - Mid-Coast Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $4,710,000
018995.25
2 - Mid-Coast Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $123,000
018995.26
2 - Mid-Coast Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000
018995.27
2 - Mid-Coast Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000
022196.26
2 - Mid-Coast Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $2,830,000
171
ID/Year Municipality Scope Name Description Total Project Cost
026456.00
2 - Mid-Coast Highway Preservation Paving
2023 Region, 4 - Various Locations Statewide interstate ramp paving. $2,000,000
Eastern Region
HCP 1
018896.36
3 - Western Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $3,310,000
018896.37
3 - Western Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $5,010,000
018995.35
3 - Western Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $100,000
018995.36
3 - Western Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000
018995.37
3 - Western Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000
022196.36
3 - Western Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $3,120,000
172
ID/Year Municipality Scope Name Description Total Project Cost
018896.46
4 - Eastern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $5,580,000
018896.47
4 - Eastern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $6,000,000
018995.45
4 - Eastern Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $100,000
018995.46
4 - Eastern Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000
018995.47
4 - Eastern Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000
022196.46
4 - Eastern Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $4,210,000
173
ID/Year Municipality Scope Name Description Total Project Cost
018896.56
5 - Northern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2023 Region $4,280,000
018896.57
5 - Northern Highway Preservation Paving
Various Locations Light Pavement Treatment.
2024 Region $3,780,000
018995.55
5 - Northern Highway Preservation Paving
Various Locations Crack Seal.
2022 Region $96,000
018995.56
5 - Northern Highway Preservation Paving
Various Locations Crack Seal.
2023 Region $100,000
018995.57
5 - Northern Highway Preservation Paving
Various Locations Crack Seal.
2024 Region $100,000
022196.56
5 - Northern Highway Preservation Paving
Various Locations Cyclical Pavement Resurfacing.
2024 Region $2,700,000
016336.22 Highway Safety and Spot Enhance the MLRC Road System
Statewide Improvements RSMS Sign Software Management Software to include technical
2022 $25,000
assistance and software adjustments.
016336.23 Highway Safety and Spot Enhance the MLRC Road System
Statewide Improvements RSMS Sign Software Management Software to include technical
2023 $25,000
assistance and software adjustments.
016336.24 Highway Safety and Spot Enhance the MLRC Road System
Statewide Improvements RSMS Sign Software Management Software to include technical
2024 $25,000
assistance and software adjustments.
174
ID/Year Municipality Scope Name Description Total Project Cost
018517.22 Bus
Statewide Various Locations Capital improvements to Park and Ride Lots.
2022 Parking Lots $100,000
018517.23 Bus
Statewide Various Locations Capital improvements to Park and Ride Lots.
2023 Parking Lots $100,000
018517.24 Bus
Statewide Various Locations Capital improvements to Park and Ride Lots. $100,000
2024 Parking Lots
175
ID/Year Municipality Scope Name Description Total Project Cost
018599.22 Rail
Operational improvements to state-owned rail
Statewide State-Owned Rail Lines
2022 Line/Track lines. $1,410,000
018599.23 Rail
Operational improvements to state-owned rail
Statewide State-Owned Rail Lines
2023 Line/Track lines. $1,410,000
018599.24 Rail
Operational improvements to state-owned rail
Statewide State-Owned Rail Lines
2024 Line/Track lines. $1,410,000
019518.22 Bus
Statewide maintenance of Park and Ride
Statewide Various Locations
2022 Parking Lots lots. $70,000
019518.23 Bus
Statewide maintenance of Park and Ride
Statewide Various Locations
2023 Parking Lots lots. $70,000
176
ID/Year Municipality Scope Name Description Total Project Cost
019518.24 Bus
Statewide maintenance of Park and Ride
Statewide Various Locations
2024 Parking Lots lots. $70,000
020773.22
Non-Project Capital FTA Section 5311 for Capital Assistance -
Statewide Rural Transit Capital $100,000
2024 transit agencies statewide RURAL.
020791.22
Non-Project Capital FTA Section 5310 for Operating / Capital
Statewide Urban Transit Capital
2022 Assistance - transit agencies URBAN. $750,000
177
ID/Year Municipality Scope Name Description Total Project Cost
020828.22 Rail
Statewide Various Locations Rail Line Improvements.
2022 Line/Track $1,500,000
020828.23 Rail
Statewide Various Locations Rail Line Improvements.
2023 Line/Track $1,500,000
178
ID/Year Municipality Scope Name Description Total Project Cost
020828.24 Rail
Statewide Various Locations Rail Line Improvements.
2024 Line/Track $1,500,000
021844.00
Non-Project Capital Work Zone Sign
Statewide Work Zone sign packages for Local Roads.
2022 Packages $120,000
022048.00 Highway Safety and Spot Pedestrian Safety efforts: Projects such as
Statewide Improvements Various Locations overhead lighting, signage, signals, crossing
2022 $50,000
improvements, etc.
022777.22
Ferry Maine State Ferry Maine State Ferry Service infrastructure
Statewide
2022 Service improvements. $630,000
022777.23
Ferry Maine State Ferry Maine State Ferry Service infrastructure
Statewide $630,000
2023 Service improvements.
022777.24
Ferry Maine State Ferry Maine State Ferry Service infrastructure
Statewide $630,000
2024 Service improvements.
022779.21
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital $3,830,000
2022 Statewide - Statewide National Distribution.
022779.22
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital
2022 Statewide - Statewide National Distribution. $4,380,000
022783.22
Non-Project Capital State bond funds to match FTA funding for
Statewide Transit
2022 Transit Buses - capital projects only. $850,000
179
ID/Year Municipality Scope Name Description Total Project Cost
024225.00 Highway Safety and Spot In conjunction with Public Safety, the location
Statewide Improvements Various Locations identification and implementation of Wrong
2023 $250,000
Way mitigation strategies.
180
ID/Year Municipality Scope Name Description Total Project Cost
024605.00
Ferry Maine State Ferry Design for a new ferry that services the
Statewide $500,000
2022 Service Maine State Ferry Service.
024709.00
Non-Project Capital FTA Section 5310 Statewide Capital
Statewide Rural Transit Capital $882,000
2023 Projects.
024731.00
Non-Project Capital FTA Section 5310 Statewide-Urban Capital
Statewide Urban Transit Capital
2023 Projects. $706,000
024733.00
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital
2023 Statewide - Statewide National Distribution. $4,120,000
181
ID/Year Municipality Scope Name Description Total Project Cost
024897.00
Ferry Maine State Ferry Design for a new ferry that services the
Statewide
2022 Service Maine State Ferry Service. $380,000
024897.10
Ferry Maine State Ferry New ferry that services the Maine State Ferry
Statewide
2022 Service Service. $10,000,000
182
ID/Year Municipality Scope Name Description Total Project Cost
025485.00
Highway Preservation Paving
Statewide Various Locations Interstate crack sealing.
2023 $600,000
183
ID/Year Municipality Scope Name Description Total Project Cost
025573.00
Non-Project Capital FTA Section 5310 for Operating / Capital
Statewide Rural Transit Capital
2024 Assistance - transit agencies statewide Rural. $882,000
025651.00
Non-Project Capital FTA Section 5339 Capital Assistance
Statewide Rural Transit Capital
2024 Statewide - Statewide National Distribution. $4,120,000
184
ID/Year Municipality Scope Name Description Total Project Cost
026039.00
Ferry Maine State Ferry Improve cold weather resilience of the E.
Statewide
2022 Service Frank Thompson Ferry. $50,000
026252.00 Highway Safety and Spot Purchase equipment meant to enhance the
Statewide Improvements Various Locations safety in areas identified during road safety
2024 $76,000
assessments and audits.
185
ID/Year Municipality Scope Name Description Total Project Cost
026458.00
Highway Preservation Paving
Statewide Various Locations Interstate crack sealing.
2024 $625,000
026580.00 Ports-Harbors
Electronic upgrades to Ferry Service
Statewide MSFS Facilities $100,000
2022 Marine Buildings/Facilities Facilities.
186
Statewide Operations
Ë
Statewide Operations
ID/Year Municipality Scope Name Description Total Project Cost
BR 23027
System Operations 24-Hour Transportation Management Center
Statewide Various Locations
2022 (TMC). $900,000
BR 23099
System Operations 24-Hour Transportation Management Center
Statewide Various Locations
2023 (TMC). $950,000
BR 23153
System Operations 24-Hour Transportation Management Center
Statewide Various Locations
2024 (TMC). $1,000,000
BR 23062
Crew Operations
Statewide Dept. Operations Augusta Sign Shop operations.
2022 $875,000
BR 23134
Crew Operations
Statewide Dept. Operations Augusta Sign Shop operations.
2023 $900,000
BR 23188
Crew Operations
Statewide Dept. Operations Augusta Sign Shop operations.
2024 $925,000
187
ID/Year Municipality Scope Name Description Total Project Cost
022009.22 Administration
Design and Construction Bridge design and construction program
Statewide $1,230,000
2022 Capital Project Support Support management and project support.
022009.23 Administration
Design and Construction Bridge design and construction program
Statewide $1,280,000
2023 Capital Project Support Support management and project support.
022009.24 Administration
Design and Construction Bridge design and construction program
Statewide
2024 Capital Project Support Support management and project support. $1,280,000
022038.22 Work Program Management Responsible for general civil rights issues
Statewide Civil Rights and specific legal requirements related to civil
2022 Compliance Activities $315,000
rights under state and federal law.
022038.23 Work Program Management Responsible for general civil rights issues
Statewide Civil Rights and specific legal requirements related to civil
2023 Compliance Activities $315,000
rights under state and federal law.
188
ID/Year Municipality Scope Name Description Total Project Cost
022038.24 Work Program Management Responsible for general civil rights issues
Statewide Civil Rights and specific legal requirements related to civil
2024 Compliance Activities $315,000
rights under state and federal law.
189
ID/Year Municipality Scope Name Description Total Project Cost
BR 23032
Contract Administration Contract Administration - Bureau of
Statewide Dept. Operations
2022 Maintenance and Operations. $1,400,000
BR 23104
Contract Administration Contract Administration - Bureau of
Statewide Dept. Operations $1,500,000
2023 Maintenance and Operations.
BR 23158
Contract Administration Contract Administration - Bureau of
Statewide Dept. Operations $1,600,000
2024 Maintenance and Operations.
022002.22 Administration
Construction contracts development,
Statewide Construction Contracts $525,000
2022 Capital Project Support procurement, and payment.
022002.23 Administration
Construction contracts development,
Statewide Construction Contracts
2023 Capital Project Support procurement, and payment. $530,000
022002.24 Administration
Construction contracts development,
Statewide Construction Contracts
2024 Capital Project Support procurement, and payment. $530,000
190
ID/Year Municipality Scope Name Description Total Project Cost
012818.22 Work Program Management Funding for USFWS liaison to review projects
subject to the federal Clean Water Act and
Statewide USFWS Reviews $260,000
2022 Compliance Activities Endangered Species Act to ensure on time
and in compliance project delivery.
012818.23 Work Program Management Funding for USFWS liaison to review projects
subject to the federal Clean Water Act and
Statewide USFWS Reviews
2023 Compliance Activities Endangered Species Act to ensure on time $260,000
and in compliance project delivery.
191
ID/Year Municipality Scope Name Description Total Project Cost
012818.24 Work Program Management Funding for USFWS liaison to review projects
subject to the federal Clean Water Act and
Statewide USFWS Reviews
2024 Compliance Activities Endangered Species Act to ensure on time $260,000
and in compliance project delivery.
192
ID/Year Municipality Scope Name Description Total Project Cost
193
ID/Year Municipality Scope Name Description Total Project Cost
194
ID/Year Municipality Scope Name Description Total Project Cost
025803.22 Administration
National Environmental National Environmental Policy Act (NEPA)
Statewide $50,000
2022 Compliance Activities Policy Act Assignment ( 23 USC 327) Management.
025803.23 Administration
National Environmental National Environmental Policy Act (NEPA)
Statewide
2023 Compliance Activities Policy Act Assignment ( 23 USC 327) Management. $50,000
025803.24 Administration
National Environmental National Environmental Policy Act (NEPA)
Statewide
2024 Compliance Activities Policy Act Assignment ( 23 USC 327) Management. $50,000
195
ID/Year Municipality Scope Name Description Total Project Cost
BR 23037
Environmental Stewardship Environmental Stewardship - Bureau of
Statewide Various Locations
2022 Maintenance and Operations. $885,000
BR 23109
Environmental Stewardship Environmental Stewardship - Bureau of
Statewide Various Locations
2023 Maintenance and Operations. $900,000
BR 23163
Environmental Stewardship Environmental Stewardship - Bureau of
Statewide Various Locations
2024 Maintenance and Operations. $950,000
018526.22 Administration
Funding to support the operations of the
Statewide Executive Office
2022 General Administration Executive Office. $1,500,000
018526.23 Administration
Funding to support the operations of the
Statewide Executive Office $1,500,000
2023 General Administration Executive Office.
018526.24 Administration
Funding to support the operations of the
Statewide Executive Office $1,500,000
2024 General Administration Executive Office.
196
ID/Year Municipality Scope Name Description Total Project Cost
197
ID/Year Municipality Scope Name Description Total Project Cost
198
ID/Year Municipality Scope Name Description Total Project Cost
020823.00 Administration
The repayment of GARVEE bonds for
Statewide Bond Principal/Interest
2022 Financial Administration Calendar Years 2022, 2023, and 2024. $81,700,000
1 - Southern
018769.22 Region, 2 - Mid- Highway System Operations
Coast Region, 4
Interstate Striping Polyurea striping for the interstate.
2022 - Eastern Highways $1,500,000
Region, 5 -
Northern Region
020820.22 Administration
Perform geotechnical field work for slope
Statewide Geotechnical Field Work
2022 Capital Project Support monitoring and miscellaneous develpoment. $25,000
199
ID/Year Municipality Scope Name Description Total Project Cost
020820.23 Administration
Perform geotechnical fieldwork for slope
Statewide Geotechnical Field Work
2023 Capital Project Support monitoring and miscellaneous development. $25,000
020820.24 Administration
Perform geotechnical fieldwork for slope
Statewide Geotechnical Field Work
2024 Capital Project Support monitoring and miscellaneous development. $25,000
022010.22 Administration
Design and Construction Highway program management and project
Statewide
2022 Capital Project Support Support support. $2,780,000
022010.23 Administration
Design and Construction Highway program management and project
Statewide
2023 Capital Project Support Support support. $2,900,000
022010.24 Administration
Design and Construction Highway program management and project
Statewide $2,900,000
2024 Capital Project Support Support support.
200
ID/Year Municipality Scope Name Description Total Project Cost
201
ID/Year Municipality Scope Name Description Total Project Cost
005412.22 Administration
Statewide Management Local Road Assistance Program (LRAP). $40,000
2022 Maintenance and Operations
005412.23 Administration
Statewide Management Local Road Assistance Program (LRAP). $40,000
2023 Maintenance and Operations
005412.24 Administration
Statewide Management Local Road Assistance Program (LRAP). $40,000
2024 Maintenance and Operations
202
ID/Year Municipality Scope Name Description Total Project Cost
018501.22 Maintenance
Statewide Vegetation Management Roadside vegetation management.
2022 Highways $100,000
018501.23 Maintenance
Statewide Vegetation Management Roadside vegetation management.
2023 Highways $100,000
018501.24 Maintenance
Statewide Vegetation Management Roadside vegetation management.
2024 Highways $100,000
203
ID/Year Municipality Scope Name Description Total Project Cost
020830.22 Administration
Municipal Coordination to find and promote
Statewide Municipal Coordination
2022 Maintenance and Operations efficiencies in transportation services. $50,000
020830.23 Administration
Municipal Coordination to find and promote
Statewide Municipal Coordination
2023 Maintenance and Operations efficiencies in transportation services. $50,000
020830.24 Administration
Municipal Coordination to find and promote
Statewide Municipal Coordination
2024 Maintenance and Operations efficiencies in transportation services. $50,000
204
ID/Year Municipality Scope Name Description Total Project Cost
205
ID/Year Municipality Scope Name Description Total Project Cost
023434.22 Maintenance
1 - Southern Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000
023434.23 Maintenance
1 - Southern Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000
023434.24 Maintenance
1 - Southern Leasing excavators to maintain and upgrade
Excavator Leasing
2024 Region Highways the drainage systems prior to paving. $100,000
023436.22 Maintenance
2 - Mid-Coast Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000
023436.23 Maintenance
2 - Mid-Coast Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2023 Region Highways the drainage systems prior to paving.
023436.24 Maintenance
2 - Mid-Coast Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2024 Region Highways the drainage systems prior to paving.
023438.22 Maintenance
3 - Western Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2022 Region Highways the drainage systems prior to paving.
023438.23 Maintenance
3 - Western Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000
023438.24 Maintenance
3 - Western Leasing excavators to maintain and upgrade
Excavator Leasing
2024 Region Highways the drainage systems prior to paving. $100,000
023440.22 Maintenance
4 - Eastern Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000
206
ID/Year Municipality Scope Name Description Total Project Cost
023440.23 Maintenance
4 - Eastern Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000
023440.24 Maintenance
4 - Eastern Leasing excavators to maintain and upgrade
Excavator Leasing
2024 Region Highways the drainage systems prior to paving. $100,000
023442.22 Maintenance
5 - Northern Leasing excavators to maintain and upgrade
Excavator Leasing
2022 Region Highways the drainage systems prior to paving. $100,000
023442.23 Maintenance
5 - Northern Leasing excavators to maintain and upgrade
Excavator Leasing
2023 Region Highways the drainage systems prior to paving. $100,000
023442.24 Maintenance
5 - Northern Leasing excavators to maintain and upgrade
Excavator Leasing $100,000
2024 Region Highways the drainage systems prior to paving.
207
ID/Year Municipality Scope Name Description Total Project Cost
208
ID/Year Municipality Scope Name Description Total Project Cost
020831.22 Administration
Operating costs for the department's Data
Statewide Data Collection Vehicle
2022 Capital Project Support Collection Vehicle (ARAN). $300,000
020831.23 Administration
Operating costs for the department's Data
Statewide Data Collection Vehicle $320,000
2023 Capital Project Support Collection Vehicle (ARAN).
020831.24 Administration
Operating costs for the department's Data
Statewide Data Collection Vehicle $320,000
2024 Capital Project Support Collection Vehicle (ARAN).
209
ID/Year Municipality Scope Name Description Total Project Cost
025025.22 Maintenance
Improvements at MaineDOT Visitor
Statewide Various Locations
2022 Highways Information Centers. $700,000
025025.23 Maintenance
Improvements at MaineDOT Visitor
Statewide Various Locations
2023 Highways Information Centers. $700,000
025025.24 Maintenance
Improvements at MaineDOT Visitor
Statewide Various Locations $700,000
2024 Highways Information Centers.
022007.22 Administration
Multimodal project engineering and
Statewide Multimodal Engineering $425,000
2022 Capital Project Support development.
022007.23 Administration
Multimodal project engineering and
Statewide Multimodal Engineering
2023 Capital Project Support development. $425,000
022007.24 Administration
Multimodal project engineering and
Statewide Multimodal Engineering
2024 Capital Project Support development. $450,000
022008.22 Administration
Multimodal design and construction program
Statewide Multimodal Production
2022 Capital Project Support management and support. $800,000
210
ID/Year Municipality Scope Name Description Total Project Cost
022008.23 Administration
Multimodal design and construction program
Statewide Multimodal Production
2023 Capital Project Support management and support. $835,000
022008.24 Administration
Multimodal design and construction program
Statewide Multimodal Production
2024 Capital Project Support management and support. $835,000
211
ID/Year Municipality Scope Name Description Total Project Cost
212
ID/Year Municipality Scope Name Description Total Project Cost
213
ID/Year Municipality Scope Name Description Total Project Cost
214
ID/Year Municipality Scope Name Description Total Project Cost
018505.22 Policy, Planning and Research Planning Partnership Initiative (PPI): This
Planning Partnership competitive program supports regional
Statewide
2022 Planning and Research Initiative planning efforts through grants awarded on a $400,000
best-value basis.
018505.23 Policy, Planning and Research Planning Partnership Initiative (PPI): This
Planning Partnership competitive program supports regional
Statewide
2023 Planning and Research Initiative planning efforts through grants awarded on a $400,000
best-value basis.
018505.24 Policy, Planning and Research Planning Partnership Initiative (PPI): This
Planning Partnership competitive program supports regional
Statewide
2024 Planning and Research Initiative planning efforts through grants awarded on a $400,000
best-value basis.
018717.03 Policy, Planning and Research Update to the Statewide Aviation System
Plan that may result in safety and
Statewide Aviation System Plan
2022 Planning and Research infrastructure improvements. AIP 3-23-0003- $797,000
012-2021
215
ID/Year Municipality Scope Name Description Total Project Cost
018717.04 Policy, Planning and Research Update to the Statewide Pavement Condition
Statewide Aviation
Statewide Index Plan that may result in safety and
2023 Planning and Research System Plan $412,000
infrastructure improvements.
216
ID/Year Municipality Scope Name Description Total Project Cost
217
ID/Year Municipality Scope Name Description Total Project Cost
022780.20 System Operations by Others FTA Section 5311 for Rural Transit
Statewide Rural Transit RTAP Assistance Program (RTAP) - statewide
2022 Transit Service Area $162,000
transit agencies RURAL.
022780.21 System Operations by Others FTA Section 5311 for Rural Transit
Statewide Rural Transit RTAP Assistance Program (RTAP) - statewide
2022 Transit Service Area $162,000
transit agencies RURAL.
022780.22 System Operations by Others FTA Section 5311 for Rural Transit
Statewide Rural Transit RTAP Assistance Program (RTAP) - statewide $160,000
2024 Transit Service Area
transit agencies RURAL.
218
ID/Year Municipality Scope Name Description Total Project Cost
024643.00 Policy, Planning and Research Planning activities and pilot deployments for
I-95 Corridor Coalition
Statewide a mileage-based user fee system with the I-
2022 Planning and Research Pilot $320,000
95 States.
219
ID/Year Municipality Scope Name Description Total Project Cost
024843.09 System Operations by Others Transit RTAP Assistance for Federal Transit
Statewide Rural Transit RTAP Administration § 5311 Rural Program, FTA $98,000
2022 Transit Service Area
American Rescue Plan funds.
Information Technology
024859.22
Support
Statewide Data Subscription Streetlight data subscription.
2022 $251,000
Planning and Research
Information Technology
024859.23
Support
Statewide Data Subscription Streetlight data subscription.
2023 $251,000
Planning and Research
220
ID/Year Municipality Scope Name Description Total Project Cost
Information Technology
024859.24
Support
Statewide Data Subscription Streetlight data subscription.
2024 $251,000
Planning and Research
221
ID/Year Municipality Scope Name Description Total Project Cost
025957.00 Policy, Planning and Research Economic Evaluation Study for commuter
Economic Evaluation
Statewide and passenger train between Portland and
2022 Planning and Research Study $200,000
Lewiston/Auburn.
026015.00 Policy, Planning and Research Transit Propensity Study for communities
between Portland and Bangor to assess
Statewide Transit Propensity Study
2022 Planning and Research demand and viability for new or enhanced $200,000
transit service including passenger.
022001.22 Administration
Statewide Project Development Capital project development and production. $535,000
2022 Capital Project Support
022001.23 Administration
Statewide Project Development Capital project development and production. $550,000
2023 Capital Project Support
022001.24 Administration
Statewide Project Development Capital project development and production. $550,000
2024 Capital Project Support
222
ID/Year Municipality Scope Name Description Total Project Cost
022005.22 Administration
Statewide Property Acquisition Property management and acquisition.
2022 Capital Project Support $950,000
022005.23 Administration
Statewide Property Acquisition Property management and acquisition.
2023 Capital Project Support $985,000
022005.24 Administration
Statewide Property Acquisition Property management and acquisition.
2024 Capital Project Support $985,000
223
ID/Year Municipality Scope Name Description Total Project Cost
224
ID/Year Municipality Scope Name Description Total Project Cost
225
ID/Year Municipality Scope Name Description Total Project Cost
026588.00 Work Program Management Identify and address gaps in the information
Straight-Line Diagram currently available to DOT personnel involved
Statewide
2022 Info. Systems Management Tool with scoping preservation projects by further $125,000
developing the straight-line diagram tool.
021800.00
Communication and Outreach Defensive Driving
Statewide Municipal defensive driving training. $15,000
2022 Training
022152.22
Work Program Management Funding to upgrade critical ADA deficiencies
Statewide ADA Improvements
2022 in priority areas. $500,000
226
ID/Year Municipality Scope Name Description Total Project Cost
022152.23
Work Program Management Funding to upgrade critical ADA deficiencies
Statewide ADA Improvements
2023 in priority areas. $500,000
022152.24
Work Program Management Funding to upgrade critical ADA deficiencies
Statewide ADA Improvements
2024 in priority areas. $500,000
022994.00
Communication and Outreach Transportation Safety
Statewide Maine Transportation Safety Coalition.
2022 Coalition $4,000
BR 23067
Custodial Maintenance
Statewide Various Locations Statewide Integrated Vegetation Control.
2022 $5,110,000
BR 23139
Custodial Maintenance
Statewide Various Locations Statewide Integrated Vegetation Control.
2023 $5,220,000
BR 23193
Custodial Maintenance
Statewide Various Locations Statewide Integrated Vegetation Control.
2024 $5,320,000
BR 23040
System Operations Statewide Intelligent Transportation System
Statewide Various Locations $475,000
2022 (ITS) Device Maintenance.
BR 23112
System Operations Statewide Intelligent Transportation System
Statewide Various Locations
2023 (ITS) Device Maintenance. $500,000
BR 23166
System Operations Statewide Intelligent Transportation System
Statewide Various Locations
2024 (ITS) Device Maintenance. $525,000
BR 23028
Custodial Maintenance Statewide bridge cleaning, washing and
Statewide Various Locations
2022 sealing. $2,130,000
227
ID/Year Municipality Scope Name Description Total Project Cost
BR 23100
Custodial Maintenance Statewide bridge cleaning, washing and
Statewide Various Locations
2023 sealing. $2,170,000
BR 23154
Custodial Maintenance Statewide bridge cleaning, washing and
Statewide Various Locations
2024 sealing. $2,250,000
BR 23031
Drainage Maintenance
Statewide Various Locations Statewide catch basin and culvert cleaning.
2022 $1,420,000
BR 23103
Drainage Maintenance
Statewide Various Locations Statewide catch basin and culvert cleaning.
2023 $1,450,000
228
ID/Year Municipality Scope Name Description Total Project Cost
BR 23157
Drainage Maintenance
Statewide Various Locations Statewide catch basin and culvert cleaning.
2024 $1,480,000
BR 23033
Crew Operations Statewide crew supervision and
Statewide Dept. Operations
2022 management. $7,100,000
BR 23105
Crew Operations Statewide crew supervision and
Statewide Dept. Operations
2023 management. $7,250,000
BR 23159
Crew Operations Statewide crew supervision and
Statewide Dept. Operations
2024 management. $7,400,000
BR 23035
Drainage Maintenance Statewide drainage maintenance and
Statewide Various Locations $8,500,000
2022 improvements.
BR 23107
Drainage Maintenance Statewide drainage maintenance and
Statewide Various Locations $20,900,000
2023 improvements.
BR 23161
Drainage Maintenance Statewide drainage maintenance and
Statewide Various Locations $21,500,000
2024 improvements.
BR 23038
Crew Operations Statewide equipment service, repair and
Statewide Dept. Operations
2022 associated fleet costs. $10,600,000
BR 23110
Crew Operations Statewide equipment service, repair and
Statewide Dept. Operations
2023 associated fleet costs. $10,700,000
BR 23164
Crew Operations Statewide equipment service, repair and
Statewide Dept. Operations
2024 associated fleet costs. $10,800,000
229
ID/Year Municipality Scope Name Description Total Project Cost
BR 23046
Custodial Maintenance
Statewide Various Locations Statewide highway patrolling and inspecting.
2022 $2,800,000
BR 23118
Custodial Maintenance
Statewide Various Locations Statewide highway patrolling and inspecting.
2023 $2,900,000
BR 23172
Custodial Maintenance
Statewide Various Locations Statewide highway patrolling and inspecting.
2024 $3,000,000
BR 23042
Custodial Maintenance
Statewide Various Locations Statewide litter and debris removal.
2022 $600,000
230
ID/Year Municipality Scope Name Description Total Project Cost
BR 23114
Custodial Maintenance
Statewide Various Locations Statewide litter and debris removal.
2023 $625,000
BR 23168
Custodial Maintenance
Statewide Various Locations Statewide litter and debris removal.
2024 $650,000
BR 23043
Crew Operations
Statewide Dept. Operations Statewide material processing and transport.
2022 $1,450,000
BR 23115
Crew Operations
Statewide Dept. Operations Statewide material processing and transport.
2023 $1,500,000
BR 23169
Crew Operations
Statewide Dept. Operations Statewide material processing and transport.
2024 $1,550,000
BR 23044
System Operations
Statewide Various Locations Statewide movable bridge operations.
2022 $1,680,000
BR 23116
System Operations
Statewide Various Locations Statewide movable bridge operations.
2023 $1,700,000
BR 23170
System Operations
Statewide Various Locations Statewide movable bridge operations.
2024 $1,730,000
BR 23045
Custodial Maintenance
Statewide Various Locations Statewide mowing.
2022 $1,350,000
BR 23117
Custodial Maintenance
Statewide Various Locations Statewide mowing.
2023 $1,400,000
231
ID/Year Municipality Scope Name Description Total Project Cost
BR 23171
Custodial Maintenance
Statewide Various Locations Statewide mowing.
2024 $1,450,000
BR 23047
Surface and Base Maintenance
Statewide Various Locations Statewide pavement maintenance and repair.
2022 $7,100,000
BR 23119
Surface and Base Maintenance
Statewide Various Locations Statewide pavement maintenance and repair.
2023 $7,250,000
BR 23173
Surface and Base Maintenance
Statewide Various Locations Statewide pavement maintenance and repair.
2024 $7,400,000
BR 23048
System Operations
Statewide Various Locations Statewide permitting.
2022 $1,000,000
BR 23120
System Operations
Statewide Various Locations Statewide permitting.
2023 $1,050,000
BR 23174
System Operations
Statewide Various Locations Statewide permitting.
2024 $1,100,000
BR 23050
Custodial Maintenance
Statewide Various Locations Statewide railroad maintenance.
2022 $425,000
BR 23122
Custodial Maintenance
Statewide Various Locations Statewide railroad maintenance.
2023 $450,000
BR 23176
Custodial Maintenance
Statewide Various Locations Statewide railroad maintenance.
2024 $475,000
232
ID/Year Municipality Scope Name Description Total Project Cost
BR 23058
Custodial Maintenance
Statewide Various Locations Statewide rest area maintenance.
2022 $650,000
BR 23130
Custodial Maintenance
Statewide Various Locations Statewide rest area maintenance.
2023 $700,000
BR 23184
Custodial Maintenance
Statewide Various Locations Statewide rest area maintenance.
2024 $750,000
BR 23060
Surface and Base Maintenance Statewide roadway shoulder and base
Statewide Various Locations
2022 maintenance. $1,880,000
BR 23132
Surface and Base Maintenance Statewide roadway shoulder and base
Statewide Various Locations $1,900,000
2023 maintenance.
BR 23186
Surface and Base Maintenance Statewide roadway shoulder and base
Statewide Various Locations $1,930,000
2024 maintenance.
BR 23059
Surface and Base Maintenance
Statewide Various Locations Statewide shoulder grading.
2022 $665,000
BR 23131
Surface and Base Maintenance
Statewide Various Locations Statewide shoulder grading.
2023 $700,000
BR 23185
Surface and Base Maintenance
Statewide Various Locations Statewide shoulder grading.
2024 $725,000
233
ID/Year Municipality Scope Name Description Total Project Cost
BR 23063
Winter Maintenance
Statewide Various Locations Statewide snow and ice control.
2022 $46,000,000
BR 23135
Winter Maintenance
Statewide Various Locations Statewide snow and ice control.
2023 $46,300,000
BR 23189
Winter Maintenance
Statewide Various Locations Statewide snow and ice control.
2024 $46,900,000
BR 23064
Custodial Maintenance
Statewide Various Locations Statewide sweeping.
2022 $1,910,000
BR 23136
Custodial Maintenance
Statewide Various Locations Statewide sweeping.
2023 $1,950,000
BR 23190
Custodial Maintenance
Statewide Various Locations Statewide sweeping.
2024 $1,990,000
BR 23065
System Operations
Statewide Various Locations Statewide traffic engineering and support.
2022 $1,650,000
BR 23137
System Operations
Statewide Various Locations Statewide traffic engineering and support.
2023 $1,680,000
234
ID/Year Municipality Scope Name Description Total Project Cost
BR 23191
System Operations
Statewide Various Locations Statewide traffic engineering and support.
2024 $1,720,000
BR 23057
System Operations Statewide transportation system emergency
Statewide Various Locations $950,000
2022 response.
BR 23129
System Operations Statewide transportation system emergency
Statewide Various Locations $975,000
2023 response.
BR 23183
System Operations Statewide transportation system emergency
Statewide Various Locations $1,000,000
2024 response.
235
ID/Year Municipality Scope Name Description Total Project Cost
236
ID/Year Municipality Scope Name Description Total Project Cost
023332.00 Highway System Operations STIC funding for Strategic Highway Research
Strategic Highway
Statewide Program (SHRP2) Traffic Incident
2022 Highways Research Program $21,000
Management (TIM) Training.
237
ID/Year Municipality Scope Name Description Total Project Cost
238
ID/Year Municipality Scope Name Description Total Project Cost
002134.22
Policy, Planning and Research Administration and management of the
Statewide Research Administration
2022 federally mandated research program. $175,000
002134.23
Policy, Planning and Research Administration and management of the
Statewide Research Administration $175,000
2023 federally mandated research program.
002134.24
Policy, Planning and Research Administration and management of the
Statewide Research Administration $175,000
2024 federally mandated research program.
007519.22
Policy, Planning and Research Evaluate new products to identify efficiencies
Statewide New Product Evaluation
2022 and increase cost effectiveness. $120,000
239
ID/Year Municipality Scope Name Description Total Project Cost
007519.23
Policy, Planning and Research Evaluate new products to identify efficiencies
Statewide New Product Evaluation
2023 and increase cost effectiveness. $120,000
007519.24
Policy, Planning and Research Evaluate new products to identify efficiencies
Statewide New Product Evaluation
2024 and increase cost effectiveness. $120,000
240
ID/Year Municipality Scope Name Description Total Project Cost
024815.00
Policy, Planning and Research Identification of aquatic species of interest
Statewide DNA Testing Protocol
2022 and development of a DNA testing protocol. $50,000
025851.22
Policy, Planning and Research Research and Pilot
Statewide Innovation Program management
2022 Projects $150,000
025851.23
Policy, Planning and Research Research and Pilot
Statewide Innovation Program management.
2023 Projects $150,000
025851.24
Policy, Planning and Research Research and Pilot
Statewide Innovation Program management. $150,000
2024 Projects
241
Municipal Index
Ë
Municipal Index
242
Municipality County Tab Municipality County Tab
Buckfield Oxford Coburn Gore Franklin
Bucksport Hancock Codyville Plt Washington
Burlington Penobscot Columbia Washington
Burnham Waldo Columbia Falls Washington
Buxton York Concord Twp Somerset
Byron Oxford Connor Twp Aroostook
C Surplus Oxford Cooper Washington
Calais Washington Coplin Plt Franklin
Cambridge Somerset Corinna Penobscot
Camden Knox Corinth Penobscot
Canaan Somerset Cornish York
Canton Oxford Cornville Somerset
Cape Elizabeth Cumberland Cove Point Twp Piscataquis
Caratunk Somerset Cranberry Isles Hancock
Caribou Aroostook Crawford Washington
Carmel Penobscot Cross Lake Twp Aroostook
Carrabassett Valley Franklin Crystal Aroostook
Carroll Plt Penobscot Cumberland Cumberland
Carrying Place Town Twp Somerset Cushing Knox
Carrying Place Twp Somerset Cutler Washington
Carthage Franklin Cyr Plt Aroostook
Cary Plt Aroostook Dallas Plt Franklin
Casco Cumberland Damariscotta Lincoln
Castine Hancock Danforth Washington
Castle Hill Aroostook Day Block Twp Washington
Caswell Aroostook Dayton York
Cathance Twp Washington Dead River Twp Somerset
Centerville Twp Washington Deblois Washington
Chain of Ponds Twp Franklin Dedham Hancock
Chapman Aroostook Deer Isle Hancock
Charleston Penobscot Denmark Oxford
Charlotte Washington Dennistown Plt Somerset
Chebeague Island Cumberland Dennysville Washington
Chelsea Kennebec Detroit Somerset
Cherryfield Washington Devereaux Twp Washington
Chester Penobscot Dexter Penobscot
Chesterville Franklin Dixfield Oxford
Chesuncook Twp Piscataquis Dixmont Penobscot
China Kennebec Dover-Foxcroft Piscataquis
Clifton Penobscot Dresden Lincoln
Clinton Kennebec Drew Plt Penobscot
243
Municipality County Tab Municipality County Tab
East Millinocket Penobscot Frenchville Aroostook
East Moxie Twp Somerset Friendship Knox
Eastbrook Hancock Frye Island Cumberland
Easton Aroostook Fryeburg Oxford
Eastport Washington Gardiner Kennebec
Durham Androscoggin Garfield Plt Aroostook
Dyer Brook Aroostook Garland Penobscot
E Twp Aroostook Georgetown Sagadahoc
Eagle Lake Aroostook Gilead Oxford
East Machias Washington Glenburn Penobscot
Ebeemee Twp Piscataquis Glenwood Plt Aroostook
Eddington Penobscot Gorham Cumberland
Edgecomb Lincoln Gouldsboro Hancock
Edinburg Penobscot Grafton Twp Oxford
Edmunds Twp Washington Grand Falls Twp Penobscot
Eliot York Grand Isle Aroostook
Elliottsville Twp Piscataquis Grand Lake Stream Plt Washington
Ellsworth Hancock Gray Cumberland
Embden Somerset Great Pond Hancock
Enfield Penobscot Greenbush Penobscot
Etna Penobscot Greene Androscoggin
Eustis Franklin Greenfield Twp Penobscot
Exeter Penobscot Greenlaw Chopping Twp Washington
Fairfield Somerset Greenville Piscataquis
Falmouth Cumberland Greenwood Oxford
Farmingdale Kennebec Grindstone Twp Penobscot
Farmington Franklin Guilford Piscataquis
Fayette Kennebec Hallowell Kennebec
Fletchers Landing Twp Hancock Hamlin Aroostook
Forest City Twp Washington Hammond Aroostook
Forest Twp Washington Hampden Penobscot
Forkstown Twp Aroostook Hancock Hancock
Fort Fairfield Aroostook Hanover Oxford
Fort Kent Aroostook Harfords Point Twp Piscataquis
Frankfort Waldo Harmony Somerset
Franklin Hancock Harpswell Cumberland
Freedom Waldo Harrington Washington
Freeman Twp Franklin Harrison Cumberland
Freeport Cumberland Hartford Oxford
Frenchboro Hancock Hartland Somerset
Frenchtown Twp Piscataquis Haynesville Aroostook
244
Municipality County Tab Municipality County Tab
Hebron Oxford Lakeville Penobscot
Hermon Penobscot Lambert Lake Twp Washington
Hersey Aroostook Lamoine Hancock
Herseytown Twp Penobscot Lang Twp Franklin
Hibberts Gore Lincoln Lebanon York
Highland Plt Somerset Lee Penobscot
Hiram Oxford Leeds Androscoggin
Hodgdon Aroostook Levant Penobscot
Holden Penobscot Lewiston Androscoggin
Hollis York Lexington Twp Somerset
Hope Knox Liberty Waldo
Houlton Aroostook Lily Bay Twp Piscataquis
Howland Penobscot Limerick York
Hudson Penobscot Limestone Aroostook
Indian Island Penobscot Limington York
Indian Twp Res Washington Lincoln Penobscot
Industry Franklin Lincoln Plt Oxford
Island Falls Aroostook Lincolnville Waldo
Isle au Haut Knox Linneus Aroostook
Islesboro Waldo Lisbon Androscoggin
Jackman Somerset Litchfield Kennebec
Jackson Waldo Littleton Aroostook
Jay Franklin Livermore Androscoggin
Jefferson Lincoln Livermore Falls Androscoggin
Jim Pond Twp Franklin Long A Twp Penobscot
Johnson Mountain Twp Somerset Long Island Cumberland
Jonesboro Washington Long Pond Twp Somerset
Jonesport Washington Lovell Oxford
Katahdin Iron Works Twp Piscataquis Lowell Penobscot
Kenduskeag Penobscot Lower Cupsuptic Twp Oxford
Kennebunk York Lubec Washington
Kennebunkport York Ludlow Aroostook
Kingfield Franklin Lyman York
Kingman Twp Penobscot Machias Washington
Kingsbury Plt Piscataquis Machiasport Washington
Kittery York Macwahoc Plt Aroostook
Knox Waldo Madawaska Aroostook
Kossuth Twp Washington Madawaska Lake Twp Aroostook
Lagrange Penobscot Madison Somerset
Lake View Plt Piscataquis Madrid Twp Franklin
245
Municipality County Tab Municipality County Tab
Magalloway Plt Oxford Mount Desert Hancock
Manchester Kennebec Mount Katahdin Twp Piscataquis
Mapleton Aroostook Mount Vernon Kennebec
Mariaville Hancock Moxie Gore Somerset
Marion Twp Washington Naples Cumberland
Mars Hill Aroostook Nashville Plt Aroostook
Marshfield Washington Nesourdnahunk Twp Piscataquis
Masardis Aroostook New Canada Aroostook
Mason Twp Oxford New Gloucester Cumberland
Matinicus Isle Plt Knox New Limerick Aroostook
Mattamiscontis Twp Penobscot New Portland Somerset
Mattawamkeag Penobscot New Sharon Franklin
Maxfield Penobscot New Sweden Aroostook
Mayfield Twp Somerset New Vineyard Franklin
Mechanic Falls Androscoggin Newburgh Penobscot
Meddybemps Washington Newcastle Lincoln
Medford Piscataquis Newfield York
Medway Penobscot Newport Penobscot
Mercer Somerset Newry Oxford
Merrill Aroostook Nobleboro Lincoln
Mexico Oxford Norridgewock Somerset
Milbridge Washington North Berwick York
Milford Penobscot North Haven Knox
Millinocket Penobscot North Yarmouth Cumberland
Milo Piscataquis N. Yarmouth Academy Grant Twp Aroostook
Milton Twp Oxford Northfield Washington
Minot Androscoggin Northport Waldo
Misery Gore Twp Somerset Norway Oxford
Molunkus Twp Aroostook Oakfield Aroostook
Monhegan Island Plt Lincoln Oakland Kennebec
Monmouth Kennebec Ogunquit York
Monroe Waldo Old Orchard Beach York
Monson Piscataquis Old Town Penobscot
Monticello Aroostook Orient Aroostook
Montville Waldo Orland Hancock
Moose River Somerset Orneville Twp Piscataquis
Moosehead Junction Twp Piscataquis Orono Penobscot
Moro Plt Aroostook Orrington Penobscot
Morrill Waldo Osborn Hancock
Moscow Somerset Otis Hancock
Mount Chase Penobscot Otisfield Oxford
246
Municipality County Tab Municipality County Tab
Owls Head Knox Ripley Somerset
Oxbow Plt Aroostook Robbinston Washington
Oxford Oxford Rockland Knox
Palermo Waldo Rockport Knox
Palmyra Somerset Rockwood Strip T1 R1 NBKP Somerset
Paris Oxford Rome Kennebec
Parkman Piscataquis Roque Bluffs Washington
Parlin Pond Twp Somerset Roxbury Oxford
Parsonsfield York Rumford Oxford
Passadumkeag Penobscot Sabattus Androscoggin
Patten Penobscot Saco York
Pembroke Washington Sagadahoc County Island Sagadahoc
Penobscot Hancock Saint Agatha Aroostook
Perham Aroostook Saint Albans Somerset
Perkins Twp Franklin Saint Francis Aroostook
Perry Washington Saint George Knox
Peru Oxford Saint John Plt Aroostook
Phillips Franklin Salem Twp Franklin
Phippsburg Sagadahoc Sandwich Academy Grant Twp Somerset
Pittsfield Somerset Sandy Bay Twp Somerset
Pittston Kennebec Sandy River Plt Franklin
Pleasant Point Washington Sanford York
Pleasant Ridge Plt Somerset Sangerville Piscataquis
Plymouth Penobscot Sapling Twp Somerset
Poland Androscoggin Scarborough Cumberland
Portage Lake Aroostook Searsmont Waldo
Porter Oxford Searsport Waldo
Portland Cumberland Sebago Cumberland
Pownal Cumberland Sebec Piscataquis
Prentiss Twp T7 R3 NBPP Penobscot Seboeis Plt Penobscot
Presque Isle Aroostook Sedgwick Hancock
Princeton Washington Shapleigh York
Prospect Waldo Sherman Aroostook
Randolph Kennebec Shirley Piscataquis
Rangeley Franklin Sidney Kennebec
Rangeley Plt Franklin Silver Ridge Twp Aroostook
Raymond Cumberland Skowhegan Somerset
Readfield Kennebec Smithfield Somerset
Reed Plt Aroostook Smyrna Aroostook
Richmond Sagadahoc Soldiertown Twp T2 R7 WELS Penobscot
Riley Twp Oxford Solon Somerset
247
Municipality County Tab Municipality County Tab
Somerville Lincoln T2 R8 NWP Penobscot
Sorrento Hancock T2 R9 NWP Penobscot
South Berwick York T2 R9 WELS Piscataquis
South Bristol Lincoln T22 MD Hancock
South Portland Cumberland T24 MD BPP Washington
South Thomaston Knox T26 ED BPP Washington
Southport Lincoln T28 MD Hancock
Southwest Harbor Hancock T3 Indian Purchase Twp Penobscot
Springfield Penobscot T3 ND Hancock
Stacyville Penobscot T3 R10 WELS Piscataquis
Standish Cumberland T3 R4 BKP WKR Somerset
Starks Somerset T30 MD BPP Washington
Stetson Penobscot T32 MD Hancock
Steuben Washington T4 Indian Purchase Twp Penobscot
Stockholm Aroostook T4 R10 WELS Piscataquis
Stockton Springs Waldo T4 R11 WELS Piscataquis
Stoneham Oxford T4 R13 WELS Piscataquis
Stonington Hancock T4 R9 NWP Piscataquis
Stow Oxford T5 R11 WELS Piscataquis
Strong Franklin T5 R7 WELS Penobscot
Sullivan Hancock T5 R8 WELS Penobscot
Summit Twp Penobscot T5 R9 WELS Piscataquis
Sumner Oxford T6 R6 WELS Penobscot
Surry Hancock T6 R7 WELS Penobscot
Swans Island Hancock T6 R8 WELS Penobscot
Swanville Waldo T7 R5 WELS Aroostook
Sweden Oxford T7 SD Hancock
T1 R13 WELS Piscataquis T8 R3 NBPP Washington
T1 R5 WELS Aroostook T8 R4 NBPP Washington
T1 R6 WELS Penobscot T8 R5 WELS Aroostook
T1 R8 WELS Penobscot T9 R5 WELS Aroostook
T1 R9 WELS Piscataquis T9 SD Hancock
T10 SD Hancock TA R2 WELS Aroostook
T11 R4 WELS Aroostook TA R7 WELS Penobscot
T14 R6 WELS Aroostook Talmadge Washington
Taunton & Raynham Academy
T15 R6 WELS Aroostook Grant Somerset
T17 R3 WELS Aroostook TD R2 WELS Aroostook
T17 R4 WELS Aroostook Temple Franklin
T18 MD BPP Washington The Forks Plt Somerset
T2 R10 WELS Piscataquis Thomaston Knox
248
Municipality County Tab Municipality County Tab
Thorndike Waldo Weld Franklin
Tomhegan Twp Somerset Wellington Piscataquis
Topsfield Washington Wells York
Topsham Sagadahoc Wesley Washington
Township 6 North of Weld Franklin West Bath Sagadahoc
Township C Oxford West Forks Plt Somerset
Township D Franklin West Gardiner Kennebec
Township E Franklin West Paris Oxford
Tremont Hancock Westbrook Cumberland
Trenton Hancock Westfield Aroostook
Trescott Twp Washington Westmanland Aroostook
Trout Brook Twp Piscataquis Weston Aroostook
Troy Waldo Westport Island Lincoln
Turner Androscoggin Whitefield Lincoln
Union Knox Whiting Washington
Unity Waldo Whitneyville Washington
Unity Twp Kennebec Williamsburg Twp Piscataquis
Upper Molunkus Twp Aroostook Willimantic Piscataquis
Upton Oxford Wilton Franklin
Van Buren Aroostook Windham Cumberland
Vanceboro Washington Windsor Kennebec
Vassalboro Kennebec Winn Penobscot
Veazie Penobscot Winslow Kennebec
Verona Island Hancock Winter Harbor Hancock
Vienna Kennebec Winterport Waldo
Vinalhaven Knox Winterville Plt Aroostook
Wade Aroostook Winthrop Kennebec
Waite Washington Wiscasset Lincoln
Waldo Waldo Woodland Aroostook
Waldoboro Lincoln Woodstock Oxford
Wales Androscoggin Woodville Penobscot
Wallagrass Aroostook Woolwich Sagadahoc
Waltham Hancock Wyman Twp Franklin
Warren Knox Yarmouth Cumberland
Washburn Aroostook York York
Washington Knox
Washington Twp Franklin
Waterboro York
Waterford Oxford
Waterville Kennebec
Wayne Kennebec
Webster Plt Penobscot
249
Work Plan
Terms & Definitions
Ë
WORK PLAN TERMS AND DEFINITIONS
ADA or Americans with Disabilities Act: The Americans with Disabilities Act prohibits
discrimination and ensures equal opportunity for persons with disabilities in employment,
government services, public accommodations, commercial facilities and transportation.
Administration: The ongoing functions that support MaineDOT programs and projects,
including department-wide financial and administrative services, financial administration for
federal programs, human resources, legal services, operation of the Executive Office, geographic
information systems, performance measurement and accountability, the Freight and Business
Services Office, the Business and Community Relations Office and engineering oversight .
Airport Master Plan: An Airport Master Plan is a comprehensive study of an airport that
describes short-, medium- and long- term development plans to meet future aviation demand.
American Rescue Plan Act (ARPA) Statewide Planning, Research, and Networks grant:
Economic adjustment assistance grants provided by the Economic Development
Administration (EDA).
Apron: The area of an airport intended to accommodate the loading and unloading of passengers
and cargo, and the refueling, servicing and parking of aircraft.
Asset Location Management: Managing transportation asset data, coordinating data between
systems, analyzing data and work-reporting, and producing reports, maps and data files.
Asset Name: Names the publicly owned or publicly used facility or program on which work is to
occur.
Avigation Easement: Avigation easement is an easement or right in the airspace above or in the
vicinity of a particular property. It includes the right to create such noise or other effects as may
result from the lawful operation of aircraft in such airspace and the right to remove any
250
obstructions to such overflight. This in effect prevents the landowners near airports from
building above a set height or requires the trimming of trees.
Bicycle- Pedestrian: Improve transportation and safety, encourage healthful activities, and
promote economic development, while improving the livability and vitality of local
communities.
BIG or Boating Infrastructure Grants: Boating Infrastructure Grants is a program of the U.S.
Fish and Wildlife Service to support boating infrastructure.
BPI or Business Partnership Initiative: Provides state funding to match private and municipal
investment in highway improvements performed to facilitate economic development.
Bridge and Structural Maintenance: Investments to prevent or repair routine problems, and to
extend the useful life of bridges until capital funding becomes available.
Bridge Deck: The portion of the bridge that provides direct support for vehicular and pedestrian
traffic.
251
Bridge Preservation: Bridge-strengthening and other bridge improvements on state-owned
bridges.
Bridge Substructure: The parts of a bridge that are below the bottom of the girders. Pilings,
shafts, spread footings and columns may be part of the substructure.
Bridge Superstructure: The parts of a bridge that are above the bottom of the girders. Girders,
bridge deck and bridge railing are parts of the superstructure.
Building and Lot Maintenance: Supports maintenance of over 600 buildings and more than 100
building lots, as well as maintenance of ancillary lot structures.
CBITD: Casco Bay Island Transit District. The ferry system that serves Portland and nearby
islands in Casco Bay.
CHBP: Competitive Highway Bridge Program. FHWA Discretionary Grant program providing
funding for highway bridge replacement or rehabilitation projects on public roads that
demonstrate cost savings by bundling at least two highway bridge projects into a single contract.
Chip Sealing: Consists of a layer of asphalt binder that is overlaid by a layer of embedded
aggregate that furnishes, among other things, protection to the asphalt layer from tire damage and
macrotexture that creates a skid-resistant surface.
CIPR or Cold in Place Recycling: The process of removing a portion of the pavement surface,
processing it to a uniform particle size, and mixing with emulsion and Portland cement in a
continuous portable operation to create a recycled pavement layer.
CMAQ or Congestion Mitigation for Air Quality: A source of Federal-aid funding for
transportation improvements designed to improve air quality and mitigate congestion.
252
CMQ, CMQR: Central Maine and Quebec Railway.
Cold Storage Building: A building facility used to store salt and sand materials for use in
maintaining a roadway facility in winter.
Communications and Outreach: This program includes the Local Transportation Assistance
Program, work zone-safety and bicycle-pedestrian safety education, and audio-visual and other
creative services.
CPR or Cyclical Pavement Resurfacing: The application of a 3/4” overlay used to preserve
lower priority roads that are considered “built”.
Crack Sealing: Roadway or runway surface crack sealing treatments, to prevent surface damage
from freeze thaw cycles.
Crew Operations: Crew management and planning, and overall work preparation activities.
Equipment transport and certain repairs also fall into this category.
CRISI: Consolidated Rail Infrastructure and Safety Improvements. FRA Discretionary Grant
program providing funding for a wide range of projects that improve the safety, efficiency and
reliability of intercity passenger and freight rail systems.
CSL or Customer Service Level: A measure of how a road compares to other roads of the same
priority across the state, based on safety, condition and service.
Culvert: Any pipe or other structure under a roadway that has a diameter of less than 5 feet, or
multiple pipes or other structures with a combined opening of less than 20 square feet in area.
Custodial Maintenance: Activities aimed at keeping the assets clean and functioning, such as
patrolling and inspecting highways, sweeping, cleaning bridges, and vegetation management.
Debt Service: Debt service is the cash required over a given time period for the repayment of
interest and principal on a debt instrument.
Description: Provides a detailed description as to the specific location of where work is to occur
and/or details the type of work that is to occur over a specific area.
253
Dolphin: Man-made marine structure that extends above the water level and is not connected to
shore.
Drainage Maintenance: Removing water from the highway structure, which increases roadway
longevity—ditching, catch basin and culvert cleaning, and installation/replacement of drainage
structure.
Easement: A certain right to use the real property of another without possessing it.
EMAS or Engineered Materials Arresting System: EMAS uses crushable material at the end
of a runway to stop an aircraft that overruns the runway.
Employee Education and Training: All costs associated with creating, presenting and attending
various trainings, as well as costs associated with attending meetings and conferences.
Enhanced Project Scoping: A planning process intended to manage future risk by detailing the
basic need, possible impacts, roadway design matters, potential cost and stakeholder issues of
proposed projects.
FAA or Federal Aviation Administration: The national aviation authority of the United States
with powers to regulate all aspects of civil aviation, including inspecting and rating civilian
aircraft and pilots, enforcing the rules of air safety, and installing and maintaining air-navigation
and traffic control facilities.
254
FASTLANE: Fostering Advancements in Shipping and Transportation for the Long-Term
Achievement of National Efficiencies. USDOT Discretionary Grant program providing funding
for nationally and regionally significant freight and highway projects.
Feasibility Study: An analysis and evaluation of a proposed action which is based on extensive
investigation and research to determine order-of-magnitude costs and benefits for the proposed
action.
Federal Functional Classification: The process by which both rural and urban streets and
highways are grouped into classes.
Federal Fund: A fund in which all resources are provided by the Federal Government.
FFY or Federal Fiscal Year: Federal Fiscal Year, which begins October 1st.
Fog Seal: A method of adding asphalt to an existing pavement surface to improve sealing or
waterproofing, prevent further stone loss by holding aggregate in place, or simply improve the
surface appearance.
FTA or Federal Transit Administration: The FTA provides financial and technical assistance
to local public transit systems, including buses, subways, light rail, commuter rail, trolleys and
ferries. FTA also oversees safety measures and helps develop next-generation technology
research.
FTA 5304: Funding provided by FTA for Statewide and Non-metropolitan Transportation
Planning.
FTA 5307: Funding provided by FTA for transit investments, operating assistance and
transportation planning in urbanized areas.
FTA 5310: Funding provided by FTA to improve transportation for seniors and individuals with
disabilities.
255
FTA 5311: Funding provided by FTA to support public transportation in rural areas.
FTA 5337: Funding provided by FTA to finance capital projects to maintain public
transportation systems in a state of good repair.
FTA 5339: Funding provided by FTA to replace, rehabilitate and purchase buses and related
equipment and to construct bus-related facilities.
Full Depth Reclamation with Foamed Asphalt: The foamed asphalt stabilization process
involves full depth reclamation of all the existing hot mix asphalt and some of the underlying
sub-base gravel, shaping this material to the desired grade and cross-slope and compacting the
material to specifications.
Funding: Comprises the total funding being applied to a project, specific to the scope.
GARVEE: A Grant Anticipation Revenue Vehicle (GARVEE) is any bond or other form of debt
repayable, either exclusively or primarily, with future Federal-aid highway funds under
Section 122 of Title 23 of the United States Code.
General Fund: A fund used to account for all transactions of a governmental unit that are not
accounted for in another fund.
General Obligation Bonds: General obligation (G.O.) bonds are debt instruments issued to raise
funds for public works. G.O. bonds are backed by the full faith and credit of the issuing entity.
Grader Work: Reshaping the shoulder of the highway to facilitate runoff to ditches.
Guardrail: Railing designed to keep vehicles from straying into dangerous or off-limits areas.
Guardrail Crash Cushion: Energy-absorbing cushioning device that offers protection from
collisions with fixed guardrail installations.
256
• HCP 2: 1,355 miles - 6% of statewide mileage; 17% of VMT; non-Interstate and high-
value arterials.
• HCP 3: 2,211 miles - 9% of statewide mileage; 16% of VMT; the remaining arterials
and the most significant major-collectors.
• HCP 4: 3,731 miles - 16% of statewide mileage; 12% of VMT; the remaining major-
and urban-collector highways, as well as minor-collector highways and state-aid roads.
• HCP 6: 14,362 miles - 61% of statewide mileage; 13% of VMT; local roads and streets
that are the year-round responsibility of municipalities.
Heavy Pavement Treatment: Applied to roadways in fair to good condition that have
deteriorated too far for light treatments to be effective, but are still able to be preserved with a
more substantial treatment.
Highway and Bridge Capital: Capital investments for highway and bridge improvements.
Highway and Bridge Maintenance: Maintenance investments for the highway and bridge
program.
Highway Fund: The State Highway Fund is an account that receives its resources mainly
through fuel taxes and is used to fund projects that are related to the State's highway system.
Highway Light Capital Paving: (LCP) Program performs light paving treatments to improve
safety and drivability, and to extend the life of lower-priority roadways.
Highway Preservation Paving: Preserves the investments in existing highways with treatments
such as repaving, crack sealing, drainage repair, etc., in each region and the Interstate.
Highway Preservation Paving 1 1/4" overlay: Projects scoped for this treatment will receive a
1 ¼ inch HMA surface covering the travel way and any adjacent paved shoulders.
Highway Preservation Paving 3/4" overlay: Projects scoped for this treatment will receive a
travel way leveling course followed by a ¾ inch HMA surface course covering mainline travel
way and shoulders.
Highway Rehabilitation: Structural enhancements that extend the service life of an existing
pavement and/or improve its load-carrying capacity.
Highway Safety and Spot Improvements: An activity grouping that includes striping, guardrail,
rumble strips, crack-sealing, signage, measures to reduce vehicle/large animal collisions,
improvements to visitor information centers, and installation of pedestrian crossing-signals.
Items in Italics indicate Statewide Operations or Statewide Capital Programs
257
Highway System Operations: Project-level expenses across multiple types of projects, and
various operational activities including: fees for river gauges, landscaping, operating costs for
the ARAN data collection vehicle, operation of intelligent transportation system field devices
and advanced transportation management system operations.
HMA or Hot Mix Asphalt: Hot mix asphalt is a combination of approximately 95% stone, sand
or gravel bound together by asphalt cement-a product of crude oil. Asphalt cement is heated
aggregate, combined, and mixed with the aggregate at an HMA facility.
HTF or Highway Trust Fund: An account established by law to hold federal highway user
taxes that are dedicated for highway and transit-related purposes. The HTF has two accounts:
the Highway Account and the Mass Transit Account.
ID or Identification Number: The primary means of identifying and tracking projects within
programs and information systems.
Infrastructure Inspection and Inventory: Collection, monitoring and review of the department’s
assets, which include highways, rail, ferry, structures and appurtenances.
Intermodal Facility: A transportation facility designed to facilitate the change in mode for
passenger or freight movement.
Interpretive Signs: Signs used to inform and make visitors aware of notable features of an area.
258
Large Culvert: (Formerly referred to as a “strut”.) A large culvert is a pipe or other structure
that has a clear span between 5 and 10 feet, or multiple pipes or structures with a combined
opening between 19 and 80 square feet in area.
LCP or Light Capital Pavement: Light Capital Pavement is typically the application of a 5/8”
nominal overlay, used as a holding action on unbuilt roads, to improve safety and durability and
to extend the life of lower-priority roadways.
LED or Light-Emitting Diode: Semiconductor light sources that are highly efficient, used in
highway lighting and signage installation.
Light Pavement Treatment: Intended to provide a new wearing surface for traffic and to
protect the underlying pavement on the roadway.
Local Road Assistance or LRAP: The program working with municipal and tribal jurisdictions
to provide training, technical assistance and information regarding the construction, maintenance
and managing of local roads and bridges in Maine.
LRFD or Load and Resistance Factor Design: LRFD incorporates state-of-the-art analysis and
design methodologies with load and resistance factors based on the known variability of applied
loads and material properties. These load and resistance factors are calibrated from actual bridge
statistics to ensure a uniform level of safety.
Marine: Programs include the Boating Infrastructure Grant program funded by the U.S. Fish and
Wildlife Service, funding for infrastructure improvements for the Maine State Ferry Service, and
marine port improvements, statewide.
MePA or Maine Port Authority: The Maine Port Authority plans, develops, maintains and
promotes port and intermodal facilities across the State to stimulate commerce and enhance the
global competitiveness for the future wealth and prosperity of Maine.
Microsurfacing: A mixture of asphalt emulsion, graded aggregates (1/4” to 3/8”), mineral filler,
water and other additives. The mixture is made and placed on a continuous basis using a travel
paver (Slurry Surfacing Machine).
Mill and Fill: A pavement management treatment that extends the life of existing roadways by
removing a portion of the roadway surface then replacing it with a suitable depth of new hot mix
asphalt.
Mitigation: Actions that avoid, minimize, or compensate for potential adverse impacts.
Items in Italics indicate Statewide Operations or Statewide Capital Programs
259
MNR: Maine Northern Railway.
MPA or Metropolitan Planning Area: The boundaries of a metropolitan planning area (MPA)
shall be determined by agreement between the MPO and the Governor. At a minimum, the MPA
boundaries shall encompass the entire existing urbanized area (as defined by the Bureau of the
Census) plus the contiguous area expected to become urbanized within a 20-year forecast period
for the metropolitan transportation plan. The MPA boundaries may be further expanded to
encompass the entire metropolitan statistical area or combined statistical area, as defined by the
Office of Management and Budget.
The cities and towns included in the MPA for each MPO are listed below:
KACTS includes Berwick, Eliot, Kittery, Lebanon, South Berwick and York
MPI or Municipal Partnership Initiative: A method to develop, fund and build projects of
municipal interest on the state infrastructure system with MaineDOT as a partner.
MTA or Maine Turnpike Authority: The Maine Turnpike Authority is a public entity that was
established for the purpose of constructing, maintaining, reconstructing and operating a toll
highway from Kittery to Augusta.
260
Multimodal Operations: Operating outlays for non-highway transportation investments.
Multimodal System Operations: An activity grouping that includes operating support for
aviation facilities, bicycle/pedestrian facilities, Visitor Information Centers, transit, and operation
of the Maine State Ferry Service.
Multi-use Path: A path or sidewalk designed for use by cyclists and pedestrians, and sometimes
motorized vehicles.
NPDES II MS4: As authorized by the Clean Water Act, the National Pollutant Discharge
Elimination System (NPDES) permit program controls water pollution by regulating point
sources that discharge pollutants into waters of the United States.
OBU or On-board Unit: A vehicle mounted device used to transmit and receive a variety of
message traffic to and from other connected devices (other OBUs and RSUs). Among the
message types and applications supported by this device are vehicle safety messages, a primary
subject of this standard, used to exchange information on each vehicle’s dynamic movements for
coordination and safety.
Operational and Safety Maintenance: A work grouping that includes traffic control and
roadway delineation and protection, including signage, traffic signal maintenance, lighting,
striping, and guardrail installation and maintenance.
PACTS Municipal Partnership Initiative: A program that funds state/ local financial
partnerships with municipalities to make highway improvements of local interest in the Portland
metropolitan area.
Park and Ride Lots: Designated parking areas for drivers who ride in another vehicle for a
portion of their trip.
261
Pilings: Linear members usually hexagon, square, round or "H" shaped constructed of timber,
steel, concrete or a composite of these materials, driven into the earth to carry structural load.
PMRAP or Plant Mix Recycled Asphalt Pavement: A cold pavement mix consisting of
reclaimed asphalt materials used as a base to add structure and correct deficient cross-slopes.
Policy, Planning and Research: An activity group that includes management of MaineDOT
planning activities and studies, public outreach; project scoping and analysis; Work Plan
development; Metropolitan and non-metropolitan planning; and research programs and projects.
Polyurea Reflective Striping: Highly reflective road paint for road lines and asphalt striping.
PPI or Planning Partnership Initiative: This competitive program supports regional planning
efforts through grants awarded on a best-value basis.
Precision Approach Path Indicator: A visual aid consisting of lights in a single row of either
two or four light units set perpendicular to the airport runway centerline. The row of light units
is normally installed on the left side of the runway.
Preservation Paving: Paving done to a highway facility that facilitates the preservation of the
investment.
Public Transportation Capital: Capital funding for buses and bus facilities under Federal Transit
Administration (FTA) intercity, urban, small urban, and rural programs that serve the general
public, and elderly and disabled persons. Some FTA funding may be used for either capital or
operating expense. This category also includes improvements to park and ride lots.
Rail: Operational improvements to state-owned rail lines, rail-crossing improvements and the
Industrial Rail Access Program (IRAP), which partners with private-sector entities to fund rail
improvements that support economic development.
262
Recreational Trails Program: A Federal Highway Administration funding set-aside that
MaineDOT transfers to the Maine Department of Agriculture, Conservation and Forestry for
improvements to multi-use trails.
Region: A MaineDOT maintenance region. MaineDOT's field operations and facilities are
grouped into five large geographic areas of the state (Northern, Southern, Eastern, Western and
Mid-Coast).
Roundabout: A type of circular intersection or junction in which road traffic is slowed and
flows almost continuously in one direction around a central island to several exits onto the
various intersecting roads.
Route: Established path along the public road network. A route's length is typically measured in
miles. Locations along the route are typically referenced by their mile point.
ROW, RW or Right of Way: A right of way is a type of ownership or easement granted over
the land for transportation purposes. This can be for a highway, public footpath, rail transport,
canal, etc. Also, the property acquisition phase of a project.
RTAP or Rural Transit Assistance Program: A Federal Transit Administration program that
provides a source of funding to assist in the design and implementation of training and technical
assistance projects and other support services tailored to meet the needs of transit operators in
non-urbanized areas.
Safety and Spot Improvements: Roadway treatments that address single issues or a series of
issues along a roadway.
Scope: The type and extent of the planned treatment, activity, or operation that will take place.
263
SHIP or Small Harbors Improvement Program: A state program that promotes economic
development, public access and improved commercial fishing opportunities, and works to
preserve and create infrastructure at facilities in tidewater and coastal municipalities.
SRTS or Safe Routes to School: An approach that promotes walking and bicycling
to school through infrastructure improvements, enforcement, tools, safety education, and
incentives to encourage walking and bicycling to school.
Surface and Base Maintenance: Localized pavement repairs, shimming, and paving of certain
corridors. This activity also includes the preparation of base gravels or shoulder work.
Taxiway: A defined path established for the taxiing of aircraft from one part of an airport to
another.
Traffic Calming: Changes in street alignment, installation of barriers and other physical
measures to reduce traffic speed and/or cut-through volumes, in the interest of street safety,
livability and other public purpose.
Transfer Bridge: A structure that facilitates car movement from a dock to a ferry.
UA or Urbanized Area: A continuous urban area as designated by the U.S. Bureau of the
Census having a population of 50,000 or more.
Ultra-Thin Bonded Wearing Course: The placement of a thin (3/4”) HMA surface course over
a polymer modified tack coat membrane placed by a spray paver.
Vessel Electronic Devices: Electronic devices classed for use in the marine environment,
designed for navigation and other marine functions.
VPI or Village Partnership Initiative: Funding for planning, scoping and design for a new
state-municipal partnership initiative to improve the economic vitality of village and downtown
areas across Maine. Cost shares to be based upon scope, nature of project, and
other factors.
Items in Italics indicate Statewide Operations or Statewide Capital Programs
264
W-beam: The wide flange I beam (W shape) is a structural steel shape with I (or H) form. Top
and bottom plates of a I beam are named as flanges and the vertical plate which connects the
flanges is named as web. In wide flange I beams, flanges are nearly parallel to each other.
Wearing Surface: The surface portion of a roadway or bridge deck which is in the direct contact
with the vehicles.
Wetland Mitigation: Actions that avoid, minimize, or compensate for potential adverse impacts
to wetlands.
Wingwalls: The retaining wall extension of an abutment extended to the side-slope material of
an approach, causeway or embankment.
Winter Maintenance: Activities associated with snow and ice control, and monitoring the
highways for hazardous winter conditions.
Work Program Management: A grouping of work activities that support the development of
projects, including overall project management, software, property acquisition and compliance
oversight.
WR or Work Request: A Work Request for the Bureau of Maintenance and Operations.
265