Project Payroll Costs: Report Guide
Project Payroll Costs: Report Guide
Section 1. Introduction
This report will allow the user to enter required criteria such as Business Unit and Date Range. Also, it
has other optional criteria such as Department, Project ID, Fund and SID. The report can be subtotaled
and sorted either by activity or department, dependent upon the user’s selection on the run control.
Report output includes date, activity, source, employee ID, employee name, fund, SID, budget reference,
department, program, account, hours, amount and analysis type.
This report has been enhanced to derive all related Payroll Cost from a new analysis group (PC106)
which will be configured for each Project Costing business unit. Examples of analysis types within this
analysis group may include Fringe Allocations, GL expense, along with Time and Labor actuals (i.e.
Payroll). This Analysis Group will be configured differently for each agency depending upon the
functionality and analysis types being used. You can confirm the list of analysis types configured for your
Agency by querying the Analysis Group.
6/25/2008 – New criteria added: Fund, and SID. Source and Analysis Type columns have been added.
Column headers now print on every page.
Type of Report
Structured Query Report (SQR); Format - Portable Document Format (PDF) or CSV (MS Excel)
Role(s) Needed to Access the Report DOT Project Costing Report Viewer, Agency Project
Costing Report Viewer, Auditor of Public Accounts Report Viewer, Core-CT Production support
1
Flexible Ledger Detail
2
Project Payroll Costs
General Notes:
Project ID To:
type project ID or use the • to display a project range – enter
lookup to select beginning and end project
type date or use the • to display one day - enter same date
* From Date:
calendar icon to select in both fields
• to display a date range – enter
beginning and end date
type date or use the
* To Date:
calendar icon to select • to display year to date – enter
07/01/YYYY and current date
3
Project Payroll Costs
push the save button to save reports that you want to run on a
Save save report parameters regular basis
OK
• push the OK button
4
Project Payroll Costs
Process Monitor
Process Monitor
Examples of rows generated for a Projects Payroll Costs report with the suggested parameters.
5
Project Payroll Costs