Test personnel:
Test location:
Seriel No.:
Owner,
Customer/Yard,
Classification Society,:
Supplier,:
Table of contents:
1. GENERAL ................................................................................................................. 4
1.1 Scope and Objectives................................................................................... 4
1.2 Abbreviations................................................................................................ 4
2. System components ................................................................................................ 4
2.1 Test details ................................................................................................... 4
2.2 Start/Stop method......................................................................................... 4
3. SIMULATED FUNCTIONAL TEST ............................................................................ 5
1. GENERAL
Related documents:
PMS Function description 3ACM000134-035
1.2 Abbreviations
ABS …………..American Bureau of Shipping
IAS…………….Integrated Automation System
CSS ………….Engine Safety & Control system
PMS …………..Power Management system
OS/VDU ………Operator Station / Video Display Unit
SWBD…………Switchboard
SD ………….Shutdown
TC …………..Type Circuit (part of software application program)
AC800…………ABB Process Controller 800
SW……………..Soft Ware
2. System components
The PMS system has interface towards SWBD with synchronizers, the Diesel engine Governor, and
Engine Safety & Control system CSS.
As these vital parts are delivered to the yard, a complete system test will be performed during
commissioning.
The generator numbers and other data which is tested is to be filled in to the test document during the
test.
CONDITION: First generator "auto", "remote" and connected with 70% load. 2nd and 3rd
generators "auto", "remote", stopped and available. Bus Tie closed.
Load start at 80%, start delay 10 sec, load stop 75%, stop delay 20 sec.
Cool down 10 sec.
ACTION RESULT APPROVED
Increase load to 85% Observe 2nd generator starts,
synchronizes and connects
after a 10-sec delay.
CONDITION: Generator ___ "auto", "remote" and connected. Generators _________ and ____
"auto", "remote", stopped and available. Bus Tie closed.
Reset alarm
NOTE:
Reset alarm
NOTE:
TEST: STOP FAILURE (Stop signal activated, but engine still running after STOP TIME DELAY)
TEST: SYNC FAILURE (Sync signal activated in SYNC TIME, but no connection of breaker)
TEST: DISCONNECT FAILURE (Disc. order issued form PMS but the breaker failed to open)
Reset alarm
NOTE:
Reset alarm
.
Reset alarm
NOTE:
Reset alarm
NOTE:
TEST: TACHO FAIL (Normal Frequency detected but no RUNNING signal received)
Reset alarm
NOTE: