Introduction on the NICA project: Zebo Tang (唐泽波)

The document provides an introduction and overview of the NICA project at JINR in Dubna, Russia. Key points include: - NICA will collide heavy ions up to Au+Au at √sNN = 4-11 GeV and protons/deuterons at √sNN = 12-26 GeV. It will also provide fixed target beams. - The accelerator complex is under construction and includes the Nuclotron, booster, and collider rings. Superconducting magnet production has started. - The Multi-Purpose Detector experiment will study QCD matter, searching for the critical point and onset of deconfinement. Its design includes a TPC, time-of-

Uploaded by

jessy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views26 pages

Introduction on the NICA project: Zebo Tang (唐泽波)

The document provides an introduction and overview of the NICA project at JINR in Dubna, Russia. Key points include: - NICA will collide heavy ions up to Au+Au at √sNN = 4-11 GeV and protons/deuterons at √sNN = 12-26 GeV. It will also provide fixed target beams. - The accelerator complex is under construction and includes the Nuclotron, booster, and collider rings. Superconducting magnet production has started. - The Multi-Purpose Detector experiment will study QCD matter, searching for the critical point and onset of deconfinement. Its design includes a TPC, time-of-

Uploaded by

jessy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

Workshop on “Flow, Jet Quenching and Strong Coupling Physics”

Dec. 17-19, 2016, Huzhou University, Huzhou, China

Introduction on the NICA project

Zebo Tang (唐泽波)


University of Science and Technology of China (USTC)
State Key Lab. of Particle Detection & Electronics, MoST

Thanks to Itzhak Tserruya, Golovatyuk Slava,


Fuqiang Wang, V. Kekelidze for the materials
1
Nuclotron based Ion Collider fAcility
Synchrotron Nuclotron is in operation since 1993 at JINR at Dubna
NICA accelerator complex is under construction (started at 2013)

R=231.5 m

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 2
NICA and Nuclotron beams
 Heavy ion colliding beams up to 197Au79+ + 197Au79+ at:
sNN = 4 - 11 GeV , Laverage= 1×1027 cm-2s-1
same or higher Laverage for lighter ions
 Polarized beams of protons and deuterons in collider mode:
p+p spp = 12 - 26 GeV Lmax ≈ 1×1032 cm-2s-1
d+d sNN = 4 - 13.8 GeV
 Nuclotron extracted beams of ions and polarized protons and
deuterons for fixed target experiments:
Li - Au = 1 - 4.5 GeV/u ion kinetic energy
p = 5 - 12.6 GeV kinetic energy
d = 2 - 5.9 GeV/u ion kinetic energy
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 3
NICA Complex
KRION-6T+HILac (3MeV/u) Accelertor complex LHEP
PS and existing
LU-20 (5MeV/u) In preparation

Transfer lines
Booster
NUCLOTRON (600 MeV/u)
0.6-4.5 GeV/u

MultiPurpose
Detector - MPD

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 4
NICA Physics

NICA NICA

QCD matter at NICA:


• Dense baryonic matter
• Energy covers Critical point search and Onset of deconfinement
• Complementary to STAR-BES, CBM and CERN experiments
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 5
Present and future HI machines
Fixed target: Colliders:
20?? NA60+?
L-limited by scale of L,
20?? SIS-300 (FAIR) detectors in cm-2s-1
2022? SIS-100 (FAIR) 1027
2020 NICA-MPD (JINR)
2018 NICA-BM@N (JINR) 1025
2017 Booster (JINR)

1023

LHC (CERN)

BES STAR
(BNL)
SPS (NA-49/61, CERN)
SIS-18 (GSI)

2 4 6 8 20 40 60 80 √SNN, GeV
1 10 102 for Au+Au
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 6
Compare to other facilities
CBM

Interaction rate [Hz] SIS-100 FAIR (2022+)

NICA/BM@N II

NICA/BM@N I
NICA/MPD (2020)
HADES
STAR F.T. STAR BES II

NA-61/SHINE

2 3 4 56 8
Collision energy √sNN [GeV]
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 7
Current status of NICA accelerator
• Design phase completed.

• Technical solutions approved by MAC.

• Contract for the construction of the collider building signed a year


ago on September 15, 2015 with STRABAG.

Civil construction has started.

• Superconducting magnets serial production has started.

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 8
Civil construction and Magnet production

http://nucloweb.jinr.ru/nucloserv/205corp.htm

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 9
MPD (Multi-Purpose Detector)
Stage 1: TPC, TOF, ECal, FHCal and FFD
Stage 2: IT and Endcaps
(tracker, TOF, ECal)
• 9 m long, 6m diameter
• Low material budget
• Good tracking and pid
• Tracking (TPC):
up to |h|<2, 2π in azimuth
• PID (TOF, TPC, ECAL):
hadrons, e, g
• Event characterization
(FHCAL):
centrality & event plane
Technical Design Reports:
http://nica.jinr.ru/files/mpd_tdr.htm
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 10
SC solenoid and TPC
Superconducting solenoid:
• 0.66 T, ~900 tons
• Contract signed with ASG superconductors (Genova, Italy)
Time Projection Chamber:
• 3.4m long, R=0.27-1.4 m
• Basic R&D finished, assembly workshop in preparation
HV-electrode
Sketch of TPC 3400 ~ 28 kV Ø2800

12 Readout
chamber

E E

~ 110 000 readout channels

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 11
Time-of-Flight system
Forward Fast Detector MRPC

Active area: ~56 m2


# channels: 13824

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 12
Calorimetry
ECAL – shashlik type Forward HCal Trigger
ECal sector Centrality
Event plane

ECal module:
25 kg

σ(E)/(E) = 53%/√E(GeV) +10%

Module tested at CERN and DESY


𝜎 = 5% ⊕ 2% Test fulfills required resolution
𝐸 𝐸
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 13
MPD performances
Momentum resolution Particle id (dE/dx)

< 2% @ pT<2 GeV/c

Efficiency vs pT Particle id (dE/dx and ToF)

Down to 0.1 GeV/c

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 14
Hyperons and hypernuclei

𝟑
𝜦𝑯
105
10 weeks
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 15
Electron and dielectron
dE/dx and TOF

σω≈14 MeV/c2

Hadron suppression
up to 10-5

Yields, central Au+Au at √sNN = 8.8 GeV


Particle Yields Decay BR Effic. % Yield/1 w
mode
4p y=0
r 31 17 e+e- 4.7 . 10-5 35 7.3 . 104
w 20 11 e+e- 7.1 . 10-5 35 7.2 . 104
j 2.6 1.2 e+e- 3 . 10-4 35 1.7 . 104

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 16
BM@N (Baryonic Matter at Nuclotron)
MPD stage I
Fixed target experiment
using Nuclotron beams
Large aperture magnet
(~1m gap between poles)
BM@N plan
Technical runs with d, Li, C
2016 – 2017;

Physics run (I stage) with Kr


int rate 20 kHz
End of 2017;

Physics run (II stage) with Au


int rate 50 kHz:
2019
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 17
BM@N performances
Technical run d+C 4 AGeV, 500K events

Physics run UrQMD & DCM-QGSM, Au+Au, Ekin.= 4.5A GeV 20 KHz trigger

900K central events  7.5M X- in 1 month


Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 18
NICA overall schedule
2015 2016 2017 2018 2019 2020 2021 2022 2023
Injection complex
Lu-20 upgrade
HI Source
HI Linac
running
Nuclotron time
general development
extracted channels
Booster
Collider
startup configuration
design configuration
BM@N
I stage
II stage
MPD
solenoid
TPC, TOF, Ecal (barrel)
upgraded end-caps
Civil engineering
MPD Hall
SPD Hall
collider tunnel
HEBT Nuclotron-collider
Cryogenic
for Booster
for Collider

19
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016
NICA Physics with MPD and BM@N
Systematic study of pp, pA and AA
 Bulk properties, EOS
- particle yields & spectra, fermtoscopy, flow

 Search for QCD Critical Point


- event-by-event fluctuations & correlations

 Onset of phase transition:


MPD - deconfinement (QGP thermal radiation)
- In-medium modification of hadron properties:
r, w, f  e+e- and continuum m < 3 GeV/c2

 Enhanced strangeness production

 Chiral Magnetic (Votical) effect


- L polarization

 Strangeness in nuclear matter


- hypernuclei
BM@N
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 20
Anything to do with us?
• 2010/06, NICA people from JINR visited Tsinghua University
and USTC

• 2011/02, we visited JINR for MRPC beam test

• 2016/09, Itzhak Tserruya gave seminars at Tsinghua University


and USTC

• 2016/11, Fuqiang and I visited JINR

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 21
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 22
Our view of NICA

Civil construction

Photo taken at the main


gate of JINR, Dubna
Dec. 1, 2016

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 23
Fuqiang at BM@N

Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 24
MPD MRPC Assembly

MPD detector
beam test facility

Magnet assembly & test

A letter of intent written by


Fuqiang Wang sent to MoST
of China after our visit
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 25
Summary
• NICA facility has the potential for competitive research in the
field of dense baryonic matter

• NICA complex construction is in good shape


• Accelerator construction in progress
• Construction of both detectors, BM@N and MPD, is
progressing well

• JINR is looking for more international collaborations

• Anyone interested in is welcome to contact Prof. Fuqiang Wang


or Zebo Tang
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 26

You might also like