Introduction on the NICA project: Zebo Tang (唐泽波)
Introduction on the NICA project: Zebo Tang (唐泽波)
R=231.5 m
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 2
NICA and Nuclotron beams
Heavy ion colliding beams up to 197Au79+ + 197Au79+ at:
sNN = 4 - 11 GeV , Laverage= 1×1027 cm-2s-1
same or higher Laverage for lighter ions
Polarized beams of protons and deuterons in collider mode:
p+p spp = 12 - 26 GeV Lmax ≈ 1×1032 cm-2s-1
d+d sNN = 4 - 13.8 GeV
Nuclotron extracted beams of ions and polarized protons and
deuterons for fixed target experiments:
Li - Au = 1 - 4.5 GeV/u ion kinetic energy
p = 5 - 12.6 GeV kinetic energy
d = 2 - 5.9 GeV/u ion kinetic energy
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 3
NICA Complex
KRION-6T+HILac (3MeV/u) Accelertor complex LHEP
PS and existing
LU-20 (5MeV/u) In preparation
Transfer lines
Booster
NUCLOTRON (600 MeV/u)
0.6-4.5 GeV/u
MultiPurpose
Detector - MPD
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 4
NICA Physics
NICA NICA
1023
LHC (CERN)
BES STAR
(BNL)
SPS (NA-49/61, CERN)
SIS-18 (GSI)
2 4 6 8 20 40 60 80 √SNN, GeV
1 10 102 for Au+Au
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 6
Compare to other facilities
CBM
NICA/BM@N II
NICA/BM@N I
NICA/MPD (2020)
HADES
STAR F.T. STAR BES II
NA-61/SHINE
2 3 4 56 8
Collision energy √sNN [GeV]
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 7
Current status of NICA accelerator
• Design phase completed.
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 8
Civil construction and Magnet production
http://nucloweb.jinr.ru/nucloserv/205corp.htm
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 9
MPD (Multi-Purpose Detector)
Stage 1: TPC, TOF, ECal, FHCal and FFD
Stage 2: IT and Endcaps
(tracker, TOF, ECal)
• 9 m long, 6m diameter
• Low material budget
• Good tracking and pid
• Tracking (TPC):
up to |h|<2, 2π in azimuth
• PID (TOF, TPC, ECAL):
hadrons, e, g
• Event characterization
(FHCAL):
centrality & event plane
Technical Design Reports:
http://nica.jinr.ru/files/mpd_tdr.htm
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 10
SC solenoid and TPC
Superconducting solenoid:
• 0.66 T, ~900 tons
• Contract signed with ASG superconductors (Genova, Italy)
Time Projection Chamber:
• 3.4m long, R=0.27-1.4 m
• Basic R&D finished, assembly workshop in preparation
HV-electrode
Sketch of TPC 3400 ~ 28 kV Ø2800
12 Readout
chamber
E E
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 11
Time-of-Flight system
Forward Fast Detector MRPC
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 12
Calorimetry
ECAL – shashlik type Forward HCal Trigger
ECal sector Centrality
Event plane
ECal module:
25 kg
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 14
Hyperons and hypernuclei
𝟑
𝜦𝑯
105
10 weeks
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 15
Electron and dielectron
dE/dx and TOF
σω≈14 MeV/c2
Hadron suppression
up to 10-5
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 16
BM@N (Baryonic Matter at Nuclotron)
MPD stage I
Fixed target experiment
using Nuclotron beams
Large aperture magnet
(~1m gap between poles)
BM@N plan
Technical runs with d, Li, C
2016 – 2017;
Physics run UrQMD & DCM-QGSM, Au+Au, Ekin.= 4.5A GeV 20 KHz trigger
19
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016
NICA Physics with MPD and BM@N
Systematic study of pp, pA and AA
Bulk properties, EOS
- particle yields & spectra, fermtoscopy, flow
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 21
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 22
Our view of NICA
Civil construction
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 23
Fuqiang at BM@N
Zebo Tang (USTC) Huzhou QCD workshop, Huzhou U., 12/17-19, 2016 24
MPD MRPC Assembly
MPD detector
beam test facility