Approval Chit (Work)

This document is an approval chit form used for construction projects. It contains sections for the contractor to request inspection and approval to proceed with work. The superintendent officer's representative would then inspect prior work, certify materials, and indicate pass/fail results. Finally, the engineer or quality assurance engineer would approve or not approve the contractor's request to proceed based on the inspection results. The form is used to document inspection and approval of earthworks, pavement, drainage, bridge and other construction works.

Uploaded by

Julia Iging
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Approval Chit (Work)

This document is an approval chit form used for construction projects. It contains sections for the contractor to request inspection and approval to proceed with work. The superintendent officer's representative would then inspect prior work, certify materials, and indicate pass/fail results. Finally, the engineer or quality assurance engineer would approve or not approve the contractor's request to proceed based on the inspection results. The form is used to document inspection and approval of earthworks, pavement, drainage, bridge and other construction works.

Uploaded by

Julia Iging
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project :

JKR SARAWAK
Contract No. :

APPROVAL CHIT CHIT NO. :


(EARTH WORKS / PAVEMENT WORKS / DRAINAGE WORKS / BRIDGE WORKS / OTHER WORKS)*

PART A : (To be filled by Contractor)

From : PROJECT MANAGER / CONSTRUCTION MANAGER / SITE AGENT * (Contractor)

To : SUPERINTENDANT OFFICER'S REPRESENTATIVE

We request for inspection and permission to proceed with the following work;

Submitted by :- Signature : Checked by :- Signature :


( ) Project Manager/Construction Manager/Site Agent*

Time : Date : / /

PART B : (To be filled by Superintendant Officer's Rep)*

Received by:- Signature : Time : Date : / /

Name :

1) Certification/Approval of materials : 2) Inspection/Measurement of Prior Work/Platform : 3) Testing of Prior Work :


Type Type Type
Pass/Fail Pass/Fail Pass/Fail
Pass/Fail Pass/Fail Pass/Fail
Pass/Fail Pass/Fail Pass/Fail

Comments (where relevant) :- Signature :


SO Representative
Date:

PART C : (To be filled by Engineer / Quality Assurance Engineer)*

From : SUPERINTENDANT OFFICER (SO) REPRESENTATIVE *

To : PROJECT MANAGER / CONSTRUCTION MANAGER / SITE AGENT * (Contractor)

Your request to proceed with the above mentioned work IS APPROVED


*
IS NOT APPROVED

Remarks :

Received for Contractor ; Signature :


PM/RE/ARE/QAE *

Time : Date : / /
Signature :
Project Manager/Construction Manager/Site Agent*
Neither the endorsement of this Form nor anything written on it is intended to convey final approval for
Time : Date : / / any part of the Works, nor does it relieves the Contractor of his responsibility to comply with the quality
requirements of the Works.

* select as appropriate

Format Rev. No. : 0


Computer ref.: C:/A-c-2/ISO/QA Forms/QA-03 Appr. Chit Minsar/QA/03