0% found this document useful (0 votes)
274 views10 pages

Bangalore Metro Rail Project Phase 2

The document outlines plans for Phase 2 of the Bangalore Metro Rail Project, which includes six new metro lines totaling 72.095km in length. Key details include: - The six new lines will extend existing East-West and North-South corridors and add two new corridors. - The lines will be constructed using similar railway parameters and infrastructure as Phase 1. - Detailed traffic demand studies were conducted to determine station locations and ridership projections on the new lines. - Phase 2 will be developed through six separate Detailed Project Reports for approval and implementation.

Uploaded by

kavyaks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
274 views10 pages

Bangalore Metro Rail Project Phase 2

The document outlines plans for Phase 2 of the Bangalore Metro Rail Project, which includes six new metro lines totaling 72.095km in length. Key details include: - The six new lines will extend existing East-West and North-South corridors and add two new corridors. - The lines will be constructed using similar railway parameters and infrastructure as Phase 1. - Detailed traffic demand studies were conducted to determine station locations and ridership projections on the new lines. - Phase 2 will be developed through six separate Detailed Project Reports for approval and implementation.

Uploaded by

kavyaks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

BMRCL PHASE-2

Bangalore Metro Rail Project Phase 2

1. BACKGROUND

The DPR for the Phase-I of Bangalore Metro Rail Project was prepared by DMRC
and submitted to BMRCL (erstwhile BMRTL) during May 2003 and DPR for
extension of N-S line of Phase-I from Yeshwanthpur to Hesaraghatta Cross & R V
Road Terminal to Puttenahalli cross was submitted during October 2007 & June
2008 respectively. The project has been sanctioned and is under implementation.
The Phase-I comprises of two corridors.

(i) East-West Corridor from Baiyappanahalli Terminal to Mysore Road


Terminal – 18.10 km.
(ii) North-South Corridor from Hesaraghatta cross Station to Puttenahalli cross
– 24.20 km.

Out of a total of 42.30 km system about 8.80 km is underground section and


balance about 33.50 km is elevated. Total 40 stations are planned out of which 7
stations are underground, 2 at grade and 31 are elevated. On East West corridor a
maintenance depot with full workshop facilities is being constructed at
Baiyappanahalli whereas for North – South Corridor a maintenance depot with full
workshop facilities has been constructed at Peenya.

The Metro system is being implemented with 750 V DC Third Rail Traction System,
Cab signaling with CATC, SCADA, and AFC. The rake interchange link is planned
at Majestic station.

In the DPR for the Phase-II, the south end of N-S corridor has extension from
Puttenahalli to Anjanapura Township (Nice Road) along the Kanakapura Road and
from Hesarghatta cross to Bangalore International Exhibition Center (BIEC) on
Tumkur Road (NH-4). East-West Corridor is also proposed for extension on both
ends. i.e. Mysore Road to Kengeri and Baiyappanahalli to White Field.

As regards extension of North-South corridor to Electronic City - Bommasandra


Industrial Area, Government of Karnataka has desired that this line may be taken
up even when Phase-I is in progress. Further extension of this line beyond
Bommasandra Industrial Area may be needed in future as the city grows in this part
of the city..
BMRCL PHASE-2

2. Traffic Demand

The detailed traffic study was got done from M/s Wibursmith Associates,
Bengaluru. Based on the detailed household surveys and traffic surveys carried out
during DPR study in 2002 - 2003 and subsequent DPR Studies for extension of N-S
line in October & December 2007 and the survey done now as a part of this study,
the Transport Demand Model was developed. The network for all the four
extensions have been developed from the primary database and used in the
transport Demand Model. The traffic demand on these four extensions and the
proposed R V Road – Electronic City/Bommasandra corridor and the new corridor
between IIM(B) and Nagawara in place has been projected.

3. PLANNING AND DESIGN PARAMETERS

DMRC has already implemented Phase I of Delhi Metro project. Various design
norms and parameters have been firmed up by DMRC after detailed studies of
norms followed by Metro systems in various countries. However, Delhi being a
much bigger Metropolitan City than Bangalore, its needs are different. However a
similar system is proposed for adoption for Bangalore city. Certain modifications to
the design norms have been recommended keeping in view the specific needs of
Bangalore city and with an idea of standardization of parameters for other
metropolitan and major cities in the country.

For the elevated section of Bangalore Metro a box shaped deck as adopted for
Delhi Metro has been recommended with overall top width of 9.519 m (track center
4.2 m to carry both the tracks. The section has side walkways at the floor level of
the coach for emergency evacuation of passengers.

Bangalore Metro system will have modern, lightweight rolling stock made of
stainless steel. Trains are proposed to be air-conditioned, consisting of 6 coaches
from the beginning itself. Maximum acceleration (1.0 m/sec2) and maximum
deceleration (1.1 m/sec2) parameters are similar to that of Delhi Metro system.

The system is proposed to have Standard Gauge tracks as this will facilitate
provision of sharp curves with radii up to 120 m which becomes a necessity in this
congested city. Other geometrical parameters are similar to that of Bangalore
metro under execution.

It is proposed to provide 750 V dc, third rail traction system for this extension as
being adopted for the phase I under implementation. The other systems like
Signaling with Automatic Train Control and Protection system, Automatic Fare
Collection system and tunnel ventilation, etc. are more or less similar to that of
Phase I of Bangalore Metro.
BMRCL PHASE-2

4. PREPARATION OF DPR FOR PHASE-II

The State Government has accorded approval vide Order No. UDD 127 BMR 2010 dated
04.01.2011 for preparation of DPRs:

Sl. Alignment Colour of Length of the line No. of Stations


No. the Line (in km)
shown in At- Elevated UG Total At- Elevated UG Total
Map at Grade Grade
Annexure-
1
1. Extension of E-W 0 6.465 0 6.465 0 5 0 5
line
Mysore Road
Terminal to Kengeri
2. Extension of E-W 0 15.50 0 15.50 0 14 0 14
line
Baiyappanahalli to
ITPL – Whitefield
Dark Blue
3. Extension of N-S 0 3.77 0 3.77 0 3 0 3
line
Hesaraghatta Cross
to BIEC

4. Extension of N-S 0 6.29 0 6.29 0 5 0 5


line Dark Blue
Puttenahalli Cross to
Anjanapura Township
(up to NICE Road)
5. New Line – N -S 0.48 6.98 13.79 21.25 0 6 12 18
IIMB to Nagawara Red
6. New Line - E-W 0 18.82 0 18.82 0 16 0 16
R.V. Road to Yellow
Bommasandra
Total 0.48 57.825 13.79 72.095 0 49 12 61

It may be seen from the above that Phase-II includes a total length of 72.095 km (13.79 km
underground) and 61 Stations with 12 Underground Stations. Each line can be traced along
with the Station Names in the Map given at Annexure-1 (Indicative ONLY)
BMRCL PHASE-2

SALIENT FEATURES OF THE SIX LINES IN PHASE-II


Baiyappanahalli to ITPL – Whitefield (Extension of E-W Line)

The line starts from south side of Bangalore Chennai Railway line and crosses
Kasturinagar road and Outer Ring road and reaches the Old Madras road. Then the
alignment reaches the Whitefield road and runs along the median of Whitefield road and
then on the median of Graphite India road. After this, the alignment runs along the median
of road and touches the ITPL and Whitefield Satya Sai Ashram. The corridor has 14
stations namely, Jyothipuram, K.R.Puram, Narayanapura, Mahadevapura,
Garudacharyapalya, Doddanakundi, Vishvesharaiah Industrial Estate, Kundalahalli,
Vaidehi Hospital, Satyasai Medical Institute, ITPL, Kadugodi, Ujwala Vidyalaya and
Whitefield.

Mysore Road Terminal to Kengeri (Extension of E-W Line)

The line continues to be on the median of the Mysore Road till it reaches the Kengeri
station. The corridor has 5 stations namely: Nayandahalli, Rajarajeshwari nagar,
Bangalore University Cross, R.V. College of Engineering and Kengeri.

Hesaraghatta Cross to Bangalore International Exhibition Centre (BIEC) (Extension of


N-S Line)

The line continues to be on the RHS of the Tumkur road and traverses along the road up
to BIEC beyond NICE road crossing. There are 3 stations namely, Manjunathanagar,
Jindal and BIEC terminal. Bangalore International Exhibition Centre will be the main and
initial beneficiary of this extension, as not much of a traffic is expected initially on this line.
Therefore, this line will become more viable if BIEC shares cost of this line. Therefore,
the work on this line can begin after BIEC agrees to share the cost.

Puttenahalli Cross to Anjanapura Township (up to NICE Road Crossing) (Extension


of N-S Line)

The line continues to be on the median of Kanakapura road and traverses along the
median of the road up to the Anjanapura Township (up to NICE Road Crossing). There
are 5 stations namely, Anjanapura Road cross, Krishnaleela Park (ISKON), Vajarahalli,
Talaghattapura and Anjanapura Township.

R.V. Road to Bommasandra (E-W New Line)

The line traverses along the R.V. road and turns left to the Marenhalli road and traverses
on the median of Marenahalli road till short of Jayadeva Hospital junction flyover. At the
Jayadeva Hospital junction the alignment shifts to the left and traverses on the footpath of
the at grade road. After crossing Jayadeva junction flyover the alignment comes back to
the median and traverses on the median of the road till the Silk Board junction. At the Silk
Board junction the alignment turns towards right to reach the western side of Hosur road.
Then the line runs on the centre of western side service lane of the Hosur road.
BMRCL PHASE-2

There are 16 Stations on this corridor namely, R.V. Road, Ragigudda temple, Jayadeva
Hospital (interchange Station of Gottigere – IIBM Nagawara line), BTM layout, Silk Board,
HSR Layout, Oxford college, Muneshwara nagar, Chikkabegur, Basapura Road, Hosa
Road, Electronic City– I, Electronic City, Huskur road, Hebbagodi and Bommasandra.

Gottigere - IIMB - Nagawara (N-S New Line)

The line traverses along Bannerghatta Road as elevated line up to Swagath Road cross and
then goes underground just after Sagar Hospital near fire station. The entire length from this
point is underground. The line passes through the Diary Circle, and runs along the MICO
industries and then reaches Hosur road, crossing Richmond Road at Vellara. After this, the
line traverses below Brigade Road and crosses the M.G. Road underneath the Phase – I
East – West metro line and reaches Kamaraj Road. Here the underground integrated station
is planned which is 90 meters from the platform edge of the existing elevated M.G Road
Station and is connected through escalators and stairs. After this the underground alignment
crosses Cubbon road to reach Shivajinagar Bus Stand. Further, the alignment traverses
below the Queens Road and reaches Cantonment Railway Station. From here the line
traverses below Nandidurga Road, Tannery Road and reaches Nagawara after crossing
ORR.

There are 18 Stations on this corridor, 6 elevated and 12 underground. The Elevated
Stations are Gottigere, Hulimavu, IIMB, J.P Nagar 4th Phase, Jayadeva Hospital
(interchange Station of R.V Road terminal to Bommasandra line) and Swagath Road Cross.
The 12 Underground Stations are Dairy Circle, Mico Industries, Langford town, Vellara Jn,
M.G Road (interchange Station of East west corridor of Phase – 1), Shivajinagar,
Cantonment Railway Station, Pottery town, Tannery Road, Venkateshpura, Arabic College
and Nagawara.

Traffic Forecast

Traffic Forecast for Four Extensions

Corridor Peak Hour Number of Passenger


Mean trip
Year Sectional passengers KM
length
loading (Lakhs/day) (Lakhs)
East - West 18,835 4.27 49.09 11.50
2016
North - South 21,606 5.51 55.63 10.10
East - West 24,200 6.51 75.52 11.60
2021
North - South 27,347 7.14 72.11 10.10
East - West 32,501 8.80 102.61 11.70
2031
North - South 36,545 9.37 96.04 10.30
East - West 37,006 10.07 117.46 11.70
2041
North - South 42,577 10.93 112.01 10.30
BMRCL PHASE-2

Traffic Forecast for R.V. Road to Bommasandra

Peak Hour Number of Passenger


Mean trip
Year Sectional passengers KM
length
loading (Lakhs/day) (Lakhs)
2016 13,078 2.40 19.27 8.0
2021 17,275 3.70 30.78 8.3
2031 21,274 4.55 38.22 8.4
2041 23,442 5.02 42.14 8.4

Traffic Forecast for Gottigere - IIMB - Nagawara

Peak Hour Number of Passenger


Mean trip
Year Sectional passengers KM
length
loading (Lakhs/day) (Lakhs)
2016 11935 2.62 24.37 9.30
2021 16381 4.03 38.20 9.50
2031 22806 5.58 52.69 9.50
2041 25315 6.19 58.81 9.50

Train Operations
Train Operations for Four Extensions

Train Operation 2016 2021


Designed Train headway 3 Minutes 3 Minutes
Operational Headway 4-8 Minutes 3 Minutes
Train Composition 6 Cars 6 Cars
Coaches required for East - West .. 105 Coaches
Four Extensions And
North - South .. 81 Coaches

Train operations for R.V. Road to Bommasandra

YEAR 2016 2021 2031 2041


Cars/trains 6 6 6 6
Head way (Minutes) 8 6 5 4.5
Max. PHPDT Demand 13078 17275 21274 23442

PHPDT Capacity Available 12195 16260 19512 21680

Requirement of Coaches 66 90 102 114


BMRCL PHASE-2

Train Operations for Gottigere - IIMB - Nagawara

YEAR 2016 2021 2031 2041


Cars/trains 3 3 3/6 3/6
Head way (Minutes) 4 3 3 3

Max. PHPDT Demand 11935 16381 22806 25315

PHPDT Capacity Available 11490 15320 23420 23420


Requirement of Coaches 69 93 141 141

Speed

The Design Speed in respect of all the Lines is 80 kmph and the Average Speed is 34
kmph.

Traction Power Supply

Particulars Four Extensions R.V. Road to Gottigere -


Bommasandra IIMB -
Nagawara
Traction system voltage 750V DC Third Rail 750V DC Third Rail 25 KV AC
Third Rail bottom Third Rail bottom
Current Collection OHE
collection collection
Power Sub Station Anjanapura, Kengeri & Naganathapura & Hulimavu &
ITPL Park R.V. Road Nagawara
Power Supply Source
66 KV AC 66 KV AC 66 KV AC

No. of Receiving Sub


3 2 2
Stations
No. of Traction Sub
14 8 2
Stations
SCADA System Provided Provided Provided

Note : Exact number of Traction Substations will get finalized after Detailed Design.
BMRCL PHASE-2

Maintenance Facilities

Particulars Four Extensions R.V. Road to Gottigere - IIMB -


Bommasandra Nagawara
Maintenance Baiyappanahalli on E-W Hebbagodi Depot Kothanur Depot
Depot
Peenya on N-S Augmentation in
(Both provided in Ph-I)existing
infrastructure at
A new depot is Peenya Depot
proposed to be
provided at Kengeri in
Phase-II

Stabling Facilities Stabling facilities at Disabled Stabling Stabling facilities


Anjanapura Depot. Line provided in at Nagawara
the Oxford Station Stabling Depot

PROJECT COST

Delhi Metro Rail Corporation have prepared the DPRs of four extensions and the 2 new
lines of R.V. Road to Bommasandra and Gottigere – IIMB – Nagawara corridors. The total
Completion Cost of all Six Lines of Phase-II is estimated at Rs.26405.14 Crore. The details
are as below:

Name of the Line Description Estimated


Completion
Cost
(Rs. in Crore)
Baiyappanahalli to ITPL – Extension of Eastern Line of 4845.00
Whitefield Phase-1
R.V. Road to Bommasandra New Line with Interchange 5744.09
Station at R.V. Road Station in
the Southern Line of Phase-1
Mysore Road Terminal to Kengeri Extension of Western Line 1867.95
Gottigere - IIMB - Nagawara New Arterial Line with a 13.79 11014.00
km Underground Line.

Puttenahalli Cross to Anjanapura Extension of Southern Line 1765.88


Township
(up to NICE Road)
Hesaraghatta Cross to BIEC Extension of Northern Line 1168.22

Total 26405.14
BMRCL PHASE-2

COMPLETION PERIOD OF PHASE-II

The Completion Period for all Lines of Phase-II will be 5 to 6 years from the date of
approval by Government of India.

FINANCIAL INDICES

The Financial Indices:

Line EIRR FIRR


Four Lines 13.40% 6.30%
R.V. Road to Bommasandra 16.70% 4.40%
Gottigere - IIMB - Nagawara 13.20% 4.00%

Land Requirement:-

Since land is a scarce commodity especially in metropolitan areas, every effort has been
made to keep land requirement to the barest minimum and acquisition of private property
has been kept minimal. Land is mainly required for route alignment, station buildings,
platforms, entry/exit structures, traffic integration, power sub-stations, temporary
construction depots / work sites and sick line facilities etc.

*****

DISCLAIMER: - The areas indicated in this report or the alignment map is only
broadly indicative of the location of the stations and viaduct / tunnel as the case
may be and should not be construed as approved locations or used as a record for
any purpose.
A R
NAG

A
ARE
EC

A
NAT
DAL

LI
NDR
BI

RY
A
A
NJU
JIN

AR E
RAH
ASA

US T
MA

LLI
ASA

IND
NAG

IND
AHA
T.D

P UR
N YA
JAL

NYA

H
NAGAVARA

PE E

PUR
ANT
PEE

NTH
HW
ARABIC COLLEGE

YES

AD
WA

RO
YES

IGE
VENKATESHPURA

MP

GARUDACHAR PALYA
SA
D
OA
SANDAL SOAP FACTORY

RE

MAHADEVPURA
TANNERY ROAD

JYOTHIPURAM

K.R.PURAM
UA
UR
PU

SQ
MP
M
MAHALAKSHMIPURAM POTTERY TOWN

VE

SIR M.VISHVESHWARAIYA
RI
IRA

BYAPANAHALLI
KU

NT
RAJAJI NAGAR

SR
CANTONMENT RLY STATION

MA

VIDHAN SOUDA

kADUGODI
CUBBUN PARK
WHITEFIELD

MAGADI ROAD

CITY RLY STN


ITPL

HOSAHALLI
SHIVAJI NAGAR DODDANEKUNDI
IND AREA UJVALA
SW VIDYALAYA
SATHYA SAI
AM VISHVESHWARAIAH HOSPITAL
M G ROAD IV IND AREA
IV

INDIRANAGAR
MG EKA

LI
MAJESTIC ROA

ITAL
ULSOOR
NA

KUNDALAHAL
D

TRINITY CIRCLE
VIJAYNAGAR ND

VYDEHI HOSP
CHICKPET A
RO
VELLARA AD
ATTIGUPPE K.R MARKET
LANGFORD TOWN
NATIONAL COLLEGE
DEEPANJALI NAGAR MICO INDUSTRIES
LALBAGH
MYSORE ROAD

RAGI GUDDA TEMPLE


NAYANDAHALLI SOUTH END CIRCLE DAIRY CIRCLE

JAYADEVA HOSPITAL
RAJA RAJESWARI NAGAR
BANGALORE UNIVERSITY
(Interchange stn.)

SILK BOARD
SWAGATH
JAYANAGAR
RD CROSS PHASE -I N-S Line
RV COLLEGE OF ENGG
RASTRIYA VIDYALAYA BTM PHASE -I E-W Line
LAYOUT PHASE - II LINES
BANSHANKARI
KENGERI JAYADEVA HOSPITAL
(Interchange stn.)
HSR LAYOUT
JP NAGAR J P NAGAR
IV PHASE
OXFORD ENGG.COLEEGE
PUTTENAHALLI
MUNISHWARA NAGAR
ANJANA PURA ROAD
IIM (B)
KRISHNA LEELA PARK
(ISKON) CHIKKA BEGUR

VAJRAHALLI
BASAPUR ROAD
HULIMAVU
THALAGHATAPURA

HOSA ROAD

ANJANAPURA TOWNSHIP GOTTIGERE


ELECTRONIC CITY - I

ELECTRONIC CITY

HUSKUR ROAD

HEBBAGODI

BOMMASANDRA

You might also like