Bangalore Metro Rail Project Phase 2
Bangalore Metro Rail Project Phase 2
1. BACKGROUND
The DPR for the Phase-I of Bangalore Metro Rail Project was prepared by DMRC
and submitted to BMRCL (erstwhile BMRTL) during May 2003 and DPR for
extension of N-S line of Phase-I from Yeshwanthpur to Hesaraghatta Cross & R V
Road Terminal to Puttenahalli cross was submitted during October 2007 & June
2008 respectively. The project has been sanctioned and is under implementation.
The Phase-I comprises of two corridors.
The Metro system is being implemented with 750 V DC Third Rail Traction System,
Cab signaling with CATC, SCADA, and AFC. The rake interchange link is planned
at Majestic station.
In the DPR for the Phase-II, the south end of N-S corridor has extension from
Puttenahalli to Anjanapura Township (Nice Road) along the Kanakapura Road and
from Hesarghatta cross to Bangalore International Exhibition Center (BIEC) on
Tumkur Road (NH-4). East-West Corridor is also proposed for extension on both
ends. i.e. Mysore Road to Kengeri and Baiyappanahalli to White Field.
2. Traffic Demand
The detailed traffic study was got done from M/s Wibursmith Associates,
Bengaluru. Based on the detailed household surveys and traffic surveys carried out
during DPR study in 2002 - 2003 and subsequent DPR Studies for extension of N-S
line in October & December 2007 and the survey done now as a part of this study,
the Transport Demand Model was developed. The network for all the four
extensions have been developed from the primary database and used in the
transport Demand Model. The traffic demand on these four extensions and the
proposed R V Road – Electronic City/Bommasandra corridor and the new corridor
between IIM(B) and Nagawara in place has been projected.
DMRC has already implemented Phase I of Delhi Metro project. Various design
norms and parameters have been firmed up by DMRC after detailed studies of
norms followed by Metro systems in various countries. However, Delhi being a
much bigger Metropolitan City than Bangalore, its needs are different. However a
similar system is proposed for adoption for Bangalore city. Certain modifications to
the design norms have been recommended keeping in view the specific needs of
Bangalore city and with an idea of standardization of parameters for other
metropolitan and major cities in the country.
For the elevated section of Bangalore Metro a box shaped deck as adopted for
Delhi Metro has been recommended with overall top width of 9.519 m (track center
4.2 m to carry both the tracks. The section has side walkways at the floor level of
the coach for emergency evacuation of passengers.
Bangalore Metro system will have modern, lightweight rolling stock made of
stainless steel. Trains are proposed to be air-conditioned, consisting of 6 coaches
from the beginning itself. Maximum acceleration (1.0 m/sec2) and maximum
deceleration (1.1 m/sec2) parameters are similar to that of Delhi Metro system.
The system is proposed to have Standard Gauge tracks as this will facilitate
provision of sharp curves with radii up to 120 m which becomes a necessity in this
congested city. Other geometrical parameters are similar to that of Bangalore
metro under execution.
It is proposed to provide 750 V dc, third rail traction system for this extension as
being adopted for the phase I under implementation. The other systems like
Signaling with Automatic Train Control and Protection system, Automatic Fare
Collection system and tunnel ventilation, etc. are more or less similar to that of
Phase I of Bangalore Metro.
BMRCL PHASE-2
The State Government has accorded approval vide Order No. UDD 127 BMR 2010 dated
04.01.2011 for preparation of DPRs:
It may be seen from the above that Phase-II includes a total length of 72.095 km (13.79 km
underground) and 61 Stations with 12 Underground Stations. Each line can be traced along
with the Station Names in the Map given at Annexure-1 (Indicative ONLY)
BMRCL PHASE-2
The line starts from south side of Bangalore Chennai Railway line and crosses
Kasturinagar road and Outer Ring road and reaches the Old Madras road. Then the
alignment reaches the Whitefield road and runs along the median of Whitefield road and
then on the median of Graphite India road. After this, the alignment runs along the median
of road and touches the ITPL and Whitefield Satya Sai Ashram. The corridor has 14
stations namely, Jyothipuram, K.R.Puram, Narayanapura, Mahadevapura,
Garudacharyapalya, Doddanakundi, Vishvesharaiah Industrial Estate, Kundalahalli,
Vaidehi Hospital, Satyasai Medical Institute, ITPL, Kadugodi, Ujwala Vidyalaya and
Whitefield.
The line continues to be on the median of the Mysore Road till it reaches the Kengeri
station. The corridor has 5 stations namely: Nayandahalli, Rajarajeshwari nagar,
Bangalore University Cross, R.V. College of Engineering and Kengeri.
The line continues to be on the RHS of the Tumkur road and traverses along the road up
to BIEC beyond NICE road crossing. There are 3 stations namely, Manjunathanagar,
Jindal and BIEC terminal. Bangalore International Exhibition Centre will be the main and
initial beneficiary of this extension, as not much of a traffic is expected initially on this line.
Therefore, this line will become more viable if BIEC shares cost of this line. Therefore,
the work on this line can begin after BIEC agrees to share the cost.
The line continues to be on the median of Kanakapura road and traverses along the
median of the road up to the Anjanapura Township (up to NICE Road Crossing). There
are 5 stations namely, Anjanapura Road cross, Krishnaleela Park (ISKON), Vajarahalli,
Talaghattapura and Anjanapura Township.
The line traverses along the R.V. road and turns left to the Marenhalli road and traverses
on the median of Marenahalli road till short of Jayadeva Hospital junction flyover. At the
Jayadeva Hospital junction the alignment shifts to the left and traverses on the footpath of
the at grade road. After crossing Jayadeva junction flyover the alignment comes back to
the median and traverses on the median of the road till the Silk Board junction. At the Silk
Board junction the alignment turns towards right to reach the western side of Hosur road.
Then the line runs on the centre of western side service lane of the Hosur road.
BMRCL PHASE-2
There are 16 Stations on this corridor namely, R.V. Road, Ragigudda temple, Jayadeva
Hospital (interchange Station of Gottigere – IIBM Nagawara line), BTM layout, Silk Board,
HSR Layout, Oxford college, Muneshwara nagar, Chikkabegur, Basapura Road, Hosa
Road, Electronic City– I, Electronic City, Huskur road, Hebbagodi and Bommasandra.
The line traverses along Bannerghatta Road as elevated line up to Swagath Road cross and
then goes underground just after Sagar Hospital near fire station. The entire length from this
point is underground. The line passes through the Diary Circle, and runs along the MICO
industries and then reaches Hosur road, crossing Richmond Road at Vellara. After this, the
line traverses below Brigade Road and crosses the M.G. Road underneath the Phase – I
East – West metro line and reaches Kamaraj Road. Here the underground integrated station
is planned which is 90 meters from the platform edge of the existing elevated M.G Road
Station and is connected through escalators and stairs. After this the underground alignment
crosses Cubbon road to reach Shivajinagar Bus Stand. Further, the alignment traverses
below the Queens Road and reaches Cantonment Railway Station. From here the line
traverses below Nandidurga Road, Tannery Road and reaches Nagawara after crossing
ORR.
There are 18 Stations on this corridor, 6 elevated and 12 underground. The Elevated
Stations are Gottigere, Hulimavu, IIMB, J.P Nagar 4th Phase, Jayadeva Hospital
(interchange Station of R.V Road terminal to Bommasandra line) and Swagath Road Cross.
The 12 Underground Stations are Dairy Circle, Mico Industries, Langford town, Vellara Jn,
M.G Road (interchange Station of East west corridor of Phase – 1), Shivajinagar,
Cantonment Railway Station, Pottery town, Tannery Road, Venkateshpura, Arabic College
and Nagawara.
Traffic Forecast
Train Operations
Train Operations for Four Extensions
Speed
The Design Speed in respect of all the Lines is 80 kmph and the Average Speed is 34
kmph.
Note : Exact number of Traction Substations will get finalized after Detailed Design.
BMRCL PHASE-2
Maintenance Facilities
PROJECT COST
Delhi Metro Rail Corporation have prepared the DPRs of four extensions and the 2 new
lines of R.V. Road to Bommasandra and Gottigere – IIMB – Nagawara corridors. The total
Completion Cost of all Six Lines of Phase-II is estimated at Rs.26405.14 Crore. The details
are as below:
Total 26405.14
BMRCL PHASE-2
The Completion Period for all Lines of Phase-II will be 5 to 6 years from the date of
approval by Government of India.
FINANCIAL INDICES
Land Requirement:-
Since land is a scarce commodity especially in metropolitan areas, every effort has been
made to keep land requirement to the barest minimum and acquisition of private property
has been kept minimal. Land is mainly required for route alignment, station buildings,
platforms, entry/exit structures, traffic integration, power sub-stations, temporary
construction depots / work sites and sick line facilities etc.
*****
DISCLAIMER: - The areas indicated in this report or the alignment map is only
broadly indicative of the location of the stations and viaduct / tunnel as the case
may be and should not be construed as approved locations or used as a record for
any purpose.
A R
NAG
A
ARE
EC
A
NAT
DAL
LI
NDR
BI
RY
A
A
NJU
JIN
AR E
RAH
ASA
US T
MA
LLI
ASA
IND
NAG
IND
AHA
T.D
P UR
N YA
JAL
NYA
H
NAGAVARA
PE E
PUR
ANT
PEE
NTH
HW
ARABIC COLLEGE
YES
AD
WA
RO
YES
IGE
VENKATESHPURA
MP
GARUDACHAR PALYA
SA
D
OA
SANDAL SOAP FACTORY
RE
MAHADEVPURA
TANNERY ROAD
JYOTHIPURAM
K.R.PURAM
UA
UR
PU
SQ
MP
M
MAHALAKSHMIPURAM POTTERY TOWN
VE
SIR M.VISHVESHWARAIYA
RI
IRA
BYAPANAHALLI
KU
NT
RAJAJI NAGAR
SR
CANTONMENT RLY STATION
MA
VIDHAN SOUDA
kADUGODI
CUBBUN PARK
WHITEFIELD
MAGADI ROAD
HOSAHALLI
SHIVAJI NAGAR DODDANEKUNDI
IND AREA UJVALA
SW VIDYALAYA
SATHYA SAI
AM VISHVESHWARAIAH HOSPITAL
M G ROAD IV IND AREA
IV
INDIRANAGAR
MG EKA
LI
MAJESTIC ROA
ITAL
ULSOOR
NA
KUNDALAHAL
D
TRINITY CIRCLE
VIJAYNAGAR ND
VYDEHI HOSP
CHICKPET A
RO
VELLARA AD
ATTIGUPPE K.R MARKET
LANGFORD TOWN
NATIONAL COLLEGE
DEEPANJALI NAGAR MICO INDUSTRIES
LALBAGH
MYSORE ROAD
JAYADEVA HOSPITAL
RAJA RAJESWARI NAGAR
BANGALORE UNIVERSITY
(Interchange stn.)
SILK BOARD
SWAGATH
JAYANAGAR
RD CROSS PHASE -I N-S Line
RV COLLEGE OF ENGG
RASTRIYA VIDYALAYA BTM PHASE -I E-W Line
LAYOUT PHASE - II LINES
BANSHANKARI
KENGERI JAYADEVA HOSPITAL
(Interchange stn.)
HSR LAYOUT
JP NAGAR J P NAGAR
IV PHASE
OXFORD ENGG.COLEEGE
PUTTENAHALLI
MUNISHWARA NAGAR
ANJANA PURA ROAD
IIM (B)
KRISHNA LEELA PARK
(ISKON) CHIKKA BEGUR
VAJRAHALLI
BASAPUR ROAD
HULIMAVU
THALAGHATAPURA
HOSA ROAD
ELECTRONIC CITY
HUSKUR ROAD
HEBBAGODI
BOMMASANDRA