Below is the IEE Checklist Report for Cemetery, Funeral Parlors, Crematorium, and
Columbarium. Please check applicable project category:
Projects Project Size Corresponding Project
Parameter Size/Threshold
Cemetery area to be ≥ 5.0 hectares
developed
total/gross floor ≥ 1 hectare
Funeral parlors, crematorium, area including
columbarium parking and other
areas
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if any,
following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and affected
areas and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization Scheme
(PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO 2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the blank spaces provided
or otherwise check () the appropriate boxes □ or parenthesis ( ). Boxes with check
marks() are automatically required. Use additional sheets if necessary and indicate this in
the appropriate space.
Misleading or erroneous answers are basis for legal actions and/or denial of ECC
issuance.
Total Project/Building
Footprint Area
(Area actually utilized)
Project Proponent:
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
__________________________________________________________________________________
__________________________________________________________________________________
_________________________________________________________________________
Attach vicinity map/s and photographs of the project site and site development/layout plan.
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
Water Source
[ ] ground water [ ] well [ ] spring [ ] others: ____________________________
Energy/Water Efficiency
Utilities Estimated Savings Proposed Efficiency/Conservation
Measures
Power/Electricity KWh
Water m³/day
1.4 MANPOWER
a. Construction Phase
Manpower Expertise/Skills Total
Requirement
b. Operation Phase
Manpower Expertise/Skills Total
Requirement
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
LAND
Consistency with land Current land use w/in 1km radius See attached proof of compatibility with
use (as per zoning ordinance): land use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others ___________________
Disturbance to wildlife Existing vegetation in the area: Compliance with conditions of DENR/LGU Annual inspection of area Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ revegetated construction /operation cost
clearing Marshland
Permit
Grassland
Limit land clearing as much as possible
Mangrove
Provide temporary fencing for vegetation
that will be retained
Wetland Promote restoration of damaged or
Others, specify destroyed vegetation where possible (e.g.,
____________________ tree planting);
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Change in surface Slope: Provide erosion control and slope Regular inspection of slope Slope/ Erosion Control
landform/ topography/ flat (0-3%) protection measures protection measures in Cost: ___________
terrain/slope gently sloping to rolling (3-18%) Designate a Spoils Storage Area, with erosion-prone areas Others, specify
steep (>18%) topsoil set aside for later use and allow Regular inspection for new ____________
Soil Erosion maximum re-use of spoils eroded areas near the site ____________
Construction during dry season Others (Pls. specify):
Stabilization of embankment with grasses ___________
or other soil cover
Others, specify:
____________
Is the project site located in an area Compliance with the DENR Administrative
identified by Order No. 2003-30 and DENR
MGB/PAGASA/PHIVOLCS as Administrative Order No. 2000-28,
hazard prone? Implementing Guidelines on Engineering
Yes Geological and Geo-hazard Assessment
(EGGA).
No
Soil/Land contamination Existing soil type in the area: Implementation of the Ecological Solid Daily inspection of Cost integrated in the
due to improper solid sandy Waste Management Plan (ESWMP) waste/recycling bins for construction /operation cost
waste disposal
clay Set-up temporary fence around the segregation
sandy-loam
construction area Daily inspection for presence
Others, specify
Implement re-use and recycling of waste of mixed garbage in the
materials facility
____________________
Implement proper segregation, collection Weekly inspection of waste
and disposal of domestic wastes in accumulated
designated areas Others, specify
Implement proper collection, labeling and ___________________________
_______
storage of hazardous waste
Provide receptacles / bins for solid wastes
Coordinate with the municipal / city waste
collectors
Engage third party company for waste
collection
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
Others, specify: ________________
Impairment of Presence of visually significant Implement landscaping and other Regular inspection of Cost integrated in the
visual aesthetics landforms/landscape/structures? beautification measures landscaping and other construction/ operation cost
Devaluation of land Yes Provide adequate buffer beautification activities
values No Compensate adjacent property owners Regular monitoring of buffer
zones
Others, specify: ________________
Regularly monitor
presence/absence of
complaints from adjacent
property owners
WATER
Increased siltation due Specify nearest/receiving water Set-up proper and adequate sanitary Regular (ocular) inspection of: Cost integrated in the
to project activities body:
____________________________
facilities Drainage / canal systems construction/ operation cost
Water quality __ Strictly require the contractor and its Water treatment facility (i.e.,
degradation workers to observe proper waste disposal grease trap, septic tank, etc.)
Others, specify Distance to nearest/receiving water and proper sanitation
______________________ body: Strictly observe proper waste handling and Regular (ocular) inspection of
waterbody for:
______ 0 to less than 0.5 km
disposal
0.5 to 1 km
Provision of wastewater treatment facility Turbidity and/or silted
(e.g. septic tank, oil and water separator, condition
More than 1 km etc.) Floating wastes or debris
If nearest/receiving water body is Set up silt trap/stilling ponds to minimize
downstream siltation
fresh water, specify classification:
AA
Others (Pls. specify): ___________
A
B Provision of three-chambered septic tank
C for domestic sewage
D
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
>5,000person ________________________
Regular coordination with
concerned agencies
Available/nearest water source. Regularly monitor
occurrences of water
Deepwell shortages
Water district/LGU Others, specify
Surface water ____________
Others, specify
________________________
Increased occurrence Is the project site located in an area Use appropriate design for project facilities Regularly monitor Cost integrated in the
identified by MGB/PAGASA as
of flooding
flood prone? Implement appropriate drainage system
presence/absence of
complaints
construction/ operation cost
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all emission Regularly monitor Cost integrated in the
0 to less than 0.5 km sources (e.g. generator, etc) presence/absence of construction/ operation cost
0.5 to 1 km Install when applicable, the appropriate air
complaints
Provide description of the Abandonment activities, such as, dismantling and waste
disposal.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Organization Chart:
This is to certify that all the information and commitments in this Initial Environmental
Examination (IEE) Checklist Report are accurate and complete to the best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising from any
misrepresentation or failure to state material information in this IEE Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant
exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.