CMR July-December 2021

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

RAPSKIE FARM CORPORATION

PROPONENT’S NAME

MONITORING PERIOD COVERED: JULY TO DECEMBER 2021

I. BASIC PROJECT INFORMATION AND UPDATES


ECC Control No/REFERENCE Code No: ECC-R08-1407-0068
Project Title: POULTRY LAYER FARM
Project Type: CHICKEN EGG PRODUCTION
Project Location: Sitio Bailan, Brgy. Cagbuhangin, Ormoc City, Leyte
Proponent Location or mailing address: (RAPSKIE FARM) Sitio Bailan, Brgy. Cagbuhangin, Ormoc City,
Leyte
Proponent Cellphone #: 09171132016
Contact Person: Darrell A. Coloscos Jr.
Contact Number: 09171377590
Email Address: [email protected]
Geographical Coordinates:
Project Stage/Phase: (i.e. construction; commissioning, etc.) : OPERATIONAL
EMP Approvalp : ◻ During ECC Application Stage
◻ Updated after ECC Issuance; approved on ________________
Changes in Project Design (if any) : _________________________________________________________

II. EXECUTIVE SUMMARY

Table II-1. Summary of Major Findings for the Monitoring Period


Condition / Requirement / Commitment Compliance Status & Recommendation/Commitm
Summary of Actions ent for the next reporting
taken
Compliance with ECC DONE
Compliance with EMP DONE
Implementation of appropriate & effective DONE
environmental impact remedial actions in case of
exceedances
Complaints Management DONE
Realistic and sufficient budget for conducting the NOT APPLICABLE
environmental monitoring and audit activities
Accountability - qualified personnel are charged with DONE
the routine monitoring of the project activities in terms
of education, training, knowledge and experience of the
environmental team
Others . . . There were no major
activities that influence
during the monitoring
period
III. RESULTS AND DISCUSSIONS

A. Compliance Monitoring

Table 1. Summary Status of ECC & EMP Compliance


ECC/EMP Condition/Requirement Relevant ECC Condition/s (if Status of
any) Compliance
REMARK
Categorization (✓ if
#/s Requirement Description S
complying)
1) Project coverage/limits/ √
2) Components √
3) Other sectoral requirements mandated by

other agencies to be complied with
4) EMP and updates as deemed required √ No updates
5) Conduct of baseline, compliance and impact

self-monitoring
6) Multi-sectoral Monitoring (as may be
N/A N/A
required)
7) Regular reporting √ SMR/CMR
8) Institutional arrangements necessary for
implementation of environmental √
management measures
9) Standard DENR requirement on transfer of
N/A
ownership
10) Standard DENR requirement on
N/A
abandonment
11) Impact Mitigation Plan or Construction/
N/A
Contractor’s Environmental Program
Join
barangay
tree
planting,
giving of
12) Social Development Plan (SDP) √ medicines
to
children,joi
n fun run &
LGU
activities
13) IEC Plan
14) Contingency/Emergency Response Plan or

equivalent Risk Management Plan
15) Abandonment Plan (when applicable) N/A
16) Environmental Monitoring Plan (EMoP) √
17) (Others)
B. Impact Monitoring
The quality of life, degree of happiness, and sense of environmental cleanliness

Banana Plantation
Citrus

BAMBOO
MANGO
i. Summary of Previous Monitoring
none
ii. Current Monitoring Results and Findings

Table 2. Summary Status of Environmental Impact Management and Monitoring Plan Implementation
Remarks
Standard/ Envt’l
Monitoring (EQPL*
Envt’l Envt’l Sampling & Measurement EIS Mgmt
Objective Monitoring commitment
Aspec Impac Prediction Measure
Parameter , if any)
t t
Stn/Loc Results
n Previous Current

Table 3. Report on Status of Environmental Budget Allocations and Expenses


Expense Item* Budget Actual Expenses
Direct Co.
Direct from Co. Budget for MMT MMT expenses
Expense
A. Implementation of Management Plans & Programs
1) Environmental Impact
N/A N/A √ N/A
Mitigation Plan
2) Social Development Plan N/A N/A √ N/A
3) IEC Plan N/A N/A √ N/A
4) Enhancement Programs (if any) N/A N/A √ N/A
B. Implementation of Monitoring Plans
1) Self-Monitoring N/A N/A √ N/A
2) Environmental Monitoring
N/A N/A N/A N/A
Fund (with MMT)
3) Environmental Guarantee Fund N/A N/A
TOTAL
*For mining projects, equivalent cost items shall be adopted, e.g. SDMP in lieu of SDP.

IV. CONCLUSIONS AND RECOMMENDATIONS


A. Compliance Status Compliance Status

Self-Monitoring Report
Compliance Monitoring Report
ECC conditions

B. Environmental Quality Status (applicable only if EQPLs have been set by the Proponent as its
commitment or if
opted to be mutually agreed upon by Proponent with the EMB and other members of the MMT)
NOT APPLICABLE
C. Environmental Management Plan Status
Site Clearing/Cleaning

Solid garbage such as steel, woods and other scraps will be collected and recycle for use or sell it as another
source of income for the company and to preserve the cleanliness in the area, garbage can will be provided. To
sustain this cleanliness, the Pollution Control Officer (PCO) of the plant will draft a proper
housekeeping/sanitation scheme to be strictly enforced. With the stiff penalties that shall be imposed to anybody
littering around the vicinity, high efficiency is expected. Unrecyclable solid waste will be disposed at location
and manner designated by the PCO while recyclable solid waste will be segregated and sold to scrap buyers or
stored for future use.

Cleaning of the Production/Dry Area

Solid garbage such as leaves, found in the area will be collected and place in the compost pit to preserve the
cleanliness in the area.

Tree Planting

In addition, with the several existing Gemilina trees, Bamboo and fruit bearing trees such as Guyabano, Mango,
and Banana may be planted within the compound at locations designated by PCO.

D. ENVIRONMENTAL RISK CATEGORIZATION

NONE

E. WORK PLAN FOR NEXT MONITORING PERIOD


Continue monitor the planted trees and plant more trees.
Make a vegetable garden.
Repaint safety environmental signages

PREPARED BY: NOTED BY:

DARRELL A. COLOSCOS JR. JOSEPH RAFAELITO T. ESCAÑO


POLLUTION CONTROL OFFICER MANAGING HEAD

RAPSKIE FARM CORPORATION RAPSKIE FARM CORPORATION


Proponent/Company Name Proponent/Company Name

01/12/2022 01/12/2022
Date Date