As Built Drawing Form (ASB)
As Built Drawing Form (ASB)
As Built Drawing Form (ASB)
DATE :
(Owner's Logo)
(clinet)
R.F.I
TO CONSULTANT OFFICE - PROJECT MANAGER :
WE ARE HERE BY TO REQUEST INFORMATION CONCERNING THE FOLLOWING MATTER , PLEASE ADVICE
CONTRACTOR PM :
COMMENTS :
CONSULTANT PM :
Submittal Ref.: HBZ2-ABS-AR-000
Project Name: Revision 00
Supervision Active Brains
Consultant: ABCG
Hacienda Bay Date 23/Dec/20
Phase 1
Zone 2
United Engineering Attachments 10 Pages
Contractor: for Construction Client: Palm Hills
Co. Size A0
Soft Copy CD
Submitted For Approval Other Shop Drawing Sub. Ref.: - Copy to: Employer - Palm Hills Other
Description Action
Item AB Drawing No. Rev. Date Title
& Notes Code
Signature :
Date :
Legends:
AR = Architectural ST = Structural EL = Electrical ME = Mechanical IN = Infra SU = Survey
FF = Fire Fighting PL = Plumbing OT = Other drawings