0% found this document useful (0 votes)
77 views24 pages

Profile PECC4 EN

EVNPECC4 was founded in 1976 as the Southern Power Planning and Designing Sub-Institute with 18 officers and engineers to renovate and reconstruct power systems in Southern Vietnam post-war. Over 45 years it has grown to become one of Vietnam's leading power engineering consulting companies with over 1,000 employees providing consulting services across Vietnam and in neighboring countries. EVNPECC4 has expanded its services from small-scale power projects to large power plants and grids, applying new technologies to optimize energy solutions for clients.

Uploaded by

Thành Viết
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views24 pages

Profile PECC4 EN

EVNPECC4 was founded in 1976 as the Southern Power Planning and Designing Sub-Institute with 18 officers and engineers to renovate and reconstruct power systems in Southern Vietnam post-war. Over 45 years it has grown to become one of Vietnam's leading power engineering consulting companies with over 1,000 employees providing consulting services across Vietnam and in neighboring countries. EVNPECC4 has expanded its services from small-scale power projects to large power plants and grids, applying new technologies to optimize energy solutions for clients.

Uploaded by

Thành Viết
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

VIETNAM ELECTRICITY

POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4

Y ears
OF ESTABLISHMENT
& DEVELOPMENT

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


MESSAGE FROM THE CHAIRMAN

Power Engineering Consulting Joint Stock Company 4 (EVNPECC4),


formerly known as Southern Power Planning and Designing
Sub-Institute, was founded in 1976 with the mission of renovating,
restoring and reconstructing the power system for Southern provinces in
Vietnam so as to meet people’s living needs and restore the postwar
economy. Up until now, EVNPECC4 has become one of the leading power
engineering consulting companies in Vietnam.

With 45 years of experience in power engineering consulting field,


EVNPECC4 has developed a workforce of highly professional officers and
engineers who are capable of researching and consulting on economic –
technical - technological solutions for energy projects contributing to the
enhancement of Vietnam power system’s effectiveness, stability and
reliability.

With the target of becoming the leading company in power engineering


consulting field, EVNPECC4 has built, developed a strong Vietnamese
brand domestically and internationally. We affirm to accelerate digital
transformation’s process, apply big data and artificial intelligence based
on 4.0 energy platform in order to improve the effectiveness and benefits
for clients and partners. We committed to constantly be innovative,
creative and bring sustainable values for the community and society.

For achieved accomplishments as today, we would like to express our


deep gratitude to the leaders of Vietnam Electricity, Ministries and its
Departments, Agencies; customers, partners, shareholders and
generations of employees who have accompanied throughout the
Company’s establishment and development.

We look forward to continuing gaining your trust and cooperation in


the future.
Sincerely!
Chairman of the Board

VU THANH DANH

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


VISION - MISSION 01

CONTENTS
ESTABLISHMENT HISTORY 02

DEVELOPMENT PROCESS 03

ORGANIZATIONAL CHART 05

BOARD OF DIRECTORS 06
& EXECUTIVE BOARD

HUMAN RESOURCES 07

MARKETS AND SERVICES, PRODUCTS 08

TYPICAL CUSTOMERS & PARTNERS 18

HONORABLE TITLES 19

GENERATIONS OF COMPANY LEADERS


20
THROUGH THE TIMES

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


VISION - MISSION Page 01

VISION
We strive to brand EVNPECC4 as a strong
energy consulting service provider in
Vietnam and internationally.

MISSION
For the sustainable development and
national energy security; for the benefits
of customers, employees and partners;
EVNPECC4, with creativity, expertise, and
in-depth industry knowledge, always
provide professional consulting service
in energy sector with the most optimal
and effective solutions.

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


ESTABLISHMENT HISTORY Page 02

14/07
ESTABLISHMENT For the purpose of renovating,
restoring and reconstructing power
system for Southern provinces,
HISTORY meeting people’s living needs and

1976
restoring the postwar economy,
Ministry of Electricity and Coal
decided to mobilized 18 officers and
engineers from Planning and
Designing Institute and other units
to establish Southern Power
Planning and Designing
Sub-Institute in Nha Trang.

Typical projects executed by Southern Power Planning


and Designing Sub-Institute during 1976-1980 period:
▶ Power generation station expansion
such as Diesel Hue, Lien Tri – Da Nang,
Song Ngang – Quy Nhon, Tuy Hoa,
Bien Hoa – Buon Me Thuot.
In spite of difficult, challenging situations and a
▶ Provided engineering services for
small number of workforce, with a high sense of
new stations such as Ngu Binh, Tra O,
responsibility and professional enthusiasm,
An Khe, Krong Pak, Cau Lung, Van
officers and engineers of Southern Power
Ninh with total installing
Planning and Designing Sub-Institute – The first
capacity of 41.8 MVA.
generation of the Company – travelled across
Central region, Central Highlands to Ho Chi Minh ▶ Prepared power development plan,
City, Eastern and Southwestern provinces in surveyed and designed many
Vietnam, participated in restoration, renovation transmission lines, 13-35kV stations
and construction engineering many new power projects in other provinces.
source and power grid projects.
45 YEARS OF ESTABLISHMENT AND DEVELOPMENT
DEVELOPMENT PROCESS Page 03

DEVELOPMENT With 45 years of establishment and development, EVNPECC4 has


grown exponentially in every aspect and become one of the leading
energy consulting companies in Vietnam with full resources
PROCESS (facilities, advanced equipment, technology and software together
with highly - qualified workforce) in order to provide economic -
technical - technological solutions; solve practical problems of the
power industry, partners and clients.

◆ Investment opportunities consulting


◆ Provide consulting, engineering services for power source, power
grid, renewable energy projects at all levels and across the country,
including Lao and Cambodia.
◆ EPC, PMC power projects
◆ Asset management in power plants/projects
◆ Investment consulting & execution

1976 1999 2007


SOUTHERN POWER POWER ENGINEERING POWER ENGINEERING
PLANNING AND CONSULTING COMPANY 4 CONSULTING JOINT
DESIGNING SUB-INSTITUTE Under EVN STOCK COMPANY 4
18 EMPLOYEES & ENGINEERS 300 EMPLOYEES & ENGINEERS 400 EMPLOYEES & ENGINEERS
Consulting service for upgrading, repairing Engineering Consulting Engineering Consulting

≈ 1000
Small-scale Power grid Hundreds MW Power grid Class 1 & Special
power source 22kV - 35kV power source 500kV power projects
45 YEARS OF ESTABLISHMENT AND DEVELOPMENT
KEY MILESTONES Trang 04

Key
milestones
LNG - Biomass -
Waste to energy
2018

Power plant
asset management
2014 2019
EPC - PMC
Coal-fired thermal
power plants 2015
2005 - 2010 Solar energy,
Onshore wind power,
Offshore wind power,
500kV Electricity grids PSH
2010 - 2014
(Transmission lines, substations)
Investments
1990 - 2000
Renovated, upgraded,
repaired the
electricity system
(22/35 kV, small
Diesel stations) 2000 - 2005
Hydropower
1976 - 1980

or 1980 - 1990
ist y 110-220kV Power grids
ent h

(Transmission lines, substations)


Dev

elopm With 45 years of experience in surveying, planning and


designing electricity system, EVNPECC4 ensures to
provide solutions satisfying the electricity quality of
power system in operation, maintenance.

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


ORGANIZATIONAL CHART Page 05

DERS
ORGANIZATIONAL
L

AREHO

M
EETIN
CHART SH G
BOARD OF SUPERVISORS

BOARD OF
DIRECTORS

EXECUTIVE
BOARD

ADMINISTRATION QUALITY HYDROPOWER & GENERAL SURVEY


COMMUNICATION MANAGEMENT, R&D RENEWABLE ENERGY ENTERPRISE
ENGINEERING CENTRE
NORTHEN ENVIRONMENTAL
AFFILIATE CONSULTING CENTRE
THERMAL POWER
FINANCE &
SOUTHERN & NEW ENERGY
ACCOUNTING CIVIL ENGINEERING
AFFILIATE ENGINEERING CENTRE
TESTING LABORATORY

EPC CENTRE POWER GEODETIC


HUMAN
TRANSMISSION LINE CONSULTING CENTRE
RESOURCES
ENGINEERING CENTRE
SITE SUPERVISION GEOLOGICAL SURVEY
CONSULTING CENTRE & GEOTECHNICS
SUBSTATION
SALES THERMAL POWER ENGINEERING CENTRE SURVEY ENGINEERING
ENGINEERING DEPARTMENT

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


BOARD OF DIRECTORS & EXECUTIVE BOARD Page 06

BOD &
EXECUTIVE
BOARD
PhD. ME. MBA.
LE CAO QUYEN TRAN CAO HY VU THANH DANH
CHAIRMAN OF THE BOARD
MEMBER OF THE BOARD MEMBER OF THE BOARD
GENERAL DIRECTOR DEPUTY GENERAL DIRECTOR

ENGINEER
1*8<(1;8$13+›¡1*
DEPUTY GENERAL DIRECTOR

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


HUMAN RESOURCES Page 07

HUMAN RESOURCES
EVNPECC4’s human resources in 2020
Bachelor & was 452 employees, in which:
75% Post graduate
◆Bachelor and post graduate accounted
for 75%.
HUMAN
RESOURCES
Intermediate ◆Engineers and experts are educated
& Technical college
9% from leading universities in Vietnam and
overseas.
16% ◆Leading industry experts who are
Workers
capable of being project director,
manager, accounted for nearly 30% of
human resources.

1u0+†1+7+j1+9j3+k775,ƒ1
<($562)(67$%/,6+0(17$1''(9(/230(17
MARKETS & SERVICES, PRODUCTS Page 08

MARKETS
&
SERVICES, Investigation - environmental

PRODUCTS impact assessment for


construction projects

Power project
investment

EPC-PMC
power projects

Investment consulting Power project Asset management in


engineering electricity field
consulting

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


MARKETS & SERVICES, PRODUCTS Page 09

◆ 500 kV Quang Trach – Doc Soi (circuit 3) transmission line


◆ 500 kV Van Phong – Vinh Tan transmission line
◆ 500 kV Quang Ninh – Thuong Tin transmission line
TYPICAL ◆ 500 kV Pleiku – My Phuoc – Cau Bong transmission line
HVDC
PROJECTS ◆ 500 kV Nam Dinh 1 - Thanh Hoa transmission line
◆ 26 km of 22kV submarine cables to Ly Son island
◆ 110kV Cho Quan – HCMC GIS Substation
◆ 110kV underground cable – Metro Line No.1, Ben Thanh
– Suoi Tien
◆ 220kV Thai Thuy Substation
500kV ◆ 220kV Phu My Substation

POWER
GRID
ENGINEERING
CONSULTING 220kV

We are one of the best


consultants in Vietnam

01

110kV

02 03 04

01. 500kV Substation 03. 110kV GIS Substation


Pleiku 2 và Branches Cho Quan – HCMC
22/35kV
02. Two 110kV underground cable lines 04. 500kV Tranmission line
Metro Line No.1 HCMC, Ben Thanh – Suoi Tien Line Pleiku – My Phuoc – Cau Bong

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


MARKETS & SERVICES, PRODUCTS Page 10

◆ Bac Ai pumped-storage hydropower with the capacity


of 1,200 MW – 1st PSH in Vietnam
◆ Trung Son Hydropower (260MW)
Coal-fired TYPICAL ◆ Buon Tua Srah Hydropower (86MW)
thermal
power
PROJECTS ◆ Krong Hnang Hydropower (64MW)
◆ Srepok 4A Hydropower (64MW)
◆ FS Cong Thanh Coal-fired Thermal Power Plant: 600MW
◆ Pre-FS Van Phong LNG Plant: 3,000 MW
Distributed ◆ Pre-FS Ca Na LNG Plant: 6,000 MW
power ◆ Adjusted Planning of Vinh Tan Electricity Center
source ◆ Pre-FS Lasuco, Nasuco Bagasse – Biomass Cogeneration Plants
◆ Quang Binh Biomass Plant
◆ FS Khanh An/Ca Mau Biomass Plant

POWER
SOURCE
CONSULTING Traditional
hydropower

We are one of the best


hydropower consultants
in Vietnam 01 02

Pumped
-storage
hydropwer
(PSH)
03 04

01. Cong Thanh Coal-fired Thermal 03. Discharge gate cluster of Bac Ai
Gas turbine Power Plant pumped-storage hydropower
cycle 02. Van Phong LNG Plant 04. Trung Son Hydropower

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


MARKETS & SERVICES, PRODUCTS Page 11

◆ Trung Nam Wind Power: 151.95 MW


◆ Binh Dai 1,2,3 Offshore Wind Power: 128 MW
Onshore,
TYPICAL ◆ Eanam Wind Power: 400 MW
floating
solar PROJECTS ◆ Lien Lap Wind Power: 48 MW
farms ◆ Da Mi Floating Solar Power: 47.5 MWp
◆ Phuoc Thai Solar Power: 200MWp
◆ Trung Nam – Thuan Nam Solar Power: 560 MWp
Biomass,
waste,
waste heat
recovery

RENEWABLE
ENERGY
FIELD
Onshore 02
wind power

We are one of the best


consultants in Vietnam

03

Tidal
power

01 04

Offshore
01. Binh Dai 1,2,3 Offshore Wind Power 03. Da Mi Floating Solar Power
wind power 02. Trung Nam Wind Power 04. Tra O Lagoon Floating Solar Power

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


MARKETS & SERVICES, PRODUCTS Page 12

◆Solutions for enhancing the reliability and operational efficiency


of Vinh Tan 2 coal-fired thermal power plant
◆Investigation, evaluation for retrofitting and upgrading Ninh Binh
coal-fired thermal power plant
Survey - TYPICAL ◆Investigation, evaluation of Uong Bi coal-fired thermal power
Evaluate PROJECTS plant 110MW
◆Investigation, evaluation of core systems of Duyen Hai coal-fired
thermal power plant
◆Consultation, survey, overall evaluation and solutions
suggestion for fixing boiler’s problems at Lam Dong Aluminum
thermal power plant
◆Replacement FO by DO for Uong Bi, Mong Duong, Vung Ang
coal-fired thermal power plants
Repair,
◆Consultation on O&M strategy of GENCO1’s thermal power plants
renovate
◆Consultation on inventory norm for O&M of Ca Mau 1&2 and
Nhon Trach power plants
ASSET
MANAGEMENT
IN ELECTRICITY
FIELD 01 02

Upgrade

03 04

O&M/ 01. Surveyed, built plan for replacing 03. Consulted on O&M strategy of GENCO1’s
Inventory FO = DO thermal power plants
norm 02. Surveyed, evaluated Vinh Tan 2 04. Evaluated the cause of tube boiler explosion
incident at Vinh Tan 2

45 YEAR OF ESTABLISHMENT AND DEVELOPMENT


MARKETS & SERVICES, PRODUCTS Page 13
◆ Investigation for FS and , technical design of 500kV Pleiku – My
Phuoc – Cau Bong transmission line: 437 km
◆ Investigation for FS, technical design, detailed design of 500kV
Quang Ninh – Thuong Tin: 148 km
TYPICAL ◆ Investigation for FS, technical design of Bac Ai pumped-storage
Topography
PROJECTS hydropower: 1,200 MW
◆ Investigation for technical design of Eanam wind power plant
in Dak Lak province: 430 MW
◆Report on compensation, support and resettlement,
environmental impact assessment, hydrometeorology and
emergency preparedness planning for extreme flood – Trung Son
Geology Hydropower in Thanh Hoa province
◆Damage survey, hydrometeorology, environmental impact
assessment – Infrastructure project of Ninh Thuan nuclear power
plant

SURVEY &
INVESTIGATION meteorology,
Hydro-

FIELD
Oceanology 02

03

01

03

Compensation,
Resettlement

02 04

Environmental 01. Drilling to 450 – 540m depth of 03. Preparation for testing shear strength of
impact Bac Ai pumped-storage hydropower (PSH) rock mass at horizontal tunnel Bac Ai PSH
assessment
02. Investigation by flycam 500kV 04. Hydrometeorological survey with Russian
(EIA)
Nam Dinh 1 – Thanh Hoa transmission line experts at Ninh Thuan 1 Nuclear power plant

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


MARKETS & SERVICES, PRODUCTS Page 14

◆ EPC contract management consulting – Vinh Tan 4


extension coal-fired thermal power plant
◆ EPC coal anti-clogging bunker renovation – Vinh Tan 2
TYPICAL coal-fired thermal power plant
PROJECTS ◆ Project management consulting and supervision (PMC)
Power – Xuan Thien Ea Sup solar power plant cluster 800 MWp
◆ Project management consulting and supervision (PMC)
grid
Dong Hai 1 wind power project
◆ Project management consulting and supervision (PMC)
Hung Hai Gia Lai wind power plant

EPC, site
supervision Renewable
consulting, energy

PMC
02

01 03

Power
source 02 04

01. EPC 03. Contract management consulting


Bunker renovation for coal anti-clogging EPC Vinh Tan 4 extension coal-fired thermal
– Vinh Tan 2 coal-fired thermal power plant power plant
02. PMC Dong Hai 1 wind power project 04. PMC Solar power project
Xuan Thien Ea Sup 800 MWp
45 YEARS OF ESTABLISHMENT AND DEVELOPMENT
INVESTMENT PROJECTS OF THE COMPANY Page 15

INVESTMENT
PROJECTS OF
THE COMPANY
The Company executed the entire phases of
projects: Identifying, evaluating investment
opportunities, consulting, investing and
operating Srepok 4A Hydropower plant 64 MW &
Son Giang Hydropower plant 10MW safely and
effectively.

- Srepok 4A Hydropower Plant -

- Son Giang Hydropower Plant -

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


RESEARCH AND DEVELOPMENT CENTER Page 16

RESEARCH AND DEVELOPMENT CENTER


ch on BESS for the develo
ear pm
es f the pow er ent
R as eso syste
m
ph De
INTRODUCTION a bl
e
ve
sy
lo
pm
n
tai es st e
em nt
s rc
u pl

of nin
o

yg n s

pr
an
s
o
re

od cal
ch

uc cula
g
ar

ts
er
se

f ro ions
en
Re

m
t
pow
er
OUR MAJOR

agnetic transient
Application of digital tr
in design & operatio
FIELDS OF

the pwoer grid


RESEARCH &
DEVELOPMENT

trom
n on
With 45 years of experience in

Elec
surveying, planning consultancy,
ns c

eno
ans

and power system designing, we

on
ons

om
for

have been offering efficient

rch
ma
ult

en
ea
ph
solutions to improve the quality of
an

tio

sio Res
cy

the power system; Applying the

n
achievements of The 4th Industrial

TS
D
ev F AC

is
Revolution to research many new el C/

m
te op
VD ans
ch m H r
products; Developing sustainable no en
to ew e rt
energy resources to meet domestic
log f sm
n t of n po
w
ya art g m e to
pp rid Develop ns
and regional requirements. lica
tion plic
a tio
s gy ap
technol

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


RESEARCH AND DEVELOPMENT CENTER Page 17

◆ Researching and assessing


the occurrence of
sub-synchronous resonance
TYPICAL caused by the power grid
impacts to Vung Ang 1
R&D PRODUCTS ◆ Offering solutions for the overall
construction of power infrastructure
Thermal Power Plant in the
period up to 2030
system to allocate capacity of renewable ◆ Researching on BESS for
energy projects in Ben Tre and KonTum the demands of renewable
provinces. energy capacity alllocation
Proposing to Vietnam
Electricity the necessity ◆ Researching on SSR phenomenon at
to build a 500kV Vung Ang 1 Thermal Power Plant Project 2021
transmission line ◆ Researching and calculating SVC installation
(circuit 3) in Quang solutions to meet the requirements of Circular
Trach - Doc Soi - Pleiku 30/2019/TT-BCT for wind power plants (Binh 2030
2 to transmit electrical Dai 1, 2, 3 power plants) Promising many new
power to the Southern 2020 products with higher
region (which was not quality to accompany
mentioned in National domestic and foreign
◆ Researching on Lightning Power Development customers
Overvoltage Transients (2014) Planning VII)

◆ Calculating the possible 2016


maximum length of 500 kV
Proposing Vietnam Tower earth conductor system
Electricity to early invest to ensure the best lightning
and construct the Pleiku dissipation capability and avoid 2019
- My Phuoc - Cau Bong back flashover that cause
500kV transmission line power trips
project to transmit
electrical power to the 2014
Southern region (which
was not mentioned in 2017
National Power Preparing the
Development Planning Solar Power
◆ Calculating and modifying the connection planning of the Southern
VII) Development
Central Power Plant Cluster connecting to the National Power System
Planning
2010 2015 (2019 - 2020)
Scheme in
◆ Calculating the connection planning of Ninh Thuan ◆ TOV : Calculating the back flashover rate (BFR) caused by lightning
Ninh Thuan 1 & 2 nuclear power plants to the province for strike on power transmission line system (2019)
National Power System (2015 - 2016) 2017 - 2020, ◆ TOV : Simulating, calculating, analyzing and proposing solutions to
◆ Researching on anti-resonance solutions with a vision the overvoltage phenomenon if there is a transient fault on the Son
under synchronization and improving the to 2030. La-Hiep Hoa and Thanh My- Pleiku 2 500kV transmission line (2019)
transmission capacity of the North-Central
1976 2012 power grid (2015) ◆ Calculating the optimal capacity of series capacitors for the 500 kV
◆ TOV: Proposing solutions to 220 kV surge power system and the effect of low frequency resonance on power
arrester damage phenomenon of AT2 plants when Circuit 3 is put into operation (2019 - 2020)
Plan researching and transformer at 220kV Thai Nguyen substation ◆ Calculating the overall solution of installing shunt capacitor and
calculating to allocate shunt reactor systems on the grid to reduce the time of synchronous
the capacity of power compensation mode for hydropower plants (2019 - 2020)
sources for the whole
Southern Central region ◆ Researching on SSR phenomenon at Song Hau 1 Thermal Power
Plant Project (2019)
45 YEARS OF ESTABLISHMENT AND DEVELOPMENT
TYPICAL CUSTOMERS & PARTNERS Page 18

TYPICAL
CUSTOMERS
&
PARTNERS

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


HONORABLE TITLES Page 19

HONORABLE
TITLES
Certificate of merits for typical projects:
◆ 500kV Pleiku – My Phuoc – Cau Bong
transmission line: Certificate of merit from
Ministry of Industry and Trade (Decision No.
4001/QD-BCT dated 08/05/2014)
◆ Buon Tua Srah Hydropower: Certificate of merit
from Prime Minister (Decision No. 90/QD-TTg dated
15/01/2011)
◆ 500kV Pleiku substation capacity upgrade:
Certificate of merit from Vietnam Electricity
(Decision No. 1355/QD-EVN dated 24/12/2009)
INDEPENDENCE INDEPENDENCE LABOR
ORDER ORDER ORDER ◆ North-South 500kV transmission line, circuit 2 (Ha
SECOND CLASS THIRD CLASS FIRST CLASS Tinh – Nho Quan): Certificate of merit from Ministry
2010 2005 1998 of Industry (Decision No. 1346/QD-BCN dated
23/05/2006)
◆ 110kV Dong Ha – Lao Bao transmission line and
With achievements Independence medal substation: Certificate of merit from Vietnam
during development,
SECOND & THIRD
Electricity (Decision No. 1025/QD-EVN-TDTT dated
PECC4 was honored 23/04/2003)
many awards ◆ 500kV Dak Nong substation: Certificate from
Labor medal Vietnam Electricity

FIRST & SECOND


◆ Transmitting electricity from national power grid to
Ly Son island district through submarine cable:
Certificate of Merit from Ministry of Industry and
Trade
45 YEARS OF ESTABLISHMENT AND DEVELOPEMENT
GENERATIONS OF COMPANY LEADERS THROUGH THE TIMES Page 20

01 02 03 04

05 06 07 08

GENERATIONS OF
COMPANY LEADERS
THROUGH THE TIMES 09 10 11

02. NGUYEN VAN TRINH 04. NGUYEN BA HUYNH 06. NGUYEN HUU TAP 08. VAN CONG MINH 10. TRAN HOAI NAM
Sub-institute Deputy Director Sub-institute Deputy Director Sub-institute Deputy Director Deputy Director Deputy General Director
1977 - 1983 1977 – 1981 1993 – 1999 2003 – 2009 2006 – 2018
Deputy Director General Director
1999 – 2006 2018 – 2020

01. MAI CAO VAN 03. NGUYEN BA THOI 05. LE NGUYEN DINH 07. PHAM MINH SON 09. TRAN VAN THO 11. PHAM NGOC SON A
Sub-institute Director Sub-institute Deputy Director Sub-institute Deputy Director Deputy Director Deputy General Director Deputy General Director
1976 - 1982 1978 – 1982 1984 – 1994 1999 – 2001 2003-2012 2013 - 2019
Sub-institute Director Sub-institute Director General Director
1983 – 1994 1994 – 2000 2001 – 2018

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT


(84-258) 3563 888
... Constantly be
innovative, creative,
and bring outstanding
HEADQUARTERS

www.pecc4.vn | [email protected] | ս(84-258) 3563 999 |


11 Hoang Hoa Tham Street, Loc Tho Ward

*
Nha Trang City, Khanh Hoa Province

values for customers NORTHEN AFFILIATE


Lot 3, TT4, Lane 183, Hoang Van Thai Street

and partners
Khuong Trung Ward, Thanh Xuan District, Ha Noi City

SOUTHERN AFFLIATE
46/9 Tran Quy Khoach Street
Tan Dinh Ward, District 1, Ho Chi Minh City

GENERAL SURVEY ENTERPRISE


137 Thong Nhat Street
Nha Trang City, Khanh Hoa Province

CIVIL ENGINEERING
TESTING LABORATORY
Vinh Trung Commune
Nha Trang City, Khanh Hoa Province
Laboratory code: LAS – XD367

45 YEARS OF ESTABLISHMENT AND DEVELOPMENT

You might also like